โค13๐2๐1
๐solutions for damp walls:
๐งIncorrect Situation
- Rainwater flows directly onto the wall.
- Causes structural damage and mold growth.
- Lack of proper detailing leads to moisture penetration.
- Wall surface remains exposed to continuous wetting.
๐งCorrect Situation
- Rainwater is diverted away from the wall.
- Use of metal flashing / drip edge prevents water seepage.
- Upstand/Empend provides a barrier against moisture.
- Roof slab detailing ensures effective protection.
- Results in long-term durability and moisture resistance.
๐ง Solution for Damp Walls
Water leakage at roof edges is one of the most common reasons for damp walls, cracks, and mold growth.
๐ด Incorrect Method:
Without proper metal flashing or drip edge, rainwater flows directly over the roof slab and down the wall surface. This leads to seepage, structural damage, and unhealthy mold formation inside the building.
๐ข Correct Method:
Providing a proper metal flashing / drip edge (Babeta) at the roof edge redirects rainwater away from the wall. This simple detailing prevents moisture penetration and protects the structure for long-term durability.
โ Small detailing = Big protection!
Always ensure proper roof edge treatment to avoid costly repairs in the future.
๐งFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
๐งIncorrect Situation
- Rainwater flows directly onto the wall.
- Causes structural damage and mold growth.
- Lack of proper detailing leads to moisture penetration.
- Wall surface remains exposed to continuous wetting.
๐งCorrect Situation
- Rainwater is diverted away from the wall.
- Use of metal flashing / drip edge prevents water seepage.
- Upstand/Empend provides a barrier against moisture.
- Roof slab detailing ensures effective protection.
- Results in long-term durability and moisture resistance.
๐ง Solution for Damp Walls
Water leakage at roof edges is one of the most common reasons for damp walls, cracks, and mold growth.
๐ด Incorrect Method:
Without proper metal flashing or drip edge, rainwater flows directly over the roof slab and down the wall surface. This leads to seepage, structural damage, and unhealthy mold formation inside the building.
๐ข Correct Method:
