Ethio Construction Engineering
32.3K subscribers
6.28K photos
359 videos
1.99K files
3.35K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
Civil engineering huge machinery 👆👆👆

@etconp
👍1
👉FACTORS AFFECTING CONCRETE STRENGTH
.
â–ļī¸Concrete strength is effected by many factors, such as quality of raw materials, water/cement ratio, coarse/fine aggregate ratio, age of concrete, compaction of concrete,
temperature, relative humidity and curing of concrete.
1. Quality of Raw Materials:
*Cement: Provided the cement conforms with the appropriate standard and it has been stored correctly (i.e. in dry conditions), it should be suitable for use in concrete.
*Aggregates: Quality of aggregates, its size, shape, texture,
strength etc determines the strength of concrete. The
presence of salts (chlorides and sulphates), silt and clay also
reduces the strength of concrete.
*Water: frequently the quality of the water is covered by a
clause stating “..the water should be fit for drinking..”. This
criterion though is not absolute and reference should be
made to respective codes for testing of water construction
purpose.
2. Water / Cement Ratio:
The relation between water cement ratio and strength of
concrete is shown in the plot as shown below:
The higher the water/cement ratio, the greater the initial spacing between the cement grains and the greater the
volume of residual voids not filled by hydration products.
There is one thing missing on the graph. For a given cement
content, the workability of the concrete is reduced if the
water/cement ratio is reduced. A lower water cement ratio
means less water, or more cement and lower workability.
However if the workability becomes too low the concrete
becomes difficult to compact and the strength reduces. For a
given set of materials and environment conditions, the
strength at any age depends only on the water-cement ratio,
providing full compaction can be achieved.
3. Coarse / fine aggregate ratio:
Following points should be noted for coarse/fine aggregate
ratio: If the proportion of fines is increased in relation to
the coarse aggregate, the overall aggregate surface
area will increase.
If the surface area of the aggregate has increased, the water demand will also increase.
*Assuming the water demand has increased, the
water cement ratio will increase Since the water cement ratio has increased, the compressive strength will decrease.
4. Aggregate / Cement Ratio:
*Following points must be noted for aggregate cement ratio:
If the volume remains the same and the proportion of cement in relation to that of sand is increased the surface area of the solid will increase.
*If the surface area of the solids has increased, the
water demand will stay the same for the constant
workability.
*Assuming an increase in cement content for no
increase in water demand, the water cement ratio will
decrease.
*If the water cement ratio reduces, the strength of
the concrete will increase.
*The influence of cement content on workability and strength
is an important one to remember and can be summarized as
follows:
1. For a given workability an increase in the proportion of
cement in a mix has little effect on the water demand and results in a reduction in the water/cement ratio.
2. The reduction in water/cement ratio leads to an increase
in strength of concrete.
3. Therefore, for a given workability an increase in the
cement content results in an increase in strength of concrete.
5. Age of concrete: The degree of hydration is synonymous with the age of concrete provided the concrete has not been allowed to dry out or the temperature is too low.
*In theory, provided the concrete is not allowed to dry out,
then it wil always be increasing albeit at an ever reducing
rate. For convenience and for most practical applications, it
is generally accepted that the majority of the strength has been achieved by 28 days.
6. Compaction of concrete: Any entrapped air resulting from inadequate compaction of the plastic concrete will lead to a reduction in strength.
If there was 10% trapped air in the concrete, the strength will fall down in the range of 30 to 40%. CONT'D 👇👇👇
7. Temperature: The rate of hydration reaction is temperature dependent.
*If the temperature increases the reaction also increases. This
means that the concrete kept at hi gher temperature will gain
strength more quickly than a similar concrete kept at a lower
temperature. However, the final strength of the concrete kept at the higher temperature will be lower. This is because the physical form of the hardened cement paste is less well structured and more porous when hydration proceeds at faster rate.
*This is an important point to remember because temperature
has a similar but more pronounced detrimental effect on
permeability of the concrete.
8. Relative humidity: If the concrete is allowed to dry out, the hydration reaction will stop.
*The hydration reaction cannot proceed without
moisture. The three curves shows the strength development
of similar concretes exposed to different conditions.
9. Curing: It should be clear from what has been said above that the detrimental effects of storage of concrete in a dry
environment can be reduced if the concrete is adequately
cured to prevent excessive moisture loss.

