What is the maximum permissible differential settlement for isolated foundation on clay as per I.S code ?
Anonymous Quiz
29%
25 mm
13%
30 mm
43%
25 mm to 40 mm
10%
40 mm
5%
65 mm
❤10
Anchor bolt are provided in column mainly due to see which function /functions?

1.  Resist tension force 2. Keep the column upright during erection 3. Serve as reinforcement in concrete pedestal below the base plate
Anonymous Quiz
22%
1 & 3 only
34%
2 & 3 only
19%
1 & 2 only
25%
All of these above
👏4❤1
The test used to evaluate the load supporting capacity of supporting power of pavement layers is
Anonymous Quiz
15%
California resistance value test
20%
Plate bearing test
55%
California bearing ratio test
10%
Triaxial test
❤6
The optimum number of revolution in which concrete is required to be mixed in a mixer machine is
Anonymous Quiz
30%
25 revolution in 3 minute
26%
20 revolution in 2.5 or 3 minute
32%
25 revolution in 3 or 4 minute
11%
30 revolution in 3 or 4 minute
❤6
For self - compacted concrete water / powder ratio by volume should be
Anonymous Quiz
45%
0.8 to 1.0
27%
1.2 to 1.4
18%
2 to 3
10%
1 to 1.2
👏3❤2
Cone dimensions of slump test , Bottom diameter , top diameter , height respectively is.
Anonymous Quiz
20%
7 , 3 , 13 inch
24%
6, 2 , 14 inch
35%
9 , 3 , 15 inch
21%
8 , 3 , 12 inch
❤6
Study the following statements and identify the correct options:
1. The going of step is the vertical distance between two successive riser - faces
2.String is the sloping members which support the steps in a stair. They run along the slope if the stair.
Anonymous Quiz
25%
A is true but B is fasle
32%
A is false but B is true
30%
Both are true
8%
Both are fasle
4%
Information insufficient
❤3🎉2
The effective length of compression flange of a simply support beam not restrained against rotation torsion at ends is K times the span , where k is
Anonymous Quiz
24%
1.20
25%
0.70
39%
0.85
12%
1.0
🙏6❤1🔥1
The effective length of a masonry wall depends on:
Anonymous Quiz
65%
A) Thickness of wall
13%
B) Type of mortar
19%
C) End conditions
4%
D) Type of plaster used
🔥2❤1
For masonry walls subjected to axial load, the maximum slenderness ratio as per IS 1905 should not exceed:
Anonymous Quiz
37%
A) 12
34%
B) 18
23%
C) 24
6%
D) 27
❤2👍2🎉1
The permissible limit of water absorption for coarse aggregates used in concrete should not exceed:
Anonymous Quiz
23%
A) 1%
32%
B) 2%
24%
C) 3%
21%
D) 5%
👏4❤1
👉Ultrasonic Pulse Velocity Concrete test/UPV test/

💫UPV ኮንክሪት ቴስት ምንድነው?

⏺የኮንክሪት ስትራክቸሩ ላይ ምንም አይነት ተቆርጦ የሚወጣ ሳምፕል ሳይወሰድ/Nestructive test (NDT)/ የሚሰራ ነው።

▶️በኮንክሪት ውስጥ የሚሄድ የድምፅ ማዕበል/Saund Wave/ Ultrasonic pulse/ ፍጥነትን በመለካት ስለኮንክሪቱ የጥራት ደረጃ/Overall Quality/ ይነግረናል።

🎲ይኽውም:-

1.ወጥነት ያለው የኮንክሪት ጥራት መኖሩን/Check uniformity in different parts of the concrete structure/

2.የግድፈቶችን አካቢዎችን ይለይልናል/Defects like Crack, Voids, honeycombing, or Poor compaction/

3.በሌላ መልኩ የኮንክሪት ጥንካሬውን ደረጃ ለማወቅ ይረዳል።/Estimate quality of Concrete indirectly/

ውጤቱ የሚያሳየው:
i) ፈጣን ድምፅ ሞገድ/Fast wave travel/ከሆነ:
ኮንክሪቱ በቂ እፍግታ ያለው መሆኑንና ወጥና ጥራት ያለው  ሙሊት መኖሩን ይነግረናል።

ii) ዘገምተኛ የድምፅ ሞገድ/Slow velocity sound wave/ከሆነ: በተቃራኒ ሆኖ በተጨማሪም በኮንክሪቱ የውስጥ ክፍል ላይ ክራክ/Severe cruck, voids ወይም honeycombingና በአጠቃላይ ደካማ የኮንክሪት ክፍል/Weak zone/ መኖሩን ይጠቁመናል ማለት ነው

