âģïļTypes of Formwork
âķïļFoundation Formwork. Foundation formworks can be designed in various ways. ...
âķïļWall Formwork. Wall formwork consists of vertically arranged upright timbers (formwork bearers) to which sheeting boards are nailed at the concrete side. ...
*Ceiling Formwork. ...
*Beam Formwork. ...
*Column Formwork.
â Formwork functions
The formwork is the main means of work in the moulding process of the concrete. Basically the process of formwork making has to meet the following requirements: - The structural component to be produced is to be moulded with the projected dimensions keeping the admissible tolerances.
@etconp
âķïļFoundation Formwork. Foundation formworks can be designed in various ways. ...
âķïļWall Formwork. Wall formwork consists of vertically arranged upright timbers (formwork bearers) to which sheeting boards are nailed at the concrete side. ...
*Ceiling Formwork. ...
*Beam Formwork. ...
*Column Formwork.
â Formwork functions
The formwork is the main means of work in the moulding process of the concrete. Basically the process of formwork making has to meet the following requirements: - The structural component to be produced is to be moulded with the projected dimensions keeping the admissible tolerances.
@etconp
ð1
Ethio Construction Engineering
https://t.me/COTMp
Telegram
ETCONp Discussion
ðĐáááááá ááģáĨ áĨá á áĩá°áŦáĻáĩ @Philemona7
âïļáá áĻ @etconp áááŦáŦ ááĐááđ áááĒ
âThis is discussion group of @ETCONpWORK
.
ðááģá°áĨáŦ ...
.
âĄïļááĐá áá ááááá áĻ áŪááĩáĩáŦáá―á ááģáŪá― áአááá á á ááá á ááááĩá!
@ETCONpBOT áááá áĨááá°ááááð
âïļáá áĻ @etconp áááŦáŦ ááĐááđ áááĒ
âThis is discussion group of @ETCONpWORK
.
ðááģá°áĨáŦ ...
.
âĄïļááĐá áá ááááá áĻ áŪááĩáĩáŦáá―á ááģáŪá― áአááá á á ááá á ááááĩá!
@ETCONpBOT áááá áĨááá°ááááð
ðFACTORS AFFECTING CONCRETE STRENGTH
.
âķïļConcrete strength is effected by many factors, such as quality of raw materials, water/cement ratio, coarse/fine aggregate ratio, age of concrete, compaction of concrete,
temperature, relative humidity and curing of concrete.
1. Quality of Raw Materials:
*Cement: Provided the cement conforms with the appropriate standard and it has been stored correctly (i.e. in dry conditions), it should be suitable for use in concrete.
*Aggregates: Quality of aggregates, its size, shape, texture,
strength etc determines the strength of concrete. The
presence of salts (chlorides and sulphates), silt and clay also
reduces the strength of concrete.
*Water: frequently the quality of the water is covered by a
clause stating â..the water should be fit for drinking..â. This
criterion though is not absolute and reference should be
made to respective codes for testing of water construction
purpose.
2. Water / Cement Ratio:
The relation between water cement ratio and strength of
concrete is shown in the plot as shown below:
The higher the water/cement ratio, the greater the initial spacing between the cement grains and the greater the
volume of residual voids not filled by hydration products.
There is one thing missing on the graph. For a given cement
content, the workability of the concrete is reduced if the
water/cement ratio is reduced. A lower water cement ratio
means less water, or more cement and lower workability.
However if the workability becomes too low the concrete
becomes difficult to compact and the strength reduces. For a
given set of materials and environment conditions, the
strength at any age depends only on the water-cement ratio,
providing full compaction can be achieved.
3. Coarse / fine aggregate ratio:
Following points should be noted for coarse/fine aggregate
ratio: If the proportion of fines is increased in relation to
the coarse aggregate, the overall aggregate surface
area will increase.
If the surface area of the aggregate has increased, the water demand will also increase.
*Assuming the water demand has increased, the
water cement ratio will increase Since the water cement ratio has increased, the compressive strength will decrease.
