๐Column Construction โ Key Points
- Cage โ Reinforcement cage prepared with longitudinal bars and stirrups.
- Stirrups โ Tied to longitudinal bars with 135ยฐ hooks for anchorage.
- Stirrup Spacing โ Minimum spacing of 8 inches.
- Longitudinal Bars โ Diameter should be at least ยฝ inch (later note mentions 1 inch as per code).
- Concrete Pouring โ Use concrete with minimum strength of 2,500 psi.
- Concrete Vibration โ Employ vibrator for proper consolidation and reduced permeability.
- Formwork โ Constructed using wooden planks to shape the column.
- Plumb Bob โ Used to check vertical alignment of the column.
- Code Compliance โ Bars and stirrups must follow structural code requirements.
๐ Column construction is a critical part of any reinforced concrete structure. ๐๏ธ This channel explains the complete process in a clear and practical way โ from reinforcement cage preparation (blue steel bars) to proper stirrup spacing, formwork installation, concrete pouring, vibration, and vertical alignment using a plumb bob.
๐ points covered:
๐น Minimum concrete strength requirements
๐น Proper stirrup hook detailing (135ยฐ hook)
๐น Correct stirrup spacing
๐น Minimum longitudinal bar diameter
๐น Importance of vibration for compaction
๐น Checking verticality before final setting With blue reinforcement, orange soil base, and clean white background, this 9:16 format design makes learning column construction simple and professional.
@etconp
- Cage โ Reinforcement cage prepared with longitudinal bars and stirrups.
- Stirrups โ Tied to longitudinal bars with 135ยฐ hooks for anchorage.
- Stirrup Spacing โ Minimum spacing of 8 inches.
- Longitudinal Bars โ Diameter should be at least ยฝ inch (later note mentions 1 inch as per code).
- Concrete Pouring โ Use concrete with minimum strength of 2,500 psi.
- Concrete Vibration โ Employ vibrator for proper consolidation and reduced permeability.
- Formwork โ Constructed using wooden planks to shape the column.
- Plumb Bob โ Used to check vertical alignment of the column.
- Code Compliance โ Bars and stirrups must follow structural code requirements.
๐ Column construction is a critical part of any reinforced concrete structure. ๐๏ธ This channel explains the complete process in a clear and practical way โ from reinforcement cage preparation (blue steel bars) to proper stirrup spacing, formwork installation, concrete pouring, vibration, and vertical alignment using a plumb bob.
๐ points covered:
๐น Minimum concrete strength requirements
๐น Proper stirrup hook detailing (135ยฐ hook)
๐น Correct stirrup spacing
๐น Minimum longitudinal bar diameter
๐น Importance of vibration for compaction
๐น Checking verticality before final setting With blue reinforcement, orange soil base, and clean white background, this 9:16 format design makes learning column construction simple and professional.
@etconp
โค11
๐แตแฎแแญแฝแ แฅแแ
๐ฉ๐ช แ แแญแแ แจแตแแ แญแต แญแแซ แตแแ (แตแฎแแญแบแ) แฅแตแ! (Hof University Scholarships 2026-27)
แแญแแ แแแญ แแฅแฐแ แแแแญ แแฐแก แ แแ แ แแ แฐแแชแแฝ แฅแฉ แแ แ แแ! Hof University of Applied Sciences แ2026-27 แจแตแแ แญแต แแแ แแแแแชแซ แฒแแช (Bachelor's) แฅแ แแแตแฐแญแต (Master's) แฐแแชแแฝ แจแฐแแซแฉ แจแตแฎแแญแบแ แฅแ แจแแญแแแต แตแแแฝแ แญแ แ แตแญแแแข
แญแ แฅแตแ แจแตแแ แญแต แแชแแ แ แฅแ แ แ แแแแต แตแฉแจแตแแ แตแแ แญแตแ แฅแ แแแต แแซแ แต แแญ แฅแป แฅแแฒแซแฐแญแ แญแจแณแแณแ! ๐๐
๐ แจแตแฎแแญแบแ แแ แแ แฅแ แแฝ (Highlights):
โ แจแแฐแ แแคแต แแแธแ แฐแแชแแฝ แ แแตแตแญ (Merit-based) แจแแฐแฅ แจแตแแ แญแต แญแแซ แตแแแข
โ แแ แแฐแ แฒแแชแ แแ แแตแ แจ-แแจแ แฐแแชแแฝ แญแแต แจแแแข
โ แจแตแแ แญแต แญแแซ แซแแ แ แแแแต แ แฐแจแแ แแแณ แแแแญ แจแแซแตแฝแแข
๐ฏ แแ แแแแจแต แญแฝแแ?