@etconp
â–ļī¸á‹¨ አዲáˆĩáŠ á‰ á‰Ŗ ቀላል á‰Ŗá‰Ąáˆ­
፡
👉ሸገር አዱ ገነá‰ĩâ¤ī¸
፡
🙏ወá‰Ĩ ምáˆŊá‰ĩ ተመኘን😍
ይህ የምá‰ĩመለከቱá‰ĩ ህንፃ áˆŗáˆ­ ቤá‰ĩ አáŠĢá‰Ŗá‰ĸ የሚገኝ ነው፤ áŠĨናም በሮዝ ቀለም የተከበውን beam ለማቆም ይህን ሁሉ scaffold ተጠቅመዋል ተገá‰ĸ ነው á‰ĩላላá‰Ŋሁ? áŠĨáˆĩáŠĒ discussion group ላይ áŠĨንወá‹Ģይ


https://t.me/COTMp
👉በኮንáˆĩá‰ĩáˆĢክáˆŊን ውል á‹¨áŒáŠ•á‰Ŗá‰ŗ መዘግየá‰ĩ á‰…áŒŖá‰ĩ/Liquidated damage/
---------------
â–ļī¸á‰ áŒ‰á‰Ŗá‹” አሰፋ(ጠበቃና የህግ አማáŠĢáˆĒ)
====================
*በኮንáˆĩá‰ĩáˆĢክáˆŊን ውል ላይ የውሉ á‹¨áŒáŠ•á‰Ŗá‰ŗ áˆĩáˆĢ ተá‰Ĩሎ የተቀመጠውን በዲዛይኑ áŠĨና ዝርዝር áˆĩፔáˆĩፊáŠŦáˆŊኑ መሰረá‰ĩ በውሉ በተቀመጠው የጊዜ ገደá‰Ĩ ሰርá‰ļ ማጠናቀቅ የተቋáˆĢጩ ሀላፊነá‰ĩ ነው፡፡
*ተቋáˆĢጩ የውሉን á‹¨áŒáŠ“á‰Ŗá‰ŗ áˆĩáˆĢ በውሉ በተቀመጠው የጊዜ ገደá‰Ĩ በወቅቱ ሰርá‰ļ á‹Ģላጠናቀቀ áŠĨንደሆነ ከውሉ ማጠናቀቂá‹Ģ ጊዜ/completion date/ በኋላ áŒáŠ•á‰Ŗá‰ŗá‹ áŠĨáˆĩከሚጠናቀቅበá‰ĩ ጊዜ á‹ĩረáˆĩ ለáŠĨá‹ĢáŠ•á‹ŗáŠ•á‹ą ቀን ተቋáˆĢጩ á‹¨áŒáŠ•á‰Ŗá‰ŗ መዘግየá‰ĩ á‰…áŒŖá‰ĩ/Liquidated damage/ የመክፈል ሀላፊነá‰ĩ á‹­áŠ–áˆ­á‰ á‰ŗáˆáĄáĄ
*በውሉ በተቀመጠው የጊዜ ገደá‰Ĩ áˆ˛á‰Ŗáˆ ምን ማለá‰ĩ ነው? áŠ áŠ•á‹ŗáŠ•á‹ĩ አሰáˆĒዎá‰Ŋ/client/ በግንዛቤ áŠĨáŒĨረá‰ĩ በውሉ ላይ የተቀመጠው ተቋáˆĢጩና አሰáˆĒው áˆˆáŒáŠ“á‰Ŗá‰ŗá‹ ማጠናቀቂá‹Ģ የተáˆĩማሙበá‰ĩን የቀን á‰Ĩዛá‰ĩ/የጊዜ áŠĨርዝማኔ/ መቆጠር የሚጀምረው ውሉ በግáˆĢ ቀኙ ከተፈረመበá‰ĩ ቀን ጀምሮ áŠĨንደሆነ á‹­áˆ¨á‹ąá‰ŗáˆáĄáĄá‹­áˆ„ áŠ áˆ¨á‹ŗá‹ĩ áˆĩህተá‰ĩ ነው፡፡