4. Aggregate / Cement Ratio:
*Following points must be noted for aggregate cement ratio:
If the volume remains the same and the proportion of cement in relation to that of sand is increased the surface area of the solid will increase.
*If the surface area of the solids has increased, the
water demand will stay the same for the constant
workability.
*Assuming an increase in cement content for no
increase in water demand, the water cement ratio will
decrease.
*If the water cement ratio reduces, the strength of
the concrete will increase.
*The influence of cement content on workability and strength
is an important one to remember and can be summarized as
follows:
1. For a given workability an increase in the proportion of
cement in a mix has little effect on the water demand and results in a reduction in the water/cement ratio.
2. The reduction in water/cement ratio leads to an increase
in strength of concrete.
3. Therefore, for a given workability an increase in the
cement content results in an increase in strength of concrete.
5. Age of concrete: The degree of hydration is synonymous with the age of concrete provided the concrete has not been allowed to dry out or the temperature is too low.
*In theory, provided the concrete is not allowed to dry out,
then it wil always be increasing albeit at an ever reducing
rate. For convenience and for most practical applications, it
is generally accepted that the majority of the strength has been achieved by 28 days.
6. Compaction of concrete: Any entrapped air resulting from inadequate compaction of the plastic concrete will lead to a reduction in strength.
If there was 10% trapped air in the concrete, the strength will fall down in the range of 30 to 40%. CONT'D ððð
.
âķïļConcrete strength is effected by many factors, such as quality of raw materials, water/cement ratio, coarse/fine aggregate ratio, age of concrete, compaction of concrete,
temperature, relative humidity and curing of concrete.
1. Quality of Raw Materials:
*Cement: Provided the cement conforms with the appropriate standard and it has been stored correctly (i.e. in dry conditions), it should be suitable for use in concrete.
*Aggregates: Quality of aggregates, its size, shape, texture,
strength etc determines the strength of concrete. The
presence of salts (chlorides and sulphates), silt and clay also
reduces the strength of concrete.
*Water: frequently the quality of the water is covered by a
clause stating â..the water should be fit for drinking..â. This
criterion though is not absolute and reference should be
made to respective codes for testing of water construction
purpose.
2. Water / Cement Ratio:
The relation between water cement ratio and strength of
concrete is shown in the plot as shown below:
The higher the water/cement ratio, the greater the initial spacing between the cement grains and the greater the
volume of residual voids not filled by hydration products.
There is one thing missing on the graph. For a given cement
content, the workability of the concrete is reduced if the
water/cement ratio is reduced. A lower water cement ratio
means less water, or more cement and lower workability.
However if the workability becomes too low the concrete
becomes difficult to compact and the strength reduces. For a
given set of materials and environment conditions, the
strength at any age depends only on the water-cement ratio,
providing full compaction can be achieved.
3. Coarse / fine aggregate ratio:
Following points should be noted for coarse/fine aggregate
ratio: If the proportion of fines is increased in relation to
the coarse aggregate, the overall aggregate surface
area will increase.
If the surface area of the aggregate has increased, the water demand will also increase.
*Assuming the water demand has increased, the
water cement ratio will increase Since the water cement ratio has increased, the compressive strength will decrease.
4. Aggregate / Cement Ratio:
*Following points must be noted for aggregate cement ratio:
If the volume remains the same and the proportion of cement in relation to that of sand is increased the surface area of the solid will increase.
*If the surface area of the solids has increased, the
water demand will stay the same for the constant
workability.
*Assuming an increase in cement content for no
increase in water demand, the water cement ratio will
decrease.
*If the water cement ratio reduces, the strength of
the concrete will increase.
*The influence of cement content on workability and strength
is an important one to remember and can be summarized as
follows:
1. For a given workability an increase in the proportion of
cement in a mix has little effect on the water demand and results in a reduction in the water/cement ratio.
2. The reduction in water/cement ratio leads to an increase
in strength of concrete.
3. Therefore, for a given workability an increase in the
cement content results in an increase in strength of concrete.
