Ethio Construction Engineering
32.4K subscribers
6.24K photos
359 videos
1.99K files
3.24K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
2428. Which apparatus we need to find soundness?
Anonymous Quiz
18%
(a) Le Chatelier
50%
(b) Vicat’s apparatus
19%
(c) CTM
13%
(d) Pat test
👏7❤6
👍6❤3
2422. Setting time of cement increases by adding 
Anonymous Quiz
34%
(a) gypsum
30%
(b) calcium chloride
25%
(c) hydrogen peroxide
11%
(d) sodium oxide
❤10🎉3
2391. Which of the following factors is included in the limit state of strength?
Anonymous Quiz
10%
(a) Fire
48%
(b) Failure by excessive deformation
11%
(c) Corrosion
30%
(d) Repairable damage or crack due to fatigue
❤15🥰2
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

Tel: 0961955555
Address: Signal, around signal mall
❤5
👉𝐊𝐞𝐲 𝐃𝐨𝐜𝐮𝐦𝐞𝐧𝐭𝐬 𝐏𝐫𝐞𝐩𝐚𝐫𝐞𝐝 𝐛𝐲 𝐐𝐀/𝐐𝐂 𝐄𝐧𝐠𝐢𝐧𝐞𝐞𝐫/𝐈𝐧𝐬𝐩𝐞𝐜𝐭𝐨𝐫𝐬

1-𝙈𝙚𝙩𝙝𝙤𝙙 𝙎𝙩𝙖𝙩𝙚𝙢𝙚𝙣𝙩 (𝙈𝙎):
A detailed document describing the methodology, materials, tools, and sequence of activities to execute specific tasks in compliance with project standards.

2-𝙍𝙞𝙨𝙠 𝘼𝙨𝙨𝙚𝙨𝙨𝙢𝙚𝙣𝙩 (𝙍𝘼):
A document identifying potential hazards and risks associated with construction activities, along with proposed mitigation measures to ensure workplace safety.

3-𝙋𝙧𝙤𝙟𝙚𝙘𝙩 𝙌𝙪𝙖𝙡𝙞𝙩𝙮 𝙋𝙡𝙖𝙣 (𝙋𝙌𝙋):
A comprehensive document outlining the quality control measures, procedures, and responsibilities to achieve the required project quality.

4-𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 𝙖𝙣𝙙 𝙏𝙚𝙨𝙩 𝙋𝙡𝙖𝙣 (𝙄𝙏𝙋):
A document specifying key stages where inspections and testing are carried out to ensure compliance with the approved specifications.

5-𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 𝘾𝙝𝙚𝙘𝙠𝙡𝙞𝙨𝙩 (𝙄𝘾𝙇):
A checklist used during inspections to verify that all required steps, specifications, and standards are adhered to.

6-𝙈𝙖𝙩𝙚𝙧𝙞𝙖𝙡 𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 𝙍𝙚𝙦𝙪𝙚𝙨𝙩 (𝙈𝙄𝙍):
A request submitted to inspect and approve materials delivered to the site before their use in construction.

7-𝙒𝙤𝙧𝙠 𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 𝙍𝙚𝙦𝙪𝙚𝙨𝙩 (𝙒𝙄𝙍) / 𝙍𝙚𝙦𝙪𝙚𝙨𝙩 𝙛𝙤𝙧 𝙄𝙣𝙨𝙥𝙚𝙘𝙩𝙞𝙤𝙣 (𝙍𝙁𝙄):
A formal request to conduct an inspection of completed work to ensure it meets the design and quality requirements.

8-𝙎𝙞𝙩𝙚 𝙊𝙗𝙨𝙚𝙧𝙫𝙖𝙩𝙞𝙤𝙣 𝙍𝙚𝙥𝙤𝙧𝙩 (𝙎𝙊𝙍):
A document used to log observations made during site visits, including any deviations from approved procedures or standards.

9-𝙉𝙤𝙣-𝘾𝙤𝙣𝙛𝙤𝙧𝙢𝙖𝙣𝙘𝙚 𝙍𝙚𝙥𝙤𝙧𝙩 (𝙉𝘾𝙍):
A formal report documenting instances where work, materials, or processes fail to meet specified standards, requiring corrective actions.

