Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.2K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
Media is too big
VIEW IN TELEGRAM
👉ንጉስ ነጃሺ ኢስላማዊ ማዕከል

💫በ ኤቲኤም ዲዛይነርስ ኃ/የተ/የግ/ማ

🎥6 ደቂቃ ተንቀሳቃሽ ምስል

@etconp
❤6🔥3
👉የጨረቃ ቤቶች ሕጋዊ እንዲሆኑ የኦሮሚያ ክልል ወሰነ❗️

በክልሉ ያሉ ሕገወጥ ወይም በተለምዶ “ጨረቃ ቤት” ተብለው የሚታወቁ ካርታ እና ፕላን የሌላቸውን ቤቶች ባሉበት ሕጋዊ ሊያደርግ እና የባለቤትነት ማረጋገጫ ሰነድ ሊሰጥ መሆኑን ዋዜማ ራድዮ ዘግቧል፡፡

የክልሉ መንግሥት ምክር ቤት ወይም ጨፌ ኦሮሚያ፣ ባሳለፍነው መጋቢት 10፣ 2018 ዓ፣ም ባካሄደው 6ኛ የሥራ ዘመን፣ 5ኛ ዓመት 3ኛ መደበኛ ጉባኤው፣ መመሪያውን አቅድቆ ለክልሉ መሬት አሥተዳደር ቢሮ ልኳል፡፡

እነዚህን ሕገ ወጥ ቤቶች ሕጋዊ የማድረጉ አሰራር ከከተሞች ፕላን እና መሠረት ልማት ጋር ፈጽሞ ሊጻረር በማይችል መልኩ ብቻ እንደሚከወን የሚያትተው መመሪያው፣ በክልሉ ከተሞች የመሬት ሊዝ አዋጅ መሰረት አስፈላጊው ክፍያ ከተፈጸመ በኋላ ሂደቱ እንደሚጀመር ያመለክታል።

ይህን አሰራር የሚከታተሉትና የሚያስፈጽሙት በከተማ አስተዳደሮች ያሉ የመሬት አስተዳደር ጽሕፈት ቤቶች መሆናቸውን የሚደነግገው የኽው መመሪያ፣ አመልካቾች ማመልከቻቸውን የሚያስገቡበትን ቀንም በይፋዊ ማስታወቂያ እንደሚገለጽ ያብራራል።

የከተማ መሬት አሥተዳደር ጽሕፈት ቤቶች በማመልከቻው መሠረት ያዋቀሯቸውን ባለሙያዎች ወደ ስፍራው በመላክ ቤቱ ያለበት ቦታ ከከተማው ፕላን ጋር የሚጣጣም መሆኑን ከተጣራ በኋላ ቤቱን ሕጋዊ የማድረግ እና የባለቤትነት ማረጋገጫ የመስክር ወረቀት የመስጠት ሂደቱ እንደሚጀመር ተመላክቷል፡፡

ሕጋዊ የሚደረገው የመኖሪያ ቤት ቦታ በካሬ ሜትር ተለክቶ ከከተማው የመሬት ሽንሻና ደረጃ ወይም ስታንዳርድ የሚተርፍ ከሆነ፣ መሬቱ ወደ መሬት ባንክ ተመላሽ እንደሚደረግ መመሪያው አትቷል። እነዚህን ሕገ ወጥ ቤቶች ሕጋዊ የማድረግ ሥራ ሸገር፣ አዳማ እና ቢሾፍቱ ከተሞችን አያካትትም፡፡

ክፍያን በተመለከተ በሊዝ ስርዓት በሚተዳደሩ ከተሞች በከተማው የመሬት ደረጃ መሰረት የከተማ መሬት ሊዝ አዋጅ ከጸደቀበት ከጥር 24፣ 2005 ዓ፣ም ጀምሮ ያለውን የሊዝ ውዝፍ ክፍያ  እንዲሁም፣ የጣሪያና ግድግዳ ግብር ክፍያ  አመልካች መክፈል እንደሚኖርበት መመሪያው ይደነግጋል።

በመሬት ሊዝ ስርዓት ስር ባልገቡ ከተሞች የሚገኙ ቤቶች ደግሞ፣ ከጥር 24፣ 2005 ዓ፣ም ጀምሮ በከተማው ደረጃ ተሰልቶ የመሬቱን ኪራይ እንዲሁም የጣሪያ እና ግድግዳ ግብር ክፍያ፣ በተጨማሪም የክፍያውን 30 በመቶ ቅጣት መክፈል እንደሚጠበቅባቸው ሰነዱ አብራርቷል፡፡

