👉What is Formwork in Building Construction?
💫Formwork is a temporary or permanent mold used in construction to shape and support fresh concrete until it hardens and gains enough strength to support itself.
🔰In simple words, formwork is the container into which concrete is poured to get the required shape, size, and position of structural elements.
🚧Purpose of Formwork in Building Construction
⏺Formwork plays a very important role in concrete construction.
⭐️Its main purposes are:
🚧1. To Give Shape and Size
⏺Formwork ensures concrete members like slabs, beams, columns, walls, and foundations are formed according to the design drawings.
🚧2. To Support Fresh Concrete
⏺Fresh concrete is heavy and fluid. Formwork holds the concrete in place until it hardens and becomes strong enough.
🚧3. To Maintain Alignment and Level
⏺It keeps structural elements straight, level, and properly aligned, avoiding deformation.
🚧4. To Achieve Good Surface Finish
⏺Proper formwork provides a smooth and neat surface, reducing plastering and finishing work.
🚧5. To Ensure Safety During Construction
⏺Strong and well-fixed formwork prevents collapse, protecting workers and materials.
🏷Common Materials Used for Formwork
⏺Timber/Wood – most common and easy to use
Plywood – smooth finish, reusable
⏺Steel – strong, durable, reusable many times
⏺Aluminum – lightweight, fast construction
⏺Plastic – reusable and water-resistant
📍Where Formwork Is Used
⏺Columns
⏺Beams
⏺Slabs
⏺Foundations
⏺Staircases
⏺Shear walls
@etconp
💫Formwork is a temporary or permanent mold used in construction to shape and support fresh concrete until it hardens and gains enough strength to support itself.
🔰In simple words, formwork is the container into which concrete is poured to get the required shape, size, and position of structural elements.
🚧Purpose of Formwork in Building Construction
⏺Formwork plays a very important role in concrete construction.
⭐️Its main purposes are:
🚧1. To Give Shape and Size
⏺Formwork ensures concrete members like slabs, beams, columns, walls, and foundations are formed according to the design drawings.
🚧2. To Support Fresh Concrete
⏺Fresh concrete is heavy and fluid. Formwork holds the concrete in place until it hardens and becomes strong enough.
🚧3. To Maintain Alignment and Level
⏺It keeps structural elements straight, level, and properly aligned, avoiding deformation.
🚧4. To Achieve Good Surface Finish
⏺Proper formwork provides a smooth and neat surface, reducing plastering and finishing work.
🚧5. To Ensure Safety During Construction
⏺Strong and well-fixed formwork prevents collapse, protecting workers and materials.
🏷Common Materials Used for Formwork
⏺Timber/Wood – most common and easy to use
Plywood – smooth finish, reusable
⏺Steel – strong, durable, reusable many times
⏺Aluminum – lightweight, fast construction
⏺Plastic – reusable and water-resistant
📍Where Formwork Is Used
⏺Columns
⏺Beams
⏺Slabs
⏺Foundations
⏺Staircases
⏺Shear walls
@etconp
❤6👍3
👉FIRST SAFETY
⚡️The first safety requirements on high-rise building construction are critical because work is done at great heights, with heavy materials, machinery, and many workers.
🚧These safety measures must be in place before and during construction to prevent serious accidents.
💫1. Site Safety Planning (Before Work Starts)
Prepare a Site Safety Plan (SSP)
⏺Conduct risk assessment for height work, lifting, fire, and electrical hazards
⏺Provide safety induction training for all workers
⏺Display safety signs, emergency contacts, and rules clearly on site
💫2. Personal Protective Equipment (PPE) – Mandatory
🏷Every worker must wear:
⏺Safety helmet (hard hat)
⏺High-visibility vest
⏺Safety boots (steel toe)
⏺Gloves
⏺Safety goggles
⏺Full body safety harness for work at height
💫3. Fall Protection Systems (Most Important)
⏺Guardrails at slab edges and openings
⏺Safety nets below work areas
⏺Lifelines and anchor points
Covered floor openings
⏺Strict rule: No work at height without fall protection
💫4. Scaffolding & Formwork Safety
⏺Scaffolding must be designed, erected, and inspected by competent persons
⏺Strong base and proper bracing
⏺Safe access ladders and platforms
⏺Formwork must be stable and checked before concreting
💫5. Lifting & Crane Safety
⏺Only certified crane operators
⏺Regular inspection of cranes, hoists, slings
⏺No lifting over workers
⏺Clear communication using signals or radios
💫6. Electrical Safety
⏺Proper grounding (earthing)
⏺Use insulated cables and tools
⏺Temporary power systems well protected
⏺No damaged wires or exposed connections
💫7. Fire Safety & Emergency Preparedness
⏺Fire extinguishers on every floor
⏺Safe storage of flammable materials
⏺Emergency evacuation routes
⏺First-aid kits and trained first-aiders
⏺Emergency drills
💫8. Housekeeping & Access Control
⏺Clean walkways and working areas
⏺Proper waste disposal
⏺Secure site fencing
⏺Restricted access for unauthorized persons
💫9. Safety Supervision & Monitoring
🎲Appoint a Safety Officer
⏺Daily safety inspections
⏺Toolbox meetings
⏺Immediate correction of unsafe acts
🔑 Key Rule:
@etconp
⚡️The first safety requirements on high-rise building construction are critical because work is done at great heights, with heavy materials, machinery, and many workers.
🚧These safety measures must be in place before and during construction to prevent serious accidents.