10-𝘾𝙤𝙧𝙧𝙚𝙘𝙩𝙞𝙫𝙚 𝘼𝙘𝙩𝙞𝙤𝙣 𝙍𝙚𝙥𝙤𝙧𝙩 (𝘾𝘼𝙍):
A follow-up report detailing the actions taken to resolve non-conformances identified during inspections.

11-𝙊𝙥𝙚𝙧𝙖𝙩𝙞𝙤𝙣 & 𝙈𝙖𝙞𝙣𝙩𝙚𝙣𝙖𝙣𝙘𝙚 𝙈𝙖𝙣𝙪𝙖𝙡𝙨 (𝙊&𝙈):
Comprehensive documentation that includes detailed operating procedures, maintenance schedules, and troubleshooting guides for all systems and equipment handed over to the client.

12-𝙁𝙞𝙣𝙖𝙡 𝙃𝙖𝙣𝙙𝙤𝙫𝙚𝙧 𝘿𝙤𝙘𝙪𝙢𝙚𝙣𝙩𝙨:
A package of key documents provided to the client at the conclusion of the project, typically including as-built drawings, test certificates, warranties, O&M manuals, and other necessary documentation.

@etconp
❤9👍7🔥1🎉1
👉ሪል ስቴት ልማት በኢትዮጵያ

📜ሪፖርተር በ ሪል ስቴት ልማት ላይ የሚስተዋሉ ችግሮችን በስፋት የዳሰሰውን ቃለመጠይቅ ማስፈንጠርያውን በመጠቀም ማንበብ ይቻላል👇

https://ethiopianreporter.com/142511/

@etconp
👍3❤2
👉ሚዲያና ኮንስትራክሽን

💫በኢትዮጵያ ሚዲያውና የኮንስትራክሽን ኢንደስትሪው ትውውቃቸው እምብዛም ነው ቢባል ማጋነን አይሆንም። ብዙውን ጊዜ መታዘብ እንደሚቻለው፣ የኢትዮጵያ ሚዲያ የፕሮጀክቶች መሠረት ድንጋይ ሲቀመጥና ሪቫን ሲቆረጥ ካልሆነ በስተቀር ለኮንስትራክሽን ዘርፍ የሚሰጠው ትኩረት እና ሽፋን አለ የሚያስብል አይደለም። አለ ከተባለም በጣም በጣም ዝቅተኛ ነው።

እንደሚታወቀው፣ በኢትዮጵያ ውስጥ የኮንስትራክሽን ኢንደስትሪ በየአመቱ ከፍተኛ በጀት የሚመደብለት ግዙፍ ኢንደስትሪ ነው።

እንዲያውም ከሀገሪቱ አመታዊ ካፒታል በጀት ውስጥ 60 ከመቶ የሚሆነው ገንዘብ ለኮንስትራክሽን ሴክተር የሚመደብ ነው።

ይሁን እንጂ፣ የሀገራችን ሚዲያ ለዚህ ሴክተር የሚሰጠው ሽፋን ዘርፉ ከሚመደብለት በጀት አንፃር በጣም አናሳ ነው።

የሀገራችን የህትመት እና ኤሌክትሮኒክስ ሚዲያ ፕሮግራሞች ሲፈተሹ ለኮንስትራክሽን ሴክተር ሽፋን የሚሰጡ የሚዲያ ፕሮግራሞች ብዛት እዚህ ግባ የሚባል አይደለም፤ በአንፃሩ ሚዲያው ለስፖርት እና መዝናኛ እንደሚሰጠው ሰፊ የአየር ሰአት ለዚህ ወሳኝ የኢንደስትሪ ዘርፍ አለመስጠቱ ወሳኝ ወሳኝ ጥያቄዎችን የሚያጭር ነው።