ክፍያውን በአንድ ጊዜ ከፍለው ማጠናቀቅ ለማይችሉ ሰዎች፣ በሁለት ዓመታት ውስጥ በአራት ጊዜ ክፍያ ከፍለው ማጠናቀቅ እንደሚችሉ የፈቀደው መመሪያው፣ በተቀመጠው የጊዜ ገደብ ክፍያውን ከፍሎ ያላጠናቀቀ አመልካች ግን መሬቱ ሕጋዊ እንደማይደረግለትና የከፈለውንም ክፍያ መልሱ ብሎ መጠየቅ እንደማይችል አስጠንቅቋል።

መመሪያዎችን በተቀመጠለት የጊዜ ገደብ ያልፈጸመ አካል፣ በመሬቱ ላይ የሰራው ቤት ፈርሶ መሬቱ ወደ መንግሥት የመሬት ባንክ ተመላሽ እንደሚሆን የጠቀሰው መመሪያው፣ መንግሥት ቤቱን በማፍረሱ የሚያስከትለው ኢኮኖሚያዊ ጉዳት ካለ ቤቱ ሳይፈርስ ባለበት እንደሚወርሰው ደንግጓል።

በየትም ቦታ በስሙም ይሁን በሌላ ሰው ስም ከአንድ በላይ ሕጋዊ ያልሆነ መሬት ያለው ግለሰብ መሬቱን ሕጋዊ በማድረግ ሂደት ውስጥ እንደማይስተናገድ የጠቀሰው መመሪያ፣ ይልቁንም መሬቱ በመንግሥት ይወረሳል ብሏል።

በተጨማሪም ከከተማ ፕላን እና መሰረተ ልማት ጋር የማይጣጣሙ ሕጋዊ ያልሆኑ ቤቶችን ማፍረስ እንደሚቀጥል የጠቀሰው ዋዜማ የተመለከተችው መመሪያ፣ ቤቱ የፈረሰባቸው ግለሰቦች የክልሉ መንግሥት በተለያዩ ጊዜያት በሚያደርገው መሬት ሸንሽኖ የመስጠት ሂደት ውስጥ እንደሚካተቱ ደንግጓል።

እነዚህን ሕገወጥ የመኖሪያ ቤቶች ወደ ሕጋዊ መንገደ የመመለስ ሂደቱ በአንድ ዓመት የጊዜ ገደብ ውስጥ ተሰርቶ እንዲጠናቀቅ መመሪያው የሚያዝ ሲሆን፣ ለሚፈጠረው ማንኛውም መዘግየትና መጓተት የወረዳ አሥተዳዳሪዎች፣ የከተማ ከንቲቦች፣ በየደረጃው ያሉ የመንግሥት የመሬት አሥተዳደር መዋቅሮች ተጠያቂ ይሆናሉ ሲል ያስጠነቅቃል።

የኦሮሚያ ክልል የከተሞች ፕላን ኢንስቲትዩት በበኩሉ፣ ከክልሉ መሬት አሥተዳደር ቢሮ ጋር ለሥራው መሳካት በቅንጅት እንዲሰራ ያሳሰበው መመሪያው፣ መመሪያው በአግባቡ ሥራ ላይ መዋል አለመዋሉን እንዲቆጣጠር ጭምር አዟል።

ይህን ሥራ በዋናነት ኃላፊነት ወስደው የሚሰሩት የክልሉ የመሬት አሥተዳደር ቢሮ፣ የክልሉ የከተማ ልማትና ቤቶች ቢሮ እንዲሁም የክልሉ የከተሞች ፕላን ኢንስቲትዩት መሆናቸውም ተመላክቷል።

@etconp
❤11👍4
👉አስደሳች ዜና ለዚህ ቻናል ቤተሰቦች
ብዝዎቻቹ በጠየቃቹን መሰረት የ ETABS ሶፍትዌር ስልጠና በ ኦንላይን በተመጣጣኝ ዋጋ ምዝገባ ጀምረናል❤

📩ለመመዝገብ @Philemona7 ወይም 0925446661 ያናግሩን🙏

@etconp
👍2❤1
👉The blue material you see in the formwork is a PVC waterstop or rubber waterstop, depending on type).

🔵 What it is: It’s a waterproofing strip placed at construction joints—especially where concrete is cast in stages (like footing,wall and slab).

