๐Avoid construction disputes
โบPrevent conflicts before they start! Clear contracts, proper planning, and transparent communication are the keys to a smooth construction project.
โญ๏ธHow to Avoid
Construction Disputes.
๐Clear Contract
๐Write down scope, timelines, and payments.
๐Document Everything
๐Keep records of drawings, approvals, and materials.
๐Good Communication
๐Talk regularly and share updates in writing.
๐Plan Properly
๐Schedule work realistically and identify risks.
๐Manage Changes
๐Record all changes with approvals and costs.
๐Check Quality
๐Inspect work regularly and fix problems early.
๐Timely Payments
๐Follow agreed payment schedule.
๐Follow Laws & Codes
๐Ensure work meets legal requirements.
๐Resolve lssues Early
๐Address small problems before they grow.
@etconp
โบPrevent conflicts before they start! Clear contracts, proper planning, and transparent communication are the keys to a smooth construction project.
โญ๏ธHow to Avoid
Construction Disputes.
๐Clear Contract
๐Write down scope, timelines, and payments.
๐Document Everything
๐Keep records of drawings, approvals, and materials.
๐Good Communication
๐Talk regularly and share updates in writing.
๐Plan Properly
๐Schedule work realistically and identify risks.
๐Manage Changes
๐Record all changes with approvals and costs.
๐Check Quality
๐Inspect work regularly and fix problems early.
๐Timely Payments
๐Follow agreed payment schedule.
๐Follow Laws & Codes
๐Ensure work meets legal requirements.
๐Resolve lssues Early
๐Address small problems before they grow.
@etconp
โค17
๐แแขแฐแฎแตแซ แ แญแญแดแญแถแฝ แแ
แ แญ แจแตแซ แ แตแแปแ แฆแณแแฝ แฅแซแตแแแ แแ แแแฝแ แญแ แแแข
๐แแญแแฉแ แจแณแฝ แ แฐแซแซแแ แจแแ แ แฉ แฆแแดแแ แแแแซ แญแแแจแฑแข
๐งAEA Members, it's an Election Year! ๐ณ
โบNominations are now open for the upcoming Executive Committee positions as part of the 25th Convention & Annual General Assembly.
โ๏ธ Self-nomination encouraged
โ๏ธ Submit one nomination at a time
โ๏ธ Nominate multiple people by reopening the link
โ๏ธ Add contact details of nominees for follow-up
โ๏ธHave someone in mind who would make a great EC member? Or ready to take the lead yourself?
๐ Submit your nomination here:๐ https://forms.gle/AQXKSfGgAqvnqceC6
โญ๏ธLetโs shape the future of our association together.
#AEA #ElectionYear #ArchitectsEthiopia #AGA25
@etconp
๐แแญแแฉแ แจแณแฝ แ แฐแซแซแแ แจแแ แ แฉ แฆแแดแแ แแแแซ แญแแแจแฑแข
๐งAEA Members, it's an Election Year! ๐ณ
โบNominations are now open for the upcoming Executive Committee positions as part of the 25th Convention & Annual General Assembly.
โ๏ธ Self-nomination encouraged
โ๏ธ Submit one nomination at a time
โ๏ธ Nominate multiple people by reopening the link
โ๏ธ Add contact details of nominees for follow-up
โ๏ธHave someone in mind who would make a great EC member? Or ready to take the lead yourself?
๐ Submit your nomination here:๐ https://forms.gle/AQXKSfGgAqvnqceC6
โญ๏ธLetโs shape the future of our association together.
#AEA #ElectionYear #ArchitectsEthiopia #AGA25
@etconp
Google Docs
Nomination Form | NEW Executive Committee (EC) Elections | 25th AGA & Convention
As part of the 25th Annual General Assembly and Convention of the Association of Ethiopian Architects (AEA), we invite all members to submit nominations for the new Executive Committee.
This nomination form accepts one nomination at a time, but members mayโฆ
This nomination form accepts one nomination at a time, but members mayโฆ
โค6
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค3
๐FORMWORK DISMANTLING:
๐ซFormwork dismantling, also known as stripping or striking, involves carefully removing the temporary molds used to shape concrete after it has hardened, ensuring the concrete structure is not damaged and that the formwork is handled safely.
๐ทHere's a more detailed breakdown of the process:
๐ง1. Timing is Crucial:
Wait for Concrete to Cure:
Formwork should only be removed after the concrete has gained sufficient strength to support itself.
๐Factors Affecting Curing Time:
The exact time depends on the concrete mix, ambient temperature, humidity, and the structure's load-bearing requirements.
