๐5 Cement Field Tests (Site Testing)
1. Color Test
Good cement should have a uniform grey color with a slight greenish shade.
2. Touch Test
Rub cement between fingers. It should feel smooth, not rough or gritty.
3. Lumps Test
Cement bag should be free from hard lumps. Lumps indicate moisture absorption.
4. Float Test
Throw a small quantity of cement into water. Good cement should float for a few seconds before sinking.
5. Smell Test
Cement should not have an earthy or clay smell. Such smell indicates presence of impurities.
@etconp
1. Color Test
Good cement should have a uniform grey color with a slight greenish shade.
2. Touch Test
Rub cement between fingers. It should feel smooth, not rough or gritty.
3. Lumps Test
Cement bag should be free from hard lumps. Lumps indicate moisture absorption.
4. Float Test
Throw a small quantity of cement into water. Good cement should float for a few seconds before sinking.
5. Smell Test
Cement should not have an earthy or clay smell. Such smell indicates presence of impurities.
@etconp
๐11โค7๐2
Followers who are interested in high-quality daily news content and geopolitical analysis: we want to introduce our partner to you - the @geopolitics_prime channel.
The team creates groundbreaking investigations, connecting historical facts with current events, revealing the truth and opening people's eyes to what's really happening https://t.me/+x7VY855rB7FmZDZi
The team creates groundbreaking investigations, connecting historical facts with current events, revealing the truth and opening people's eyes to what's really happening https://t.me/+x7VY855rB7FmZDZi
โค1
๐Hereโs the Isolated Footing Design explained in detail :
๐๏ธ Step-by-Step Explanation
๐ฐSoil Pressure
- The column load is 1500 kN.
- The soil can safely carry 250 kN/mยฒ.
- The actual pressure applied is 135 kN/mยฒ, which is within safe limits.
โ๏ธFooting Size
- Required area is 2.5 mยฒ.
- Footing dimensions are 2.5 m ร 2.5 m.
- Depth is 600 mm.
This ensures stability and proper load transfer.
๐ฒPunching Shear
- Punching shear is checked around the column perimeter.
- The footing is safe against punching shear failure.
๐ฐBending Moment
- The maximum bending moment is 450 kNm.
- This value is used to design reinforcement.
โญ๏ธReinforcement
- Steel reinforcement is required to resist bending.
- Provided reinforcement: 12 mm bars placed at 150 mm spacing in both directions.
- Effective steel area is 750 mmยฒ/m.
This ensures strength and durability.
๐งFinal Detailing
- Column size: 400 mm ร 400 mm.
- Reinforcement: 12 mm bars @ 150 mm spacing.
- Cover depth: 0.6 m.
- Concrete grade: M30.
- Steel grade: Fe500.
โ Key Takeaway This design ensures:
- Safe soil pressure distribution
- Adequate footing size
- Resistance against punching shear
- Proper reinforcement for bending
- Strong detailing for durability
๐ซA well-designed isolated footing guarantees structural safety and longevity of the building foundation.
#CivilEngineering #StructuralDesign #FoundationSafety #SmartEngineering
@etconp
๐๏ธ Step-by-Step Explanation
๐ฐSoil Pressure
- The column load is 1500 kN.
- The soil can safely carry 250 kN/mยฒ.
- The actual pressure applied is 135 kN/mยฒ, which is within safe limits.
โ๏ธFooting Size
- Required area is 2.5 mยฒ.
- Footing dimensions are 2.5 m ร 2.5 m.
- Depth is 600 mm.
This ensures stability and proper load transfer.
๐ฒPunching Shear
- Punching shear is checked around the column perimeter.
- The footing is safe against punching shear failure.
๐ฐBending Moment
- The maximum bending moment is 450 kNm.
- This value is used to design reinforcement.
โญ๏ธReinforcement
- Steel reinforcement is required to resist bending.
- Provided reinforcement: 12 mm bars placed at 150 mm spacing in both directions.
- Effective steel area is 750 mmยฒ/m.
This ensures strength and durability.
๐งFinal Detailing
- Column size: 400 mm ร 400 mm.
- Reinforcement: 12 mm bars @ 150 mm spacing.
- Cover depth: 0.6 m.
- Concrete grade: M30.
- Steel grade: Fe500.
โ Key Takeaway This design ensures:
- Safe soil pressure distribution
- Adequate footing size
- Resistance against punching shear
- Proper reinforcement for bending
- Strong detailing for durability
๐ซA well-designed isolated footing guarantees structural safety and longevity of the building foundation.
#CivilEngineering #StructuralDesign #FoundationSafety #SmartEngineering
@etconp
โค10
๐What is BIM (Building Information Modeling)?
๐ซBIM (Building Information Modeling) is a digital process used in construction where a building is designed, planned, and managed using a 3D intelligent model.
๐งIt is not just 3D drawing โ it contains complete project information like materials, cost, time, and structure details.
@etconp
๐ซBIM (Building Information Modeling) is a digital process used in construction where a building is designed, planned, and managed using a 3D intelligent model.
๐งIt is not just 3D drawing โ it contains complete project information like materials, cost, time, and structure details.
@etconp
โค5๐1
๐super elevation design on highways, keeping it clear and practical.
๐ Key Details
- Definition: Super elevation is the upward tilting of the outer edge of a road curve to help vehicles counteract centrifugal force.
- Purpose: It reduces skidding, improves safety, and ensures smoother driving comfort on curves.
- Design Inputs:
- Design speed of the vehicle
- Radius of the curve
- Side friction factor (resistance between tires and road surface)
- Example Case:
- Speed considered: 80 km/h
- Curve radius: 250 m
- Side friction factor: 0.15
- Result: Required super elevation = 5% (outer edge raised by 5% of road width).
๐ Practical Values
- Maximum super elevation: 7% (as per IRC standards).
- Normal camber: 2.5% on straight roads.
- Side friction factor: Typically ranges between 0.10 and 0.17 depending on speed and road type.
๐ Importance
- Enhances road safety by balancing forces on curves.
- Improves driver comfort during high-speed travel.
- Ensures efficient traffic flow even on sharp bends.
๐ Reference
Standards are guided by IRC: 73 โ 2001 (Geometric Design of Highways), which sets the limits and recommendations for safe design.
#CivilEngineering #SuperElevation
#RoadSafety
@etconp
๐ Key Details
- Definition: Super elevation is the upward tilting of the outer edge of a road curve to help vehicles counteract centrifugal force.
- Purpose: It reduces skidding, improves safety, and ensures smoother driving comfort on curves.
- Design Inputs:
- Design speed of the vehicle
- Radius of the curve
- Side friction factor (resistance between tires and road surface)
- Example Case:
- Speed considered: 80 km/h
- Curve radius: 250 m
- Side friction factor: 0.15
- Result: Required super elevation = 5% (outer edge raised by 5% of road width).
๐ Practical Values
- Maximum super elevation: 7% (as per IRC standards).
- Normal camber: 2.5% on straight roads.
- Side friction factor: Typically ranges between 0.10 and 0.17 depending on speed and road type.
๐ Importance
- Enhances road safety by balancing forces on curves.
- Improves driver comfort during high-speed travel.
- Ensures efficient traffic flow even on sharp bends.
๐ Reference
Standards are guided by IRC: 73 โ 2001 (Geometric Design of Highways), which sets the limits and recommendations for safe design.