🎯 Its purpose: Prevent water leakage through construction joints
Act as a barrier inside the concrete so water cannot pass through the joint

🎲Commonly used in:

⏺Water tanks
⏺Basements
⏺Retaining walls
⏺Foundations exposed to groundwater

🏗️ In your case:
From the image, it looks like it's placed along the joint between the base slab and the vertical wall formwork.

💫This means: The concrete will be poured in two stages

The blue strip will be embedded halfway in the first pour and halfway in the second
It ensures a watertight connection between the two pours

⚠️ Important notes:

⏺It must be properly aligned and fixed before pouring
⏺Any displacement can cause leakage later
Joints should be clean before the second pour.

@etconp
❤8👍3🥰1
👉ሚድሮክ ኢትዮጵያ በሀገሪቱ እየተካሄደ ያለውን የማክሮ ኢኮኖሚ ማሻሻያ ተከትሎ፣ ከታዋቂው ዓለም አቀፍ ብራንድ ማርዮት (Marriott) ጋር በመተባበር 10 አዳዲስ ሆቴሎችን ለመገንባት የሚያስችለውን ግዙፍ የማስፋፊያ ዕቅድ ይፋ አድርጓል።

የሚድሮክ ኢትዮጵያ ዋና ሥራ አስፈፃሚ አቶ ጀማል አህመድ ይህንን ያስታወቁት፣ ከ800 በላይ ዓለም አቀፍ ባለሀብቶች፣ ፖሊሲ አውጪዎች እና የንግድ መሪዎች በተገኙበት በአዲስ አበባ ስካይላይት ሆቴል እየተካሄደ ባለው አራተኛው 'ኢንቨስት ኢን ኢትዮጵያ' ከፍተኛ የቢዝነስ ፎረም ላይ ነው።

አቶ ጀማል እንዳብራሩት፣ አዲሶቹ የማርዮት ሆቴሎች በአዲስ አበባ፣ በጅማ እና በሀዋሳ ከተሞች የሚገነቡ ይሆናሉ።

ዋና ሥራ አስፈፃሚው ይህ ግዙፍ የማስፋፊያ ዕቅድ ሊታሰብ የቻለው መንግሥት እያደረገ ባለው የኢኮኖሚ እና የፖሊሲ ማሻሻያዎች ምክንያት የኢንቨስትመንት ከባቢው እጅግ ምቹ በመሆኑ ነው ብለዋል።

የኢንቨስትመንት ፖሊሲዎች እና ተቆጣጣሪ ተቋማት አሁን ላይ ይበልጥ ለቢዝነስ ምቹ እና ተደራሽ ወደሆነ አሰራር መለወጣቸውን ያሞገሱት አቶ ጀማል፤ ሚድሮክ በአሁኑ ወቅት በግብርና፣ በማኑፋክቸሪንግ፣ በማዕድን እና በኮንስትራክሽን ዘርፎች 80 ሺህ ሠራተኞችን እያስተዳደረ እንደሚገኝ ገልጸዋል።

ከሆቴል እና ቱሪዝም ዘርፉ ባሻገርም፣ ኩባንያው በቆላማ አካባቢዎች ግዙፍ የመስኖ ልማቶችን፣ እንዲሁም ለሀገር ውስጥ እና ለውጭ ገበያ የሚቀርብ 25 ሺህ ሄክታር የቡና እርሻን እና የሻይ ልማቶችን በማስፋፋት ላይ ይገኛል።

ምንም እንኳን ይህ አስደሳች እድገት ቢኖርም፣ የፖለቲካ አመራሩ ቁርጠኝነት እና ትክክለኛ ፖሊሲ መኖር ብቻውን በቂ ባለመሆኑ መንግሥት የቢሮክራሲ ማነቆዎችን ፈጥኖ ሊፈታ ይገባል ሲሉ አቶ ጀማል አሳስበዋል።

በተለይም የኢንቨስትመንት ማበረታቻ አዋጆች እንዲከለሱ፣ እንዲሁም ለባለሙያዎች እና ለኮንፈረንስ ቱሪስቶች የቪዛ አሰጣጥ ሂደት እንዲቀል ጥሪ አቅርበዋል።

በመድረኩ ላይ ንግግር ያደረጉት የፕላን እና ልማት ሚኒስትሯ ዶ/ር ፍፁም አሰፋ በበኩላቸው፣ የባለሀብቶችን ስጋት መንግሥት በሚገባ እንደሚረዳ ገልጸው፣ የቅርብ ጊዜ ማሻሻያዎች እነዚህን ተግዳሮቶች ለመፍታት ሆን ተብለው የተቀረጹ መሆናቸውን አብራርተዋል።