💫1. Site Safety Planning (Before Work Starts)
Prepare a Site Safety Plan (SSP)
⏺Conduct risk assessment for height work, lifting, fire, and electrical hazards
⏺Provide safety induction training for all workers
⏺Display safety signs, emergency contacts, and rules clearly on site
💫2. Personal Protective Equipment (PPE) – Mandatory
🏷Every worker must wear:
⏺Safety helmet (hard hat)
⏺High-visibility vest
⏺Safety boots (steel toe)
⏺Gloves
⏺Safety goggles
⏺Full body safety harness for work at height
💫3. Fall Protection Systems (Most Important)
⏺Guardrails at slab edges and openings
⏺Safety nets below work areas
⏺Lifelines and anchor points
Covered floor openings
⏺Strict rule: No work at height without fall protection
💫4. Scaffolding & Formwork Safety
⏺Scaffolding must be designed, erected, and inspected by competent persons
⏺Strong base and proper bracing
⏺Safe access ladders and platforms
⏺Formwork must be stable and checked before concreting
💫5. Lifting & Crane Safety
⏺Only certified crane operators
⏺Regular inspection of cranes, hoists, slings
⏺No lifting over workers
⏺Clear communication using signals or radios
💫6. Electrical Safety
⏺Proper grounding (earthing)
⏺Use insulated cables and tools
⏺Temporary power systems well protected
⏺No damaged wires or exposed connections
💫7. Fire Safety & Emergency Preparedness
⏺Fire extinguishers on every floor
⏺Safe storage of flammable materials
⏺Emergency evacuation routes
⏺First-aid kits and trained first-aiders
⏺Emergency drills
💫8. Housekeeping & Access Control
⏺Clean walkways and working areas
⏺Proper waste disposal
⏺Secure site fencing
⏺Restricted access for unauthorized persons
💫9. Safety Supervision & Monitoring
🎲Appoint a Safety Officer
⏺Daily safety inspections
⏺Toolbox meetings
⏺Immediate correction of unsafe acts
🔑 Key Rule:
Fall protection + PPE + supervision = life-saving combination in high-rise construction
@etconp
❤12👍9👏4🎉1
👉 INTERCON Construction Chemicals
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
☎️ Tel: 0961955555
🔹 Address 1: Signal road, around
Dinberwa Hospital
🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
☎️ Tel: 0961955555
🔹 Address 1: Signal road, around
Dinberwa Hospital
🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
❤4👏2
Ethio Construction Engineering
👉Effective Length of a Column 💫Effective length (Le) of a column is the length between points of zero bending moment (contraflexure). It depends on the end support conditions, not only on the actual height. Formula: Le = K × L Where: L = actual unsupported…
👉Sections of Beam (Based on Reinforcement)
💫Reinforced concrete beams are classified into Balanced, Under-Reinforced, and Over-Reinforced sections based on the amount of steel provided.
🚧1) Balanced Section
▶️A balanced section is one in which both concrete and steel reach their permissible stresses at the same time.
• Concrete reaches its maximum compressive strain
• Steel just reaches its yield stress
• Neutral axis depth = critical depth
▶️Failure nature:
• Sudden and brittle
📜Remarks:
• Ideal theoretical condition
• Rarely used in practice due to lack of warning before failure
🚧2) Under-Reinforced Section
▶️An under-reinforced section has less steel than required for a balanced section.
• Steel yields first before concrete crushes
• Neutral axis depth < critical depth
📜Failure nature:
• Ductile failure
• Large deflection and visible cracks before failure
🎲Advantages:
• Gives sufficient warning before collapse
• Safe and preferred in design
🔰Used in practice:
• YES (most commonly used in RCC design)
🚧3) Over-Reinforced Section
▶️An over-reinforced section has more steel than required for a balanced section.
• Concrete crushes before steel yields
• Neutral axis depth > critical depth
📜Failure nature:
• Brittle failure
• Sudden collapse without warning
🎲Disadvantages:
• Unsafe
• Not recommended in RCC design
🔰Used in practice:
• NO (avoided by design codes)
📍Comparison Summary
❇️Balanced section:
• Steel and concrete fail together
• Brittle failure
❇️Under-reinforced section:
• Steel fails first
• Ductile and safe
❇️Over-reinforced section:
• Concrete fails first
• Brittle and unsafe
@etconp
💫Reinforced concrete beams are classified into Balanced, Under-Reinforced, and Over-Reinforced sections based on the amount of steel provided.
🚧1) Balanced Section
▶️A balanced section is one in which both concrete and steel reach their permissible stresses at the same time.
• Concrete reaches its maximum compressive strain
• Steel just reaches its yield stress
• Neutral axis depth = critical depth
▶️Failure nature:
• Sudden and brittle
📜Remarks:
• Ideal theoretical condition
• Rarely used in practice due to lack of warning before failure
🚧2) Under-Reinforced Section
▶️An under-reinforced section has less steel than required for a balanced section.
• Steel yields first before concrete crushes
• Neutral axis depth < critical depth
📜Failure nature:
• Ductile failure
• Large deflection and visible cracks before failure
🎲Advantages:
• Gives sufficient warning before collapse
• Safe and preferred in design
🔰Used in practice:
• YES (most commonly used in RCC design)
🚧3) Over-Reinforced Section
▶️An over-reinforced section has more steel than required for a balanced section.
• Concrete crushes before steel yields
• Neutral axis depth > critical depth
📜Failure nature:
• Brittle failure
• Sudden collapse without warning
🎲Disadvantages:
• Unsafe
• Not recommended in RCC design
🔰Used in practice:
• NO (avoided by design codes)
📍Comparison Summary
❇️Balanced section:
• Steel and concrete fail together
• Brittle failure
❇️Under-reinforced section:
• Steel fails first
• Ductile and safe
❇️Over-reinforced section:
• Concrete fails first
• Brittle and unsafe
@etconp
❤7
👉Design Requirements for Solid Slab Design (Building Construction)
🚧A solid slab is a reinforced concrete slab that transfers loads directly to beams, walls, or columns.
💫To ensure safety, serviceability, and economy, the following requirements must be satisfied.
🏷1. Applicable Design Codes
⏺Design must comply with recognized standards, for example:
EBCS
ACI 318 (USA)
Eurocode 2 (EN 1992)
BS 8110
IS 456
Local building codes (as applicable)
🏷2. Span & Support Conditions
📍Identify whether the slab is one-way or two-way:
▶️One-way slab: Longer span / shorter span ≥ 2
▶️Two-way slab: Longer span / shorter span < 2
⏺Define support type: simply supported, continuous, or cantilever.
🏷3. Loads to Be Considered
⏺All relevant loads must be included:
❇️Dead load: Self-weight of slab + floor finishes
❇️Live load: Occupancy load (residential, office, storage, etc.)
