๐8 Geosynthetics Every Civil Engineer Must Know Before Site Work
๐งGeosynthetics are smart construction materials used to strengthen soil, improve drainage, stop leakage, and increase structure life.
๐ฒFrom roads to retaining walls, they make construction safer and more durable.
@etconp
๐งGeosynthetics are smart construction materials used to strengthen soil, improve drainage, stop leakage, and increase structure life.
๐ฒFrom roads to retaining walls, they make construction safer and more durable.
@etconp
โค9๐5
๐Roof Truss Types
๐งSteel vs Wooden
๐ซSteel Truss Roof: A steel truss roof is made with steel members connected by bolts and gusset plates.
โญ๏ธIt is strong, durable, fire-resistant, and suitable for large-span buildings like factories and warehouses.
๐ซWooden Truss Roof:
A wooden truss roof is made from timber sections joined together to support roof loads.
๐ฐIt is lightweight, economical, and commonly used in residential houses and small buildings.
๐ฒMain Difference:
โบSteel truss โ stronger and long-lasting
โบWooden truss โ cheaper and easier to construct
#WoodenTruss
#RoofTruss
#CivilEngineering
#BuildingConstruction
#RoofDesign
#StructuralEngineering
#SteelRoof
#WoodenRoof
#ConstructionDetails
#EngineeringNotes
@etconp
๐งSteel vs Wooden
๐ซSteel Truss Roof: A steel truss roof is made with steel members connected by bolts and gusset plates.
โญ๏ธIt is strong, durable, fire-resistant, and suitable for large-span buildings like factories and warehouses.
๐ซWooden Truss Roof:
A wooden truss roof is made from timber sections joined together to support roof loads.
๐ฐIt is lightweight, economical, and commonly used in residential houses and small buildings.
๐ฒMain Difference:
โบSteel truss โ stronger and long-lasting
โบWooden truss โ cheaper and easier to construct
#WoodenTruss
#RoofTruss
#CivilEngineering
#BuildingConstruction
#RoofDesign
#StructuralEngineering
#SteelRoof
#WoodenRoof
#ConstructionDetails
#EngineeringNotes
@etconp
โค10๐6
๐Explains the estimation of wall plaster materials in a clear stepโbyโstep manner.
๐ทLetโs break it down in detail:
๐น Step 1: Wet Volume of Mortar
- For a 1 m ร 1 m wall with 12 mm plaster thickness, the wet volume is calculated as:
Length ร Breadth ร Thickness = 1 ร 1 ร 0.012 = 0.012 mยณ.
This represents the actual plaster volume applied on the wall surface.
๐น Step 2: Dry Volume of Mortar
- Since mortar shrinks and voids exist, a 30% increase is considered.
Dry Volume = Wet Volume ร 1.30 = 0.012 ร 1.30 = 0.0156 mยณ.
This ensures enough material is prepared.
๐น Step 3: Quantity of Cement
- Mortar ratio is 1:6 (cement:sand).
- Cement fraction = 1 รท (1+6) = 1/7.
- Cement volume = (1/7) ร Dry Volume = (1/7) ร 0.0156 = 0.00223 mยณ.
- Converting to weight using cement density (1440 kg/mยณ):
0.00223 ร 1440 = 3.21 kg cement โ 0.064 bag (since 1 bag = 50 kg).
๐น Step 4: Quantity of Sand
- Sand fraction = 6 รท (1+6) = 6/7.
- Sand volume = (6/7) ร Dry Volume = 0.01337 mยณ.
- Converting to cubic feet (1 mยณ = 35.3147 ftยณ):
0.01337 ร 35.3147 = 0.47 ftยณ sand.
๐น Summary of Materials (for 1 mยฒ wall plaster, 12 mm thick, 1:6 mix)
- Wet Volume = 0.012 mยณ
- Dry Volume = 0.0156 mยณ
- Cement = 3.21 kg โ 0.064 bag
- Sand = 0.47 ftยณ
This method allows engineers and site supervisors to scale up easily for larger wall areas by multiplying with total surface area.
It ensures accurate procurement of cement and sand, avoiding wastage or shortage during plastering work.
#PlasterEstimation #ConstructionDetails #MaterialCalculation
@etconp
๐ทLetโs break it down in detail:
๐น Step 1: Wet Volume of Mortar
- For a 1 m ร 1 m wall with 12 mm plaster thickness, the wet volume is calculated as:
Length ร Breadth ร Thickness = 1 ร 1 ร 0.012 = 0.012 mยณ.