Providing a proper metal flashing / drip edge (Babeta) at the roof edge redirects rainwater away from the wall. This simple detailing prevents moisture penetration and protects the structure for long-term durability.
โ Small detailing = Big protection!
Always ensure proper roof edge treatment to avoid costly repairs in the future.
๐งFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค9
แแแแต แแแฝ แแแฐ แแแณแต แจแแแฃแแธแ แจแฐแแฝ แจแแซแแซแญแกแ แณแญแแ แฅแญแต แ แญแณแฝแ แจแแซแซแญแแ แแธแแข
โแจแฐแ แแ "แจแจแฐแ แแตแแแต" (Urban Sprawl) แฐแฝแฅแ แตแญ แแตแ แจแฐแธแแ แญแแตแแแข แญแ แ แแตแแแต แ แแชแ แแญ แฅแแ แจแแแ แจแฐแ แณแฐแ แแแญแ แแตแญ แฒแแแฃ แญแ แ แแแซแฝแ แ แแฒแต แณแฆแ แแแแแต แฅแป แ แแแต แถแ แจแฅแจแต แณแฅแ (แแชแ) แแตแฅ แจแแแญแซ แฆแณแฝแ แฐแแตแฐแ แฆแตแต แชแแแตแญ แฅแแตแแแ แ แตแแตแถแแแข
โแญแ แจแชแ-แ แแ แฅแ แตแแจแฐแ แแตแแต แฅแป แ แญแฐแแแค แฅแแ แแ แ แซแ แฅแ แ แซแฃแขแซแ แแตแแตแ แญแแญ แฅแแแข
แแแซแ แแ แแ แแ แแตแจแ แฅแแณแแฅแ แจแแแแ แฒแแ แฃ แแแ แจแตแแจแฐแ แแตแฐแซแจแซ แแณแชแซแแฝแ แ แฅแแฝแ แญแแแแก-
โโ แจแฐแ แณแฐแ แแฐ แฐแ แแ (Compactness)
แแตแแแต แจแฐแแแ แจแคแต "แฐแดแถแฝแ" แญแฐแ แแแข แแแซแจแฅ แแ แขแซแแต แ แซแฌ แชแ แแตแญ 15,000 แฐแแฝ แจแแแฉแ แต แจแฐแแแ แจแจแฐแ แ แญแฝ แญแฐแ แแแข แญแ แ แจแ แซแฃแข แฑแแฝ แฅแ แจแแแฅ แตแซแแตแแญแต แแคแณแ แฅแแฒแแ แซแฐแญแแแข
โโ แจแจแ แ แแ แแฐ แฅแแญ แแ
แ แ แฎแแ แแดแ แจแจแ แ แแแแต แฐแแฆแฝ แฅแตแจแแฝ แแแข แ แ แฒแฑ แแดแ แแ แจแแแต แฐแแแต แแแแถแฝแ แจ5 แฅแตแจ 15 แฐแแ แจแฅแแญ แแ แแตแฅ แญแแแโแญแ แ "แจแคแต-แฅแซ-แ แแแแแต" แถแตแต แแแแแ (Home-Work-Service triangle)แซแแแแแข
โโ แจแ แแต แ แแแแแต แแฐ แฐแแแ แแญแแต (Mixed-Vibrancy)
แ แแแซแฝแแ แ แฐแแซแฉ "แแ แแแฝ" แแซแจแ แแจแแแ แแแ แ แแฅแแข แจแแแชแซแฃ แจแแแต แฅแ แจแแแฅ แฆแณแแฝแ แ แแแแแแฃ แ แแ 24 แฐแแต แฐแ แแแณแธแ แจแฐแ แ แ แฅแ แแ แจแแ แแณแแแฝแ แฅแแแฅแซแแแข
โโ แ แแชแ แจแแแซแต แแฐ แแแ แแณแแแฝ
แจแแตแแแต แแญแค แแฐแฝแจแญแซแช แ แแซ แแณแแแฝ แ แตแแซแ แญแฐแฃแแค แจแแแซแจแฅ แแญแค แแ แแฐแ แแ แ แตแแซ แ แแตแ แต แแฅแแญ แแแฃ แแฅแตแญแแต แฅแ แแ แญแฅ แแแแแถแฝ แ แตแฐแแแ แแแแถแฝแ แซแแแแแข
โโ แจแฅแแต แฐแแแญแแต แแฐ แฝแแต (Resilience)
แจแจแฐแ แแตแแแต แฐแแฅแฎแ แญแแฃแแข แแแซแจแฅ แแ แฐแแฅแฎแ แจแฐแแญ แแญ แซแแ แณแแค แญแ แ แ แแตแแแต แแญแแซแต แจแแแฃแแ แแแตแ แจแแญแ แ แฐแ แแแแแต แญแจแณแแข
โ
Via UN-HABITAT
@etconp