#CivilEngineering #SuperElevation
#RoadSafety
@etconp
โค9
๐กแแแแ แจแฅแตแแแ แฅแแแต แฐแจแณแฎแฝ แ แแ แฅแแณแ แ1447แแ แณแแ แจแขแต แ แ แ แตแ (แ แจแ) แ แแ แ แฐแแแ แ แคแ แ แฐแจแณแฝแ๐
แ แแ แ แแฐแณแฐแฅแฃ แ แ แฅแฎแแตแ แ แแ แญ
แจแฐแแ แฅแแฒแแแแฝแ แฅแแแแแ๐
แแต แแฃแจแญโค
@etconp
แ แแ แ แแฐแณแฐแฅแฃ แ แ แฅแฎแแตแ แ แแ แญ
แจแฐแแ แฅแแฒแแแแฝแ แฅแแแแแ๐
แแต แแฃแจแญโค
@etconp
โค3๐2
๐แฅแแณแ แฐแต แ แแน !๐
Purchasers แฅแ contractors แ แแฅแแต แฅแ แ แแแ suppliers แฅแแฒแซแแ แจแแซแตแฝแ construction material sourcing bot แ แแแ แฐแแแข
Bot user name: ๐
๐ @hbhbuyerbot ๐
๐
แ แแ bot แ แแซแแแตแฆ
โข Quotations แ แแฅแแต แแ แจแ
โข แจsuppliers แแ แแแณแฐแญ
โข แซแ materials แ แแแ แแแแต
โข แฅแ suppliers แ แตแแญ แจแแฐแแ แแ แแแ แฅ
แจแแแ materials แจแแจแฐแแต แแซแจแแฆ
* Rebar
* Cement
* Hollow Block
* Aggregate
* CHS/RHS Steel
* Plumbing & Electrical Materials
* And more
Step 1 : แญแแแแก
Step 2 : โNew purchase orderโแจแแแแ แ แแซแ แแฐแแแแจแฐแ แ แ แซแข PO แ แแแญ แแฅแญแถแ แซแแแฅแ
Bot user name: ๐
๐ @hbhbuyerbot ๐
Purchasers แฅแ contractors แ แแฅแแต แฅแ แ แแแ suppliers แฅแแฒแซแแ แจแแซแตแฝแ construction material sourcing bot แ แแแ แฐแแแข
Bot user name: ๐
๐ @hbhbuyerbot ๐
๐
แ แแ bot แ แแซแแแตแฆ
โข Quotations แ แแฅแแต แแ แจแ
โข แจsuppliers แแ แแแณแฐแญ
โข แซแ materials แ แแแ แแแแต
โข แฅแ suppliers แ แตแแญ แจแแฐแแ แแ แแแ แฅ
แจแแแ materials แจแแจแฐแแต แแซแจแแฆ
* Rebar
* Cement
* Hollow Block
* Aggregate
* CHS/RHS Steel
* Plumbing & Electrical Materials
* And more
Step 1 : แญแแแแก
Step 2 : โNew purchase orderโแจแแแแ แ แแซแ แแฐแแแแจแฐแ แ แ แซแข PO แ แแแญ แแฅแญแถแ แซแแแฅแ
Bot user name: ๐
๐ @hbhbuyerbot ๐
โค7๐1
๐Trigonometric leveling is a surveying method that determines the height difference between two points using measured vertical angles and horizontal distances.
It is especially useful when the two points are not at the same level, allowing surveyors to calculate elevations without physically moving to the same height.
๐ Key Elements
- Vertical angle: Measured as upward (+) or downward (โ).
- Horizontal distance: Distance between instrument and prism.
- Instrument height and Prism height: Must be carefully noted for accuracy.
๐ Example (Without Formula)
Suppose Point A has an elevation of 100.000 m.
- Instrument height = 1.500 m
- Prism height = 1.800 m
- Horizontal distance = 85.000 m
- Vertical angle = +12ยฐ30โฒ
After applying the trigonometric process, the calculated height difference is 18.094 m.
Thus, Elevation of Point B = 100.000 + 18.094 = 118.094 m.
โ ๏ธ Common Mistakes
- Ignoring the sign of the angle (positive for upward, negative for downward).
- Misreading instrument or prism height.
- Using poorly calibrated instruments.
โ Best Practices
- Double-check angles and distances.
- Confirm instrument calibration.
- Review calculations before finalizing.
This technique ensures precision in civil engineering projects, making it a reliable method for determining elevations in the field.
#Surveying
#CivilEngineering #Trigonometry
#Leveling
#Construction
@etconp
It is especially useful when the two points are not at the same level, allowing surveyors to calculate elevations without physically moving to the same height.
๐ Key Elements
- Vertical angle: Measured as upward (+) or downward (โ).
- Horizontal distance: Distance between instrument and prism.
- Instrument height and Prism height: Must be carefully noted for accuracy.
๐ Example (Without Formula)
Suppose Point A has an elevation of 100.000 m.
- Instrument height = 1.500 m
- Prism height = 1.800 m
- Horizontal distance = 85.000 m
- Vertical angle = +12ยฐ30โฒ
After applying the trigonometric process, the calculated height difference is 18.094 m.
Thus, Elevation of Point B = 100.000 + 18.094 = 118.094 m.
โ ๏ธ Common Mistakes
- Ignoring the sign of the angle (positive for upward, negative for downward).
- Misreading instrument or prism height.
- Using poorly calibrated instruments.
โ Best Practices
- Double-check angles and distances.
- Confirm instrument calibration.
- Review calculations before finalizing.
This technique ensures precision in civil engineering projects, making it a reliable method for determining elevations in the field.
#Surveying
#CivilEngineering #Trigonometry
#Leveling
#Construction
@etconp
โค8
แแ แแจแแต๐ฅ
แ แฐแญแ แแแ แแแแฅแต แจแฐแฐแฉ แตแแแ แแฎแแญแถแฝแ แ แแแซแต แจแแณแแแต แขแแแแญ แซแณ แแฅแฌ แจแแ แ แแ แ แแต แฐแแฉแข
แขแแ แแญ แซแณ แ 92 แแแต แฅแตแแซแธแ แญแแฉแ แต แ แแ แจแ แ แแชแซ แแแญ แ แญแแณแธแ แแแ แฐแฐแแทแแข