5. Age of concrete: The degree of hydration is synonymous with the age of concrete provided the concrete has not been allowed to dry out or the temperature is too low.
*In theory, provided the concrete is not allowed to dry out,
then it wil always be increasing albeit at an ever reducing
rate. For convenience and for most practical applications, it
is generally accepted that the majority of the strength has been achieved by 28 days.
6. Compaction of concrete: Any entrapped air resulting from inadequate compaction of the plastic concrete will lead to a reduction in strength.
If there was 10% trapped air in the concrete, the strength will fall down in the range of 30 to 40%. CONT'D ððð
7. Temperature: The rate of hydration reaction is temperature dependent.
*If the temperature increases the reaction also increases. This
means that the concrete kept at hi gher temperature will gain
strength more quickly than a similar concrete kept at a lower
temperature. However, the final strength of the concrete kept at the higher temperature will be lower. This is because the physical form of the hardened cement paste is less well structured and more porous when hydration proceeds at faster rate.
*This is an important point to remember because temperature
has a similar but more pronounced detrimental effect on
permeability of the concrete.
8. Relative humidity: If the concrete is allowed to dry out, the hydration reaction will stop.
*The hydration reaction cannot proceed without
moisture. The three curves shows the strength development
of similar concretes exposed to different conditions.
9. Curing: It should be clear from what has been said above that the detrimental effects of storage of concrete in a dry
environment can be reduced if the concrete is adequately
cured to prevent excessive moisture loss.
@etconp
*If the temperature increases the reaction also increases. This
means that the concrete kept at hi gher temperature will gain
strength more quickly than a similar concrete kept at a lower