ሚኒስትሯ አክለውም፣ በጠቅላይ ሚኒስትሩ የሚመራው የኢንቨስትመንት ቦርድ መካከለኛ ደረጃ ላይ ያሉ የቢሮክራሲ መጓተቶችን አልፎ ቀጥተኛ የአመራር ክትትል በማድረግ ማነቆዎችን ለመፍታት ቁልፍ ሚና እየተጫወተ መሆኑን አስረድተዋል።

Via ዘ ሐበሻ

@etconp
❤19👍1👏1
Please open Telegram to view this post
VIEW IN TELEGRAM
❤10🔥1
2. Convert steel density 7850 kg/m³ into ton/m³.
Anonymous Quiz
5%
A) 6.85 ton/m³
7%
B) 7.50 ton/m³
83%
C) 7.85 ton/m³
3%
D) 8.10 ton/m³
2%
E) 9.00 ton/m³
👍9❤1
The formula for the unit weight of steel bar per meter is:
Anonymous Quiz
3%
A) d² / 150
87%
B) d² / 162.19
5%
C) d² / 200
4%
D) d² / 180
1%
E) d² / 250
👍11❤4
What is the Young’s Modulus of Steel?
Anonymous Quiz
8%
A) 100 GPa
10%
B) 150 GPa
12%
C) 180 GPa
52%
D) 200 GPa
19%
E) 250 GPa
👍10❤4
Weight of concrete cube = 8.1 kg Cube size = 150 mm × 150 mm × 150 mm Find density (kg/m³).
Anonymous Quiz
6%
A) 2200
7%
B) 2300
70%
C) 2400
12%
D) 2500
5%
E) 2600
👍5🥰5❤2
👍7❤2👌1
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

🔹 Address 1: Signal road, around
Dinberwa Hospital

🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
❤2
👉The Logic of Alternating Hooks

💫​Staggering column stirrup hooks is a functional necessity for effective core confinement, not just a detailing preference.

⭐️​Why Staggering is Mandatory:

✅​Avoids "Unzipping": Aligning all hooks on a single longitudinal bar creates a continuous vertical plane of weakness. Under extreme loading, this can lead to a localized failure where the cage "unzips."

✅​Core Integrity: Alternating the 135° hooks ensures the concrete core remains restrained from all corners, even after the exterior concrete cover spalls during a seismic event or high axial loading.

✅​Uniform Buckling Resistance: Staggering provides consistent lateral support to all longitudinal bars, preventing premature buckling.

@etconp
👍4❤1👌1
🎯 Why Cement Has Specific Gravity ~3.15 but Unit Weight is Only 1440 kg/m³?

💫If you've ever asked:

“Cement’s specific gravity is 3.15  so why is its unit weight only 1440 kg/m³?”

⏺You’re not alone. Let’s break it down in simple terms 👇

✅ What is Specific Gravity of Cement?

⏺It's the ratio of cement’s density to water’s density.

⏺Water's density = 1000 kg/m³ So, Cement’s density = 3.15 × 1000 = 3150 kg/m³.

🚧BUT ⚠️ This is the absolute density  measured in lab, without air gaps, fully compacted and used in mix design calculations.

✅ What is Unit Weight (Bulk Density)?

⏺This is the actual weight per m³ of cement as stored or handled on site.

⏺Cement particles are not tightly packed in a bag  there are air voids.

⏺That’s why the unit weight is only ~1440 kg/m³.
It is used when calculating volume-based cement quantity on site.

#EthiopianConstructionEngineering
#SiteExecution #PlanningToBuild
#ConstructionBasics  #BuildSmart #CivilEngineering #MasonryWorks
#OnSiteLearning #ECEMS #EthiopianConstruction #Ethioconstruction

@etconp
❤12👍5😱1
👉የቤተሰብ ቁጥር ዕድገት በመጨመሩ ዓመታዊ የቤት ፍላጎት 486,000 መድረሱ ተነገረ

🚧በየዓመቱ አዳዲስ የሚመሠረት የቤተሰብ ቁጥር እየጨመረ በመሆኑ፣ ዓመታዊ የቤት ፍላጎት በሁለት እጥፍ አድጎ 486,000 መድረሱንና አቅርቦቱ ከፍላጎቱ አኳያ በግማሽ እንደሚያንስ ተገለጸ፡፡