แขแแแแญ แซแณ แแฅแฌ แจแขแตแฎแตแซ แ แแ แฎแแ แ แฒแชแ แแ แแตแตแ แซแแณ แแแญ แ แแแแ แจแฅแชแฒแฝ แฎแแแขแซ แฉแแจแญแฒแฒ แจแ แแต แแแต แจแตแ แจ แแจแ แตแแ แญแณแธแแ แแจแณแฐแแธแแ แจแ แญแแต แณแชแซแธแ แซแตแจแณแแข
แ แตแแ แญแต แแแตแดแญ แ แแ แแแแฒแตแแตแฃ แ แคแถแฝแ แจแฐแ แแแต แแแตแดแญ แแแตแตแญแแตแฃ แ แคแญแตแซ แจแ แ แแญ แแแฑ แแ แแแแฒแตแฃ แ แแแป แฎแแตแตแซแญแฝแ แแแตแตแญแแต แฅแ แ แฐแแซแฉ แจแแฐแ แจแแแแฅแต แแแแแถแฝ แฅแตแจ แฐแญแ แตแญแแต แแฅแแต แตแญแต แ แแแแแแแข
แขแแแแญ แซแณ แ แฐแญแ แตแญแแต แแ แต แจแฐแฐแฉ แตแแแ แแฎแแญแถแฝแแ แแญแฐแแแข
แ แถแแ แแจแซ แฆแญแแต แแ แต แ แแฃแ แ แซแแต แจแฐแแ แแ แตแ แจแณแ แ แฆแญ แแณ แแแฃแณ แ แ แญแญ แแ แแตแฅ แแแแแณแธแ แจแแ แแตแแธแ แตแซแแปแธแ แแจแจแ แญแแแ แณแแข
แจแแแแฝแ แ แแแต แ แแฃ แแตแจแณแแฝ แแ แต แจแแแฃแณ แแญแแ แแญแฐแแแข
แจแฃแ แ แแต แแตแฅแฃ แจแแญ แแตแแ แแแปแฃ แแข แธแ แ แแดแแฃ แแแแ แแแปแแฝแฃ แ แญแฑแ แฝแฎแ แคแฐแญแญแตแฒแซแแฃ แ แญแซแณ แจแจแฐแ แแแแฝแ แตแแตแฎแฝ แจแณแแแ แฅแซแแปแธแ แแซแจแ แญแ แแณแแข
แ แแ แ แแแ แ แตแฐแแฟแธแ แแแแแแท แขแตแฎแตแซ แแแฃแณ แจแแ แจแต แฃแฎแฝ แแซแจแ แ แแฑ แฐแฐแญแแแ แญแแณแแข
แ แแชแท แจแแฐแ แจแตแญแ แ แฐแ แแตแฅ แ แแฃแฝแ แต แแ แตแ แแแฝแ แตแญแ แซแแ แต แแฐ แตแญแ แแฐแแแ แต แ แซแฃแข แ แแแแญ แจแฅแแแตแ แจแจแแฅ แ แฐแ แ แแณแฐแ แตแแ แฐแฅแแ แ แตแฐแแ แฆ แแ แญแจแณแธแแแ แจแ แญแแต แณแชแซแธแ แซแตแจแณแแข
แ แถ แซแณ แแฅแฌ แจแแแต แแแถแฝ แฅแ แจแแแต แดแถแฝ แแแฝ แ แฃแตแ แแ แฉแข
แ 92 แแแต แฅแตแแซแธแ แแฌ แจแแ แแแ แ แแต แจแฐแแฉแต แขแแแแญ แซแณ แแฅแฌ แจแแฅแญ แตแแตแญแแณแธแ แ แ แแชแซแ แแแญ แแบแแแฐแ แฒแฒ แ แแแแ แฐแฅแจ แแญแ แ แฑแต แแฅแญแคแ แซแดแตแซแแฃ แฐแ แแแฆแต 24 แแ 2018 แแแฃ แ แ แแฉ แฐแแต แ แแฃแ แญ แจแ แแฑ แ 3:30 แฐแแต แจแแแแ แฒแแ แ แ แฒแต แ แ แฃ แจแแณแฐแขแซ แแญแแแฅแญ แ แแฃแญ แแแต แญแฐแจแแแธแแ แฐแฅแแแข
@etconp แแแแ แคแฐแฐแฆแปแธแแฃ แแแณแ แแแถแปแธแ แแ แแแตแ แฅแแแแแ๐
@etconp
แ แฐแญแ แแแ แแแแฅแต แจแฐแฐแฉ แตแแแ แแฎแแญแถแฝแ แ แแแซแต แจแแณแแแต แขแแแแญ แซแณ แแฅแฌ แจแแ แ แแ แ แแต แฐแแฉแข
แขแแ แแญ แซแณ แ 92 แแแต แฅแตแแซแธแ แญแแฉแ แต แ แแ แจแ แ แแชแซ แแแญ แ แญแแณแธแ แแแ แฐแฐแแทแแข
แขแแแแญ แซแณ แแฅแฌ แจแขแตแฎแตแซ แ แแ แฎแแ แ แฒแชแ แแ แแตแตแ แซแแณ แแแญ แ แแแแ แจแฅแชแฒแฝ แฎแแแขแซ แฉแแจแญแฒแฒ แจแ แแต แแแต แจแตแ แจ แแจแ แตแแ แญแณแธแแ แแจแณแฐแแธแแ แจแ แญแแต แณแชแซแธแ แซแตแจแณแแข
แ แตแแ แญแต แแแตแดแญ แ แแ แแแแฒแตแแตแฃ แ แคแถแฝแ แจแฐแ แแแต แแแตแดแญ แแแตแตแญแแตแฃ แ แคแญแตแซ แจแ แ แแญ แแแฑ แแ แแแแฒแตแฃ แ แแแป แฎแแตแตแซแญแฝแ แแแตแตแญแแต แฅแ แ แฐแแซแฉ แจแแฐแ แจแแแแฅแต แแแแแถแฝ แฅแตแจ แฐแญแ แตแญแแต แแฅแแต แตแญแต แ แแแแแแแข
แขแแแแญ แซแณ แ แฐแญแ แตแญแแต แแ แต แจแฐแฐแฉ แตแแแ แแฎแแญแถแฝแแ แแญแฐแแแข
แ แถแแ แแจแซ แฆแญแแต แแ แต แ แแฃแ แ แซแแต แจแฐแแ แแ แตแ แจแณแ แ แฆแญ แแณ แแแฃแณ แ แ แญแญ แแ แแตแฅ แแแแแณแธแ แจแแ แแตแแธแ แตแซแแปแธแ แแจแจแ แญแแแ แณแแข
แจแแแแฝแ แ แแแต แ แแฃ แแตแจแณแแฝ แแ แต แจแแแฃแณ แแญแแ แแญแฐแแแข
แจแฃแ แ แแต แแตแฅแฃ แจแแญ แแตแแ แแแปแฃ แแข แธแ แ แแดแแฃ แแแแ แแแปแแฝแฃ แ แญแฑแ แฝแฎแ แคแฐแญแญแตแฒแซแแฃ แ แญแซแณ แจแจแฐแ แแแแฝแ แตแแตแฎแฝ แจแณแแแ แฅแซแแปแธแ แแซแจแ แญแ แแณแแข
แ แแ แ แแแ แ แตแฐแแฟแธแ แแแแแแท แขแตแฎแตแซ แแแฃแณ แจแแ แจแต แฃแฎแฝ แแซแจแ แ แแฑ แฐแฐแญแแแ แญแแณแแข
แ แแชแท แจแแฐแ แจแตแญแ แ แฐแ แแตแฅ แ แแฃแฝแ แต แแ แตแ แแแฝแ แตแญแ แซแแ แต แแฐ แตแญแ แแฐแแแ แต แ แซแฃแข แ แแแแญ แจแฅแแแตแ แจแจแแฅ แ แฐแ แ แแณแฐแ แตแแ แฐแฅแแ แ แตแฐแแ แฆ แแ แญแจแณแธแแแ แจแ แญแแต แณแชแซแธแ แซแตแจแณแแข
แ แถ แซแณ แแฅแฌ แจแแแต แแแถแฝ แฅแ แจแแแต แดแถแฝ แแแฝ แ แฃแตแ แแ แฉแข
แ 92 แแแต แฅแตแแซแธแ แแฌ แจแแ แแแ แ แแต แจแฐแแฉแต แขแแแแญ แซแณ แแฅแฌ แจแแฅแญ แตแแตแญแแณแธแ แ แ แแชแซแ แแแญ แแบแแแฐแ แฒแฒ แ แแแแ แฐแฅแจ แแญแ แ แฑแต แแฅแญแคแ แซแดแตแซแแฃ แฐแ แแแฆแต 24 แแ 2018 แแแฃ แ แ แแฉ แฐแแต แ แแฃแ แญ แจแ แแฑ แ 3:30 แฐแแต แจแแแแ แฒแแ แ แ แฒแต แ แ แฃ แจแแณแฐแขแซ แแญแแแฅแญ แ แแฃแญ แแแต แญแฐแจแแแธแแ แฐแฅแแแข
@etconp แแแแ แคแฐแฐแฆแปแธแแฃ แแแณแ แแแถแปแธแ แแ แแแตแ แฅแแแแแ๐
@etconp
โค19๐ญ16๐1
๐ INTERCON Construction Chemicals
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โ Concrete Admixtures
โ Bonding Agents
โ Waterproofings
โ Wall Putty, Prime Coat
โ Concrete Repair Mortar
โ Floor hardener, Epoxy
โ Grout, Self-level mortar
โ Quartz paint, Contextra
โ Tile Adhesive & Tile Joint Fillers
โ Geotextiles and other construction chemicals and materials
โ๏ธ Tel: 0961955555
๐น Address 1: Signal road, around
Dinberwa Hospital
๐น Addres 2: Wellosefer, Infront of
Dani Plaza
โค4๐1
๐Contour lines are one of the most fundamental tools in topographic mapping and civil engineering because they transform the threeโdimensional shape of the land into a twoโdimensional representation that can be analyzed, designed upon, and interpreted.
