Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.2K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
🏗️ Which of these is a pozzolanic material commonly used in concrete?
💬 Comment your choice before revealing the
Anonymous Quiz
51%
👉 A) Limestone
27%
👉 B) Fly ash
6%
👉 C) Granite
16%
👉 D) Sand
❤10
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

🔹 Address 1: Signal road, around
Dinberwa Hospital

🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
👍2❤1
🏠Roof Types and Details

🏷Basic Terms

- Slope – The angle or inclination of the roof surface.
- Pitch – Ratio of rise to span; determines steepness.
- Ridge – The horizontal line at the top where two roof planes meet.
- Hip – The external angle formed by the intersection of two sloping roof surfaces.

⭐️Roof Types Explained

- Single-Pitch (Lean-to Roof)
- One sloping surface.
- Simple, economical, often used for sheds or extensions.

- Gable Roof
- Two sloping sides meeting at a ridge.
- Classic triangular profile, good for drainage and ventilation.

- Half-Hip Roof
- Gable roof with the upper part of the gable cut off by a small hip.
- Provides better wind resistance than a full gable.

- Half-Hipped (Four-Pitched)
- Combination of gable and hip on all sides.
- Adds stability and aesthetic variation.

- Half-Hipped (Double-Pitched)
- Two slopes on each side, with truncated gables.
- Offers more attic space and improved wind resistance.

- Hipped (Four-Pitched)
- All sides slope downwards to walls.
- Strong against wind, common in tropical climates.

- Multi-Pitch Roof
- Several roof planes intersecting.
- Used for complex structures, adds architectural interest.

- Mansard (Hipped)
- Four-sided roof with two slopes per side, lower slope steeper.
- Maximizes attic space, French origin.

- Mansard (Half-Hipped)
- Variation with truncated gables.
- Combines attic space with wind resistance.

- Tent Roof
- Steeply pitched, pyramid-like.
- Often used for towers or small structures.

- Pyramidal (Spires)
- Four equal triangular sides meeting at a point.
- Common in temples, towers, and monuments.

- Conical (Spires)
- Circular base tapering to a point.
- Seen in turrets, gazebos, and traditional huts.

- Hipped with Broken Pitch
- Hip roof with a change in slope mid-way.
- Adds character and allows more usable upper space.

- Gable roofs are cost-effective but less wind-resistant.
- Hip roofs are stronger in high-wind zones.
- Mansard roofs maximize usable space but are more complex to construct.
- Conical and pyramidal roofs are mainly aesthetic or symbolic.

#CivilEngineering #Construction #RoofDesign #RoofTypes #StructuralEngineering #BuildingDesign #Architecture #RoofStructure #GableRoof #HipRoof #MansardRoof #ConstructionDetails #BuildingConstruction #CivilEngineeringBasics #EngineeringStudents #LearnEngineering #EngineeringFacts #ConstructionKnowledge #CivilEngineeringWorld #ExplorePage #TrendingNow #ViralPost #ReelsIndia #ContentCreator

@etconp
🙏7❤5👍1
👉Hydroelectric Dam

🚧Key Details

- Reservoir (Water Intake Area): Stores water at a higher elevation, providing potential energy.
- Trash Rack: Filters debris before water enters the intake system.
- Gated Intake Tower: Controls the flow of water into the penstock.
- Penstock (Steel Pipe): Directs high-pressure water toward the turbines.
- Turbines (not labeled but implied): Convert kinetic energy of flowing water into mechanical energy.
- Spillway & Stilling Basin: Safely release excess water to prevent overflow and reduce erosion.
- Grouting Gallery: Strengthens dam foundations and prevents seepage.
- Drainage Holes: Relieve water pressure inside the dam structure.
- Sluice Gates (Bottom Outlet): Allow controlled release of water for flood management.
- Debris Boom: Prevents floating debris from entering the intake.
- High Voltage Transmission Lines: Carry generated electricity to the grid.
- Lower River (Discharge): Returns water downstream after energy conversion.

