๐ชงHigh-rise buildings demand an extraordinary level of precision.
Unlike low-rise structures, where errors may be easier to detect and correct, dimensional inaccuracies in tall buildings can multiply from floor to floor. A few millimeters of deviation in one location can eventually affect the alignment and functionality of the entire structure.
Surveyors help prevent this through effective dimensional control.
The process begins with the establishment of accurate survey control points. These fixed reference points, with known coordinates and elevations, form the measurement framework for the entire project. Every setting-out activity and verification check depends on this control network.
Using Total Stations and other precision instruments, surveyors transfer approved design dimensions from drawings onto the construction site. Structural grids, column centerlines, wall locations, beam positions, slab edges, and service openings are marked out exactly as designed.
However, dimensional control does not end after setting-out.
As the building rises, surveyors continuously transfer coordinates and reference levels from lower floors to upper levels. This ensures that each new floor maintains the same dimensional accuracy established at the foundation stage.
Routine verification is equally important.
Surveyors regularly check distances, offsets, widths, lengths, and alignments before and after major construction activities. These inspections help identify deviations early, allowing corrections to be made before subsequent works depend on them.
Dimensional control also improves coordination between different trades.
Architectural finishes, mechanical systems, electrical installations, plumbing services, elevators, and faรงade components all rely on accurately constructed spaces. When dimensions are maintained correctly, these systems fit together as intended, reducing delays and rework.
Surveyors also monitor construction tolerances.
Concrete movement, formwork displacement, material variations, and workmanship differences can all affect dimensions. By tracking these tolerances throughout the project, surveyors help ensure that the structure remains within acceptable limits.
In high-rise projects, vertical transfer accuracy is particularly critical.
Repeated dimensional checks help maintain consistency between floors, ensuring that columns align properly, walls remain true to the grid, and openings retain their specified sizes and locations.
Modern surveying technologies have significantly improved the speed and precision of these tasks. Yet technology alone cannot guarantee success.
Reliable dimensional control depends on stable control points, disciplined procedures, repeated verification, and experienced surveyors who understand that accuracy is built through consistency.
Because high-rise construction is not simply about reaching greater heights.
It is about maintaining precision at every level.
A dimension overlooked today can become a major problem tomorrow.
In reality, the seamless appearance and functionality of tall buildings often result from thousands of measurements that most people never notice.
Behind every properly fitting faรงade panel, aligned corridor, and accurately positioned structural element is a surveyor ensuring that every dimension remains true to the original design.
๐งทHere is something to think about:
If a few millimeters of dimensional error can multiply across dozens of floors, how important is continuous dimensional control in ensuring that high-rise buildings remain safe, functional, and true to their design?
#Surveying #HighRiseConstruction #DimensionalControl #ConstructionSurveying #Engineering@ETCONp
@etconp
๐ชงHigh-rise buildings demand an extraordinary level of precision.
Unlike low-rise structures, where errors may be easier to detect and correct, dimensional inaccuracies in tall buildings can multiply from floor to floor. A few millimeters of deviation in one location can eventually affect the alignment and functionality of the entire structure.
Surveyors help prevent this through effective dimensional control.
The process begins with the establishment of accurate survey control points. These fixed reference points, with known coordinates and elevations, form the measurement framework for the entire project. Every setting-out activity and verification check depends on this control network.
Using Total Stations and other precision instruments, surveyors transfer approved design dimensions from drawings onto the construction site. Structural grids, column centerlines, wall locations, beam positions, slab edges, and service openings are marked out exactly as designed.
However, dimensional control does not end after setting-out.
As the building rises, surveyors continuously transfer coordinates and reference levels from lower floors to upper levels. This ensures that each new floor maintains the same dimensional accuracy established at the foundation stage.
Routine verification is equally important.
Surveyors regularly check distances, offsets, widths, lengths, and alignments before and after major construction activities. These inspections help identify deviations early, allowing corrections to be made before subsequent works depend on them.
Dimensional control also improves coordination between different trades.
Architectural finishes, mechanical systems, electrical installations, plumbing services, elevators, and faรงade components all rely on accurately constructed spaces. When dimensions are maintained correctly, these systems fit together as intended, reducing delays and rework.
Surveyors also monitor construction tolerances.
Concrete movement, formwork displacement, material variations, and workmanship differences can all affect dimensions. By tracking these tolerances throughout the project, surveyors help ensure that the structure remains within acceptable limits.
In high-rise projects, vertical transfer accuracy is particularly critical.
Repeated dimensional checks help maintain consistency between floors, ensuring that columns align properly, walls remain true to the grid, and openings retain their specified sizes and locations.
Modern surveying technologies have significantly improved the speed and precision of these tasks. Yet technology alone cannot guarantee success.
Reliable dimensional control depends on stable control points, disciplined procedures, repeated verification, and experienced surveyors who understand that accuracy is built through consistency.
Because high-rise construction is not simply about reaching greater heights.
It is about maintaining precision at every level.
A dimension overlooked today can become a major problem tomorrow.
In reality, the seamless appearance and functionality of tall buildings often result from thousands of measurements that most people never notice.
Behind every properly fitting faรงade panel, aligned corridor, and accurately positioned structural element is a surveyor ensuring that every dimension remains true to the original design.
๐งทHere is something to think about:
If a few millimeters of dimensional error can multiply across dozens of floors, how important is continuous dimensional control in ensuring that high-rise buildings remain safe, functional, and true to their design?
#Surveying #HighRiseConstruction #DimensionalControl #ConstructionSurveying #Engineering@ETCONp
@etconp
โค12๐3๐1
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแปแฝแ
๐ชง4แ แแญ แฆแแแญแ แตแแ แแแปแฝแ แแแแฃ แแแจแแ
โแญแจแแต แฅแแแตแ แฅแ แแซแ แแณแ แญ แญแแแแ?
๐ซแฅแแแตแซแแต แจ ETABS แฅแ QUANTITY SURVEYING แแ แฆแแแญแ แฎแญแต แ 25 % แ แแฝ แแแแฃ แแแจแแ แฅแแฒแแ แแแฑแ แฎแญแถแฝ แ แ แแต แแญ แแแแตแฑ แจ แฅแซแแณแแฑ แจ 40% แ แแฝ แญแฐแจแแแนแแ๐
๐ฉแแแแแแฅ @Philemona7 แญแแแแ แแญแ แแ แแ แแจแ แ 0925446661 แญแฐแแแแโค๏ธ
@etconp
๐ชง4แ แแญ แฆแแแญแ แตแแ แแแปแฝแ แแแแฃ แแแจแแ
โแญแจแแต แฅแแแตแ แฅแ แแซแ แแณแ แญ แญแแแแ?