UPV ቴስት በአብዛኛው ሀመር ቴስትን ተክቶ ሊሰራ የሚችል ሲሆን ተደራቢ ሙከራ ሆኖ ሊያገለግል ይችላል። የUPV ቴስት ውጤትን ተከትሎ እንደሁኔታው Core Test ማድረግ አስገዳጅ ሊሆን ይችላል።

UPV ቴስት የኮንክሪትን አጠቃላይ የኮንክሪት ጥራት ደረጃን ለመገምገም ቀላልና ፈጣኑ የቴስት ዓይነት ነው።

@etconp
❤11👍1🥰1
“Recovery schedules in construction”

@etconp👇
❤3
Ethio Construction Engineering
“Recovery schedules in construction” @etconp👇
👉“Recovery schedules in construction”

💫Recovery schedules are not just updated programs—they're your strategic response to delay, and a commitment to realignment.

🚧Here are the key steps to prepare a proper Recovery Schedule:

1. Remove the Assigned

⏺Baseline Detach the current baseline to allow a clean slate for schedule modifications.

2. Incorporate Approved Scope Changes

⏺Reflect any client-approved changes in the schedule that impact the timeline or resources.

3. Fix Out-of-Sequence Activities

⏺Review the logic and correct any activities that are not following a logical sequence.

4. Adjust Project and Milestone Dates

⏺Use schedule compression techniques like crashing (more resources) or fast-tracking (parallel activities) to meet revised deadlines.

5. Update Remaining Early Start Dates

⏺Reset early start dates of in-progress activities to reflect a realistic continuation from the current data date.

6. Cost Loading (if applicable)

⏺Adjust or include cost data for relevant activities to maintain alignment between cost and schedule.

7. Fix Remaining Durations

⏺Eliminate decimal durations to simplify calculations and enhance clarity.

8. Update Actual Start Dates

⏺Make sure all actual start dates are accurate for in-progress tasks based on current progress.

9. Perform Global Changes

⏺Apply logical, approved global changes to clean up the schedule and align planned vs actual durations and dates.

10. Monitor and Iterate
Continuously review

⏺performance against the recovery schedule and adjust based on new developments or risks.

💫Tip: Always support your recovery schedule with a narrative explaining what changed, how recovery will be achieved, and why the revised plan is credible.

🏷For Ms Project Tuetorial Visit Our YouTube Channel👇

https://youtube.com/@ethiopianconstruction?si=YPBAC3MRTl5Uu6BK

Via Yonatan Tadesse, PMP®

@etconp
❤8🙏3
_@etconp_2018_1st_Quarter_CONSTRUCTION_WORKS_ONLY_DIRECT_COST.pdf
24.2 MB
🏷በ2018 ዓ.ም አንደኛ ሩብ ዓመት ተግባራዊ የሚደረግ የግንባታ ሥራዎች ይፋዊ ቀጥተኛ ዋጋ ተመን (1st Quarter Construction Works of Direct Cost)

🔑በተለይ የዋጋ ተመን (BOQ - Priced bill of Quantities) ለምታወጡ የዲዛይን አማካሪዎች እና የፕሮጀክት መሐንዲሶች ይጠማችኋል።

💫በሌሎች የሀገሪቱ ክፍሎች የምትገኙ የኮንስትራክሽን ባለሙያዎችም እንደመነሻ ሀሳብ ይጠቅማችኋል።


🏷YouTube👇
https://youtube.com/@ethiopianconstruction?si=YPBAC3MRTl5Uu6BK

🌟Vacancy And Tender👇
https://t.me/ETCONpWORK

@etconp
🙏12❤10
👉Colloidal silica is a suspension of fine silica (silicon dioxide) particles in a liquid, usually water.

@etconp 👇
❤3
Ethio Construction Engineering
👉Colloidal silica is a suspension of fine silica (silicon dioxide) particles in a liquid, usually water. @etconp 👇
👉Colloidal silica

⭐️Colloidal silica is a suspension of fine silica (silicon dioxide) particles in a liquid, usually water.

⏺Its history dates back to the mid-20th century, with the first patent granted in 1959.