This represents the actual plaster volume applied on the wall surface.
๐น Step 2: Dry Volume of Mortar
- Since mortar shrinks and voids exist, a 30% increase is considered.
Dry Volume = Wet Volume ร 1.30 = 0.012 ร 1.30 = 0.0156 mยณ.
This ensures enough material is prepared.
๐น Step 3: Quantity of Cement
- Mortar ratio is 1:6 (cement:sand).
- Cement fraction = 1 รท (1+6) = 1/7.
- Cement volume = (1/7) ร Dry Volume = (1/7) ร 0.0156 = 0.00223 mยณ.
- Converting to weight using cement density (1440 kg/mยณ):
0.00223 ร 1440 = 3.21 kg cement โ 0.064 bag (since 1 bag = 50 kg).
๐น Step 4: Quantity of Sand
- Sand fraction = 6 รท (1+6) = 6/7.
- Sand volume = (6/7) ร Dry Volume = 0.01337 mยณ.
- Converting to cubic feet (1 mยณ = 35.3147 ftยณ):
0.01337 ร 35.3147 = 0.47 ftยณ sand.
๐น Summary of Materials (for 1 mยฒ wall plaster, 12 mm thick, 1:6 mix)
- Wet Volume = 0.012 mยณ
- Dry Volume = 0.0156 mยณ
- Cement = 3.21 kg โ 0.064 bag
- Sand = 0.47 ftยณ
This method allows engineers and site supervisors to scale up easily for larger wall areas by multiplying with total surface area.
It ensures accurate procurement of cement and sand, avoiding wastage or shortage during plastering work.
#PlasterEstimation #ConstructionDetails #MaterialCalculation
@etconp
โค19
๐Steel in Slab
- Main bars are the primary reinforcement running along the slabโs length, designed to resist bending stresses.
- Cross bars provide distribution reinforcement across the width, ensuring crack control and structural stability.
- The clear cover protects steel from corrosion and fire exposure, while spacing between bars ensures proper load transfer and concrete bonding.
- The total steel weight is determined by bar diameter, spacing, and slab dimensions, ensuring adequate strength without over-reinforcement.
๐๏ธ Cement, Sand, and Aggregate
- The concrete volume is based on slab dimensions, and a dry volume factor is applied to account for voids and wastage.
- Mix proportions (cement : sand : aggregate) define the grade of concrete, balancing strength and workability.
- Cement is measured in weight for procurement, while sand and aggregate are measured in volume.
- Proper proportioning ensures durability, strength, and economy in construction.
๐ Key Points
- Reinforcement layout must follow design spacing for structural safety.
- Clear cover is critical for durability.
- Dry volume adjustment is standard practice in site estimation.
- Material estimation helps in budgeting, procurement, and avoiding wastage.
This streamlined approach gives engineers a clear understanding of how materials are quantified for slab construction without diving into numerical steps.
#ConstructionDetails #SlabDesign #MaterialEstimation
@etconp
- Main bars are the primary reinforcement running along the slabโs length, designed to resist bending stresses.
- Cross bars provide distribution reinforcement across the width, ensuring crack control and structural stability.
- The clear cover protects steel from corrosion and fire exposure, while spacing between bars ensures proper load transfer and concrete bonding.
- The total steel weight is determined by bar diameter, spacing, and slab dimensions, ensuring adequate strength without over-reinforcement.
๐๏ธ Cement, Sand, and Aggregate
- The concrete volume is based on slab dimensions, and a dry volume factor is applied to account for voids and wastage.
- Mix proportions (cement : sand : aggregate) define the grade of concrete, balancing strength and workability.
- Cement is measured in weight for procurement, while sand and aggregate are measured in volume.
- Proper proportioning ensures durability, strength, and economy in construction.
๐ Key Points
- Reinforcement layout must follow design spacing for structural safety.
- Clear cover is critical for durability.
- Dry volume adjustment is standard practice in site estimation.
- Material estimation helps in budgeting, procurement, and avoiding wastage.
This streamlined approach gives engineers a clear understanding of how materials are quantified for slab construction without diving into numerical steps.
#ConstructionDetails #SlabDesign #MaterialEstimation
@etconp
โค10
๐Proper Site Handover Decides Project Success or Failure!
๐ซSite handover is the final and most important stage of construction.
๐งIt ensures all work is completed, tested, documented, and officially transferred to the client with full quality assurance.