@etconp
❤11
👉አስደሳች ዜና ለዚህ ቻናል ቤተሰቦች

💫የ ትንሳኤ በዓል ምክንያት በማስመልከት የ Quantity Surveying እና ETABS ኦንላይን ኮርሶች በ 25% ዋጋ ቅናሽ ምዝገባ ጀምረናል🙏

📩ለመመዝገብ በ @Philemona7 ይፃፉልን ወይ በ 0925446661 ይደውሉልን❤

@etconp
👍2
👉የ መሬትና የ ቤት ዝውውር የሚፈፀምባቸው መንገዶች

📜የባለቤትነት (የይዞታ) ስም ዝውውር የሚደረገው በሚከተሉት ምክንያቶች ነው፦

• በሽያጭ (Sale): በሻጭና በገዥ መካከል በሚደረግ የውል ስምምነት
• በስጦታ (Gift): በቤተሰብ ወይም በግለሰቦች መካከል በሚደረግ ነጻ ስጦታ
• በውርስ (Inheritance): በሕግ ወይም በኑዛዜ ለወራሾች የሚተላለፍ
• በፍርድ ቤት ትእዛዝ: በዕዳ ወይም በሌላ የሕግ ክርክር ምክንያት በውርስ፣ በሽያጭ እና በስጦታ ስም ለማዛወር የሚያስፈልጉ ሂደቶችና መረጃዎች እንደሚከተለው ቀርበዋል።

1. በሽያጭ (Sale)

አስፈላጊ መረጃዎች፦
o ዋናው የባለቤትነት ማረጋገጫ ካርታ (Original Title Deed)
o በሰነዶች ማረጋገጫ የጸደቀ የሽያጭ ውል
o የሻጭ እና የገዢ የታደሰ መታወቂያ
o ንብረቱ በጋራ ሀብትነት የተመዘገበ ከሆነ የትዳር ጓደኛ ስምምነት
o ከዕዳ እና እገዳ ነፃ መሆኑን የሚገልጽ ማስረጃ
o የግብር ደረሰኝ


2. በውርስ (Inheritance)

ውርስ የሚፈጸመው ባለቤቱ በህይወት በሌለበት ወቅት ሲሆን፣ ህጋዊ ወራሽነትን ማረጋገጥ ቀዳሚው ተግባር ነው።
አስፈላጊ መረጃዎች፦
o የሟች የባለቤትነት ማረጋገጫ ካርታ
o የሟች የሞት ምስክር ወረቀት
o ከፍርድ ቤት የተሰጠ የሕጋዊ ወራሽነት ማረጋገጫ (Heirship Certificate)
o ወራሾች ንብረቱን ለመከፋፈል ከተስማሙ በሰነዶች ማረጋገጫ የጸደቀ የውርስ ክፍፍል ስምምነት
o የወራሾች የታደሰ መታወቂያ

3. በስጦታ (Gift)

አስፈላጊ መረጃዎች፦
o ዋናው የባለቤትነት ማረጋገጫ ካርታ
o በሰነዶች ማረጋገጫ የጸደቀ የስጦታ ውል
o የሰጪ እና የተቀባይ የታደሰ መታወቂያ
o የጋራ ሀብት ከሆነ የትዳር ጓደኛ ስምምነት


የመረጃው ምንጭ፡- የተሸሻለው የከተማ መሬት ይዞታ ማረጋገጥ እና ምዝገባ መመሪያ ቁጥር 61/2010

Via Addis Ababa City Admin. Landholding Registration and Information

@etconp
❤14👍5
👉Runway Markings Explained

Threshold – The start of the runway where aircraft land. Marked by white stripes.

Landing Designator – The runway number (like 09, 27) showing its direction based on compass heading.

Centerline – The dashed white line in the middle that pilots follow for alignment.

Aiming Point – Large white blocks where pilots aim to touch down during landing.

Touchdown Zone Markings – Groups of white bars that help pilots judge distance while landing.

Edge Markings – Solid white lines on both sides showing runway boundaries.

Blast Pad – Area before the runway that protects the surface from jet blast; not for landing or takeoff.

