2712. Which of the following methods used for finding the slope and deflection of beams is also called the β€˜method of singularity function’?
Anonymous Quiz
41%
Moment area method
35%
Conjugate beam method
11%
Macaulay’s method
13%
Mohr’s Theorem method
❀13πŸ‘3πŸ‘1
2709. Which of the following conditions followed in making concrete reduces the workability of concrete?
Anonymous Quiz
35%
Higher water-cement ratio in concrete
13%
Use of superplasticisers
14%
Use of round aggregates
38%
Higher aggregate-cement ratio in concrete
πŸ‘8❀3πŸ₯°2
2707. The distance travelled by a vehicle after the application of brakes to a dead stop position is known as:
Anonymous Quiz
8%
distance to react
19%
deacceleration distance
39%
braking distance
34%
stopping distance
πŸ‘8
2706. The curve that is generally used to avoid the obstructions like hard rocks, deep cuttings, soft gradients is called
Anonymous Quiz
17%
simple curve
43%
transitional curve
23%
compound curve
17%
parabolic curve
❀6πŸ₯°3
2701. Which of the following options serves all the three objectives mentioned below?
I: To promote human health
II: To provide a cleaner environment III: To break the cycle of diseases
Anonymous Quiz
15%
Scavenging system
13%
Distribution system
29%
Drainage system
43%
Sanitary system
πŸ‘4❀3
2697. In the laboratory determination of California Bearing Ratio (CBR) test on soils as per IS : 2720 (Part 16) – 1987, the CBR values are usually reported for penetration values of:
Anonymous Quiz
21%
5.0 mm, 7.5 mm
21%
3.5 mm, 5.0 mm
24%
1.5 mm, 2.5 mm
34%
2.5 mm, 5.0 mm
πŸ‘6❀2
2688. Which of the following has more fire resisting characteristics:
Anonymous Quiz
24%
Marble
17%
Lime stone
28%
Compact sand stone
31%
Granite
❀9
2685. In the direct shear test conducted on soils, a proving ring is used to ____.
Anonymous Quiz
47%
measure the magnitude of shear load
26%
measure vertical strain
15%
measure horizontal strain
13%
measure horizontal stress
❀4
2682. If 90% of soil particles got retained over 2 mm sieve and 50% of soil particles got retained over 4.75 mm sieve, then the effective diameter of the soil will be:
Anonymous Quiz
27%
2 mm
43%
4.75 mm
18%
1.25 mm
12%
6.75 mm
❀6πŸ”₯2πŸ‘1
2681. A catchment area of 10 square km has recorded a rainfall of 25 mm/h. Assuming a runoff co-efficient of 0.3, the peak discharge from the catchment using the rational method is
Anonymous Quiz
26%
18.36 cumec
35%
26.56 cumec
20%
24.6 cumec
20%
20.83 cumec
❀4πŸŽ‰4
πŸ‘‰ INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

Tel: 0961955555
Address: Signal, around signal mall
❀3
πŸ‘‰How to Measure Sand & Aggregate in a Dumper - A Practical Guide for Civil Engineers"

πŸ’«Accurately measuring the quantity of sand or aggregate delivered to the site is a key responsibility for any site engineer or quantity surveyor.

🏷This image illustrates a practical method to calculate the volume of a dumper using basic geometry.

⏺Formula: Volume = Length x Width x Height

❇️In this case, two different lengths of the dumper are measured:

- Front (L1) = 6 m

- Rear (L2) = 5.5 m

So, the average length = (6+5.5)/2 = 5.75 m

- Width (B) = 1.7 m

- Height (H) = 2 m

Calculated Volume: 5.75 x 1.7 x 2 = 19.55 cubic meters

🚧This technique is extremely useful to verify material quantities on-site and prevent shortages or overbilling.

@etconp
πŸ‘8❀2
#ADVERTISEMENT

🏭🏠TSEGAYE and YOHANNES J-α‰¦αˆα‰΅ & PLATE πŸšπŸ— πŸŒπŸŒ†

🧿 OUR SERVICES ‡️

πŸ”²Plate

βš™οΈ  J-Bolt


βš“Anchor Bolt

➽Tie Rod

πŸ­πŸ›–πŸŒ‰scrap🚧πŸͺπŸ”—
Phone : 🀳0938494506 
              πŸ€³ 0951087077
              🀳 0929044037
αŠ₯αŠ“αˆ˜αˆ°αŒαŠ“αˆˆαŠ•::
πŸ‘‰αŠ α‹΅αˆ«αˆ»α¦  αˆ˜αˆ­αŠ«α‰Ά αˆαŠ•αŠ αˆˆαˆ½ α‰°αˆ« αŠ¨αŒ­α‹΅ α‰°αˆ« ከፍ α‰₯ሎ

https://t.me/tsegaye2016Jbolt
❀3πŸ‘2
πŸ‘‰Construction Project Management Basics

πŸ’«PART 1

⏺Construction project management is the discipline of planning, coordinating, and controlling a construction project from its start to completion, ensuring that the client’s goals are met within scope, time, budget, and quality constraints.

