👉In building construction, a roof structure is made up of several key components that work together to support loads, protect the building, and drain rainwater.
🚧The main components are:
💫1. Structural Members (Load-Bearing Parts)
These carry the weight of the roof and transfer loads to walls or columns.
Roof Truss – A triangular framework (wood or steel) that supports the roof over large spans
Rafters – Sloping members that support the roof covering
Beams / Purlins – Horizontal members that support rafters or roof sheets
Tie Beams / Ceiling Joists – Prevent the roof from spreading and may support ceilings
💫2. Roof Decking / Sheathing
Roof Slab (in RCC roofs) –
Reinforced concrete slab forming the roof
Decking / Boards / Sheets – Base layer fixed on rafters or purlins (wood, metal, or concrete)
💫3. Roof Covering (Weather Protection)
This protects the building from rain, sun, and wind.
Corrugated metal sheets
Clay or concrete tiles
Shingles
Roofing membranes (for flat roofs)
💫4. Insulation Layer
Reduces heat transfer and improves comfort
Common materials: foam boards, fiberglass, mineral wool
💫5. Waterproofing Layer
Prevents water leakage
Includes membranes, bitumen layers, or coatings (especially in flat roofs)
💫6. Drainage Components
Gutters – Collect rainwater
Downpipes – Carry water to the ground or drainage system
Roof slope – Directs water flow
💫7. Roof Finishing & Accessories
Fascia board – Covers rafter ends
Eaves & Overhangs – Protect walls from rain
Flashing – Seals joints and edges
Ridge & Hip caps – Cover roof intersections
💫8. Ceiling (Optional but Common)
Fixed below the roof structure for aesthetics and insulation
Made of gypsum board, PVC, or wood panels
@etconp
🚧The main components are:
💫1. Structural Members (Load-Bearing Parts)
These carry the weight of the roof and transfer loads to walls or columns.
Roof Truss – A triangular framework (wood or steel) that supports the roof over large spans
Rafters – Sloping members that support the roof covering
Beams / Purlins – Horizontal members that support rafters or roof sheets
Tie Beams / Ceiling Joists – Prevent the roof from spreading and may support ceilings
💫2. Roof Decking / Sheathing
Roof Slab (in RCC roofs) –
Reinforced concrete slab forming the roof
Decking / Boards / Sheets – Base layer fixed on rafters or purlins (wood, metal, or concrete)
💫3. Roof Covering (Weather Protection)
This protects the building from rain, sun, and wind.
Corrugated metal sheets
Clay or concrete tiles
Shingles
Roofing membranes (for flat roofs)
💫4. Insulation Layer
Reduces heat transfer and improves comfort
Common materials: foam boards, fiberglass, mineral wool
💫5. Waterproofing Layer
Prevents water leakage
Includes membranes, bitumen layers, or coatings (especially in flat roofs)
💫6. Drainage Components
Gutters – Collect rainwater
Downpipes – Carry water to the ground or drainage system
Roof slope – Directs water flow
💫7. Roof Finishing & Accessories
Fascia board – Covers rafter ends
Eaves & Overhangs – Protect walls from rain
Flashing – Seals joints and edges
Ridge & Hip caps – Cover roof intersections
💫8. Ceiling (Optional but Common)
Fixed below the roof structure for aesthetics and insulation
Made of gypsum board, PVC, or wood panels
@etconp
❤11🙏2👍1
👉የሥራ ተቋራጭ (Contractor) የሕግ ተጠያቂነት
🚧በኮንስትራክሽን ውል ሁለት አይነት የግንባታ ስራ ርክክቦች ያሉ ሲሆን እነሱም ግዚያዊ ርክክብ እና የመጨረሻ ርክክብ በመባል ይታወቃሉ፡፡
🏷1/ ግዚያዊ ርክክብ
⏺ግዜአዊ ርክክብ በተለይ በኮንስትራክሽን ውል የተመለከቱ የግንባታ ስራዎች ተከናውነው ካበቁ በኋላ ወዲያውኑ ሁለቱ ወገኖች ማለትም አሰሪውና ተቋራጩ ባሉበት በስራው ላይ የሚደረግ የምርመራ ማረጋገጫ ነው:: (የፍትሀብሄር ህግ አንቀጽ 3274(1)):: ይሄውም አሰሪው በትክክል የተገነባውን ግንባታ በእጁ አግብቶ መያዙን ጭምር ያረጋግጣል፡፡
⏺ስለዚህ ጊዜአዊ ርክክብ በዋናነት የተሰራውን የግንባታ ስራ አሰሪው መብቱን ጠብቆ በመጀመሪያ የሚረከብበት ሂደት ነው፡፡ በስራው ላይ ምርመራ መደረጉንም የሚያረጋግጥ ነው፡፡
⏺እንግዲህ ስራው ከተመረመረ በኋላ አሰሪው ያላመነበትን ግንባታ ፈርሶ እንደገና እንዲሰራ ወይም እንዲጠገን ተደርጐ የጥራት ደረጃውን ባሟላ ሁኔታ እንዲከናወን ለማዘዝ እንደሚችል ፒፒኤ ክሎስ 85 ይፈቅድለታል:: በዚህም መሰረት ግንባታው የስራ ምርመራውን ካለፈ አሰሪው ግንባታውን የሚረከበው ይሆናል፡፡
🏷2/ የመጨረሻ ርክክብ
የመጨረሻ ርክክብ/Final Acceptance/
⏺በተለይ የድህንነት ጊዜ ካለቀ በኋላ እና ተቋራጩ ጠቅላላ ግዴታዎቹን በደህና ሁኔታ የፈጸመ መሆኑን አሰሪው ሲያረጋግጥ ግንባታውን ሙሉ በሙሉ በእጁ የሚያደርግበት ስለመሆኑ የፍትሀብሄር ህግ አንቀጽ 3279 ይደነግጋል፡፡
⏺የመጨረሻ ርክክብ አሰሪውና ተቋራጩ ባሉበት በጽሁፍ መደረግ እንዳለበት በአስገዳጅ ሁኔታ በፍትሀብሄር ህግ አንቀጽ 3279(2) ላይ ተደንግጓል፡፡
⏺በፍትሀብሄር ህግ አንቀጽ 3282 ላይ እንደተቀመጠው ከመጨረሻ ርክክብ በኋላ ተቋራጩ እስከ 10 አመት ድረስ ስለስራው አሰራር ጉድለት ተቋራጩ ሀላፊነት አለበት ፣ ለስራው ጥራት መድህን ሆኖም ይቀጥላል፡፡ ስለሆነም በሀዋሳ ዩኒቨርሲቲ የተደረመሰውን ድልድይ የገነባው ሥራ ተቋራጭ ለደረሰው ጉዳት በሕግ ተጠያቂ የሚሆንበት አግባብ ሊኖር ይችላል:: ይሁን እንጂ በመጨረሻ ርክክብ ወቅት የሚታዩ ለነበሩ የጥራት ጉድለቶች ተቋራጩ ሀላፊነት የለበትም፡፡
@etconp
🚧በኮንስትራክሽን ውል ሁለት አይነት የግንባታ ስራ ርክክቦች ያሉ ሲሆን እነሱም ግዚያዊ ርክክብ እና የመጨረሻ ርክክብ በመባል ይታወቃሉ፡፡
🏷1/ ግዚያዊ ርክክብ
⏺ግዜአዊ ርክክብ በተለይ በኮንስትራክሽን ውል የተመለከቱ የግንባታ ስራዎች ተከናውነው ካበቁ በኋላ ወዲያውኑ ሁለቱ ወገኖች ማለትም አሰሪውና ተቋራጩ ባሉበት በስራው ላይ የሚደረግ የምርመራ ማረጋገጫ ነው:: (የፍትሀብሄር ህግ አንቀጽ 3274(1)):: ይሄውም አሰሪው በትክክል የተገነባውን ግንባታ በእጁ አግብቶ መያዙን ጭምር ያረጋግጣል፡፡
⏺ስለዚህ ጊዜአዊ ርክክብ በዋናነት የተሰራውን የግንባታ ስራ አሰሪው መብቱን ጠብቆ በመጀመሪያ የሚረከብበት ሂደት ነው፡፡ በስራው ላይ ምርመራ መደረጉንም የሚያረጋግጥ ነው፡፡