#RunwayMarkings #AviationBasics #PilotTraining #AviationKnowledge #AirportEngineering #CivilEngineering #RunwayDesign #AviationLife #FlightTraining #AircraftLanding #AviationFacts

@etconp
❤12
ADVERTISMENT

ታምራት ፕሌት እና ጄ ቦልት አቅራቢ

✅የምንሰጣቸው አገልግሎቶች

🔅 ፕሌት any Size & thickness
🔅 ጄ ቦልት (ጥርስ ማዉጣትና ማጠፍ)

🔅 የተለያዩ  [modefic] ስራዎችን እንሰራለን።

♦️ ማንኛዉንም ብረታ ብረት እንገዛለን።

☎️ስልክ 0904040477 ወይም 0911016833 ደውለው ያግኙን
📱ቴሌግራም ላይ ፦https://t.me/heavenic1

አድራሻ፦  ቁ 1.መርካቶ
                ቁ.2 አየር ጤና  ኪዳነ ምህረት

ጥራትና ታማኝነት መለያችን ነው።
ታምራት ፕሌት እና ጄ ቦልት አቅራቢ
❤1
🔥🔥🔥 7 Days Easter Holiday Discount

          🌟Online Class (With Certificate)

1. Ms Project Price = 2000birr
2. Quantity Survey Price = 2000birr
3. Civil 3D Price =2800birr
4.. Etabs With Safe Price = 3500birr
5.. Advanced Structural Design Using ETABS, SAFE and SAP2000 = 5500birr
6. Structural Design in ProtaStructure Software = 4500birr
7. Autocad Price = 2000birr
8. Autodesk Revit Architecture = 3500BIRR


🚧Prepared by Engineering Solution Abel Muluken

🫵For Registration - 0948552002  Or @AbelMuluken

🚧Telegram Channel - https://t.me/AbelMulukenEngineeringSolution

🚧YouTube Channel - https://youtube.com/channel/UCNxyykElOiXVKVlA4jXI2BA
👉Concrete Durability: Water-Resistant Mix Design

🚧Water-resistant concrete is designed to reduce permeability, preventing water from entering and damaging the structure.

⏺This increases durability and service life.

🔹 Key Factors:

❇️Low water-cement ratio → Less water = fewer pores
❇️Proper mix proportion → Balanced cement, sand, and aggregates
❇️Waterproof additives → Create crystals that block pores
❇️Good compaction → Removes air voids
Proper curing → Improves strength and density

🔹 Result:

🎲Concrete becomes dense, strong, and leak-resistant, ideal for foundations, basements, water tanks, and roofs.

#ConcreteDurability #WaterproofConcrete #CivilEngineering #Construction #ConcreteMix #BuildingStrong

@etconp
❤6
👉Phythagorean Theorem In Construction

💫The Pythagorean Theorem is used to create perfect 90° (right angle) in construction work.

a2+b2=C2

🎲How it works on site:

Workers use the 3-4-5 rule
Measure 3 ft (or m) on one side
Measure 4 ft (or m) on another side
The diagonal should be 5 ft (or m)

✅ If it matches → angle is exactly 90°

📍Where it is used:

Building layout (setting corners)
Foundation marking
Wall alignment
Road & culvert construction

🔰Why important:

Ensures accuracy, straight structure, and no layout error 🧱

#PythagoreanTheorem #345Rule #RightAngle #ConstructionLife #CivilEngineering #SiteWork #EngineeringTricks #BuildingLayout #ConstructionTips #SmartWork

@etconp
❤10
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

🔹 Address 1: Signal road, around
Dinberwa Hospital

🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
❤2👍1
👉በግንባታ ዘርፍ የድርድር ጥበብ (Construction Negotiation)


የግንባታ ድርድር የፕሮጀክት ስጋቶችን ለመቆጣጠር፣ አለመግባባቶችን ለመፍታት እና የውል ስምምነቶችን (የስራ ዝርዝር፣ ዋጋ እና የጊዜ ሰሌዳ) በግልጽ ለመለየት የሚረዳ ወሳኝ ሂደት ነው። ዋና አላማውም በግንባታ ሂደት ውስጥ የሚከሰቱ መዘግየቶችን መከላከል ነው፤