@etconp
๐ซSite handover is the final and most important stage of construction.
๐งIt ensures all work is completed, tested, documented, and officially transferred to the client with full quality assurance.
@etconp
โค11๐2
๐แจแปแญแแ แฃแแแฅแต แจแแ แแซแแดแญ แดแซแแญ แแแจแป แจแฐแฃแ แแแ แแฅแชแซ แแฌ แฐแแญแแแข
แจแแแแ แต แจแฐแ แฆ แแ
แแฅแชแซแ แซแจแแ แต แฆแณ แฆ 300,000 แซแฌ แแตแญ
แจแแฃแ แต แแช แฆ แจ2 แขแแฎแ แฅแญ แ แแญ
แจแแแ แแ แฆ แจแแ แต แฅแตแจ แแ แฅแซ แแตแแแญ 9 แแญ
แจแฅแฌ แฅแ แแแญแฆ 80 แ แแถ แจแ แซแฃแขแ (แ 100 แช/แ แแตแฅ)
แ แ แแ แแ แต 60ร60 แดแซแแญ แ แตแแต แแแจแต แแแฏแแข
80x80แฃ 60x120แฃ 70x140 แฅแ 80x160 แแฐแแต แจแแแจแฑ แจแแฃแ แแ แแฝ แแธแแข
Via TikVah
@etconp
แจแแแแ แต แจแฐแ แฆ แแ
แแฅแชแซแ แซแจแแ แต แฆแณ แฆ 300,000 แซแฌ แแตแญ
แจแแฃแ แต แแช แฆ แจ2 แขแแฎแ แฅแญ แ แแญ
แจแแแ แแ แฆ แจแแ แต แฅแตแจ แแ แฅแซ แแตแแแญ 9 แแญ
แจแฅแฌ แฅแ แแแญแฆ 80 แ แแถ แจแ แซแฃแขแ (แ 100 แช/แ แแตแฅ)
แ แ แแ แแ แต 60ร60 แดแซแแญ แ แตแแต แแแจแต แแแฏแแข
80x80แฃ 60x120แฃ 70x140 แฅแ 80x160 แแฐแแต แจแแแจแฑ แจแแฃแ แแ แแฝ แแธแแข
Via TikVah
@etconp
๐12โค8
Calculate the size of the column square in cross- section to carry an axial load of 2100 kN. Use grade of steel Fe 415 & grade of concrete of M-20 grade:
Anonymous Quiz
16%
558.60mm
35%
564.30mm
33%
556.80mm
16%
560.33mm
โค5๐4๐ฅ1๐1
Identify the correct sequence in a house water connection.
Anonymous Quiz
19%
Water meter, Gooseneck, Ferrule, Stopcock, Service pipe
28%
Water meter, Service pipe, Stopcock, Gooseneck, Ferrule
37%
Ferrule, Gooseneck, Service pipe, Stopcock, Water meter
17%
Ferrule, Water meter, Gooseneck, Service pipe, Stopcock
โค3๐2
1 Warping stresses in cement concrete pavements are caused by the seasonal variation in temperature
2. Tie bars are generally provided across transverse joints of cement concrete pavements The correct option evaluating the above statements is
2. Tie bars are generally provided across transverse joints of cement concrete pavements The correct option evaluating the above statements is
Anonymous Quiz
20%
1 False 2 False
39%
1 True 2 True
26%
1 True 2 Fase
15%
1 False 2 True
โค5
The independent elastic constant for a homogeneous and isotropic material are
Anonymous Quiz
29%
E G K.v
34%
E G K
20%
E G v
17%
E G
๐7โค2
1. The mass per unit volume of a liquid at a standard temperature and pressure is called
Anonymous Quiz
64%
Density
16%
Mass density
18%
A and b
2%
None
๐ฅ4โค3๐1
๐The compact guide to building quantity estimation, which is a critical part of civil engineering and construction planning.
๐งLet me break down the details clearly:
๐๏ธ Concrete Quantity
Concrete estimation involves calculating the volume of structural elements like slabs, beams, and columns.
- For the foundation slab, the product of length ร width ร thickness gives the volume.
- For columns, the cross-sectional area ร height gives the concrete required.
Accurate concrete volume ensures proper batching and avoids wastage.
๐ฉ Steel Quantity
Steel estimation is based on the length of reinforcement bars and their unit weight per meter.
- Main bars and stirrups are calculated separately.
