๐Dumpy Level
๐ง Components
- Integrated Collimator โ helps in rough targeting.
- Focusing Knob โ sharpens the image.
- Telescope with Objective Lens โ main viewing system.
- Eyepiece Lens โ adjusts crosshair visibility for the eye.
- Compensator โ ensures automatic leveling inside the instrument.
- Spirit Level โ checks horizontal alignment.
- Horizontal Drive Screw โ fine adjustment for precise targeting.
- Horizontal Circle โ measures angles in degrees or gons.
- Base Plate โ supports the instrument on the tripod.
๐๏ธ Uses in Construction
- Establishes horizontal levels for foundations, roads, and pipelines.
- Measures height differences between points on site.
- Ensures accuracy in excavation and filling.
- Used for surveying and alignment in civil engineering projects.
๐ท Practical Notes
- Mounted on a tripod for stability.
- Requires calibration and leveling before use.
- Operator reads measurements on a staff/rod placed at target points.
- Commonly used in earthworks, drainage, and structural layout.
๐ง Dumpy Level โ Essential Surveying Instrument Explained
โบA Dumpy Level is one of the most important tools in surveying, used to determine accurate horizontal levels on construction sites.
โบIt ensures precision in leveling for foundations, roads, drainage systems, and structural alignment.
๐ Key Components: ๐ธ Integrated Collimator โ Helps in rough targeting
๐ธ Telescope โ Provides clear sight of the staff
๐ธ Focusing Knob โ Sharpens the image
๐ธ Compensator โ Maintains level automatically
๐ธ Horizontal Drive Screw โ Enables fine horizontal adjustment
๐ธ Horizontal Circle โ Measures angles in degrees
๐ธ Spirit Level โ Ensures the instrument is perfectly leveled
๐ธ Base Plate โ Supports and stabilizes the device
๐ทโโ๏ธ Widely used in construction and civil engineering projects, the dumpy level improves accuracy, reduces errors, and ensures quality work on-site.
๐ Pro Tip: Always check the bubble in the spirit level before taking readings for best accuracy!
#CivilEngineering #Surveying #DumpyLevel #ConstructionTools #Leveling #EngineeringLife #SiteWork #CivilTechTime #EngineeringStudents #SurveyEquipment #ConstructionSite #Infrastructure #FieldWork #EngineeringBasics #LearnEngineering
@etconp
๐ง Components
- Integrated Collimator โ helps in rough targeting.
- Focusing Knob โ sharpens the image.
- Telescope with Objective Lens โ main viewing system.
- Eyepiece Lens โ adjusts crosshair visibility for the eye.
- Compensator โ ensures automatic leveling inside the instrument.
- Spirit Level โ checks horizontal alignment.
- Horizontal Drive Screw โ fine adjustment for precise targeting.
- Horizontal Circle โ measures angles in degrees or gons.
- Base Plate โ supports the instrument on the tripod.
๐๏ธ Uses in Construction
- Establishes horizontal levels for foundations, roads, and pipelines.
- Measures height differences between points on site.
- Ensures accuracy in excavation and filling.
- Used for surveying and alignment in civil engineering projects.
๐ท Practical Notes
- Mounted on a tripod for stability.
- Requires calibration and leveling before use.
- Operator reads measurements on a staff/rod placed at target points.
- Commonly used in earthworks, drainage, and structural layout.
๐ง Dumpy Level โ Essential Surveying Instrument Explained
โบA Dumpy Level is one of the most important tools in surveying, used to determine accurate horizontal levels on construction sites.
โบIt ensures precision in leveling for foundations, roads, drainage systems, and structural alignment.
๐ Key Components: ๐ธ Integrated Collimator โ Helps in rough targeting
๐ธ Telescope โ Provides clear sight of the staff
๐ธ Focusing Knob โ Sharpens the image
๐ธ Compensator โ Maintains level automatically
๐ธ Horizontal Drive Screw โ Enables fine horizontal adjustment
๐ธ Horizontal Circle โ Measures angles in degrees
๐ธ Spirit Level โ Ensures the instrument is perfectly leveled
๐ธ Base Plate โ Supports and stabilizes the device
๐ทโโ๏ธ Widely used in construction and civil engineering projects, the dumpy level improves accuracy, reduces errors, and ensures quality work on-site.
๐ Pro Tip: Always check the bubble in the spirit level before taking readings for best accuracy!
#CivilEngineering #Surveying #DumpyLevel #ConstructionTools #Leveling #EngineeringLife #SiteWork #CivilTechTime #EngineeringStudents #SurveyEquipment #ConstructionSite #Infrastructure #FieldWork #EngineeringBasics #LearnEngineering
@etconp
โค5๐ฅ5
๐ แฅแแณแ แ1447 แจแขแต แ แ-แแฅแญ แ แแ แ แฐแแ แ แฐแจแณแฝแโค
๐แ แแ แจแฐแแ แฃ แจแแ แญ แฃ แจแฐแตแณแ แจแแฐแณแฐแฅ แญแแแแฝแ๐
๐ฌ @etconp
๐แ แแ แจแฐแแ แฃ แจแแ แญ แฃ แจแฐแตแณแ แจแแฐแณแฐแฅ แญแแแแฝแ๐
๐ฌ @etconp
โค8๐3
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค3
๐Concrete Column
๐งMaterial: Reinforced concrete with longitudinal bars and stirrups.
- Dimensions: 25 cm ร 25 cm cross-section, stirrups spaced at 20 cm, 4 cm cover.
- Strengths:
- High compression strength.
- More massive, stable under heavy loads.
- Limitations:
- Heavier structure.
- Slower installation due to curing time.
- Foundation: Embedded in footing.
๐ฉ Metal Column
- Material: Steel HEB section with base plate, welds, and anchor bolts.
- Strengths:
- Lightweight compared to concrete.
- High resistance to axial loads.
- Quick installation.
- Limitations:
- Susceptible to corrosion if not protected.
- Requires precision welding and bolting.
- Foundation: Fixed with base plate and anchor bolts.
โ๏ธ Common Feature
- Both work in compression to resist axial loads.
๐งConcrete Column vs Metal Column ๐๏ธ
โบUnderstanding the difference between concrete and metal (steel) columns is essential in structural design.
โบConcrete columns are known for their high compression strength and durability, making them ideal for heavy load-bearing structures.
โบThey include reinforcement bars and stirrups to enhance strength and stability.
โบOn the other hand, metal (steel) columns are lightweight, quick to install, and provide excellent strength-to-weight ratio.
โบWith base plates and anchor bolts, they are widely used in modern construction where speed and flexibility are required.
๐ทBoth types work effectively in compression, but the choice depends on project requirements, cost, and construction time.
๐งFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
๐งMaterial: Reinforced concrete with longitudinal bars and stirrups.
- Dimensions: 25 cm ร 25 cm cross-section, stirrups spaced at 20 cm, 4 cm cover.
- Strengths:
- High compression strength.
- More massive, stable under heavy loads.
- Limitations:
- Heavier structure.
- Slower installation due to curing time.
- Foundation: Embedded in footing.
๐ฉ Metal Column
- Material: Steel HEB section with base plate, welds, and anchor bolts.
- Strengths:
- Lightweight compared to concrete.
- High resistance to axial loads.
- Quick installation.
- Limitations:
- Susceptible to corrosion if not protected.
- Requires precision welding and bolting.
- Foundation: Fixed with base plate and anchor bolts.
โ๏ธ Common Feature
- Both work in compression to resist axial loads.
๐งConcrete Column vs Metal Column ๐๏ธ
โบUnderstanding the difference between concrete and metal (steel) columns is essential in structural design.
โบConcrete columns are known for their high compression strength and durability, making them ideal for heavy load-bearing structures.
โบThey include reinforcement bars and stirrups to enhance strength and stability.
โบOn the other hand, metal (steel) columns are lightweight, quick to install, and provide excellent strength-to-weight ratio.
โบWith base plates and anchor bolts, they are widely used in modern construction where speed and flexibility are required.
๐ทBoth types work effectively in compression, but the choice depends on project requirements, cost, and construction time.
