๐The machine efficiency of a concrete batching plant can affect the volume of concrete loaded onto a truck.
๐ซCBP-M-Efficiency can affect:
Accurate Measurement:
โบIf the batching plant's equipment is not calibrated correctly, and/or from becoming to older in age may result in inaccurate measurement of materials, leading to less concrete being loaded than intended.
๐งProduction Speed:
Efficient machinery can produce concrete more quickly. If the plant is operating below its capacity due to mechanical issues or inefficiencies, this may result in delays and potentially less concrete being delivered in each load.
๐งMixing Quality:
The efficiency of the mixing process affects the homogeneity of the concrete. If the mixing is inefficient, it may lead to a need for adjustments that can reduce the volume delivered.
๐งTime Management:
If the batching plant is not efficient in transitioning from one batch to another, it can lead to longer wait times, potentially affecting logistics and scheduling of truck loads.
๐งMaterial Availability: If the batching plant is not efficiently managing its inventory of raw materials, delays in obtaining materials can reduce the volume of concrete produced and subsequently loaded onto trucks.
๐งConsistency in Production:Variability in production output can lead to differences in the volume of concrete delivered. Consistent and efficient operation is key to ensuring that each truck leaves with the intended volume.
๐Overall, improving the efficiency of a concrete batching plant can enhance the reliability and accuracy of loading trucks, ensuring that they carry the correct volume of concrete to the site.
@etconp
๐ซCBP-M-Efficiency can affect:
Accurate Measurement:
โบIf the batching plant's equipment is not calibrated correctly, and/or from becoming to older in age may result in inaccurate measurement of materials, leading to less concrete being loaded than intended.
๐งProduction Speed:
Efficient machinery can produce concrete more quickly. If the plant is operating below its capacity due to mechanical issues or inefficiencies, this may result in delays and potentially less concrete being delivered in each load.
๐งMixing Quality:
The efficiency of the mixing process affects the homogeneity of the concrete. If the mixing is inefficient, it may lead to a need for adjustments that can reduce the volume delivered.
๐งTime Management:
If the batching plant is not efficient in transitioning from one batch to another, it can lead to longer wait times, potentially affecting logistics and scheduling of truck loads.
๐งMaterial Availability: If the batching plant is not efficiently managing its inventory of raw materials, delays in obtaining materials can reduce the volume of concrete produced and subsequently loaded onto trucks.
๐งConsistency in Production:Variability in production output can lead to differences in the volume of concrete delivered. Consistent and efficient operation is key to ensuring that each truck leaves with the intended volume.
๐Overall, improving the efficiency of a concrete batching plant can enhance the reliability and accuracy of loading trucks, ensuring that they carry the correct volume of concrete to the site.
@etconp
โค9๐ฅ6
Ethio Construction Engineering
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแฝ ๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แฆแแแญแ แแญ แ แ แแญแ แแแ แแแญ แจแแตแแแ แฐแแชแแฝ แฅแ แจ แฎแแตแตแซแญแฝแ แฃแแแซแแฝ แแแฐแ แแญ แ แฐแแฃแฃแ แแ แแฅแแต แฐแแชแแฝ แแแแฃ แแแจแแ ๐ฅ แญแ
แตแแ แ แแ แแ แตแแ
แญแถแฝแ แซแซแตแณแ? ๐ซTakeoff sheet ๐ซBill of Quantity(BOQ) ๐ซPaymentโฆ
๐ทแแแแฃ แจแญแฐแแ๐
๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แ แฆแแแญแ แแแแญ แจแฐแแแแฃแน แ แแ แ แณแ แแณ แ แแต แฐแแต แญแแต แญแแแซแ แฐแแแโค
๐ฉแแ แแ แแจแ @Philemona7 แแญแ 0925446661 แญแฐแแ
@etconp
๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แ แฆแแแญแ แแแแญ แจแฐแแแแฃแน แ แแ แ แณแ แแณ แ แแต แฐแแต แญแแต แญแแแซแ แฐแแแโค
๐ฉแแ แแ แแจแ @Philemona7 แแญแ 0925446661 แญแฐแแ
@etconp
โค7๐3
๐ญ๐ TSEGAYE and YOHANNES J-แฆแแต & PLATE ๐๐ ๐๐
๐งฟ แจแแแฐแฃแธแ แ แแแแแถแฝ โคต๏ธ
๐ฒPlate at any Size & thickness.