*በኮንáˆĩá‰ĩáˆĢክáˆŊን ውል áˆĩለ ጊዜ áŠ á‰†áŒŖáŒ áˆ­ በተለይ á‹¨áŒáŠ•á‰Ŗá‰ŗ ውል የተደረገበá‰ĩ ቀን/contract signing date/ áŖáˆžá‰ĸላይዜáˆŊን ፔáˆŦá‹ĩ/mobilization period/áŖá‹¨áˆŗá‹­á‰ĩ ርክክá‰Ĩ/site handover/áŖ የáˆĩáˆĢ መጀመáˆĒá‹Ģ ቀን/commencement date/ áŠĨና የáˆĩáˆĢ ማጠናቀቂá‹Ģ ቀን/completion date/ የሚሉá‰ĩን áˆ˜áˆ¨á‹ŗá‰ĩ á‹¨áŒáŠ•á‰Ŗá‰ŗ መዘግየá‰ĩ á‰…áŒŖá‰ĩ/Liquidated damage/ የሚለውን á‰ áŠ áŒá‰Ŗá‰Ą ለማወቅ ይጠቅማል፡፡
*በመሰረቱ በውሉ የተቀመጠው የáˆĩáˆĢ ማከናወኛ የጊዜ ገደá‰Ĩ መቆጠር የሚጀምረው ተቋáˆĢጩ á‹¨áŒáŠ“á‰Ŗá‰ŗá‹áŠ• áˆŗá‹­á‰ĩ ከአሰáˆĒው ከተረከበ በኋላ ነው፡፡ይሄውም áŠ¨áˆŗá‹­á‰ĩ ርክክá‰Ĩ በኋላ የáˆĩáˆĢ መጀመáˆĒá‹Ģ ቀን /commencement date/ በመሀንዲሱ የሚወሰን áŠĨና ለተቋáˆĢጩ የሚገለáŒŊለá‰ĩ ይሆናል፡፡
*áŠĨንግዲህ ከዚሁ በመሀንዲሱ ከሚወሰነው የáˆĩáˆĢ መጀመáˆĒá‹Ģ ቀን ጀምሮ በውሉ ላይ የተቀመጠው ቀን ይቆጠርና የáˆĩáˆĢ ማጠናቀቂá‹Ģ ቀን/completion date/ መቸ áŠĨንደሆነ ለማወቅ á‹Ģáˆĩá‰Ŋላል ማለá‰ĩ ነው፡፡
*áŠĨዚህ ላይ áˆŠá‰ŗá‹ˆá‰… á‹¨áˆšáŒˆá‰Ŗá‹ ነገር በኮንáˆĩá‰ĩáˆĢክáˆŊን ውሉ ላይ የተወሰነውን የáˆĩáˆĢ ክፍል ከውሉ የማጠናቀቂá‹Ģ ጊዜ አáˆĩቀá‹ĩሞ ለማጠናቀቅ ውል ሊደረግ የሚá‰Ŋልበá‰ĩ áŠĨá‹ĩልም አለ፡፡/part work completion/ ማለá‰ĩ ነው፡፡የቀን áŠ á‰†áŒŖáŒ áˆŠ ከላይ áŠĨንደተá‰ĨáˆĢáˆĢው የሚሰላ ይሆናል፡፡
*áˆĩለሆነም á‹¨áŒáŠ•á‰Ŗá‰ŗ መዘግየá‰ĩ á‰…áŒŖá‰ĩ የሚለው áŒ‰á‹ŗá‹­ á‹¨áˆšáˆ˜áŒŖá‹ ተቋáˆĢጩ የውሉን á‹¨áŒáŠ•á‰Ŗá‰ŗ áˆĩáˆĢ በውሉ áˆĩáˆĢ የማጠናቀቂá‹Ģ ጊዜ /completion date/ áˆŗá‹Ģጠናቅቅ የቀረ áŠĨንደሆነ ነው፡፡የገንዘá‰Ĩ á‰…áŒŖá‰ą á‹¨áˆšáŒŖáˆˆá‹ በተቋáˆĢጩ ላይ ነው፡፡ተቋáˆĢጩ áŒáŠ•á‰Ŗá‰ŗá‹áŠ• ላዘገየበá‰ĩ ለáŠĨá‹ĢáŠ•á‹ŗáŠ•á‹ą ቀን በውሉ የተቀመጠውን á‹¨áŒáŠ•á‰Ŗá‰ŗ መዘግየá‰ĩ á‰…áŒŖá‰ĩ የሚከፍል ይሆናል፡፡በነገáˆĢá‰Ŋን ላይ áŠĨየተቀጡ መáˆĩáˆĢá‰ĩ ለተቋáˆĢጩ መá‰Ĩá‰ĩም ጭምር ነው፡፡ይህ ማለá‰ĩ አሰáˆĒው የውሉ ማጠናቀቂá‹Ģ ጊዜ áˆĩላለቀ ውል áŠ á‰‹áˆ­áŒŖáˆˆáˆ ማለá‰ĩ አይá‰Ŋልም፡፡በውሉ ላይ የተቀመጠው የመዘግየá‰ĩ á‰…áŒŖá‰ĩ áŒŖáˆĒá‹Ģ መጠን ከሞላ በኋላ ግን አሰáˆĒው ውል ማቋረáŒĨ ይá‰Ŋላል፡፡ውል ከተቋረጠ በኋላ የመዘግየá‰ĩ á‰…áŒŖá‰ĩ á‹¨áˆšá‰Ŗáˆ ነገርም የለም፡፡
*ሌላው ተቋáˆĢጩ ወደ መዘግየá‰ĩ á‰…áŒŖá‰ĩ áŠĨáŠ•á‹˛áŒˆá‰Ŗ ከመደረጉ አáˆĩቀá‹ĩሞ á‰ áŠ áŒá‰Ŗá‰Ą መረጋገáŒĨ á‹Ģለበá‰ĩ ነገር መሀንዲሱ ለተቋáˆĢጩ የጊዜ ማáˆĢዘሚá‹Ģ/time extension/ ፈቅዷል ወይáˆĩ አልፈቀደም የሚለው ነáŒĨá‰Ĩ ነው፡፡ምክንá‹Ģቱም ለተቋáˆĢጩ የጊዜ ማáˆĢዘሚá‹Ģ ተፈቅá‹ļለá‰ĩ ከሆነ á‹¨áŒáŠ•á‰Ŗá‰ŗ ማጠናቀቂá‹Ģ ጊዜውም አá‰Ĩሎ áˆĩለሚáˆĢዘምና ቀኑ áˆĩለሚቀየር ነው፡፡
*የሀገáˆĢá‰Ŋንን የህግ ማáŠĨቀፍ በዚህ ረገá‹ĩ ምን ይላል? የሚለውን ለመመለáˆĩ በፍá‰ĩሀá‰Ĩሄር ህግ አንቀáŒŊ 1887 áŠĨáˆĩከ 1895 á‹ĩረáˆĩ የተደነገጉá‰ĩን áˆ˜á‹ŗáˆ°áˆĩ ይጠይቃል፡፡
*በፍá‰ĩሀá‰Ĩሄር ህግ አንቀáŒŊ 1889 ላይ ተዋዋዮá‰Ŋ በውላቸው áˆáŠ“áˆá‰Ŗá‰ĩ አንደኛው ወገን áŠĨንደውሉ áŒá‹´á‰ŗá‹áŠ• á‹Ģልፈጸመ áŠĨንደሆነ ወይም አጓá‹ĩሎ የፈጸመ áŠĨንደሆነ ወይም አዘግይá‰ļ የፈጸመ áŠĨንደሆነ የሚከፍለውን የመቀጮ መጠን አáˆĩቀá‹ĩመው በውላቸው ለመወሰን áŠĨንደሚá‰Ŋሉ በሚፈቅá‹ĩ መልኩ ተደንግጓል፡፡áŠĨዚህ ላይ የውል áŒá‹´á‰ŗáŠ• አዘግይá‰ļ መፈጸም áˆĩለሚá‹Ģáˆĩከá‰ĩለው á‰…áŒŖá‰ĩ የሚዋዋሉá‰ĩ በተለይ á‹¨áŒáŠ•á‰Ŗá‰ŗ መዘግየá‰ĩ á‰…áŒŖá‰ĩ/liquidated damage/ የሚመለከá‰ĩ ይሆናል፡፡
*የመዘግየá‰ĩ á‰…áŒŖá‰ĩ áˆĩምምነá‰ĩ á‰Ŗáˆˆ ጊዜ አሰáˆĒው የውሉ áˆĩáˆĢ áŠĨንዲፈጸምና á‹¨á‰…áŒŖá‰ĩ ገንዘቡንም ለመቀበል መá‰Ĩá‰ĩ áŠĨንደሚኖረው የፍ/ህ/ቁ 1890(2) ይደነግጋል፡፡áŠĨንደዚሁም አሰáˆĒው áŠĒáˆŗáˆĢ á‰Ŗá‹­á‹°áˆ­áˆĩበá‰ĩ áŠĨáŠ•áŠŗ የመዘግየá‰ĩ á‰…áŒŖá‰ĩ ገንዘቡ ሊከፈለው