🎲These nanoparticle silica sols exhibit unique properties due to their small size (typically 5 to 100 nanometers) and high surface area, making them valuable in many applications, including construction.

📜History and Chemical Composition

⏺Colloidal silica was first introduced as a technical material by Bryan H. Green in the United States in the late 1950s.

⏺It consists of amorphous, nonporous, typically spherical silica particles dispersed in water.

⏺The particles carry a negative surface charge, stabilized by pH adjustment or additives.

⏺The chemical composition is primarily silicon dioxide (SiO2), with some variations where silicon atoms may be partially replaced by aluminum to enhance stability.

⏺The particles are produced through polymerization of silica nuclei from silicate solutions under alkaline conditions.

📍Advantages of Colloidal Silica in Ethiopia

❇️Using colloidal silica in construction in Ethiopia offers several advantages:

• Enhanced strength and durability of concrete structures, important for infrastructure development.
• Pore water reduction, free alkali content reduction, reduction in permeability and improved resistance to environmental damage, which is valuable in Ethiopia’s varied climates.
• Faster curing times aiding accelerated project timelines.
• Potential economic benefits by reducing maintenance costs and improving lifespan of buildings and roads.

📍Resources in Ethiopia for Production

⏺Ethiopia has abundant natural resources suitable for producing colloidal silica.

▶️Notably, the Jema River region holds extensive silica sand reserves, which can be processed to produce high-quality silica materials.

🔰Establishing local production facilities could reduce reliance on imports, lower costs, create jobs, and support Ethiopia’s growing industrial and construction sectors.

⏺The availability of local silica sand combined with emerging processing technologies makes Ethiopia a promising location for colloidal silica manufacture.
In summary, colloidal silica is a nanoscale silica suspension with a proven ability to improve construction materials’ strength and durability.

⏺Ethiopia’s natural silica resources offer opportunities for local production, which could greatly benefit the construction industry and economic development.

⏺The integration of colloidal silica as an additive in Ethiopian construction projects can enhance infrastructure quality and longevity while fostering domestic industrial growth.

Via Yonatan Tadesse, PMP®


@etconp
❤9👍5
👉የአዲስ አበባ ዲዛይንና ግንባታ ስራዎች ቢሮ በዓዋጅ የተሰጡትን ተግባራት ዕውን ለማድረግ ያስችለው ዘንድ በ2018 በጀት ዓመት ከ10 የከተማ አስተዳደሩ ተቋማት ጋር ቅንጅታዊ ትስስር ስምምነት ሰነድ መፈራረሙን ተከትሎ በዛሬው ዕለት  የመጀመሪያውን ሩብ ዓመት አፈፃፀም ገምግሟል፡፡

የተፈጠረው ቅንጅትም ቢሮው የመፈፀም አቅሙ እንዲያድግ ፤ አገልግሎት አሰጣጡን እንዲያሻሽል ፤ የመልካም አስተዳደር ጥያቄዎች አፋጣኝ መልስ እንዲያገኙ ፤ የህዝብ ሀብት ለተገቢው ዓላማ እንዲውል ፤ ከወሰን ማስከበር ጋር ተያይዘው የሚመጡ የፕሮጀክት መዘግየቶች እንዲቀሩ ፤ የመሰረተ ልማት ዝርጋታዎች እንዲሳለጡ ባጠቃላይ የሕብረተሰቡ ተጠቃሚነት እንዲረጋገጡና የተሻለ አፈፃፀም እንዲያስመዘግብ አስቻይ ሁኔታዎችን ፈጥሯል ተብሏል።

በጊዜ ማዕቀፉ ተቋማት በአዋጅ በተሰጠ ተግባር ላይ መሰረት አድርጎ ያለማቀድ ፤  በተቋም የሚሰሩ መደበኛ ስራዎችን ወደ ትስስር እቅድ ማምጣት ፤ በስምምነት የታቀዱ ተግባራትን መከታተልና ሪፖርት መላክ ላይ የሚታዩ ክፍተቶች በውስንነት የተገመገሙ ሲሆን በቀጣይ ሩብ አመት ከአሁኑ በተደረገው ቅንጅት መነሻነት የከተማዋን ፕሮጀክት አፈፃፀም ውጤታማነት ለማረጋገጥ እንደሚሰራ ተመኣክቷል።

Via አዲስ አበባ ዲዛይንና ግንባታ ስራዎች ቢሮ ኮሙኒኬሽን ጉዳዮች ዳይሬክቶሬት

@etconp