โแจแฐแ แแ "แจแจแฐแ แแตแแแต" (Urban Sprawl) แฐแฝแฅแ แตแญ แแตแ แจแฐแธแแ แญแแตแแแข แญแ แ แแตแแแต แ แแชแ แแญ แฅแแ แจแแแ แจแฐแ แณแฐแ แแแญแ แแตแญ แฒแแแฃ แญแ แ แแแซแฝแ แ แแฒแต แณแฆแ แแแแแต แฅแป แ แแแต แถแ แจแฅแจแต แณแฅแ (แแชแ) แแตแฅ แจแแแญแซ แฆแณแฝแ แฐแแตแฐแ แฆแตแต แชแแแตแญ แฅแแตแแแ แ แตแแตแถแแแข
โแญแ แจแชแ-แ แแ แฅแ แตแแจแฐแ แแตแแต แฅแป แ แญแฐแแแค แฅแแ แแ แ แซแ แฅแ แ แซแฃแขแซแ แแตแแตแ แญแแญ แฅแแแข
แแแซแ แแ แแ แแ แแตแจแ แฅแแณแแฅแ แจแแแแ แฒแแ แฃ แแแ แจแตแแจแฐแ แแตแฐแซแจแซ แแณแชแซแแฝแ แ แฅแแฝแ แญแแแแก-
โโ แจแฐแ แณแฐแ แแฐ แฐแ แแ (Compactness)
แแตแแแต แจแฐแแแ แจแคแต "แฐแดแถแฝแ" แญแฐแ แแแข แแแซแจแฅ แแ แขแซแแต แ แซแฌ แชแ แแตแญ 15,000 แฐแแฝ แจแแแฉแ แต แจแฐแแแ แจแจแฐแ แ แญแฝ แญแฐแ แแแข แญแ แ แจแ แซแฃแข แฑแแฝ แฅแ แจแแแฅ แตแซแแตแแญแต แแคแณแ แฅแแฒแแ แซแฐแญแแแข
โโ แจแจแ แ แแ แแฐ แฅแแญ แแ
แ แ แฎแแ แแดแ แจแจแ แ แแแแต แฐแแฆแฝ แฅแตแจแแฝ แแแข แ แ แฒแฑ แแดแ แแ แจแแแต แฐแแแต แแแแถแฝแ แจ5 แฅแตแจ 15 แฐแแ แจแฅแแญ แแ แแตแฅ แญแแแโแญแ แ "แจแคแต-แฅแซ-แ แแแแแต" แถแตแต แแแแแ (Home-Work-Service triangle)แซแแแแแข
โโ แจแ แแต แ แแแแแต แแฐ แฐแแแ แแญแแต (Mixed-Vibrancy)
แ แแแซแฝแแ แ แฐแแซแฉ "แแ แแแฝ" แแซแจแ แแจแแแ แแแ แ แแฅแแข แจแแแชแซแฃ แจแแแต แฅแ แจแแแฅ แฆแณแแฝแ แ แแแแแแฃ แ แแ 24 แฐแแต แฐแ แแแณแธแ แจแฐแ แ แ แฅแ แแ แจแแ แแณแแแฝแ แฅแแแฅแซแแแข
โโ แ แแชแ แจแแแซแต แแฐ แแแ แแณแแแฝ
แจแแตแแแต แแญแค แแฐแฝแจแญแซแช แ แแซ แแณแแแฝ แ แตแแซแ แญแฐแฃแแค แจแแแซแจแฅ แแญแค แแ แแฐแ แแ แ แตแแซ แ แแตแ แต แแฅแแญ แแแฃ แแฅแตแญแแต แฅแ แแ แญแฅ แแแแแถแฝ แ แตแฐแแแ แแแแถแฝแ แซแแแแแข
โโ แจแฅแแต แฐแแแญแแต แแฐ แฝแแต (Resilience)
แจแจแฐแ แแตแแแต แฐแแฅแฎแ แญแแฃแแข แแแซแจแฅ แแ แฐแแฅแฎแ แจแฐแแญ แแญ แซแแ แณแแค แญแ แ แ แแตแแแต แแญแแซแต แจแแแฃแแ แแแตแ แจแแญแ แ แฐแ แแแแแต แญแจแณแแข
โ
Via UN-HABITAT
@etconp
โค7๐2๐1๐1
Forwarded from Kelemat Ads
Great news for tech lovers!
Free Data Analytics and Visualization Training
Weโre excited to announce a powerful collaborative training between INFNOVA Technologies and Orange Digital Center Liberia ๐
Join us for a 3 day intensive online training on Data Visualization and Analytics using Python, happening March 16โ18, delivered in English and designed to equip you with practical, real world data skills.
If you want to turn data into insights, build analytical thinking, and strengthen your Python skills, this is your opportunity.