โข แ แฉแแจแญแฒแฒแ แแฎแแซแแฝ แแญ แฐแแฃแญแแต (Admission) แซแแ แ แแแซแพแฝแข
โข แจแแฐแ แจแ แซแณแแญ แแคแต แซแแธแแฃ แจแแชแแต แ แ แ แฅแ แแตแแ แญแณแธแ แจแแฐแ แฐแแณแฝแแต แซแแธแ แฐแแชแแฝแข
๐ แจแแฐแก แจแตแแ แญแต แแญแแฝ (Fields of Study):
โข Engineering & Technology (แแ แแตแตแ แฅแ แดแญแแแ)
โข Computer Science & Information Systems (แฎแแแแฐแญ แณแญแแต)
โข Business Administration & Management (แขแแแต แฅแ แแแ แแแต)
โข Sustainable Systems & Renewable Energy (แณแณแฝ แแญแ)
โข Media & Communication (แแฒแซ แฅแ แฎแแแฌแฝแ)
๐ แ แแ แแญแฎแฝ แแแแแจแต:
โ แจแตแฎแแญแบแ แแแแจแป แแ แจแแฐแ แแ แจแ แตแแฝแ แแ แจแฐแแจ แแแ แตแแแฝแ แแตแแ แซแแแญแฑ! โ แจแตแแ แญแต แแตแจแแแ (Transcripts)แฃ แ แแซแซ แจแแฒแฌแฝแ แแฐแญ (Motivation Letter) แฅแ แชแแจแแถแฝแ (References) แแตแแ แ แแแฃ แซแแแแข
โก๏ธแแณแฐแขแซแก แแตแฎแแญแบแ แแแแณแฐแญ แแแแชแซ แจแณแฝ แฃแแ แแแญ แแฅแฐแ แแฉแแจแญแฒแฒแ แ แตแแฝแ แแแแจแต แแดแณ แแแข
#Scholarships2026 #StudyInGermany #HofUniversity #FinancialAid #InternationalStudents #HigherEducation #TarikuInfo #Ethiopia ๐๐ฉ๐ช
๐ แจแแแแจแป แแญแณแ (Official Application Link)๐
https://www.hof-university.com/
๐ฉ๐ช แ แแญแแ แจแตแแ แญแต แญแแซ แตแแ (แตแฎแแญแบแ) แฅแตแ! (Hof University Scholarships 2026-27)
แแญแแ แแแญ แแฅแฐแ แแแแญ แแฐแก แ แแ แ แแ แฐแแชแแฝ แฅแฉ แแ แ แแ! Hof University of Applied Sciences แ2026-27 แจแตแแ แญแต แแแ แแแแแชแซ แฒแแช (Bachelor's) แฅแ แแแตแฐแญแต (Master's) แฐแแชแแฝ แจแฐแแซแฉ แจแตแฎแแญแบแ แฅแ แจแแญแแแต แตแแแฝแ แญแ แ แตแญแแแข
แญแ แฅแตแ แจแตแแ แญแต แแชแแ แ แฅแ แ แ แแแแต แตแฉแจแตแแ แตแแ แญแตแ แฅแ แแแต แแซแ แต แแญ แฅแป แฅแแฒแซแฐแญแ แญแจแณแแณแ! ๐๐
๐ แจแตแฎแแญแบแ แแ แแ แฅแ แแฝ (Highlights):
โ แจแแฐแ แแคแต แแแธแ แฐแแชแแฝ แ แแตแตแญ (Merit-based) แจแแฐแฅ แจแตแแ แญแต แญแแซ แตแแแข
โ แแ แแฐแ แฒแแชแ แแ แแตแ แจ-แแจแ แฐแแชแแฝ แญแแต แจแแแข
โ แจแตแแ แญแต แญแแซ แซแแ แ แแแแต แ แฐแจแแ แแแณ แแแแญ แจแแซแตแฝแแข
๐ฏ แแ แแแแจแต แญแฝแแ?
โข แ แฉแแจแญแฒแฒแ แแฎแแซแแฝ แแญ แฐแแฃแญแแต (Admission) แซแแ แ แแแซแพแฝแข
โข แจแแฐแ แจแ แซแณแแญ แแคแต แซแแธแแฃ แจแแชแแต แ แ แ แฅแ แแตแแ แญแณแธแ แจแแฐแ แฐแแณแฝแแต แซแแธแ แฐแแชแแฝแข
๐ แจแแฐแก แจแตแแ แญแต แแญแแฝ (Fields of Study):
โข Engineering & Technology (แแ แแตแตแ แฅแ แดแญแแแ)
โข Computer Science & Information Systems (แฎแแแแฐแญ แณแญแแต)
โข Business Administration & Management (แขแแแต แฅแ แแแ แแแต)
โข Sustainable Systems & Renewable Energy (แณแณแฝ แแญแ)
โข Media & Communication (แแฒแซ แฅแ แฎแแแฌแฝแ)
๐ แ แแ แแญแฎแฝ แแแแแจแต:
โ แจแตแฎแแญแบแ แแแแจแป แแ แจแแฐแ แแ แจแ แตแแฝแ แแ แจแฐแแจ แแแ แตแแแฝแ แแตแแ แซแแแญแฑ! โ แจแตแแ แญแต แแตแจแแแ (Transcripts)แฃ แ แแซแซ แจแแฒแฌแฝแ แแฐแญ (Motivation Letter) แฅแ แชแแจแแถแฝแ (References) แแตแแ แ แแแฃ แซแแแแข
โก๏ธแแณแฐแขแซแก แแตแฎแแญแบแ แแแแณแฐแญ แแแแชแซ แจแณแฝ แฃแแ แแแญ แแฅแฐแ แแฉแแจแญแฒแฒแ แ แตแแฝแ แแแแจแต แแดแณ แแแข
#Scholarships2026 #StudyInGermany #HofUniversity #FinancialAid #InternationalStudents #HigherEducation #TarikuInfo #Ethiopia ๐๐ฉ๐ช
๐ แจแแแแจแป แแญแณแ (Official Application Link)๐
https://www.hof-university.com/
Hochschule Hof
Innovative, Hands-On, International - Hof University
Welcome to the website of Hof University, Germany. Find out more about our innovative and practice-oriented Bachelor's and Master's programs.
โค3
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค1
๐Why Scheduling Matters in Constructionโ
โญ๏ธA construction schedule is not just dates on paper. It is a control tool. Without a schedule:
๐โโ Materials arrive late
๐โโWorkers wait idle
๐โโCosts increase
๐โโProjects delay
๐ฒA good schedule helps you:
๐โโControl time
๐โโControl cost
๐โโCoordinate trades
๐โโ Predict problems early
๐ No schedule = no control๐
โญ๏ธSimple Rule of Good Schedulingโญ๏ธ
๐ทA schedule must answer 3 questions:
๐โโWhat activity?
๐โโWhen does it start?
๐โโWhen does it finish?