๐งFor more information click this Link Below And Subscribe Our YouTube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค7
๐Home for Humanity (แคแต แแฐแฅแ แแแต)
๐งแจแตแแแฐแ แแ แแ แแซแแฝ แแตแ แ แแป แจแแจแกแ แต แตแจ -แแฝ
๐ซโแญแ แ แแป แแฐแจแตแ แต แจแแฝแ แตแจ-แแฝ แจแฐแแจแก แจแตแแแฐแ แแ แแ แแซ แแตแแฝแ (Emergency Shelter Designs) แจแแซแแญแฅ แฒแแแฃ แฅแแแ แ แแตแแฝ แแฐ แตแแแ แแแแซแแฝ แฅแ แฐแจแ แ แฐแจแ แจแแจแแแ แจแแแฃแ แแซ แแแชแซแแฝ แฐแฐแญแแแแแข
โ"Home for Humanity" แ แขแฒแคแฝ แแชแญ (ETH Zurich) แจแแฎแแฐแญ แแแฎ แซแญแแ (แจแ แญแญแดแญแธแญ แขแแชแจแฎแแ แแแแแ แญ) แฅแ แจแแฎแแฐแญ แแจแแต แตแณแแญ (แจแ แญแญแดแญแธแญ แฒแแช แแแแแ แญ) แจแตแฅแฅแญ แจแแญแแญ แแฎแแญแต แแแข
โแจแแฎแแญแฑ แกแตแ แจ1950แแน แแแฎ แฅแตแซแแ แตแจแต แซแ แจ150 แ แแญ แจแตแแแฐแ แแ แแ แแซแแฝแ แจแแจแแจ แฒแแแฃ แฅแแแ แแ แ แฒแแณแ แแแตแแญแ แ แแซแแแต แ แฅแญแแต แ แฐแซแ แถ แแแแ แญแแต แฅแแฒแแ แ แตแญแแแข
โ"Home for Humanity" แ "Fashion Girls for Humanity" แจแแฐแแ แฒแแแฃ แจแแแ แ แแ แ แแฎแฝ แแแณแ "Peace Winds Japan" แฅแ "แแแ แ แแ แจแตแฐแฐแแฝ แตแญแ แต (IOM)" แแญ แ แแฐแฃแ แญ แจแ แแธแ แแแข
โแตแจ-แแนแ แ แแจแฐแแ แแตแแแ แญแซ แฐแ แ แแ แญแแแจแฑ๐
https://diyhomes.ai/
Via Department Architektu
@etconp
๐งแจแตแแแฐแ แแ แแ แแซแแฝ แแตแ แ แแป แจแแจแกแ แต แตแจ -แแฝ
๐ซโแญแ แ แแป แแฐแจแตแ แต แจแแฝแ แตแจ-แแฝ แจแฐแแจแก แจแตแแแฐแ แแ แแ แแซ แแตแแฝแ (Emergency Shelter Designs) แจแแซแแญแฅ แฒแแแฃ แฅแแแ แ แแตแแฝ แแฐ แตแแแ แแแแซแแฝ แฅแ แฐแจแ แ แฐแจแ แจแแจแแแ แจแแแฃแ แแซ แแแชแซแแฝ แฐแฐแญแแแแแข
โ"Home for Humanity" แ แขแฒแคแฝ แแชแญ (ETH Zurich) แจแแฎแแฐแญ แแแฎ แซแญแแ (แจแ แญแญแดแญแธแญ แขแแชแจแฎแแ แแแแแ แญ) แฅแ แจแแฎแแฐแญ แแจแแต แตแณแแญ (แจแ แญแญแดแญแธแญ แฒแแช แแแแแ แญ) แจแตแฅแฅแญ แจแแญแแญ แแฎแแญแต แแแข
โแจแแฎแแญแฑ แกแตแ แจ1950แแน แแแฎ แฅแตแซแแ แตแจแต แซแ แจ150 แ แแญ แจแตแแแฐแ แแ แแ แแซแแฝแ แจแแจแแจ แฒแแแฃ แฅแแแ แแ แ แฒแแณแ แแแตแแญแ แ แแซแแแต แ แฅแญแแต แ แฐแซแ แถ แแแแ แญแแต แฅแแฒแแ แ แตแญแแแข
โ"Home for Humanity" แ "Fashion Girls for Humanity" แจแแฐแแ แฒแแแฃ แจแแแ แ แแ แ แแฎแฝ แแแณแ "Peace Winds Japan" แฅแ "แแแ แ แแ แจแตแฐแฐแแฝ แตแญแ แต (IOM)" แแญ แ แแฐแฃแ แญ แจแ แแธแ แแแข
โแตแจ-แแนแ แ แแจแฐแแ แแตแแแ แญแซ แฐแ แ แแ แญแแแจแฑ๐
https://diyhomes.ai/
Via Department Architektu
@etconp
โค7๐4
๐Types of Levelling
๐ Differential Levelling
- Used when instrument height changes.
- Staff readings taken at multiple points (A, B, C, D).
- Ensures accurate elevation differences across long distances.
๐ Simple Levelling
- Instrument placed midway between two points.
- Equal shot distances for accuracy.
- Readings taken in sequence to determine relative height.
๐ Trigonometric Levelling
- Uses angles and distances measured with instruments.
- Height differences calculated using trigonometric formulas.
- Useful for tall structures or inaccessible points.
๐ Reciprocal Levelling
- Applied across obstacles like rivers or valleys.
- Readings taken from both sides to minimize errors.
- Final level determined by averaging differences.
๐จ Color Legend (for diagrams)
- Orange โ Instrument
- Red line โ Ground profile
- Dark purple โ Text labels
- Light blue โ Staff & sight lines
- Pale yellow โ Special highlighted areas
๐ทLevelling is a fundamental surveying process used to determine the elevation of different points on the earthโs surface.
๐ด Differential Levelling
Used to find the difference in elevation between multiple points when the ground is uneven. It involves shifting the instrument and taking multiple readings.
๐ด Simple Levelling
The most basic method where the instrument is placed between two points to determine height difference with equal sight distances.
๐ด Trigonometric Levelling
Used for measuring elevations using angles and distances, especially useful in hilly terrains and long distances.
๐ด Reciprocal Levelling
Applied when measuring across obstacles like rivers to eliminate errors caused by curvature, refraction, and instrument misalignment.
๐ก Each method serves a unique purpose depending on terrain, accuracy required, and site conditionsโmaking levelling an essential skill in surveying and construction.
#CivilEngineering #Surveying #Levelling #DifferentialLevelling #SimpleLevelling #TrigonometricLevelling #ReciprocalLevelling #ConstructionBasics #EngineeringStudents #SiteEngineering #CivilTechTime #EngineeringGraphics #SurveyingTechniques #LearnCivil #Infrastructure #FieldWork #EngineeringKnowledge
@etconp
๐ Differential Levelling
- Used when instrument height changes.
- Staff readings taken at multiple points (A, B, C, D).
- Ensures accurate elevation differences across long distances.
๐ Simple Levelling
- Instrument placed midway between two points.
- Equal shot distances for accuracy.
- Readings taken in sequence to determine relative height.
๐ Trigonometric Levelling
- Uses angles and distances measured with instruments.
- Height differences calculated using trigonometric formulas.
- Useful for tall structures or inaccessible points.
๐ Reciprocal Levelling
- Applied across obstacles like rivers or valleys.
- Readings taken from both sides to minimize errors.
- Final level determined by averaging differences.
๐จ Color Legend (for diagrams)
- Orange โ Instrument
- Red line โ Ground profile
- Dark purple โ Text labels
- Light blue โ Staff & sight lines
- Pale yellow โ Special highlighted areas
๐ทLevelling is a fundamental surveying process used to determine the elevation of different points on the earthโs surface.
๐ด Differential Levelling
Used to find the difference in elevation between multiple points when the ground is uneven. It involves shifting the instrument and taking multiple readings.
๐ด Simple Levelling
The most basic method where the instrument is placed between two points to determine height difference with equal sight distances.
๐ด Trigonometric Levelling
Used for measuring elevations using angles and distances, especially useful in hilly terrains and long distances.
๐ด Reciprocal Levelling
Applied when measuring across obstacles like rivers to eliminate errors caused by curvature, refraction, and instrument misalignment.
๐ก Each method serves a unique purpose depending on terrain, accuracy required, and site conditionsโmaking levelling an essential skill in surveying and construction.
#CivilEngineering #Surveying #Levelling #DifferentialLevelling #SimpleLevelling #TrigonometricLevelling #ReciprocalLevelling #ConstructionBasics #EngineeringStudents #SiteEngineering #CivilTechTime #EngineeringGraphics #SurveyingTechniques #LearnCivil #Infrastructure #FieldWork #EngineeringKnowledge
@etconp
โค6๐2๐ฅ1
๐Different Types of Roofs
๐ซChoosing the right roof is essential for both structural strength and aesthetic appeal. This guide showcases various roof types used in modern construction, each designed for specific needs and conditions.