๐ Registration Deadline: Saturday, March 14
๐ Register here: https://forms.gle/odghyX3tfySUgCx19
Free Data Analytics and Visualization Training
Weโre excited to announce a powerful collaborative training between INFNOVA Technologies and Orange Digital Center Liberia ๐
Join us for a 3 day intensive online training on Data Visualization and Analytics using Python, happening March 16โ18, delivered in English and designed to equip you with practical, real world data skills.
If you want to turn data into insights, build analytical thinking, and strengthen your Python skills, this is your opportunity.
๐ Registration Deadline: Saturday, March 14
๐ Register here: https://forms.gle/odghyX3tfySUgCx19
๐ฃ๏ธ Rigid Road Construction Process Step By Step
Rigid road means a cement concrete pavement. It is strong and durable, used for highways and heavy traffic roads.
Step-by-Step
1.Site Survey & Marking
Alignment, levels, and road width are marked.
2.Excavation
Soil is removed to required depth.
3.Subgrade Preparation
Soil is compacted properly to provide a strong base.
4.Laying Sub-Base
Granular material (like crushed stone) is spread and compacted.
5.Formwork & Reinforcement
Side forms are fixed and steel bars/mesh placed (if required).
6.Concrete Mixing & Pouring
Cement concrete is poured on prepared surface.
7.Vibrating & Leveling
Vibrator removes air gaps and surface is leveled.
8.Joint Cutting & Finishing
Expansion and contraction joints are provided.
9.Curing
Water curing is done for 7โ14 days to gain strength.
10.Opening to Traffic
After proper strength (usually 28 days), road is opened.
@etconp
Rigid road means a cement concrete pavement. It is strong and durable, used for highways and heavy traffic roads.
Step-by-Step
1.Site Survey & Marking
Alignment, levels, and road width are marked.
2.Excavation
Soil is removed to required depth.
3.Subgrade Preparation
Soil is compacted properly to provide a strong base.
4.Laying Sub-Base
Granular material (like crushed stone) is spread and compacted.
5.Formwork & Reinforcement
Side forms are fixed and steel bars/mesh placed (if required).
6.Concrete Mixing & Pouring
Cement concrete is poured on prepared surface.
7.Vibrating & Leveling
Vibrator removes air gaps and surface is leveled.
8.Joint Cutting & Finishing
Expansion and contraction joints are provided.
9.Curing
Water curing is done for 7โ14 days to gain strength.
10.Opening to Traffic
After proper strength (usually 28 days), road is opened.
@etconp
โค7๐5
๐Steps in Concrete Road Construction
1. Site Survey & Marking
- Survey the area and mark boundaries.
- Trench depth: 8โ12 inches.
2. Excavation
- Dig the marked area using excavators.
- Trench width: 200โ10 mm.
3. Laying Sub-Base
- Place sub-base material (gravel/sand).
- Compact for stability.
4. Placing Forms & Steel Reinforcement
- Install formwork.
- Lay steel reinforcement grids.
5. Mixing Concrete
- Prepare concrete at batching plant.
- Ensure correct mix ratio.
6. Pouring & Spreading Concrete
- Pour concrete from mixer truck.
- Spread evenly across the surface.
7. Vibrating, Leveling & Finishing
- Use vibrators to remove air voids.
- Level and finish the surface.
8. Joints & Texturing
- Cut expansion joints.
- Apply surface texturing for grip.
9. Curing Concrete
- Keep surface moist for strength gain.
- Road opened after curing period
๐ง Concrete Road Construction โ Step by Step Process | Civil Tech Time ๐๏ธ
Building a strong and durable concrete road requires proper planning, execution, and quality control at every stage. From site survey to final curing, each step plays a vital role in ensuring long-lasting performance and safety.