የድርድር ዋና ዋና ጉዳዮች


መሰረታዊ ግቦች፦ ውድ ከሆነው የህግ ክርክር መራቅ፣ ሙያዊ ግንኙነቶችን ማስቀጠል እና ውስብስብ የሆኑ የባለድርሻ አካላትን ፍላጎት ግልጽ ማድረግ፤

የድርድር አርዕስቶች፦ ዋጋ፣ የአከፋፈል ሁኔታ፣ የለውጥ ትዕዛዝ (Change Order) ሂደቶች፣ ኢንሹራንስ፣ የስጋት ክፍፍል እና የፕሮጀክት የጊዜ ሰሌዳ፤

የሚያጋጥሙ እንቅፋቶች፦ የፕሮጀክት ሰነዶች አለመጣጣም፣ ግልጽ ያልሆነ የዋጋ አወጣጥ እና የሀገሪቱን የህግ ማዕቀፎች ግምት ውስጥ አለማስገባት፤

ውጤታማ የድርድር ስልቶች


ቅድመ ዝግጅት፦ ወደ ድርድር ከመግባትዎ በፊት ሁሉንም ተዛማጅ ቴክኒካዊ፣ ፋይናንሳዊ እና ህጋዊ መረጃዎችን ማሰባሰብ፤

በፍላጎት ላይ የተመሰረተ አቀራረብ (Win-Win)፦ ከአላስፈላጊ ግጭት ይልቅ ለሁለቱም ወገን የሚጠቅም መፍትሄ ላይ ማተኮር፤

ግልጽ ሰነድ፦ በድርድር ወቅት የተደረሱ ስምምነቶች፣ ክለሳዎች ወይም ቃል ኪዳኖች ለወደፊት አለመግባባት እንዳይፈጥሩ በጽሁፍ መመዝገባቸውን ማረጋገጥ፤

ድርድር የማይደረግባቸው ነጥቦች


(Non-negotiables)፦ ሊለወጡ የማይችሉ መሰረታዊ መስፈርቶችን መለየት እና የማይስማማ ሁኔታ ካለ ከድርድሩ ለመውጣት ዝግጁ መሆን።

በውል ስምምነት ውስጥ ሊታዩ የሚገባቸው ነጥቦች


የዋጋ መዋቅር፦ "የስራው ወጪ" (Cost of Work) እና "አጠቃላይ ሁኔታዎች" (General Conditions) በግልጽ መለየት አለባቸው።

የስጋት አስተዳደር፦ ተገቢ የሆኑ የኢንሹራንስ ውሎችን እና የካሳ ክፍያዎችን (Indemnity) በመደራደር ተቀባይነት ያለው የስጋት ደረጃ መወሰን።

ተጠባባቂ ወጪ (Contingency)፦ እንደ "ሊኩዊዴትድ ዴሜጅ"
(Liquidated Damages) ያሉ ቅጣቶችን ከማካተት በፊት ከተጠባባቂ ወጪ እና ከክፍያ ማስተካከያ ጋር ማመጣጠን።

የድርድር አይነቶች


የትብብር ድርድር (Cooperative)፦ ለሁሉም ወገኖች ተቀባይነት ያለው እሴት መፍጠር ላይ ያተኩራል።

የግጭት/ተቃርኖ ድርድር (Adversarial)፦ በጊዜያዊ አለመግባባቶች ላይ ጥቅም ላይ የሚውል ቢሆንም፣ የረጅም ጊዜ ግንኙነትን ሊያበላሽ ይችላል።

ለማለዳ ስንቅ ማጠቃለያ፦ በግንባታ ድርድር ወቅት "አሸናፊ-አሸናፊ" (Win-Win) የሆነ አቀራረብን መከተል ለረጅም ጊዜ አጋርነት ወሳኝ ነው። ሁሉንም ስምምነቶች በሰነድ ማረጋገጥ እና ስጋቶችን በፍትሃዊነት መከፋፈል የፕሮጀክቱን ስኬት ያረጋግጣል።