๐ธ Shed Roof โ Simple, cost-effective, and easy to construct
๐ธ Gable Roof โ Most common design with good ventilation
๐ธ Hip Roof โ Strong and stable, ideal for harsh weather
๐ธ Half-Hip Roof โ Combines style with extra interior space
๐ธ Cross-Gable Roof โ Perfect for complex and modern layouts
๐ธ Vaulted Roof โ Elegant design used in premium structures
๐ธ Tent Roof โ Symmetrical and suitable for compact designs
๐ธ Gambrel Roof โ Double slope design for more attic space
๐ Each roof type offers unique benefits in terms of durability, cost, space utilization, and design flexibility. Select wisely based on your project requirements!
#CivilEngineering #RoofTypes #Construction #BuildingDesign #Architecture #CivilTechTime #EngineeringBasics #SiteKnowledge #ConstructionLife #StructuralDesign #HomeDesign #Builders #EngineeringWorld #LearningCivil #DesignInspiration
@etconp
๐ซChoosing the right roof is essential for both structural strength and aesthetic appeal. This guide showcases various roof types used in modern construction, each designed for specific needs and conditions.
๐ธ Shed Roof โ Simple, cost-effective, and easy to construct
๐ธ Gable Roof โ Most common design with good ventilation
๐ธ Hip Roof โ Strong and stable, ideal for harsh weather
๐ธ Half-Hip Roof โ Combines style with extra interior space
๐ธ Cross-Gable Roof โ Perfect for complex and modern layouts
๐ธ Vaulted Roof โ Elegant design used in premium structures
๐ธ Tent Roof โ Symmetrical and suitable for compact designs
๐ธ Gambrel Roof โ Double slope design for more attic space
๐ Each roof type offers unique benefits in terms of durability, cost, space utilization, and design flexibility. Select wisely based on your project requirements!
#CivilEngineering #RoofTypes #Construction #BuildingDesign #Architecture #CivilTechTime #EngineeringBasics #SiteKnowledge #ConstructionLife #StructuralDesign #HomeDesign #Builders #EngineeringWorld #LearningCivil #DesignInspiration
@etconp
โค9
ADVERTISMENT
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โ แจแแแฐแฃแธแ แ แแแแแถแฝ
๐ แแแต any Size & thickness
๐ แ แฆแแต (แฅแญแต แแแฃแตแ แแ แ)
๐ แจแฐแแซแฉ [modefic] แตแซแแฝแ แฅแแฐแซแแแข
โฆ๏ธ แแแแแแ แฅแจแณ แฅแจแต แฅแแแแแแข
โ๏ธแตแแญ 0904040477 แแญแ 0911016833 แฐแแแ แซแแแ
๐ฑแดแแแซแ แแญ แฆhttps://t.me/heavenic1
แ แตแซแปแฆ แ 1.แแญแซแถ
แ.2 แ แจแญ แคแ แชแณแ แแ แจแต
แฅแซแตแ แณแแแแต แแแซแฝแ แแแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โ แจแแแฐแฃแธแ แ แแแแแถแฝ
๐ แแแต any Size & thickness
๐ แ แฆแแต (แฅแญแต แแแฃแตแ แแ แ)
๐ แจแฐแแซแฉ [modefic] แตแซแแฝแ แฅแแฐแซแแแข
โฆ๏ธ แแแแแแ แฅแจแณ แฅแจแต แฅแแแแแแข
โ๏ธแตแแญ 0904040477 แแญแ 0911016833 แฐแแแ แซแแแ
๐ฑแดแแแซแ แแญ แฆhttps://t.me/heavenic1
แ แตแซแปแฆ แ 1.แแญแซแถ
แ.2 แ แจแญ แคแ แชแณแ แแ แจแต
แฅแซแตแ แณแแแแต แแแซแฝแ แแแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โค2
๐Master the concept of Reduced Level (RL) calculation using Dumpy Level with this easy and practical method ๐
๐ธ Formula: RL = HI โ Staff Reading
๐ธ Helps in determining accurate ground levels in surveying
๐ธ Essential for construction layout, road works, and site development
๐ In this visual
โ๏ธ Benchmark (BM) is taken as reference
โ๏ธ Height of Instrument (HI) calculated
โ๏ธ Staff readings subtracted to get RL at different points
โ๏ธ Clear step-by-step understanding with real field illustration
๐ก This method ensures precision in leveling work and avoids costly errors on site.
๐ซLeveling & RL Calculation
- Benchmark (BM): A fixed reference point with a known RL (e.g., 50.00 m).
- Height of Instrument (HI): Calculated as BM RL + Back-sight reading.
- Example: BM = 50.00 m, Back-sight = 1.20 โ HI = 51.20 m.
- Reduced Level (RL): Found using formula:
โบRL = HI - Staff Reading
- Staff Readings: Taken at different points on terrain (e.g., 1.200, 1.750, 2.500, 3.200).
- Example Calculation:
- HI = 51.20 m
- Staff Reading = 1.75 m
- RL = 51.20 โ 1.75 = 49.45 m
- Types of Sight:
- Back-sight (BS): Reading on BM or known RL point.
- Fore-sight (FS): Reading on unknown point to determine RL.
- Purpose: Ensures accurate determination of elevations across uneven terrain for construction and surveying.
- Distances: Terrain marked at intervals (e.g., 50 m, 60 m) to show leveling across sections.
#CivilEngineering #Surveying #DumpyLevel #Leveling #ConstructionBasics #SiteEngineering #EngineeringStudent #CivilTechTime #EngineeringConcepts #FieldWork #SurveyTools #LearnEngineering #ConstructionSite #EngineeringLife
@etconp
๐ธ Formula: RL = HI โ Staff Reading
๐ธ Helps in determining accurate ground levels in surveying
๐ธ Essential for construction layout, road works, and site development
๐ In this visual
โ๏ธ Benchmark (BM) is taken as reference
โ๏ธ Height of Instrument (HI) calculated
โ๏ธ Staff readings subtracted to get RL at different points
โ๏ธ Clear step-by-step understanding with real field illustration
๐ก This method ensures precision in leveling work and avoids costly errors on site.
๐ซLeveling & RL Calculation
- Benchmark (BM): A fixed reference point with a known RL (e.g., 50.00 m).
- Height of Instrument (HI): Calculated as BM RL + Back-sight reading.
- Example: BM = 50.00 m, Back-sight = 1.20 โ HI = 51.20 m.
- Reduced Level (RL): Found using formula:
โบRL = HI - Staff Reading
- Staff Readings: Taken at different points on terrain (e.g., 1.200, 1.750, 2.500, 3.200).
- Example Calculation:
- HI = 51.20 m
- Staff Reading = 1.75 m
- RL = 51.20 โ 1.75 = 49.45 m
- Types of Sight:
- Back-sight (BS): Reading on BM or known RL point.
- Fore-sight (FS): Reading on unknown point to determine RL.
- Purpose: Ensures accurate determination of elevations across uneven terrain for construction and surveying.
- Distances: Terrain marked at intervals (e.g., 50 m, 60 m) to show leveling across sections.
#CivilEngineering #Surveying #DumpyLevel #Leveling #ConstructionBasics #SiteEngineering #EngineeringStudent #CivilTechTime #EngineeringConcepts #FieldWork #SurveyTools #LearnEngineering #ConstructionSite #EngineeringLife
@etconp
โค9
๐IMPORTANT NOTE FOR CIVIL ENGINEERS
๐ซHere are essential and practical notes every Civil Engineer should knowโrefined for site work, exams, and professional practice .