❇️Partition wall load (if any)
Environmental loads: seismic and wind (indirect effect on slabs)
❇️Apply load combinations as per the code.
🏷4. Slab Thickness (Depth)
⏺Minimum thickness to control deflection:
⏺Simply supported slab:
h ≥ L / 20
🎲Continuous slab:
h ≥ L / 26
⏺Cantilever slab:
h ≥ L / 10
(L = effective span)
⏺Also check deflection limits according to code.
🏷5. Material Requirements
⏺Concrete grade: Usually ≥ C25/30
⚡️Reinforcement steel:
⏺Yield strength (fy) = 415 MPa or 500 MPa
⏺Materials must meet durability and exposure conditions.
🏷6. Reinforcement Design
Main reinforcement: Along the direction of bending
❇️Distribution reinforcement: Perpendicular to main bars
❇️Minimum reinforcement:
Typically ≥ 0.12% of gross concrete area (for HYSD bars)
❇️Bar spacing:
⏺Main bars ≤ 3d or 300 mm
⏺Distribution bars ≤ 5d or 450 mm (d = effective depth)
🏷7. Bending Moment Check
Calculate design bending moments.
🚧Ensure: Mu ≤ φMn (or equivalent safety format per code)
🏷8. Shear Check
⏺Slab should resist one-way shear without shear reinforcement in most cases.
🚧Ensure:
Vu ≤ Vc
If Vu > Vc → increase slab thickness.
🏷9. Deflection Control
⏺Satisfy span-to-depth ratios.
Long-term deflection (creep + shrinkage) must be within limits.
🏷10. Crack Control
⏺Limit bar spacing and stress in steel.
⏺Proper curing is essential to minimize cracking.
🏷11. Cover to Reinforcement
Minimum clear cover (typical values):
⏺Interior slab: 20–25 mm
⏺Exposed or aggressive environment: 30–40 mm
🏷12. Construction & Detailing Requirements
⏺Proper formwork alignment
Correct bar placement and spacing Adequate compaction (vibration)
⏺Minimum curing period (7–14 days)
🏷13. Serviceability & Durability
⏺Control cracking and deflection Ensure fire resistance and long-term durability
⏺Consider waterproofing for roofs and wet areas
@etconp
🚧A solid slab is a reinforced concrete slab that transfers loads directly to beams, walls, or columns.
💫To ensure safety, serviceability, and economy, the following requirements must be satisfied.
🏷1. Applicable Design Codes
⏺Design must comply with recognized standards, for example:
EBCS
ACI 318 (USA)
Eurocode 2 (EN 1992)
BS 8110
IS 456
Local building codes (as applicable)
🏷2. Span & Support Conditions
📍Identify whether the slab is one-way or two-way:
▶️One-way slab: Longer span / shorter span ≥ 2
▶️Two-way slab: Longer span / shorter span < 2
⏺Define support type: simply supported, continuous, or cantilever.
🏷3. Loads to Be Considered
⏺All relevant loads must be included:
❇️Dead load: Self-weight of slab + floor finishes
❇️Live load: Occupancy load (residential, office, storage, etc.)
❇️Partition wall load (if any)
Environmental loads: seismic and wind (indirect effect on slabs)
❇️Apply load combinations as per the code.
🏷4. Slab Thickness (Depth)
⏺Minimum thickness to control deflection:
⏺Simply supported slab:
h ≥ L / 20
🎲Continuous slab:
h ≥ L / 26
⏺Cantilever slab:
h ≥ L / 10
(L = effective span)
⏺Also check deflection limits according to code.
🏷5. Material Requirements
⏺Concrete grade: Usually ≥ C25/30
⚡️Reinforcement steel:
⏺Yield strength (fy) = 415 MPa or 500 MPa
⏺Materials must meet durability and exposure conditions.
🏷6. Reinforcement Design
Main reinforcement: Along the direction of bending
❇️Distribution reinforcement: Perpendicular to main bars
❇️Minimum reinforcement:
Typically ≥ 0.12% of gross concrete area (for HYSD bars)
❇️Bar spacing:
⏺Main bars ≤ 3d or 300 mm
⏺Distribution bars ≤ 5d or 450 mm (d = effective depth)
🏷7. Bending Moment Check
Calculate design bending moments.
🚧Ensure: Mu ≤ φMn (or equivalent safety format per code)
🏷8. Shear Check
⏺Slab should resist one-way shear without shear reinforcement in most cases.
🚧Ensure:
Vu ≤ Vc
If Vu > Vc → increase slab thickness.
🏷9. Deflection Control
⏺Satisfy span-to-depth ratios.
Long-term deflection (creep + shrinkage) must be within limits.
🏷10. Crack Control
⏺Limit bar spacing and stress in steel.
⏺Proper curing is essential to minimize cracking.