temperature. However, the final strength of the concrete kept at the higher temperature will be lower. This is because the physical form of the hardened cement paste is less well structured and more porous when hydration proceeds at faster rate.
*This is an important point to remember because temperature
has a similar but more pronounced detrimental effect on
permeability of the concrete.
8. Relative humidity: If the concrete is allowed to dry out, the hydration reaction will stop.
*The hydration reaction cannot proceed without
moisture. The three curves shows the strength development
of similar concretes exposed to different conditions.
9. Curing: It should be clear from what has been said above that the detrimental effects of storage of concrete in a dry
environment can be reduced if the concrete is adequately
cured to prevent excessive moisture loss.
@etconp
áá
áĻááĩáááĻáąáĩ á
áá áģá áĪáĩ á áŦáĢáĒ áĻááá áááĪ áĨáá á áŪá ááá áĻá°áĻá áá beam áááá áá
á áá scaffold á°á á
ááá á°ááĒ áá áĩááá―á? áĨáĩአdiscussion group áá áĨáááŦá
https://t.me/COTMp
https://t.me/COTMp
ðá áŪááĩáĩáŦáá―á áá áĻáááĢáģ ááááĻáĩ á
áĢáĩ/Liquidated damage/
---------------
âķïļá ááĢá á á°á(á á áá áĻá á á ááŦáŠ)
====================
*á áŪááĩáĩáŦáá―á áá áá áĻáá áĻáááĢáģ áĩáŦ á°áĨá áĻá°ááá áá á áēááá áĨá áááá áĩááĩááŽá―á áá°áĻáĩ á áá á á°ááá á áĻáá áá°áĨ á°ááķ áá ááá áĻá°ááŦáĐ áááááĩ áááĄáĄ
*á°ááŦáĐ áĻááá áĻáááĢáģ áĩáŦ á áá á á°ááá á áĻáá áá°áĨ á áá áą á°ááķ áŦáá ááá áĨáá°áá áĻáá áá ááááŦ áá/completion date/ á áá áááĢáģá áĨáĩáĻáá ááá á áĩ áá áĩáĻáĩ ááĨáŦááģááą áá á°ááŦáĐ áĻáááĢáģ ááááĻáĩ á áĢáĩ/Liquidated damage/ áĻáááá áááááĩ áááá áģááĄáĄ
*á áá á á°ááá á áĻáá áá°áĨ áēáĢá áá áááĩ áá? á ááģááĩ á á°áŠáá―/client/ á ááááĪ áĨáĨáĻáĩ á áá áá áĻá°ááá á á°ááŦáĐá á á°áŠá ááááĢáģá áá ááááŦ áĻá°áĩááá áĩá áĻáá áĨááĩ/áĻáá áĨáááá/ ááá á áĻááááĻá áá á ááŦ áá áĻá°ááĻáá áĩ áá áááŪ áĨáá°áá ááĻáąáģááĄáĄáá á áĻáģáĩ áĩá á°áĩ áááĄáĄ