๐ 1. Always Understand Drawings First
Study structural, architectural, and MEP drawings before starting work
Check:
Dimensions
Levels
Reinforcement details
Never build based on assumptions
๐ 2. Accuracy in Measurement is Critical
โSmall error = Big failureโ
Always verify:
Layout with surveying tools
Levels using leveling instruments
Recheck before concreting
๐งฑ 3. Concrete is the Heart of Construction
Maintain correct mix ratio & water-cement ratio
Ensure:
Proper mixing
Adequate compaction (no honeycombing)
Timely placing
โญ๏ธGolden Rule:
Bad concrete = Weak structure
๐ง 4. Never Compromise on Curing
Curing improves:
Strength
Durability
Crack resistance
Minimum:
7 days (basic)
14โ28 days (recommended)
โบMost site failures come from poor curing
๐ 5. Foundation Determines Stability
Always conduct soil investigation
Design based on:
Safe bearing capacity
Groundwater condition
โบPoor foundation = Structural failure risk
๐งฐ 6. Right Material = Strong Structure
Check quality of:
Cement (fresh, no lumps)
Sand (clean, well graded)
Aggregate (proper size)
Steel (no rust, correct grade)
โบNever use substandard materials to cut cost
๐ 7. Load Understanding is Essential
Structures must resist:
Dead load
Live load
Wind load
Earthquake load
โบDesign guidelines often follow standards
๐ง 8. Site Supervision is Key
Engineer must:
Monitor workmanship
Ensure correct procedures
Guide workers
โบGood supervision = Quality construction
โ ๏ธ 9. Safety is Non-Negotiable
Always enforce PPE:
Helmet
Safety boots
Reflective vest
Check:
Scaffolding
Machinery
Electrical connections
โบSafety saves lives and cost
๐ 10. Soil Knowledge is a Must
Understand:
Soil type (clay, sand, silt)
Compaction
Settlement behavior
๐งTest before construction (never guess soil capacity)
๐ 11. Time, Cost, Quality โ The 3 Pillars
Every project must balance:
Time (schedule)
Cost (budget)
Quality (standards)
โบPoor planning leads to delays and losses
๐ 12. Documentation & Records
Keep:
Daily site reports
Material records
Test results
Helps in:
Claims
Quality control
Project tracking
๐ง 13. Common Mistakes to Avoid
Ignoring drawings
Poor compaction of concrete
Inadequate curing
Wrong reinforcement placement
Lack of supervision
๐ Final Professional Tips
Always ask questions on site
Learn from experienced workers Stay updated with modern tools (e.g., Total Station) Maintain integrityโnever compromise quality for profit.
@etconp
๐ซHere are essential and practical notes every Civil Engineer should knowโrefined for site work, exams, and professional practice .
๐ 1. Always Understand Drawings First
Study structural, architectural, and MEP drawings before starting work
Check:
Dimensions
Levels
Reinforcement details
Never build based on assumptions
๐ 2. Accuracy in Measurement is Critical
โSmall error = Big failureโ
Always verify:
Layout with surveying tools
Levels using leveling instruments
Recheck before concreting
๐งฑ 3. Concrete is the Heart of Construction
Maintain correct mix ratio & water-cement ratio
Ensure:
Proper mixing
Adequate compaction (no honeycombing)
Timely placing
โญ๏ธGolden Rule:
Bad concrete = Weak structure
๐ง 4. Never Compromise on Curing
Curing improves:
Strength
Durability
Crack resistance
Minimum:
7 days (basic)
14โ28 days (recommended)
โบMost site failures come from poor curing
๐ 5. Foundation Determines Stability
Always conduct soil investigation
Design based on:
Safe bearing capacity
Groundwater condition
โบPoor foundation = Structural failure risk
๐งฐ 6. Right Material = Strong Structure
Check quality of:
Cement (fresh, no lumps)
Sand (clean, well graded)
Aggregate (proper size)
Steel (no rust, correct grade)
โบNever use substandard materials to cut cost
๐ 7. Load Understanding is Essential
Structures must resist:
Dead load
Live load
Wind load
Earthquake load
โบDesign guidelines often follow standards
๐ง 8. Site Supervision is Key
Engineer must:
Monitor workmanship
Ensure correct procedures
Guide workers
โบGood supervision = Quality construction
โ ๏ธ 9. Safety is Non-Negotiable
Always enforce PPE:
Helmet
Safety boots
Reflective vest
Check:
Scaffolding
Machinery
Electrical connections
โบSafety saves lives and cost
๐ 10. Soil Knowledge is a Must
Understand:
Soil type (clay, sand, silt)
Compaction
Settlement behavior
๐งTest before construction (never guess soil capacity)
๐ 11. Time, Cost, Quality โ The 3 Pillars
Every project must balance:
Time (schedule)
Cost (budget)
Quality (standards)
โบPoor planning leads to delays and losses
๐ 12. Documentation & Records
Keep:
Daily site reports
Material records
Test results
Helps in:
Claims
Quality control
Project tracking
๐ง 13. Common Mistakes to Avoid
Ignoring drawings
Poor compaction of concrete
Inadequate curing
Wrong reinforcement placement
Lack of supervision
๐ Final Professional Tips
Always ask questions on site
Learn from experienced workers Stay updated with modern tools (e.g., Total Station) Maintain integrityโnever compromise quality for profit.