โ๏ธ J-Bolt height and diameter you want it.
๐ฉ anchor โ bolt at any size
๐ญ๐๐scrap(แฐแจแ-แแญแต)๐ง๐ช
๐ แแญแฅแซแญ แ แฎแซแแต แแฅแฐแ แ แชแ แฅแแณแตแแแแแฑ แ แแตแญแ แฅแแแแแแข
Phone : ๐คณ0938494506
๐คณ 0951087077
๐คณ 0929044037
แฅแแแฐแแแแ::
๐แ แตแซแปแฆ แแญแซแถ แแแ แแฝ แฐแซ แจแญแต แฐแซ แจแ แฅแ
https://t.me/tsegaye2016Jbolt
๐งฟ แจแแแฐแฃแธแ แ แแแแแถแฝ โคต๏ธ
๐ฒPlate at any Size & thickness.
โ๏ธ J-Bolt height and diameter you want it.
๐ฉ anchor โ bolt at any size
๐ญ๐๐scrap(แฐแจแ-แแญแต)๐ง๐ช
๐ แแญแฅแซแญ แ แฎแซแแต แแฅแฐแ แ แชแ แฅแแณแตแแแแแฑ แ แแตแญแ แฅแแแแแแข
Phone : ๐คณ0938494506
๐คณ 0951087077
๐คณ 0929044037
แฅแแแฐแแแแ::
๐แ แตแซแปแฆ แแญแซแถ แแแ แแฝ แฐแซ แจแญแต แฐแซ แจแ แฅแ
https://t.me/tsegaye2016Jbolt
โค5
๐Deshuttering Time in construction refers to the time period after which the formwork (shuttering) can be safely removed without damaging the freshly cast concrete.
๐งWhen concrete is poured into formwork (like in your image), it needs time to gain sufficient strength to support itself and any applied loads before removing the shuttering.
๐ซDeshuttering Time for Different Elements (IS 456:2000 Guidelines)
๐1. Vertical Formwork (Columns, Walls, Beams Sides)16โ24 hours
* Since these parts are mostly in compression and not carrying heavy loads, formwork can be removed early.
๐2. *Soffit of Slabs (Props Left Underneath)3 days
* Slab sides can be removed, but props/supports remain to bear the load.
๐3. *Soffit of Beams (Props Left Underneath)7 days
* Beams take longer because they carry more load.
๐4. Removal of Props
*Slabs spanning up to 4.5 m โ 7 days
*Slabs spanning over 4.5 m โ 14 days
*Beams up to 6 m span โ 14 days
*Beams over 6 m span โ 21 days
๐ทFactors Affecting Deshuttering Time
*Type of Cement (OPC, PPC, PSC)
*Temperature & Weather (hot weather speeds up curing)
*Quality of Materials
* Load on the Member
*Use of Accelerators/Retarders in concrete
โญ๏ธKey Tips
* Always check concrete strength (usually 70% of design strength) before removing shuttering.
* Premature deshuttering can lead to cracks, sagging, or even collapse.
* Proper curing should continue even after deshuttering.
@etconp
๐งWhen concrete is poured into formwork (like in your image), it needs time to gain sufficient strength to support itself and any applied loads before removing the shuttering.
๐ซDeshuttering Time for Different Elements (IS 456:2000 Guidelines)
๐1. Vertical Formwork (Columns, Walls, Beams Sides)16โ24 hours
* Since these parts are mostly in compression and not carrying heavy loads, formwork can be removed early.
๐2. *Soffit of Slabs (Props Left Underneath)3 days
* Slab sides can be removed, but props/supports remain to bear the load.
๐3. *Soffit of Beams (Props Left Underneath)7 days
* Beams take longer because they carry more load.
๐4. Removal of Props
*Slabs spanning up to 4.5 m โ 7 days
*Slabs spanning over 4.5 m โ 14 days
*Beams up to 6 m span โ 14 days
*Beams over 6 m span โ 21 days
๐ทFactors Affecting Deshuttering Time
*Type of Cement (OPC, PPC, PSC)
*Temperature & Weather (hot weather speeds up curing)
*Quality of Materials
* Load on the Member
*Use of Accelerators/Retarders in concrete
โญ๏ธKey Tips
* Always check concrete strength (usually 70% of design strength) before removing shuttering.