1๏ธโฃ Site Survey & Marking
2๏ธโฃ Excavation
3๏ธโฃ Laying Sub-Base
4๏ธโฃ Placing Forms & Steel Reinforcement
5๏ธโฃ Mixing Concrete
6๏ธโฃ Pouring & Spreading Concrete
7๏ธโฃ Vibrating, Leveling & Finishing
8๏ธโฃ Joints & Texturing
9๏ธโฃ Curing Concrete
โ Proper depth and alignment
โ Strong sub-base preparation
โ Correct reinforcement placement
โ Proper vibration to avoid honeycombing
โ Adequate curing for strength gain
A well-executed process = Stronger roads + Longer service life + Better safety ๐
๐ทFollow for more practical civil engineering knowledge and site execution tips!
๐งFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
1. Site Survey & Marking
- Survey the area and mark boundaries.
- Trench depth: 8โ12 inches.
2. Excavation
- Dig the marked area using excavators.
- Trench width: 200โ10 mm.
3. Laying Sub-Base
- Place sub-base material (gravel/sand).
- Compact for stability.
4. Placing Forms & Steel Reinforcement
- Install formwork.
- Lay steel reinforcement grids.
5. Mixing Concrete
- Prepare concrete at batching plant.
- Ensure correct mix ratio.
6. Pouring & Spreading Concrete
- Pour concrete from mixer truck.
- Spread evenly across the surface.
7. Vibrating, Leveling & Finishing
- Use vibrators to remove air voids.
- Level and finish the surface.
8. Joints & Texturing
- Cut expansion joints.
- Apply surface texturing for grip.
9. Curing Concrete
- Keep surface moist for strength gain.
- Road opened after curing period
๐ง Concrete Road Construction โ Step by Step Process | Civil Tech Time ๐๏ธ
Building a strong and durable concrete road requires proper planning, execution, and quality control at every stage. From site survey to final curing, each step plays a vital role in ensuring long-lasting performance and safety.
1๏ธโฃ Site Survey & Marking
2๏ธโฃ Excavation
3๏ธโฃ Laying Sub-Base
4๏ธโฃ Placing Forms & Steel Reinforcement
5๏ธโฃ Mixing Concrete
6๏ธโฃ Pouring & Spreading Concrete