๐If your schedule cannot answer these clearly, itโs useless.
โบEven a simple Excel schedule is better than no schedule.
๐ทFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โญ๏ธA construction schedule is not just dates on paper. It is a control tool. Without a schedule:
๐โโ Materials arrive late
๐โโWorkers wait idle
๐โโCosts increase
๐โโProjects delay
๐ฒA good schedule helps you:
๐โโControl time
๐โโControl cost
๐โโCoordinate trades
๐โโ Predict problems early
๐ No schedule = no control๐
โญ๏ธSimple Rule of Good Schedulingโญ๏ธ
๐ทA schedule must answer 3 questions:
๐โโWhat activity?
๐โโWhen does it start?
๐โโWhen does it finish?
๐If your schedule cannot answer these clearly, itโs useless.
โบEven a simple Excel schedule is better than no schedule.
๐ทFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค16๐3
๐แจแแแแ แคแต แจแ
แจแณ แดแญแแปแ แฃแแแซ แฐแแฃแญแ แแแแแถแฝ แแ แแ แแธแ???
๐งแจแแแแ แคแต แ แจแณ แดแญแแปแ (แ แจแณ แฃแแแซ) แ แจแฐแ แแแแ แแแต แแตแฅ แแณแ แแ แจแแซแแฐแ แฒแแแฃ แแ แฐแแฃแฉ แแฌแตแ แแแซแตแฃ แตแแ แญ แแแจแต แฅแ แจแแฌแต แซแญแณ แแแแแต แแแข
๐แแ แแ แฐแแฃแซแตแ แแแแแต
1. แจแแฌแต แ แจแณ แฅแ แแแซแต
แจแฆแณ แตแแ แญ แแแจแตแฆ แจแ แแตแ แแฌแตแฃ แคแต แแญแ แแฅแจแต แตแญแญแแ แตแแ แญ แ แแแฃแต แแณแจแตแข
แแแชแซ แแซแแตแฆ แแแแ แจแ แจแณ แแณแชแซแแฝแ (แแแณแ แถแณแ แตแดแฝแแฃ แแแคแตแฃ แตแฎแ) แ แแ แแ แจแแฌแฑแ แตแแตแฃ แญแแแต แฅแ แ แญแ แแแซแตแข
แจแจแฐแ แซแญแณ แแแแแฆ แ แณแฒแต แ แแปแแฝแฃ แแแแถแฝ แฅแ แจแแฌแต แญแแแแฝ แฅแแฒแณแฉ แจแจแฐแแแ แซแญแณ แ แจแแแ แแแแแข
2. แจแแแต แ แฐแฃแฅ แแฐแต แแตแฅ แแณแฐแ
แจแ แแป แแแต แแฐแปแฆ แ แแต แฐแ แคแต แแแแแฃแต แแแต แฒแซแแแญแตแฃ แซแแจแ แ แแแ แจแแแแฐแ แจแแฌแต แตแแ แญ แฅแ แจแจแฐแ แแแ แแญ แจแแตแแ แแแแ แแจแแแฅแข
แจแตแแ แญ แแจแแแซแฆ แแฅแจแต แฒแธแฅ แแญแ แฒแแจแตแฃ แจแแฌแฑ แตแแ แญ แตแญแญแแ แแแแ แ แฆแณแ แ แแ แจแต แแจแแแฅแข
3. แจแแ-แแฅ แแแฃแณ แญแตแตแ
แแฅแฅแญแฆ แ แจแฐแแ แแตแฅ แซแ แแแต แแญแ แจแแแต แแญ แจแแฐแจแ แแแฃแณ แแแฉแ แแจแณแฐแแข
แแตแแ แฅแ แชแแญแต แแตแจแแฆ แแ-แแฅ แแแฃแณ แฒแแ แแแตแแ แฅแ แแแ แฃแแตแแฃแ แชแแญแต แแตแจแแข
4. แจแณแฐแณ แฅแแต แฅแ แชแแญแต แแ แจแฅ
แชแแญแต แแแแแตแฆ แฃแซแแฐแ แ แจแณ แแฐแจแต แดแญแแซแ แชแแญแตแฃ แซแญแณ แฅแ แแตแ แ แแแแแต แแ แแญ แ แซแ แแ แจแฅแข
แแจแ แ แซแซแแฆ แจแฐแแซแฉ แจแแฌแต แแจแแแฝแ (แฒแแณแ แฅแ แ แแแ) แ แแจแแธแตแฃ แ แแฐแซแแต แฅแ แแตแฐแณแฐแญแข
5. แจแ แฅแจแฐแฐแก แแญ แแแแแต
แแญแญ แแตแ แตแฆ แแ แแแแแต แแแ แแแฝ แจแแฌแต แตแแ แญแฃ แจแแแต แ แฐแฃแฅ แแฐแต แฅแ แจแจแฐแ แแแ แฐแแฆแฝแ แ แฐแแแจแฐ แแตแจแณแตแ แแแจแญแข
แ แแแแฃแฃแต แแแณแตแฆ แ แแจแคแถแฝ แแซแจแ แจแตแแ แญ แญแญแญแญ แฒแแ แญ แ แฆแณแ แ แแ แจแต แฅแแแณแแ แ แแตแจแณแต แ แแแแฃแฃแฑแ แแแแณแต แแญแณแตแข
6. แจแแณแชแซ แฅแแญแฅแซแค
แจแแณแชแซ แ แซแซแแฆ แแต แจแแ แจแ แจแณ แแณแชแซแแฝแ (แถแณแ แตแดแฝแแฃ แดแแถแแญแตแฃ แแแฐ) แ แ แแฃแก แแ แแแฃ แแแจแฃแจแฅ แฅแ แแตแฐแซแจแแข
๐ซแแแแ แคแต แแตแฅ แจแ แจแณ แดแญแแปแ แแ แแตแซแต แแแต แจแจแฐแแแ แตแญแ แต แฅแ แแ แต แแแตแ แ แ แฃ แจแแแฝแ แจแฃแแคแตแแต แแฅแต แแแจแแแฅ แฅแ แแแแ แแแต แแฐแจแต แจแแ แแจแ แ แแ แจแฅ แจแแต แแฅแฐแ แ แตแฐแแฝแฆ แแ แญแจแต แแแข
@etconp
๐งแจแแแแ แคแต แ แจแณ แดแญแแปแ (แ แจแณ แฃแแแซ) แ แจแฐแ แแแแ แแแต แแตแฅ แแณแ แแ แจแแซแแฐแ แฒแแแฃ แแ แฐแแฃแฉ แแฌแตแ แแแซแตแฃ แตแแ แญ แแแจแต แฅแ แจแแฌแต แซแญแณ แแแแแต แแแข
๐แแ แแ แฐแแฃแซแตแ แแแแแต
1. แจแแฌแต แ แจแณ แฅแ แแแซแต
แจแฆแณ แตแแ แญ แแแจแตแฆ แจแ แแตแ แแฌแตแฃ แคแต แแญแ แแฅแจแต แตแญแญแแ แตแแ แญ แ แแแฃแต แแณแจแตแข
แแแชแซ แแซแแตแฆ แแแแ แจแ แจแณ แแณแชแซแแฝแ (แแแณแ แถแณแ แตแดแฝแแฃ แแแคแตแฃ แตแฎแ) แ แแ แแ แจแแฌแฑแ แตแแตแฃ แญแแแต แฅแ แ แญแ แแแซแตแข