áŠĨáŠ•á‹°áˆšáŒˆá‰Ŗ የፍ/ህ/ቁ 1892(1) ይደነግጋል፡፡áŠĨንግዲህ ተቋáˆĢጩ áŒáŠ•á‰Ŗá‰ŗá‹áŠ• በወቅቱ á‹Ģላጠናቀቀው አሰáˆĒውን ሆነ á‰Ĩሎ áˆˆáˆ˜áŒ‰á‹ŗá‰ĩ አáˆĩá‰Ļ ጉልህ በሆነ ቸልተኝነá‰ĩ ወይም á‰ áŠ¨á‰Ŗá‹ĩ áŒĨፋá‰ĩ መሆኑ የተረጋገጠ áŠĨንደሆነ አሰáˆĒው በውሉ ከተቀመጠው á‹¨á‰…áŒŖá‰ĩ ገንዘá‰Ĩ በላይ በደረሰበá‰ĩ á‰ĩክክለኛ áŒ‰á‹ŗá‰ĩ መጠን ልክ ከተቋáˆĢጩ ላይ áŠĒáˆŗáˆĢ ለመጠየቅ áŠĨንደሚá‰Ŋል የፍ/ህ/ቁ 1892(2) ይደነግጋል፡፡
*ሌላው የመዘግየá‰ĩ á‰…áŒŖá‰ĩ መጠን á‰ á‹ŗáŠžá‰Ŋ ሊቀነáˆĩ የሚá‰Ŋልበá‰ĩ áŠĨá‹ĩል áˆĩለመኖሩ የፍ/ህ/ቁ 1893 ይደነግጋል፡፡ይሄውም ተቋáˆĢጩ áŒá‹´á‰ŗá‹áŠ• በከፊል የፈጸመ ሆኖ ሲገኝ ነው፡፡ይህ ማለá‰ĩ ተቋáˆĢጩ á‰ŖáŠ¨áŠ“á‹ˆáŠá‹ áˆĩáˆĢ ሁሉ á‰…áŒŖá‰ĩ á‹¨áˆšáŒŖáˆá‰ á‰ĩ አይሆንም ማለá‰ĩ ነው፡፡
*በዚህ ረገá‹ĩ በሲá‰Ēል áŒáŠ•á‰Ŗá‰ŗ áˆĩáˆĢዎá‰Ŋ ቋሚ የውል áˆ˜á‰°á‹ŗá‹°áˆĒá‹Ģ አንቀáŒŊ 47(1) ላይ ተቋáˆĢጩ áˆĩáˆĢውን በውሉ የማጠናቀቂá‹Ģ ጊዜ áŠĢላጠናቀቀ ለዘገየበá‰ĩ ለáŠĨá‹ĢáŠ•á‹ŗáŠ•á‹ą ቀን የውሉን ዋጋ 1/1000 áŠĨንደሚከፍል áŠĨና ይሄውም አጠቃላይ መጠኑ ከውሉ ዋጋ ከ20% መá‰ĨለáŒĨ áŠĨንደማይá‰Ŋል ይደነግጋል፡፡ሆኖም ግን በከፊል ለተከናወነው áˆĩáˆĢ መሀንዲሱ ማረጋገáŒĢ ሰርተፍáŠŦá‰ĩ በሰጠ ጊዜ á‹¨á‰…áŒŖá‰ą መጠን የሚሰላው á‰Ŗáˆá‰°áŠ¨áŠ“á‹ˆáŠá‹ áˆĩáˆĢ መጠን ዋጋ ላይ በመመáˆĩረá‰ĩ ይሆናል ማለá‰ĩ ነው፡፡
*በመጨረáˆģም የመዘግየá‰ĩ á‰…áŒŖá‰ĩ በኛ ሀገር ከላይ áŠĨáŠ•á‹ŗá‹¨áŠá‹ áŠĨáŠ•á‹°á‰…áŒŖá‰ĩ የሚቆጠርና በህጉ á‰…áŒŖá‰ą áŠĨውቅና የሚሰጠው ሲሆን በኮመን ሎው የህግ áˆĩርአá‰ĩ ግን á‰…áŒŖá‰ĩ አይደለም፡፡በኮመን ሎው ሊኩዴá‰ĩá‹ĩ á‹ŗáˆœáŒ… በአሰáˆĒው ላይ ከደረሰው áŒ‰á‹ŗá‰ĩ ጋር áŠĨኩል ሆኖ መመዛዘን የሚኖርበá‰ĩ ሲሆን á‹¨á‰…áŒŖá‰ĩ አይነá‰ĩ á‰°áˆ˜áˆŗáˆŗá‹­ á‰Ŗáˆ…áˆĒ áŠĢለው ተፈáŒģሚነá‰ĩ አይኖረውም፡፡ አመሰግናለሁ!

