128. Minimum spacing of vertical stiffeners is limited to _____. (Where, d is the distance between flange angles)
Anonymous Quiz
42%
(a) d/4
24%
(b) d/3
15%
(c) d/2
18%
(d) 2d/3
๐Ÿ‘6
117. In plane surveying where a graduated staff is observed either with horizontal line of sight or inclined line of sight, the effect of refraction is to
Anonymous Quiz
35%
(a) Increase the staff reading
24%
(b) Decrease the staff reading
27%
(c) Neither increase nor decrease the staff reading
15%
(d) Duplicate the staff reading
โค7
114. The process of levelling in which the elevations of points are computed from the vertical angles and horizontal distances measured in the field is known as
Anonymous Quiz
63%
(a) Trigonometric levelling
22%
(b) Reciprocal levelling
8%
(c) Barometric levelling
7%
(d) Spirit levelling
โค4๐Ÿ‘4
90. The type of surveying in which the curvature of the earth taken into account is called
Anonymous Quiz
42%
Geodetic surveying
17%
Plane surveying
8%
Preliminary surveying
33%
Topographical surveying
โค6๐Ÿ™5
79. If the R.L of a B.M is 50 m, the back sight is 1.25 and foresight is 1.85, then what will be the R.L of the forward station? (in m)
Anonymous Quiz
14%
46.9
48%
49.4
28%
50.6
9%
53.1
๐Ÿ‘Œ9
74. If a bar is cranked at 45ยฐ on both ends for an effective of beam 'L' and depth 'd', the total length of the bar is considered to be _____.
Anonymous Quiz
5%
(a) L
39%
(b) L + 0.54 d
23%
(c) L + 0.84 d
33%
(d) L + 2d
๐Ÿ‘9โค1
73. . The item of work which very difficult to measure or assess during its execution is technically termed as _____.
Anonymous Quiz
32%
(a) Miscellaneous item
26%
(b) Indeterminable item
35%
(c) Lump-sum item
6%
(d) Supplementary item
๐Ÿฅฐ8โค2
71. If aggregates completely pass through a sieve of size 70 mm and retained on a sieve size 60 mm, the particular aggregate will be flaky if its minimum dimension is less than _____.
Anonymous Quiz
18%
(a) 127 mm
29%
(b) 39 mm
21%
(c) 117 mm
33%
(d) 49 mm
๐Ÿ™5โค2๐ŸŽ‰1
65. R.L. of point 'A' is 50 m and R.L. of point 'B' is 46.655 m. The distance between AB is 150 m. The gradient of line AB is
Anonymous Quiz
20%
(a) 1 in 67.26 (Rising)
51%
(b) 1 in 44.84 (Falling)
17%
(c) 1 in 30.00 (Rising)
12%
(d) 1 in 30.00 (Falling)
โค8
63. If the reduced level of a benchmark is 101.00 m. The back sight reading is 1.215 m and the fore sight is 1.810 m, the reduced level of the forward station is
Anonymous Quiz
44%
100.405 m
30%
104.025 m
9%
104305 m
17%
99.605 m
๐Ÿ‘7โค5
66. The process of mixing, transporting, placing and compacting concrete using Ordinary Portland cement should not take more than how much time?
Anonymous Quiz
65%
30 min
16%
40 min
13%
75 min
6%
none of the above
๐Ÿ‘9โค2
๐Ÿ“Œ What Is Traffic Engineering?

โ€ข  A branch of civil engineering that deals with the safe, efficient movement of people and goods on roadways.
โ€ข  Focuses on road design, traffic flow, signs & signals, and control systems.
โ€ข  In Ethiopia, it's guided by ERA manuals and urban traffic policies.

๐Ÿ“Œ Core Objectives

โ€ข  Balance mobility and safety for drivers, cyclists, and pedestrians.
โ€ข  Minimize congestion, delays, accidents, and environmental impacts.
โ€ข  Optimize intersection design, signal timing, and vehicle capacity.

๐Ÿ“Œ Key Elements of Traffic Engineering

โ€ข  Traffic Flow: Measured using volume, speed, and density (fundamental diagram).
โ€ข  Control Devices:
โ€ƒโ€ƒ- Signs (regulatory, warning, guide)
โ€ƒโ€ƒ- Signals (traffic lights)
โ€ƒโ€ƒ- Markings (lanes, arrows, zebra crossings)
โ€ข Traffic Studies:
โ€ƒโ€ƒ- Volume counts
โ€ƒโ€ƒ- Speed studies
โ€ƒโ€ƒ- Origin-destination surveys
โ€ƒโ€ƒ- Parking & accident analysis

๐Ÿ“Œ Intersection & Signal Design

โ€ข Controlled using STOP/SLOW signs or traffic lights, based on flow volume.
โ€ข Signal timing must consider pedestrian crossing, peak hours, and turning movement.
โ€ข Ethiopia uses manuals from ERA and local authorities like AACRA for design specs.