@etconp
❤7👍2
👉የቢሾፍቱ አየር ማረፊያ ፕሮጀክት እጩዎች ዝርዝር በዋናነት በቻይና ኩባንያዎች ተይዟል።

💫Chinese Firms Dominate Shortlist for Bishoftu Airport Project

🚧​የኢትዮጵያ አየር መንገድ ግሩፕ የቢሾፍቱ ዓለም አቀፍ አየር ማረፊያ ፕሮጀክት የዋና ሥራዎች የግንባታ፣ የግዥ እና የፋይናንስ (EPC-F) ጨረታ የቅድመ-ብቃት ግምገማን አጠናቆ ዓለም አቀፍ ጥምረት ያላቸውን ድርጅቶች በእጩነት መርጧል። ግሩፑ ውጤቱን ቅዳሜ ዕለት ያሳወቀ ሲሆን፣ የተመረጡት ተጫራቾች ዝርዝር የጨረታ ሰነድ ቀርቦላቸው ወደ ቀጣዩ ደረጃ እንዲሸጋገሩ ይደረጋል።
​ፕሮጀክቱ በአራት ዋና ዋና ክፍሎች የተከፈለ ሲሆን፣ እነሱም፡-
• ​F1: ዋና ዋና መገልገያዎች (Main Facilities)
• ​F2: የድጋፍ ሰጪ መገልገያዎች (Support Facilities)
• ​I1: የአየር ማረፊያ ሜዳ እና መሰረተ ልማት (Airfield and Infrastructure)
• ​I2: ከግቢ ውጭ ያሉ ትስስሮች (Offsite Links) ናቸው።
​ለዋና ዋና መገልገያዎች (F1) ፓኬጅ ሰባት ኩባንያዎች ያለፉ ሲሆን፣ ከእነዚህም መካከል፡-
• ​ቻይና ኮሚዩኒኬሽንስ ኮንስትራክሽን ካምፓኒ (CCCC)
• ​በቻይና ኮንስትራክሽን ኤይትዝ (eighth) ኢንጂነሪንግ ዲቪዥን (CCEED) እና በቻይና ሮድ ኤንድ ብሪጅ ኮርፖሬሽን (CRBC) የተመሰረተ ጥምረት
• ​ቤጂንግ አርባን ኮንስትራክሽን ግሩፕ (BUCG) እና ሌሎች አራት ድርጅቶች ይገኙበታል።
​ለከግቢ ውጭ ትስስሮች (I2) ፓኬጅ ደግሞ በኢትዮ-ጂቡቲ ምድር ባቡር (EDR) እና በቻይና ሲቪል ኢንጂነሪንግ ኮንስትራክሽን ኮርፖሬሽን (CCECC) መካከል የተመሰረተ ጥምረት በእጩነት ከቀረቡት መካከል አንዱ ነው። በጥቅሉ ሲታይ በእጩነት ከተመረጡት ኩባንያዎች መካከል ግማሽ ያህሉ የቻይና ኩባንያዎች ናቸው።

Via Addis Fortune

@etconp
❤13👍6
👉አስደሳች ዜና ለዚህ ቻናል ቤተሰቦች

💫የ ትንሳኤ በዓል ምክንያት በማስመልከት የ Quantity Surveying እና ETABS ኦንላይን ኮርሶች በ 25% ዋጋ ቅናሽ ምዝገባ ጀምረናል🙏

📩ለመመዝገብ በ @Philemona7 ይፃፉልን ወይ በ 0925446661 ይደውሉልን❤

@etconp
❤6
👉የኢትዮጵያ መንገዶች ባለፉት ስምንት ዓመታት

የኢትዮጵያ መንገዶች አስተዳደር (ኢ.መ.አ) ክልሎችን እርስ በርስ የሚያገናኝና ሀገራዊ የንግድ  ኮሪደሮችን የሚያጠናክር ጠንካራ የፌዴራል የመንገድ መረብ የመዘርጋት ተልዕኮውን ወደ ተግባር በመለወጥ ረገድ ያስመዘገበው አሀዛዊ መረጃ በርካታ ውጤቶች መመዝገባቸውን ያሳያል።