แจแจแฐแ แซแญแณ แแแแแฆ แ แณแฒแต แ แแปแแฝแฃ แแแแถแฝ แฅแ แจแแฌแต แญแแแแฝ แฅแแฒแณแฉ แจแจแฐแแแ แซแญแณ แ แจแแแ แแแแแข
2. แจแแแต แ แฐแฃแฅ แแฐแต แแตแฅ แแณแฐแ
แจแ แแป แแแต แแฐแปแฆ แ แแต แฐแ แคแต แแแแแฃแต แแแต แฒแซแแแญแตแฃ แซแแจแ แ แแแ แจแแแแฐแ แจแแฌแต แตแแ แญ แฅแ แจแจแฐแ แแแ แแญ แจแแตแแ แแแแ แแจแแแฅแข
แจแตแแ แญ แแจแแแซแฆ แแฅแจแต แฒแธแฅ แแญแ แฒแแจแตแฃ แจแแฌแฑ แตแแ แญ แตแญแญแแ แแแแ แ แฆแณแ แ แแ แจแต แแจแแแฅแข
3. แจแแ-แแฅ แแแฃแณ แญแตแตแ
แแฅแฅแญแฆ แ แจแฐแแ แแตแฅ แซแ แแแต แแญแ แจแแแต แแญ แจแแฐแจแ แแแฃแณ แแแฉแ แแจแณแฐแแข
แแตแแ แฅแ แชแแญแต แแตแจแแฆ แแ-แแฅ แแแฃแณ แฒแแ แแแตแแ แฅแ แแแ แฃแแตแแฃแ แชแแญแต แแตแจแแข
4. แจแณแฐแณ แฅแแต แฅแ แชแแญแต แแ แจแฅ
แชแแญแต แแแแแตแฆ แฃแซแแฐแ แ แจแณ แแฐแจแต แดแญแแซแ แชแแญแตแฃ แซแญแณ แฅแ แแตแ แ แแแแแต แแ แแญ แ แซแ แแ แจแฅแข
แแจแ แ แซแซแแฆ แจแฐแแซแฉ แจแแฌแต แแจแแแฝแ (แฒแแณแ แฅแ แ แแแ) แ แแจแแธแตแฃ แ แแฐแซแแต แฅแ แแตแฐแณแฐแญแข
5. แจแ แฅแจแฐแฐแก แแญ แแแแแต
แแญแญ แแตแ แตแฆ แแ แแแแแต แแแ แแแฝ แจแแฌแต แตแแ แญแฃ แจแแแต แ แฐแฃแฅ แแฐแต แฅแ แจแจแฐแ แแแ แฐแแฆแฝแ แ แฐแแแจแฐ แแตแจแณแตแ แแแจแญแข
แ แแแแฃแฃแต แแแณแตแฆ แ แแจแคแถแฝ แแซแจแ แจแตแแ แญ แญแญแญแญ แฒแแ แญ แ แฆแณแ แ แแ แจแต แฅแแแณแแ แ แแตแจแณแต แ แแแแฃแฃแฑแ แแแแณแต แแญแณแตแข
6. แจแแณแชแซ แฅแแญแฅแซแค
แจแแณแชแซ แ แซแซแแฆ แแต แจแแ แจแ แจแณ แแณแชแซแแฝแ (แถแณแ แตแดแฝแแฃ แดแแถแแญแตแฃ แแแฐ) แ แ แแฃแก แแ แแแฃ แแแจแฃแจแฅ แฅแ แแตแฐแซแจแแข
๐ซแแแแ แคแต แแตแฅ แจแ แจแณ แดแญแแปแ แแ แแตแซแต แแแต แจแจแฐแแแ แตแญแ แต แฅแ แแ แต แแแตแ แ แ แฃ แจแแแฝแ แจแฃแแคแตแแต แแฅแต แแแจแแแฅ แฅแ แแแแ แแแต แแฐแจแต แจแแ แแจแ แ แแ แจแฅ แจแแต แแฅแฐแ แ แตแฐแแฝแฆ แแ แญแจแต แแแข
@etconp
โค15
ADVERTISMENT
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โ แจแแแฐแฃแธแ แ แแแแแถแฝ
๐ แแแต any Size & thickness
๐ แ แฆแแต (แฅแญแต แแแฃแตแ แแ แ)
๐ แจแฐแแซแฉ [modefic] แตแซแแฝแ แฅแแฐแซแแแข
โฆ๏ธ แแแแแแ แฅแจแณ แฅแจแต แฅแแแแแแข
โ๏ธแตแแญ 0904040477 แแญแ 0911016833 แฐแแแ แซแแแ
๐ฑแดแแแซแ แแญ แฆhttps://t.me/heavenic1
แ แตแซแปแฆ แ 1.แแญแซแถ
แ.2 แ แจแญ แคแ แชแณแ แแ แจแต
แฅแซแตแ แณแแแแต แแแซแฝแ แแแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โ แจแแแฐแฃแธแ แ แแแแแถแฝ
๐ แแแต any Size & thickness
๐ แ แฆแแต (แฅแญแต แแแฃแตแ แแ แ)
๐ แจแฐแแซแฉ [modefic] แตแซแแฝแ แฅแแฐแซแแแข
โฆ๏ธ แแแแแแ แฅแจแณ แฅแจแต แฅแแแแแแข
โ๏ธแตแแญ 0904040477 แแญแ 0911016833 แฐแแแ แซแแแ
๐ฑแดแแแซแ แแญ แฆhttps://t.me/heavenic1
แ แตแซแปแฆ แ 1.แแญแซแถ
แ.2 แ แจแญ แคแ แชแณแ แแ แจแต
แฅแซแตแ แณแแแแต แแแซแฝแ แแแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โค3
๐Concrete doesnโt gain strength overnight โ it develops step by step through proper curing. ๐๏ธ
๐น Day 1 โ Initial Setting:Surface water starts evaporating.
Early hydration begins.
๐น Day 7 โ Hardening:
Crystal formation increases.
Cement hydration continues.
Strength grows rapidly.
๐น Day 28 โ Maximum Strength:Concrete achieves its design strength and becomes a solid structural element.
Proper curing = Better durability + Higher strength + Longer service life.
โก๏ธNever ignore curing in construction work!
๐งConcrete Curing Process โ Key Points
- Day 1: Initial Setting
- Surface water evaporates
- Loss of moisture at the top layer
- Concrete begins to stiffen
- Day 7: Hardening
- Hydration of cement continues
- Crystals start forming within the mix
- Strength development is noticeable
- Day 28: Maximum Strength
- Solid, dense structure achieved
- Design strength is fully reached
- Concrete is durable and ready for load-bearing