- The total steel weight is derived by multiplying bar length with unit weight.
This ensures reinforcement is sufficient for structural strength and safety.
๐งฑ Brickwork Calculation
Brickwork is measured in square meters of wall area, deducting openings like doors and windows.
- The brick factor depends on wall thickness (e.g., 230 mm).
- Multiplying wall area by the brick factor gives the total number of bricks required.
This helps in ordering the right quantity of bricks for masonry.
๐ Plaster Area
Plastering is calculated by measuring surface areas of walls and ceilings, again deducting openings.
- Ceiling area is straightforward (length ร width).
- Wall surfaces are summed up, with deductions for doors and windows.
This ensures smooth finishing and avoids excess material use.
๐ Material Summary
All materialsโconcrete, steel, bricks, cement, sand, and aggregateโare tabulated for clarity.
- This summary helps in budgeting, procurement, and scheduling.
- It ensures no shortage or surplus during construction.
#ConstructionEstimation #BuildingMaterials #StructuralDesign #SmartPlanning
@etconp
๐งLet me break down the details clearly:
๐๏ธ Concrete Quantity
Concrete estimation involves calculating the volume of structural elements like slabs, beams, and columns.
- For the foundation slab, the product of length ร width ร thickness gives the volume.
- For columns, the cross-sectional area ร height gives the concrete required.
Accurate concrete volume ensures proper batching and avoids wastage.
๐ฉ Steel Quantity
Steel estimation is based on the length of reinforcement bars and their unit weight per meter.
- Main bars and stirrups are calculated separately.
- The total steel weight is derived by multiplying bar length with unit weight.
This ensures reinforcement is sufficient for structural strength and safety.
๐งฑ Brickwork Calculation
Brickwork is measured in square meters of wall area, deducting openings like doors and windows.
- The brick factor depends on wall thickness (e.g., 230 mm).
- Multiplying wall area by the brick factor gives the total number of bricks required.
This helps in ordering the right quantity of bricks for masonry.
๐ Plaster Area
Plastering is calculated by measuring surface areas of walls and ceilings, again deducting openings.
- Ceiling area is straightforward (length ร width).
- Wall surfaces are summed up, with deductions for doors and windows.
This ensures smooth finishing and avoids excess material use.
๐ Material Summary
All materialsโconcrete, steel, bricks, cement, sand, and aggregateโare tabulated for clarity.
- This summary helps in budgeting, procurement, and scheduling.
- It ensures no shortage or surplus during construction.
#ConstructionEstimation #BuildingMaterials #StructuralDesign #SmartPlanning
@etconp
โค12๐3
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค2๐2
๐5 Cement Field Tests (Site Testing)
1. Color Test
Good cement should have a uniform grey color with a slight greenish shade.
2. Touch Test
Rub cement between fingers. It should feel smooth, not rough or gritty.
3. Lumps Test
Cement bag should be free from hard lumps. Lumps indicate moisture absorption.
4. Float Test
Throw a small quantity of cement into water. Good cement should float for a few seconds before sinking.
5. Smell Test
Cement should not have an earthy or clay smell. Such smell indicates presence of impurities.
@etconp
1. Color Test
Good cement should have a uniform grey color with a slight greenish shade.
2. Touch Test
Rub cement between fingers. It should feel smooth, not rough or gritty.
3. Lumps Test
Cement bag should be free from hard lumps. Lumps indicate moisture absorption.
4. Float Test
Throw a small quantity of cement into water. Good cement should float for a few seconds before sinking.
5. Smell Test
Cement should not have an earthy or clay smell. Such smell indicates presence of impurities.
@etconp
๐11โค7๐2
Followers who are interested in high-quality daily news content and geopolitical analysis: we want to introduce our partner to you - the @geopolitics_prime channel.
The team creates groundbreaking investigations, connecting historical facts with current events, revealing the truth and opening people's eyes to what's really happening https://t.me/+x7VY855rB7FmZDZi
The team creates groundbreaking investigations, connecting historical facts with current events, revealing the truth and opening people's eyes to what's really happening https://t.me/+x7VY855rB7FmZDZi
โค1
๐Hereโs the Isolated Footing Design explained in detail :
๐๏ธ Step-by-Step Explanation
๐ฐSoil Pressure
- The column load is 1500 kN.
- The soil can safely carry 250 kN/mยฒ.
- The actual pressure applied is 135 kN/mยฒ, which is within safe limits.
