๐Road Super Elevation
๐ซSuper elevation is the tilting of the road surface at a curve so that the outer edge of the pavement is raised above the inner edge.
โบIt helps counteract the effect of centrifugal force on vehicles moving along curved paths.
โญ๏ธPurpose of Super Elevation
โ๏ธTo reduce the tendency of vehicles to overturn or skid outward.
โ๏ธTo provide comfort and safety to drivers.
โ๏ธTo allow vehicles to negotiate curves at higher speeds smoothly.
โ๏ธ Formula
๐ฐe + f = V2/127R
๐ฒWhere:
โบe = rate of super elevation (m/m)
โบf = lateral friction factor (usually 0.15)
โบv = speed of vehicle (km/hr)
โบR = radius of curve (m)
๐ Design Steps
1. Calculate required super elevation using the above formula.
2. Limit the maximum super elevation (generally 1 in 15 to 1 in 20, or 7% for highways).
3. Provide transition length for smooth rise.
๐ฃ๏ธ Methods of Providing Super Elevation
โนBy rotating the pavement about the inner edge.
โนBy raising the outer edge with respect to the center.
โนBy rotating about the center line (commonly used method).
โ ๏ธ Limitations
โก๏ธNot suitable for urban roads with slow-moving traffic.
โก๏ธExcessive super elevation can cause problems for slow or parked vehicles.
๐Advantages
โบIncreases vehicle stability.
โบReduces side friction demand.
โบEnhances comfort and safety at curves.
@etconp
๐ซSuper elevation is the tilting of the road surface at a curve so that the outer edge of the pavement is raised above the inner edge.
โบIt helps counteract the effect of centrifugal force on vehicles moving along curved paths.
โญ๏ธPurpose of Super Elevation
โ๏ธTo reduce the tendency of vehicles to overturn or skid outward.
โ๏ธTo provide comfort and safety to drivers.
โ๏ธTo allow vehicles to negotiate curves at higher speeds smoothly.
โ๏ธ Formula
๐ฐe + f = V2/127R
๐ฒWhere:
โบe = rate of super elevation (m/m)
โบf = lateral friction factor (usually 0.15)
โบv = speed of vehicle (km/hr)
โบR = radius of curve (m)
๐ Design Steps
1. Calculate required super elevation using the above formula.
2. Limit the maximum super elevation (generally 1 in 15 to 1 in 20, or 7% for highways).
3. Provide transition length for smooth rise.
๐ฃ๏ธ Methods of Providing Super Elevation
โนBy rotating the pavement about the inner edge.
โนBy raising the outer edge with respect to the center.
โนBy rotating about the center line (commonly used method).
โ ๏ธ Limitations
โก๏ธNot suitable for urban roads with slow-moving traffic.
โก๏ธExcessive super elevation can cause problems for slow or parked vehicles.
๐Advantages
โบIncreases vehicle stability.
โบReduces side friction demand.
โบEnhances comfort and safety at curves.