* Premature deshuttering can lead to cracks, sagging, or even collapse.
* Proper curing should continue even after deshuttering.
@etconp
โค14๐4
๐แจแซแต แแฎแแ แตแแตแญ แฐแแตแถ แ แแแฎ แ แญ แจแแฐแญแฐแ 720 แแตแญ แจแแธแแแ แจแแแ แณแญแป แจแแแแต แแแฃแณแ แแแ แแแ
แฅแจแฐแ แซ แแแ แฐแแแแข
๐งแจแแแฃแณ แฅแซแ แจแแณแ แณแญแญแ แแฐแแแแซ แแตแแญแฃ แจแฅแแจแ แแแแต แแแฃแณแ แจแแฎแซ แตแซแญแ แจแแฎ แแแฝ แฐแซแซแฅ แจแแแต แฅแซแแฝแ แซแซแฐแฐ แแ แฐแฅแแแแกแก
@etconp
๐งแจแแแฃแณ แฅแซแ แจแแณแ แณแญแญแ แแฐแแแแซ แแตแแญแฃ แจแฅแแจแ แแแแต แแแฃแณแ แจแแฎแซ แตแซแญแ แจแแฎ แแแฝ แฐแซแซแฅ แจแแแต แฅแซแแฝแ แซแซแฐแฐ แแ แฐแฅแแแแกแก
@etconp
โค8๐1
๐96 แจแฃแต แแชแแแฝ แ แ แแด แแธแจแ แจแแฝแแ แจแปแญแแ แตแแตแญ
๐งแปแญแ แดแญแ แฅแแณแตแณแแแแฃ แจแตแแตแฉ แจแแจแจแป แจแญแแต แแแแ แแจแซ แแ แแตแต แฐแจแณแณแญ แแแต แฐแซแแทแแข
๐ซแ แแ แแแ 3,360 แแตแชแญ แถแ แญแฅแฐแต แซแแธแ 96 แจแฃแต แแชแแแฝ แ แ แแต แแญ แ แตแแตแฉ แแญ แฐแแแ แแแข
โบแ แ แ แแแญ 2,900 แแตแญ แญแแแตแ 1,420 แตแแ แตแแต แซแแ แญแ แตแแตแญแฃ แจแแแ แแแ แ แแญ แ 625 แแตแญ แจแแณ แแญ แญแแแแข
๐แ แ แญแก แ แแแแแต แแตแ แต แญแแแซแ แฐแฅแแแข
@etconp
๐งแปแญแ แดแญแ แฅแแณแตแณแแแแฃ แจแตแแตแฉ แจแแจแจแป แจแญแแต แแแแ แแจแซ แแ แแตแต แฐแจแณแณแญ แแแต แฐแซแแทแแข
๐ซแ แแ แแแ 3,360 แแตแชแญ แถแ แญแฅแฐแต แซแแธแ 96 แจแฃแต แแชแแแฝ แ แ แแต แแญ แ แตแแตแฉ แแญ แฐแแแ แแแข
โบแ แ แ แแแญ 2,900 แแตแญ แญแแแตแ 1,420 แตแแ แตแแต แซแแ แญแ แตแแตแญแฃ แจแแแ แแแ แ แแญ แ 625 แแตแญ แจแแณ แแญ แญแแแแข
๐แ แ แญแก แ แแแแแต แแตแ แต แญแแแซแ แฐแฅแแแข
@etconp
โค5๐2
๐What is a Water-Tight Structure?
๐ซA water-tight structure is a construction element or system designed to prevent water penetration and resist leakage even under hydrostatic pressure.
โบThese are essential in places where structures are in contact with water (like basements, tanks, tunnels, or swimming pools) or below ground level where groundwater pressure is high.
๐งIn simple terms:
๐๏ธ Key Features
โบDense, low-permeability concrete or masonry
โบProper joint sealing (construction & expansion joints)
โบUse of waterproof membranes or coatings
โบAdequate reinforcement to control cracks
โบGood drainage systems to reduce water pressure
๐ Main Types of Water-Tight Structures
โบWater-tight structures can be classified based on their function and method of water resistance:
๐ง1. Water-Retaining Structures
โบThese hold or store water inside.