⏺እንግዲህ ስራው ከተመረመረ በኋላ አሰሪው ያላመነበትን ግንባታ ፈርሶ እንደገና እንዲሰራ ወይም እንዲጠገን ተደርጐ የጥራት ደረጃውን ባሟላ ሁኔታ እንዲከናወን ለማዘዝ እንደሚችል ፒፒኤ ክሎስ 85 ይፈቅድለታል:: በዚህም መሰረት ግንባታው የስራ ምርመራውን ካለፈ አሰሪው ግንባታውን የሚረከበው ይሆናል፡፡
🏷2/ የመጨረሻ ርክክብ
የመጨረሻ ርክክብ/Final Acceptance/
⏺በተለይ የድህንነት ጊዜ ካለቀ በኋላ እና ተቋራጩ ጠቅላላ ግዴታዎቹን በደህና ሁኔታ የፈጸመ መሆኑን አሰሪው ሲያረጋግጥ ግንባታውን ሙሉ በሙሉ በእጁ የሚያደርግበት ስለመሆኑ የፍትሀብሄር ህግ አንቀጽ 3279 ይደነግጋል፡፡
⏺የመጨረሻ ርክክብ አሰሪውና ተቋራጩ ባሉበት በጽሁፍ መደረግ እንዳለበት በአስገዳጅ ሁኔታ በፍትሀብሄር ህግ አንቀጽ 3279(2) ላይ ተደንግጓል፡፡
⏺በፍትሀብሄር ህግ አንቀጽ 3282 ላይ እንደተቀመጠው ከመጨረሻ ርክክብ በኋላ ተቋራጩ እስከ 10 አመት ድረስ ስለስራው አሰራር ጉድለት ተቋራጩ ሀላፊነት አለበት ፣ ለስራው ጥራት መድህን ሆኖም ይቀጥላል፡፡ ስለሆነም በሀዋሳ ዩኒቨርሲቲ የተደረመሰውን ድልድይ የገነባው ሥራ ተቋራጭ ለደረሰው ጉዳት በሕግ ተጠያቂ የሚሆንበት አግባብ ሊኖር ይችላል:: ይሁን እንጂ በመጨረሻ ርክክብ ወቅት የሚታዩ ለነበሩ የጥራት ጉድለቶች ተቋራጩ ሀላፊነት የለበትም፡፡
@etconp
❤9👍7
👉Soil Bearing Capacity
💫1. Bearing Capacity
⏺Bearing capacity is the ability of soil to support the loads coming from a foundation without shear failure or excessive settlement.
💫2. Ultimate Bearing Capacity (qu)
⏺Ultimate bearing capacity is the maximum pressure that soil can withstand just before failure occurs.
⏺Terzaghi’s equation (for strip footing):
qu = cNc + γDfNq + 0.5γBNγ
💫3. Safe Bearing Capacity (qs)
⏺Safe bearing capacity is the allowable pressure on soil obtained by dividing the ultimate bearing capacity by a factorof safety.
qs = qu / FOS
@etconp
💫1. Bearing Capacity
⏺Bearing capacity is the ability of soil to support the loads coming from a foundation without shear failure or excessive settlement.
💫2. Ultimate Bearing Capacity (qu)
⏺Ultimate bearing capacity is the maximum pressure that soil can withstand just before failure occurs.
⏺Terzaghi’s equation (for strip footing):
qu = cNc + γDfNq + 0.5γBNγ
💫3. Safe Bearing Capacity (qs)
⏺Safe bearing capacity is the allowable pressure on soil obtained by dividing the ultimate bearing capacity by a factorof safety.
qs = qu / FOS
@etconp
❤15🙏6👍5
👉 INTERCON Construction Chemicals
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
☎️ Tel: 0961955555
🔹 Address 1: Signal road, around
Dinberwa Hospital
🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
☎️ Tel: 0961955555
🔹 Address 1: Signal road, around
Dinberwa Hospital
🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
❤2👍1
👉FIDIC Books Explained — The Colors of Construction Contracts
🚧In the world of construction and engineering, contracts are not about mistrust — they’re about mutual understanding.