โ๏ธFooting Size
- Required area is 2.5 mยฒ.
- Footing dimensions are 2.5 m ร 2.5 m.
- Depth is 600 mm.
This ensures stability and proper load transfer.
๐ฒPunching Shear
- Punching shear is checked around the column perimeter.
- The footing is safe against punching shear failure.
๐ฐBending Moment
- The maximum bending moment is 450 kNm.
- This value is used to design reinforcement.
โญ๏ธReinforcement
- Steel reinforcement is required to resist bending.
- Provided reinforcement: 12 mm bars placed at 150 mm spacing in both directions.
- Effective steel area is 750 mmยฒ/m.
This ensures strength and durability.
๐งFinal Detailing
- Column size: 400 mm ร 400 mm.
- Reinforcement: 12 mm bars @ 150 mm spacing.
- Cover depth: 0.6 m.
- Concrete grade: M30.
- Steel grade: Fe500.
โ Key Takeaway This design ensures:
- Safe soil pressure distribution
- Adequate footing size
- Resistance against punching shear
- Proper reinforcement for bending
- Strong detailing for durability
๐ซA well-designed isolated footing guarantees structural safety and longevity of the building foundation.
#CivilEngineering #StructuralDesign #FoundationSafety #SmartEngineering
@etconp
๐๏ธ Step-by-Step Explanation
๐ฐSoil Pressure
- The column load is 1500 kN.
- The soil can safely carry 250 kN/mยฒ.
- The actual pressure applied is 135 kN/mยฒ, which is within safe limits.
โ๏ธFooting Size
- Required area is 2.5 mยฒ.
- Footing dimensions are 2.5 m ร 2.5 m.
- Depth is 600 mm.
This ensures stability and proper load transfer.
๐ฒPunching Shear
- Punching shear is checked around the column perimeter.
- The footing is safe against punching shear failure.
๐ฐBending Moment
- The maximum bending moment is 450 kNm.
- This value is used to design reinforcement.
โญ๏ธReinforcement
- Steel reinforcement is required to resist bending.
- Provided reinforcement: 12 mm bars placed at 150 mm spacing in both directions.
- Effective steel area is 750 mmยฒ/m.
This ensures strength and durability.
๐งFinal Detailing
- Column size: 400 mm ร 400 mm.
- Reinforcement: 12 mm bars @ 150 mm spacing.
- Cover depth: 0.6 m.
- Concrete grade: M30.
- Steel grade: Fe500.
โ Key Takeaway This design ensures:
- Safe soil pressure distribution
- Adequate footing size
- Resistance against punching shear
- Proper reinforcement for bending
- Strong detailing for durability
๐ซA well-designed isolated footing guarantees structural safety and longevity of the building foundation.
#CivilEngineering #StructuralDesign #FoundationSafety #SmartEngineering
@etconp
โค10
๐What is BIM (Building Information Modeling)?
๐ซBIM (Building Information Modeling) is a digital process used in construction where a building is designed, planned, and managed using a 3D intelligent model.
๐งIt is not just 3D drawing โ it contains complete project information like materials, cost, time, and structure details.
@etconp
๐ซBIM (Building Information Modeling) is a digital process used in construction where a building is designed, planned, and managed using a 3D intelligent model.
๐งIt is not just 3D drawing โ it contains complete project information like materials, cost, time, and structure details.
@etconp
โค5๐1
๐super elevation design on highways, keeping it clear and practical.
๐ Key Details
- Definition: Super elevation is the upward tilting of the outer edge of a road curve to help vehicles counteract centrifugal force.
- Purpose: It reduces skidding, improves safety, and ensures smoother driving comfort on curves.
- Design Inputs:
- Design speed of the vehicle
- Radius of the curve
- Side friction factor (resistance between tires and road surface)
- Example Case:
- Speed considered: 80 km/h
- Curve radius: 250 m
- Side friction factor: 0.15
- Result: Required super elevation = 5% (outer edge raised by 5% of road width).
๐ Practical Values
- Maximum super elevation: 7% (as per IRC standards).
- Normal camber: 2.5% on straight roads.
- Side friction factor: Typically ranges between 0.10 and 0.17 depending on speed and road type.
๐ Importance
- Enhances road safety by balancing forces on curves.
- Improves driver comfort during high-speed travel.
- Ensures efficient traffic flow even on sharp bends.
๐ Reference
Standards are guided by IRC: 73 โ 2001 (Geometric Design of Highways), which sets the limits and recommendations for safe design.