@etconp
๐น Day 1 โ Initial Setting:Surface water starts evaporating.
Early hydration begins.
๐น Day 7 โ Hardening:
Crystal formation increases.
Cement hydration continues.
Strength grows rapidly.
๐น Day 28 โ Maximum Strength:Concrete achieves its design strength and becomes a solid structural element.
Proper curing = Better durability + Higher strength + Longer service life.
โก๏ธNever ignore curing in construction work!
๐งConcrete Curing Process โ Key Points
- Day 1: Initial Setting
- Surface water evaporates
- Loss of moisture at the top layer
- Concrete begins to stiffen
- Day 7: Hardening
- Hydration of cement continues
- Crystals start forming within the mix
- Strength development is noticeable
- Day 28: Maximum Strength
- Solid, dense structure achieved
- Design strength is fully reached
- Concrete is durable and ready for load-bearing
@etconp
โค7๐4๐1
๐Common Reasons for Wall Cracks
๐งWall cracks are not just cosmetic problems โ they can indicate deeper structural issues.
๐ Major Causes:
1๏ธโฃ Foundation Settlement Uneven soil movement can cause vertical or diagonal cracks.
2๏ธโฃ Poor Curing
Insufficient water curing leads to shrinkage cracks.
3๏ธโฃ Overloading
Excess structural load creates stress beyond design capacity.
4๏ธโฃ Thermal Expansion
Temperature changes cause expansion and contraction of materials.
๐ Always inspect cracks early.
โบSmall cracks today can become major repairs tomorrow.
- Foundation Settlement
- Vertical cracks often appear.
- Caused by uneven soil movement or weak foundation support.
- Poor Curing
- Diagonal cracks in brickwork.
- Results from insufficient water curing during construction.
- Overloading
- Cracks near corners or joints.
- Happens when structural members carry more load than designed.
- Thermal Expansion
- Fine, hairline cracks on concrete surfaces.
- Due to temperature changes causing expansion and contraction.
๐ทFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
๐งWall cracks are not just cosmetic problems โ they can indicate deeper structural issues.
๐ Major Causes:
1๏ธโฃ Foundation Settlement Uneven soil movement can cause vertical or diagonal cracks.
2๏ธโฃ Poor Curing
Insufficient water curing leads to shrinkage cracks.
3๏ธโฃ Overloading
Excess structural load creates stress beyond design capacity.
4๏ธโฃ Thermal Expansion
Temperature changes cause expansion and contraction of materials.
๐ Always inspect cracks early.
โบSmall cracks today can become major repairs tomorrow.
- Foundation Settlement
- Vertical cracks often appear.
- Caused by uneven soil movement or weak foundation support.
- Poor Curing
- Diagonal cracks in brickwork.
- Results from insufficient water curing during construction.
- Overloading
- Cracks near corners or joints.
- Happens when structural members carry more load than designed.
- Thermal Expansion
- Fine, hairline cracks on concrete surfaces.
- Due to temperature changes causing expansion and contraction.
๐ทFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค12
๐Calculating Elevations Using Auto Level
โThis Engineering Visual Explains How To Determine Point Elevations Using An Auto Level And Staff Readings.
For Point A, The Base Elevation Of 1637.9 m Plus A 1.4 m Base Height Minus A 6.0 m Staff Reading Results In An Elevation Of 1633.3 m.