@etconp
โค12๐11
๐ ๐ขแจแฎแแตแตแซแญแฝแ แฅแซ แ แแซแญ แตแแถแฝ (Construction Management Techniques)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โโ แฅแ แต แฅแ แจแแ แฐแแณ (Planning & Scheduling)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ โแจแฅแซ แญแแแ แแแ แญ (WBS): แแฎแแญแฑแ แแฐ แตแแแฝแ แแฐแแ แฉ แแฐแแฝแ แญแแแฝ แแจแแแแข
โถ๏ธ โแแแต แปแญแต (Gantt Charts): แจแฅแซ แแฐแตแ แ แแซแ แแณแซแข
๐โแญแชแฒแซแ แแ แแฐแต (CPM): แแณแ แจแแ แจแฅแซ แแตแแฎแฝแ แแแจแตแข
โถ๏ธ โแจแแญแแตแถแ แฅแ แต (Milestone Planning): แแ แแ แแฆแฝแ แแแตแข
โ๐ แฅแ แ: แแฎแแญแฑ แ แณแแฐแแต แแ แฅแแฒแ แแแ แซแฐแญแแแข
โโถ แจแแช แ แตแฐแณแฐแญ (Cost Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โแแญแแญ แจแแช แแแต: แฅแซแแณแแฑ แฅแซ แแ แซแ แ แแช แฅแแฐแแ แญแ แแตแแตแข
โถ๏ธ แจแ แแต แแตแฅ: แแฐแแซแฉ แจแฅแซ แญแแแฝ แ แแต แแแฐแฅแข
โถ๏ธ แจแแแแฅ แแฐแต แตแแ แซ (Cash flow): แจแแแแฅ แแขแ แแชแ แแแแตแข
โถ๏ธโ แจแแช แแฉแแต แตแแฐแ: แจแ แแต แ แแญ แฅแแณแญแแฃ แแแฃแ แญแข
โ๐ แฅแ แ: แซแแฐแแฃ แฅแญแแตแ แจแแ แ แซแแ แแช แญแจแแจแแแข
โโ แจแฅแซแต แ แตแฐแณแฐแญ (Quality Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธโ แจแฅแซแต แแจแแแซ (QA): แแฐแฑ แตแญแญแแ แแแแ แแจแแแฅแข
โถ๏ธ โแจแฅแซแต แแฅแฅแญ (QC): แแคแฑ แฐแจแแแ แจแ แ แ แแแแ แแแฐแฝแข
โถ๏ธ โแจแฅแฌ แแ แแฐแปแ แแญแแซ: แฅแซแณแธแ แจแฐแจแแแ แแฅแแถแฝแ แแ แแแข
โถ๏ธ แฐแจแแแฝแ แแญแ แญ: แจแแแฃแณ แแแฝแแ แแญแแญ แแแชแซแแฝแ แแจแฐแแข
โ๐ แฅแ แ: แ แแซแซแ แฐแ แแแฑ แจแฐแ แ แ แแแฃแณ แฅแแฒแแญ แซแฐแญแแแข
โโธ แจแแ แ แตแฐแณแฐแญ (Time Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ แจแฅแซแแฝ แ แฐแ แฐแจแฐแ: แจแตแแ แฅแซ แแตแ แแจแแแ แฅแแณแแ แต แแแจแตแข
โถ๏ธ แจแแฅแต แแแฃแ แ (Resource leveling): แจแฐแ แแญแแ แแฃแชแซแ แ แแแ แแจแแแแข
โถ๏ธ แจแแฐแต แญแตแตแ: แฅแซแ แ แแ แฐแจแ แแญ แฅแแณแ แแจแณแฐแแข
โถ๏ธโ แจแแแแจแต แตแแฐแ: แแแ แฅแแฐแแแจ แแแจแตแ แแแตแ แแแแแข
โ๐ แฅแ แ: แจแแ แฐแแณ แแแฃแตแ (Overrun) แซแตแแซแแข
โโน แจแ แฐแ แตแแต แ แตแฐแณแฐแญ (Risk Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ แ แฐแแ แแแจแต: แแซแแฅแ แจแแฝแ แฝแแฎแฝแ แ แตแแตแ แแแ แข
โถ๏ธ แ แฐแแ แแแแแ: แจแฝแแฉแ แญแฅแฐแตแ แจแแจแฐแต แแตแ แแแแแข
โถ๏ธ แจแแแแป แฅแ แต: แฝแแฉแ แแแแแต แแญแ แแแตแแแต แแแตแข
โถ๏ธ โแจแแ แฃแ แแซ แญแแฝแต: แแ แฐแ แแ แจแแแ แแแแฅ แแญแ แแ แแซแแข
โ๐ แฅแ แ: แซแแฐแ แ แ แฅแแ แแถแฝแ แญแแแณแแข
โโบ แจแแฅแต แ แตแฐแณแฐแญ (Resource Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธโ แจแฐแ แแญแ แฅแ แต: แ แตแแแ แจแแ แ แซแฐแแฝแ แแฐแซแแตแข
โถ๏ธโ แจแแฝแแชแแฝ แแตแฅ: แแฃแชแซแแฝแ แแแแแแ แฅแซ แแจแแแแข
โถ๏ธ แจแแณแแต แ แ แญแฆแต แฅแ แต: แจแแแฃแณ แแแแฝ แจแแแแ แตแ แแ แแแฐแแข
โถ๏ธ โแจแแญแณแแแต แญแตแตแ: แจแฅแซ แ แแฅแแแ แแแซแตแข
โ๐ แฅแ แ แ แแแฃแณ แฆแณ แแญ แซแแแ แฅแญแแต แญแแแณแแข
โโป แจแแแแแต แ แตแฐแณแฐแญ (Communication Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ แแฐแ แ แจแฃแขแซ แตแฅแฐแฃแแฝ: แจแฃแแแซแแฝ แแญ แแแซแจแตแข
โถ๏ธ โแจแแฐแต แชแแญแถแฝ: แจแฅแซแแ แแคแต แ แฝแแ แแณแแ แข
โถ๏ธ แฃแแตแญแป แ แซแแตแ แแตแฐแแ แญ: แจแฃแแคแฑแ แจแฃแแแซแแฝ แแญ แแแ แฅแข
โถ๏ธ แจแฐแแต แแฅแฅแญ: แแจแแแฝแแ แแแแฝแ แ แ แแฃแก แแซแแข
โ๐ แฅแ แ: แแแฝแแตแแ แจแกแตแ แฅแซแ แซแ แแญแซแแข
โโ แจแฐแ แแแต แ แตแฐแณแฐแญ (Safety Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ โแจแฐแ แแแต แฅแ แตแ แแแป (Toolbox talks): แแ แซแฐแแฝ แจแฐแ แแแต แตแแ แญแต แแตแ แตแข
โถ๏ธโ แจแแจแแจแซ แแฃแชแซแแฝ (PPE): แแฅแฃ แซแแ แแฅแต แแ แแแ แแจแแแฅแข
โถ๏ธ แจแ แฐแ แตแแฐแ: แจแแแฃแณ แฆแณแแ แ แฐ แแแแต แแแฐแฝแข
โถ๏ธแจแ แฐแ แชแแญแต: แ แฐแ แฒแจแฐแต แ แ แแฃแก แแแแแฅแ แแแญแข
โ๐ แฅแ แ: แ แซแฐแแฝแแ แแฅแจแตแ แจแ แฐแ แญแ แฅแแแข
โโฝ แจแแฅ แ แตแฐแณแฐแญ (Procurement Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ แจแ แ แซแขแแฝ แแญแซ: แฅแซแต แซแแ แแ แจแแซแแญแก แตแญแ แถแฝแ แแแจแตแข
โถ๏ธโ แจแแ แ แตแฐแณแฐแญ: แตแแแแถแฝแแ แฎแแตแซแถแฝแ แแแฃแ แญแข
โถ๏ธโ แจแแแแฝ แ แ แญแฆแต แฐแแณ: แแแแฝ แ แฐแแฑ แฃแขแซแ แฅแแฒแฐแญแฑ แแตแจแแข
โถ๏ธ แจแแแแ แแฅแฅแญ (Inventory): แซแแตแ แแแแฝ แแแฃแ แญแข
โ๐ แฅแ แ: แ แแ แฅแฅแจแต แแญแแซแต แฅแซ แฅแแณแญแแ แญแจแณแแข
โโ แญแตแตแ แฅแ แแฅแฅแญ (Monitoring & Control)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
๐โแจแ แแปแธแ แแแชแซแแฝ (KPIs): แแคแณแแแตแ แแแซแตแข
๐โแจแฐแจแแแ แฅแซ แแ (EVM): แจแแช แ แแปแญ แจแฐแ แซแแ แฅแซ แแแแแข
๐โแจแฃแขแซ แฆแฒแต: แฅแซแ แ แตแญแญแ แแจแแแแ แแแฐแฝแข
๐โแจแแตแฐแซแจแซ แฅแญแแแแฝ: แตแ แฐแต แฒแแญ แแฒแซแแ แแจแแข
โ๐ แฅแ แ: แแฎแแญแฑ แ แณแแแแต แแตแแญ แฅแแฒแแต แซแฐแญแแแข
@etconp
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โโ แฅแ แต แฅแ แจแแ แฐแแณ (Planning & Scheduling)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ โแจแฅแซ แญแแแ แแแ แญ (WBS): แแฎแแญแฑแ แแฐ แตแแแฝแ แแฐแแ แฉ แแฐแแฝแ แญแแแฝ แแจแแแแข
โถ๏ธ โแแแต แปแญแต (Gantt Charts): แจแฅแซ แแฐแตแ แ แแซแ แแณแซแข
๐โแญแชแฒแซแ แแ แแฐแต (CPM): แแณแ แจแแ แจแฅแซ แแตแแฎแฝแ แแแจแตแข
โถ๏ธ โแจแแญแแตแถแ แฅแ แต (Milestone Planning): แแ แแ แแฆแฝแ แแแตแข
โ๐ แฅแ แ: แแฎแแญแฑ แ แณแแฐแแต แแ แฅแแฒแ แแแ แซแฐแญแแแข
โโถ แจแแช แ แตแฐแณแฐแญ (Cost Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โแแญแแญ แจแแช แแแต: แฅแซแแณแแฑ แฅแซ แแ แซแ แ แแช แฅแแฐแแ แญแ แแตแแตแข
โถ๏ธ แจแ แแต แแตแฅ: แแฐแแซแฉ แจแฅแซ แญแแแฝ แ แแต แแแฐแฅแข