7๏ธโฃ Vibrating, Leveling & Finishing
8๏ธโฃ Joints & Texturing
9๏ธโฃ Curing Concrete
โ Proper depth and alignment
โ Strong sub-base preparation
โ Correct reinforcement placement
โ Proper vibration to avoid honeycombing
โ Adequate curing for strength gain
A well-executed process = Stronger roads + Longer service life + Better safety ๐
๐ทFollow for more practical civil engineering knowledge and site execution tips!
๐งFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค11
๐แตแ แตแซแแ แณแแญ (Trump Tower) 8 แ แตแแซแ แฅแแแณแแฝ
โข แตแซแแ แณแแญ แ แแ แฎแญแญ แฒแฒ แแตแฅ แ แแแแแ แ แแแ แแญ แซแ แณแแแ แแต แแณแแแฝ แ แแฑ แ แแแ แ แแแ แ แฌแ แแญ แญแแแแข
โข แตแซแแ แณแแญ 58 แแแฝ แซแแต แฒแแแฃ แแแฑแ แแฐ 202 แแตแญ (664 แซแ) แแฐแ แญแจแแแแข
โข แจแ แแปแ แแแฃแณ แ 1983 แจแฐแ แแแ แฒแแแฃ แแแฃแณแแ แซแจแแแแ แถแแแต แตแซแแ แ แซแณแธแ แตแญแ แต "แ แตแซแแ แฆแญแแแญแแฝแ" (The Trump Organization) แ แแซแแแต แแแข
โข แแฐแแซแฉ แ แแแแแถแฝ แจแแแ แ แแปแฆ แ แแปแ แจแ แแฆแต แ แแญแณแแแฝแแฃ แขแฎแแฝแแฃ แแแฅ แคแถแฝแแ แจแแ แซ แฑแแฝแ แ แ แแต แแญ แจแซแ แแแข แจแณแฝแแน แแแฝ แแแแฅ แญแแต แจแแ แจแแ แซ แฆแณแแฝ แ แแธแแข
แแฉ แแฝแณแแฝ
โข แแซแช แจแแญแฅแ แแข (Atrium)แฆ แ แแปแ แ แฎแ แแญแฅแ (pink marble) แจแฐแธแแแฃ แจแคแต แแตแฅ แแแดแแฝแ แฐแแแณแแฝ แฐแจแแแฝ (Escalators) แซแแต แฃแ 6 แแ แแซแช แแข แ แแแข
โข แ แแญแ แจแฐแแ แ แจแแตแฅ แแตแแซแฆ แจแ แแปแ แฅแ แญแแแฝแฃ แ แฐแแญแ แจแถแแแต แตแซแแ แจแแ แแแชแซแฃ แ แแญแ แจแฐแแ แก แแฃแแฆแฝแฃ แจแแญแฅแ แแแแฝแ แแต แจแญแชแตแณแ แแฅแซแถแฝ (Chandeliers) แซแแ แต แแแข
โข แจแ แแฆแต แจแแ แซ แตแแซแฆ แจแณแฝแแน แแแฝ แจแแฐแ แฅแซแต แซแแธแแ แจแแ แซ แฑแแฝแ แซแแแฝแ แจแซแ แ แแแแธแแฃ แแฐ แแ แฎแญแญ แจแแแก แ แญแซแณ แฑแชแตแถแฝแแ แแ แซแฐแแฝแ แญแตแฃแแข
โข แจแแฐแ แฅแ แแ แแฉ แแแชแซแแฝแฆ แ แแปแ แจแแฐแ แฅแ แ แจแแฐแจแแแตแ แแแฅแณแ แแแชแแฝ แฅแป แจแฐแจแแ แจแแแชแซ แแแฝ แซแแต แ แแแแฃ แ แจแฐแแ แซแ แณแแแ แแต แจแ แแฆแต แแแชแซแแฝ แ แแฑ แแแข
๐ทแจ YouTube แแแฝแ แแแแแแ แจแณแฝ แฃแแ แแแญ แ แแแฃแต SubScribe แ แญแแ แคแฐแฐแฅ แญแแ๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โข แตแซแแ แณแแญ แ แแ แฎแญแญ แฒแฒ แแตแฅ แ แแแแแ แ แแแ แแญ แซแ แณแแแ แแต แแณแแแฝ แ แแฑ แ แแแ แ แแแ แ แฌแ แแญ แญแแแแข