๐Ÿ“Œ Challenges in Ethiopia

โ€ข Narrow roads, poor signage, and weak enforcement affect safety.
โ€ข High pedestrian volume in Addis Ababa requires integrated planning.
โ€ข Informal public transport (minibus taxis) causes unpredictable traffic flow.

@etconp
โค16๐Ÿ™2
๐Ÿ‘‰แŠ แˆตแ‹ฐแˆณแ‰ฝ แ‹œแŠ“ แˆˆแ‹šแˆ… แ‰ปแŠ“แˆ แ‰คแ‰ฐแˆฐแ‰ฆแ‰ฝ

๐Ÿ’ซแ‹จ "Quantity Surveying" Full Course แ‰  แŠฆแŠ•แˆ‹แ‹ญแŠ• แˆ˜แˆ›แˆญ แ‹จแˆแ‰ตแˆแˆแŒ‰ แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แŠฅแŠ“ แ‹จ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แ‰ฃแˆˆแˆžแ‹ซแ‹Žแ‰ฝ แŠฃแŠ•แ‹ฐแŠ› แ‹™แˆญ แ‰ แ‰ฐแˆ˜แŒฃแŒฃแŠ แ‹‹แŒ‹ แˆˆแŒฅแ‰‚แ‰ต แ‰ฐแˆ›แˆชแ‹Žแ‰ฝ แˆแ‹แŒˆแ‰ฃ แŒ€แˆแˆจแŠ“แˆโค

๐Ÿ“ฉแˆ˜แˆ˜แ‹แŒˆแ‰ฅ แ‹จแˆแ‰ตแˆแˆแŒ‰ @Philemona7 แ‹ˆแ‹ญแˆ แˆˆแ‰ แˆˆแŒ  แˆ˜แˆจแŒƒ แ‰  0925446661 แ‹ฐแ‹แˆˆแ‹ แ‹ซแŒแŠ™แŠ•๐Ÿ™

@etconp
๐Ÿ™15โค4๐Ÿ‘Œ1
This media is not supported in your browser
VIEW IN TELEGRAM
๐Ÿ‘‰แ‹จแ‰ฃแˆญแˆดแˆŽแŠ“ แˆตแ‰ณแ‹ฒแ‹จแˆ "แŠ‘ แŠซแˆแ•" แŠฅแ‹จแ‰ฐแŠซแˆ„แ‹ฐแˆˆแ‰ต แ‰ฃแˆˆแ‹ แˆ˜แŒ แŠ• แˆฐแŠ แ‹•แ‹ตแˆณแ‰ต แŠฅแŠ“ แ‹จแˆ›แˆตแ‹แŠแ‹ซ แ•แˆฎแŒ€แŠญแ‰ต แ‹จแˆšแ‹ญแ‹˜แ‹ แ‹จแ‰ฐแˆ˜แˆแŠซแ‰ฝ แ‰ฅแ‹›แ‰ต 105 แˆบแˆ… แ‹ญแ‹ฐแˆญแˆณแˆแข

๐Ÿ’ซแ‰ แ‹šแˆ… แˆ˜แŒ แŠ• แ‰ แˆตแ”แŠ•แˆ แˆ†แА แ‰ แŠ แ‹แˆฎแ– แ‰ฅแ‹™ แ‰ฐแˆ˜แˆแŠซแ‰ฝแŠ• แ‰ แˆ˜แ‹ซแ‹ แŠ‘ แŠซแˆแ• แ‰€แ‹ณแˆš แ‹ญแˆ†แŠ“แˆแข

@etconp
โค8๐Ÿ‘7๐Ÿ‘4
แ‰ณแˆแˆซแ‰ต  แ•แˆŒแ‰ต แŠฅแŠ“ แŒ„แ‰ฆแˆแ‰ต แŠ แ‰…แˆซแ‰ข

๐Ÿ“Œแ•แˆŒแ‰ตแŠ“ แŒ„แ‰ฆแˆแ‰ต แ‰ แˆแˆˆแŒ‰แ‰ต แŠ แ‹ญแАแ‰ต แ‹จแ‰ฐแ‹˜แŒ‹แŒ€ แŠ แˆˆแŠ•

โ™ง แˆแˆ‰แŠ• แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แˆˆแˆแˆ‰แˆ แ‰…แˆญแ‰ฅ

๐Ÿ“แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹‰แˆตแŒฅ แ‹จแ‰ตแˆ แŠฅแŠ•แˆแŠญแˆŽแ‰ณแˆˆแŠ•

โ™ง แ‹ญแ‹ฐแ‹แˆ‰แˆแŠ• แ‹ซแˆ›แŠญแˆฉแŠ•

0904040477
0994941708
โค3
"Purpose of Stirrups during construction?" ๐Ÿ‘‡