🏷11. Cover to Reinforcement
Minimum clear cover (typical values):
⏺Interior slab: 20–25 mm
⏺Exposed or aggressive environment: 30–40 mm
🏷12. Construction & Detailing Requirements
⏺Proper formwork alignment
Correct bar placement and spacing Adequate compaction (vibration)
⏺Minimum curing period (7–14 days)
🏷13. Serviceability & Durability
⏺Control cracking and deflection Ensure fire resistance and long-term durability
⏺Consider waterproofing for roofs and wet areas
@etconp
❤10🙏9
ታምራት ፕሌት እና ጄ ቦልት አቅራቢ
✅የምንሰጣቸው አገልግሎቶች
🔅 ፕሌት any Size & thickness
🔅 ጄ ቦልት (ጥርስ ማዉጣትና ማጠፍ)
🔅 የተለያዩ [modefic] ስራዎችን እንሰራለን።
♦️ ማንኛዉንም ብረታ ብረት እንገዛለን።
☎️ስልክ 0904040477 ወይም 0911016833 ደውለው ያግኙን
📱ቴሌግራም ላይ ፦https://t.me/heavenic1
አድራሻ፦ ቁ 1.መርካቶ
ቁ.2 አየር ጤና ኪዳነ ምህረት
ቁ.3 ቄራ
ጥራትና ታማኝነት መለያችን ነው።
ታምራት ፕሌት እና ጄ ቦልት አቅራቢ
✅የምንሰጣቸው አገልግሎቶች
🔅 ፕሌት any Size & thickness
🔅 ጄ ቦልት (ጥርስ ማዉጣትና ማጠፍ)
🔅 የተለያዩ [modefic] ስራዎችን እንሰራለን።
♦️ ማንኛዉንም ብረታ ብረት እንገዛለን።
☎️ስልክ 0904040477 ወይም 0911016833 ደውለው ያግኙን
📱ቴሌግራም ላይ ፦https://t.me/heavenic1
አድራሻ፦ ቁ 1.መርካቶ
ቁ.2 አየር ጤና ኪዳነ ምህረት
ቁ.3 ቄራ
ጥራትና ታማኝነት መለያችን ነው።
ታምራት ፕሌት እና ጄ ቦልት አቅራቢ
❤4👍2
👉Design Requirements of Shear Walls according to EBCS (Ethiopian Building Code Standards)
🚧1. Purpose of Shear Wall
💫Shear walls are structural elements provided to:
⏺Resist lateral loads (earthquake & wind)
⏺Control story drift
Increase stiffness and strength of buildings
⏺Improve seismic performance, especially for mid- and high-rise buildings
🚧2. Location & Layout Requirements
💫According to EBCS-8: Shear walls shall be:
⏺Continuous from foundation to roof
⏺Uniformly distributed in plan to avoid torsion
⏺Preferably placed:
At building cores (stairs, elevators)
⏺Symmetrically in both X and Y directions
⏺Avoid: Sudden termination of walls and Large offsets or irregular wall alignment
🚧3. Thickness Requirements
As per EBCS-2:
💫Minimum wall thickness:
⏺150 mm for low-rise buildings
⏺200 mm or more for multi-storey buildings
⚡️Thickness must satisfy:Slenderness limits,Fire resistance,Durability requirements
🚧4. Material Requirements
Concrete
⏺Minimum concrete grade:
C25 (fck ≥ 25 MPa) for seismic areas
⏺Good compaction and curing are mandatory
⚡️Reinforcement Steel
⏺Deformed bars with:
fy = 300–500 Mpa
🚧5. Reinforcement Requirements (Very Important)
🏷5.1 Vertical Reinforcement
Minimum vertical steel ratio:
ρv ≥ 0.0025 (0.25%)
Bars: Uniformly distributed
⏺Minimum bar diameter: Ø10 mm
⏺Spacing: ≤ 300 mm
🏷5.2 Horizontal Reinforcement
⏺Minimum horizontal steel ratio: ρh ≥ 0.0025
⏺Spacing: ≤ 300 mm
📍Purpose:
⏺Control cracking
⏺Improve ductility
🚧6. Boundary Elements (Seismic Requirement)
⏺According to EBCS-8: Boundary elements are mandatory when:
🔰Wall is heavily stressed High axial force exists
🎲Requirements:
⏺Confined reinforcement (ties/stirrups)
⏺Tie spacing: ≤ 100 mm near ends
⏺Boundary zone width: ≥ max( wall thickness, 300 mm )
🚧7. Openings in Shear Walls
💫Openings (doors/windows) must:
⏺Be limited in size
⏺Be properly reinforced around edges
⏺Lintels and coupling beams:
Must be designed for shear + bending
⏺Require diagonal reinforcement in seismic zones
🚧8. Seismic Design Provisions (EBCS-8)
💫Shear walls must be designed for:
⏺Design base shear
⏺Overstrength factor
⏺Ductile detailing is compulsory:
⏺Proper anchorage
⏺Lap splices away from critical zones
⏺Drift limits must be checked:
Inter-story drift ≤ allowable limit
🚧9. Foundation Connection
💫Shear walls must be:
⏺Rigidly connected to foundation
⏺Proper dowel bars and development length provided
⚡️Foundation must resist:
⏺Overturning
⏺Sliding
🚧10. Construction & Quality Control
💫Accurate bar placement
Proper cover:
⏺≥ 25–40 mm depending on exposure
⏺Continuous supervision is required
📜Conclusion
💫According to EBCS, a shear wall must be:
⏺Properly located
⏺Adequately thick
⏺Correctly reinforced
⏺Detailed for ductility and seismic resistance
⏺Fully integrated with foundation and slabs
@etconp
🚧1. Purpose of Shear Wall
💫Shear walls are structural elements provided to:
⏺Resist lateral loads (earthquake & wind)
⏺Control story drift
Increase stiffness and strength of buildings
⏺Improve seismic performance, especially for mid- and high-rise buildings
🚧2. Location & Layout Requirements
💫According to EBCS-8: Shear walls shall be:
⏺Continuous from foundation to roof
⏺Uniformly distributed in plan to avoid torsion
⏺Preferably placed:
At building cores (stairs, elevators)
⏺Symmetrically in both X and Y directions
⏺Avoid: Sudden termination of walls and Large offsets or irregular wall alignment
🚧3. Thickness Requirements
As per EBCS-2:
💫Minimum wall thickness:
⏺150 mm for low-rise buildings
⏺200 mm or more for multi-storey buildings
⚡️Thickness must satisfy:Slenderness limits,Fire resistance,Durability requirements
🚧4. Material Requirements
Concrete
⏺Minimum concrete grade:
C25 (fck ≥ 25 MPa) for seismic areas
⏺Good compaction and curing are mandatory
⚡️Reinforcement Steel
⏺Deformed bars with:
fy = 300–500 Mpa
🚧5. Reinforcement Requirements (Very Important)
🏷5.1 Vertical Reinforcement
Minimum vertical steel ratio:
ρv ≥ 0.0025 (0.25%)
Bars: Uniformly distributed
⏺Minimum bar diameter: Ø10 mm
⏺Spacing: ≤ 300 mm
🏷5.2 Horizontal Reinforcement
⏺Minimum horizontal steel ratio: ρh ≥ 0.0025
⏺Spacing: ≤ 300 mm
📍Purpose:
⏺Control cracking
⏺Improve ductility
🚧6. Boundary Elements (Seismic Requirement)
⏺According to EBCS-8: Boundary elements are mandatory when:
🔰Wall is heavily stressed High axial force exists
🎲Requirements:
⏺Confined reinforcement (ties/stirrups)
⏺Tie spacing: ≤ 100 mm near ends
⏺Boundary zone width: ≥ max( wall thickness, 300 mm )
🚧7. Openings in Shear Walls
💫Openings (doors/windows) must:
⏺Be limited in size
⏺Be properly reinforced around edges
⏺Lintels and coupling beams:
Must be designed for shear + bending
⏺Require diagonal reinforcement in seismic zones
🚧8. Seismic Design Provisions (EBCS-8)
💫Shear walls must be designed for:
⏺Design base shear
⏺Overstrength factor
⏺Ductile detailing is compulsory:
⏺Proper anchorage
⏺Lap splices away from critical zones
⏺Drift limits must be checked:
Inter-story drift ≤ allowable limit
🚧9. Foundation Connection
💫Shear walls must be:
⏺Rigidly connected to foundation
⏺Proper dowel bars and development length provided
⚡️Foundation must resist:
⏺Overturning
⏺Sliding
🚧10. Construction & Quality Control
💫Accurate bar placement
Proper cover:
⏺≥ 25–40 mm depending on exposure
⏺Continuous supervision is required
📜Conclusion
💫According to EBCS, a shear wall must be:
⏺Properly located
⏺Adequately thick
⏺Correctly reinforced
⏺Detailed for ductility and seismic resistance
⏺Fully integrated with foundation and slabs
@etconp
❤12👌3
👉ሌላኛው ቻናላችን ተቀላቅለዋል?
