Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.21K links
πŸ”¨ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

πŸ“¨ @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
πŸ‘‰αˆ°αˆ‹αˆ ውዡ α‰€α‰°αˆ°α‰¦α‰»α‰½αŠ•

πŸ’«α‰₯α‹™ αˆ°α‹Žα‰½ የ Thesis αŠ₯αŠ“ Internship αˆ³αˆα•αˆŽα‰½ αˆ‹αŠ©αˆαŠ• α‰₯αˆ‹α‰Ήα‹‹αˆ

πŸš§αˆ΅αˆˆα‹šαˆ… α‹›αˆ¬ የ Thesis αˆ³αˆα•αˆ αŠ₯αŠ•αˆˆα‰…αˆ‹α‰Ήα‹‹αˆˆαŠ• ነገ α‹°αˆž Internship αˆ³αˆα•αˆ αŠ₯αŠ•αˆαŠ­αˆ‹α‰Ήα‹‹αˆαŠ•πŸ™ πŸ‘‡

@etconp
πŸ™5❀2
THESIS_ON_BUILDING_DESIGN,_EXCEL.pdf
10.2 MB
FOR THOSE OF YOU DOING YOUR THESIS (SENIOR ESSEY) IN STRUCTURAL DESIGN THIS FILE IS HELPFUL. IT ENCOMPASSES:

1. SOLID, RIBBED, FLAT AND WAFFLE SLAB DESIGN AND COST COMPARISON

2. DOG LEGGED, OPEN NEWEL & FREE STANDING STAIR ANALYSIS AND DESIGN

3. EXCEL TEMPLATE PREPARATION FOR 11 TYPES OF STAIRS

4. EXCEL TEMPLATE PREPARATION FOR NON-RECTANGULAR SLABS SUCH AS TRAPIZOIDAL SLAB AND SUCH.

5. MOMENT COEFFICIENT PREPARATION FOR TRAPIZOIDAL SLAB

6. ANALYSIS AND DESIGN OF 2B+G+M+15 OFFICE BUILDING

PART OF IT WAS PUBLISHED IN THE JOURNAL OF ETHIOPIAN CIVIL ENGINEERING ASSOCIATION

I HOPE IT IS HELPS!

https://t.me/ETCONpWORK

@etconp
❀9πŸ‘5
Abubeker Jemal.pdf
689 KB
▢️Thesis samples on Telegram @COTMp

https://t.me/ETCONpWORK

@etconp
❀1
πŸ‘†πŸ‘†πŸ‘†
πŸ‘‰Hello Our Channel Families

πŸ’«Here Are Thesis Project Samples

🚧Tomorrow We Will Realises Internship Report Samples

@etconp
πŸ™6❀1
πŸ‘‰ INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

πŸ”Ή Address 1: Signal road, around
Dinberwa Hospital

πŸ”Ή Addres 2: Wellosefer, Infront of
Dani Plaza
❀2
πŸ‘‰Site Engineer’s responsibilities during the construction of Reinforced Concrete slabs β€” step by step, from preparation to completion:

🧱 1. Pre-Construction Responsibilities
Before slab work starts, the site engineer must:

⏺Check drawings and specifications: Review structural and architectural drawings (reinforcement details, slab thickness, beam layout, and column locations).
⏺Verify formwork setup: Ensure the formwork/shuttering is correctly placed, level, and properly supported to prevent sagging or deflection.
⏺Confirm materials: Check the quality of cement, aggregates, water, and reinforcement bars according to standards.
⏺Ensure correct cover: Verify that proper cover blocks are provided for top and bottom reinforcement as per design.
⏺Inspect services layout: Coordinate with electrical and plumbing teams so conduits and pipes are placed before concreting.

πŸ”© 2. Reinforcement Work Supervision
Check bar bending schedule (BBS):

⏺Ensure bars are cut, bent, and placed as per approved BBS.
⏺Rebar placement: Confirm correct spacing, overlap (lapping length), anchorage, and alignment of top and bottom meshes.
⏺Support and chairs: Verify that proper spacers and chairs are provided to maintain reinforcement position.
⏺Inspection before concreting: Ensure all reinforcement and embedded items (pipes, sleeves, inserts) are inspected and approved by the structural engineer or consultant.

🧰 3. Formwork & Level Control

⏺Form alignment: Confirm formwork is tight, clean, and oiled to prevent leakage.
⏺Level and slope: Use leveling instruments to ensure the slab surface will be even and at correct height.
⏺Joint sealing: Check joints in shuttering to avoid cement slurry leakage during pouring.

πŸ§ͺ 4. Concreting Work

⏺Mix verification: Ensure the concrete mix ratio and slump meet the approved design (trial mix results).
⏺Pouring supervision: Oversee concrete pouring in layers and prevent segregation.
⏺Vibration: Ensure proper compaction with mechanical vibrators to avoid honeycombing or voids.
⏺Curing compound (if used): Ensure correct application for flat slabs, especially in large surface areas.

πŸ’§ 5. Curing and Finishing

⏺Curing: Ensure continuous curing for at least 7–21 days (depending on cement type) using water ponding or wet coverings & Admixtures.
⏺Surface finishing: Check for surface smoothness, slopes (if any), and cracks after curing starts.
⏺Remove formwork: Only after achieving sufficient strength (as per engineer’s direction).

🧾 6. Documentation and Quality Control

⏺Maintain daily site records, concrete cube test reports, and pour cards.
⏺Record slump test results, concrete delivery times, and curing logs.
⏺Prepare as-built reports and update site diary regularly.

πŸ§β€β™‚οΈ 7. Safety Responsibilities

⏺Ensure workers wear PPEs (helmets, gloves, boots).
⏺Check formwork safety before pouring.
⏺Prevent overloading on slab before achieving full strength.

@etconp
❀12πŸ‘4πŸ‘1