Precise Measurements Over A 100 m Horizontal Distance Ensure Accurate Grading And Site Surveying For Infrastructure Projects.
โ#CivilEngineering #Surveying #AutoLevel #LandSurveying #EngineeringCalculations #SiteEngineering #ConstructionSurvey #Geomatics
@etconp
โThis Engineering Visual Explains How To Determine Point Elevations Using An Auto Level And Staff Readings.
For Point A, The Base Elevation Of 1637.9 m Plus A 1.4 m Base Height Minus A 6.0 m Staff Reading Results In An Elevation Of 1633.3 m.
Precise Measurements Over A 100 m Horizontal Distance Ensure Accurate Grading And Site Surveying For Infrastructure Projects.
โ#CivilEngineering #Surveying #AutoLevel #LandSurveying #EngineeringCalculations #SiteEngineering #ConstructionSurvey #Geomatics
@etconp
โค6
#แแฅแญ
แ แ แฒแฑ แจแแข แแฅแญ แ แแ แแฐแจแต แจแฐแจแ "แ" แแฅแญ แจแแฎแฝ แจแฐแซแแ แจแแฅแญ แ แแต แ แแต แ แแ แจแ แจแแฅแญ แแแต แจแจแแแตแ แแฅแญ 25% แจแแณแฅ แชแแญแต แจแแแญแฅแ แต แแญ แแจแจแป แแแฎ แ แจแถแตแต แแฉ แ แฐแ แแแ 30 แแแต แแตแฅ แ แตแแตแแ แแญแแ แฅแแณแแฃแธแ แฐแฐแแแแแข
แ แ แแ แแฐแจแต แ แฝแซแญ แแญ แจแฐแแแฐ แจแ แตแ แแข แแฅแญ แฐแแแฝ แ แแตแจแ แแฅแฉ แแจแแ แ แแ แตแข
แ eTax แแฅแญแ แ แณแแ แแแญแแ แฅแแฒแปแ Advance Quarterly payment Advice-Schedule C แจแแ Account แแจแแฑแ แจแแขแแฝ แแแตแดแญ แ แณแแแแข
แแฅแญ แจแแฎแฝ แ2017 แจแแฅแญ แแแต แจแฐแจแแแแ แแฅแญ 25%(1/4) แจแแญแแซ แแแ แจแซแฒแต 30/2018 แณแซแแ Efiled แ แตแญแแ แแฅแซแธแแ แฅแแฒแจแแ แแแตแดแฉ แ แณแตแงแแข
แแแญแถ แจแแจแแ แแฅแญ #แแแต แฅแ #แแแซ แจแแซแตแจแตแ แแแ แฐแแแญแทแแข
แจแ แจแแแ แแฐแฑแ แ แฐแแแจแฐ แจแแญ แแฅแซแชแซ แแญแงแแข
@etconp
แ แ แฒแฑ แจแแข แแฅแญ แ แแ แแฐแจแต แจแฐแจแ "แ" แแฅแญ แจแแฎแฝ แจแฐแซแแ แจแแฅแญ แ แแต แ แแต แ แแ แจแ แจแแฅแญ แแแต แจแจแแแตแ แแฅแญ 25% แจแแณแฅ แชแแญแต แจแแแญแฅแ แต แแญ แแจแจแป แแแฎ แ แจแถแตแต แแฉ แ แฐแ แแแ 30 แแแต แแตแฅ แ แตแแตแแ แแญแแ แฅแแณแแฃแธแ แฐแฐแแแแแข
แ แ แแ แแฐแจแต แ แฝแซแญ แแญ แจแฐแแแฐ แจแ แตแ แแข แแฅแญ แฐแแแฝ แ แแตแจแ แแฅแฉ แแจแแ แ แแ แตแข
แ eTax แแฅแญแ แ แณแแ แแแญแแ แฅแแฒแปแ Advance Quarterly payment Advice-Schedule C แจแแ Account แแจแแฑแ แจแแขแแฝ แแแตแดแญ แ แณแแแแข
แแฅแญ แจแแฎแฝ แ2017 แจแแฅแญ แแแต แจแฐแจแแแแ แแฅแญ 25%(1/4) แจแแญแแซ แแแ แจแซแฒแต 30/2018 แณแซแแ Efiled แ แตแญแแ แแฅแซแธแแ แฅแแฒแจแแ แแแตแดแฉ แ แณแตแงแแข
แแแญแถ แจแแจแแ แแฅแญ #แแแต แฅแ #แแแซ แจแแซแตแจแตแ แแแ แฐแแแญแทแแข
แจแ แจแแแ แแฐแฑแ แ แฐแแแจแฐ แจแแญ แแฅแซแชแซ แแญแงแแข
@etconp
โค5๐2๐ฅ1
๐What Is Scaffold
โถA SCAFFOLD is a temporary structure erected to support access or working platforms.
*Scaffolds are commonly used in construction work so workers have a safe, stable work platform when work cannot be done at ground level or on a finished floor.
*SCAFFOLDING means the individual components, for example tubes, couplers or frames and materials
that when assembled form a scaffold. *Scaffolding is classified as plant under Work Health and Safety
.
*about 35 to 40 percent of all the accidents that take place in building construction sites is due to faulty scaffolding and consequent fall of persons from heights, strict supervision should be taken in putting up of scaffolding according to standard
practices.
โถScaffolding Parts.
Scaffolding contains the following parts.
1. Standards: The vertical posts (also called uprights).
2. Ledgers: The horizontal members parallel to the wall.
3. Braces: The bracing system.
4. Putlogs: Horizontal members normal to the wall.
5. Transoms: Putlogs whose both ends are supported on ledgers in double scaffolding.
6. Bridle: Member used to bridge openings.
7. Boarding: Planks on which workmen stand.
8. Guard rail: Rail provided at about 1 m level to guard the men working on the boarding.
9. Toe board: Boards placed parallel to boarding near the wall to give protection to workers.
10. Base plate or sole plate: Plates on the ground supporting standards.
.
