One of the main disadvantages of the bar chart
for construction management is-
for construction management is-
Anonymous Quiz
15%
(a) The time schedule is not shown properly
19%
(b) Progress of the work cannot be monitored
25%
(c) The financial aspect is not shown
41%
(d) Does not show the interdependencies of the activity
π11β€3
The minimum gross pressure intensity at the
base of the foundation at which the soil fails in
shear is called as :
base of the foundation at which the soil fails in
shear is called as :
Anonymous Quiz
42%
(a) Ultimate bearing capacity
11%
(b) Net safe bearing capacity
35%
(c) Allowable bearing capacity
12%
(d) Safe bearing capacity
β€7
Sand pile are primarily used for
Anonymous Quiz
38%
a) increasing the bearing capacity of soil
13%
(b) accelerating the total settlement
21%
(c) to reduce the settlement
28%
(d) to increase shear strength of soil
π4β€2π1
For upstream face of an earth dam, the most
adverse condition for stability of slope, is:
adverse condition for stability of slope, is:
Anonymous Quiz
28%
(a) sudden draw down.
36%
(b) steady seepage condition.
11%
(c) during construction.
25%
(d) during overflowing.
π₯3π2
The yield of retaining wall required to reach
failure is
failure is
Anonymous Quiz
37%
(a) More for the active state
28%
(b) More for the passive state
23%
(c) Equal for both active and passive
12%
(d) No yield necessary
β€5π1
Treatment required for raw water containing
only carbon dioxide and odorous gases is
only carbon dioxide and odorous gases is
Anonymous Quiz
24%
(a) Plain sedimentation and chlorination
15%
(b) Chlorination only
44%
(c) Aeration followed by disinfection
16%
(d) Softening and chlorination
β€4
What type of beam will produce maximum
strain energy, if the uniformly distributed load
on its full length?
strain energy, if the uniformly distributed load
on its full length?
Anonymous Quiz
45%
(a) Fixed beam
15%
(b) Propped cantilever
21%
(c) Simply supported
19%
(d) Cantilever
β€6π1
In case of two way slab, the limiting deflection
of the slab is .....................
of the slab is .....................
Anonymous Quiz
27%
(a) Primarily a function of the long span
30%
(b) Primarily a function of the short span
11%
(c) Independent of long or short span
32%
(d) Dependent on both long and short spans
π3β€2π₯°2π1
The project is falling behind schedule, and the team lead reports that they do not have enough skilled resources to complete a key task on time.
What should the project manager do FIRST?
What should the project manager do FIRST?
Anonymous Quiz
11%
A. Cut a non-essential feature from the project scope.
16%
B. Ask the team to work overtime to meet the deadline.
61%
C. Meet with the team lead to assess the resource needs and current workload.
11%
D. Immediately request more resources from the project sponsor.
β€4π1
A supplier delivers substandard sand. Your site team wants to use it to maintain schedule, arguing the defect is minor. The schedule is already delayed by 3 weeks, and replacing the supplier may cause further delays.
What You should do?
What You should do?
Anonymous Quiz
15%
A. Accept the material to avoid additional delay
68%
B. Conduct a technical impact assessment on structural quality
6%
C. Escalate to sponsor for decision
11%
D. Reject material and order from a new supplier
π8β€1
A key piece of construction equipment breaks down, and repairs will take two weeks. The site supervisor requests immediate rental of a replacement at a much higher cost. What should the project manager do FIRST?
Anonymous Quiz
10%
A. Approve the rental to avoid work stoppage
81%
B. Perform a cost-benefit analysis of renting vs. waiting
5%
C. Escalate the issue to senior management
5%
D. Update the procurement management plan
β€5π1
During construction of a high-rise building, a government agency issues a new regulation that directly impacts your ongoing works and will require design modifications. What should the project manager do FIRST?
Anonymous Quiz
14%
A. Stop the project until the regulation is fully clarified
69%
B. Assess the impact of the regulation on scope, cost, and schedule
12%
C. Raise a formal change request immediately
6%
D. Escalate the issue to the project sponsor
π5π₯°2β€1
You discover that a critical material was delivered late because the procurement team miscommunicated the required delivery date to the supplier. What should the project manager do FIRST?
Anonymous Quiz
8%
A. Escalate the issue to senior management
14%
B. Update the lessons learned register and risk register
72%
C. Analyze how the delay impacts the projectβs critical path
6%
D. Replace the supplier for better performance
A vendor delivers sand to site, but quality tests reveal it doesnβt meet the the required grade specified in the contract. The site team is pressuring to use it to avoid delay. What should the project manager do FIRST?
Anonymous Quiz
12%
A. Approve usage of the cement if supplier provides a discount
53%
B. Review quality specifications and contract terms
9%
C. Escalate the issue to the sponsor for decision
27%
D. Order a new batch immediately to avoid risks
β€2