⚡️ሰሙኑ የወጡ ጨረታዎች ጨምሮ
🌟አዳዲስ የስራ ቅጥሮች እና የኮንስትራክሽን ጨረታዎች ሲወጡ በቀላሉና በ ትኩሱ ለመመልከት ከታች ባለው ሊንካችን ይቀላቀሉን።
📌እንዲሁም ለወዳጆቻቹ SHARE በማረግ አዳርሱ👇
https://t.me/ETCONpWORK
⚡️ሰሙኑ የወጡ ጨረታዎች ጨምሮ
🌟አዳዲስ የስራ ቅጥሮች እና የኮንስትራክሽን ጨረታዎች ሲወጡ በቀላሉና በ ትኩሱ ለመመልከት ከታች ባለው ሊንካችን ይቀላቀሉን።
📌እንዲሁም ለወዳጆቻቹ SHARE በማረግ አዳርሱ👇
https://t.me/ETCONpWORK
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
❤4🙏2
👉Diagonal Reinforcement Bar in Open-Down Building Structures
💫Diagonal reinforcement bars are steel bars placed at an inclined (diagonal) angle in structural elements.
🚧In open-down structures (such as buildings with open ground floors, soft storey, large openings, or stilt parking), these bars are very important for stability and earthquake resistance.
❇️What is an Open-Down Structure?
⏺An open-down (soft storey) building has: Open ground floor (parking, shops, halls)
Fewer walls or columns at the lower level Reduced stiffness compared to upper floors
This makes the structure vulnerable to lateral loads (earthquake & wind).
📍Purpose of Diagonal Reinforcement Bars
⏺Diagonal bars are mainly used to: Resist shear forces
Prevent diagonal cracking due to lateral loads
⏺Improve seismic performance:-Act like a bracing system during earthquakes
⏺Control cracking:-Especially around openings (doors, windows, soft storey)
⏺Increase ductility:-Helps structure deform safely without sudden failure
🏷Where Diagonal Bars Are Commonly Used
⏺Shear walls Masonry walls (around openings)
⏺Soft storey / open ground floor
⏺Beam-column joints Infill walls for seismic zones
🏷How They Work (Simple Explanation)
⚡️When an earthquake pushes a building sideways:
⏺One diagonal bar works in tension
⏺The opposite diagonal resists compression
⏺This action distributes forces safely to the foundation
🔰Typical Arrangement
⏺Placed at 45°–60° angle
Anchored properly into beams, columns, or boundary elements
⏺Used in X-shape or single diagonal pattern
⏺According to Codes (General) Required in seismic design codes (EBCS, IS, Eurocode, ACI)
⏺Mandatory for soft storey mitigation
⏺Bar diameter and spacing depend on structural design
📜Simple Summary
@etconp
💫Diagonal reinforcement bars are steel bars placed at an inclined (diagonal) angle in structural elements.
🚧In open-down structures (such as buildings with open ground floors, soft storey, large openings, or stilt parking), these bars are very important for stability and earthquake resistance.
❇️What is an Open-Down Structure?
⏺An open-down (soft storey) building has: Open ground floor (parking, shops, halls)
Fewer walls or columns at the lower level Reduced stiffness compared to upper floors
This makes the structure vulnerable to lateral loads (earthquake & wind).
📍Purpose of Diagonal Reinforcement Bars
⏺Diagonal bars are mainly used to: Resist shear forces
Prevent diagonal cracking due to lateral loads
⏺Improve seismic performance:-Act like a bracing system during earthquakes
⏺Control cracking:-Especially around openings (doors, windows, soft storey)
⏺Increase ductility:-Helps structure deform safely without sudden failure
🏷Where Diagonal Bars Are Commonly Used
⏺Shear walls Masonry walls (around openings)
⏺Soft storey / open ground floor
⏺Beam-column joints Infill walls for seismic zones
🏷How They Work (Simple Explanation)
⚡️When an earthquake pushes a building sideways:
⏺One diagonal bar works in tension
⏺The opposite diagonal resists compression
⏺This action distributes forces safely to the foundation
🔰Typical Arrangement
⏺Placed at 45°–60° angle
Anchored properly into beams, columns, or boundary elements
⏺Used in X-shape or single diagonal pattern
⏺According to Codes (General) Required in seismic design codes (EBCS, IS, Eurocode, ACI)
⏺Mandatory for soft storey mitigation
⏺Bar diameter and spacing depend on structural design
📜Simple Summary
Diagonal reinforcement bars strengthen open-down buildings by resisting shear, improving earthquake safety, and preventing sudden collapse.