*á áŪááĩáĩáŦáá―á áá áĩá áá á ááĢá á á á°áá áĻáááĢáģ áá áĻá°á°áĻáá áĩ áá/contract signing date/ áĢááĒáááá―á ááŽáĩ/mobilization period/áĢáĻáģááĩ ááááĨ/site handover/áĢ áĻáĩáŦ ááááŠáŦ áá/commencement date/ áĨá áĻáĩáŦ áá ááááŦ áá/completion date/ áĻáááĩá ááĻáģáĩ áĻáááĢáģ ááááĻáĩ á áĢáĩ/Liquidated damage/ áĻáááá á á ááĢᥠáááá áá á áááĄáĄ
*á áá°áĻáą á áá áĻá°ááá á áĻáĩáŦ ááĻááá áĻáá áá°áĨ ááá á áĻááááĻá á°ááŦáĐ áĻáááĢáģáá áģááĩ áĻá á°áŠá áĻá°áĻáĻá á áá áááĄáĄáááá áĻáģááĩ ááááĨ á áá áĻáĩáŦ ááááŠáŦ áá /commencement date/ á ááááēáą áĻááá°á áĨá áá°ááŦáĐ áĻáááá―ááĩ áááááĄáĄ
*áĨáááēá áĻáá á ááááēáą áĻááá°áá áĻáĩáŦ ááááŠáŦ áá áááŪ á áá áá áĻá°ááá á áá ááá áá áĻáĩáŦ áá ááááŦ áá/completion date/ ááļ áĨáá°áá áááá áŦáĩá―áá áááĩ áááĄáĄ
*áĨáá áá ááģáá áĻáááĢá ááá á áŪááĩáĩáŦáá―á áá áá áĻá°áá°ááá áĻáĩáŦ ááá áĻáá áĻáá ááááŦ áá á áĩááĩá ááá ááá áá áá°áĻá áĻáá―áá áĩ áĨáĩáá á ááĄáĄ/part work completion/ áááĩ áááĄáĄáĻáá á ááĢá áĐ áĻáá áĨáá°á°áĨáŦáŦá áĻáá°á áááááĄáĄ
*áĩáááá áĻáááĢáģ ááááĻáĩ á áĢáĩ áĻááá ááģá áĻáááĢá á°ááŦáĐ áĻááá áĻáááĢáģ áĩáŦ á áá áĩáŦ áĻáá ááááŦ áá /completion date/ áģáŦá áá á áĻááĻ áĨáá°áá áááĄáĄáĻááááĨ á áĢáą áĻááĢáá á á°ááŦáĐ áá áááĄáĄá°ááŦáĐ áááĢáģáá ááááĻá áĩ ááĨáŦááģááą áá á áá áĻá°ááá áá áĻáááĢáģ ááááĻáĩ á áĢáĩ áĻááĻáá áááááĄáĄá áááŦá―á áá áĨáĻá°áᥠááĩáŦáĩ áá°ááŦáĐ ááĨáĩá ááá áááĄáĄáá áááĩ á á°áŠá áĻáá áá ááááŦ áá áĩááá áá á áááĢáá áááĩ á áá―áááĄáĄá áá áá áĻá°ááá á áĻááááĻáĩ á áĢáĩ áĢáŠáŦ áá á áĻáá á áá áá á á°áŠá áá áááĻáĨ áá―áááĄáĄáá áĻá°ááĻá á áá áĻááááĻáĩ á áĢáĩ áĻááĢá áááá áĻáááĄáĄ
*ááá á°ááŦáĐ áá° ááááĻáĩ á áĢáĩ áĨááēááĢ áĻáá°áĻá á áĩááĩá á á ááĢᥠááĻáááĨ áŦáá áĩ ááá ááááēáą áá°ááŦáĐ áĻáá ááŦáááŦ/time extension/ áá á·á áááĩ á áááá°á áĻááá ááĨáĨ áááĄáĄááááŦáąá áá°ááŦáĐ áĻáá ááŦáááŦ á°áá áķááĩ áĻáá áĻáááĢáģ áá ááááŦ áááá á áĨáŪ áĩáááŦááá áá áĩááááĻá áááĄáĄ
*áĻáááŦá―áá áĻá á ááĨáá á áá áĻááĩ áá ááá? áĻáááá áááááĩ á ááĩááĨáá á á á ááá― 1887 áĨáĩáĻ 1895 áĩáĻáĩ áĻá°á°ááááĩá ááģá°áĩ áá ááááĄáĄ
*á ááĩááĨáá á á á ááá― 1889 áá á°áááŪá― á áááļá ááááĢáĩ á áá°áá ááá áĨáá°áá ááīáģáá áŦáááļá áĨáá°áá ááá á ááĩá áĻááļá áĨáá°áá ááá á ááááķ áĻááļá áĨáá°áá áĻááĻáááá áĻáááŪ áá á á áĩááĩáá á áááļá áááá°á áĨáá°áá―á á ááá áĩ áááĐ á°á°áááááĄáĄáĨáá áá áĻáá ááīáģá á ááááķ áááļá áĩáááŦáĩáĻáĩáá á áĢáĩ áĻáááááĩ á á°áá áĻáááĢáģ ááááĻáĩ á áĢáĩ/liquidated damage/ áĻááááĻáĩ áááááĄáĄ