@etconp
โค10๐4
#ADVERTISEMENT
๐แแแแฃแณแ แแ แต แฅแแ แตแ แแแตแแแแ แจแแแฃแณ แ แแ แแฐ แฅแ แญแฐแแแข
๐ซAR Building Finishing & Water Proofing Works แแ แแแแฝ แแ แต แแฃแชแแฝ แแ
๐งแ แแฉ แฅแซแต แจแแแฝแแ แตแซแแ แ แ แแแ แคแตแ แแ แต แ แแแ แแ แฅแแตแจแญแฅแแณแแแข
๐แจแแแชแซ แคแต แฅแตแจ แตแแแ แ แแแแฝ แ แปแซแฝแแ แ แณแญแแแแข
โถ๏ธContextra
โถ๏ธFine quartez
โถ๏ธ Water Proofing Chemicals
โถ๏ธ Membranes แ แฅแซแต แฅแแฐแซแแแข
๐ฒแ แฐแจแแช แจ Sales แตแซแแฝ แฅแแฐแซแแ
๐แ แตแซแป:โแกแซแคแ แแญแแแ แ แแ
แตแแญ 0977 67 67 90
0912 23 04 71
๐ซAR Building Finishing & Water Proofing Works
๐แดแแแซแ๐
https://t.me/antearb
https://t.me/antearb
https://t.me/antearb
๐แแแแฃแณแ แแ แต แฅแแ แตแ แแแตแแแแ แจแแแฃแณ แ แแ แแฐ แฅแ แญแฐแแแข
๐ซAR Building Finishing & Water Proofing Works แแ แแแแฝ แแ แต แแฃแชแแฝ แแ
๐งแ แแฉ แฅแซแต แจแแแฝแแ แตแซแแ แ แ แแแ แคแตแ แแ แต แ แแแ แแ แฅแแตแจแญแฅแแณแแแข
๐แจแแแชแซ แคแต แฅแตแจ แตแแแ แ แแแแฝ แ แปแซแฝแแ แ แณแญแแแแข
โถ๏ธContextra
โถ๏ธFine quartez
โถ๏ธ Water Proofing Chemicals
โถ๏ธ Membranes แ แฅแซแต แฅแแฐแซแแแข
๐ฒแ แฐแจแแช แจ Sales แตแซแแฝ แฅแแฐแซแแ
๐แ แตแซแป:โแกแซแคแ แแญแแแ แ แแ
แตแแญ 0977 67 67 90
0912 23 04 71
๐ซAR Building Finishing & Water Proofing Works
๐แดแแแซแ๐
https://t.me/antearb
https://t.me/antearb
https://t.me/antearb
โค4๐1
๐Steps for Implementing a Potable Water Supply Project:
๐ซ1. Feasibility Study
- Evaluation of potable water needs
- Identification of available water sources
๐ซ2. Project Design
- Design of the water supply network
- Calculation of flow rates and pressures
๐ซ3. Environmental Impact Assessment
- Evaluation of potential environmental impacts
- Development of mitigation measures
๐ซ4. Land Acquisition
- Acquisition of land required for the project
- Compensation of landowners
๐ซ5. Tendering and Contracting
- Preparation of tender documents
- Selection of contractors and award of contracts
๐ซ6. Construction
- Site preparation and excavation
- Installation of pipes and equipment
- Connection to existing network
๐ซ7. Commissioning and Testing
- Verification of water quality
@etconp
๐ซ1. Feasibility Study
- Evaluation of potable water needs
- Identification of available water sources
๐ซ2. Project Design
- Design of the water supply network
- Calculation of flow rates and pressures
๐ซ3. Environmental Impact Assessment
- Evaluation of potential environmental impacts
- Development of mitigation measures
๐ซ4. Land Acquisition
- Acquisition of land required for the project
- Compensation of landowners
๐ซ5. Tendering and Contracting
- Preparation of tender documents
- Selection of contractors and award of contracts
๐ซ6. Construction
- Site preparation and excavation
- Installation of pipes and equipment
- Connection to existing network
๐ซ7. Commissioning and Testing
- Verification of water quality
@etconp
โค6๐6
๐Objectives of Soil Investigation
๐ซ1. To determine the type and stratification (layers) of soil beneath the site.
๐ซ2. To find out the bearing capacity of the soil how much load it can safely support.
๐ซ3. To determine the depth of the water table (groundwater level).
๐ซ4. To detect any weak or problematic soils (e.g., expansive clay, peat).
๐ซ5. To recommend the most suitable type of foundation (e.g., raft, pad, pile).
๐ซ6. To estimate settlement and stability under loading.
@etconp
๐ซ1. To determine the type and stratification (layers) of soil beneath the site.
๐ซ2. To find out the bearing capacity of the soil how much load it can safely support.
๐ซ3. To determine the depth of the water table (groundwater level).
๐ซ4. To detect any weak or problematic soils (e.g., expansive clay, peat).