๐ซแฅแแแตแซแแต แจ ETABS แฅแ QUANTITY SURVEYING แแ แฆแแแญแ แฎแญแต แ 25 % แ แแฝ แแแแฃ แแแจแแ แฅแแฒแแ แแแฑแ แฎแญแถแฝ แ แ แแต แแญ แแแแตแฑ แจ แฅแซแแณแแฑ แจ 40% แ แแฝ แญแฐแจแแแนแแ๐
๐ฉแแแแแแฅ @Philemona7 แญแแแแ แแญแ แแ แแ แแจแ แ 0925446661 แญแฐแแแแโค๏ธ
@etconp
๐5โค3๐2
๐แจแฃแแญ แณแญ แตแณแฒแจแแ แแแญแ แจแ แแชแซ แแแซ แแฃแชแซ แจแแณ แแแตแจแต แฅแจแฐแ แซ แแแกแก
แ แขแตแฎแฝแซ แจแซแแ แแแแ แจแแซแแ แตแณแฒแจแ แ แแฅแแฑ แจแขแตแฎแตแซ แฅแแซแ แกแตแ แ แแแญ แแตแฅ แแตแจแ แจแแแฃแแ แจแแณ แจแแแฉ แแญ แแแตแจแ แฐแแตแทแแข
แจแขแตแฎแตแซ แฅแแซแ แกแตแแ แแฐ แแแญ แแแแแต แตแณแตแฌแ แแแฃแณ แแญ แ แตแฉแจแต แฅแจแฐแ แซ แแแข
แฅแจแฐแแแก แจแแแ แตแณแตแฌแแฝ แแซแจแ แจแฃแแญ แณแญ แแแ แแแ แตแณแฒแจแ แ แแฐแแ แแแข
แตแณแฒแจแ แ แแ แแญ แจแซแแ แแตแแญแต แ แแแถ แจแแณแแฝแ แแแตแฐแแแต แซแ แแญ แฐแญแทแแกแก
แจแ แแซ แญแแ แฃแแแฃ แฑแชแแ แฅแ แตแแญแต แขแฎ แแญแตแ แแแ แแปแ แฐแแฃ แฐแณแฒแจแ 90 แ แแถ แแแฃแณแ แแ แแแแ แ แตแจแตแฐแแแกแก
แแณแ แซแ แจแฐแ แแ แ แตแฐแซแจแต แ แแจแฐแ แจแแซแแป แแณ แณแญแค แจแญแฅแญ แฅแแแถแฝ แแแแซแค แจแฐแซแแพแฝ แแแ แป แญแแแฃ แจแแณแ แแฅแซแถแฝ แฅแ แแแฝ แฅแซแแฝ แฐแจแแธแแ แจแ แ แ แพแแ แฐแแแ แฐแแ แแ แซแแตแข
แแณแ แ แแ แฃแแ แจแแแฃแณ แแฅแแต แจแแ แ แ แแญแ แแตแจแจแ แแแแจแ แจแ แแจแซ แแแซ แแฃแชแซ แจแแณ แญแฐแญแณแ แแ แจแฐแฃแแแกแก
แจแซแ แแแแ แกแตแแ แจแตแณแฒแจแแ แฅแซ แญแแ แแ แฐแฅแแ แญแ แ แแแข
แตแณแฒแจแ แฒแ แแแ แแฅ แจแพแแฝแ แฃแแญ แณแญ แจแฐแ แซแแต แตแแแต แ แฐแจแแช แจแฑแชแตแต แแณแจแป แฅแ แจแตแแญแฑ แฑแชแแ แแแจแ แฅแแฐแแซแฐแญแแต แแแธแแแข
Via แ แแฎ
@etconp
แ แขแตแฎแฝแซ แจแซแแ แแแแ แจแแซแแ แตแณแฒแจแ แ แแฅแแฑ แจแขแตแฎแตแซ แฅแแซแ แกแตแ แ แแแญ แแตแฅ แแตแจแ แจแแแฃแแ แจแแณ แจแแแฉ แแญ แแแตแจแ แฐแแตแทแแข
แจแขแตแฎแตแซ แฅแแซแ แกแตแแ แแฐ แแแญ แแแแแต แตแณแตแฌแ แแแฃแณ แแญ แ แตแฉแจแต แฅแจแฐแ แซ แแแข
แฅแจแฐแแแก แจแแแ แตแณแตแฌแแฝ แแซแจแ แจแฃแแญ แณแญ แแแ แแแ แตแณแฒแจแ แ แแฐแแ แแแข
แตแณแฒแจแ แ แแ แแญ แจแซแแ แแตแแญแต แ แแแถ แจแแณแแฝแ แแแตแฐแแแต แซแ แแญ แฐแญแทแแกแก
แจแ แแซ แญแแ แฃแแแฃ แฑแชแแ แฅแ แตแแญแต แขแฎ แแญแตแ แแแ แแปแ แฐแแฃ แฐแณแฒแจแ 90 แ แแถ แแแฃแณแ แแ แแแแ แ แตแจแตแฐแแแกแก
แแณแ แซแ แจแฐแ แแ แ แตแฐแซแจแต แ แแจแฐแ แจแแซแแป แแณ แณแญแค แจแญแฅแญ แฅแแแถแฝ แแแแซแค แจแฐแซแแพแฝ แแแ แป แญแแแฃ แจแแณแ แแฅแซแถแฝ แฅแ แแแฝ แฅแซแแฝ แฐแจแแธแแ แจแ แ แ แพแแ แฐแแแ แฐแแ แแ แซแแตแข
แแณแ แ แแ แฃแแ แจแแแฃแณ แแฅแแต แจแแ แ แ แแญแ แแตแจแจแ แแแแจแ แจแ แแจแซ แแแซ แแฃแชแซ แจแแณ แญแฐแญแณแ แแ แจแฐแฃแแแกแก
แจแซแ แแแแ แกแตแแ แจแตแณแฒแจแแ แฅแซ แญแแ แแ แฐแฅแแ แญแ แ แแแข
แตแณแฒแจแ แฒแ แแแ แแฅ แจแพแแฝแ แฃแแญ แณแญ แจแฐแ แซแแต แตแแแต แ แฐแจแแช แจแฑแชแตแต แแณแจแป แฅแ แจแตแแญแฑ แฑแชแแ แแแจแ แฅแแฐแแซแฐแญแแต แแแธแแแข
Via แ แแฎ
@etconp
โค7๐1
๐Strategic Project Planning: The Secret Behind Every Successful Project
๐A project without a strategy is just a collection of tasks.
๐ชงStrategic Project Planning helps teams align goals, resources, timelines, and risks to achieve maximum project success.
๐From defining objectives to tracking performance, every step matters in delivering projects on time, within budget, and with lasting impact.
@etconp
๐A project without a strategy is just a collection of tasks.
๐ชงStrategic Project Planning helps teams align goals, resources, timelines, and risks to achieve maximum project success.
๐From defining objectives to tracking performance, every step matters in delivering projects on time, within budget, and with lasting impact.
@etconp
โค7๐5
๐Hidden costs in construction
1. Change orders.
2. Permitting and regulatory fees.
3. Site preparation and soil issues.
4. Labor costs.
5. Material price fluctuations.
6. Equipment rental and maintenance.
7. Insurance and bonding.
8. Project management and administrative costs.
9. Utility connection fees.
10. Delays and liquidated damages.
11. Waste management and disposal.
12. Contingency funds.
13. Training and safety programs.
14. Final touches and Punch list items.
๐Please Subscribe Our Youtube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
1. Change orders.
2. Permitting and regulatory fees.
3. Site preparation and soil issues.
4. Labor costs.
5. Material price fluctuations.
6. Equipment rental and maintenance.
7. Insurance and bonding.
8. Project management and administrative costs.
9. Utility connection fees.
10. Delays and liquidated damages.
11. Waste management and disposal.
12. Contingency funds.
13. Training and safety programs.
14. Final touches and Punch list items.
๐Please Subscribe Our Youtube Channel๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค11๐3๐ฅฐ2
๐In civil engineering, soils are classified based on grain size, composition, and engineering behavior.
๐ชงEach soil type has different construction properties that affect foundation design, stability, and load-bearing capacity.
๐๏ธ Major Soil Types & Their Construction Properties
1. Gravel (Coarse-Grained Soil)
Particle size: > 4.75 mm
Drainage: Excellent
Strength: Very high shear strength
Compressibility: Very low
Construction use:
Best for foundations
Road base material
High load-bearing capacity
2. Sand (Coarse-Grained Soil)
Particle size: 0.075 โ 4.75 mm
Drainage: Good
Strength: Medium to high (depends on compaction)
Compressibility: Low
Construction use:
Backfilling
Pavement layers
Good for shallow foundations (if compacted)
3. Silt (Fine-Grained Soil)
Particle size: 0.002 โ 0.075 mm
Drainage: Poor
Strength: Low to medium
Compressibility: Moderate
Construction use:
Not ideal for heavy structures
Needs stabilization or mixing
Prone to settlement and water retention
4. Clay (Very Fine-Grained Soil)
Particle size: < 0.002 mm
Drainage: Very poor
Strength: Low when wet, high when dry
Compressibility: High
Construction use:
Requires special foundation design
Swelling/shrinkage issues
Used after soil improvement (lime/cement stabilization)
5. Organic Soil (Peat)
Composition: Decomposed plant material
Drainage: Variable but weak structure
Strength: Very low
Compressibility: Very high
Construction use:
Not suitable for construction
Must be removed or replaced
โ๏ธ Key Engineering Properties (Important in Construction)
In geotechnical engineering, soil performance is judged by:
Bearing capacity (ability to support load)
Permeability (water flow through soil)
Compaction characteristics
Shear strength
Plasticity & shrink-swell behavior
Settlement potential
๐ Summary
Gravel & sand = good for construction
Silt = moderate, needs care
Clay = problematic, needs treatment
Organic soil = avoid for structures
If you want, I can also give you:
Soil classification chart (USCS / AASHTO)
๐Here are some relevant hashtags for Soil Types & Construction Properties ๐ทโโ๏ธ
#SoilEngineering #GeotechnicalEngineering #CivilEngineering #SoilTypes #ConstructionMaterials #FoundationEngineering #SiteEngineering #BuildingConstruction #EngineeringStudents #ConstructionKnowledge #SoilMechanics #CivilNotes #LearnEngineering #EngineeringBasics #ConstructionSite #EngineeringLife #SoilTesting #FieldWork #StructuralEngineering #EngineeringEducation
@etconp
๐ชงEach soil type has different construction properties that affect foundation design, stability, and load-bearing capacity.