โถScaffolding Types.
Some of the commonly types of scaffolding are described below:
1. Single scaffolding or bricklayers scaffolding. This type of scaffolding is mostly used for brickwork and consists of an outer row of verticals;(called standards) to which longitudinal members are tied at different levels of working
2. Double scaffolding or Masonโs scaffolding. This is a supporting system used by masons for plastering .
It has pairs of (inner and outer) verticals. The putlogs, instead of being supported on the wall, are supported on an inner system of verticals and longitudinalโs.
To give additional lateral stability to the narrow and tall framework, it is tied to the building at intervals when used for multistory building.
3. Cantilever or needle scaffolding.
For the construction of the upper part of a tall residential building , cantilever scaffolding eliminates unwanted scaffolding at lower levels keeping the
space free for vehicles, etc.
It is similar to the double scaffold, except that it is
supported at the bottom by a cantilever prop.
4. Birdscage scaffolding.
It is used for internal work and consists of a simple cage supported on four verticals from which the;workers can work.
It is movable and can be easily moved from place to place.
5. Ladder or trestle scaffolding.
This is used for light work and is usually portable.
It consists of two ladders with the top ends joined together by planks so that a person can work on this platform.
6. Suspended scaffolding.
In tall buildings for working at high levels, such as the painting of tall buildings, it is more convenient
and economical to suspend the working platform from above the ground than to support it from the ground.
*This is especially so when the height is more than 30 meters.
.
โถImportant Points in Scaffolding.
The following are some of the important rules to be remembered in scaffolding work:
1. The uprights (standards) should not be spaced more than 1.8 m (6 ft) for heavy work such as masonry and not more than 3 m (10 ft) for light
work such as painting.
2. The putlogs in single scaffolding should bear well on the wall opening. Short members nailed onto the wall should not be used as putlogs.
3. The platforms should be wide enough. It should not be less than 17 inches (425 mm) in width if the
height is more than 1.8 meters.
If materials are stored on it, it should not be less than 850 mm (34 inches) in width.
*Each board should be 50 mm thick and
200 mm (8 inches) wide for the putlog spacing of 1.5 m or more.
It can be 38 mm (11/2 inches)
thick for 0.9 to 1.5 m and 25 mm (1 inch) for less than 1.5 in putlog spacingโs.
@etconp
โถA SCAFFOLD is a temporary structure erected to support access or working platforms.
*Scaffolds are commonly used in construction work so workers have a safe, stable work platform when work cannot be done at ground level or on a finished floor.
*SCAFFOLDING means the individual components, for example tubes, couplers or frames and materials
that when assembled form a scaffold. *Scaffolding is classified as plant under Work Health and Safety
.
*about 35 to 40 percent of all the accidents that take place in building construction sites is due to faulty scaffolding and consequent fall of persons from heights, strict supervision should be taken in putting up of scaffolding according to standard
practices.
โถScaffolding Parts.
Scaffolding contains the following parts.
1. Standards: The vertical posts (also called uprights).
2. Ledgers: The horizontal members parallel to the wall.
3. Braces: The bracing system.
4. Putlogs: Horizontal members normal to the wall.
5. Transoms: Putlogs whose both ends are supported on ledgers in double scaffolding.
6. Bridle: Member used to bridge openings.
7. Boarding: Planks on which workmen stand.
8. Guard rail: Rail provided at about 1 m level to guard the men working on the boarding.
9. Toe board: Boards placed parallel to boarding near the wall to give protection to workers.
10. Base plate or sole plate: Plates on the ground supporting standards.
.
โถScaffolding Types.
Some of the commonly types of scaffolding are described below:
1. Single scaffolding or bricklayers scaffolding. This type of scaffolding is mostly used for brickwork and consists of an outer row of verticals;(called standards) to which longitudinal members are tied at different levels of working
2. Double scaffolding or Masonโs scaffolding. This is a supporting system used by masons for plastering .
It has pairs of (inner and outer) verticals. The putlogs, instead of being supported on the wall, are supported on an inner system of verticals and longitudinalโs.
To give additional lateral stability to the narrow and tall framework, it is tied to the building at intervals when used for multistory building.
3. Cantilever or needle scaffolding.
For the construction of the upper part of a tall residential building , cantilever scaffolding eliminates unwanted scaffolding at lower levels keeping the
space free for vehicles, etc.
It is similar to the double scaffold, except that it is
supported at the bottom by a cantilever prop.
4. Birdscage scaffolding.
It is used for internal work and consists of a simple cage supported on four verticals from which the;workers can work.
It is movable and can be easily moved from place to place.
5. Ladder or trestle scaffolding.
This is used for light work and is usually portable.
It consists of two ladders with the top ends joined together by planks so that a person can work on this platform.
6. Suspended scaffolding.
In tall buildings for working at high levels, such as the painting of tall buildings, it is more convenient
and economical to suspend the working platform from above the ground than to support it from the ground.
*This is especially so when the height is more than 30 meters.
.
โถImportant Points in Scaffolding.
The following are some of the important rules to be remembered in scaffolding work:
1. The uprights (standards) should not be spaced more than 1.8 m (6 ft) for heavy work such as masonry and not more than 3 m (10 ft) for light
work such as painting.
2. The putlogs in single scaffolding should bear well on the wall opening. Short members nailed onto the wall should not be used as putlogs.
3. The platforms should be wide enough. It should not be less than 17 inches (425 mm) in width if the
height is more than 1.8 meters.
If materials are stored on it, it should not be less than 850 mm (34 inches) in width.