በተመሳሳይ፦ ከባለሙያዎች አንፃር ካየነው የምናገኘው ውጤት ተመሳሳይ ነው። በኮንስትራክሽን ኢንደስትሪ ላይ ትኩረት አድርገው የሚሠሩ ጋዜጠኞችም አሉ ለማለት የሚያስደፍር አይደለም። ከዚህ አንፃር ሲታይ በኛ ሀገር የሚዲያ ዐውድ የmedia Specialization ችግር ይስተዋላል። ስፖርትና ሙዚቃ ላይ ብቻ ትኩረት አድርገው የሚሠሩ ጋዜጠኞች እና ፕሮግራሞች የመብዛታቸውን ያህል፣ የኮንስትራክሽን ዘርፉን ጠንቅቀው የሚያውቁ፣ በይዘቶች ላይ ተመስርተው ፕሮግራሞችን ሊሠሩ የሚችሉ ጋዜጠኞችም የግድ ያስፈልጋሉ።

እንደሚታወቀው ኮንስትራክሽን ከፍተኛ በጀት ብቻ የሚመደብለት ሴክተር አይደለም። ከፍተኛ የሥራ ዕድል ፈጣሪ ኢንደስትሪ ነው። ከግብርና ቀጥሎ ትልቁ ሥራ ፈጣሪ የኮንስትራክሽን ሴክተር ነው።

ይህ ግዙፍ ሴክተር፣ ለአንድ ሀገር ኢኮኖሚያዊ ዕድገት ያለው ድርሻ ሰፊ ነው የሚባለው ኮንስትራክሽን ለሁሉም የኢኮኖሚ ዘርፍ ወሳኝ ኢንደስትሪ ስለሆነ ነው።

ከቱሪዝም እስከ አይቲ፣ ከማዕድን እስከ ማኑፋክቸሪንግ ዕድገት ሲታሰብ ከኮንስትራክሽን ኢንደስትሪ ውጪ የሚታሰብ አይደለም። ይህ ደግሞ በሚዲያ የማይታገዝ ከሆነ ትርፉ ድካም ብቻ ነው የሚሆነው።

ሌላው ቢቀር የማኑፋክቸሪንግ ኢንዱስትሪው፣ ከኮንስትራክሽን ጋር ያለውን ቁርኝት ብቻ በማየት ለዘርፍ ከፍተኛ ትኩረት ሊሰጠው እንደሚገባ መረዳት ይቻላል።

ኮንስትራክሽን ለማኑፋክቸሪንግ ኢንደስትሪ የጀርባ አጥንት ነው ብቻ ተብሎ የሚገለጽ አይደለም። ሲሚንቶ፣ ብረት፣ ቀለም፣ ሴራሚክ፣ መስታወት፣ ፕላስቲክ፣ የኤሌክትሪክ ዕቃ፣ ፈርኒቸር ወዘተ በሙሉ የሚመረተው ለኮንስትራክሽን ሴክተር ተብሎ ነው።


ኢትዮጵያ በርካታ የፊኒሺንግ ማቴሪያሎች በውጭ ምንዛሪ ከውጪ ነው የምታስገባው። ይህን መላ የሚያስፈልገው አንገብጋቢ ጉዳይ ነው። ከ80 ከመቶ በላይ የሚሆነው የፊኒሺንግ ማቴሪያል አሁንም ከውጪ ነው የሚመጣው። 

ይህ ሴክተር በሚዲያ በጣም መደገፍ አለበት የሚባለው ለዚህ ነው። ተከታታይ የሆነ የማይቋረጥ የሚዲያ ሽፋን አገኘ ማለት ጥቅሙ ብዙ ነው። የሀገር ውስጥ ምርቶችን መሠረት ያደረጉ የሚዲያ ሽፋኖች ያስፈልጋሉ። ዘርፉ ካሉበት ፈተናዎች ተላቆ ተኪ የፊኒሺንግ ምርቶች በስፋት እንዲያመርት በሚዲያ መታገዝ አለበት። ምክንያቱም፦ የሴክተሩ ኢኮኖሚያዊ አስተዋጽኦ እየጎላ ይመጣል። በዘርፉ የሚስተዋሉ ሙስና እና አባካኝነት እንዲቀንስ ብሎም እንዲጠፋ ለዘርፉ የሚሰጠው የሚዲያ ሽፋን ወሳኝነቱ ላቅ ያለ ነው።