โข แตแซแแ แณแแญ 58 แแแฝ แซแแต แฒแแแฃ แแแฑแ แแฐ 202 แแตแญ (664 แซแ) แแฐแ แญแจแแแแข
โข แจแ แแปแ แแแฃแณ แ 1983 แจแฐแ แแแ แฒแแแฃ แแแฃแณแแ แซแจแแแแ แถแแแต แตแซแแ แ แซแณแธแ แตแญแ แต "แ แตแซแแ แฆแญแแแญแแฝแ" (The Trump Organization) แ แแซแแแต แแแข
โข แแฐแแซแฉ แ แแแแแถแฝ แจแแแ แ แแปแฆ แ แแปแ แจแ แแฆแต แ แแญแณแแแฝแแฃ แขแฎแแฝแแฃ แแแฅ แคแถแฝแแ แจแแ แซ แฑแแฝแ แ แ แแต แแญ แจแซแ แแแข แจแณแฝแแน แแแฝ แแแแฅ แญแแต แจแแ แจแแ แซ แฆแณแแฝ แ แแธแแข
แแฉ แแฝแณแแฝ
โข แแซแช แจแแญแฅแ แแข (Atrium)แฆ แ แแปแ แ แฎแ แแญแฅแ (pink marble) แจแฐแธแแแฃ แจแคแต แแตแฅ แแแดแแฝแ แฐแแแณแแฝ แฐแจแแแฝ (Escalators) แซแแต แฃแ 6 แแ แแซแช แแข แ แแแข
โข แ แแญแ แจแฐแแ แ แจแแตแฅ แแตแแซแฆ แจแ แแปแ แฅแ แญแแแฝแฃ แ แฐแแญแ แจแถแแแต แตแซแแ แจแแ แแแชแซแฃ แ แแญแ แจแฐแแ แก แแฃแแฆแฝแฃ แจแแญแฅแ แแแแฝแ แแต แจแญแชแตแณแ แแฅแซแถแฝ (Chandeliers) แซแแ แต แแแข
โข แจแ แแฆแต แจแแ แซ แตแแซแฆ แจแณแฝแแน แแแฝ แจแแฐแ แฅแซแต แซแแธแแ แจแแ แซ แฑแแฝแ แซแแแฝแ แจแซแ แ แแแแธแแฃ แแฐ แแ แฎแญแญ แจแแแก แ แญแซแณ แฑแชแตแถแฝแแ แแ แซแฐแแฝแ แญแตแฃแแข
โข แจแแฐแ แฅแ แแ แแฉ แแแชแซแแฝแฆ แ แแปแ แจแแฐแ แฅแ แ แจแแฐแจแแแตแ แแแฅแณแ แแแชแแฝ แฅแป แจแฐแจแแ แจแแแชแซ แแแฝ แซแแต แ แแแแฃ แ แจแฐแแ แซแ แณแแแ แแต แจแ แแฆแต แแแชแซแแฝ แ แแฑ แแแข
๐ทแจ YouTube แแแฝแ แแแแแแ แจแณแฝ แฃแแ แแแญ แ แแแฃแต SubScribe แ แญแแ แคแฐแฐแฅ แญแแ๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค12
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค1
๐แ แแต แจแตแซ แฐแแฃแฃแช แแแแตแต แจแฎแแ แฎแแญแชแต แจแแแแฑ แ แแต แแญแแแญแญ แตแซแ แแญ แแแแณแธแแ แแจแแแฅ แจแแแฃแ แแฐแจแณแ แแฅแฆแฝ
โต. แฅแฅแ แแแแ/Formwork rigidity
๐แจแฐแแแแ แแญแแแญแญ แจแซแฑแ แญแฅแฐแต/self weight/แฃแจแฅแจแฑแ แญแฅแฐแตแฃแจแญแฅแฅ แฎแแญแชแฑแ แญแฅแฐแตแฃ แจแฎแแญแชแต แฐแซแฐแแฝแฃ แจแแแต แแแตแฃ แจแตแซ แแณแชแซแแฝแ แแแฝ แแซแแฅแ แจแแฝแ แซแแแฝแ แจแแแแ แแ แ แ แฅแแซแฌ แแฎแต แแฐแซแฑแ แแจแแแฅ แจแแแแชแซ แตแซ แญแแแแข