Don't Rush:
Removing formwork prematurely can lead to structural failure or damage.
๐ง2. Safe Dismantling Practices:
Systematic Approach:
Develop a systematic method for releasing and lowering components in a controlled manner.
Start from the Top:
Remove the highest forms first, working downwards.
Use Appropriate Tools:
Use pry bars, hammers, or lifting equipment, as appropriate, to avoid damaging the concrete surface.
Avoid Damage:
Be careful not to damage the concrete, especially edges and corners.
Maintain Structural Balance:
Remove formwork on alternating sides to help maintain structural balance.
Safety First:
Use temporary platforms to minimize the risk of falls when stripping and ensure adequate lighting.
Protect Workers:
Protect workers from falling objects by setting up exclusion zones and installing warning signs.
Curing After Removal:
After removing the formwork, cover all exposed surfaces with polythene or wet hessian or แแแซ to prevent moisture loss for about 5 days, so that the concrete is fully cured.
๐ง3. Specific Considerations:
Vertical Formwork:
Often removed by using pry bars, hammers, or lifting equipment, as appropriate.
Horizontal Formwork:
May require props to be left under the slab until it gains sufficient strength.
Bridge Formwork:
Follow specific procedures for dismantling steel formwork of bridges, including removing supports and arches in a controlled manner.
Aluminum Formwork:
Follow specific procedures for construction and dismantling of aluminum alloy formwork, including removing diagonal supports and wall bolts.
๐ง4. Post-Dismantling:
Recycle or Dispose Responsibly:
If formwork is still in good condition, it may be reused for other parts of your project or stored for future projects.
Clean and Store:
Clean up the removed formwork and accessories in time, and transport them to the same position on the upper floor and lay them flat.
Maintenance:
Ensure the formwork is carefully handled at all times to maintain its value and operational readiness.
Waste Removal:
Damaged material Boards shall be removed as per Ethiopian waste management procedures.
@etconp
๐ซFormwork dismantling, also known as stripping or striking, involves carefully removing the temporary molds used to shape concrete after it has hardened, ensuring the concrete structure is not damaged and that the formwork is handled safely.
๐ทHere's a more detailed breakdown of the process:
๐ง1. Timing is Crucial:
Wait for Concrete to Cure:
Formwork should only be removed after the concrete has gained sufficient strength to support itself.
๐Factors Affecting Curing Time:
The exact time depends on the concrete mix, ambient temperature, humidity, and the structure's load-bearing requirements.
Don't Rush:
Removing formwork prematurely can lead to structural failure or damage.
๐ง2. Safe Dismantling Practices:
Systematic Approach:
Develop a systematic method for releasing and lowering components in a controlled manner.
Start from the Top:
Remove the highest forms first, working downwards.
Use Appropriate Tools:
Use pry bars, hammers, or lifting equipment, as appropriate, to avoid damaging the concrete surface.
Avoid Damage:
Be careful not to damage the concrete, especially edges and corners.
Maintain Structural Balance:
Remove formwork on alternating sides to help maintain structural balance.
Safety First:
Use temporary platforms to minimize the risk of falls when stripping and ensure adequate lighting.
Protect Workers:
Protect workers from falling objects by setting up exclusion zones and installing warning signs.
Curing After Removal:
After removing the formwork, cover all exposed surfaces with polythene or wet hessian or แแแซ to prevent moisture loss for about 5 days, so that the concrete is fully cured.
๐ง3. Specific Considerations:
Vertical Formwork:
Often removed by using pry bars, hammers, or lifting equipment, as appropriate.
Horizontal Formwork:
May require props to be left under the slab until it gains sufficient strength.
Bridge Formwork:
Follow specific procedures for dismantling steel formwork of bridges, including removing supports and arches in a controlled manner.
Aluminum Formwork:
Follow specific procedures for construction and dismantling of aluminum alloy formwork, including removing diagonal supports and wall bolts.
๐ง4. Post-Dismantling:
Recycle or Dispose Responsibly:
If formwork is still in good condition, it may be reused for other parts of your project or stored for future projects.
Clean and Store:
Clean up the removed formwork and accessories in time, and transport them to the same position on the upper floor and lay them flat.
Maintenance:
Ensure the formwork is carefully handled at all times to maintain its value and operational readiness.
Waste Removal:
Damaged material Boards shall be removed as per Ethiopian waste management procedures.