▪️  በ2010 ዓ.ም የነበረው የ126,773 ኪሎ ሜትር አጠቃላይ የመንገድ ሽፋን በ2018 ዓ.ም አጋማሽ ወደ 180,232 ኪሎ ሜትር በማደጉ፣ ከ53 ሺህ ኪሎ ሜትር በላይ አዲስ መንገድ ለሀገሪቱ ተጨምሯል።

▪️ የመንገድ ጥግግቱ በየ1000 ስኩዌር ኪሎ ሜትር ከ115.2 ወደ 157 ኪሎ ሜትር አድጓል።

▪️ ባለፉት ስምንት ዓመታት ውስጥ ብቻ 182  ፕሮጀክቶች ወደ ግንባታ እንዲገቡ የተደረገ ሲሆን፣ 71 ግዙፍ ፕሮጀክቶች ግንባታቸው ተጠናቆ ለትራፊክ ክፍት ሆነዋል።

▪️ ተቋሙ የመንገድ ጥራትን ከመጠበቅ አንጻርም 80,037 ኪሎ ሜትር መደበኛ ጥገና እና 3,035 ኪሎ ሜትር ከባድ ጥገና በማከናወን የሀገሪቱን የመንገድ ሀብት የመንከባከብ ስራ በትኩረት ሰርቷል።

▪️  የውጤቱ ሌላኛው ማሳያ ሀገራችንን የንግድና የኢንዱስትሪ ማዕከል የሚያደርጉ ግዙፍ የፍጥነት መንገዶች እውን መሆናቸው ነው።

▪️ከለውጡ በፊት የነበረው 84.7 ኪ.ሜ የሚረዝመው የአዲስ አበባ-አዳማ የፍጥነት መንገድ ብቻ ሲሆን፣ ዛሬ ግን የሞጆ-መቂ-ባቱ-አርሲ ነገሌ (151 ኪ.ሜ) እና የድሬዳዋ-ደዋሌ (220 ኪ.ሜ) የፍጥነት መንገዶች ተጠናቅቀው ለአገልግሎት በቅተዋል።

▪️  ከዚህ በተጨማሪ ተቋሙ ከአዲስ አበባ ወደ ደሴ፣ ጅማ፣ ደብረ ማርቆስ እና ነቀምቴ የሚዘልቁ አራት አዳዲስ የፍጥነት መንገዶችን ለመገንባት የአዋጭነት ጥናት እያጠናቀቀ ሲሆን፣ ይህም ኢትዮጵያን በ10 ዓመታት ውስጥ የ1,600 ኪሎ ሜትር የፍጥነት መንገድ ባለቤት ለማድረግ ለተያዘው ግብ ትልቅ እርምጃ ነው።

▪️  ሌላኛው ትልቅ ስኬት ኢትዮጵያን ከጎረቤት ሀገራት ጋር የሚያገናኙ ግዙፍ መንገዶች እውን መሆናቸው ነው። 

▪️ ተቋማዊ አደረጃጀትን በማዘመንና ዘመናዊ አሰራርን በመዘርጋት ረገድም በለውጡ ማግስት ሰፊ ስራዎች ተከናውነዋል።

▪️ ቀደም ሲል ተነጥለው የነበሩ የመንገድ ጥገና ዲስትሪክቶችና ሴክሽኖች ወደ ኢትዮጵያ መንገዶች አስተዳደር እንዲመለሱ ተደርጓል።

▪️በተጨማሪም በሀገሪቱ በተለያዩ ክፍሎች  የግንባታ ፕሮጀክቶች ማስተባበሪያ ጽህፈት ቤቶች ተከፍተው ስራ እንዲጀምሩ በመደረጉ፣ የፕሮጀክቶች ክትትልና ድጋፍ በመንገድ ግንባታው ስፍራ ቅርብ እንዲሆኑ አስችሏል።

▪️  የመንገድ ሀብቱን ለመጠበቅና የከባድ ተሽከርካሪዎችን ጫና ለመቆጣጠር የሚረዱ የሚዛን ጣቢያዎች ከለውጡ ማግስት ጀምሮ በማስፋፋት እና ያሉትን ዲጂታላይዝ እንዲሆኑ ተደርገዋል።

▪️ ይህ የዲጂታላይዜሽን ስራ የተሽከርካሪዎችን ክብደት ከሰው እጅ ንክኪ ነጻ በሆነ መልኩ በመመዝገብ፣ የአሰራር ግልጽነትን በማስፈንና የመንገድ ብልሽትን በመቀነስ ረገድ የላቀ ሚና እየተጫወተ ይገኛል።

▪️  በመንገድ ምርምር ረገድም የተቋሙን የምርምርና ላቦራቶሪ ማዕከል አቅም በማሳደግ የመንገድ ግንባታ ግብአቶችን ጥራት በሳይንሳዊ መንገድ ለመፈተሽ የሚያስችሉ ስራዎች ተሰርተዋል።

▪️ የዘርፉን አቅም ለመገንባትም በቢሊዮን የሚቆጠር ብር ወጪ የተደረገባቸው በርካታ ዘመናዊ ለመንገድ ግንባታ የሚውሉ ማሽነሪዎች ግዢ መፈጸሙ  እና ሌሎችም በርካታ ተግባራት ተከናውነውል።

Via ERA

@etconp
❤18
ADVERTISMENT

ታምራት ፕሌት እና ጄ ቦልት አቅራቢ

✅የምንሰጣቸው አገልግሎቶች

🔅 ፕሌት any Size & thickness
🔅 ጄ ቦልት (ጥርስ ማዉጣትና ማጠፍ)

🔅 የተለያዩ  [modefic] ስራዎችን እንሰራለን።

♦️ ማንኛዉንም ብረታ ብረት እንገዛለን።

☎️ስልክ 0904040477 ወይም 0911016833 ደውለው ያግኙን
📱ቴሌግራም ላይ ፦https://t.me/heavenic1

አድራሻ፦  ቁ 1.መርካቶ
                ቁ.2 አየር ጤና  ኪዳነ ምህረት

ጥራትና ታማኝነት መለያችን ነው።
ታምራት ፕሌት እና ጄ ቦልት አቅራቢ
❤3
👉Here’s a detailed breakdown of the two truss designs shown👇
❤3
Ethio Construction Engineering
👉Here’s a detailed breakdown of the two truss designs shown👇
👉Here’s a detailed breakdown of the two truss designs shown:

🔹 Truss A
- Slope: 12/12 (steep pitch, symmetrical rise and run) 
- Span (L): Between 5 m and 8.5 m 
- Divisions: 
  - Top chord divided into L/4 + L/4 
  - Bottom chord divided into L/3 + L/3 
- Angles: 60°, 30°, 30° 
- Special Note: Internal angles include 20° and 30°, giving a more distributed load path. 
- Structural Behavior: This layout balances forces with smaller internal angles, making it efficient for moderate spans.

🔹 Truss B
- Slope: 12/12 (same as Truss A) 
- Span (L): Between 5 m and 8.5 m 
- Divisions: 
  - Top chord divided into L/4 + L/4 
  - Bottom chord divided into L/3 + L/3 
- Angles: 60°, 30°, 30° 
- Special Note: Internal angles include 20° and 90°, creating a vertical member. 
- Structural Behavior: The vertical angle (90°) provides stronger vertical support, useful for central load transfer, but may increase material usage compared to Truss A.

⚖️ Comparison
- Both trusses share the same slope and span range. 
- Truss A distributes forces diagonally with smaller angles → lighter, efficient design. 
- Truss B introduces a vertical member → stronger central support, but heavier. 
- Choice depends on load type: 
  - Truss A: Better for uniform roof loads. 
  - Truss B: Better for concentrated loads at mid-span.

#StructuralDesign
#RoofTruss #ConstructionDetails #EngineeringEducation #InfographicReady

@etconp
❤7