*Each board should be 50 mm thick and
200 mm (8 inches) wide for the putlog spacing of 1.5 m or more.
It can be 38 mm (11/2 inches)
thick for 0.9 to 1.5 m and 25 mm (1 inch) for less than 1.5 in putlog spacingโs.
@etconp
๐8โค1
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค5
๐Multi-Sport Court Dimension Guide
1. Ball Sports Fields
๐Basketball Court: 26mร14m (with buffer zone, recommend 30mร18m).
A basketball court is a common sports venue with standard dimensions of 26 meters by 14 meters.
It is recommended to add a buffer zone to reach 30 meters by 18 meters.
๐Volleyball Court: 18mร9m (an 8m obstacle-free area is required beyond the end line).
The volleyball court measures 18 meters by 9 meters, with an 8-meter obstacle-free area required beyond the end line.
๐Tennis Court: 23.77mร10.97m (for doubles, including buffer zone it requires 36.6mร18.3m).
A tennis court is the standard size for doubles matches, with dimensions of 36.6 meters by 18.3 meters when including the buffer zone.
๐Badminton Court: 13.4mร6.1m (singles is 5.18m wide, with a 1.5m safety distance required around the perimeter).
The singles width of a badminton court is 5.18 meters, requiring a safety distance around the perimeter.
2. Water Sports Fields
๐Short Pool: 25mร12.5m (recommended depth โฅ1.35m).
The standard size for a short pool is 25 meters by 12.5 meters, with a recommended depth of at least 1.35 meters.
๐Standard Pool: 50mร25m (Olympic specification, requires 2.5m lanes).
The standard pool size is 50 meters by 25 meters, suitable for Olympic specifications, and requires 2.5-meter lanes.
3. Track and Field Sport Fields
๐Football Soccer Field: 105mร68m (11-a-side international standard).
The soccer field dimensions are 105 meters by 68 meters, the international standard for 11-a-side matches.
๐400m Track: 176mร98m (8-lane track with a 36.5m radius curve).
The 400m track dimensions are 176 meters by 98 meters, suitable for an 8-lane track with a curve radius of 36.5 meters.
๐200m Track: 93.1mร50.6m (common 6-lane configuration for primary and secondary schools).
The 200m track dimensions are 93.1 meters by 50.6 meters, a common 6-lane configuration for primary and secondary schools.
โญ๏ธPlanning and Design Guide:
1. All dimensions are for the competition area net size and require an external buffer zone (recommend โฅ3m).
Design must consider the net size of the competition area and expand with a buffer zone.
2. Pay attention to the orientation of the field: a north-south layout avoids direct sunlight.
When laying out the field, orientation should be considered to avoid direct sunlight affecting the competition.
3. For multi-use fields, it is recommended to stack functions (e.g., a basketball court that can also be used for badminton).
To improve field utilization, consider stacking different functions.
4. Pools need separate changing/disenfection areas (with auxiliary space at a 1:1 ratio).
Pool design requires separate changing and disinfection areas.
5. Soccer fields need to consider lawn slope (0.3%-0.5% drainage slope). Soccer field lawn design must consider drainage slope.
@etconp
1. Ball Sports Fields
๐Basketball Court: 26mร14m (with buffer zone, recommend 30mร18m).
A basketball court is a common sports venue with standard dimensions of 26 meters by 14 meters.
It is recommended to add a buffer zone to reach 30 meters by 18 meters.
๐Volleyball Court: 18mร9m (an 8m obstacle-free area is required beyond the end line).
The volleyball court measures 18 meters by 9 meters, with an 8-meter obstacle-free area required beyond the end line.
๐Tennis Court: 23.77mร10.97m (for doubles, including buffer zone it requires 36.6mร18.3m).
A tennis court is the standard size for doubles matches, with dimensions of 36.6 meters by 18.3 meters when including the buffer zone.
๐Badminton Court: 13.4mร6.1m (singles is 5.18m wide, with a 1.5m safety distance required around the perimeter).
The singles width of a badminton court is 5.18 meters, requiring a safety distance around the perimeter.
2. Water Sports Fields
๐Short Pool: 25mร12.5m (recommended depth โฅ1.35m).
The standard size for a short pool is 25 meters by 12.5 meters, with a recommended depth of at least 1.35 meters.
๐Standard Pool: 50mร25m (Olympic specification, requires 2.5m lanes).
The standard pool size is 50 meters by 25 meters, suitable for Olympic specifications, and requires 2.5-meter lanes.
3. Track and Field Sport Fields
๐Football Soccer Field: 105mร68m (11-a-side international standard).
The soccer field dimensions are 105 meters by 68 meters, the international standard for 11-a-side matches.
๐400m Track: 176mร98m (8-lane track with a 36.5m radius curve).
The 400m track dimensions are 176 meters by 98 meters, suitable for an 8-lane track with a curve radius of 36.5 meters.
๐200m Track: 93.1mร50.6m (common 6-lane configuration for primary and secondary schools).
The 200m track dimensions are 93.1 meters by 50.6 meters, a common 6-lane configuration for primary and secondary schools.
โญ๏ธPlanning and Design Guide:
1. All dimensions are for the competition area net size and require an external buffer zone (recommend โฅ3m).
Design must consider the net size of the competition area and expand with a buffer zone.
2. Pay attention to the orientation of the field: a north-south layout avoids direct sunlight.
When laying out the field, orientation should be considered to avoid direct sunlight affecting the competition.
3. For multi-use fields, it is recommended to stack functions (e.g., a basketball court that can also be used for badminton).
To improve field utilization, consider stacking different functions.
4. Pools need separate changing/disenfection areas (with auxiliary space at a 1:1 ratio).
Pool design requires separate changing and disinfection areas.
5. Soccer fields need to consider lawn slope (0.3%-0.5% drainage slope). Soccer field lawn design must consider drainage slope.