๐๏ธ Major Soil Types & Their Construction Properties
1. Gravel (Coarse-Grained Soil)
Particle size: > 4.75 mm
Drainage: Excellent
Strength: Very high shear strength
Compressibility: Very low
Construction use:
Best for foundations
Road base material
High load-bearing capacity
2. Sand (Coarse-Grained Soil)
Particle size: 0.075 โ 4.75 mm
Drainage: Good
Strength: Medium to high (depends on compaction)
Compressibility: Low
Construction use:
Backfilling
Pavement layers
Good for shallow foundations (if compacted)
3. Silt (Fine-Grained Soil)
Particle size: 0.002 โ 0.075 mm
Drainage: Poor
Strength: Low to medium
Compressibility: Moderate
Construction use:
Not ideal for heavy structures
Needs stabilization or mixing
Prone to settlement and water retention
4. Clay (Very Fine-Grained Soil)
Particle size: < 0.002 mm
Drainage: Very poor
Strength: Low when wet, high when dry
Compressibility: High
Construction use:
Requires special foundation design
Swelling/shrinkage issues
Used after soil improvement (lime/cement stabilization)
5. Organic Soil (Peat)
Composition: Decomposed plant material
Drainage: Variable but weak structure
Strength: Very low
Compressibility: Very high
Construction use:
Not suitable for construction
Must be removed or replaced
โ๏ธ Key Engineering Properties (Important in Construction)
In geotechnical engineering, soil performance is judged by:
Bearing capacity (ability to support load)
Permeability (water flow through soil)
Compaction characteristics
Shear strength
Plasticity & shrink-swell behavior
Settlement potential
๐ Summary
Gravel & sand = good for construction
Silt = moderate, needs care
Clay = problematic, needs treatment
Organic soil = avoid for structures
If you want, I can also give you:
Soil classification chart (USCS / AASHTO)
๐Here are some relevant hashtags for Soil Types & Construction Properties ๐ทโโ๏ธ
#SoilEngineering #GeotechnicalEngineering #CivilEngineering #SoilTypes #ConstructionMaterials #FoundationEngineering #SiteEngineering #BuildingConstruction #EngineeringStudents #ConstructionKnowledge #SoilMechanics #CivilNotes #LearnEngineering #EngineeringBasics #ConstructionSite #EngineeringLife #SoilTesting #FieldWork #StructuralEngineering #EngineeringEducation
@etconp
โค13๐4๐ฅ1
๐ง๐๐ ๐ฝ๐ ๐๐๐๐๐พ๐๐๐๐ ๐พ๐๐๐๐๐พ ๐บ๐ผ๐ผ๐๐๐บ๐๐พ ๐ฟ๐
๐๐๐ ๐บ๐
๐๐๐๐๐พ๐๐ ๐๐๐๐๐๐๐๐๐๐ ๐๐๐พ ๐ผ๐๐๐๐๐๐๐ผ๐๐๐๐ ๐๐ฟ ๐๐๐๐-๐๐๐๐พ ๐ป๐๐๐
๐ฝ๐๐๐๐?
In high-rise construction, accuracy is not achieved once and forgotten.
It must be maintained continuously from the foundation to the highest floor. Every slab cast, every column erected, and every wall constructed depends on the accuracy of the levels and alignments established before it.
A slight error on one floor may appear insignificant. But when repeated over dozens of storeys, that small deviation can result in misaligned walls, uneven floors, poorly fitting doors and windows, elevator shaft problems, service clashes, and expensive corrective work.
This is why surveyors play such a critical role in ensuring accurate floor alignment throughout the construction process.
The process begins with the establishment of reliable survey control points.
Surveyors create a stable horizontal and vertical control network tied to the approved project coordinates and elevations. These control points become the permanent reference framework for all setting-out and verification activities carried out during construction.
Using precision instruments such as Total Stations and digital leveling equipment, surveyors transfer gridlines, coordinates, and reference levels onto each floor. This ensures that every structural element is positioned according to the approved design.
Coordinate transfer is one of the most important aspects of maintaining floor alignment.
As the building rises, surveyors accurately transfer positions and elevations from lower floors to upper levels using established control procedures. This helps ensure that each new floor remains consistent with the original building geometry.
Level control is equally essential.
Surveyors verify slab elevations, beam levels, and finished floor heights before and after major construction activities. These checks ensure that floors remain level and that variations do not accumulate as the structure progresses upward.
Continuous verification further strengthens accuracy.
Surveyors routinely inspect dimensions, offsets, centerlines, and vertical alignment to confirm that construction remains within specified tolerances. Any deviation detected is addressed early before subsequent work depends on it.
This attention to detail also benefits other disciplines.
Architectural finishes rely on straight and level surfaces. Staircases require consistent riser heights and landings. Elevator shafts must remain aligned from the lowest floor to the highest level. Mechanical, electrical, and plumbing systems depend on accurately positioned openings and service routes.
Floor alignment therefore affects not only appearance but also functionality and structural efficiency.
Environmental influences such as temperature changes, wind effects, and construction loading can also impact measurements in tall structures. Surveyors account for these factors through careful observation procedures and repeated checks throughout the project lifecycle.
Modern technologies have significantly improved the speed and precision of floor alignment operations.
However, even the most advanced equipment cannot guarantee success without proper procedures, stable control networks, and experienced professionals who understand the importance of measurement discipline.
Because a high-rise building is not built as one complete structure.
It is built floor by floor, with each level depending on the accuracy of the one before it.
When survey control is maintained, the building rises exactly as intended. When it is neglected, small errors can multiply into major construction challenges.
In reality, the level floors, straight corridors, aligned faรงades, and smooth operation of building systems that people admire in completed skyscrapers often result from thousands of careful measurements made behind the scenes.
In high-rise construction, accuracy is not achieved once and forgotten.
It must be maintained continuously from the foundation to the highest floor. Every slab cast, every column erected, and every wall constructed depends on the accuracy of the levels and alignments established before it.
A slight error on one floor may appear insignificant. But when repeated over dozens of storeys, that small deviation can result in misaligned walls, uneven floors, poorly fitting doors and windows, elevator shaft problems, service clashes, and expensive corrective work.
This is why surveyors play such a critical role in ensuring accurate floor alignment throughout the construction process.
The process begins with the establishment of reliable survey control points.
Surveyors create a stable horizontal and vertical control network tied to the approved project coordinates and elevations. These control points become the permanent reference framework for all setting-out and verification activities carried out during construction.
Using precision instruments such as Total Stations and digital leveling equipment, surveyors transfer gridlines, coordinates, and reference levels onto each floor. This ensures that every structural element is positioned according to the approved design.
Coordinate transfer is one of the most important aspects of maintaining floor alignment.
As the building rises, surveyors accurately transfer positions and elevations from lower floors to upper levels using established control procedures. This helps ensure that each new floor remains consistent with the original building geometry.
Level control is equally essential.
Surveyors verify slab elevations, beam levels, and finished floor heights before and after major construction activities. These checks ensure that floors remain level and that variations do not accumulate as the structure progresses upward.
Continuous verification further strengthens accuracy.
Surveyors routinely inspect dimensions, offsets, centerlines, and vertical alignment to confirm that construction remains within specified tolerances. Any deviation detected is addressed early before subsequent work depends on it.
This attention to detail also benefits other disciplines.
Architectural finishes rely on straight and level surfaces. Staircases require consistent riser heights and landings. Elevator shafts must remain aligned from the lowest floor to the highest level. Mechanical, electrical, and plumbing systems depend on accurately positioned openings and service routes.
Floor alignment therefore affects not only appearance but also functionality and structural efficiency.
Environmental influences such as temperature changes, wind effects, and construction loading can also impact measurements in tall structures. Surveyors account for these factors through careful observation procedures and repeated checks throughout the project lifecycle.
Modern technologies have significantly improved the speed and precision of floor alignment operations.
However, even the most advanced equipment cannot guarantee success without proper procedures, stable control networks, and experienced professionals who understand the importance of measurement discipline.
Because a high-rise building is not built as one complete structure.
It is built floor by floor, with each level depending on the accuracy of the one before it.
When survey control is maintained, the building rises exactly as intended. When it is neglected, small errors can multiply into major construction challenges.
In reality, the level floors, straight corridors, aligned faรงades, and smooth operation of building systems that people admire in completed skyscrapers often result from thousands of careful measurements made behind the scenes.
โค4
And behind those measurements is the surveyor's commitment to precision from the first floor to the final rooftop.
Here is something to think about:
If just a few millimeters of error can multiply across dozens of floors, how important is continuous survey verification in ensuring that high-rise buildings remain aligned, functional, and true to their design?
#Surveying #HighRiseConstruction #FloorAlignment #ConstructionSurveying #Engineering
@etconp
Here is something to think about:
If just a few millimeters of error can multiply across dozens of floors, how important is continuous survey verification in ensuring that high-rise buildings remain aligned, functional, and true to their design?
#Surveying #HighRiseConstruction #FloorAlignment #ConstructionSurveying #Engineering
@etconp
โค11๐3
๐Construction Inventory Management
๐10 Ways to Reduce Waste and Save Project Costs!
๐งทPoor inventory management can cause delays, material shortages, and budget overruns.
๐ทA well-organized inventory system helps site engineers maintain control over materials, improve productivity, and increase project profitability.
@etconp
๐10 Ways to Reduce Waste and Save Project Costs!
๐งทPoor inventory management can cause delays, material shortages, and budget overruns.
๐ทA well-organized inventory system helps site engineers maintain control over materials, improve productivity, and increase project profitability.
@etconp
โค8๐5
๐Stages of Asphalt Road Construction Every Engineer Must Know
๐งFrom site survey to the final wearing course, every stage of asphalt road construction plays a vital role in ensuring durability, safety, and performance.
๐ชงUnderstanding the correct sequence helps engineers deliver roads that last longer and perform better under traffic loads.
@etconp
๐งFrom site survey to the final wearing course, every stage of asphalt road construction plays a vital role in ensuring durability, safety, and performance.
๐ชงUnderstanding the correct sequence helps engineers deliver roads that last longer and perform better under traffic loads.
@etconp
๐6๐ฅ5โค3
๐CBR Definition
๐ซThe CBR is a measure of soil strength, used to determine how thick pavement layers should be.
๐ทStronger soils (higher CBR) require thinner pavements, while weaker soils (lower CBR) need thicker pavements.