@etconp
👍7❤5
👉 INTERCON Construction Chemicals
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
☎️ Tel: 0961955555
🔹 Address 1: Signal road, around
Dinberwa Hospital
🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers
● Geotextiles and other construction chemicals and materials
☎️ Tel: 0961955555
🔹 Address 1: Signal road, around
Dinberwa Hospital
🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
❤6
👉Foundation masonry work
💫it is masonry construction (stone, brick, or block) built below or just above ground level as part of the building foundation system.
🚧Its main purpose is to safely transfer building loads to the soil and protect the structure.
⭐️Purpose of Foundation Masonry Work
🎲1. Load Transfer to Soil
⏺Foundation masonry:
Receives loads from columns, walls, and beams Distributes these loads evenly to the footing and soil This prevents uneven settlement and structural cracks.
🎲2. Raises Structure Above Ground Level
⏺Masonry foundation walls or plinth walls: Lift the superstructure above natural ground Protect the building from surface water, moisture, and flooding
🎲3. Protection Against Moisture & Soil Contact
⏺Foundation masonry:Acts as a barrier between soil and upper structure Reduces dampness, termites, and soil chemicals from affecting walls
Often combined with DPC (Damp Proof Course) at plinth level.
🎲4. Provides a Level & Strong Base
⏺It creates: A firm, level base for RCC columns or load-bearing walls
⏺Proper alignment and stability for the superstructure
🎲5. Improves Durability & Strength
⏺Stone or block masonry foundations: Are durable and economical
⏺Resist compression forces very well
⏺Extend the building’s service life
🎲6. Cost Efficiency (Especially Low-rise Buildings)
⏺For: Low-rise buildings Load-bearing structures
Masonry foundations are often cheaper than full RCC foundations.
🏷Common Types of Foundation Masonry
❇️Stone masonry foundation
❇️Brick masonry foundation
❇️Block masonry foundation
📜Summary
📍Foundation masonry work is essential to:
⏺Transfer loads safely
⏺Protect against moisture and soil effects
⏺Provide a strong, durable, and level base
⏺Improve structural safety and building life
@etconp
💫it is masonry construction (stone, brick, or block) built below or just above ground level as part of the building foundation system.
🚧Its main purpose is to safely transfer building loads to the soil and protect the structure.
⭐️Purpose of Foundation Masonry Work
🎲1. Load Transfer to Soil
⏺Foundation masonry:
Receives loads from columns, walls, and beams Distributes these loads evenly to the footing and soil This prevents uneven settlement and structural cracks.
🎲2. Raises Structure Above Ground Level
⏺Masonry foundation walls or plinth walls: Lift the superstructure above natural ground Protect the building from surface water, moisture, and flooding
🎲3. Protection Against Moisture & Soil Contact
⏺Foundation masonry:Acts as a barrier between soil and upper structure Reduces dampness, termites, and soil chemicals from affecting walls
Often combined with DPC (Damp Proof Course) at plinth level.
🎲4. Provides a Level & Strong Base
⏺It creates: A firm, level base for RCC columns or load-bearing walls
⏺Proper alignment and stability for the superstructure
🎲5. Improves Durability & Strength
⏺Stone or block masonry foundations: Are durable and economical
⏺Resist compression forces very well
⏺Extend the building’s service life
🎲6. Cost Efficiency (Especially Low-rise Buildings)
⏺For: Low-rise buildings Load-bearing structures
Masonry foundations are often cheaper than full RCC foundations.
🏷Common Types of Foundation Masonry
❇️Stone masonry foundation
❇️Brick masonry foundation
❇️Block masonry foundation
📜Summary
📍Foundation masonry work is essential to:
⏺Transfer loads safely
⏺Protect against moisture and soil effects
⏺Provide a strong, durable, and level base
⏺Improve structural safety and building life
@etconp
❤10👍5👏1🙏1
👉CALCULATION – Field Density Test (FDT)
📜Example
⚖️ Weight of sand used
= Weight of sand + cylinder before test − Weight of sand + cylinder after test
= 8373 − 2524
= 5849 g
🕳️ Weight of sand in hole
= Weight of sand used − Weight of sand in cone
= 5849 − 1610
= 4239 g
📦 Volume of hole
= Weight of sand in hole ÷ Bulk density of sand
= 4239 ÷ 1.344
= 3154 cc
🪨 Weight of soil passing 19 mm sieve
= Weight of wet material − Weight retained on 19 mm sieve
= 7263 − 1350
= 5913 g
⚙️ Bulk density of soil
= Weight of soil ÷ Volume of hole
= 5913 ÷ 3154
= 1.875 g/cc
💧 Moisture content (Speedy Moisture Tester)
= 7.8 %
📊 Field dry density
= Bulk density ÷ (1 + Moisture content ÷ 100)
= 1.875 ÷ (1 + 7.8 ÷ 100)
= 1.875 ÷ 1.078
= 1.74 g/cc
📈 Percentage of compaction
= Field dry density ÷ Laboratory MDD × 100
= 1.74 ÷ 2.144 × 100
= 96.3 %
✅ RESULT
📌 Field Dry Density = 1.74 g/cc
📌 Laboratory MDD = 2.144 g/cc
📌 Compaction Achieved = 96.3 %
🫵For More Subscribe👇
https://t.me/ETCONpWORK
@etconp
📜Example
⚖️ Weight of sand used
= Weight of sand + cylinder before test − Weight of sand + cylinder after test
= 8373 − 2524
= 5849 g
🕳️ Weight of sand in hole
= Weight of sand used − Weight of sand in cone
= 5849 − 1610
= 4239 g
📦 Volume of hole
= Weight of sand in hole ÷ Bulk density of sand
= 4239 ÷ 1.344
= 3154 cc
🪨 Weight of soil passing 19 mm sieve
= Weight of wet material − Weight retained on 19 mm sieve
= 7263 − 1350
= 5913 g
⚙️ Bulk density of soil
= Weight of soil ÷ Volume of hole
= 5913 ÷ 3154
= 1.875 g/cc
💧 Moisture content (Speedy Moisture Tester)
= 7.8 %
📊 Field dry density
= Bulk density ÷ (1 + Moisture content ÷ 100)
= 1.875 ÷ (1 + 7.8 ÷ 100)
= 1.875 ÷ 1.078
= 1.74 g/cc
📈 Percentage of compaction
= Field dry density ÷ Laboratory MDD × 100
= 1.74 ÷ 2.144 × 100
= 96.3 %
✅ RESULT
📌 Field Dry Density = 1.74 g/cc
📌 Laboratory MDD = 2.144 g/cc
📌 Compaction Achieved = 96.3 %
🫵For More Subscribe👇
https://t.me/ETCONpWORK
@etconp
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
👍11❤8👏1
👉በጨረታ ሂደት ውስጥ አንድ ብቻ ተጫራች ከተሳተፈ አሸናፊ ማድረግ ይቻላል?