๐ฒExamples:Water tanks & reservoirs,Swimming pools,Dams,Overhead tanks
๐ง2. Water-Excluding Structures
โบThese prevent water from entering.
๐ฒExamples:Basements,Underground car parks,Retaining walls,Tunnels,Lift pits
๐ Practical Examples
Underground Basement
โบWaterproofed with membranes + drainage
โบSwimming Pool,Integral waterproof concrete + epoxy coating
โบTunnel,Segmental lining with water stops
โบReservoir or Dam, Crystalline admixtures + surface coatings
๐ ๏ธ Best Practices
โ๏ธProper mix design: low water-cement ratio
โ๏ธQuality workmanship: good compaction & curing
๐ฒCrack control through reinforcement design and Regular inspection and maintenance of seals.
@etconp
๐ซA water-tight structure is a construction element or system designed to prevent water penetration and resist leakage even under hydrostatic pressure.
โบThese are essential in places where structures are in contact with water (like basements, tanks, tunnels, or swimming pools) or below ground level where groundwater pressure is high.
๐งIn simple terms:
A water-tight structure keeps water out (external waterproofing) or keeps water in (internal waterproofing), ensuring durability and functionality.
๐๏ธ Key Features
โบDense, low-permeability concrete or masonry
โบProper joint sealing (construction & expansion joints)
โบUse of waterproof membranes or coatings
โบAdequate reinforcement to control cracks
โบGood drainage systems to reduce water pressure
๐ Main Types of Water-Tight Structures
โบWater-tight structures can be classified based on their function and method of water resistance:
๐ง1. Water-Retaining Structures
โบThese hold or store water inside.
๐ฒExamples:Water tanks & reservoirs,Swimming pools,Dams,Overhead tanks
๐ง2. Water-Excluding Structures
โบThese prevent water from entering.
๐ฒExamples:Basements,Underground car parks,Retaining walls,Tunnels,Lift pits
๐ Practical Examples
Underground Basement
โบWaterproofed with membranes + drainage
โบSwimming Pool,Integral waterproof concrete + epoxy coating
โบTunnel,Segmental lining with water stops
โบReservoir or Dam, Crystalline admixtures + surface coatings
๐ ๏ธ Best Practices
โ๏ธProper mix design: low water-cement ratio
โ๏ธQuality workmanship: good compaction & curing
๐ฒCrack control through reinforcement design and Regular inspection and maintenance of seals.
@etconp
โค6๐4๐1
๐Different Types of HCB or Brick Bonds
๐งStretcher Bond:-
โข Characterized by bricks laid lengthwise in a continuous pattern.
โข Each course overlaps the one below it by half the length of a brick.
โข A simple and cost-effective method commonly used for walls.
๐งHeader Bond:-
โข Features bricks laid with their ends facing outward.
โข Used for constructing walls that are one brick thick.
โข Often employed for decorative purposes or to add structural strength.
๐งFlemish Bond:-
โข Alternates between stretchers and headers in each course.
โข Creates a visually appealing pattern with a mix of brick orientations.
โข Known for its aesthetic appeal and structural integrity.
๐งEnglish Bond:-
- Combines alternating courses of stretchers and headers.
โข Provides excellent strength and durability due to the interlocking pattern.
โข A traditional and widely used bonding technique.
๐งStack Bond:-
โข Bricks are stacked directly on top of each other without overlapping.
โข Results in a uniform, grid-like pattern.
โข Often used for decorative purposes or in modern architectural designs.
๐งFacing Bond:-
โข Not a standard term in bricklaying; possibly referring to a specific aesthetic or application.
โข May relate to the appearance or orientation of bricks on the surface of a wall.
@etconp
๐งStretcher Bond:-
โข Characterized by bricks laid lengthwise in a continuous pattern.
โข Each course overlaps the one below it by half the length of a brick.
โข A simple and cost-effective method commonly used for walls.
๐งHeader Bond:-
โข Features bricks laid with their ends facing outward.
โข Used for constructing walls that are one brick thick.
โข Often employed for decorative purposes or to add structural strength.
๐งFlemish Bond:-
โข Alternates between stretchers and headers in each course.
โข Creates a visually appealing pattern with a mix of brick orientations.
โข Known for its aesthetic appeal and structural integrity.
๐งEnglish Bond:-
- Combines alternating courses of stretchers and headers.