They are essentially imaginary lines connecting points of equal elevation, which means every point along a contour line sits at the same height above a reference level, usually mean sea level.
๐ Key Details
- Nonโcrossing lines: Contour lines never intersect because a single point cannot have two different elevations.
- Closed loops: Hills and depressions are represented by loops; the difference lies in whether the elevation increases or decreases toward the center.
- Slope steepness: The spacing between lines indicates gradient โ closer lines mean steeper terrain, wider spacing means gentler slopes.
- Index contours: Bold lines drawn at regular intervals help quickly identify elevation levels.
- Valleys vs ridges: A โVโ shape pointing upstream indicates a valley, while pointing downstream indicates a ridge.
๐ Applications
- Road design: Engineers use contour maps to plan routes that minimize steep gradients.
- Earthwork calculation: Essential for estimating cut and fill volumes in construction.
- Drainage & watersheds: Contours help identify water flow paths and catchment areas.
- Urban planning: Guides zoning, land use, and infrastructure placement.
- Civil works: Used in designing dams, canals, and other structural projects.
๐ ๏ธ Tools for Contour Mapping
- Total Station
- GPS Receiver
- Automatic Level
- Drone Photogrammetry
- Topographic Software
๐ Field Tips
- Always verify contour interval consistency.
- Use control points for accuracy.
- Match the map scale to project requirements.
- Field validation prevents costly design errors.
Contour lines are more than just symbols on a map โ they are the language of the land, allowing engineers, geographers, and planners to visualize terrain, anticipate challenges, and design solutions that respect natural topography.
#Topography
#CivilEngineering #ContourLines
#Mapping
#Surveying
@etconp
They are essentially imaginary lines connecting points of equal elevation, which means every point along a contour line sits at the same height above a reference level, usually mean sea level.
๐ Key Details
- Nonโcrossing lines: Contour lines never intersect because a single point cannot have two different elevations.
- Closed loops: Hills and depressions are represented by loops; the difference lies in whether the elevation increases or decreases toward the center.
- Slope steepness: The spacing between lines indicates gradient โ closer lines mean steeper terrain, wider spacing means gentler slopes.
- Index contours: Bold lines drawn at regular intervals help quickly identify elevation levels.
- Valleys vs ridges: A โVโ shape pointing upstream indicates a valley, while pointing downstream indicates a ridge.
๐ Applications
- Road design: Engineers use contour maps to plan routes that minimize steep gradients.
- Earthwork calculation: Essential for estimating cut and fill volumes in construction.
- Drainage & watersheds: Contours help identify water flow paths and catchment areas.
- Urban planning: Guides zoning, land use, and infrastructure placement.
- Civil works: Used in designing dams, canals, and other structural projects.
๐ ๏ธ Tools for Contour Mapping
- Total Station
- GPS Receiver
- Automatic Level
- Drone Photogrammetry
- Topographic Software
๐ Field Tips
- Always verify contour interval consistency.
- Use control points for accuracy.
- Match the map scale to project requirements.
- Field validation prevents costly design errors.
Contour lines are more than just symbols on a map โ they are the language of the land, allowing engineers, geographers, and planners to visualize terrain, anticipate challenges, and design solutions that respect natural topography.
#Topography
#CivilEngineering #ContourLines
#Mapping
#Surveying
@etconp
โค11๐1๐1
แจแฅแซ แฐแแซแฎแฝ แแแต
แฅแซแฐแแซแฎแฝ แ แ แแต แจแแแแฅแต แจแจแณ แแญ แแแแณแฐแญ แฅแแฐแจแฐแจแแธแ แแ แจแฅ แซแแฃแธแ แแ แฐแ แจแฅแซ แแแต แแแ แ แ แ แจแฐแแแ แฒแแแค แแฐแจแ แ แแต แฅแ แแแต (Level 1 and 2) แจแ แแตแต แแแต แแแตแฃ แแฐแจแ 3 (Level 3) แจแฆแตแต แแแต แแแตแฃ แแฐแจแ 4 แฅแ 5 (Level 4 and 5) แจแแแต แแแต แแแต แแแซแธแ แญแแฃแแกแก
แแแญ แแ แจแแฃแ แจแจแณ แจแแ แญแแ แแตแแญแต (Evaluation criteria) แญแ แแ แณแณแข แซแแฐแจแ แขแแ แ แฌแณ แจแแจแ แ แต ยซแ แแฃแฅ แซแแแ แจแจแณยป แ แแ แแฐแจแ แญแฝแแแข
@etconp
โค14๐2๐ฑ2๐ฅ1
๐แจแจแจแณ แแตแจแ แชแซ (bid security/bond) แแแแฅ แแ แ แ แแณแฐแ
๐งแ แฒแฑ แจแแแแตแต แแข แแแชแซ แจแจแจแณ แแตแจแ แชแซ แแแแฅ แ แแณแฐแแ แ แฐแแแจแฐ ยซแจแแแแตแต แ/แคแฑ แจแ แ แแ แแฅแแ แแแณแ แแ แแฐแจแต แ แแตแจแ แจ 0.5% แซแแแฐ แฅแ แจ 2% แซแแแ แแ แจแจแจแณ แแตแจแ แชแซ แจแแแแฅ แแ แ แแตแ แ แจแจแณแ แฅแชแ แฅแ แ แจแจแณ แฐแแฑ แแตแฅ แแแแ แญแแญแ แณแแกแก
แ แแ แแ แจแต แจแแแฐแแ แจแจแจแณ แแตแจแ แชแซ แแ แ แจแฅแญ 2,000,000 (แแแต แแแฎแ แฅแญ) แจแ แแ แแแ แจแแ แตแยป แจแแ แตแแแ แ แตแแแงแแข
แ แแแแ แ แ แแต แจแจแจแณ แแฅแชแซ (Tender notice) แแญแ แ แจแจแณ แฐแแต แแตแฅ แจแฐแแแ แ แจแจแจแณ แแตแจแ แชแซ แจ 0.5% แซแแฐ แแญแ แจ2% แจแ แแ แจแแแฃ แ แจแตแแแ แแแฉ แฐแแ แจ 2,000,000 แฅแญ แจแ แแ แจแจแณแแ แแซแฐแญแ แญแฝแแแข
@etconp
๐งแ แฒแฑ แจแแแแตแต แแข แแแชแซ แจแจแจแณ แแตแจแ แชแซ แแแแฅ แ แแณแฐแแ แ แฐแแแจแฐ ยซแจแแแแตแต แ/แคแฑ แจแ แ แแ แแฅแแ แแแณแ แแ แแฐแจแต แ แแตแจแ แจ 0.5% แซแแแฐ แฅแ แจ 2% แซแแแ แแ แจแจแจแณ แแตแจแ แชแซ แจแแแแฅ แแ แ แแตแ แ แจแจแณแ แฅแชแ แฅแ แ แจแจแณ แฐแแฑ แแตแฅ แแแแ แญแแญแ แณแแกแก
แ แแ แแ แจแต แจแแแฐแแ แจแจแจแณ แแตแจแ แชแซ แแ แ แจแฅแญ 2,000,000 (แแแต แแแฎแ แฅแญ) แจแ แแ แแแ แจแแ แตแยป แจแแ แตแแแ แ แตแแแงแแข
แ แแแแ แ แ แแต แจแจแจแณ แแฅแชแซ (Tender notice) แแญแ แ แจแจแณ แฐแแต แแตแฅ แจแฐแแแ แ แจแจแจแณ แแตแจแ แชแซ แจ 0.5% แซแแฐ แแญแ แจ2% แจแ แแ แจแแแฃ แ แจแตแแแ แแแฉ แฐแแ แจ 2,000,000 แฅแญ แจแ แแ แจแจแณแแ แแซแฐแญแ แญแฝแแแข
@etconp
โค7๐7
๐Different Between Sluice Gate Vs Spillway
๐ทSluice Gate: A sluice gate is a movable gate used to control the flow of water in canals, dams, and drainage systems.