የኢትዮጵያ ኢንቨስትመንት ኮሚሽን በኢትዮጵያ ያልሙ (Investin Ethiopia) በሚል መሪ ሐሳብ ለሁለት ቀናት ያካሄደውን ፎረም በማስመልከት የገንዘብ ሚኒስቴር፣ የኢንቨስትመንት ኮሚሽንና የአውሮፓ ንግድ ምክር ቤት በኢትዮጵያ የአገሪቱን የኢንቨስትመንት ዘርፍ አጠቃላይ መረጃዎችን ያካተተ ሰነድ በጋራ አዘጋጅተዋል፡፡

በመንግሥትና በግሉ ዘርፍ አጋርነት ከሚተገበሩ የመንግሥት ፕሮጀክቶች መካከል አንዱ የሆነው የቤት ግንባታን በሚመለከት ባብራራው የሰነዱ ክፍል፣ በኢትዮጵያ በአጠቃላይ የቤት ፍላጎት እየጨመረ መሆኑንና በዓመት 486,000 መድረሱ ተመላክቷል፡፡

በየዓመቱ የሚመሠረተው አዲስ የቤተሰብ ቁጥር እያደገ መምጣት፣ በየዓመቱ አምስት በመቶ የሚጨምረው ፈጣን የከተማና የሕዝብ ቁጥር ዕድገት ለቤት ፍላጎት መጨመር ዋና ዋና ምክንያቶች መሆናቸው ተገልጿል፡፡

መንግሥት በየዓመቱ ለሚያድገው የቤት ፍላጎት የሚያቀርበው 165,000 ቤቶችን መሆኑን፣ ይህም ከፍላጎቱ አኳያ ግማሽ ያህሉን እንኳን እንደማያዳርስ ሰነዱ ያመላክታል፡፡

የቤት ፍላጎቱ በየጊዜው ዕያደገ በመምጣቱ ከፍተኛ እጥረት መከሰቱን የሚጠቁመው ሰነዱ፣ ይህም ጠንካራና ቀጣይነት ያለው ፍላጎት ስለሚፈጥር፣ ኢንቨስተሮች በመንግሥትና በግል አጋርነት የቤት አቅርቦት ፕሮጀክቶች መሠረት ተመጣጣኝ፣ መካከለኛ ገቢ ያላቸውን ዜጎች ተጠቃሚ የሚያደርግና ለኪራይ አገልግሎት የሚውሉ የቤት...

🔗 ተጨማሪ ያንብቡ👇 https://ethiopianreporter.com/153967/

@etconp
❤4👍1🎉1
ADVERTISMENT

ታምራት ፕሌት እና ጄ ቦልት አቅራቢ

✅የምንሰጣቸው አገልግሎቶች

🔅 ፕሌት any Size & thickness
🔅 ጄ ቦልት (ጥርስ ማዉጣትና ማጠፍ)

🔅 የተለያዩ  [modefic] ስራዎችን እንሰራለን።

♦️ ማንኛዉንም ብረታ ብረት እንገዛለን።

☎️ስልክ 0904040477 ወይም 0911016833 ደውለው ያግኙን
📱ቴሌግራም ላይ ፦https://t.me/heavenic1

አድራሻ፦  ቁ 1.መርካቶ
                ቁ.2 አየር ጤና  ኪዳነ ምህረት

ጥራትና ታማኝነት መለያችን ነው።
ታምራት ፕሌት እና ጄ ቦልት አቅራቢ
👍1
📅Project scheduling

💫In construction, a well-planned schedule is the backbone of every successful project. Without a solid plan, delays pile up, costs spiral out of control, and crews waste valuable time waiting for the next step. 

Project scheduling isn’t just about dates on a calendar—it’s about keeping materials, equipment, and manpower moving like a well-oiled machine. Whether you’re managing a high-rise, a bridge, or a residential development, a solid schedule ensures that every phase flows seamlessly from start to finish.

📌 What is Project Scheduling?
In construction, every project has a sequence of steps that must be followed to keep things on track. Project scheduling is the process of organizing those steps into a clear timeline, ensuring that: 

✅ Work progresses logically and efficiently 
✅ Crews, subcontractors, and materials arrive at the right time
✅ Delays are minimized, and risks are reduced 
✅ The project stays within budget 

A strong schedule is like a roadmap—it tells your team where they need to be, what needs to happen next, and what could cause bottlenecks if not managed properly. 