โข Provides excellent strength and durability due to the interlocking pattern.
โข A traditional and widely used bonding technique.
๐งStack Bond:-
โข Bricks are stacked directly on top of each other without overlapping.
โข Results in a uniform, grid-like pattern.
โข Often used for decorative purposes or in modern architectural designs.
๐งFacing Bond:-
โข Not a standard term in bricklaying; possibly referring to a specific aesthetic or application.
โข May relate to the appearance or orientation of bricks on the surface of a wall.
@etconp
โค10๐2
Ethio Construction Engineering
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแฝ ๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แฆแแแญแ แแญ แ แ แแญแ แแแ แแแญ แจแแตแแแ แฐแแชแแฝ แฅแ แจ แฎแแตแตแซแญแฝแ แฃแแแซแแฝ แแแฐแ แแญ แ แฐแแฃแฃแ แแ แแฅแแต แฐแแชแแฝ แแแแฃ แแแจแแ ๐ฅ แญแ
แตแแ แ แแ แแ แตแแ
แญแถแฝแ แซแซแตแณแ? ๐ซTakeoff sheet ๐ซBill of Quantity(BOQ) ๐ซPaymentโฆ
๐ทแแแแฃ แจแญแฐแแ๐
๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แ แฆแแแญแ แแแแญ แจแฐแแแแฃแน แ แแ แแฌ แ แณแ แแณ แ แแต แฐแแต แญแแต แญแแแซแ แฐแแแโค
๐ฉแแ แแ แแจแ @Philemona7 แแญแ 0925446661 แญแฐแแ
@etconp
๐ซแแแฐแ แแญ แจ "Quantity Surveying" Full Course แ แฆแแแญแ แแแแญ แจแฐแแแแฃแน แ แแ แแฌ แ แณแ แแณ แ แแต แฐแแต แญแแต แญแแแซแ แฐแแแโค
๐ฉแแ แแ แแจแ @Philemona7 แแญแ 0925446661 แญแฐแแ
@etconp
โค3๐1๐1
แจ"Site Diary" แฅแ แแ แญแแต
{The importance and Format of Site Diary}
๐แ แแแฃแณ แแฐแต แแตแฅ แจแแแแแธแ แจแฐแแซแจ แแแแ แญแแต แซแแธแ แฐแแถแฝ แ แแข แแแณแ แซแ แแฆ แจแแ แฐแแต (contract document)แฃ แจแฅแซ แแแต (Work Permit/order)แฃ แจแแแฃแณ แแแต (Building Permit)แฃ แจแฅแซ แแแ แแแแฅ (Checklists)แฃ แจแแแต แฅแซ แแตแณแแป (Site Diary)แฃ แแตแแฝ (Drawings) ... แจแแณแฐแแต แญแแแ แณแแข
แ แแแซแฝแ แจแแ แแปแแแฝ (แ แ แชแฃ แฐแแซแญ แฅแ แ แแซแช) แแญแต แแตแฅ แแแแฃแณแธแ แ แแฑแ แแแแ แแญแแซแต แฅแแแ แฐแแถแฝ แ แแแฃแณ แฅแซ แ แแแแแณแธแ แแแแ แจแฐแ แ แฅแแถแฝแ แ แแแแแข
แจแฅแแแ แแตแฅ แ แแฑ แจแแแแ แจแแแต แฅแซ แแตแณแแป (Site Diary) แฅแแแแจแณแแแข แฅแ แแ แตแแแ แฐแแต แซแแ แตแฉแจแต แแแฅ แซแ แแ แจแแตแฐแแ แขแแแ แฅแ แจแฅแซ แฐแแซแฎแฝแฃ แ แแซแชแแฝ แฅแ แ แ แชแแฝ แจแตแจแแ แณแแข
แญแแ แ แแต แแ แแ แฅแ แแฆ