*áĻááááĻáĩ á áĢáĩ áĩááááĩ áĢá áá á á°áŠá áĻáá áĩáŦ áĨááēááļáá áĻá áĢáĩ ááááĄáá áááá á ááĨáĩ áĨáá°áááĻá áĻá/á /á 1890(2) áá°áááááĄáĄáĨáá°ááá á á°áŠá áŠáģáŦ áĢáá°ááĩá áĩ áĨááģ áĻááááĻáĩ á áĢáĩ áááᥠááĻááá áĨáá°áááĢ áĻá/á /á 1892(1) áá°áááááĄáĄáĨáááēá á°ááŦáĐ áááĢáģáá á áá áą áŦáá áááá á á°áŠáá áá áĨá ááááģáĩ á áĩáĶ ááá á áá áļáá°áááĩ ááá á áĻáĢáĩ áĨááĩ ááá áĻá°áĻááá áĨáá°áá á á°áŠá á áá áĻá°ááá á áĻá áĢáĩ ááááĨ á áá á á°áĻá°á áĩ áĩáááá ááģáĩ áá á áá áĻá°ááŦáĐ áá áŠáģáŦ ááá áĻá áĨáá°áá―á áĻá/á /á 1892(2) áá°áááááĄáĄ
*ááá áĻááááĻáĩ á áĢáĩ áá á á áģáá― ááááĩ áĻáá―áá áĩ áĨáĩá áĩááááĐ áĻá/á /á 1893 áá°áááááĄáĄáááá á°ááŦáĐ ááīáģáá á áĻáá áĻááļá áá áēáá áááĄáĄáá áááĩ á°ááŦáĐ áĢáĻáááá áĩáŦ áá á áĢáĩ áĻááĢáá áĩ á áááá áááĩ áááĄáĄ
*á áá áĻááĩ á áēáŠá áááĢáģ áĩáŦáá― áá áĻáá áá°áģá°áŠáŦ á ááá― 47(1) áá á°ááŦáĐ áĩáŦáá á áá áĻáá ááááŦ áá áŦáá ááá ááááĻá áĩ ááĨáŦááģááą áá áĻááá áá 1/1000 áĨáá°ááĻáá áĨá áááá á á ááá áá á áĻáá áá áĻ20% ááĨááĨ áĨáá°ááá―á áá°áááááĄáĄááá áá á áĻáá áá°áĻáááá áĩáŦ ááááēáą ááĻáááŦ á°áá°ááŽáĩ á á°á áá áĻá áĢáą áá á áĻáá°áá áĢáá°áĻáááá áĩáŦ áá á áá áá á áááĩáĻáĩ áááá áááĩ áááĄáĄ
*á ááĻáĻáŧá áĻááááĻáĩ á áĢáĩ á á ááá áĻáá áĨááģáĻáá áĨáá°á áĢáĩ áĻááá áá á á á á áĢáą áĨáá á áĻáá°á á áēáá á áŪáá áá áĻá á áĩáá áĩ áá á áĢáĩ á áá°áááĄáĄá áŪáá áá ááĐáīáĩáĩ áģáá á á á°áŠá áá áĻá°áĻá°á ááģáĩ áá áĨáĐá áá ááááá áĻáááá áĩ áēáá áĻá áĢáĩ á áááĩ á°ááģáģá áĢá አáŦáá á°ááŧáááĩ á áááĻáááĄáĄ á áá°áááá!
@etconp
---------------
âķïļá ááĢá á á°á(á á áá áĻá á á ááŦáŠ)
====================
*á áŪááĩáĩáŦáá―á áá áá áĻáá áĻáááĢáģ áĩáŦ á°áĨá áĻá°ááá áá á áēááá áĨá áááá áĩááĩááŽá―á áá°áĻáĩ á áá á á°ááá á áĻáá áá°áĨ á°ááķ áá ááá áĻá°ááŦáĐ áááááĩ áááĄáĄ
*á°ááŦáĐ áĻááá áĻáááĢáģ áĩáŦ á áá á á°ááá á áĻáá áá°áĨ á áá áą á°ááķ áŦáá ááá áĨáá°áá áĻáá áá ááááŦ áá/completion date/ á áá áááĢáģá áĨáĩáĻáá ááá á áĩ áá áĩáĻáĩ ááĨáŦááģááą áá á°ááŦáĐ áĻáááĢáģ ááááĻáĩ á áĢáĩ/Liquidated damage/ áĻáááá áááááĩ áááá áģááĄáĄ