ፕሮጀክቶች በተያዘላቸው ጊዜ እና በጀት በጥራት ተገንብተው እንዲጠናቀቁ ሚዲያ ያለው ሚና ተኪ አይገኝለትም።

አሁን አሁን ግንባታ ማለት ቴክኖሎጂ ሆኗል። ኮንስትራክሽንን ከቴክኖሎጂ ውጪ ማሰብ ጨርሶውኑ የማይታሰብ ነው። ቴክኖሎጂ ወደ ሀገር ውስጥ እንዲገባ ደግሞ ሚዲያ ያለው ድርሻ ጉልህ ነው።

ኢትዮጵያ ገና ከፍተኛ የመሠረተ ልማት ዝርግታ  የሚያስፈልጋት ሀገር ስለሆነች መጠነ ሰፊ በጀት በዚህ ኢንደስትሪ በኩል ማለፉ የማይቀር ነው።

ሚዲያው ይህንን ለሀገር ትልቅ ጥቅም ያለው ኢንደስትሪን ሳይደግፍ ሀገር ዘላቂ ልማትን ታካሂዳለች፤ ዜጎችም ተጠቃሚ ይሆናሉ ማለት ዘበት ነው፣ የኛ ሀገር ሚዲያዎች፦ሬዲዮም ሆነ ቲቪ እንዲሁም ዘመን አመጣሹ ሶሻል ሚዲያ ለሴክተሩ ሰፊ ሽፋን የሚሰጡበትን ስትራቴጂ ነድፈው ቢንቀሳቀሱ ሀገር ትጠቀማለች።

@etconp
❤11👍7
👉የኢትዮጵያ ኮንትራክተሮች ማህበር ፕሬዘዳንት ኢንጂነር የሱፍ መሀመድ የአፍሪካ ኮንትራክተሮች ፌዴሬሽን የስራ አመራር አባል ሆነው ተመረጡ።

የኢትዮጵያ ኮንትራክተሮች ማህበር በግብፅ ካይሮ በሚካሄደው 20ኛው የአፍሪካ ኮንትራክተሮች አሶሴሽን እየተሳተፈ ይገኛል።

የኢትዮጲያ ኮንስትራክሽን ስራ ተቋራጮች ማህበር ፕሬዝዳንት የሆኑት ኢ/ር የሱፍ መሐመድ በግብጽ ካይሮ እየተካሄደ በሚገኘው 20 ኛው የአፍሪካ ኮንስትራክሽን ሥራ ተቋራጮች ማኅበራት ፌዴሬሽን(AFCCA) ጉባኤ ላይ ም /ፕሬዘዳንት ሆነው ተመረጡ።


በአፍሪካ ከቅርብ ጊዜ ወዲህ የሀገራችን ተቋራጮች እና ባለሙያዎች በስራዎች በሰፊው የመሳተፍ ሙከራዎችን የበለጠ ለማሣደግ ኢ/ር ዩሱፍ መሀመድ ም/ፕሬዘዳንት ሆነው መመረጣቸው እንደ ትልቅ አጋጣሚ የሚወሰድ ይሆናል።

ማኅበሩ ለሚያደርገው ሁለንተናዊ እቅድ ደግሞ የሞራል ስንቅ የሚሆን ነው።

የኢትዮጵያ ኮንትራክተሮች እና የዘርፉ ተዋናዮች እንኳን ደስ ያላችሁ🙏

@etconp
❤21👏2🔥1
ታምራት  ፕሌት እና ጄቦልት አቅራቢ

📌ፕሌትና ጄቦልት በፈለጉት አይነት የተዘጋጀ አለን

♧ ሁሉን በአንድ ቦታ ለሁሉም ቅርብ

♧ ምስክራችን ስራችን

📍ኢትዮጵያ ዉስጥ የትም እንልክሎታለን

♧ ይደውሉልን ያማክሩን

0904040477
0994941708
🚧Preparatory Works (Before Execution)

⏺1. Review Structural and Geotechnical Drawings:

• Confirm pile type (CFA, Bored, Driven, Micro-pile, etc.)
• Check pile diameters, depths, spacing, and load capacity.