1แ). แจแแแต แฐแแฃแซแตแ แแแแแขแซแก แญแ แจแแตแณแแป แฅแซแ แแญแ แฐแแต แ แจแแ แ แแแฃแณ แฆแณแ แแญ แจแฐแจแแแ แฅแซแแฝแ แฅแแแแแฅแ แณแแแข แจแฐแฐแฉ แฅแซแแฝแแฃ แแแฃแณแ แซแแ แตแ แฐแจแแฃ แ แแแฑ แซแแแ แจแ แจแญ แแแณแฃ แแแแฃแณ แฅแซแ แจแฐแณแฐแ แฃแแแซแแฝแแ แจแแแ แต แฐแซแฐแแฝแ แฅแแตแฃ แจแแ แ แฝแแฎแฝแแฃ แจแฐแแฐแฑ แแแตแแแฝแแฃ แ แฃแแตแญแป แ แซแแต แจแณแแ แแฉ แตแฅแแแฝ (แซแ) แฅแแแ แแจแแแฝ แจแแแแแแฅแ แต แจแแแ แจแแแฃแณ แตแซแแฝ แ แ แแแญ แแแณแ แแแแฅ แแ แซแแแแแแข แญแ แฐแแต แจแแฎแแญแฑแ แฅแตแแต แแแจแณแฐแ แแณแ แฒแแ แ แแแต แฐแแแต แฅแแ แตแแดแ แแตแฅ แแแ แแตแ แซแจแแแฃแแฃ แจแแฎแแญแต แ แตแฐแณแณแชแแฝ แฅแ แฃแแตแญแป แ แซแแต แตแแฆแณแ แแแณ แฅแแฒแซแแ แซแแแแข
2แ). แ แฌแณ แแญแ แจแญแญแญแญ แจแแแณแ แต แแแฆ แ แแแฃแณ แแฎแแญแถแฝ แแตแฅ แแแฐแตแแฃ แจแ แ แ แแแฅแ แแญแ แจแฅแซ แฅแซแตแ แ แฐแแแจแฐ แ แแแแฃแฃแถแฝ แแแ แฉ แญแฝแแแข แ แแแแ แจแแแต แญแตแฐแต แแตแณแแปแ แฐแแต แ แฆแณแ แแญ แตแ แแแถแฝ แฅแ แแแณแแฝ แแตแจแ แจแแซแแญแฅ แ แแ แจแแแฃแณ แฐแแต แแ แจแแแ แญ แตแแแ แ แจแตแแแ แจแแตแ แแแแต แ แกแแแต แ แแแข แแแณแ แซแ แแฆ แจแแ แแแฐแต แจแแแฅแฉ แญแตแฐแถแฝ แซแ (แแ แฅแแต) แแแ แแ แแแฅ แขแแ แแญแ แ แซแฃแขแ แจแฅแป แขแแ แฅแแแ แญแตแฐแถแฝ แจแแฐแฑแตแ แแ (แฐแแตแฃ แแแฃ แแญ) แ แแฅแญ แจแแแฐแแ แจ'Site Diary แแญ แแ แแ แตแแแ แญแตแฐแถแน แฃแตแฐแแแแต แจแแ แแ แ แแญ แ แแ แแญ แจแแ แจแแ แแแฃแณ แจแแ แแแ แ แตแ แแ แแแซแแ แซแแแแข แ แแแ แ แฉแ (แแแณแ) แจแแแฃแณ แแฅแ แต แแ แจแฅ แจแ แ แชแ (Client/employer) แตแญแป แขแแ แฅแ แจแแแฃแณ แแ แ แแ แจแฐแแณ แขแแฐแตแ แต แฅแซ แฐแแซแฉ แจแแ แแซแแแซ แฅแ แจแ แซแฐแแฝ แซแแฅแซ แจแแฉแ แตแ แญแแซ แ แ แชแ แฅแแฒแจแแ แแ แญแ แ แต แจแแฝแแ แ 'Site Diary แแญ แ แ แแฃแก แจแฐแแแ แแแแฅ แซแ แแแข
3แ) แฅแซแตแ แแแแฃแ แญ แแจแแแซ แญแแแแฆ site diary แแซแ แจแฅแซแต แแฅแฅแญ แฅแญแแแแฝแ แฅแ แแฐแปแแฝแ แแแแแแฅ แซแตแฝแแแข แแแณแแฆ แ แแแฑ แจแฐแ แซแ แฅแซ แจแแฎ แฅแจแต แฅแ แจแ แญแแณ แแแต แแ แฅแแ แฅแแตแฅ แแฅแซแแณแแฑ แตแตแซแญแธแญ แจแฐแ แแแแ แจแแฎ แฅแจแต แ แญแแตแ แฅแแตแฃ แจแฒแแแถ แจแ แธแ แฅแ แจแ แ แญ แฅแแตแฃ แจแฐแจแแแ แจแคแฐแแจแซ แฅแซแแฝแ แแคแถแปแธแ แฅแ แจแฐแตแฐแแ แซแแฐแแ แแณแฎแฝแ แจแแแแแแฅแ แต แตแแแ แจแแแฃแณ แฅแซ แ แฒแแญแ แแฐแจแต แแ แฐแแแ แแตแแญแต แ แแแถ แฅแจแฐแจแแแ แตแแแแแ แตแแแแแ แฅแซแฑแ แฅแแตแแแฃแ แญแฃ แจแแแแแแ แฐแจแแ แแตแแญแต แจแแซแแ แแแแ แแแจแแแฅแฃ แฐแ แซแแแตแ แแแตแแ แฅแ แ แ แแแญ แจแแฎแแญแต แฅแซแตแ แแแปแปแ แซแแแแข
แญแแ แแแตแก แญแแฑ แแ แแแฐแ แ แแ แต
แญแแฅแแ .....