🚧1. What is a Construction Project?

A construction project is a temporary effort to build or renovate a physical structure such as housing units, commercial buildings, roads, or infrastructure. It involves multiple stakeholders, activities, and resources, all aligned to produce a unique result.

🚧2. The Project Life Cycle in Construction

Construction projects follow five main phases:
β€’ Initiation: This is where the project idea is formalized. It includes conducting feasibility studies, defining the objectives, identifying stakeholders, and obtaining approval or funding.
β€’ Planning: In this phase, the entire project is detailed out. Plans include technical designs, work schedules, cost estimates, procurement strategies, risk analysis, and resource planning.
β€’ Execution: Actual construction begins. The project team mobilizes labor, equipment, and materials to perform site works, construct structures, install systems, and carry out finishing tasks.
β€’ Monitoring and Control: This involves tracking the project’s progress to ensure it stays on schedule, within budget, and according to quality standards. It includes handling site issues, reporting, inspections, and making necessary adjustments.
β€’ Closure: The final phase includes completing all work, verifying that deliverables meet requirements, obtaining client approval, handing over the completed project, and documenting lessons learned.

🚧3. Core Knowledge Areas in Construction Project Management

Effective project management requires understanding and applying several key disciplines:
β€’ Scope Management: Clearly defining what is included and excluded from the project, to avoid misunderstandings or scope creep.
β€’ Time Management: Creating a realistic project schedule, sequencing tasks, and ensuring activities are completed on time.
β€’ Cost Management: Estimating costs accurately and tracking expenses throughout the project to stay within budget.
β€’ Quality Management: Making sure that construction works meet required standards, specifications, and client expectations.
β€’ Procurement Management: Managing how materials, subcontractors, and services are sourced and contracted.
β€’ Risk Management: Identifying potential project risks early and developing plans to avoid or reduce their impact.
β€’ Resource Management: Allocating labor, machinery, and materials effectively to avoid delays and inefficiencies.
β€’ Communication Management: Ensuring timely and accurate information flow among clients, contractors, consultants, and project staff.
β€’ Stakeholder Management: Identifying all people affected by the project and engaging them appropriately to maintain support.

🚧4. Project Roles in Construction

Many roles contribute to a construction project:
β€’ The project owner or client provides funding and defines the overall goals.
β€’ The project manager oversees the full lifecycle of the project and ensures coordination between all parties.
β€’ Consultants, such as architects and engineers, provide technical design and supervision.
β€’ The contractor carries out the construction activities.
β€’ Subcontractors perform specialized tasks like plumbing, electrical, or finishing.
β€’ Suppliers deliver materials and equipment to the site.

@etconp
❀12πŸ‘10
πŸ‘‰Types of stone used in stone mansory

🚧a) Igneous stones

These stones are obtained from igneous rocks, formed from the cooling and solidification of magma generated within the Earth at high temperatures during volcanic activity.

They are generally used for purposes that require strength and durability, such as kerbstones, countertops, floorings, and breakwaters. The igneous stone ranges from very soft rocks such as pumice and scoria to somewhat harder rocks such as tuff and hard rocks such as granite and basalt.

🚧b) Sedimentary stones

They are obtained from sedimentary rocks that are formed by accumulation and cementation of mineral grains (sediments) transported by wind, water or ice to a basin or by precipitation at a site. There are mainly two types of sedimentary stones used in masonry work, limestone and sandstone. One of the sedimentary rocks is Limestone that is composed largely of the minerals calcite and aragonite, which are different crystal forms of calcium carbonate.

Limestone is the main construction material and used in various fields such as a building material, as aggregate for the base of roads, as white pigment or filler in products such as toothpaste or paints, and as a chemical feedstock.

On the other hand, sandstone is an elastic sedimentary rock composed mainly of sand-sized minerals (mostly quartz and/or feldspar) or rock grains. It is relatively soft, making it easy to change as the required shape.

Typically used as flooring or paving material, it has also been used for artistic purposes to create ornamental fountains and statues.

🚧c) Metamorphic stones

They are obtained from metamorphic rocks, which are pre-existing rocks that have been altered by great heat and/or pressure or by chemical conditions.  They have traditionally been used for carving statues, and as facing in many Byzantine and Renaissance Italian buildings. Slate and marble are metamorphic stones commonly used in the building industry.

Slates are typically used for flooring, roofing, and countertops whereas marbles are suitable for wall-cladding, roofing, flooring, and all other interior and exterior applications.