@etconp
โค5๐2
๐Factors influencing the strength of concrete
๐ซThe strength of concrete is mainly affected by the quality of raw materials, cement content, water-to-cement ratio, concrete pressure during pouring, concrete life, and treatment conditions.
โญ๏ธMajor factors affecting the strength of concreteแฆ
1. Quality of Raw Materials
Cement: It must meet standard specifications and be stored in dry conditions. Any pollution or loss of quality diminishes strength.
Gravel (gravel and sand): Its shape, size, purity, clay and salts (chlorides, sulfates) are very important.
Water: Preferably drinkable, as contaminated water affects chemical reaction.
2. Water to Cement Ratio
As the percentage of water to cement increases, the gaps in the interior structure of concrete increase, thus the strength decreases.
The ideal ratio strikes a balance between maneuverability and pressure force.
If the percentage is too low, the concrete becomes hard of the blood, which also leads to weak strength
3. The Contents of Cement
Increasing cement content (with consistency of water) reduces the content of water to cement, thus increases strength.
But too much cement can lead to shrinking and cracking problems.
4. Compaction of Concrete
Good blood removes air gaps and increases the density of concrete, improving its resistance.
Weakness of pressure leads to internal gaps that diminish strength.
5. The Age Of Concrete
Concrete gains most of its strength within 28 days of pouring.
Strength continues to increase with age if handled correctly
6. The Conditions of Curing
Curing Compounds are essential to retain moisture.
Untreated direct sun exposed concrete is much weaker than treated concrete.
๐Practical notes
โบUntreated concrete under direct sun may be as strong as one quarter of the strength of water-treated concrete at 20ยฐC.
โ๏ธTherefore, processing and durability are the two most neglected workers on site, though they determine the quality of final concrete more than anything else.
@etconp
๐ซThe strength of concrete is mainly affected by the quality of raw materials, cement content, water-to-cement ratio, concrete pressure during pouring, concrete life, and treatment conditions.
Any failure in these factors will result in weak mechanical resistance of concrete.
โญ๏ธMajor factors affecting the strength of concreteแฆ
1. Quality of Raw Materials
Cement: It must meet standard specifications and be stored in dry conditions. Any pollution or loss of quality diminishes strength.
Gravel (gravel and sand): Its shape, size, purity, clay and salts (chlorides, sulfates) are very important.
Water: Preferably drinkable, as contaminated water affects chemical reaction.
2. Water to Cement Ratio
As the percentage of water to cement increases, the gaps in the interior structure of concrete increase, thus the strength decreases.
The ideal ratio strikes a balance between maneuverability and pressure force.
If the percentage is too low, the concrete becomes hard of the blood, which also leads to weak strength
3. The Contents of Cement
Increasing cement content (with consistency of water) reduces the content of water to cement, thus increases strength.
But too much cement can lead to shrinking and cracking problems.
4. Compaction of Concrete
Good blood removes air gaps and increases the density of concrete, improving its resistance.
Weakness of pressure leads to internal gaps that diminish strength.
5. The Age Of Concrete
Concrete gains most of its strength within 28 days of pouring.
Strength continues to increase with age if handled correctly
6. The Conditions of Curing
Curing Compounds are essential to retain moisture.
Untreated direct sun exposed concrete is much weaker than treated concrete.
๐Practical notes
โบUntreated concrete under direct sun may be as strong as one quarter of the strength of water-treated concrete at 20ยฐC.
โ๏ธTherefore, processing and durability are the two most neglected workers on site, though they determine the quality of final concrete more than anything else.
@etconp
โค15๐2๐1
๐Main abbreviation in Construction engineering
1. BBS= Bar Bending Schedule
2. F.O.S= Factor of Safety
3. RCC = Reinforced Cement Concrete
4. PCC = plain cement concrete
5. NDT = Non destructive test
6. DL = Dead load
7. LL = live load
8. UDL = uniformly distributed load
9. FEM = finite element method
10. CAD = computer aided design
๐ Question ๐ฌ
1๏ธโฃ. Whatโs EBCS
2๏ธโฃ. whatโs BIM stands for
3๏ธโฃ. whatโs FCR
4๏ธโฃ. Whatโs W/C ratio
5๏ธโฃ. Whatโs FM ?
6๏ธโฃ. Whatโs TMT ?