*á áá á á°ááá á áĻáá áá°áĨ áēáĢá áá áááĩ áá? á ááģááĩ á á°áŠáá―/client/ á ááááĪ áĨáĨáĻáĩ á áá áá áĻá°ááá á á°ááŦáĐá á á°áŠá ááááĢáģá áá ááááŦ áĻá°áĩááá áĩá áĻáá áĨááĩ/áĻáá áĨáááá/ ááá á áĻááááĻá áá á ááŦ áá áĻá°ááĻáá áĩ áá áááŪ áĨáá°áá ááĻáąáģááĄáĄáá á áĻáģáĩ áĩá á°áĩ áááĄáĄ
*á áŪááĩáĩáŦáá―á áá áĩá áá á ááĢá á á á°áá áĻáááĢáģ áá áĻá°á°áĻáá áĩ áá/contract signing date/ áĢááĒáááá―á ááŽáĩ/mobilization period/áĢáĻáģááĩ ááááĨ/site handover/áĢ áĻáĩáŦ ááááŠáŦ áá/commencement date/ áĨá áĻáĩáŦ áá ááááŦ áá/completion date/ áĻáááĩá ááĻáģáĩ áĻáááĢáģ ááááĻáĩ á áĢáĩ/Liquidated damage/ áĻáááá á á ááĢᥠáááá áá á áááĄáĄ
*á áá°áĻáą á áá áĻá°ááá á áĻáĩáŦ ááĻááá áĻáá áá°áĨ ááá á áĻááááĻá á°ááŦáĐ áĻáááĢáģáá áģááĩ áĻá á°áŠá áĻá°áĻáĻá á áá áááĄáĄáááá áĻáģááĩ ááááĨ á áá áĻáĩáŦ ááááŠáŦ áá /commencement date/ á ááááēáą áĻááá°á áĨá áá°ááŦáĐ áĻáááá―ááĩ áááááĄáĄ
*áĨáááēá áĻáá á ááááēáą áĻááá°áá áĻáĩáŦ ááááŠáŦ áá áááŪ á áá áá áĻá°ááá á áá ááá áá áĻáĩáŦ áá ááááŦ áá/completion date/ ááļ áĨáá°áá áááá áŦáĩá―áá áááĩ áááĄáĄ
*áĨáá áá ááģáá áĻáááĢá ááá á áŪááĩáĩáŦáá―á áá áá áĻá°áá°ááá áĻáĩáŦ ááá áĻáá áĻáá ááááŦ áá á áĩááĩá ááá ááá áá áá°áĻá áĻáá―áá áĩ áĨáĩáá á ááĄáĄ/part work completion/ áááĩ áááĄáĄáĻáá á ááĢá áĐ áĻáá áĨáá°á°áĨáŦáŦá áĻáá°á áááááĄáĄ
*áĩáááá áĻáááĢáģ ááááĻáĩ á áĢáĩ áĻááá ááģá áĻáááĢá á°ááŦáĐ áĻááá áĻáááĢáģ áĩáŦ á áá áĩáŦ áĻáá ááááŦ áá /completion date/ áģáŦá áá á áĻááĻ áĨáá°áá áááĄáĄáĻááááĨ á áĢáą áĻááĢáá á á°ááŦáĐ áá áááĄáĄá°ááŦáĐ áááĢáģáá ááááĻá áĩ ááĨáŦááģááą áá á áá áĻá°ááá áá áĻáááĢáģ ááááĻáĩ á áĢáĩ áĻááĻáá áááááĄáĄá áááŦá―á áá áĨáĻá°áᥠááĩáŦáĩ áá°ááŦáĐ ááĨáĩá ááá áááĄáĄáá áááĩ á á°áŠá áĻáá áá ááááŦ áá áĩááá áá á áááĢáá áááĩ á áá―áááĄáĄá áá áá áĻá°ááá á áĻááááĻáĩ á áĢáĩ áĢáŠáŦ áá á áĻáá á áá áá á á°áŠá áá áááĻáĨ áá―áááĄáĄáá áĻá°ááĻá á áá áĻááááĻáĩ á áĢáĩ áĻááĢá áááá áĻáááĄáĄ
*ááá á°ááŦáĐ áá° ááááĻáĩ á áĢáĩ áĨááēááĢ áĻáá°áĻá á áĩááĩá á á ááĢᥠááĻáááĨ áŦáá áĩ ááá ááááēáą áá°ááŦáĐ áĻáá ááŦáááŦ/time extension/ áá á·á áááĩ á áááá°á áĻááá ááĨáĨ áááĄáĄááááŦáąá áá°ááŦáĐ áĻáá ááŦáááŦ á°áá áķááĩ áĻáá áĻáááĢáģ áá ááááŦ áááá á áĨáŪ áĩáááŦááá áá áĩááááĻá áááĄáĄ