✅አንድ ተጫራች ብቻ ከሆነ አሸናፊ ማድረግ በህግ ሊቻል ይችላል፣
✅ ነገር ግን ይህ የሚከናወነው የጨረታ ሂደቱ በሙሉ በግልጽነት እና በህግ መሠረት ከተካሄደ እና የቀረበው የዋጋ ስሌት
➣ተመራጭ፣
➣ብቁ እና
➣በተገቢው የገበያ ዋጋ ክልል ውስጥ ከሆነ ብቻ ነው።
⭐️ይህንን ለመረዳት የሚከተሉትን ነጥቦች ማስተዋል አስፈላጊ ነው፡
📍1. የጨረታው ህጋዊ እና ሥርዓታዊ መሠረት
⏺የማንኛውም ጨረታ ዋና ዓላማ ተጫማሪ ውድድርን ማምጣት እና ለግምገማ ብቁ የሆኑ ብዙ ተጫራቾችን ማሰባሰብ ነው።
⏺ "የማይመለከታቸው ጨረታዎች" ወይም "ሙሉ በሙሉ ያልተሳኩ ጨረታዎች" በብዙ የግዥ ስርዓቶች ውስጥ እንደ አንድ ጉዳይ ተደርጎ ይቆጠራል። አንድ ተጫራች ብቻ መኖሩ ይህንን ሁኔታ ያስከትላል።
📍2. አንድ ተጫራች ብቻ ሲኖር የጨረታውን ሂደት ለመቀጠል የሚከተሉት መሟላት አለባቸው፡-
❇️የጨረታው ማስታወቂያ (Bid Invitation) በቂ ጊዜ እና በተገቢው መንገድ መወጣቱ፡
❇️ጨረታው በሕዝብ ተደራሽ የሆኑ መገናኛዎች (ማለትም ጋዜጦች፣ ድረገጾች) ላይ በተገቢው ጊዜ እንደተለጠፈ ማረጋገጥ አለበት።
❇️ይህ ለሁሉም አመቺ የሆኑ ተጫራቾች የመሳተፍ እድል እንዳላቸው ለማረጋገጥ ነው።
❇️የአንድ ተጫራች ዋጋ ስሌት (Bid) ተመራጭ እና ኢኮኖሚያዊ መሆኑ፡ የቀረበው ዋጋ በጨረታው ሰነድ ውስጥ በተገለጸው በጀት ወይም በገበያ ዋጋ ማለት ይቻላል በሚገመት የዋጋ ክልል ውስጥ መሆን አለበት።
🔰ከመጠን በላይ ከፍ ያለ ዋጋ መጠየቅ ችግር ሊፈጥር ይችላል።
🔰የተጫራቹ የብቃት ማረጋገጫ (Responsiveness and Responsibility)፡ አንድ ብቁ ተጫራች መሆኑን ማለትም ሁሉንም የጨረታ መስፈርቶች እንደሚያሟላ እና ሥራውን ለማከናወን የሚያስፈልገውን ቴክኒካል፣ ፋይናንሻል እና ህጋዊ አቅም እንዳለው ማረጋገጥ አለበት።
🔰የግዢው ኮሚቴ/አካል ውሳኔ፡ በመጨረሻ ላይ፣ ጨረታውን የሚያስተዳድረው ኮሚቴ ወይም አካል አንድ ተጫራች ብቻ ሆኖ የቀረበውን የዋጋ ስሌት የመቀበል ወይም የመግባባት ውሳኔ ማሳለጥ አለበት።
🔰ይህ ውሳኔ ብዙውን ጊዜ ከላይ ከተጠቀሱት መስፈርቶች ጋር በማገናኘት ይወሰዳል።
📍3. የሚከተሉት ሁኔታዎች ሊኖሩ ይችላሉ
⏺ጨረታው መዝጋት እና እንደገና መቅረብ፡ የግዢው አካል አንድ ተጫራች ብቻ ስላለ ወይም የቀረበው ዋጋ ከመጠን በላይ ከፍ ብሎ ስላገኘ ጨረታውን ሙሉ በሙሉ እንደማይመለከት ሊወስን ይችላል።
⏺በዚህ ሁኔታ ጨረታው ይታጠፍና እና እንደገና በተሻለ ማስተዋወቂያ እና በማሳሰቢያ ሊቀርብ ይችላል።
⏺ከአንድ ተጫራች ጋር በቀጥታ ድርድር (Direct Negotiation)፡ በአንዳንድ ስርዓቶች፣ አንድ ተጫራች ብቻ ከቀረበ በኋላ፣ የግዢው አካል ከዚያ ተጫራች ጋር በቀጥታ ለመድርስ ውሳኔ ሊሰጥ ይችላል።
⏺ይህ ሂደት ግን በጣም ጥብቅ የሆኑ ህጎች ውስጥ ነው እና በግልጽነት መሠረት መከናወን አለበት።
🏷ለስራ ቅጥር እና ጨረታዎች👇
https://t.me/ETCONpWORK
@etconp
✅አንድ ተጫራች ብቻ ከሆነ አሸናፊ ማድረግ በህግ ሊቻል ይችላል፣
✅ ነገር ግን ይህ የሚከናወነው የጨረታ ሂደቱ በሙሉ በግልጽነት እና በህግ መሠረት ከተካሄደ እና የቀረበው የዋጋ ስሌት
➣ተመራጭ፣
➣ብቁ እና
➣በተገቢው የገበያ ዋጋ ክልል ውስጥ ከሆነ ብቻ ነው።
⭐️ይህንን ለመረዳት የሚከተሉትን ነጥቦች ማስተዋል አስፈላጊ ነው፡
📍1. የጨረታው ህጋዊ እና ሥርዓታዊ መሠረት
⏺የማንኛውም ጨረታ ዋና ዓላማ ተጫማሪ ውድድርን ማምጣት እና ለግምገማ ብቁ የሆኑ ብዙ ተጫራቾችን ማሰባሰብ ነው።
⏺ "የማይመለከታቸው ጨረታዎች" ወይም "ሙሉ በሙሉ ያልተሳኩ ጨረታዎች" በብዙ የግዥ ስርዓቶች ውስጥ እንደ አንድ ጉዳይ ተደርጎ ይቆጠራል። አንድ ተጫራች ብቻ መኖሩ ይህንን ሁኔታ ያስከትላል።
📍2. አንድ ተጫራች ብቻ ሲኖር የጨረታውን ሂደት ለመቀጠል የሚከተሉት መሟላት አለባቸው፡-
❇️የጨረታው ማስታወቂያ (Bid Invitation) በቂ ጊዜ እና በተገቢው መንገድ መወጣቱ፡
❇️ጨረታው በሕዝብ ተደራሽ የሆኑ መገናኛዎች (ማለትም ጋዜጦች፣ ድረገጾች) ላይ በተገቢው ጊዜ እንደተለጠፈ ማረጋገጥ አለበት።
❇️ይህ ለሁሉም አመቺ የሆኑ ተጫራቾች የመሳተፍ እድል እንዳላቸው ለማረጋገጥ ነው።