โถ๏ธ แจแแแแฅ แแฐแต แตแแ แซ (Cash flow): แจแแแแฅ แแขแ แแชแ แแแแตแข
โถ๏ธโ แจแแช แแฉแแต แตแแฐแ: แจแ แแต แ แแญ แฅแแณแญแแฃ แแแฃแ แญแข
โ๐ แฅแ แ: แซแแฐแแฃ แฅแญแแตแ แจแแ แ แซแแ แแช แญแจแแจแแแข
โโ แจแฅแซแต แ แตแฐแณแฐแญ (Quality Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธโ แจแฅแซแต แแจแแแซ (QA): แแฐแฑ แตแญแญแแ แแแแ แแจแแแฅแข
โถ๏ธ โแจแฅแซแต แแฅแฅแญ (QC): แแคแฑ แฐแจแแแ แจแ แ แ แแแแ แแแฐแฝแข
โถ๏ธ โแจแฅแฌ แแ แแฐแปแ แแญแแซ: แฅแซแณแธแ แจแฐแจแแแ แแฅแแถแฝแ แแ แแแข
โถ๏ธ แฐแจแแแฝแ แแญแ แญ: แจแแแฃแณ แแแฝแแ แแญแแญ แแแชแซแแฝแ แแจแฐแแข
โ๐ แฅแ แ: แ แแซแซแ แฐแ แแแฑ แจแฐแ แ แ แแแฃแณ แฅแแฒแแญ แซแฐแญแแแข
โโธ แจแแ แ แตแฐแณแฐแญ (Time Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ แจแฅแซแแฝ แ แฐแ แฐแจแฐแ: แจแตแแ แฅแซ แแตแ แแจแแแ แฅแแณแแ แต แแแจแตแข
โถ๏ธ แจแแฅแต แแแฃแ แ (Resource leveling): แจแฐแ แแญแแ แแฃแชแซแ แ แแแ แแจแแแแข
โถ๏ธ แจแแฐแต แญแตแตแ: แฅแซแ แ แแ แฐแจแ แแญ แฅแแณแ แแจแณแฐแแข
โถ๏ธโ แจแแแแจแต แตแแฐแ: แแแ แฅแแฐแแแจ แแแจแตแ แแแตแ แแแแแข
โ๐ แฅแ แ: แจแแ แฐแแณ แแแฃแตแ (Overrun) แซแตแแซแแข
โโน แจแ แฐแ แตแแต แ แตแฐแณแฐแญ (Risk Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ แ แฐแแ แแแจแต: แแซแแฅแ แจแแฝแ แฝแแฎแฝแ แ แตแแตแ แแแ แข
โถ๏ธ แ แฐแแ แแแแแ: แจแฝแแฉแ แญแฅแฐแตแ แจแแจแฐแต แแตแ แแแแแข
โถ๏ธ แจแแแแป แฅแ แต: แฝแแฉแ แแแแแต แแญแ แแแตแแแต แแแตแข
โถ๏ธ โแจแแ แฃแ แแซ แญแแฝแต: แแ แฐแ แแ แจแแแ แแแแฅ แแญแ แแ แแซแแข
โ๐ แฅแ แ: แซแแฐแ แ แ แฅแแ แแถแฝแ แญแแแณแแข
โโบ แจแแฅแต แ แตแฐแณแฐแญ (Resource Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธโ แจแฐแ แแญแ แฅแ แต: แ แตแแแ แจแแ แ แซแฐแแฝแ แแฐแซแแตแข
โถ๏ธโ แจแแฝแแชแแฝ แแตแฅ: แแฃแชแซแแฝแ แแแแแแ แฅแซ แแจแแแแข
โถ๏ธ แจแแณแแต แ แ แญแฆแต แฅแ แต: แจแแแฃแณ แแแแฝ แจแแแแ แตแ แแ แแแฐแแข
โถ๏ธ โแจแแญแณแแแต แญแตแตแ: แจแฅแซ แ แแฅแแแ แแแซแตแข
โ๐ แฅแ แ แ แแแฃแณ แฆแณ แแญ แซแแแ แฅแญแแต แญแแแณแแข
โโป แจแแแแแต แ แตแฐแณแฐแญ (Communication Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ แแฐแ แ แจแฃแขแซ แตแฅแฐแฃแแฝ: แจแฃแแแซแแฝ แแญ แแแซแจแตแข
โถ๏ธ โแจแแฐแต แชแแญแถแฝ: แจแฅแซแแ แแคแต แ แฝแแ แแณแแ แข
โถ๏ธ แฃแแตแญแป แ แซแแตแ แแตแฐแแ แญ: แจแฃแแคแฑแ แจแฃแแแซแแฝ แแญ แแแ แฅแข
โถ๏ธ แจแฐแแต แแฅแฅแญ: แแจแแแฝแแ แแแแฝแ แ แ แแฃแก แแซแแข
โ๐ แฅแ แ: แแแฝแแตแแ แจแกแตแ แฅแซแ แซแ แแญแซแแข
โโ แจแฐแ แแแต แ แตแฐแณแฐแญ (Safety Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ โแจแฐแ แแแต แฅแ แตแ แแแป (Toolbox talks): แแ แซแฐแแฝ แจแฐแ แแแต แตแแ แญแต แแตแ แตแข
โถ๏ธโ แจแแจแแจแซ แแฃแชแซแแฝ (PPE): แแฅแฃ แซแแ แแฅแต แแ แแแ แแจแแแฅแข
โถ๏ธ แจแ แฐแ แตแแฐแ: แจแแแฃแณ แฆแณแแ แ แฐ แแแแต แแแฐแฝแข
โถ๏ธแจแ แฐแ แชแแญแต: แ แฐแ แฒแจแฐแต แ แ แแฃแก แแแแแฅแ แแแญแข
โ๐ แฅแ แ: แ แซแฐแแฝแแ แแฅแจแตแ แจแ แฐแ แญแ แฅแแแข
โโฝ แจแแฅ แ แตแฐแณแฐแญ (Procurement Management)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
โถ๏ธ แจแ แ แซแขแแฝ แแญแซ: แฅแซแต แซแแ แแ แจแแซแแญแก แตแญแ แถแฝแ แแแจแตแข
โถ๏ธโ แจแแ แ แตแฐแณแฐแญ: แตแแแแถแฝแแ แฎแแตแซแถแฝแ แแแฃแ แญแข
โถ๏ธโ แจแแแแฝ แ แ แญแฆแต แฐแแณ: แแแแฝ แ แฐแแฑ แฃแขแซแ แฅแแฒแฐแญแฑ แแตแจแแข
โถ๏ธ แจแแแแ แแฅแฅแญ (Inventory): แซแแตแ แแแแฝ แแแฃแ แญแข
โ๐ แฅแ แ: แ แแ แฅแฅแจแต แแญแแซแต แฅแซ แฅแแณแญแแ แญแจแณแแข
โโ แญแตแตแ แฅแ แแฅแฅแญ (Monitoring & Control)
โช๏ธโช๏ธโช๏ธโช๏ธโช๏ธ
๐โแจแ แแปแธแ แแแชแซแแฝ (KPIs): แแคแณแแแตแ แแแซแตแข
๐โแจแฐแจแแแ แฅแซ แแ (EVM): แจแแช แ แแปแญ แจแฐแ แซแแ แฅแซ แแแแแข
๐โแจแฃแขแซ แฆแฒแต: แฅแซแ แ แตแญแญแ แแจแแแแ แแแฐแฝแข
๐โแจแแตแฐแซแจแซ แฅแญแแแแฝ: แตแ แฐแต แฒแแญ แแฒแซแแ แแจแแข
โ๐ แฅแ แ: แแฎแแญแฑ แ แณแแแแต แแตแแญ แฅแแฒแแต แซแฐแญแแแข
@etconp
โค21๐2
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแฝ
แฅแแแปแน แ แ แจแแนแ แแฐแจแต แจ ETABS แถแแตแแญ แตแแ แ แ แฆแแแญแ แ แฐแแฃแฃแ แแ แแแแฃ แแแจแแโค
๐ฉแแแแแแฅ @Philemona7 แแญแ 0925446661 แซแแแฉแ๐
@etconp
แฅแแแปแน แ แ แจแแนแ แแฐแจแต แจ ETABS แถแแตแแญ แตแแ แ แ แฆแแแญแ แ แฐแแฃแฃแ แแ แแแแฃ แแแจแแโค
๐ฉแแแแแแฅ @Philemona7 แแญแ 0925446661 แซแแแฉแ๐
@etconp
โค8
If โHโ is the overall height of a retaining wall retaining a surcharge, the width of the base slab usually provided, is
Anonymous Quiz
43%
0.3 H
20%
0.4 H
21%
0.5 H
15%
0.7 H
๐8โค5
In a pre-stressed member it is advisable to use
Anonymous Quiz
7%
Low strength concrete only
19%
High strength concrete only
24%
Low strength concrete but high tensile steel
50%
High strength concrete and high tensile steel
๐5โค4
Distribution of shear intensity over a rectangular section of a beam, follows:
Anonymous Quiz
15%
A circular curve
39%
A straight line
40%
A parabolic curve
6%
An elliptical curve
โค7๐ฅฐ5๐2
In a simply supported slab, alternate bars are curtailed at
Anonymous Quiz
74%
1/4th of the span
9%
1/5th of the span
12%
1/6th of the span
5%
1/7th of the span
โค7๐2
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแฝ
แฅแแแปแน แ แ แจแแนแ แแฐแจแต แจ ETABS แถแแตแแญ แตแแ แ แ แฆแแแญแ แ แฐแแฃแฃแ แแ แแแแฃ แแแจแแโค
๐ฉแแแแแแฅ @Philemona7 แแญแ 0925446661 แซแแแฉแ๐
@etconp
แฅแแแปแน แ แ แจแแนแ แแฐแจแต แจ ETABS แถแแตแแญ แตแแ แ แ แฆแแแญแ แ แฐแแฃแฃแ แแ แแแแฃ แแแจแแโค
๐ฉแแแแแแฅ @Philemona7 แแญแ 0925446661 แซแแแฉแ๐
@etconp
๐5
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค4๐3
๐ทแ แแตแ แฒแแจแญ แแแแฒแต แจแแแจแญ แ แฅแแแต แจแแแจแ แแแตแ แแ?