โบIt can be opened or closed manually or mechanically.
๐ทSpillway: A spillway is a fixed structure in a dam that safely releases excess water when the water level becomes too high.
๐งMain Difference:
โบSluice Gate controls and regulates water flow.
โบSpillway safely disposes of overflow water to protect the dam from damage.
@etconl
๐ทSluice Gate: A sluice gate is a movable gate used to control the flow of water in canals, dams, and drainage systems.
โบIt can be opened or closed manually or mechanically.
๐ทSpillway: A spillway is a fixed structure in a dam that safely releases excess water when the water level becomes too high.
๐งMain Difference:
โบSluice Gate controls and regulates water flow.
โบSpillway safely disposes of overflow water to protect the dam from damage.
@etconl
โค5๐5๐4๐ฅฐ2
๐Here is a comprehensive infographic detailing 8 essential laboratory tests for soil in civil and geotechnical engineering.
๐งWe break down the Purpose, step-by-step Procedure, fundamental Formulas (like Moisture Content % and Hydraulic Conductivity k), and standard Standards (ASTM and AASHTO). We also include critical visual aids like Particle Size Distribution (GSD) curves, the Soil Plasticity Chart, and Compaction/Proctor Density curves for deep classification and engineering application.
This guide is a vital reference for students and site professionals evaluating soil suitability for everything from foundations to pavements and retaining walls.
โ#CivilEngineering #GeotechnicalEngineering #SoilMechanics #SoilTesting #GeotechEngineering #ConstructionSite #MaterialsTesting #LaboratoryTests #SoilClassification #StandardProctor
#CBRTest #ASTM #AASHTO #EngineeringChecklist
@etconp
๐งWe break down the Purpose, step-by-step Procedure, fundamental Formulas (like Moisture Content % and Hydraulic Conductivity k), and standard Standards (ASTM and AASHTO). We also include critical visual aids like Particle Size Distribution (GSD) curves, the Soil Plasticity Chart, and Compaction/Proctor Density curves for deep classification and engineering application.
This guide is a vital reference for students and site professionals evaluating soil suitability for everything from foundations to pavements and retaining walls.
โ#CivilEngineering #GeotechnicalEngineering #SoilMechanics #SoilTesting #GeotechEngineering #ConstructionSite #MaterialsTesting #LaboratoryTests #SoilClassification #StandardProctor
#CBRTest #ASTM #AASHTO #EngineeringChecklist
@etconp
โค8
#ADVERTISEMENT
๐แฅแแณแ แฐแต แ แแน !๐
Purchasers แฅแ contractors แ แแฅแแต แฅแ แ แแแ suppliers แฅแแฒแซแแ แจแแซแตแฝแ construction material sourcing bot แ แแแ แฐแแแข
Bot user name: ๐
๐ @hbhbuyerbot ๐
๐
แ แแ bot แ แแซแแแตแฆ
โข Quotations แ แแฅแแต แแ แจแ
โข แจsuppliers แแ แแแณแฐแญ
โข แซแ materials แ แแแ แแแแต
โข แฅแ suppliers แ แตแแญ แจแแฐแแ แแ แแแ แฅ
แจแแแ materials แจแแจแฐแแต แแซแจแแฆ
* Rebar
* Cement
* Hollow Block
* Aggregate
* CHS/RHS Steel
* Plumbing & Electrical Materials
* And more
Step 1 : แญแแแแก
Step 2 : โNew purchase orderโแจแแแแ แ แแซแ แแฐแแแแจแฐแ แ แ แซแข PO แ แแแญ แแฅแญแถแ แซแแแฅแ
Bot user name: ๐
๐ @hbhbuyerbot ๐
๐แฅแแณแ แฐแต แ แแน !๐
Purchasers แฅแ contractors แ แแฅแแต แฅแ แ แแแ suppliers แฅแแฒแซแแ แจแแซแตแฝแ construction material sourcing bot แ แแแ แฐแแแข
Bot user name: ๐
๐ @hbhbuyerbot ๐
๐
แ แแ bot แ แแซแแแตแฆ
โข Quotations แ แแฅแแต แแ แจแ
โข แจsuppliers แแ แแแณแฐแญ
โข แซแ materials แ แแแ แแแแต
โข แฅแ suppliers แ แตแแญ แจแแฐแแ แแ แแแ แฅ
แจแแแ materials แจแแจแฐแแต แแซแจแแฆ
* Rebar
* Cement
* Hollow Block
* Aggregate
* CHS/RHS Steel
* Plumbing & Electrical Materials
* And more
Step 1 : แญแแแแก
Step 2 : โNew purchase orderโแจแแแแ แ แแซแ แแฐแแแแจแฐแ แ แ แซแข PO แ แแแญ แแฅแญแถแ แซแแแฅแ
Bot user name: ๐
๐ @hbhbuyerbot ๐
โค7
๐Detailed Explanation: Simply Supported Beam โ Maximum Deflection
๐งA simply supported beam subjected to a uniformly distributed load (UDL) bends downward, with the greatest deflection occurring at the mid-span.
๐ซThe derivation process involves several logical steps, but here Iโll explain it clearly without formulas or tables.
๐น Step-by-Step Process
1. Beam and Loading
- A beam of span \(L\) carries a uniform load across its entire length.
- The goal is to determine how much it bends at the center.
2. Support Reactions
- Since the load is uniform and the beam is symmetric, both supports carry equal reactions.
3. Bending Moment at Section
- At any point along the beam, the bending moment is calculated using equilibrium principles.
- This moment varies along the span, being maximum at the center.
4. Elastic Curve Equation
- The bending moment is related to the curvature of the beam.
- By integrating step by step, the deflection equation is obtained.
5. Boundary Conditions
- At both supports, the deflection is zero.
- These conditions help determine the constants in the deflection equation.
6. Deflection Equation
- After applying conditions, the general deflection curve of the beam is established.
7. Location of Maximum Deflection
- The slope of the deflection curve is set to zero to find where the maximum occurs.
- This point is at the mid-span of the beam.
8. Maximum Deflection
- Substituting the mid-span location into the deflection equation gives the maximum downward deflection.
- The result shows that the deflection depends on the load intensity, span length, material stiffness, and beam geometry.
๐น Engineering Insight
This derivation is essential in structural analysis.
It ensures beams are designed not only for strength but also for serviceability, meaning they donโt bend excessively under load.
๏ธ#CivilEngineering #BeamDeflection #StructuralAnalysis #UDL #MechanicsOfMaterials #EngineeringDesign
@etconp
๐งA simply supported beam subjected to a uniformly distributed load (UDL) bends downward, with the greatest deflection occurring at the mid-span.
๐ซThe derivation process involves several logical steps, but here Iโll explain it clearly without formulas or tables.