❇️የአንድ ተጫራች ዋጋ ስሌት (Bid) ተመራጭ እና ኢኮኖሚያዊ መሆኑ፡ የቀረበው ዋጋ በጨረታው ሰነድ ውስጥ በተገለጸው በጀት ወይም በገበያ ዋጋ ማለት ይቻላል በሚገመት የዋጋ ክልል ውስጥ መሆን አለበት።
🔰ከመጠን በላይ ከፍ ያለ ዋጋ መጠየቅ ችግር ሊፈጥር ይችላል።
🔰የተጫራቹ የብቃት ማረጋገጫ (Responsiveness and Responsibility)፡ አንድ ብቁ ተጫራች መሆኑን ማለትም ሁሉንም የጨረታ መስፈርቶች እንደሚያሟላ እና ሥራውን ለማከናወን የሚያስፈልገውን ቴክኒካል፣ ፋይናንሻል እና ህጋዊ አቅም እንዳለው ማረጋገጥ አለበት።
🔰የግዢው ኮሚቴ/አካል ውሳኔ፡ በመጨረሻ ላይ፣ ጨረታውን የሚያስተዳድረው ኮሚቴ ወይም አካል አንድ ተጫራች ብቻ ሆኖ የቀረበውን የዋጋ ስሌት የመቀበል ወይም የመግባባት ውሳኔ ማሳለጥ አለበት።
🔰ይህ ውሳኔ ብዙውን ጊዜ ከላይ ከተጠቀሱት መስፈርቶች ጋር በማገናኘት ይወሰዳል።
📍3. የሚከተሉት ሁኔታዎች ሊኖሩ ይችላሉ
⏺ጨረታው መዝጋት እና እንደገና መቅረብ፡ የግዢው አካል አንድ ተጫራች ብቻ ስላለ ወይም የቀረበው ዋጋ ከመጠን በላይ ከፍ ብሎ ስላገኘ ጨረታውን ሙሉ በሙሉ እንደማይመለከት ሊወስን ይችላል።
⏺በዚህ ሁኔታ ጨረታው ይታጠፍና እና እንደገና በተሻለ ማስተዋወቂያ እና በማሳሰቢያ ሊቀርብ ይችላል።
⏺ከአንድ ተጫራች ጋር በቀጥታ ድርድር (Direct Negotiation)፡ በአንዳንድ ስርዓቶች፣ አንድ ተጫራች ብቻ ከቀረበ በኋላ፣ የግዢው አካል ከዚያ ተጫራች ጋር በቀጥታ ለመድርስ ውሳኔ ሊሰጥ ይችላል።
⏺ይህ ሂደት ግን በጣም ጥብቅ የሆኑ ህጎች ውስጥ ነው እና በግልጽነት መሠረት መከናወን አለበት።
🏷ለስራ ቅጥር እና ጨረታዎች👇
https://t.me/ETCONpWORK
@etconp
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
❤8👌1
3085. In which condition Raft Foundation is provided?
Anonymous Quiz
10%
(a) When individual footing would overlap.
12%
(b) Large variation in the load on individual columns.
20%
(c) there are chances of differential settlement.
58%
(d) All of the above
❤6👍5
3084. When the two columns are so close to each other that their individual footing would overlap then which type of footing is provided?
Anonymous Quiz
18%
(a) Strap Footing
69%
(b) Combined footing
11%
(c) Raft Footing
1%
(d) Grillage Footing
❤8👍1
3083. The method used for studying of horizontal changes in the sub-soil is
Anonymous Quiz
20%
(a) Resistive soundings
27%
(b) Resistive mapping
21%
(c) Mean resistivity
31%
(d) Critical distance
👍4❤1
3080. How is the fineness of cement measured?
Anonymous Quiz
22%
(a) Volume/Mass
55%
(b) Mass/Volume
14%
(c) Mass/Area
9%
(d) Area/Mass
❤5🙏3
3074. S etting time of cement decrease by reducing
Anonymous Quiz
35%
(a) gypsum
28%
(b) calcium chloride
26%
(c) hydrogen peroxide
11%
(d) sodium oxide
👍5
3055. Process of taking levels on each side of a main line at right angles to that line is called
Anonymous Quiz
22%
(a) Differential levelling
40%
(b) Cross-section levelling
30%
(c) Profile levelling
9%
(d) Reciprocal levelling
❤5
3039. Which line is perpendicular to the horizontal surface?
Anonymous Quiz
12%
(a) Level line
13%
(b) Horizontal line
20%
(c) Datum line
55%
(d) Vertical line
🔥3👏2