๐ซแ แแ แแตแตแ แแแ แแตแฅ แแตแแ แแแจแ แฅแปแธแแ แตแญแแ แจแแธแแแข แฅแแแฐแแ แแฉแแต แจแแแฃแ แแแฎแฝแ แ แแณแฉแ แต แแแฝแญ แแแข
๐ซแแฅแฎแฝแ แจแแซแฐแ แแแจแญแฃ แตแซแแ แ แ แแญแแต แแฐแแแซ แฒแแจแญ แจแ แจแแซแฐแญแแฝแ แฅแแแฐแแ แแ แญแ แแแข
1. แแตแ-แแณแฅ แจแฅแแแณ (Theory vs. Reality)
แแแจแญ แแแแฒแต แตแญแญแแแแ "แแฅแญ" แแแแแต แฒแจแแ แฃ แฒแแจแฉ แแ แซ แแฅแญ แ แณแญแต แแญ "แแฐแแ แญ" แแปแแ แซแตแฃแแข
แแณแแฆ แ แแต แแแจแญ แ แแจแแต แแญ แฅแ แ แ แฃแ แ แแซแซ แจแแ แจแฅแจแต แแญแแญ (Rebar detailing) แซแแฃแแข แแแญ แแ แฅแจแถแน แ แฃแ แจแแ แแแณแธแ แจแฐแแณ แฎแแญแชแต แแตแฅ แแฅแถ vibrate แแแตแจแ แฆแณ แฅแแฐแแญแแญ แ แซแตแฐแแแแข แฒแแจแฉ แแ แฒแแญแแ แ แญแถ "แญแ แ แแจแแต แแญ แขแฐแซแแฃ แณแญแต แแญ แ แญแฐแซแ" แฅแ แแแฅ แซแฐแญแแแข
2. แแตแแซแ แ แตแฐแณแฐแฅ แจแ แตแ-แแแ แต (Linear Thinking vs. Contingency)
แแแจแญ แตแซแ "แฅแแฒแฐแซ" แฅแป แฒแซแ แตแฃ แฒแแจแฉ แแ แตแซแ "แแ แแฝ" แจแแฝแแฃแธแแ แแแแถแฝ แ แตแแตแ แญแแแณแแข
แแณแแฆ แฎแแญแชแต แแแแแต แแแ แต แฒแฐแจแแฃ แแแจแฉ แจแแแ แฅแ แจแแญแฐแญ แแชแแแฝแ แแแฃแต แฅแป แญแ แฃแ แแแข แฒแแจแฉ แแ "แแแ แขแ แแฝ แแญแ แจแตแซแแญ แแจแแแ แขแแญ แฎแแญแชแฑ แฅแแณแญแ แแฝ แแ แฅแแฐแญแแแ?" แฅแ 'Plan B' แซแแแแแข
3. แแจแ แแตแจแต แจแแแตแ แ แ แซแขแแต (Reporting vs. Solving)
แแแจแญ แแแแฒแต แฅแแ แแถแฝแ แชแแญแต แซแฐแญแแแค แฒแแจแฉ แแ แฅแแ แแถแนแ แ แแ แจแแแตแ แตแ แซแญแณ แญแ แญแแฃแแข
แแณแแฆ แจแแฝแแช แฅแแฝแต แฒแซแแฅแแฃ แแแจแฉ "แถแแฉ แฐแ แแฝแทแ" แฅแ แญแแแซแแข แฒแแจแฉ แแ "แถแแฉ แฐแ แแฝแทแแค แตแแแ แจแฅแแ แฃแแแซ แ แญแปแแแฃ แฅแตแจแแซแ แแ แฐแซแฐแแน แแ แฅแแณแซแฃแญแ แแฐ แแ แแตแฅ แ แแแฌแซแธแแแ" แฅแ แแแตแแแ แจแแฎ แซแแญแฃแแข
4. แฐแแฃแญแ แจแแ แแญ แแแแแต (Task vs. Value)
แแแจแญ แตแซแแ แฅแแฐ แ แแต "แฐแแฃแญ" แซแจแแแค แฒแแจแฉ แแ แตแซแแ แฅแแฐ "แซแแณแ" แขแแจแตแตแแแต แญแแแจแฐแแแข
แแณแแฆ แ แแตแ แจแแแฃแณ แแฅแแต (Material) แ แแแต แแ แแแแจแต แแแจแฉ แฅแแฐ แแแ "แแแจแต" แซแจแแแข แฒแแจแฉ แแ แซ แจแแแต แแ แแแแจแต แจแฃแแญ แแแตแ แฅแแฐแแจแแญแฃ แจแชแซแญ แแฝแแฝ แซแ แตแซ แฅแแฒแแ แฅแแฐแแซแฐแญแแ แจแแฎแแญแฑแ แ แ แแแญ แตแญแ แฅแแฐแแ แแ แญแจแณแ (Big Picture)แข
๐กแแแแ "แแแ?" แฅแแฝแ แ แญแแข แฒแแญแ แแแ แฅแแฒแ แแ? แแญแแ แแแ แ แแซ แแแแต แฐแซแ? แจแขแฎ แแฅแณแฝแ แณแญแต แแญ แซแ แฃแแแซแแฝ แแญ แตแตแแแแฉแฃ แ แแจแแต แแญ แจแแญแแแตแ แฅแแแฐแ แจแแ แแตแตแ แฅแ แฆแฝ แตแแซแแฝแแข
แฅแแแฐ แ แแซ แ แญแแณแฝแ "แ แแ แแ แฅแแฐ แฒแแจแญ แฅแซแฐแฅแฉ แแ" แซแแฝแแ แตแ แ แแฃแ แณแตแณแแณแแฝแ? แแ แฐแแฅแฎ แแ แญ? แแณแฃแฝแแ แ แฎแแแต แ แแฉแ! ๐
@etconp
๐ซแ แแ แแตแตแ แแแ แแตแฅ แแตแแ แแแจแ แฅแปแธแแ แตแญแแ แจแแธแแแข แฅแแแฐแแ แแฉแแต แจแแแฃแ แแแฎแฝแ แ แแณแฉแ แต แแแฝแญ แแแข
๐ซแแฅแฎแฝแ แจแแซแฐแ แแแจแญแฃ แตแซแแ แ แ แแญแแต แแฐแแแซ แฒแแจแญ แจแ แจแแซแฐแญแแฝแ แฅแแแฐแแ แแ แญแ แแแข
1. แแตแ-แแณแฅ แจแฅแแแณ (Theory vs. Reality)
แแแจแญ แแแแฒแต แตแญแญแแแแ "แแฅแญ" แแแแแต แฒแจแแ แฃ แฒแแจแฉ แแ แซ แแฅแญ แ แณแญแต แแญ "แแฐแแ แญ" แแปแแ แซแตแฃแแข
แแณแแฆ แ แแต แแแจแญ แ แแจแแต แแญ แฅแ แ แ แฃแ แ แแซแซ แจแแ แจแฅแจแต แแญแแญ (Rebar detailing) แซแแฃแแข แแแญ แแ แฅแจแถแน แ แฃแ แจแแ แแแณแธแ แจแฐแแณ แฎแแญแชแต แแตแฅ แแฅแถ vibrate แแแตแจแ แฆแณ แฅแแฐแแญแแญ แ แซแตแฐแแแแข แฒแแจแฉ แแ แฒแแญแแ แ แญแถ "แญแ แ แแจแแต แแญ แขแฐแซแแฃ แณแญแต แแญ แ แญแฐแซแ" แฅแ แแแฅ แซแฐแญแแแข
2. แแตแแซแ แ แตแฐแณแฐแฅ แจแ แตแ-แแแ แต (Linear Thinking vs. Contingency)
แแแจแญ แตแซแ "แฅแแฒแฐแซ" แฅแป แฒแซแ แตแฃ แฒแแจแฉ แแ แตแซแ "แแ แแฝ" แจแแฝแแฃแธแแ แแแแถแฝ แ แตแแตแ แญแแแณแแข
แแณแแฆ แฎแแญแชแต แแแแแต แแแ แต แฒแฐแจแแฃ แแแจแฉ แจแแแ แฅแ แจแแญแฐแญ แแชแแแฝแ แแแฃแต แฅแป แญแ แฃแ แแแข แฒแแจแฉ แแ "แแแ แขแ แแฝ แแญแ แจแตแซแแญ แแจแแแ แขแแญ แฎแแญแชแฑ แฅแแณแญแ แแฝ แแ แฅแแฐแญแแแ?" แฅแ 'Plan B' แซแแแแแข
3. แแจแ แแตแจแต แจแแแตแ แ แ แซแขแแต (Reporting vs. Solving)