@etconp
โค30๐9๐1
๐Sieve Analysis
๐ตใ3แฑแ แจ แ แ แญ แ แญแแถแฝ ( แฐแแ แซแ แจแ แ แญ แฃ แแซแจแแ แ แ แญ แฅแ แตแแน แ แ แญ) แ แแ แซแ แ แแ แ แฐแซแทแ แจแแ แจแแญแแซ แแฐแต แแแข
๐ผ๏ธ แแตแแ แฐแแแจแฑ แจแ แแ แแแจแณแต
โช๏ธ แจ แแแ แแแ แแณแชแซ (apparatus)
ใผ แจแฐแแซแจ แแ แ แซแแ แแแแต แจ 4.75 แแแแตแญ แแแญแแชแซ แแแแต แ แฃแ แตแแน 100 แแฎแแตแญ แตแจแต
ใผใแจแญแฅแฐแต แแแชแซ
ใผใแฅแฉแฝ แฅแ แตแฌแญ
๐ แ แ แซแ แฒแแ แจ 4.75 แแแแตแญ แฅแตแจ 80 แแแแตแญ แแแแต แ แซแแแ
โ๏ธ แแฐแต
1๏ธโฃ. แจแฐแแฐแ แแ แ แซแแ แ แ แญ แแฐแฑ แญแฅแฐแฑแ แแฉ
2๏ธโฃ. แ แแแแฑ แจ แตแแ แแแซแฝแ แแฐ แตแแน แ 15 แฐแแ แธแญแฝแฉ ( แจแแญแแ แแแแต แแฐแณแฝแแ)
3๏ธโฃ. แ แจแ แแณแแฑ แแแแต แจแฐแซแแแ แ แ แญ แแแ
ใผใแจแฐแซแแ แแ แ (%) =ใแจแฐแซแแแ แ แ แญ แญแฅแฐแต แ แ แ แแ แญแฅแฐแต แฒแซแแ แ แแถ แตแแฃแ
ใผใแซแแแ แแ แ(%)= 100%ใ- แจแฐแซแ แจแ แ แญ แแ แ
@etconp
๐ตใ3แฑแ แจ แ แ แญ แ แญแแถแฝ ( แฐแแ แซแ แจแ แ แญ แฃ แแซแจแแ แ แ แญ แฅแ แตแแน แ แ แญ) แ แแ แซแ แ แแ แ แฐแซแทแ แจแแ แจแแญแแซ แแฐแต แแแข
๐ผ๏ธ แแตแแ แฐแแแจแฑ แจแ แแ แแแจแณแต
โช๏ธ แจ แแแ แแแ แแณแชแซ (apparatus)
ใผ แจแฐแแซแจ แแ แ แซแแ แแแแต แจ 4.75 แแแแตแญ แแแญแแชแซ แแแแต แ แฃแ แตแแน 100 แแฎแแตแญ แตแจแต
ใผใแจแญแฅแฐแต แแแชแซ
ใผใแฅแฉแฝ แฅแ แตแฌแญ
๐ แ แ แซแ แฒแแ แจ 4.75 แแแแตแญ แฅแตแจ 80 แแแแตแญ แแแแต แ แซแแแ
โ๏ธ แแฐแต
1๏ธโฃ. แจแฐแแฐแ แแ แ แซแแ แ แ แญ แแฐแฑ แญแฅแฐแฑแ แแฉ
2๏ธโฃ. แ แแแแฑ แจ แตแแ แแแซแฝแ แแฐ แตแแน แ 15 แฐแแ แธแญแฝแฉ ( แจแแญแแ แแแแต แแฐแณแฝแแ)
3๏ธโฃ. แ แจแ แแณแแฑ แแแแต แจแฐแซแแแ แ แ แญ แแแ
ใผใแจแฐแซแแ แแ แ (%) =ใแจแฐแซแแแ แ แ แญ แญแฅแฐแต แ แ แ แแ แญแฅแฐแต แฒแซแแ แ แแถ แตแแฃแ
ใผใแซแแแ แแ แ(%)= 100%ใ- แจแฐแซแ แจแ แ แญ แแ แ
@etconp
โค9๐8
A prismatic beam of length L and fixed at both ends carries a uniformly distributed load. The distance of points of contraflexure from either end is
Anonymous Quiz
18%
0.207L
42%
0.277L
17%
0.211L
23%
0.347L
โค8๐1๐1
Your client delays payments, and your company is on the verge of bankruptcy.