๐งPavement Layers
1. Asphalt (surface layer) โ 100 mm
2. Base (gravel/aggregates) โ 150 mm
3. Sub-base (compacted coarse sand) โ 200 mm
4. Compacted subgrade (natural soil foundation)
๐Steps in Design
1. Determine CBR value of subgrade soil.
- Poor: 2โ4%
- Average: 4โ7%
- Good: 7โ10%
2. Use design charts or formulas to select thickness.
3. Adjust for traffic load and material properties.
๐ชงExample Calculation
- Given: CBR = 5%
- From design chart: Recommended pavement thickness = 550 mm
- This includes all layers combined.
๐Key Notes
- Higher CBR โ thinner pavement.
- Lower CBR โ thicker pavement.
@etconp
๐ซThe CBR is a measure of soil strength, used to determine how thick pavement layers should be.
๐ทStronger soils (higher CBR) require thinner pavements, while weaker soils (lower CBR) need thicker pavements.
๐งPavement Layers
1. Asphalt (surface layer) โ 100 mm
2. Base (gravel/aggregates) โ 150 mm
3. Sub-base (compacted coarse sand) โ 200 mm
4. Compacted subgrade (natural soil foundation)
๐Steps in Design
1. Determine CBR value of subgrade soil.
- Poor: 2โ4%
- Average: 4โ7%
- Good: 7โ10%
2. Use design charts or formulas to select thickness.
3. Adjust for traffic load and material properties.
๐ชงExample Calculation
- Given: CBR = 5%
- From design chart: Recommended pavement thickness = 550 mm
- This includes all layers combined.
๐Key Notes
- Higher CBR โ thinner pavement.
- Lower CBR โ thicker pavement.
@etconp
โค9๐5๐ฅ2
๐Roof Slope Calculation
๐Detailed Breakdown
๐ซDefinition of slope (i)
๐ฅThe slope of a roof is the ratio of its vertical rise (h) to its horizontal run (b), expressed as a percentage.
๐ฅFormula: i = (h รท b) ร 100%
โ๏ธKey parameters
- h = Height (vertical rise of the roof)
- b = Base (half the width of the building for a gable roof)
๐ทExample Calculation
๐ฑFor a gable roof with total width = 1000 cm
- Each half = 500 cm (base)
- If slope = 30%, then rise = (30 รท 100) ร 500 = 150 cm
- Meaning: For every 100 cm horizontally, the roof rises 30 cm vertically.
๐Importance of slope
- Ensures proper rainwater drainage
- Provides durability against weather conditions
- Maintains structural safety and aesthetics
๐Practical takeaway
โ๏ธA slope of 30% is considered moderate, balancing safety, drainage, and construction economy.
๐Steeper slopes may be used in areas with heavy rainfall or snow, while flatter slopes are common in dry climates.
@etconp
๐Detailed Breakdown
๐ซDefinition of slope (i)
๐ฅThe slope of a roof is the ratio of its vertical rise (h) to its horizontal run (b), expressed as a percentage.
๐ฅFormula: i = (h รท b) ร 100%
โ๏ธKey parameters
- h = Height (vertical rise of the roof)
- b = Base (half the width of the building for a gable roof)
๐ทExample Calculation
๐ฑFor a gable roof with total width = 1000 cm
- Each half = 500 cm (base)
- If slope = 30%, then rise = (30 รท 100) ร 500 = 150 cm
- Meaning: For every 100 cm horizontally, the roof rises 30 cm vertically.
๐Importance of slope
- Ensures proper rainwater drainage
- Provides durability against weather conditions
- Maintains structural safety and aesthetics
๐Practical takeaway
โ๏ธA slope of 30% is considered moderate, balancing safety, drainage, and construction economy.
๐Steeper slopes may be used in areas with heavy rainfall or snow, while flatter slopes are common in dry climates.
@etconp
โค18๐ฅ1
๐ท Site Engineer
- Supervises site work
- Checks quality & safety
- Manages labor & materials
๐ Project Manager
- Overall in-charge
- Controls time & cost
- Coordinates with clients
๐ฐ Quantity Surveyor
- Cost estimation
- Prepares BOQ & billing
- Budget control
๐ฆบ Safety Officer
- Conducts site safety inspections
- Provides safety training
- Prevents accidents
๐ทEvery successful construction project depends on a strong team of professionals. Each role plays an important part in planning, designing, managing, and ensuring safety at the construction site.
๐ท Site Engineer โ Supervises site work, checks quality & safety, and manages labor and materials.
๐ Project Manager โ Overall in-charge of the project, controls time & cost, and coordinates with clients.
๐ Structural Engineer โ Responsible for structural design, calculations, and ensuring building stability.
๐ Quantity Surveyor โ Handles cost estimation, BOQ preparation, billing, and budget control.
๐ฆบ Safety Officer โ Conducts safety inspections, training, and prevents accidents on site.
A well-coordinated team ensures quality construction, safety, and timely project completion.
#CivilEngineering
#ConstructionManagement