@etconp
đŸ‘‰áŠŖáˆáŠ• áŠĨáˆĩቲ áˆĩለ Pile foundation á‰ĩንáˆŊ áŠĨንበል...
.
â–ļī¸Pile foundations are the part of a structure used to carry and transfer the load of the structure to the bearing ground located at some depth below ground surface.
*The main components of the foundation are the pile cap and the piles.
*Piles are relatively long and slender members used to transmit foundation loads through soil strata of low bearing capacity to deeper soil or rock having a higher bearing capacity
፡
â‡ī¸The purpose of apile foundation
💠to transmit a foundation load to a solid ground
💠to resist vertical ,lateral and uplift load
💠to reduce excessive settlement
፡
✅ When pile foundation is used ??
âžĄī¸The soil near the surface does not have sufficient bearing capacity to support the structural loads
âžĄī¸The estimate settlement of the soil exceed tolerable limits
âžĄī¸Differential settlement due to soil variability is happen
âžĄī¸The structural loads consist of lateral loads ,moments & uplift force singly or in combination
፡
âœŗī¸pile capacity
🔴The ultimate bearing capacity of a pile is the maximum load which it can carry without failure or excessive settlement of the ground
🔴The allowable load on a pile is the load which can be imposed upon it with an adequate margin of safety ,it may be the ultimate load divided by a suitable factor of safety,or the load at which the settlement reaches the allowable value
:
🅾The bearing capacity of apile depends on:-
👉The method of installation
👉pile c-xes such as pile length ,cross section ,and shape
👉soil configuration and short and long-term soil properties.

@etconp
👉ይህ በ ምáˆĩሉ የምá‰ĩመለከቱá‰ĩ በáˆĩፔን áˆŗáŒáˆĢá‹ŗ ፋሚáŠĸሊኤ የተሰኘ ቤተክርáˆĩቲá‹Ģን ላለፉá‰ĩ 130 áŠ áˆ˜á‰ŗá‰ĩ በላይ á‰ áŒáŠ•á‰Ŗá‰ŗ ላይ ይገኛልáĸ
â–ļī¸áŠĨáˆĩáŠĢሁን á‹Ģልተጠናቀቀ ሲሆን በፈረንጆቹ 2026 ይጠናቀቃል ተá‰Ĩሎ ይጠበቃልáĸ
👌ከ130 á‹“áˆ˜á‰ŗá‰ĩ በላይ á‹¨áŒáŠ•á‰Ŗá‰ŗ ሂደá‰ĩ á‹Ģለፈውን ቤተክርáˆĩቲá‹Ģን ለማየá‰ĩ በርáŠĢá‰ļá‰Ŋ ጓግተዋልáĸ
.
â–ļī¸á‹á‰Ĩ ምáˆŊá‰ĩ ተመኘን😍
Which one is correct ? Why? Use discussion group 👇đŸŋ
Busan South Korea 🇰🇷

ውá‰Ĩ ምáˆŊá‰ĩ ተመኘን
Without single degree , they built us roads that have lasted an eternity
Shanghai đŸ‡¨đŸ‡ŗ

ውá‰Ĩ ምáˆŊá‰ĩ ተመኘን
Columns are designed for minimum eccentricity

A. 10mm
B. 20mm
C. 40mm
D. All

Use discussion group and we justify the reason