#CivilEngineering #SuperElevation
#RoadSafety
@etconp
๐ Key Details
- Definition: Super elevation is the upward tilting of the outer edge of a road curve to help vehicles counteract centrifugal force.
- Purpose: It reduces skidding, improves safety, and ensures smoother driving comfort on curves.
- Design Inputs:
- Design speed of the vehicle
- Radius of the curve
- Side friction factor (resistance between tires and road surface)
- Example Case:
- Speed considered: 80 km/h
- Curve radius: 250 m
- Side friction factor: 0.15
- Result: Required super elevation = 5% (outer edge raised by 5% of road width).
๐ Practical Values
- Maximum super elevation: 7% (as per IRC standards).
- Normal camber: 2.5% on straight roads.
- Side friction factor: Typically ranges between 0.10 and 0.17 depending on speed and road type.
๐ Importance
- Enhances road safety by balancing forces on curves.
- Improves driver comfort during high-speed travel.
- Ensures efficient traffic flow even on sharp bends.
๐ Reference
Standards are guided by IRC: 73 โ 2001 (Geometric Design of Highways), which sets the limits and recommendations for safe design.
#CivilEngineering #SuperElevation
#RoadSafety
@etconp
โค9
๐กแแแแ แจแฅแตแแแ แฅแแแต แฐแจแณแฎแฝ แ แแ แฅแแณแ แ1447แแ แณแแ แจแขแต แ แ แ แตแ (แ แจแ) แ แแ แ แฐแแแ แ แคแ แ แฐแจแณแฝแ๐
แ แแ แ แแฐแณแฐแฅแฃ แ แ แฅแฎแแตแ แ แแ แญ
แจแฐแแ แฅแแฒแแแแฝแ แฅแแแแแ๐
แแต แแฃแจแญโค
@etconp
แ แแ แ แแฐแณแฐแฅแฃ แ แ แฅแฎแแตแ แ แแ แญ
แจแฐแแ แฅแแฒแแแแฝแ แฅแแแแแ๐
แแต แแฃแจแญโค
@etconp
โค3๐2
๐แฅแแณแ แฐแต แ แแน !๐
Purchasers แฅแ contractors แ แแฅแแต แฅแ แ แแแ suppliers แฅแแฒแซแแ แจแแซแตแฝแ construction material sourcing bot แ แแแ แฐแแแข
Bot user name: ๐
๐ @hbhbuyerbot ๐
๐
แ แแ bot แ แแซแแแตแฆ
โข Quotations แ แแฅแแต แแ แจแ
โข แจsuppliers แแ แแแณแฐแญ
โข แซแ materials แ แแแ แแแแต
โข แฅแ suppliers แ แตแแญ แจแแฐแแ แแ แแแ แฅ
แจแแแ materials แจแแจแฐแแต แแซแจแแฆ
* Rebar
* Cement
* Hollow Block
* Aggregate
* CHS/RHS Steel
* Plumbing & Electrical Materials
* And more
Step 1 : แญแแแแก
Step 2 : โNew purchase orderโแจแแแแ แ แแซแ แแฐแแแแจแฐแ แ แ แซแข PO แ แแแญ แแฅแญแถแ แซแแแฅแ
Bot user name: ๐
๐ @hbhbuyerbot ๐
Purchasers แฅแ contractors แ แแฅแแต แฅแ แ แแแ suppliers แฅแแฒแซแแ แจแแซแตแฝแ construction material sourcing bot แ แแแ แฐแแแข
Bot user name: ๐
๐ @hbhbuyerbot ๐
๐
แ แแ bot แ แแซแแแตแฆ
โข Quotations แ แแฅแแต แแ แจแ
โข แจsuppliers แแ แแแณแฐแญ
โข แซแ materials แ แแแ แแแแต
โข แฅแ suppliers แ แตแแญ แจแแฐแแ แแ แแแ แฅ
แจแแแ materials แจแแจแฐแแต แแซแจแแฆ
* Rebar
* Cement
* Hollow Block
* Aggregate
* CHS/RHS Steel
* Plumbing & Electrical Materials
* And more
Step 1 : แญแแแแก
Step 2 : โNew purchase orderโแจแแแแ แ แแซแ แแฐแแแแจแฐแ แ แ แซแข PO แ แแแญ แแฅแญแถแ แซแแแฅแ
Bot user name: ๐
๐ @hbhbuyerbot ๐
โค7๐1