A bank offers a loan of 50M ETB at 15% interest, but your profit margin on the project is only 8% of 200M = 16M ETB.
What is the MOST strategic choice?
A bank offers a loan of 50M ETB at 15% interest, but your profit margin on the project is only 8% of 200M = 16M ETB.
What is the MOST strategic choice?
Anonymous Quiz
23%
A) Take the loan and finish project
10%
B) Refuse loan and suspend works
57%
C) Negotiate with client for advance or faster payment terms
10%
D) Finance project from retained earnings at a loss
1โค7
A hydraulic excavator can load 2.5 mยณ of soil per cycle. Each cycle takes 2.5 minutes. If the machine operates 7 hours per day, its theoretical productivity (mยณ/day) is:
A) 420 mยณ B) 4200 mยณ C) 700 mยณ D) 1050 mยณ
A) 420 mยณ B) 4200 mยณ C) 700 mยณ D) 1050 mยณ
Anonymous Quiz
64%
A) 420 mยณ
16%
B) 4200 mยณ
8%
C) 700 mยณ
12%
D) 1050 mยณ
โค7๐ฅ1
A bulldozer was available 10 hours in a day. During that day, it worked 6 hours due to site congestion and had a breakdown of 1 hour. Its availability (%) and utilization (%) are:
Anonymous Quiz
39%
A) Availability 90%, Utilization 60%
29%
B) Availability 80%, Utilization 60%
19%
C) Availability 90%, Utilization 66.7%
12%
D) Availability 85%, Utilization 70%
โค10
A motor grader has the following performance for one week:
Total available hours: 50 Breakdown hours: 5 Operating hours: 40 Standard production rate: 100 mยณ/hr Actual production rate: 90 mยณ/hr Calculate OEE (%):
Total available hours: 50 Breakdown hours: 5 Operating hours: 40 Standard production rate: 100 mยณ/hr Actual production rate: 90 mยณ/hr Calculate OEE (%):
Anonymous Quiz
30%
A) 72%
33%
B) 68%
26%
C) 65%
12%
D) 70%
โค7
A contractor planned 1,000 mยณ of concrete at 12,000 ETB/mยณ. Actual quantity placed was 1,100 mยณ at an actual cost of 14,000 ETB/mยณ. What is the cost variance (CV)?
Anonymous Quiz
48%
A) -3,400,000 ETB
28%
B) -2,200,000 ETB
14%
C) -1,800,000 ETB
10%
D) -1,200,000 ETB
๐4๐3โค1
PRP pool = 60,000 ETB
Weights: Schedule = 40%, Quality = 30%, Safety = 30%
Performance: Schedule = 90%, Quality = 80%, Safety = 100% What is the PRP earned?
Weights: Schedule = 40%, Quality = 30%, Safety = 30%
Performance: Schedule = 90%, Quality = 80%, Safety = 100% What is the PRP earned?
Anonymous Quiz
20%
A) 53,000 ETB
42%
B) 54,000 ETB
25%
C) 52,000 ETB
12%
D) 55,000 ETB
โค3๐ฅ1