๐น Step-by-Step Process
1. Beam and Loading
- A beam of span \(L\) carries a uniform load across its entire length.
- The goal is to determine how much it bends at the center.
2. Support Reactions
- Since the load is uniform and the beam is symmetric, both supports carry equal reactions.
3. Bending Moment at Section
- At any point along the beam, the bending moment is calculated using equilibrium principles.
- This moment varies along the span, being maximum at the center.
4. Elastic Curve Equation
- The bending moment is related to the curvature of the beam.
- By integrating step by step, the deflection equation is obtained.
5. Boundary Conditions
- At both supports, the deflection is zero.
- These conditions help determine the constants in the deflection equation.
6. Deflection Equation
- After applying conditions, the general deflection curve of the beam is established.
7. Location of Maximum Deflection
- The slope of the deflection curve is set to zero to find where the maximum occurs.
- This point is at the mid-span of the beam.
8. Maximum Deflection
- Substituting the mid-span location into the deflection equation gives the maximum downward deflection.
- The result shows that the deflection depends on the load intensity, span length, material stiffness, and beam geometry.
๐น Engineering Insight
This derivation is essential in structural analysis.
It ensures beams are designed not only for strength but also for serviceability, meaning they donโt bend excessively under load.
๏ธ#CivilEngineering #BeamDeflection #StructuralAnalysis #UDL #MechanicsOfMaterials #EngineeringDesign
@etconp
โค9
๐แจแณแณแฉ แ แ-แปแซแต แคแฐแฐแฅ แ 12.5 แขแแฎแ แถแแญ แ แแแแฃแ แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแฎแแญแต แแญ แแแณแฐแ แแแฑ แฐแแแ!
แ แถแญแซแ แณแณแญ แแตแฅ แ แฃแ แตแแ แ แฐแ แจแแแต แฐแแ แซแแ แจแ แ-แธแซแต แคแฐแฐแฅ แ แ แแชแซ แแฐแจแฐ-แแแต แแญ แขแแจแตแต แแแตแจแ แฅแซแแฐ แฒแแแฃ แ แขแตแฎแตแซ แ 12.5 แขแแฎแ แถแแญ แ แแแแฃแ แจแขแพแแฑ แแแ แ แแ แ แจแญ แแจแแซ แแฎแแญแต แแญ แตแญแป แแแแฐแต แแแแ แฅแแแ แญแ แแแงแแข
แจแคแฐแฐแก แแฅแจแต แจแแแ แฉแฒแฒ แแแฒแแ แจแฐแฐแแ แฉแฃแแซ แ แขแตแฎแตแซ แจแแแแฃแ แแ แ แจแญ แแจแแซ แ แฐแจแแช แ แฒแแญแซแฒแญ แชแแฅแแญ แฎแแ แจ400 แชแ แแตแญ แ แแซ แแณแ แแแฃแณแ แจแแฎ แ แ แแชแซ แตแแแ แจแตแซแแตแแญแต แแฎแแญแถแฝ แแญ แแแณแฐแ แ แแแแข
แญแ แณแแ แจแฃแแแฅแถแฝ แคแฐแฐแฅ แ แ แณแญ 2025 แ.แ. แ แฐแซแแฐแ แจแฉแแญแตแต แตแดแตแต แแฌแแณแแต แถแแแต แตแซแแ แจแ แแ-แฒแแต แฅแ-แฅแญแแต แแญ แจแฐแแ แฅแแต แฐแฐแแญ แจแแแ แณแแ แฐแแฝ แแซแจแ แ แแฑ แแ แญแข
แจแ แฒแต แ แ แฃ แ แตแฐแฐแกแฅ แแตแซแ 40 แชแ แแตแญ แญแแต แแญ แจแแแแฃแแ แ แแ แแฒแต แ แญแญแดแญแถแฝ แฒแแญแ แจแฐแฐแจแแ แญแ แ แฒแต แ แจแญ แแจแแซแฃ แจแขแตแฎแตแซ แ แจแญ แแแแตแ แจแแฐแแต แจแ แชแฌแฝแ แแแจแแแต แแแ แแจแญ แซแแแ แ แ แแชแซ แตแแ แฅแแฐแแแ แญแ แ แแแข
แ แแแตแฎแ แจแฅแญ แแญ แแญ แจแแแแชแซ แแแซแ แแแฃแณแ แจแฐแแแจแแ 35 แตแฉแแญ แชแ แแตแญ แแฌแต แแญ แจแแซแญแแ แญแ แ แแฎแแแ แแจแแซแฃ แ แแแแชแซแ แแแซแ 60 แแแฎแ แฐแณแแชแแฝแ แจแแตแฐแแแต แ แ แ แญแแจแแแข
แจแ แจแญ แแแแฑ แแ แตแซ แ แตแแแ แ แถ แแตแแ แฃแฐแ แฅแแฐแแแนแตแฃ แ แ แแแญ แแฎแแญแฑ แฐแ แแ แฒแซแแ แ แ แแต แฅแตแจ 100 แแแฎแ แฐแณแแชแแฝแ แแตแฐแแแต แจแแฝแ แจแ แ แแชแฑ แแแ แจแตแซแแแต แแฐแแแแซ แญแแแแข
@etconp
แ แถแญแซแ แณแณแญ แแตแฅ แ แฃแ แตแแ แ แฐแ แจแแแต แฐแแ แซแแ แจแ แ-แธแซแต แคแฐแฐแฅ แ แ แแชแซ แแฐแจแฐ-แแแต แแญ แขแแจแตแต แแแตแจแ แฅแซแแฐ แฒแแแฃ แ แขแตแฎแตแซ แ 12.5 แขแแฎแ แถแแญ แ แแแแฃแ แจแขแพแแฑ แแแ แ แแ แ แจแญ แแจแแซ แแฎแแญแต แแญ แตแญแป แแแแฐแต แแแแ แฅแแแ แญแ แแแงแแข
แจแคแฐแฐแก แแฅแจแต แจแแแ แฉแฒแฒ แแแฒแแ แจแฐแฐแแ แฉแฃแแซ แ แขแตแฎแตแซ แจแแแแฃแ แแ แ แจแญ แแจแแซ แ แฐแจแแช แ แฒแแญแซแฒแญ แชแแฅแแญ แฎแแ แจ400 แชแ แแตแญ แ แแซ แแณแ แแแฃแณแ แจแแฎ แ แ แแชแซ แตแแแ แจแตแซแแตแแญแต แแฎแแญแถแฝ แแญ แแแณแฐแ แ แแแแข
แญแ แณแแ แจแฃแแแฅแถแฝ แคแฐแฐแฅ แ แ แณแญ 2025 แ.แ. แ แฐแซแแฐแ แจแฉแแญแตแต แตแดแตแต แแฌแแณแแต แถแแแต แตแซแแ แจแ แแ-แฒแแต แฅแ-แฅแญแแต แแญ แจแฐแแ แฅแแต แฐแฐแแญ แจแแแ แณแแ แฐแแฝ แแซแจแ แ แแฑ แแ แญแข
แจแ แฒแต แ แ แฃ แ แตแฐแฐแกแฅ แแตแซแ 40 แชแ แแตแญ แญแแต แแญ แจแแแแฃแแ แ แแ แแฒแต แ แญแญแดแญแถแฝ แฒแแญแ แจแฐแฐแจแแ แญแ แ แฒแต แ แจแญ แแจแแซแฃ แจแขแตแฎแตแซ แ แจแญ แแแแตแ แจแแฐแแต แจแ แชแฌแฝแ แแแจแแแต แแแ แแจแญ แซแแแ แ แ แแชแซ แตแแ แฅแแฐแแแ แญแ แ แแแข
แ แแแตแฎแ แจแฅแญ แแญ แแญ แจแแแแชแซ แแแซแ แแแฃแณแ แจแฐแแแจแแ 35 แตแฉแแญ แชแ แแตแญ แแฌแต แแญ แจแแซแญแแ แญแ แ แแฎแแแ แแจแแซแฃ แ แแแแชแซแ แแแซแ 60 แแแฎแ แฐแณแแชแแฝแ แจแแตแฐแแแต แ แ แ แญแแจแแแข
แจแ แจแญ แแแแฑ แแ แตแซ แ แตแแแ แ แถ แแตแแ แฃแฐแ แฅแแฐแแแนแตแฃ แ แ แแแญ แแฎแแญแฑ แฐแ แแ แฒแซแแ แ แ แแต แฅแตแจ 100 แแแฎแ แฐแณแแชแแฝแ แแตแฐแแแต แจแแฝแ แจแ แ แแชแฑ แแแ แจแตแซแแแต แแฐแแแแซ แญแแแแข
@etconp
โค10
๐แจแแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แแแแแฝ แแแตแ แแธแ?