⏺2. Site Survey and Marking:

• Set out the pile locations accurately using Total Station or GPS.
• Mark pile points using wooden pegs or steel rods with clear identifiers.

⏺3. Equipment and Site Preparation:

• Ensure the piling rig, tremie pipes, concrete pump, and reinforcement cages are on-site and calibrated.
• Clean and level the working platform for stability.

🚧2. Execution Steps (On-Site Piling Works)

🔸 Steps may slightly vary depending on the pile type (CFA, Bored, Driven), but generally follow the below:

⏺1. Drilling / Driving:

• For Bored Piles: Drill to the designed depth using auger or rotary tools.
• For Driven Piles: Hammer the precast pile using hydraulic hammer or vibro hammer.
• For CFA Piles: Use continuous flight auger to drill while displacing soil.

⏺2. Inspection of Borehole:

• Check pile depth, verticality, and cleanliness.
• If groundwater is present, consider dewatering or casing as needed.

⏺3. Concrete Pouring:

• Concrete is poured using a tremie pipe for deep piles or under water conditions.
• Continuous pouring is critical to avoid cold joints or soil intrusion.
• Concrete slump should be high (typically 180–220 mm).

⏺4. Rebar Cage Installation:

• Insert reinforcement cage carefully into the fresh concrete.
• Use centralizers (spacers) to maintain cage position and cover.

🚧3. Quality Control (QC) and Documentation

• Slump Test and Concrete Cube Samples (every 50 m³ or as per spec).
• Record the following:
• Pile Number
• Start & finish times
• Depth
• Concrete volume used
• Rebar cage length and insertion time
• Pile Integrity Test (PIT) if required by specification.

🚧4. Health, Safety & Environment (HSE) Measures

• Ensure all safety permits (PTW) are in place before starting.
• Secure all pile locations with barricades and warning signs.
• Full PPE is mandatory: helmet, vest, gloves, goggles, and safety boots.
• Always have a safety officer monitoring operations.

@etconp
❤15🔥1👏1
👉A box girder is a type of structural element that is commonly used in bridges and buildings.

Its design resembles a hollow rectangular or box-shaped beam, which provides high strength and stiffness.

💫Here are some key points about box girders:

Structure:

- Shape: The cross-section is typically rectangular or square, which maximizes the area for bending and shear forces.
- Material: Box girders can be made from various materials, including steel, concrete, or a combination of both.

Benefits:

- Strength-to-Weight Ratio: They have a high strength-to-weight ratio, making them efficient for carrying heavy loads with less material.
- Versatility: Box girders are suitable for various applications, including bridges, overpasses, and even high-rise buildings.
- Aesthetic Appeal: Their smooth, simple design can be visually appealing in architectural designs.

🚧Applications:
- Bridges: Box girders are often used in highway and railway bridges due to their ability to span long distances.
- Buildings: In buildings, they can support floors and roofs, providing open spaces without columns.

🚧Construction:
- Erection: Box girders can be prefabricated and transported to the construction site, allowing for quicker assembly.
- Connections: They can be connected to other structural elements using various methods, including welding or bolting.

🚧Considerations:
- Weight:While they are efficient, box girders can be heavy, which might require careful planning for transport and erection.
- Design Codes: Engineers must ensure that the design complies with local building codes and safety standards.

🔰Overall, box girders are a crucial component in modern engineering, providing a balance of strength, efficiency, and aesthetics.

A box girder bridge is made of horizontal beams, often shaped like a hollow rectangle or box. These bridges are commonly used for long spans, including highway and railway bridges, due to their strength and versatility in construction.

Construction: Box girder bridges are typically built using materials such as steel, reinforced concrete, or prestressed concrete. They consist of two main girders, often supported by cross-bracing or diaphragms to enhance stability.
Applications: These bridges are utilized in various contexts, including highway and railway bridges, pedestrian bridges, and even some building structures.