๐แญแฌแธแชแ แตแณแแ แ แตแญแญแ แแแณแฑแแ แ แ แฅแแซแฌ แแฎแต vibrator แตแแ แแ แแแต แแแแ แฅแแตแฝแแ แจแฆแณแ แฅแแณแญแธแฝ แ แ แซแฑแ แ แ แฃแซ แแแ แชแซ แแแฉแ แ แญแแณ แจแแแแฑ แ แแต แแจแแแฅ
๐ แแญแ แแญแญ แแแฃแ แแซ แแญ แญแแฐแต แซแ แ แญแแณ แตแแ แ แญแแฐแฑ แซแญแฅแฌแฐแญ แตแแ แแ แแจแ แแฐ แแญ แฅแแณแญแแต แ แธแซ แแญแแ แ แแ แแแญ แญแแฐแต แแฐแแแ แแจแแแฅ
โถ.แจแแญแแแญแญ แฅแซแต/Quality of formwork material/
๐แแแญแแแญแญ แตแซ แฅแ แ แแญ แจแแแ แฅแ แซแแฐแฃแแแฃ แซแแ แ แ แซแแแ แ แฃแแฅแแต แซแแ แฃแซแแฐแแฐแฐแ แฅแฉ แฅแแซแฌแ แจแแธแจแ แ แ แ แซแแ แแแแ แแจแแแฅ แแ แ แตแแแ แตแซ แแ::
โท.แ แแฃแ แแ/Vertical alignment/
๐แจแฐแแแแ แฎแแ แแญแแแญแญ แฒแแญแ แฅแแฐแแ แญแแ แแญ แ แแแฃ แแฐแแญ แแฅ แแแฑแ แแจแแแฅ แ แแ แตแข
โธ.แ แแตแ แแ/Horizontal alignment/
๐แจแฐแแแแ แฎแแ แแญแแแญแญ แฒแแญแ แฅแแฐแแ แญแแ แจแแแฝ แฎแแแฝ แ แแปแญ แซแแ แ แแแแฅแฃ แจแณแแ แแแป แ แแแฃ แแฅแแต แซแแ แแ แแแแกแ แแจแแแฅ แ แแ แตแข
@etconp
โต. แฅแฅแ แแแแ/Formwork rigidity
๐แจแฐแแแแ แแญแแแญแญ แจแซแฑแ แญแฅแฐแต/self weight/แฃแจแฅแจแฑแ แญแฅแฐแตแฃแจแญแฅแฅ แฎแแญแชแฑแ แญแฅแฐแตแฃ แจแฎแแญแชแต แฐแซแฐแแฝแฃ แจแแแต แแแตแฃ แจแตแซ แแณแชแซแแฝแ แแแฝ แแซแแฅแ แจแแฝแ แซแแแฝแ แจแแแแ แแ แ แ แฅแแซแฌ แแฎแต แแฐแซแฑแ แแจแแแฅ แจแแแแชแซ แตแซ แญแแแแข
๐แญแฌแธแชแ แตแณแแ แ แตแญแญแ แแแณแฑแแ แ แ แฅแแซแฌ แแฎแต vibrator แตแแ แแ แแแต แแแแ แฅแแตแฝแแ แจแฆแณแ แฅแแณแญแธแฝ แ แ แซแฑแ แ แ แฃแซ แแแ แชแซ แแแฉแ แ แญแแณ แจแแแแฑ แ แแต แแจแแแฅ
๐ แแญแ แแญแญ แแแฃแ แแซ แแญ แญแแฐแต แซแ แ แญแแณ แตแแ แ แญแแฐแฑ แซแญแฅแฌแฐแญ แตแแ แแ แแจแ แแฐ แแญ แฅแแณแญแแต แ แธแซ แแญแแ แ แแ แแแญ แญแแฐแต แแฐแแแ แแจแแแฅ
โถ.แจแแญแแแญแญ แฅแซแต/Quality of formwork material/
๐แแแญแแแญแญ แตแซ แฅแ แ แแญ แจแแแ แฅแ แซแแฐแฃแแแฃ แซแแ แ แ แซแแแ แ แฃแแฅแแต แซแแ แฃแซแแฐแแฐแฐแ แฅแฉ แฅแแซแฌแ แจแแธแจแ แ แ แ แซแแ แแแแ แแจแแแฅ แแ แ แตแแแ แตแซ แแ::
โท.แ แแฃแ แแ/Vertical alignment/
๐แจแฐแแแแ แฎแแ แแญแแแญแญ แฒแแญแ แฅแแฐแแ แญแแ แแญ แ แแแฃ แแฐแแญ แแฅ แแแฑแ แแจแแแฅ แ แแ แตแข
โธ.แ แแตแ แแ/Horizontal alignment/
๐แจแฐแแแแ แฎแแ แแญแแแญแญ แฒแแญแ แฅแแฐแแ แญแแ แจแแแฝ แฎแแแฝ แ แแปแญ แซแแ แ แแแแฅแฃ แจแณแแ แแแป แ แแแฃ แแฅแแต แซแแ แแ แแแแกแ แแจแแแฅ แ แแ แตแข
@etconp
โค19๐5๐ฅฐ1