FIDIC’s “rainbow” of contract books helps align responsibilities, risks, and expectations across projects worldwide.
🔴 Red Book – Construction (Employer-Designed)
Employer designs, Contractor builds. Best for roads, bridges, and fixed-design infrastructure. Risk: Employer-heavy.
🟡 Yellow Book – Plant & Design-Build
Contractor designs & builds. Ideal for MEP-heavy and industrial projects. Risk: Contractor-heavy (design).
⚙️ Silver Book – EPC / Turnkey
Contractor delivers ready-to-operate projects. Fixed price, fixed time. Risk: Contractor-heavy.
✨ Gold Book – Design, Build & Operate (DBO)
Contractor designs, builds, and operates long-term. Perfect for PPPs and water treatment plants. Risk: Shared lifecycle.
🟢 Green Book – Short Form
Simplified for small, fast projects. Risk: Balanced.
🔵 Blue Book – Dredging & Reclamation
Tailored for marine and hydraulic works. Risk: Environmental/geotechnical shared.
⚪ White Book – Client–Consultant Agreement
Defines consultant scope, fees, and liability. Risk: Professional liability.
💗 Pink Book – MDB Edition
Adapted Red Book for projects funded by multilateral banks. Risk: Balanced with compliance.
@etconp
🚧In the world of construction and engineering, contracts are not about mistrust — they’re about mutual understanding.
FIDIC’s “rainbow” of contract books helps align responsibilities, risks, and expectations across projects worldwide.
🔴 Red Book – Construction (Employer-Designed)
Employer designs, Contractor builds. Best for roads, bridges, and fixed-design infrastructure. Risk: Employer-heavy.
🟡 Yellow Book – Plant & Design-Build
Contractor designs & builds. Ideal for MEP-heavy and industrial projects. Risk: Contractor-heavy (design).
⚙️ Silver Book – EPC / Turnkey
Contractor delivers ready-to-operate projects. Fixed price, fixed time. Risk: Contractor-heavy.
✨ Gold Book – Design, Build & Operate (DBO)
Contractor designs, builds, and operates long-term. Perfect for PPPs and water treatment plants. Risk: Shared lifecycle.
🟢 Green Book – Short Form
Simplified for small, fast projects. Risk: Balanced.
🔵 Blue Book – Dredging & Reclamation
Tailored for marine and hydraulic works. Risk: Environmental/geotechnical shared.
⚪ White Book – Client–Consultant Agreement
Defines consultant scope, fees, and liability. Risk: Professional liability.
💗 Pink Book – MDB Edition
Adapted Red Book for projects funded by multilateral banks. Risk: Balanced with compliance.
@etconp
👍11❤6👏3
👉Short Column Vs Long Column
🚧Short Column
⏺1.Slenderness ratio (L/r) < 12.
⏺2.Failure occurs due to crushing (compression).
⏺3.High load-carrying capacity.
⏺4.Common in low-rise buildings.
⏺5.Strength mainly depends on material strength (concrete/steel).
🚧Long Column
▶️1.Slenderness ratio (L/r) > 12.
▶️2.Failure occurs due to buckling (instability).
▶️3.Lower load-carrying capacity compared to short columns.
▶️4.Common in tall structures.
▶️5.Strength mainly depends on slenderness ratio and buckling effect.
📜Summary:
💫Short column → Crushing failure
💫Long column → Buckling failure
@etconp
🚧Short Column
⏺1.Slenderness ratio (L/r) < 12.
⏺2.Failure occurs due to crushing (compression).
⏺3.High load-carrying capacity.
⏺4.Common in low-rise buildings.
⏺5.Strength mainly depends on material strength (concrete/steel).
🚧Long Column
▶️1.Slenderness ratio (L/r) > 12.
▶️2.Failure occurs due to buckling (instability).
▶️3.Lower load-carrying capacity compared to short columns.
▶️4.Common in tall structures.
▶️5.Strength mainly depends on slenderness ratio and buckling effect.
📜Summary:
💫Short column → Crushing failure
💫Long column → Buckling failure