Specifications: The specifications for box girder bridges depend on factors such as span length, traffic load, environmental conditions, and the materials used. Engineers take into account the needed strength, durability, and cost-effectiveness when designing these bridges.

⭐️Advantages:
1. High Strength: Box girder bridges are known for their high strength-to-weight ratio, making them suitable for long spans and heavy loads.
2. Versatility: They can be designed to accommodate different types of traffic loads and environmental conditions.
3. Aesthetic Appeal: The box shape provides opportunities for architectural design, making these bridges visually appealing.
4. Ease of Construction: The construction methods for box girder bridges are well-established, resulting in relatively straightforward building processes.
5. Longevity: When properly designed and maintained, box girder bridges can have a long service life.

🏷Disadvantages:
1. Cost: Box girder bridges can be more expensive to construct compared to simpler bridge designs.
2. Maintenance:The hollow sections of box girders may be susceptible to moisture ingress and corrosion, necessitating regular maintenance.
3. Complexity:The design and construction of box girder bridges can be more intricate than that of other bridge types, requiring careful engineering and skilled labour.
4. Limited Flexibility: Once constructed, box girder bridges offer limited flexibility for future modifications or expansions, compared to some other bridge designs.
🔰Overall, box girder bridges are a popular choice for many infrastructure projects due to their strength, versatility, and aesthetic appeal, despite some drawbacks related to cost and maintenance.

@etconp
❤10👍2
This media is not supported in the widget
VIEW IN TELEGRAM
❤5👍4😭3
👉Reasons for cause and description of type of cracks

⭐️1. Diagonal Cracks

⏺The main cause of diagonal cracks in concrete columns is
⏺Inadequate load carrying capacity of the columns;
⏺insufficient cross-section and inadequate reinforcement steel.
⏺Diagonal Cracks would influence structural soundness and hence it needs to be dealt with.

⭐️2. Horizontal Cracks

⏺Horizontal crack in reinforced concrete column is observed to initiate mostly at the beam-column junction, and on column face where tensile stress is large.
⏺Columns with in adequate moment resistance capacity,
⏺Insufficient reinforcements, or disposition of installed reinforcement are prone to horizontal cracking

💫Horizontal cracks substantially reduce the shear strength of the column leading to a greatly increased risk of failure. So, it is required to be tackled as soon as

⭐️3. Splitting Cracks

⏺Splitting cracks in reinforced concrete column are short parallel vertical cracks with non-uniform width.
⏺Columns with Insufficient steel reinforcement, and low concrete quality are susceptible to experience such types of cracks.
⏺Splitting cracks in concrete columns initiated as a result of reaching its maximum load carrying capacity.

⭐️4. Corrosion Cracks

⏺Corrosion cracks in concrete columns are developed along the line of reinforcements.

⏺This type of cracks is commonly uniform in width and widen as the column is ageing.

💫Possible reinforcement corrosion and inadequate bond between concrete and steel bars are the cause of corrosion reinforcement in concrete columns.

@etconp
❤9🔥1
👉3ተኛው ዓለም አቀፍ የኮንስትራክሽን የንግድ ትርዒት ከሰኔ 19 እስከ 21 በሚሊኒየም አዳራሽ እንደሚካሄድ ተገለጸ

💫በከተማ እና መሰረተ ልማት ሚኒስቴር እውቅና ተሰጥቶት በዓለም አቀፉ ዲኤምጂ ኢቨንት (dmg events) የሚዘጋጀው ሦስተኛው ዓለም አቀፍ የቢግ 5 ኮንስትራክት ኢትዮጵያ የኮንስትራክሽን ኢንዱስትሪ ኤግዚቢሽን፤ ሲምፖዚየም እና የንግድ ትርዒትን ከምስራቅ አፍሪካ መሰረተ ልማት እና የውሀ ኤክስፖ ጋር በመተባበር ከሰኔ 19 እስከ 21 ቀን 2017 ዓ.ም ድረስ በአዲስ አበባ ሚሊኒየም አዳራሽ እንደሚካሄድ ተገልጿል።