7๏ธโฃ. Whatโs Fck
8๏ธโฃ. Whatโs HYSD
@etconp
1. BBS= Bar Bending Schedule
2. F.O.S= Factor of Safety
3. RCC = Reinforced Cement Concrete
4. PCC = plain cement concrete
5. NDT = Non destructive test
6. DL = Dead load
7. LL = live load
8. UDL = uniformly distributed load
9. FEM = finite element method
10. CAD = computer aided design
๐ Question ๐ฌ
1๏ธโฃ. Whatโs EBCS
2๏ธโฃ. whatโs BIM stands for
3๏ธโฃ. whatโs FCR
4๏ธโฃ. Whatโs W/C ratio
5๏ธโฃ. Whatโs FM ?
6๏ธโฃ. Whatโs TMT ?
7๏ธโฃ. Whatโs Fck
8๏ธโฃ. Whatโs HYSD
@etconp
โค14๐ฑ2
Permanent dimension changes due to loading is termed as:
Anonymous Quiz
6%
Extent
25%
Strain
21%
Creep
49%
Deformation
โค7
Which admixture is used to improve workability?
Anonymous Quiz
50%
Plasticizers
10%
Aggregates
32%
Accelerators
7%
Reducers
๐ฅฐ5โค4
The accumulation of water on the outer surface of concrete is called:
Anonymous Quiz
28%
Curing
60%
Bleeding
9%
Absorption
3%
Hardening
๐3
In the slope deflection equations, the
deformations are considered to be caused by
deformations are considered to be caused by
Anonymous Quiz
15%
a) Shear force
36%
(b) Bending moment
18%
(c) Axial force
32%
(d) Bending moment and shear force both
๐4โค2
A fixed beam settles at one end by ฮด, if EI is the
flexural rigidity of the beam, the fixed end
moments at the ends be
flexural rigidity of the beam, the fixed end
moments at the ends be
Anonymous Quiz
25%
(a) EI ฮด/L2
31%
(b) 2EI ฮด/L2
28%
(c) 4EI ฮด/L2
16%
(d) 6EI ฮด/L2
๐4โค2
The elastic curve of a beam means
Anonymous Quiz
25%
(a) BMD
8%
(b) SFD
28%
(c) Deflection curve
40%
(d) Stress-strain curve
๐11โค1
The deflection of beams may be decreased by
Anonymous Quiz
70%
(a) Increasing the depth of beam
13%
(b) Increase the span
10%
(c) Decreasing the depth of beam
7%
(d) Increasing the width of beam
โค6๐3
Conjugate beam of an indeterminate structure
will be
will be
Anonymous Quiz
25%
(a) Unstable
43%
(b) Indeterminate
26%
(c) Stable
5%
(d) Can't say
๐6โค5๐1
โThe deflection of a point in the real beam is
numerically equal to the bending moment at
the corresponding point in the conjugate beamโ. This theorem is used for analysis of beams in which of the following methods?
numerically equal to the bending moment at
the corresponding point in the conjugate beamโ. This theorem is used for analysis of beams in which of the following methods?
Anonymous Quiz
13%
(a) Castigliano's method
32%
(b) Moment area method
51%
(c) Conjugate beam method
4%
(d) None of the above
๐6โค2
The principle of virtual work is applied to elastic
system by considering virtual work done by
system by considering virtual work done by
Anonymous Quiz
19%
(a) Internal forces only
19%
(b) External forces only
58%
(c) Internal as well as external forces
4%
(d) None of the above
๐1
Which of the following statements is not
applicable to Unit Load Method?
applicable to Unit Load Method?
Anonymous Quiz
24%
(a) External and internal forces are in equilibrium
23%
(c) The material is strained well within elastic limit
31%
(d) The structure is redundant
21%
(b) The structure is determinate
โค5
In reinforced concrete construction, the
structures in which marked changes in plane
dimension take place abruptly shall be provided with :
structures in which marked changes in plane
dimension take place abruptly shall be provided with :
Anonymous Quiz
15%
(a) contraction joints
16%
(b) vertical cut
35%
(c) construction joints
34%
(d) expansion joints
โค6
In reinforced cement concrete construction; lap
splices are not recommended to be used for
rebars when the bar diameter is more than :
splices are not recommended to be used for
rebars when the bar diameter is more than :
Anonymous Quiz
43%
(a) 32 mm
13%
(b) 30 mm
29%
(c) 36 mm
15%
(d) 25 m
โค6๐2
Effective moment of inertia for short term
deflection of a reinforced concrete section does
not depend onโ
deflection of a reinforced concrete section does
not depend onโ
Anonymous Quiz
20%
(a) the maximum moment under the service load
21%
(c) breadth of the compression face
35%
(d) ultimate shrinkage strain of concrete.
24%
(b) depth of the neutral axis
๐5โค1