#SiteEngineer
#ProjectManager
#StructuralEngineer
#QuantitySurveyor
#SafetyOfficer
#ConstructionSite
#EngineeringLife
#BuildingConstruction
#ConstructionIndustry
#CivilEngineeringLife
#EngineeringKnowledge
#ConstructionEducation ๐๏ธ
@etconp
- Supervises site work
- Checks quality & safety
- Manages labor & materials
๐ Project Manager
- Overall in-charge
- Controls time & cost
- Coordinates with clients
๐ฐ Quantity Surveyor
- Cost estimation
- Prepares BOQ & billing
- Budget control
๐ฆบ Safety Officer
- Conducts site safety inspections
- Provides safety training
- Prevents accidents
๐ทEvery successful construction project depends on a strong team of professionals. Each role plays an important part in planning, designing, managing, and ensuring safety at the construction site.
๐ท Site Engineer โ Supervises site work, checks quality & safety, and manages labor and materials.
๐ Project Manager โ Overall in-charge of the project, controls time & cost, and coordinates with clients.
๐ Structural Engineer โ Responsible for structural design, calculations, and ensuring building stability.
๐ Quantity Surveyor โ Handles cost estimation, BOQ preparation, billing, and budget control.
๐ฆบ Safety Officer โ Conducts safety inspections, training, and prevents accidents on site.
A well-coordinated team ensures quality construction, safety, and timely project completion.
#CivilEngineering
#ConstructionManagement
#SiteEngineer
#ProjectManager
#StructuralEngineer
#QuantitySurveyor
#SafetyOfficer
#ConstructionSite
#EngineeringLife
#BuildingConstruction
#ConstructionIndustry
#CivilEngineeringLife
#EngineeringKnowledge
#ConstructionEducation ๐๏ธ
@etconp
โค12๐5๐ฅ1
แจแขแตแฎแตแซ แฎแแตแตแซแญแฝแ แฃแแตแแฃแ แจ2018 แ.แ แจแแ
แต แจแ แแปแธแ แชแแญแตแ 2019 แ.แ. แตแตแซแดแแญ แแ
แตแ แ แ แ แแแญ แจแ แซแฐแ แแตแจแญ แจแแฐแ แจแฐแแ แแแแแฝ แฅแ แ แซแฐแแฝ แ แฐแแแ แต แแแแแข
แจแชแแญแฑแ แฐแแต แจแตแตแซแดแ แแณแฎแฝ แตแซ แ แตแแปแ แ แถ แฐแแแ แ แณแแญ แซแแจแก แฒแแ แ แชแแญแฑ แจแแแฃแณ แแฅแฅแญ แแ แแจแญแฃ แจแแแฃแณ แแถแฝ แฐแจแ แแตแฐแซแจแแฃ แจแแญแแซแ แฆแฒแต แตแซแแฝแ แแปแปแ แฅแ แ แฎแแตแตแซแญแฝแ แแญแ แแตแฅ แจแแแ แฉ แญแญแญแฎแฝแ แ แแตแฅ แ แ แแ แแแณ แจแแแณแต แตแญแแถแฝแ แแ แแจแญแ แซแซแฐแฑ แแ แจแตแฌแต แแฅแฆแฝแ แซแณแจ แแ แ แ แแแญ แจแฐแแ แ แแแแ 96.71 แแแ แฐแแแฟแแกแก
แ 2018 แ แแต แแแต แฃแแตแแฃแ 39 แแฆแฝแ แฅแ 163 แฐแแฃแซแตแ แ แแแต แจแฎแแตแตแซแญแฝแ แแญแแ แแแ แแจแญ แฐแ แตแซแแฝแ แ แจแแแแแข แจแแแ แฐแแฃแซแต แแตแฅ แจแฐแแ แแ แแ แแคแถแฝ
1,621 แฐแแแแฎแฝแ แฃแณแฐแ แจแฅแญแซแณ แฅแแต 98% แจแ แแแแแต แฅแญแซแณ แฐแแแแงแแข
9,333 แฃแแแซแแฝแฃ 7,398 แฉแฃแแซแแฝ แฅแ 523 แจแแแแตแต แแฎแแญแถแฝ แฐแแแแ แ แจแฅแแต แแจแแแซ แ แแแแแต แ แแแฐแแแข
300 แจแแแแฃ 90 แจแตแซแแตแแญแต แฅแ 60 แจแแแ แขแแญแ แแฎแแญแถแฝ แแญ แจแแฅแฅแญแ แญแตแตแ แตแซ แฐแจแแแแแข
46 แจแแแ แฅแ 25 แจแแ แจแฐ แแแต แแฎแแญแถแฝ แแ แแแแธแ แฐแจแแแงแแข
84 แแฎแแญแถแฝ แจแฒแแญแ แแแแ แฐแฐแญแแแข
40 แแแซแ แจแแแ แฎแถแฝแ แตแณแแณแญแถแฝ แฐแแแ แฐแ แธแตแแแแค 24 แ แณแฒแต แฅแ 16 แจแฐแปแปแ แฎแถแฝ แฐแซแฐแแแข
แจแฎแแตแตแซแญแฝแ แฌแแแถแช แแจแ แฅแญแแต (CRIS) แฐแ แแ แแฐ แแจแซ แ แแแแแต แแฅแทแแข
320 แ แแญ แฐแซแฐแแฝ แ 13 แจแตแแ แ แแญแแฝ แตแแ แ แแตแฐแแแข
แแ แ แซแ แแแแแตแ แ แฐแแแจแฐ
แจ3,000 แ แแญ แฝแแแฝ แ แ แจแแแด แ แปแซ แแญแ แแฅแญ แฐแฐแญแแแแข
แแฐแแชแแฝ แจแตแแ แญแต แแณแแตแฃ แแ แ แ แฐแซแแฝ แจแแแฅ แตแแ แฅแ แ14 แแแ แ แแฃ แ แแแต แแ แตแแ แฐแฐแญแแแข
แ แ แ แแแญ แ 2018 แ แแต แแแต แฃแแตแแฃแ แ แแแแฃแฃแ แแฅแฅแญแฃแ แฎแตแ แตแณแแณแญแต แแแ แตแฃแ แฒแแณแ แแแฅ แฅแ แ แฐแแแแญ แฅแญแซแณ แจแแต แจแแฐแ แแคแต แ แแตแแแแฅ แจแฐแแแ แจแแฅแฅแญ แฅแญแแต แแ แแจแญ แแปแ แฐแแแแแข
แ แฐแซแซแแ แจ2019 แ.แ แฅแ แต แจแแจแ แฒแแ แจแขแตแฎแตแซ แฎแแตแตแซแญแฝแ แฃแแตแแฃแ แจ2019 แ แแต แแแต แแ แต แ แแแแต แจแฎแแตแตแซแญแฝแ แแญแแ แแฅแฅแญแฃ แฅแซแต แฅแ แจแ แฐแซแญ แฅแญแแต แแแแแ แซแแ แแแ แฐแแแแแข
๐แจแแ แฑ แแ แแ แแฅแฆแฝ
ยท แจแฎแแตแตแซแญแฝแ แฎแต แฅแ แตแณแแณแญแต: แ แณแฒแต แจแ แแปแฃ แจแแ แฅแ แจแขแแญแ แฎแถแฝแ แแแแแตแฃ แแฝแฐแ แฅแ แ แฒแแณแ แ แแซแฎแฝ แฐแฐแซแฝ แแตแจแแข
ยท แฒแแณแ แแจแ แ แซแซแ: แจแฎแแตแตแซแญแฝแ แฌแแแถแช แขแแแญแแฝแ แฒแตแฐแ (CRIS) แ แ แแแแ แ แแ แแจแญแฃ แแจแแแฝแ แ แณแณ แแญ แ แฐแแฐแจแฐ แแแฉ แแแณแ แฐแชแแต แแแแแตแข
ยท แแแแฃ แฅแ แฅแแต แแจแแแซ: แแฃแแแซแแฝแ แแฉแฃแแซแแฝ แจแแฐแ แแ แจแแแแฃ แ แแแแแต แแแฃแ แแตแจแแฃ แฅแแฒแแ แจแแญแแ แฐแแแซแ แ แ แฒแตแ แ แแฃแญ แแแแฃ แแซแฐแตแข
ยท แแญแต แ แแณแต: แจแแแฃแณ แแ แ แแแแฃแฃแถแฝแ แแฐ แแญแต แคแต แณแญแแฑ แ แ แแซแญ แแแแต แจแแแณแต แ แ แแ แแณแฐแแข
ยท แแแฃแณ แแฅแฅแญ แฅแ แฆแฒแต: แ แแแแตแต แ แแต แจแแแแก แจแ แแปแฃ แจแแแฃ แจแขแแญแ แฅแ แจแแแแต แแฎแแญแถแฝแ แ แตแแต แแจแณแฐแแฃ แแแฃแ แญ แฅแ แจแฆแฒแต แตแซแแฝแ แแจแแแแข
ยท แแฅแแต แแฅแฅแญ: แจแแแฃแณ แแฅแแถแฝ แ แตแแณแ แจแฅแซแต แฐแจแแแฝแ แแแแณแธแแ แ แแ แซ แญแตแตแแ แ แแฅแชแซ แแญแแซ แแจแแแฅแข