የኢትዮጵያን ወደ 67 ቢሊዮን ዶላር የሚገመት የግንባታ ገበያን እና 395 ቢሊዮን ዶላር የሚገመት የመሠረተ ልማት ገበያን በመደገፍ ዘርፈ ብዙ ትብብር እና ጠንካራ ስትራቴጂካዊ የንግድ ትሥሥር ይፈጥራል ተብሏል።

የከተማና መሰረተ ልማት ሚኒስቴር ሚኒስትር ወ/ሮ ጫልቱ ሳኒ፤ ከዚህ ቀደም ሁለት ጊዜ የተካሄዱት የንግድ ትርኢት ከዓለም ሀገራት ጋር ከፍተኛ የሆነ እውቅትና ልምድ ለመቅሰም ያስቻለ እንደነበረ አንስተዋል።

ዘንድሮ በሚካሄደው በሦስተኛው የንግድ ትርኢት ላይ የኮንስትራክሽን ዘርፉን ከማነቃቃት ባሻገር፤ ለኢትዮጵያ ኢኮኖሚ ትልቅ አስተዋፅኦ እንዳለው ተናግረዋል።

በኢትዮጵያ ከግብርና ቀጥሎ ትልቅ የሆነ ኢኮኖሚ የሚንቀሳቀሰው በኮንስትራክሽን ዘርፉ እንደሆነ የገለጹት ሚኒስትሯ፤ ኢትዮጵያ ከዓለም ሀገራት ልምድ ከመቅሰም ባለፈም ያላትን አቅም ለማሳየትና የቴክኖሎጂና የእውቀት ሽግግር ለማድረግ ትልቅ እድል እንደሆነ ተናግረዋል።

የዲኤምጂ ኢቨንት ምክትል ፕሬዝዳንት ቤን ግሪኒሽ በበኩላቸው፤ ቢግ 5 ኮንስትራክሽን የንግድ ትርኢት የኢትዮጵያን የልማት ውይቶች፣ ማበረታቻዎች፣ የኮንፈረንስ እና ኤግዚቢሽኖች ዘርፍን በማዘመን ከፍተኛ ሚና እንዳለው ገልፀዋል።

በኮንስትራክሽንና በመሠረተ ልማት ሥነ-ምኅዳሩ ኢንቨስትመንትን ለመሳብ የሥራ እድል ፈጠራን በመደገፍ እና በንግድ ፍሰቱ ላይ ተጽእኖ በማሳደር ለዘላቂ ልማት አስተዋፅኦ እንደሚያደርግ ተናግረዋል።

ከዚህ ቀደም በነበረው የንግድ ትርኢት በርካታ የሀገር ውስጥ ካምፓኒዎች ከዓለም አቀፍ ካምፓኒዎች ጋር የሥራ ትስስር መፍጠር እንደቻሉ የገለጹት ደግሞ፤ የኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን ዋና ሥራ አስፈፃሚ ኢንጂነር ዮናስ አያሌው ናቸው።

በዘንድሮው ዓመትም የሀገር ውስጥ ባለሙያዎች ዓለም የደረሰበት ደረጃ ላይ ለመድረስና ልምድ ለመለዋወጥ ትልቅ እድል እንደሚፈጥርላቸው ተናግረዋል።

ከቻይና፣ ጀርመን፣ ህንድ፣ ጣሊያን፣ ኬንያ፣ ኦማን፣ ሰዑዲ አረቢያ እና የተባበሩት አረብ ኢሚሬትስን ጨምሮ ከ180 በላይ ከሚሆኑና ከ20 ሀገራት የተውጣጡ ኤግዚቢሽን አቅራቢዎች፣ አዳዲስ የግንባታ እና የመሠረተ ልማት ግብእቶችን በንግድ ትርዒቱ ላይ ያቀርባሉ ተብሏል።

Via አሐዱ ሬዲዮ

@etconp
❤12👍1👏1
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

Tel: 0961955555