📊 Gantt Charts – The Blueprint for Time Management
What is a Gantt Chart?
A Gantt chart is one of the most widely used tools in construction scheduling. Think of it as a visual roadmap that lays out the entire project timeline in a bar chart format. Each task has a start and end date, making it easy to see what’s happening and when. 

🔹 Key Elements of a Gantt Chart:
📌 Task List – All project activities (e.g., site clearance, bulk excavation,foundation concrete, electrical, roofing) 
📌 Bars – The duration of each task 
📌 Dependencies – How tasks are linked (e.g., you can’t pour concrete before formwork is done) 
📌 Milestones – Major project checkpoints (e.g., completion of structural work) 

🔹 Why Construction Teams Love Gantt Charts:
✅ Clear, at-a-glance scheduling for project managers and site supervisors 
✅ Tracks overlapping activities—helps manage multiple subcontractors working at once 
✅ Quickly highlights delays so adjustments can be made in real-time 

🔗 Critical Path Method (CPM) 
📍 What is CPM?
The Critical Path Method (CPM) is a powerful scheduling technique used in construction to identify the longest sequence of dependent tasks that determine the project’s overall duration. 

💡 How It Works
1️⃣ Break the project into tasks and subtasks
2️⃣ Assign estimated durations to each task 
3️⃣ Identify dependencies (which tasks must happen before others can begin) 
4️⃣ Calculate the longest path of tasks that, if delayed, will extend the entire project timeline.

📌 Why is CPM Critical in Construction? 
✔️ Helps prevent costly delays by focusing on the most time-sensitive tasks 
✔️ Prioritizes work that directly affects project completion 
✔️ Allows managers to adjust schedules dynamically when unexpected issues arise.

It will continue....

#construction
#engineering
#Projectmanagement
#ethiopian
#constructionindustry

@etconp
❤10👍8👏1
👉የደረጃ አሰራር ስሌት መመሪያ (Staircase Calculation Guide)

🚧ደረጃን በሚነድፉበት ጊዜ ደህንነትን እና ምቾትን ለመጠበቅ ትክክለኛውን መጠን መጠቀም አስፈላጊ ነው፦

🔹 መሰረታዊ ቃላት፦

* Rise (R): የአንድ እርምጃ ከፍታ
* Tread (T): የአንድ እርምጃ ስፋት (እግር የሚያርፍበት)
* Total Rise: ከወለል እስከ ወለል ያለው ጠቅላላ ከፍታ
* Going: የደረጃው ጠቅላላ አግድም ርዝመት

🔹 መደበኛ ቀመር (Formula):

👉 2R + T = 600–650 ሚ.ሜ (የምቾት ህግ)

🔹 ደረጃ በደረጃ አሰራር፦

* ጠቅላላ ከፍታን መለካት
   * ምሳሌ፦ 3000 ሚ.ሜ

* የአንድ ደረጃ ከፍታ (Rise) መምረጥ
   * ተመራጭ = 150–180 ሚ.ሜ
   * 👉 150 ሚ.ሜ እንውሰድ
* የደረጃዎች ብዛት
   * = 3000 / 150 = 20 ደረጃዎች
* የእርምጃ ስፋት (Tread) ማስላት
   * በቀመሩ መሰረት፦ 2(150) + T = 600
   * 👉 T = 300 ሚ.ሜ

* ጠቅላላ የደረጃው ርዝመት (Total Going)
   * = 300 \times (20 – 1) = 5700 ሚ.ሜ

🔹 መደበኛ መጠኖች፦

* Rise (ከፍታ): 150–180 ሚ.ሜ
* Tread (ስፋት): 250–300 ሚ.ሜ
* የደረጃው ጎንዮሽ ስፋት: 900–1200 ሚ.ሜ

🔹 ጠቃሚ ምክሮች፦

* ሁሉንም ደረጃዎች እኩል መጠን ያድርጉ።
* ከ10–12 ደረጃዎች በኋላ የእረፍት ቦታ (Landing) ያዘጋጁ።
* የእጅ መደገፊያ (Handrail) ከፍታ 900 ሚ.ሜ አካባቢ መሆኑን ያረጋግጡ።

🏷የ YouTube ገፃችን ለመቀላቀል ከታች ባለው ሊንክ በመግባት SubScribe አርገው ቤተሰብ ይሁኑ👇

https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
‎
‎@etconp
❤18👍3