โถ๏ธ แจแแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แแ แแแ แจแแแแตแต แแช แแแ แแแตแ แฅแแฒแฐแแ แแตแจแ แฅแ แจแแแแตแต แแแแฅ แฐแแฃแฃแ แแ (Value for Money) แฅแแฒแซแแ แแตแปแ แแแกแก
แญแ แ แฅแแฒแ แฅแแณแ แแแฝ แแญแแญ แแแแแฝ แญแแฉแณแแกแก แฅแแแ แ แจแแแแตแตแ แแฅแต แ แฅแแต แแ แแแ แแ แจแณแณแตแฃ แ แซแฃแขแ แแ แ แ แฃ แแ แ แซแ แแตแแแแตแ แฅแ แจแฐแฅแ แ แแฅแถแฝแ แแฐแแแฃ แแแ แจแขแฎแแ แแตแแตแ แแ แจแณแณแตแฃ แแแฝแแตแ แฅแ แฐแ แซแแแตแ แแ แแจแญแฃ แแ แซแ แฅแ แ แจแแแด แดแญแแแแแฝแ แแ แจแณแณแตแฃ แแแญ แ แแ แฐแแแตแ แฅแ แ แแตแฐแ แตแญแ แถแฝแ แแฐแแ แฅแ แแแฝ แฐแซแซแฅ แแณแฎแฝแ แแ แแฑ แญแฝแแแกแก
โถ๏ธ แตแแแแ แญแ แจแแฅ แตแญแแต แจแแแแตแต แฐแแแต แจแแ แแแต แแแแฝแ แฅแ แ แแแแแถแฝแ แแแแแต แฅแป แณแญแแ แฐแ แซแ แจแฅแแซแ แแแต แแฆแฝแแ แแแณแซแต แญแแญ แฅแแฐแแ แจแแซแตแแแแฅ แแแข แ แแแแต แจแแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แแณแฎแฝแ แณแณแข แซแฐแจแ แแแข
แแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แฆแตแต แแ แแ แแณแฎแฝแ แณแณแข แซแฐแจแ แแ แฒแฃแ แแ แแแต แแ?
โถ๏ธ แแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แจแ แแต แ แ แฃแซ แฅแป แจแแณแญ แ แญแฐแแแกแก
แแแตแ แแฅแแ แแแแธแ แแ แฐแ แแแ แฅแแฐ แแตแแจแต แแแฐแต แ แ แ แญแฐแแแค แจแฅแแแ แฅแซแตแ แฅแแฐ แแฅ แแตแแญแต แแตแถ แแฅแแ แแแธแ แ แ แ แญแฐแแแกแก แญแแแแ แแฅแแ แแแแธแ แจแแญ แจแแแธแแธแ แแตแแญแถแฝ แ แฐแจแแช แซแแแ แขแฎแแแซแ แ แแแณแฃ แ แ แซแฃแข แแญ แฐแฝแแ แจแแซแณแตแญ แแแแฃ แแ แ แซแ แ แแแแแต แแญ แซแแ แ แตแฐแแฝแแฃ แ แจแแแด แแแตแ แแตแแ แจแแซแตแฝแ แแแแ แแแฝ แแฐแ แแตแแญแถแฝ แจแแแต แแตแฅ แจแแแก แแธแแกแก แ แแญแแญ แแแแแจแต แซแ แแฆ
โถ๏ธ แจแขแฎแแ แแแแแต (Economic sustainability)แฆ แจแขแฎแแ แแแแแต แ แแญแถแฝ แฅแ แ แ แแแแแถแฝ แจแ แญแแต แแฐแต แแตแฅ แแฐแจแแแ แแแแฅ แฐแแฃแฃแ แแ (Value for Money) แแจแแแฅ แแญ แซแฐแฉแซแแข
แญแ แ แจแแช แแคแณแแแตแ (Cost efficiency)แฃ แจแฅแซแต แแปแปแซแ (Quality improvement)แฃ แแแแแตแ (Durability)แฃ แจแฅแแ แแช แแแแตแ (Reduction of maintenance costs) แฅแ แจแจแ แ แแ แจแแญแแแต แแ แฃแ (Long-term financial savings) แแฐแจแต แซแฐแจแ แแแกแก
แตแแแแ แ แแ แแฐแต แแตแฅ แจแแฅ แฃแแแซแแฝ แจแแแฃ แแ แแญ แฅแป แ แซแฐแฉแฉแ แญแแแแ แจแแแฃ แแแ แ แฐแจแแช แจแฅแซ แแตแฌแ แแชแแฝแแฃ แจแฅแแ แแชแแฝแ แฅแ แจแแตแแแ แแชแแฝแแ แแแแคแ แแตแฅ แซแตแแฃแแข
โถ๏ธ แจแ แซแฃแข แแแแแต (Environmental sustainability)แก- แจแ แซแฃแข แแแแแต แจแแฅ แแฐแถแฝ แแฅแ แ แ แซแฃแข แแญ แจแแซแตแจแตแแแ แ แแณแ แฐแ แแ แแแแต แแญ แซแฐแฉแซแแข แจแแญ แแแแแฝ แฅแแฐแแจแญแแ แจแแแ แแฅแแฝ แ แ แซแฃแข แแญ แฅแญแแตแ แจแแซแตแจแตแ แแแแธแ แแจแแแฅ แญแแญแ แณแแกแก
แญแ แ แตแแ แจแแแ แแญแถแฝ แฅแญแแตแ แจแแแแฑแฃ แแญแแ แจแแแฅแกแฃ แฅแแฐแแ แฅแ แ แแญ แแแ แจแแฝแ แแณแแถแฝแ แจแแ แแแฃ แจแแชแ แแแต แแแฝแ แจแแแแฑ แฅแ แณแณแฝ แแญแแ แจแแซแ แจแณแฑ แแแแธแ แแแแค แแตแฅ แแแฃแต แญแแญแ แณแแกแก
แแญแแซแฑแ แจแ แซแฃแข แฐแตแแ แแฅ (Environmental Sustainability Procurement) แจแ แจแญ แแฅแจแต แแแฅแ แแแแแต แฅแ แจแฐแแฅแฎ แแฅแถแฝแ แแแ แ แ แ แตแฐแแ แฆ แซแฐแญแแแข
โถ๏ธ แแ แ แซแ แแแแแต (Social Sustainability):- แแ แ แซแ แแแแแต แจแแ แ แซแ แฐแ แแแตแ แแแปแปแ แฅแ แฅแ-แแแฃแซแ แจแแแต แ แ แซแฎแฝ แแจแแแฅ แแญ แจแแซแฐแฉแญ แฒแแ แแตแแ แจแฅแซ แแแถแฝแฃ แจแฐแฅแ แ แแฅแถแฝ แฅแ แแฃ แจแฅแซ แฆแณ แฐแ แแแตแฃ แจแแณ แฅแฉแแแตแฃ แจแฅแซ แแตแ แแ แซ แฅแ แแฐแแแญ แกแตแแฝ แตแแ แแตแ แตแ แจแแซแ แจแณแณ แแแกแก
@etconp