*áĻáááŦá―áá áĻá á ááĨáá á áá áĻááĩ áá ááá? áĻáááá áááááĩ á ááĩááĨáá á á á ááá― 1887 áĨáĩáĻ 1895 áĩáĻáĩ áĻá°á°ááááĩá ááģá°áĩ áá ááááĄáĄ
*á ááĩááĨáá á á á ááá― 1889 áá á°áááŪá― á áááļá ááááĢáĩ á áá°áá ááá áĨáá°áá ááīáģáá áŦáááļá áĨáá°áá ááá á ááĩá áĻááļá áĨáá°áá ááá á ááááķ áĻááļá áĨáá°áá áĻááĻáááá áĻáááŪ áá á á áĩááĩáá á áááļá áááá°á áĨáá°áá―á á ááá áĩ áááĐ á°á°áááááĄáĄáĨáá áá áĻáá ááīáģá á ááááķ áááļá áĩáááŦáĩáĻáĩáá á áĢáĩ áĻáááááĩ á á°áá áĻáááĢáģ ááááĻáĩ á áĢáĩ/liquidated damage/ áĻááááĻáĩ áááááĄáĄ
*áĻááááĻáĩ á áĢáĩ áĩááááĩ áĢá áá á á°áŠá áĻáá áĩáŦ áĨááēááļáá áĻá áĢáĩ ááááĄáá áááá á ááĨáĩ áĨáá°áááĻá áĻá/á /á 1890(2) áá°áááááĄáĄáĨáá°ááá á á°áŠá áŠáģáŦ áĢáá°ááĩá áĩ áĨááģ áĻááááĻáĩ á áĢáĩ áááᥠááĻááá áĨáá°áááĢ áĻá/á /á 1892(1) áá°áááááĄáĄáĨáááēá á°ááŦáĐ áááĢáģáá á áá áą áŦáá áááá á á°áŠáá áá áĨá ááááģáĩ á áĩáĶ ááá á áá áļáá°áááĩ ááá á áĻáĢáĩ áĨááĩ ááá áĻá°áĻááá áĨáá°áá á á°áŠá á áá áĻá°ááá á áĻá áĢáĩ ááááĨ á áá á á°áĻá°á áĩ áĩáááá ááģáĩ áá á áá áĻá°ááŦáĐ áá áŠáģáŦ ááá áĻá áĨáá°áá―á áĻá/á /á 1892(2) áá°áááááĄáĄ
*ááá áĻááááĻáĩ á áĢáĩ áá á á áģáá― ááááĩ áĻáá―áá áĩ áĨáĩá áĩááááĐ áĻá/á /á 1893 áá°áááááĄáĄáááá á°ááŦáĐ ááīáģáá á áĻáá áĻááļá áá áēáá áááĄáĄáá áááĩ á°ááŦáĐ áĢáĻáááá áĩáŦ áá á áĢáĩ áĻááĢáá áĩ á áááá áááĩ áááĄáĄ
*á áá áĻááĩ á áēáŠá áááĢáģ áĩáŦáá― áá áĻáá áá°áģá°áŠáŦ á ááá― 47(1) áá á°ááŦáĐ áĩáŦáá á áá áĻáá ááááŦ áá áŦáá ááá ááááĻá áĩ ááĨáŦááģááą áá áĻááá áá 1/1000 áĨáá°ááĻáá áĨá áááá á á ááá áá á áĻáá áá áĻ20% ááĨááĨ áĨáá°ááá―á áá°áááááĄáĄááá áá á áĻáá áá°áĻáááá áĩáŦ ááááēáą ááĻáááŦ á°áá°ááŽáĩ á á°á áá áĻá áĢáą áá á áĻáá°áá áĢáá°áĻáááá áĩáŦ áá á áá áá á áááĩáĻáĩ áááá áááĩ áááĄáĄ
*á ááĻáĻáŧá áĻááááĻáĩ á áĢáĩ á á ááá áĻáá áĨááģáĻáá áĨáá°á áĢáĩ áĻááá áá á á á á áĢáą áĨáá á áĻáá°á á áēáá á áŪáá áá áĻá á áĩáá áĩ áá á áĢáĩ á áá°áááĄáĄá áŪáá áá ááĐáīáĩáĩ áģáá á á á°áŠá áá áĻá°áĻá°á ááģáĩ áá áĨáĐá áá ááááá áĻáááá áĩ áēáá áĻá áĢáĩ á áááĩ á°ááģáģá áĢá አáŦáá á°ááŧáááĩ á áááĻáááĄáĄ á áá°áááá!
@etconp