ยท แ แตแฐแณแฐแซแ แตแแ: แจแฐแ แแญแ แญแ แแตแ แแณแฐแแฃ แจแแญแแแต แ แตแฐแณแฐแญแ แแแแแฃ แฅแแฒแแ แจแฅแ-แแแฃแญ แฅแ แจแธแจ-แแตแ แตแซแแฝแ แแ แแจแญแข
ยท แ แซแณแฝแแต: แ แแแ แจแแ แต แ แแปแธแ แแฐแถแฝ แแตแฅ แจแดแถแฝแฃ แ แปแแต แฅแ แ แซแ แแณแฐแแฝแ แฐแ แแแแตแ แฐแณแตแ แแจแแแฅแข แญแ แแ แต แฐแแ แ แดแญแแแ แจแฐแฐแแแฃ แฅแซแตแ แจแ แ แ แฅแ แแขแตแฎแตแซ แฎแแตแตแซแญแฝแ แแญแ แฅแตแแต แแณแ แแ แจแแซแแต แฐแแ แฅแแฒแแ แซแแ แแแข
แจแแจแ แแ แชแแญแตแ แฅแ แต แแแป แ แแตแจแ แแญแญแต แจแฐแซแแฐ แฒแแ แ แแญแญแฑ แแแธแแแต แจแแซแตแแแธแ แแฅแฆแฝแ แแฅแซแชแซแแฝ แแญแ แแ แ แแ แแแซแแตแ แจแฐแแ แแ แณแญแฌแญแฐแญ แแตแแ แแแ (แถ/แญ) แ แแช แจแ แแต แ แแฑ แแแซแต แแช แตแซแแฝ แแ แแแ แฅแแฐแแฃแธแแฃ แซแแแ แ แ แ แ แแ แแ แจ2019 แ.แ แตแซแแฝแ แแจแแแแ แจแตแตแตแต แแซแต แ แแ แญแแณ แจแแซแตแแแธแแ แ แแจแต แจแแฐแแ แญ แแแแแฃแจแชแแญแ แตแซแแฝ แแญ แตแฉแจแต แ แแตแ แต แ แแแฐแฅ แฐแจแ แซแตแ แแฅแแต แฅแแฐแแซแตแแแแฃแแฐแซแฐแแ แฒแตแแแ แตแแแแฃแญ แแณแ แ แแแ แ แฒแตแแแ แแแซแต แฅแแฐแแแฃแ แ แ แฃแซ แ แแตแแแฅ แแญแแฅแฉ แฐแ แแแแกแก
แจแขแตแฎแตแซ แฎแแตแตแซแญแฝแ แฃแแตแแฃแ
@etconp
แจแชแแญแฑแ แฐแแต แจแตแตแซแดแ แแณแฎแฝ แตแซ แ แตแแปแ แ แถ แฐแแแ แ แณแแญ แซแแจแก แฒแแ แ แชแแญแฑ แจแแแฃแณ แแฅแฅแญ แแ แแจแญแฃ แจแแแฃแณ แแถแฝ แฐแจแ แแตแฐแซแจแแฃ แจแแญแแซแ แฆแฒแต แตแซแแฝแ แแปแปแ แฅแ แ แฎแแตแตแซแญแฝแ แแญแ แแตแฅ แจแแแ แฉ แญแญแญแฎแฝแ แ แแตแฅ แ แ แแ แแแณ แจแแแณแต แตแญแแถแฝแ แแ แแจแญแ แซแซแฐแฑ แแ แจแตแฌแต แแฅแฆแฝแ แซแณแจ แแ แ แ แแแญ แจแฐแแ แ แแแแ 96.71 แแแ แฐแแแฟแแกแก
แ 2018 แ แแต แแแต แฃแแตแแฃแ 39 แแฆแฝแ แฅแ 163 แฐแแฃแซแตแ แ แแแต แจแฎแแตแตแซแญแฝแ แแญแแ แแแ แแจแญ แฐแ แตแซแแฝแ แ แจแแแแแข แจแแแ แฐแแฃแซแต แแตแฅ แจแฐแแ แแ แแ แแคแถแฝ
1,621 แฐแแแแฎแฝแ แฃแณแฐแ แจแฅแญแซแณ แฅแแต 98% แจแ แแแแแต แฅแญแซแณ แฐแแแแงแแข
9,333 แฃแแแซแแฝแฃ 7,398 แฉแฃแแซแแฝ แฅแ 523 แจแแแแตแต แแฎแแญแถแฝ แฐแแแแ แ แจแฅแแต แแจแแแซ แ แแแแแต แ แแแฐแแแข
300 แจแแแแฃ 90 แจแตแซแแตแแญแต แฅแ 60 แจแแแ แขแแญแ แแฎแแญแถแฝ แแญ แจแแฅแฅแญแ แญแตแตแ แตแซ แฐแจแแแแแข
46 แจแแแ แฅแ 25 แจแแ แจแฐ แแแต แแฎแแญแถแฝ แแ แแแแธแ แฐแจแแแงแแข
84 แแฎแแญแถแฝ แจแฒแแญแ แแแแ แฐแฐแญแแแข
40 แแแซแ แจแแแ แฎแถแฝแ แตแณแแณแญแถแฝ แฐแแแ แฐแ แธแตแแแแค 24 แ แณแฒแต แฅแ 16 แจแฐแปแปแ แฎแถแฝ แฐแซแฐแแแข
แจแฎแแตแตแซแญแฝแ แฌแแแถแช แแจแ แฅแญแแต (CRIS) แฐแ แแ แแฐ แแจแซ แ แแแแแต แแฅแทแแข
320 แ แแญ แฐแซแฐแแฝ แ 13 แจแตแแ แ แแญแแฝ แตแแ แ แแตแฐแแแข
แแ แ แซแ แแแแแตแ แ แฐแแแจแฐ
แจ3,000 แ แแญ แฝแแแฝ แ แ แจแแแด แ แปแซ แแญแ แแฅแญ แฐแฐแญแแแแข
แแฐแแชแแฝ แจแตแแ แญแต แแณแแตแฃ แแ แ แ แฐแซแแฝ แจแแแฅ แตแแ แฅแ แ14 แแแ แ แแฃ แ แแแต แแ แตแแ แฐแฐแญแแแข
แ แ แ แแแญ แ 2018 แ แแต แแแต แฃแแตแแฃแ แ แแแแฃแฃแ แแฅแฅแญแฃแ แฎแตแ แตแณแแณแญแต แแแ แตแฃแ แฒแแณแ แแแฅ แฅแ แ แฐแแแแญ แฅแญแซแณ แจแแต แจแแฐแ แแคแต แ แแตแแแแฅ แจแฐแแแ แจแแฅแฅแญ แฅแญแแต แแ แแจแญ แแปแ แฐแแแแแข
แ แฐแซแซแแ แจ2019 แ.แ แฅแ แต แจแแจแ แฒแแ แจแขแตแฎแตแซ แฎแแตแตแซแญแฝแ แฃแแตแแฃแ แจ2019 แ แแต แแแต แแ แต แ แแแแต แจแฎแแตแตแซแญแฝแ แแญแแ แแฅแฅแญแฃ แฅแซแต แฅแ แจแ แฐแซแญ แฅแญแแต แแแแแ แซแแ แแแ แฐแแแแแข
๐แจแแ แฑ แแ แแ แแฅแฆแฝ
ยท แจแฎแแตแตแซแญแฝแ แฎแต แฅแ แตแณแแณแญแต: แ แณแฒแต แจแ แแปแฃ แจแแ แฅแ แจแขแแญแ แฎแถแฝแ แแแแแตแฃ แแฝแฐแ แฅแ แ แฒแแณแ แ แแซแฎแฝ แฐแฐแซแฝ แแตแจแแข
ยท แฒแแณแ แแจแ แ แซแซแ: แจแฎแแตแตแซแญแฝแ แฌแแแถแช แขแแแญแแฝแ แฒแตแฐแ (CRIS) แ แ แแแแ แ แแ แแจแญแฃ แแจแแแฝแ แ แณแณ แแญ แ แฐแแฐแจแฐ แแแฉ แแแณแ แฐแชแแต แแแแแตแข
ยท แแแแฃ แฅแ แฅแแต แแจแแแซ: แแฃแแแซแแฝแ แแฉแฃแแซแแฝ แจแแฐแ แแ แจแแแแฃ แ แแแแแต แแแฃแ แแตแจแแฃ แฅแแฒแแ แจแแญแแ แฐแแแซแ แ แ แฒแตแ แ แแฃแญ แแแแฃ แแซแฐแตแข
ยท แแญแต แ แแณแต: แจแแแฃแณ แแ แ แแแแฃแฃแถแฝแ แแฐ แแญแต แคแต แณแญแแฑ แ แ แแซแญ แแแแต แจแแแณแต แ แ แแ แแณแฐแแข
ยท แแแฃแณ แแฅแฅแญ แฅแ แฆแฒแต: แ แแแแตแต แ แแต แจแแแแก แจแ แแปแฃ แจแแแฃ แจแขแแญแ แฅแ แจแแแแต แแฎแแญแถแฝแ แ แตแแต แแจแณแฐแแฃ แแแฃแ แญ แฅแ แจแฆแฒแต แตแซแแฝแ แแจแแแแข
ยท แแฅแแต แแฅแฅแญ: แจแแแฃแณ แแฅแแถแฝ แ แตแแณแ แจแฅแซแต แฐแจแแแฝแ แแแแณแธแแ แ แแ แซ แญแตแตแแ แ แแฅแชแซ แแญแแซ แแจแแแฅแข
ยท แ แตแฐแณแฐแซแ แตแแ: แจแฐแ แแญแ แญแ แแตแ แแณแฐแแฃ แจแแญแแแต แ แตแฐแณแฐแญแ แแแแแฃ แฅแแฒแแ แจแฅแ-แแแฃแญ แฅแ แจแธแจ-แแตแ แตแซแแฝแ แแ แแจแญแข
ยท แ แซแณแฝแแต: แ แแแ แจแแ แต แ แแปแธแ แแฐแถแฝ แแตแฅ แจแดแถแฝแฃ แ แปแแต แฅแ แ แซแ แแณแฐแแฝแ แฐแ แแแแตแ แฐแณแตแ แแจแแแฅแข แญแ แแ แต แฐแแ แ แดแญแแแ แจแฐแฐแแแฃ แฅแซแตแ แจแ แ แ แฅแ แแขแตแฎแตแซ แฎแแตแตแซแญแฝแ แแญแ แฅแตแแต แแณแ แแ แจแแซแแต แฐแแ แฅแแฒแแ แซแแ แแแข
แจแแจแ แแ แชแแญแตแ แฅแ แต แแแป แ แแตแจแ แแญแญแต แจแฐแซแแฐ แฒแแ แ แแญแญแฑ แแแธแแแต แจแแซแตแแแธแ แแฅแฆแฝแ แแฅแซแชแซแแฝ แแญแ แแ แ แแ แแแซแแตแ แจแฐแแ แแ แณแญแฌแญแฐแญ แแตแแ แแแ (แถ/แญ) แ แแช แจแ แแต แ แแฑ แแแซแต แแช แตแซแแฝ แแ แแแ แฅแแฐแแฃแธแแฃ แซแแแ แ แ แ แ แแ แแ แจ2019 แ.แ แตแซแแฝแ แแจแแแแ แจแตแตแตแต แแซแต แ แแ แญแแณ แจแแซแตแแแธแแ แ แแจแต แจแแฐแแ แญ แแแแแฃแจแชแแญแ แตแซแแฝ แแญ แตแฉแจแต แ แแตแ แต แ แแแฐแฅ แฐแจแ แซแตแ แแฅแแต แฅแแฐแแซแตแแแแฃแแฐแซแฐแแ แฒแตแแแ แตแแแแฃแญ แแณแ แ แแแ แ แฒแตแแแ แแแซแต แฅแแฐแแแฃแ แ แ แฃแซ แ แแตแแแฅ แแญแแฅแฉ แฐแ แแแแกแก
แจแขแตแฎแตแซ แฎแแตแตแซแญแฝแ แฃแแตแแฃแ
@etconp
โค13
๐แแ แจแแแแ แคแต แแ แจแแ แแตแแญ แแฐ แแฌแต แแตแฅ แจแแแ แจแแ แแ แซแแแซ (แณแแ) แญแแฃแ::
๐แจแแซแ แ แแแ แแฐ แแแแ แ แแต แแญ แแฐแแแ แจแแ แณแแญ แญแแฐแณแแข
๐ซแจแฆแจแญแแต แณแแฉ แแแ แ แตแ แต (Gravity) แแญแ แ แงแแงแแฝแฃ แซแแฎแฝ แฅแ แ แญแแซแ แแตแแฎแฝ แ แแซแแแต แฐแฐแซแญแถ 10 แแ แแแแแ แ แแ แ แฅแแต แซแแญแฃแแข
๐ง10-แแ แแแ แจแแ แ แ แญแฆแต แตแญแแต
(10-Storey Building Water Supply System)
โ๏ธแแแแซ (LEGEND)
1. แจแแแแ แคแต แแ แจแแ แแตแแญ (Municipal Water Main) แจแจแฐแแ แแ แจแแ แแตแแญ แจแแแญแฅ แแ
2. แจแแฌแต แ แณแฝ แซแ แจแแ แแ แซแแแซ (Underground Sump Tank) แฅแฌ แแแ แจแแซแจแแฝ
3. แแแ (Pump) แแแ แแฐ แจแแฐแแ แณแแญ แจแแซแตแฐแแแ
4. แจแแญแแ แจแแ แณแแญ (Overhead Tank) แแแแแ แ แแแแแต แจแฐแฃแซ แแ แจแแซแจแแฝ
5. แจแแ แแจแแแซ แงแแง (Distribution Pipe) แแแ แแฐ แจแฐแแซแฉ แแแฝ แจแแซแแญแฅ
6. แจแแ แแแฃแ แชแซ แซแแญ (Floor Stop Valve) แแฐ แฅแซแแณแแฑ แแ แจแแแฐแแ แจแแ แ แ แญแฆแต แจแแแฃแ แญ
7. แจแ แญแแซแ แงแแง (Branch Pipe) แแแ แแฐ แฅแซแแณแแฑ แจแแ แแแซ แแฅแฅ แจแแซแฐแญแต
๐ชงแจแตแญแแฑ แ แ แซแญ
โข แแ แจแแแแ แคแต แแ แจแแ แแตแแญ แแฐ แจแแฌแต แ แณแฝ แซแแ แแ แซแแแซ (แณแแ) แญแแฃแแข
โข แแแ แแแแ แจแณแแ แแฐ แจแแญแแ แจแแ แณแแญ แซแตแฐแแแแแข
โข แจแณแแฉ แ แแ แแแ แ แตแ แต (Gravity) แแญแ แแฐ แแแ แแแฝ แญแฐแซแซแแข
@etconp
๐แจแแซแ แ แแแ แแฐ แแแแ แ แแต แแญ แแฐแแแ แจแแ แณแแญ แญแแฐแณแแข
๐ซแจแฆแจแญแแต แณแแฉ แแแ แ แตแ แต (Gravity) แแญแ แ แงแแงแแฝแฃ แซแแฎแฝ แฅแ แ แญแแซแ แแตแแฎแฝ แ แแซแแแต แฐแฐแซแญแถ 10 แแ แแแแแ แ แแ แ แฅแแต แซแแญแฃแแข
๐ง10-แแ แแแ แจแแ แ แ แญแฆแต แตแญแแต
(10-Storey Building Water Supply System)
โ๏ธแแแแซ (LEGEND)
1. แจแแแแ แคแต แแ แจแแ แแตแแญ (Municipal Water Main) แจแจแฐแแ แแ แจแแ แแตแแญ แจแแแญแฅ แแ
2. แจแแฌแต แ แณแฝ แซแ แจแแ แแ แซแแแซ (Underground Sump Tank) แฅแฌ แแแ แจแแซแจแแฝ
3. แแแ (Pump) แแแ แแฐ แจแแฐแแ แณแแญ แจแแซแตแฐแแแ
4. แจแแญแแ แจแแ แณแแญ (Overhead Tank) แแแแแ แ แแแแแต แจแฐแฃแซ แแ แจแแซแจแแฝ
5. แจแแ แแจแแแซ แงแแง (Distribution Pipe) แแแ แแฐ แจแฐแแซแฉ แแแฝ แจแแซแแญแฅ
6. แจแแ แแแฃแ แชแซ แซแแญ (Floor Stop Valve) แแฐ แฅแซแแณแแฑ แแ แจแแแฐแแ แจแแ แ แ แญแฆแต แจแแแฃแ แญ
7. แจแ แญแแซแ แงแแง (Branch Pipe) แแแ แแฐ แฅแซแแณแแฑ แจแแ แแแซ แแฅแฅ แจแแซแฐแญแต
๐ชงแจแตแญแแฑ แ แ แซแญ
โข แแ แจแแแแ แคแต แแ แจแแ แแตแแญ แแฐ แจแแฌแต แ แณแฝ แซแแ แแ แซแแแซ (แณแแ) แญแแฃแแข
โข แแแ แแแแ แจแณแแ แแฐ แจแแญแแ แจแแ แณแแญ แซแตแฐแแแแแข
โข แจแณแแฉ แ แแ แแแ แ แตแ แต (Gravity) แแญแ แแฐ แแแ แแแฝ แญแฐแซแซแแข
@etconp
โค4๐3
๐Rigid Pavement Engineering Guide
๐ซRigid roads, also known as concrete roads, are designed with a layered system to handle heavy traffic and provide long-lasting durability.
๐งThe top layer, PQC, acts as the main load-bearing surface, supported by DLC and GSB layers that provide stability and drainage.
โ๏ธCritical components like dowel and tie bars are used at joints to manage movement and transfer loads between slabs, while a proper camber ensures efficient water runoff to side drains.
#RigidPavement #RoadConstruction #CivilEngineering #ConcreteRoads #PavementDesign #HighwayEngineering #InfrastructureDevelopment #EngineeringEducation #ConstructionDetails #DurableRoads
@etconp
๐ซRigid roads, also known as concrete roads, are designed with a layered system to handle heavy traffic and provide long-lasting durability.
๐งThe top layer, PQC, acts as the main load-bearing surface, supported by DLC and GSB layers that provide stability and drainage.
โ๏ธCritical components like dowel and tie bars are used at joints to manage movement and transfer loads between slabs, while a proper camber ensures efficient water runoff to side drains.
#RigidPavement #RoadConstruction #CivilEngineering #ConcreteRoads #PavementDesign #HighwayEngineering #InfrastructureDevelopment #EngineeringEducation #ConstructionDetails #DurableRoads
@etconp
โค7๐2
แจแขแพแแฑ แ แแฎแแแ แแจแแซ แแฎแแญแตแกแแแแ แจแขแตแฎแตแซ แ แฒแต แจแตแฌแต แแแซแ
แฃแแแต แแแณแต แจแแแฝแ แแแแฐแแ แฐแ แแแแต แ แแจแแแฅแ แ แแซแซ แฐแแแตแ แ แแแแฃแต แจแแต แแแชแฑแ แจแ แซแฐแจแ แ แ แญแต แฐแแฃแซแต แฐแจแแแแแแข
แตแฌแต แจแฐแแแแ แฃแธแ แฐแแแต แ แแฑ แฐแแ แจแขแตแฎแตแซ แ แจแญ แแแแต แแแขแฐแแ แ แจแแญแ แแ แแ แฅแซแณแฐแ แแแขแแแ แ แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณ แ แฅแจแ แแแข
แ แ แแญ แแแตแตแญ แแขแญ แ แแแต (แถ/แญ) แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณแ แฅแญ 2 แแ 2018 แ.แ แฃแตแแแฉแ แต แแ แต แ แฐแแญ แแแ แญแฉ แแญแจแฆแปแฝแ แฅแแฐ แตแแ แแฐแฅ แแ แซแแแแแแคแญแ แ แแขแตแฎแตแซ แจแแแตแฒแญแต แฅแญแแต แจแแแแต แตแฅแซแต แแแฝ แจแแฐแฅ แแ แแแณแธแ แญแณแแณแแข
แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณ แจแ แแชแซแ แ แชแฌแฝแ แฅแตแแต แแณแซ แฅแ แตแแ แ แญแ แซ แฅแแฐแแแ แญแ แ แแแข