แแแจแญ แแแแฒแต แฅแแ แแถแฝแ แชแแญแต แซแฐแญแแแค แฒแแจแฉ แแ แฅแแ แแถแนแ แ แแ แจแแแตแ แตแ แซแญแณ แญแ แญแแฃแแข
แแณแแฆ แจแแฝแแช แฅแแฝแต แฒแซแแฅแแฃ แแแจแฉ "แถแแฉ แฐแ แแฝแทแ" แฅแ แญแแแซแแข แฒแแจแฉ แแ "แถแแฉ แฐแ แแฝแทแแค แตแแแ แจแฅแแ แฃแแแซ แ แญแปแแแฃ แฅแตแจแแซแ แแ แฐแซแฐแแน แแ แฅแแณแซแฃแญแ แแฐ แแ แแตแฅ แ แแแฌแซแธแแแ" แฅแ แแแตแแแ แจแแฎ แซแแญแฃแแข
4. แฐแแฃแญแ แจแแ แแญ แแแแแต (Task vs. Value)
แแแจแญ แตแซแแ แฅแแฐ แ แแต "แฐแแฃแญ" แซแจแแแค แฒแแจแฉ แแ แตแซแแ แฅแแฐ "แซแแณแ" แขแแจแตแตแแแต แญแแแจแฐแแแข
แแณแแฆ แ แแตแ แจแแแฃแณ แแฅแแต (Material) แ แแแต แแ แแแแจแต แแแจแฉ แฅแแฐ แแแ "แแแจแต" แซแจแแแข แฒแแจแฉ แแ แซ แจแแแต แแ แแแแจแต แจแฃแแญ แแแตแ แฅแแฐแแจแแญแฃ แจแชแซแญ แแฝแแฝ แซแ แตแซ แฅแแฒแแ แฅแแฐแแซแฐแญแแ แจแแฎแแญแฑแ แ แ แแแญ แตแญแ แฅแแฐแแ แแ แญแจแณแ (Big Picture)แข
๐กแแแแ "แแแ?" แฅแแฝแ แ แญแแข แฒแแญแ แแแ แฅแแฒแ แแ? แแญแแ แแแ แ แแซ แแแแต แฐแซแ? แจแขแฎ แแฅแณแฝแ แณแญแต แแญ แซแ แฃแแแซแแฝ แแญ แตแตแแแแฉแฃ แ แแจแแต แแญ แจแแญแแแตแ แฅแแแฐแ แจแแ แแตแตแ แฅแ แฆแฝ แตแแซแแฝแแข
แฅแแแฐ แ แแซ แ แญแแณแฝแ "แ แแ แแ แฅแแฐ แฒแแจแญ แฅแซแฐแฅแฉ แแ" แซแแฝแแ แตแ แ แแฃแ แณแตแณแแณแแฝแ? แแ แฐแแฅแฎ แแ แญ? แแณแฃแฝแแ แ แฎแแแต แ แแฉแ! ๐
@etconp
๐28โค12
๐งฑ แจแฅแแฌแต แแ แแ แแฅแแถแฝแ แ แแแ แฅแแดแต แแตแแต แญแปแแ? (Site Method)
แ แแแฃแณ แณแญแต แแญ แแแแตแ แแ แแแข แแแ แต แแฃแ แฅแ แตแญแญแแ แตแแต แแ แแ แแแแ แแแแฅแ แญแแฅแฃแแข แญแ แแตแ แ 6 * 3 แแตแญ (18{m}^2) แแตแแณ แแญ แจแแซแตแแแ แแฅแแถแฝแ แ แแแ แจแแซแณแญ แแแข
๐ แแ แแ แแฅแฆแฝแฆ
* แจแแตแแณ แตแแต (Wall Area): แญแแแต แ แแแต (L*H)แข
* แแณแแฆ 6{m} * 3{m} = 18{m}^2
* แจแฅแแฌแต แฅแแต: แ แ แแต แซแฌ แแตแญ (1{m}^2) แแตแฅ แ แ แแซแ 12.5 แฅแแฌแถแฝ แซแตแแแแแข
* แตแแตแฆ 18{m}^2 * 12.5 = 225 แฅแแฌแถแฝแข
* แจแฒแแแถแ แ แธแ แแแแต (แ 1:6 แแญแณแญ แตแฅแแ ):
* แ 225 แฅแแฌแถแฝ ๐ 5 แฉแแณแ แฒแแแถแข
* แแแญแณแญ แจแแแ แ แธแ ๐ 0.8 แฉแฉแขแญ แแตแญ (0.8{m}^3)แข
๐ก แแแ แญแ แ แแด แฅแแ แแแแ?
* แแแณแแต แแญแแญ (BOQ) แแแ แต แแฅแแต แตแแแแแข
* แ แณแญแต แแญ แฅแญแแตแ แแแแแต แตแแแจแณแข
* แจแแข แ แแตแ แ แตแแตแ แแแฐแแ แญ แซแตแฝแแแข
แแณแฐแขแซแฆ แญแ แตแแต แฅแแฐ แฅแแฌแฑ แแ แแ แฅแแฐ แแญแณแญ แแแจแต แแ แแ แแฉแแต แแแจแ แตแแแฝแแฃ แแ แแ แฅแแแ แจ 5% แฅแญแแต (Wastage) แแแต แแตแฅ แแตแแฃแต แญแแจแซแแข
แ แแแฃแณ แแชแซ แฐแจแแช แแจแแแฝแ แแแแแต แแแฝแแ แญแจแฐแ!
๐ทแจ YouTube แแแฝแ แแแแแแ แจแณแฝ แฃแแ แแแญ แ แแแฃแต SubScribe แ แญแแ แคแฐแฐแฅ แญแแ๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
แ แแแฃแณ แณแญแต แแญ แแแแตแ แแ แแแข แแแ แต แแฃแ แฅแ แตแญแญแแ แตแแต แแ แแ แแแแ แแแแฅแ แญแแฅแฃแแข แญแ แแตแ แ 6 * 3 แแตแญ (18{m}^2) แแตแแณ แแญ แจแแซแตแแแ แแฅแแถแฝแ แ แแแ แจแแซแณแญ แแแข
๐ แแ แแ แแฅแฆแฝแฆ
* แจแแตแแณ แตแแต (Wall Area): แญแแแต แ แแแต (L*H)แข
* แแณแแฆ 6{m} * 3{m} = 18{m}^2
* แจแฅแแฌแต แฅแแต: แ แ แแต แซแฌ แแตแญ (1{m}^2) แแตแฅ แ แ แแซแ 12.5 แฅแแฌแถแฝ แซแตแแแแแข
* แตแแตแฆ 18{m}^2 * 12.5 = 225 แฅแแฌแถแฝแข
* แจแฒแแแถแ แ แธแ แแแแต (แ 1:6 แแญแณแญ แตแฅแแ ):
* แ 225 แฅแแฌแถแฝ ๐ 5 แฉแแณแ แฒแแแถแข
* แแแญแณแญ แจแแแ แ แธแ ๐ 0.8 แฉแฉแขแญ แแตแญ (0.8{m}^3)แข
๐ก แแแ แญแ แ แแด แฅแแ แแแแ?
* แแแณแแต แแญแแญ (BOQ) แแแ แต แแฅแแต แตแแแแแข
* แ แณแญแต แแญ แฅแญแแตแ แแแแแต แตแแแจแณแข
* แจแแข แ แแตแ แ แตแแตแ แแแฐแแ แญ แซแตแฝแแแข
แแณแฐแขแซแฆ แญแ แตแแต แฅแแฐ แฅแแฌแฑ แแ แแ แฅแแฐ แแญแณแญ แแแจแต แแ แแ แแฉแแต แแแจแ แตแแแฝแแฃ แแ แแ แฅแแแ แจ 5% แฅแญแแต (Wastage) แแแต แแตแฅ แแตแแฃแต แญแแจแซแแข
แ แแแฃแณ แแชแซ แฐแจแแช แแจแแแฝแ แแแแแต แแแฝแแ แญแจแฐแ!
๐ทแจ YouTube แแแฝแ แแแแแแ แจแณแฝ แฃแแ แแแญ แ แแแฃแต SubScribe แ แญแแ แคแฐแฐแฅ แญแแ๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค21