Common Construction Materials

🧱 Bricks
- Made from clay
- Strong and durable
- Used for walls and partitions

🏗️ Cement
- Binding material
- Mixed with sand & water
- Used in mortar and concrete

🏢 Concrete
- Mix of cement, sand, gravel & water
- Very strong
- Used in foundations, beams, slabs, roads

🔩 Steel
- High strength
- Used for reinforcement and structural frames
- Common in buildings and bridges

🪨 Stone
- Natural rock material
- Very strong and long-lasting
- Used for foundations, walls and decoration

🪟 Glass
- Transparent material
- Used in windows, doors and facades
- Allows natural light inside

⚙️ Plastic (PVC)
- Lightweight and waterproof
- Used for pipes, fittings and insulation

🏖️ Sand
- Fine aggregate
- Used in concrete, mortar and plastering
- Fills the gaps and improves workability

🪨 Aggregates (Gravel)
- Coarse aggregate
- Mixed with cement and sand to make concrete
- Gives strength and stability

@etconp
❤13
📐 Circular Water Tank Design (20,000 Liters)

Objective: Design a circular water tank to store 20 m³ (20,000 liters) with a maximum depth of 2 meters.

Step 1 – Capacity Conversion:
- 20,000 liters = 20 m³

Step 2 – Trial Depths:
- Depth = 0.5 m → Diameter ≈ 7.0 m
- Depth = 1.0 m → Diameter ≈ 5.0 m
- Depth = 1.5 m → Diameter ≈ 4.1 m
- Depth = 2.0 m → Diameter ≈ 3.56 m

Step 3 – Final Design:
- Depth = 1.5 m
- Diameter = 4.10 m
- Capacity ≈ 20 m³

✅ Practical Choice:
A depth of 1.5 m with a diameter of 4.10 m balances construction feasibility and storage efficiency.

🔑 Key Takeaway
For a 20,000-liter circular tank, the most practical design is:
Depth = 1.5 m, Diameter = 4.10 m

#WaterTankDesign #ConcreteAndSteel #CivilTechTime #ConstructionDetails #StructuralEngineering #PlumbingDesign

@etconp
❤8👍2
👉Bridge Column (Pier) Design

🚧Bridge columns, or piers, are vital vertical supports transferring loads from the superstructure to the foundation.

⏺Their design ensures stability, strength, and durability under combined axial, bending, and shear forces.

🏷Key Design Steps:

1. Load Calculation: Combine dead, live, and environmental loads (wind, earthquake, water).
2. Axial Capacity: Compute concrete and steel contribution using AASHTO LRFD formulas.
3. Slenderness Check: Evaluate buckling through slenderness ratio and apply moment magnification if needed.
4. Shear Strength: Sum concrete and steel resistance for total shear capacity.
5. Interaction Diagram: Verify that the design point lies within the safe zone of the P–M curve.
6. Thumb Rules:
- Column diameter ≈ 1/10–1/15 of height
- Reinforcement ratio: 1–4%
- Use proper ties/spirals for confinement

❇️Design Tip: Always ensure adequate cover, detailing, and load transfer to the foundation for long-term performance.

@etconp
❤5👏3
👉How to Calculate Staircase Concrete Volume

💫This infographic explains the step-by-step method for calculating the concrete quantity required for an RCC staircase.

🏷Calculate the number of steps using total height ÷ riser height.

❇️Find the horizontal length using steps × tread.

⏺Determine the waist slab length with the Pythagorean theorem.

⏺Compute the waist slab volume and single step volume separately.

⏺Add all step volumes to the waist slab volume to get the total concrete volume.

✅ Total concrete required for this staircase = 1.5 m³

#StaircaseDesign #ConcreteVolume #CivilEngineering #Construction #RCCStaircase #QuantitySurveying #BuildingConstruction #EngineeringCalculation #StructuralEngineering

@etconp
❤10👏1
👉ሰሜን ኮሪያንና ሩሲያን የሚያገናኘው ቁልፍ ድልድይ ግንባታ መጠናቀቁን የሳተላይት ምስሎች አሳዩ

🚧በሰሜን ኮሪያና በሩሲያ ድንበር ላይ የሚገኘውን ቱመን ወንዝን የሚያቋርጠው አዲሱ ስትራቴጂካዊ የጎዳና ድልድይ ግንባታ ተጠናቆ ለአገልግሎት ዝግጁ መሆኑን የሳተላይት ምስሎች ማሳየታቸው ተዘግቧል።

አዲሱ ድልድይ ከዚህ ቀደም ሁለቱን ሀገራት በየብስ ያገናኝ ከነበረውና "የጓደኝነት ድልድይ" ተብሎ ከሚጠራው ነባር የባቡር መስመር ጎን የተገነባ ነው።

የሩሲያ ትራንስፖርት ሚኒስቴር እንዳስታወቀው አዲሱ ድልድይ በቀን እስከ 300 ተሽከርካሪዎችንና 2 ሺህ 850 ሰዎችን የማስተናገድ አቅም አለው።

የሩሲያ የመንግሥት መገናኛ ብዙኃን እንደዘገቡት ከሆነ ድልድዩን ለመገንባት የወጣው ጠቅላላ ወጪ ከ9 ቢሊዮን ሩብል በላይ እንደሆነ ተገምቷል።

ይህ የግንባታ ወጪ በወቅታዊ የምንዛሬ ተመን ሲሰላ 120 ሚሊዮን የአሜሪካ ዶላር ወይም 88 ሚሊዮን የእንግሊዝ ፓውንድ ገደማ ይሆናል።

ምንጭ : ቢቢሲ

@etconp
❤5👍2
👉 INTERCON Construction Chemicals 

● Concrete Admixtures
● Bonding Agents
● Waterproofings
● Wall Putty, Prime Coat
● Concrete Repair Mortar
● Floor hardener, Epoxy
● Grout, Self-level mortar
● Quartz paint, Contextra
● Tile Adhesive & Tile Joint Fillers 
● Geotextiles and other construction chemicals and materials

☎️ Tel: 0961955555

🔹 Address 1: Signal road, around
Dinberwa Hospital

🔹 Addres 2: Wellosefer, Infront of
Dani Plaza
👍2❤1
👉ማስታወቂያ

💫የአዲስ አበባ ከተማ ቤቶች ልማት ኮርፖሬሽን ከተማ አስተዳደሩ በልዩ ትኩረት እየተገበረ ለሚገኝው መጠነ ሰፊ የቤት ልማት ፕሮግራም በግንባታው ዘርፍ ላይ የተሰማሩ እና መስፈርቱን የሚያሟሉ ስራ ተቋራጮችን አወዳድሮ ለማሰራት ይጋብዛል ፡፡

🏷በዚህም መነሻ

1. ለስራ ተቋራጮች ምዝገባ መሟላት
ያለባቸው መረጃዎች፡-

ሀ) የታደሰ የንግድ ፍቃድ ፣ የተጨማሪ እሴት ታክስ ምዝገባ ሰርተፍኬት ፣ የታደሰ የብቃት ማረጋገጫ ምዝገባ ሰርተፍኬት እና የአቅራቢዎች ዝርዝር ውስጥ ስለመመዝገቡ የምስክር ወረቀት ማቅረብ የሚችል፤

⏺በምዝገባው ወቅት የሰነዶቹን ዋና እና አንድ የማይመለስ ቅጂ በአካል የሚቀርብ ሆኖ የስራ ተቋራጩ የበላይ ኃላፊ ባለቤት ወይም ህጋዊ ውክልና ያለው ተወካይ ፊርማ እና የድርጅቱ ህጋዊ ማህተም በማድረግ ማቅረብ ይጠበቅበታል፡፡

2. ደረጃ 1 እና 2 (ህንፃ (BC) እና ጠቅላላ ስራ ተቋራጭ(GC)) እንዲሁም ደረጃ- 3 (ጠቅላላ ስራ ተቋራጭ (GC)) የብቃት ማረጋገጫ ያላቸው በግንባታው ዘርፍ ላይ የተሰማሩ ስራ ተቋራጮች ተሳታፊ መሆን ይችላሉ

3. ከዓርብ ሚያዝያ 30 ቀን 2018 ዓ/ም ከጠዋቱ 2፡30 ጀምሮ ቅዳሜን ጨምሮ ለ5 (አምስት) ተከታታይ የስራ ቀናት ( እስከ ዕሮብ ግንቦት 5 ቀን 2018 ዓ/ም ከሰዓት እስከ 11፡30)) በአካል በመቅረብ በኮርፖሬሽኑ 11ኛ ወለል በሚገኝ አዳራሽ ላይ ምዝገባ በማድረግ መረጃዎቹ መሟላታቸው በመዝጋቢው ሲረጋገጥ ለዚሁ የተዘጋጀ የቴክኒካል ሰነድ መግዛት ይቻላል፤

4. ተገቢውን ሰነድ በማቅረብ የምዝገባ ሂደቱን በሚገባ ያሟላ ስራ ተቋራጮችን በተመለከተ ምዝገባው በተጠናቀቀ በ 24 ሰዓት ውስጥ ግንቦት 6 ቀን 2018 ዓ/ም በተቋሙ ማህበራዊ ድህረ ገጽ እና በኮርፖሬሽኑ የማስታወቂያ ቦርድ 11ኛ ወለል የሚለጠፍ ይሆናል፡፡

5. ስራ ተቋራጮች የቅድመ ምዝገባ ውጤት ከታወቀበት ቀን ቅዳሜን ጨምሮ በአስር (10) ተከታታይ የስራ ቀናት ውስጥ አንድ ኦርጅናል እና ሁለት ቅጂ የቴክኒካል ፕሮፖዛላችሁን ለዚሁ በተዘጋጀ ሳጥን እስከ ቀን ግንቦት 18 ቀን 2018 ዓ/ም ከሰዓት 10፡00 ድረስ ብቻ ማስገባት ይኖርባቸዋል፡፡

6. ስራ ተቋራጮች ለምዝገባ እና ለቴክኒካል ሰነድ ግዢ የማይመለስ ብር

ለደረጃ 1 ...........ብር 7500
ለደረጃ 2 .......... ብር 6500
ለደረጃ 3 ...........ብር 5500 መክፈል ይጠበቅባቸዋል፡፡

📍አድራሻ:-ቂርቆስ ክ/ተማ ወረዳ 01
ባምቢስ አከባቢ ግሪክ ት/ቤት ፊት ለፊት በሚገኘው የአዲስ አበባ ቤቶች ልማት አስተዳደር ህንፃ ላይ

ሚያዝያ 29 ቀን 2018 ዓ/ም

@etconp
❤8🙏1
👉How to Calculate Number of Floor Tiles

1. Measure Room Dimensions

- Example: Length = 20 ft, Width = 20 ft
- Total area = 400 sq ft

2. Measure Tile Size

- Example: 60 cm × 60 cm
- Area of one tile = 3.875 sq ft

3. Calculate Tiles Needed

- Divide total floor area by tile area
- Result ≈ 104 tiles

4. Final Result
You’ll need around 104 tiles to cover the floor.

🏷Always add 5–10% extra for wastage and cutting.

📌 Viral Caption Idea
“Measure smart, tile right! 🧱✨ Accurate tile calculation saves money, time, and effort.

#construction
#civil #building #civilconstruction
#structure
#civilengineer
❤9
👉Cement, Sand & Brick Quantity Estimation 1 Cubic Meter Brick Masonry Work

💫Brick masonry calculation is used to estimate the required number of bricks, cement, and sand for constructing 1 cubic meter of brick wall.

❇️Standard brick size with mortar is considered as 20 cm × 10 cm × 10 cm.

🚧Number of Bricks: ≈ 500 bricks
🚧Cement Required: ≈ 63 kg (about 1.25 bags)
🚧Sand Required: ≈ 9.28 ft³
🚧Mortar Ratio: 1 : 6 (Cement : Sand)

🏷This estimation helps civil engineers, contractors, and site supervisors calculate material quantities accurately, reduce wastage, and manage construction costs efficiently.

#CivilEngineering
#BrickMasonry
#Construction
#QuantityEstimation
#BrickWork #CementCalculation #SandCalculation #BuildingMaterials #ConstructionSite
#MasonryWork #CivilEngineer
#SiteEngineering #QuantitySurveying #ConstructionManagement

@etconp
❤11👍1
👉Road Construction Components

🚧Road construction is done in multiple layers to provide strength, durability, and smooth transportation.

❇️Subgrade – Natural soil prepared and compacted as the foundation.

❇️Subbase Course – Provides extra support and improves drainage.

❇️Base Course – Main load-bearing layer that distributes traffic load.

❇️Binder Course – Connects the base and top surface for added strength.

❇️Surface Course – Top asphalt/concrete layer for smooth and safe driving.

❇️Proper road construction increases durability, reduces maintenance, and improves road safety.

#RoadConstruction #CivilEngineering #HighwayEngineering #RoadLayers #ConstructionWork #Infrastructure #AsphaltRoad #TransportationEngineering #RoadProject #ConstructionSite #EngineeringStudent #Surveying #ConcreteRoad #RoadSafety

@etconp
❤8👍1
👉የአዲስ አበባ ከተማ ምክር ቤት 5ኛ ዓመት የስራ ዘመን 3ኛ መደበኛ ጉብኤው ዛሬ ሚያዚያ 30 ቀን 2018 ዓ.ም ማከናወን ጀምሯል

💫የአዲስ አበባ ከተማ አስተዳደር  የመኖሪያ ቤት አቅርቦት ችግርን ለመቅረፍ  እየተገበራቸዉ የሚገኙ አምስቱ ስትራቴጂዎች

1ኛ. በመንግስት በጀት የሚገነቡ ቤቶች

2ኛ. በመንግስትና በግል ትብብር  የሚገነቡ ቤቶች

3ኛ. በግለሰቦች የሚገነቡ ቤቶች

4ኛ. በሪል ስቴት (በድርጅቶች)  የሚገነቡ ቤቶች

5ኛ. ግለሰብ ከግለሰብ (መሬትና በጀት ያለዉ)  በመቀናጀት የሚገነቡ ቤቶች ናቸዉ፡፡

Via ከንቲባ አዳነች አቤቤ

@etconp
👍5❤4
👉Column Alignment Rules in Civil Engineering

@etconp 👇
👍4❤1
Ethio Construction Engineering
👉Column Alignment Rules in Civil Engineering @etconp 👇
👉Column Alignment Rules in Civil Engineering

🚧Proper column alignment is the backbone of safe and efficient construction.

🏷Each rule ensures structural stability, architectural harmony, and long-term durability. 

1. Vertical Alignment – Columns must be stacked directly above one another to transfer loads safely. 
2. Grid Alignment – Follow a planned grid layout for uniformity and ease of construction. 
3. Center Line Matching – Beam and column center lines should align to avoid structural imbalance. 
4. Architectural Coordination – Columns must blend with walls and room layouts for functional design. 
5. Foundation Alignment – Column positions should match footing centers to prevent uneven load transfer. 
6. Beam Connectivity – Beams must connect properly between columns for structural integrity. 
7. Offset Columns – Avoid offsets; if necessary, use transfer beams to redirect loads. 
8. Plumb Check – Ensure columns remain perfectly vertical during construction. 
9. Rebar Alignment – Reinforcement bars should be straight, properly lapped, and aligned. 
10. Construction Tolerance – Follow permissible deviation limits (±10 mm) as per codes and drawings.

@etconp
❤11👍3
📐 Brick Calculation in Masonry Work

⏺Accurate estimation of bricks is essential in civil site engineering to avoid material shortages and wastage.

🔰Step-by-Step Process:

1. Measure Wall Dimensions – Calculate the centerline length of walls.
2. Find Wall Area – Multiply wall length by height.
3. Deduct Openings – Subtract door and window areas.
4. Deduct Lintel Areas – Account for lintel space above openings.
5. Net Masonry Area – Remaining wall surface for brickwork.
6. Brick Requirement per sq.ft – Based on brick size and wall thickness.
7. Total Bricks – Multiply net area by bricks per sq.ft, add 5% for wastage.

🏷Example Result:

📍For a 15' × 10' room with 10' height, 1 door, and 2 windows:

- Net Masonry Area ≈ 454 sq.ft
- Bricks per sq.ft ≈ 4.8
- Total Bricks ≈ 2180 Nos. (2290 with wastage)

🔑 Key Takeaway

⏺Proper calculation ensures cost efficiency, structural accuracy, and smooth project execution.

@etconp
👍5❤2
👉ለኮንክሪት ጥንካሬና ጥራት ተብለው ስለሚመረቱት ኬሚካሎችና የጥራት ጉድለት ማን ተጠያቂ ይሁን?

በኢትዮጵያ የኮንስትራክሽን ኢንዱስትሪ በፍጥነት እያደገ ከመምጣቱ ጋር ተያይዞ፣ የኮንክሪትን ባህሪ ለማሻሻል የሚረዱ የኬሚካል አድሚክቸሮች (Admixtures) አጠቃቀም ወሳኝ ደረጃ ላይ ደርሷል።

እነዚህ ኬሚካሎች የኮንክሪትን ጥንካሬ፣ ፈሳሽነት እና የመቆየት አቅም ላይ ከፍተኛ ተጽዕኖ የማሳደር አቅም አላቸው። ይሁን እንጂ፣ በአገር ውስጥ ገበያ ላይ የሚቀርቡ ምርቶች ጥራት ወጥ አለመሆን እና የቁጥጥር ስርዓቱ ክፍተቶች በህንጻዎች እና በመሰረተ ልማቶች ደህንነት ላይ ስጋት እየፈጠሩ ይገኛሉ።

ይህ ሰነድ በአድሚክቸር አቅርቦት ሂደት ውስጥ ሊወሰዱ የሚገባቸውን የጥንቃቄ እርምጃዎች፣ የሚጠበቁ ቴክኒካዊ ሰነዶችን እና የኢትዮጵያ የደረጃዎች ኤጀንሲ (ESA) የሚያስቀምጣቸውን መስፈርቶች በዝርዝር ያብራራል።

ዋና ዓላማውም በግንባታ ሂደት ላይ የሚሳተፉ አካላት ከጥራት ጉድለት ጋር ተያይዞ ከሚመጣ ኪሳራ ራሳቸውን እንዲከላከሉ ሙያዊ መረጃ መስጠት ነው።

1. የተሟላ ቴክኒካዊ ሰነዶች እና የምርመራ ምስክር ወረቀቶች
እያንዳንዱ አድሚክቸር የሚከተሉትን ሰነዶች ማካተት ይኖርበታል፦

•  የምርት መረጃ ዝርዝር (Product Data Sheet - PDS)

•  የቁስ ደህንነት መረጃ ዝርዝር (Material Safety Data Sheet - MSDS)

•  የላቦራቶሪ ምርመራ ሪፖርቶች፦

የኮንክሪት ጥንካሬ ውጤት (Compressive strength results)፣

የመድረቂያ ጊዜ (Setting time)፣

የውሃ ቅነሳ መጠን (%)(water reduction %)፤ እና

ከሲሚንቶ ጋር ያለው ተስማሚነት (compatibility with cement)።

•  እነዚህ ምርመራዎች እንደ ASTM C494 ያሉ ዓለም አቀፍ መስፈርቶችን መከተል አለባቸው።

የኢትዮጵያ ነባራዊ ሁኔታ / ስጋት

•  አንዳንድ የአገር ውስጥ አቅራቢዎች ያልተሟሉ ወይም ጠቅላላ የሆኑ መረጃዎችን ብቻ ያቀርባሉ።

•  ለእያንዳንዱ የምርት ዙር (Batch-specific) የተሰራ የምስክር ወረቀት እጥረት አለ።

•  አንዳንድ ሰነዶች ከውጭ አገር ምርቶች የተቀዱ እንጂ በአገር ውስጥ የተሞከሩ አይደሉም።

ሊጠየቁ የሚገቡ ግዴታዎች

•  “እውቅና ካላቸው ላቦራቶሪዎች የተሰጠ፣ የተሟላ እና ለእያንዳንዱ የምርት ዙር የተዘጋጀ የምርመራ ምስክር ወረቀት ያላቸው መሆኑን ማረጋገጥ።”

•  “ሰነዶች የምርመራ ዘዴውን፣ ቀኑን እና የመረመረውን ላቦራቶሪ በግልጽ ማሳየት አለባቸው።”

2. በገበያ ላይ ካሉ ምርቶች ጋር የሚደረግ የንጽጽር መረጃ
አዲስ አድሚክቸር ከሚከተሉት ጋር መነጻጸር አለበት፦

•  ያለ አድሚክቸር የተሰራ የኮንክሪት ውህድ (Reference mix)

•  በገበያ ላይ ጥራቱ ከተረጋገጠ ምርት (Benchmark) ጋር ያለው ልዩነትና ተመሳሳይነት


        ንጽጽሩ የሚከተሉትን ማካተት አለበት፦

  የፈሳሽነት ቆይታ (Slump retention)፣

  የጥንካሬ እድገት (Compressive strength results) (በ7 እና 28 ቀናት)፣

  የመድረቂያ ጊዜ (Setting time) እና

  የመቆየት አቅም (Durability)።

የኢትዮጵያ ነባራዊ ሁኔታ / ስጋት

አብዛኞቹ የአገር ውስጥ አምራቾች

•  የንጽጽር መረጃ አያቀርቡም።
•  “ከውጭ ከሚገባው ጋር እኩል
ነው” የሚል የቃል መግለጫ ብቻ ይሰጣሉ።

የንጽጽር የሙከራ ውህድ (Trial mix comparison) ባህል ገና አልዳበረም።

ሊጠየቁ የሚገባው ግዴታዎች

•  “አቅራቢው ተቀባይነት ካለው አድሚክቸር ጋር የተደረገ የንጽጽር የሙከራ ውጤት ማቅረብ ይኖርበታል።”

•  “ውሳኔ የሚሰጠው በአምራቹ መግለጫ ላይ ብቻ ሳይሆን በሳይት ላይ በሚደረግ የሙከራ ውጤት ላይ ተመስርቶ መሆን የገባቸዋል።”

3. ተዛማጅ መስፈርቶችን (ASTM, EN, ወዘተ) ማሟላት
የሚጠበቅ አድሚክቸሮች የሚከተሉትን መስፈርቶች ማሟላት አለባቸው፦

•  ASTM C494 (main standard for chemical admixtures)

•  ASTM C260 (air entraining)

•  ሌሎች ኧገር አቀፍና እና አለማቀፍ መስፈርቶችን

  እነዚህ መስፈርቶች የአድሚክቸር አይነቶችን (ከA እስከ G) እና የአፈጻጸም ገደቦችን ይወስናሉ።

የኢትዮጵያ ነባራዊ ሁኔታ / ስጋት

•  ኢትዮጵያ የASTM መስፈርቶችን ብትቀበልም፣ አፈጻጸሙ ወጥ አይደለም።

•  ብዙዎቹ የአገር ውስጥ ምርቶች በASTM መመዘኛዎች ሙሉ በሙሉ አይፈተሹም።

•  “መስፈርቱን ያሟላል” የሚለው አባባል በተግባር ሳይረጋገጥ በይፋዊ መግለጫ ላይ ብቻ ይሰፍራል።

ሊጠየቁ የሚገባው ግዴታዎች

•  “አድሚክቸሩ የASTM C494 (ወይም ተመጣጣኝ የEN መስፈርት) ሙሉ በሙሉ ማሟላቱን ማሳየት አለበት።”

•  “መስፈርቱን ማሟላቱ በገለልተኛ ላቦራቶሪ የምርመራ ውጤት መደገፍ አለበት።”

4. የኢትዮጵያ የደረጃዎች ኤጀንሲ (ESA) ምስክር ወረቀት
ምርቱ የሚከተሉት ሊኖሩት ይገባል፦

•  የESA የምስክር ወረቀት ወይም ምዝገባ።

•  የአገር ውስጥ የጥራት ተስማሚነት ግምገማ (Conformity assessment)።

የኢትዮጵያ ነባራዊ ሁኔታ / ስጋት

•  በገበያ ላይ ያሉ አብዛኞቹ አድሚክቸሮች በኢትዮጵያ ደረጃ መዳቢዎች የተመዘገቡ ወይም የተረጋገጡ አይደሉም።

•  አንዳንድ ምርቶች ያለ ESA ጥብቅ ቁጥጥር ወደ ገበያ ይገባሉ።

ሊጠየቁ የሚገባው ግዴታዎች

•  “ከኢትዮጵያ የደረጃዎች ኤጀንሲ ህጋዊ የምስክር ወረቀት ወይም ፈቃድ ያላቸው አድሚክቸሮች ብቻ ተቀባይነት ይኖራቸዋል።”

•  “አቅራቢው ህጋዊ የምስክር ወረቀት እና የምዝገባ ቁጥር ማቅረብ ይኖርበታል።”

5. የጽሁፍ የአፈጻጸም ዋስትና እና የተጠያቂነት ማረጋገጫ (Written performance guarantee and liability confirmation)

አቅራቢው የሚከተሉትን ማቅረብ አለበት፦

•  የጽሁፍ የአፈጻጸም ዋስትና።
•  ለጥንካሬ ጉድለት፣ ለመድረሻ ጊዜ ችግሮች እና ለጥንካሬ መጓደል ተጠያቂነትን የመውሰድ ማረጋገጫ።

የኢትዮጵያ ነባራዊ ሁኔታ / ስጋት

•  ብዙ አቅራቢዎች የጽሁፍ ተጠያቂነት ከመውሰድ ይቆጠባሉ።

•  የቃል ማረጋገጫ ብቻ ይሰጣሉ።

•  ችግር በሚፈጠርበት ጊዜ ተጠያቂነትን ለማረጋገጥ እና ክርክሮችን ለመፍታት አስቸጋሪ ይሆናል።

ሊጠየቁ የሚገባው ግዴታዎች

•  “አቅራቢው ለተጠቀሰው የውህድ ዲዛይን (Mix design) የጽሁፍ የአፈጻጸም ዋስትና መስጠት ይኖርበታል።”

•  “ከአድሚክቸሩ ጥራት ጉድለት ጋር ተያይዞ ለሚመጣ ማንኛውም ቴክኒካዊ እና ፋይናንሳዊ ኪሳራ አቅራቢው ሃላፊነቱን ሊወስድ ይገባል።”


ማጠቃለያ

በኢትዮጵያ የአድሚክቸር ምርት እያደገ ቢሆንም፣ በሚከተሉት ምክንያቶች የጥራት ስጋቶች አሉ፦

1.  ደካማ የሰነድ እና የምርመራ ስርዓት።

2.  የንጽጽር ሙከራዎች እጥረት።

3.  የASTM መስፈርቶችን ሙሉ በሙሉ አለመተግበር።

4.  የESA የምስክር ወረቀት አሰጣጥ ወጥ አለመሆን።

5.  የአቅራቢዎች ተጠያቂነት ግልጽ አለመሆን።

ስለሆነም፦ ማንኛውንም አድሚክቸር ከመፍቀዳችን በፊት ጥብቅ የቴክኒክ ሰነዶችን መጠየቅ እና በሳይት ላይ በተግባር ማረጋገጥ የግድ አስፈላጊ ነው።

@etconp
❤15👍1
Egg-shaped sewers are about _____ more expensive than circular sewers.
Anonymous Quiz
29%
75 %
31%
50 %
21%
65 %
20%
10 %
👍4❤3
An irrigation canal flowing free above a drainage and drainage is flowing under pressure is specifically is called a
Anonymous Quiz
26%
Canal syphon
30%
Canal aqueduct
26%
Siphon aqueduct
19%
Super passage
❤2
When the velocity distribution is uniform over the cross-section, the correction factor for
momentum is
Anonymous Quiz
25%
0
52%
1
20%
4/3
4%
2
❤4