โถ๏ธ แจแแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แแ แแแ แจแแแแตแต แแช แแแ แแแตแ แฅแแฒแฐแแ แแตแจแ แฅแ แจแแแแตแต แแแแฅ แฐแแฃแฃแ แแ (Value for Money) แฅแแฒแซแแ แแตแปแ แแแกแก
แญแ แ แฅแแฒแ แฅแแณแ แแแฝ แแญแแญ แแแแแฝ แญแแฉแณแแกแก แฅแแแ แ แจแแแแตแตแ แแฅแต แ แฅแแต แแ แแแ แแ แจแณแณแตแฃ แ แซแฃแขแ แแ แ แ แฃ แแ แ แซแ แแตแแแแตแ แฅแ แจแฐแฅแ แ แแฅแถแฝแ แแฐแแแฃ แแแ แจแขแฎแแ แแตแแตแ แแ แจแณแณแตแฃ แแแฝแแตแ แฅแ แฐแ แซแแแตแ แแ แแจแญแฃ แแ แซแ แฅแ แ แจแแแด แดแญแแแแแฝแ แแ แจแณแณแตแฃ แแแญ แ แแ แฐแแแตแ แฅแ แ แแตแฐแ แตแญแ แถแฝแ แแฐแแ แฅแ แแแฝ แฐแซแซแฅ แแณแฎแฝแ แแ แแฑ แญแฝแแแกแก
โถ๏ธ แตแแแแ แญแ แจแแฅ แตแญแแต แจแแแแตแต แฐแแแต แจแแ แแแต แแแแฝแ แฅแ แ แแแแแถแฝแ แแแแแต แฅแป แณแญแแ แฐแ แซแ แจแฅแแซแ แแแต แแฆแฝแแ แแแณแซแต แญแแญ แฅแแฐแแ แจแแซแตแแแแฅ แแแข แ แแแแต แจแแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แแณแฎแฝแ แณแณแข แซแฐแจแ แแแข
แแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แฆแตแต แแ แแ แแณแฎแฝแ แณแณแข แซแฐแจแ แแ แฒแฃแ แแ แแแต แแ?
โถ๏ธ แแแ แจแแแแตแต แแฅ (Sustainable Public Procurement) แจแ แแต แ แ แฃแซ แฅแป แจแแณแญ แ แญแฐแแแกแก
แแแตแ แแฅแแ แแแแธแ แแ แฐแ แแแ แฅแแฐ แแตแแจแต แแแฐแต แ แ แ แญแฐแแแค แจแฅแแแ แฅแซแตแ แฅแแฐ แแฅ แแตแแญแต แแตแถ แแฅแแ แแแธแ แ แ แ แญแฐแแแกแก แญแแแแ แแฅแแ แแแแธแ แจแแญ แจแแแธแแธแ แแตแแญแถแฝ แ แฐแจแแช แซแแแ แขแฎแแแซแ แ แแแณแฃ แ แ แซแฃแข แแญ แฐแฝแแ แจแแซแณแตแญ แแแแฃ แแ แ แซแ แ แแแแแต แแญ แซแแ แ แตแฐแแฝแแฃ แ แจแแแด แแแตแ แแตแแ แจแแซแตแฝแ แแแแ แแแฝ แแฐแ แแตแแญแถแฝ แจแแแต แแตแฅ แจแแแก แแธแแกแก แ แแญแแญ แแแแแจแต แซแ แแฆ
โถ๏ธ แจแขแฎแแ แแแแแต (Economic sustainability)แฆ แจแขแฎแแ แแแแแต แ แแญแถแฝ แฅแ แ แ แแแแแถแฝ แจแ แญแแต แแฐแต แแตแฅ แแฐแจแแแ แแแแฅ แฐแแฃแฃแ แแ (Value for Money) แแจแแแฅ แแญ แซแฐแฉแซแแข
แญแ แ แจแแช แแคแณแแแตแ (Cost efficiency)แฃ แจแฅแซแต แแปแปแซแ (Quality improvement)แฃ แแแแแตแ (Durability)แฃ แจแฅแแ แแช แแแแตแ (Reduction of maintenance costs) แฅแ แจแจแ แ แแ แจแแญแแแต แแ แฃแ (Long-term financial savings) แแฐแจแต แซแฐแจแ แแแกแก
แตแแแแ แ แแ แแฐแต แแตแฅ แจแแฅ แฃแแแซแแฝ แจแแแฃ แแ แแญ แฅแป แ แซแฐแฉแฉแ แญแแแแ แจแแแฃ แแแ แ แฐแจแแช แจแฅแซ แแตแฌแ แแชแแฝแแฃ แจแฅแแ แแชแแฝแ แฅแ แจแแตแแแ แแชแแฝแแ แแแแคแ แแตแฅ แซแตแแฃแแข
โถ๏ธ แจแ แซแฃแข แแแแแต (Environmental sustainability)แก- แจแ แซแฃแข แแแแแต แจแแฅ แแฐแถแฝ แแฅแ แ แ แซแฃแข แแญ แจแแซแตแจแตแแแ แ แแณแ แฐแ แแ แแแแต แแญ แซแฐแฉแซแแข แจแแญ แแแแแฝ แฅแแฐแแจแญแแ แจแแแ แแฅแแฝ แ แ แซแฃแข แแญ แฅแญแแตแ แจแแซแตแจแตแ แแแแธแ แแจแแแฅ แญแแญแ แณแแกแก
แญแ แ แตแแ แจแแแ แแญแถแฝ แฅแญแแตแ แจแแแแฑแฃ แแญแแ แจแแแฅแกแฃ แฅแแฐแแ แฅแ แ แแญ แแแ แจแแฝแ แแณแแถแฝแ แจแแ แแแฃ แจแแชแ แแแต แแแฝแ แจแแแแฑ แฅแ แณแณแฝ แแญแแ แจแแซแ แจแณแฑ แแแแธแ แแแแค แแตแฅ แแแฃแต แญแแญแ แณแแกแก
แแญแแซแฑแ แจแ แซแฃแข แฐแตแแ แแฅ (Environmental Sustainability Procurement) แจแ แจแญ แแฅแจแต แแแฅแ แแแแแต แฅแ แจแฐแแฅแฎ แแฅแถแฝแ แแแ แ แ แ แตแฐแแ แฆ แซแฐแญแแแข
โถ๏ธ แแ แ แซแ แแแแแต (Social Sustainability):- แแ แ แซแ แแแแแต แจแแ แ แซแ แฐแ แแแตแ แแแปแปแ แฅแ แฅแ-แแแฃแซแ แจแแแต แ แ แซแฎแฝ แแจแแแฅ แแญ แจแแซแฐแฉแญ แฒแแ แแตแแ แจแฅแซ แแแถแฝแฃ แจแฐแฅแ แ แแฅแถแฝ แฅแ แแฃ แจแฅแซ แฆแณ แฐแ แแแตแฃ แจแแณ แฅแฉแแแตแฃ แจแฅแซ แแตแ แแ แซ แฅแ แแฐแแแญ แกแตแแฝ แตแแ แแตแ แตแ แจแแซแ แจแณแณ แแแกแก
@etconp
โค7๐3