Ethio Construction Engineering
32.3K subscribers
6.28K photos
359 videos
1.99K files
3.34K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
👌👌👌 ገነተ-ልዑል 👌👌👌
፡
👉የቀዳሞ ዓፄ ሀ/ሥላሴ ቤተ-መንግሥት ዋና መግቢያ
፡
▶️ውብ ምሽት ተመኘን❤️
👉ስለ የ joint ዓይነቶች አብረን እንይ
፡
▶️An expansion joint or movement joint is an
assembly designed to safely absorb the heat-
induced expansion and contraction of construction
materials, to absorb vibration, to hold parts
together, or to allow movement due to ground
settlement or earthquakes. They are commonly
found between sections of buildings, bridges ,
sidewalks, railway tracks, piping systems, ships,
and other structures.
Building faces, concrete slabs, and pipelines
expand and contract due to warming and cooling
from seasonal variation, or due to other heat
sources. Before expansion joint gaps were built into
these structures, they would crack under the stress
induced.
.
▶️Control joints, or contraction joints, are sometimes
confused with expansion joints, but are completely
different in purpose and function. Control joints are
cut into pavement at regular intervals to control
cracking. Concrete and asphalt have relatively
weak tensile strength, and typically form cracks as
they age, shrink, and are exposed to environmental
stresses (including stresses of thermal expansion
and contraction). Without the control joint, cracking
can occur in a random fashion, and compromise
the surface of the structure. This is primarily an
aesthetic issue. Control joints attenuate the
cracking in a more controlled fashion. The cracks
will tend to form along the cut planes that makes
up the control joints.
.
▶️A construction joint occurs when there are multiple
concrete placements. It can occur between different
days of concrete placements as shown below.
There is a construction joint between the placement
of a footing and the placement of the column.

@etconp

Facebook:- https://www.facebook.com/etconp/
👉ሰላም ውድ የ ቻናላችን ቤተሰቦች ዛሬ መወያያ ጥያቄ ይዘን ቀርበናል
፡
▶️ጥያቄው ... አንድ ድልድይ ተሰርቶ ጊዜያዊ ርክክብ ተደረገ እናም በወቅቱ ሌላ ስራ የሚሰራ የቻይና ድርጅት ድልድዩን በቀን በጣም በርካታ የሆነ ተሸከርካሪ ሲሄድበት ቆይቱል ከዚህ ቡኃላ በጣለ ከባድ ዝናብ ድልድዩ ተደረመሰ ፡የሪቴንሽን ጊዜው ሲደርስ የሰራው ተቑራጭ እኔን አይመለከተኝም አለ ፤ አሰሪ መስሪያ ቤቱ ደግሞ መጠገን አለብህ አል ፤ማነው ይህን ሪስክ መውሰድ ያለበት???
፡
▶️መልሳቹ @COTMp ወይም Discussion ላይ ፃፉልን:: እንወቅ እንማማር፡፡
👉ስለ STAIRS ትንሽ ጠቃሚ ሃሳብ እንማማር 👇
.
▶️Calculations for the construction of stairs, ramps and guards are set out in various national building regulations. The guidelines here are based on German standards.
.
▶️Dwellings with no more than two flats must have an effective stair width of at least 0.80 m and 17/29 rise-to-tread ratio. Stairs which are not strictly covered by building regulations may be as little as 0.50m wide and have a 21/21 ratio. Stairs governed by building regulations must have a width of 1.00m and a ratio of 17/28. In high rise flats they must be 1.25 m wide . The length of stair runs from 23 steps up to,,; 18 steps --> @. Landing length = n times the length of stride + 1 depth of step (e.g. with a rise-to-tread ratio of 17/29 = 1 x 63 + 29 = 92 cm or 2 x 63 + 29 = 1.55 m). Doors opening into the stairwell must not restrict the effective width.

▶️The time required for complete evacuation must be calculated for stair widths in public buildings or theatres. Such staircases or front entrance steps are climbed slowly, so they can have a more gradual ascent. A staircase at a side entrance or emergency stairs should make a rapid descent easy.
.
▶️The experiences one has of ascending and descending stairs varies greatly with the stair design, for example there is a significant difference between an interior domestic design and a grand flight of entrance steps. Climbing stairs takes on average seven times as much energy as walking on the flat. From the physiological point of view, the best use of 'climbing effort' is with an angle of incline of 30° and a ratio of rise of: rise of step/going of step; r/g= 17/29.
.
▶️The angle of rise is determined by the length of an adult's stride (about 61-64cm). To arrive at the optimum rise, which takes the least energy, the following formula can be applied:
2r+ g= 63cm (1 stride)
.
▶️In the dimensioning and design of flights of stairs, the function and purpose of the staircase is of primary importance, taking in the factors mentioned above.
.
▶️Not only is the gaining of height important, but also the way that the height is gained. For front door steps in frequent use, low steps of 16 x 30cm are preferable. However, stairs in a workplace, or emergency stairs, should enable height to be gained rapidly. Every main staircase must be set in its own continuous stairwell, which together with its access routes and exit to the open air, should be designed and arranged so as to ensure its safe use as an emergency exit. The width of the exit should be greater than or equal tothe width of the staircase.

Source: Neufert,Architect's data

@etconp
👍1
China
መልካም ምሽት
What is the reason for this give valid reason? Use discussion group

@etconp
Flow test👇👇👇👇👇👇
👉የ ኣፍሪቃ ህብረት መሰብሰቢያ ኣዳራሽ
፡
👌ሸገር ኣዱ ገነት የ ኣፍሪቃችን መዲና
፡
▶️ውብ ምሽት ተመኘን❤️
ASTU research guide.docx
19.2 KB
▶️ሪሰርች ስትሰሩ ኣጋዥ ነው ተጠቀሙበት፡፡

@etconp
✳️Types of Formwork
▶️Foundation Formwork. Foundation formworks can be designed in various ways. ...
▶️Wall Formwork. Wall formwork consists of vertically arranged upright timbers (formwork bearers) to which sheeting boards are nailed at the concrete side. ...
*Ceiling Formwork. ...
*Beam Formwork. ...
*Column Formwork.
✅Formwork functions
The formwork is the main means of work in the moulding process of the concrete. Basically the process of formwork making has to meet the following requirements: - The structural component to be produced is to be moulded with the projected dimensions keeping the admissible tolerances.

@etconp