๐ซ5. To recommend the most suitable type of foundation (e.g., raft, pad, pile).
๐ซ6. To estimate settlement and stability under loading.
@etconp
โค13๐2
The capillary porosity of a cement paste depends on:
Anonymous Quiz
14%
the cement content and the curing
68%
the water/cement ratio and the curing
4%
only the curing
14%
the water content and the curing
๐7โค3
๐ฉโ๐ซ What are the main raw materials used in the manufacture of portland cement?
Anonymous Quiz
20%
limestone and quartz
8%
clay and gypsum
36%
limestone and clay
37%
limestone and gypsum
โค9๐1
Which of the following is not a work of "Accelerators?"
Anonymous Quiz
17%
They make the hydration process faster.
17%
They make the setting time shorter.
15%
They make the hardening sooner.
51%
None of the above.
โค4๐1
What physical unit and parameter are directly measured in the Slump Test to assess the workability and consistency of concrete at its fresh state?
Anonymous Quiz
20%
Length; The average diameter that a sample of concrete has slumped on the surface of the tray.
59%
Variation in height; The initial-final altitude of the concrete slump upon the Abram's Cone removal.
10%
Speed; How fast concrete slumps in the absence of vibrations over definite time intervals.
11%
Volume; The estimated amount of concrete retained within the inferior opening of the Abram Cone.
โค3๐3
Which characteristic of Expansive Cement is ideal, especially after its setting time?
Anonymous Quiz
39%
It expands internally resulting to a compaction and compression, leading to higher strength.
24%
Its grains shrink, guaranteeing maximum workability and lower water:cement ratio.
21%
Its C-S-H swells, giving off a bleeding phenomenon that hydrates and protects the structure.
17%
Oxides and Sulphates on its surface are repelled, favoring high resistance to corrosion.
โค5
Besides increasing compressive strength in concrete, the main purpose of correct curing is:
Anonymous Quiz
39%
to make it less sensitive to environmental attacks
9%
to lead to a eutectic formation
32%
to maintain a higher amount of adsorbed liquid water
20%
to guarantee a higher flexural elongation
๐3๐1
The phenomenon in concrete wherein larger aggregates fall towards the lower part of the pour is termed as:
Anonymous Quiz
81%
segregation
9%
bleeding
7%
compaction
3%
curing
๐6โค2
The Slump Test is used to measure concrete's:
Anonymous Quiz
3%
Vebe Time
4%
Unit Weight
10%
Ratio of porosity to sieve size
83%
Workability
๐7โค1๐ฅ1
Void ratio is the ratio of:
Anonymous Quiz
48%
volume of voids to total volume
31%
volume of voids to volume of solids
11%
volume of solids to volume of voids
11%
volume of soil mass to volume of voids
โค9
In wet soil mass, air occupies one-seventh of its volume and water occupies one-eighth of its volume. The void ratio of the soil is:
Anonymous Quiz
43%
0.25
26%
0.36
19%
0.43
12%
1
โค9๐2
To control corrosion in concrete, which characteristic is needed?
Anonymous Quiz
50%
Low permeability
25%
Low thermal coefficient
15%
More cement content
10%
Coarser aggregates
๐4๐3
For a fully saturated soil sample, the Volume of voids is equal to:
Anonymous Quiz
20%
Volume of air
40%
Volume of water
25%
Volume of air and Volume of water
15%
Volume of water and Volume of solids
๐ฅ2
Compaction is done to:
Anonymous Quiz
5%
Place concrete on a flat surface
13%
Increase the volume of solids
77%
Remove air bubbles
5%
Increase the void ratio
๐5โค1๐ฅ1
Which component of steel is now reduced by engineers to avoid brittle failures?
Anonymous Quiz
19%
Alumina
55%
Carbon
6%
Patina
19%
Iron
โค3
Which of the following types of cement is used in marine environments?
Anonymous Quiz
12%
Expanding cement
35%
High Alumina Cement
36%
Blast furnace slag cement
18%
White cement
๐3โค1