แญแ แแฎแแญแต แขแตแฎแตแซแ แจแแแ แแณแ แจแ แชแฌแฝแ แฐแญแณ แจแแซแฐแแ แฒแแ แจแขแตแฎแตแซ แ แจแญ แแแแตแ แแแ แ แแ แฐแแณแณแชแแต แ แจแแฐแ แฐแจแ แซแณแตแแแแข
แ แ แแชแซ แณแชแญ แตแแ แจแ แชแฌแฝแ แแ แจแฐ-แแแต แแฎแแญแต แ แแแแ แขแตแฎแตแซ แ แ แจแญ แตแซแแตแแญแต แแญแ แซแแตแ แ แ แ แ แญแ แแฅ แจแ แฃแ แฉแซแต แซแตแ แซแแข
แ แแฎแแแ แแจแแซแ แแแชแฑแ แจแ แแชแซ แแ แแแต แแฃแ (AfCFTA) แฐแแฃแซแแแต แแแแแ แแ แจแ แ แแชแฑแ แจแแแตแ แจแขแฎแแ แตแตแตแญ แแแ แแจแญ แแแ แแ แญแซแแณแแข
แจแ แแฎแแแ แแจแแซแ แแญ แฐแซแญแ แจแแแฐแจแฐแ แจแคแญแแญแต แจแฐแ แ แแแตแฃแ แขแแฑแตแตแชแ แ แฑแชแแ แแญแแฝ แแ แซแฃแขแ แแตแแต แตแแ แ แตแฐแแฝแ แจแแแจแ แฒแแ แฐแจแแช แจแขแฎแแ แฅแแ แตแแดแแฝแ แญแแฅแซแแข
แจแแฎแแญแฑ แแแแแต แฅแ แตแตแซแดแแซแ แ แแแณ แจแแญ แแฅแฐแ แขแแจแตแตแแแตแ (FDI) แแฐ แขแตแฎแตแซ แจแแณแฅ แ แฐแจแแชแ แ แแแฃแณแ แแ แต แฅแ แจแฐแ แแแ แ แแ แ แแฐแก แ แแแแแถแฝ แ แบแแฝ แแแแ แฉ แจแแแชแฑ แแแฝ แแฅแฐแ แฅแ แแฅแฐแ แซแแแ แจแฅแซ แแตแ แญแแฅแซแแข
แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณ แจแขแตแฎแตแซแ แณแแ แแต แ แญแ แแฅ แจแแซแ แแญแญแฃแจแแแฝแ แฐแ แแแแต แ แจแแญแ แจแแซแณแตแ แฅแ แแแชแฑแ แจแแแ แแณแ แจแ แชแฌแฝแ แฐแญแณ แจแแซแฐแแ แแ แแฎแแญแต แแแข
แแฎแแญแฑ แ แแแแต แฝแแแญแฃแ แฅแซ แแตแ แแ แซแฃแ แซแฃแขแแ แฅแแ แแแญแ แ แแแแต แขแตแฎแตแซแ แ แ แจแญ แตแซแแตแแญแต แแญแ แ แแ แซแแต แ แ แ แ แญแ แแฅ แจแแซแตแ แซ แแแข
แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณ แฃแแแต แจแแแฅ แแแณแต แจแฐแฐแแ แจแ แแฎแแญแถแฝแ แแแฎ แจแแแธแ แ แ แ แแจแแแซ แฅแแฐแแแแ แญแ แ แแแข
แแแชแฑ แณแแแ แ แแตแฅแตแฅ แแ แแฎแแญแถแฝแ แ แ แแซแซ แ แแซแญ แฐแชแแต แ แแแซแต แ แฐแแแ แแธแ แแแ แฅแซแต แ แ แแ แแแญแแต แ แแฅแแต แจแแต แ แแแ แ แแ แฐแจแ แจแฐแแฐแจแแต แ แฒแต แฅแแซแ แจแฅแซ แฃแ แ แแฅแซแแฝแข
แฅแแฐ แแณแแ แณแแ แจแขแตแฎแตแซ แแณแด แแตแฅแ แแ แแแ แฃแจแแตแ แตแ แแณแฐแขแซแ แ แ แญแญ แแ แแแแฃแตแฃแจแณแญแแต แแแจแแฃแจแฎแชแฐแญ แแแถแฝ แฅแ แแแแ แจแฑแชแตแต แแแแปแแฝ แ แฅแซแต แฐแ แแแ แแ แแแแแต แแฅแแณแธแ แขแตแฎแตแซ แ แแ แแญ แแแ แจแขแฎแแแ แจแแ แจแฐ-แแแต แแฎแแญแถแฝแ แจแแแตแฃแจแแแซแตแ แ แฐแซแแแธแ แแ แจแแ แแแ แ แ แแ แ แฐแจแฃแญ แจแแซแณแญ แแแข
แจแขแพแแฑ แ แแฎแแแ แแจแแซแ แญแ แแ แจแฝแแตแ แจแตแฌแต แแ แ แแ แฐแจแ แจแแฐแแ แญแแแแข
Via แขแแ
@etconp
แฃแแแต แแแณแต แจแแแฝแ แแแแฐแแ แฐแ แแแแต แ แแจแแแฅแ แ แแซแซ แฐแแแตแ แ แแแแฃแต แจแแต แแแชแฑแ แจแ แซแฐแจแ แ แ แญแต แฐแแฃแซแต แฐแจแแแแแแข
แตแฌแต แจแฐแแแแ แฃแธแ แฐแแแต แ แแฑ แฐแแ แจแขแตแฎแตแซ แ แจแญ แแแแต แแแขแฐแแ แ แจแแญแ แแ แแ แฅแซแณแฐแ แแแขแแแ แ แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณ แ แฅแจแ แแแข
แ แ แแญ แแแตแตแญ แแขแญ แ แแแต (แถ/แญ) แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณแ แฅแญ 2 แแ 2018 แ.แ แฃแตแแแฉแ แต แแ แต แ แฐแแญ แแแ แญแฉ แแญแจแฆแปแฝแ แฅแแฐ แตแแ แแฐแฅ แแ แซแแแแแแคแญแ แ แแขแตแฎแตแซ แจแแแตแฒแญแต แฅแญแแต แจแแแแต แตแฅแซแต แแแฝ แจแแฐแฅ แแ แแแณแธแ แญแณแแณแแข
แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณ แจแ แแชแซแ แ แชแฌแฝแ แฅแตแแต แแณแซ แฅแ แตแแ แ แญแ แซ แฅแแฐแแแ แญแ แ แแแข
แญแ แแฎแแญแต แขแตแฎแตแซแ แจแแแ แแณแ แจแ แชแฌแฝแ แฐแญแณ แจแแซแฐแแ แฒแแ แจแขแตแฎแตแซ แ แจแญ แแแแตแ แแแ แ แแ แฐแแณแณแชแแต แ แจแแฐแ แฐแจแ แซแณแตแแแแข
แ แ แแชแซ แณแชแญ แตแแ แจแ แชแฌแฝแ แแ แจแฐ-แแแต แแฎแแญแต แ แแแแ แขแตแฎแตแซ แ แ แจแญ แตแซแแตแแญแต แแญแ แซแแตแ แ แ แ แ แญแ แแฅ แจแ แฃแ แฉแซแต แซแตแ แซแแข
แ แแฎแแแ แแจแแซแ แแแชแฑแ แจแ แแชแซ แแ แแแต แแฃแ (AfCFTA) แฐแแฃแซแแแต แแแแแ แแ แจแ แ แแชแฑแ แจแแแตแ แจแขแฎแแ แตแตแตแญ แแแ แแจแญ แแแ แแ แญแซแแณแแข
แจแ แแฎแแแ แแจแแซแ แแญ แฐแซแญแ แจแแแฐแจแฐแ แจแคแญแแญแต แจแฐแ แ แแแตแฃแ แขแแฑแตแตแชแ แ แฑแชแแ แแญแแฝ แแ แซแฃแขแ แแตแแต แตแแ แ แตแฐแแฝแ แจแแแจแ แฒแแ แฐแจแแช แจแขแฎแแ แฅแแ แตแแดแแฝแ แญแแฅแซแแข
แจแแฎแแญแฑ แแแแแต แฅแ แตแตแซแดแแซแ แ แแแณ แจแแญ แแฅแฐแ แขแแจแตแตแแแตแ (FDI) แแฐ แขแตแฎแตแซ แจแแณแฅ แ แฐแจแแชแ แ แแแฃแณแ แแ แต แฅแ แจแฐแ แแแ แ แแ แ แแฐแก แ แแแแแถแฝ แ แบแแฝ แแแแ แฉ แจแแแชแฑ แแแฝ แแฅแฐแ แฅแ แแฅแฐแ แซแแแ แจแฅแซ แแตแ แญแแฅแซแแข
แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณ แจแขแตแฎแตแซแ แณแแ แแต แ แญแ แแฅ แจแแซแ แแญแญแฃแจแแแฝแ แฐแ แแแแต แ แจแแญแ แจแแซแณแตแ แฅแ แแแชแฑแ แจแแแ แแณแ แจแ แชแฌแฝแ แฐแญแณ แจแแซแฐแแ แแ แแฎแแญแต แแแข
แแฎแแญแฑ แ แแแแต แฝแแแญแฃแ แฅแซ แแตแ แแ แซแฃแ แซแฃแขแแ แฅแแ แแแญแ แ แแแแต แขแตแฎแตแซแ แ แ แจแญ แตแซแแตแแญแต แแญแ แ แแ แซแแต แ แ แ แ แญแ แแฅ แจแแซแตแ แซ แแแข
แจแขแพแแฑ แแแ แ แแ แ แแฎแแแ แแจแแซ แแแฃแณ แฃแแแต แจแแแฅ แแแณแต แจแฐแฐแแ แจแ แแฎแแญแถแฝแ แแแฎ แจแแแธแ แ แ แ แแจแแแซ แฅแแฐแแแแ แญแ แ แแแข
แแแชแฑ แณแแแ แ แแตแฅแตแฅ แแ แแฎแแญแถแฝแ แ แ แแซแซ แ แแซแญ แฐแชแแต แ แแแซแต แ แฐแแแ แแธแ แแแ แฅแซแต แ แ แแ แแแญแแต แ แแฅแแต แจแแต แ แแแ แ แแ แฐแจแ แจแฐแแฐแจแแต แ แฒแต แฅแแซแ แจแฅแซ แฃแ แ แแฅแซแแฝแข
แฅแแฐ แแณแแ แณแแ แจแขแตแฎแตแซ แแณแด แแตแฅแ แแ แแแ แฃแจแแตแ แตแ แแณแฐแขแซแ แ แ แญแญ แแ แแแแฃแตแฃแจแณแญแแต แแแจแแฃแจแฎแชแฐแญ แแแถแฝ แฅแ แแแแ แจแฑแชแตแต แแแแปแแฝ แ แฅแซแต แฐแ แแแ แแ แแแแแต แแฅแแณแธแ แขแตแฎแตแซ แ แแ แแญ แแแ แจแขแฎแแแ แจแแ แจแฐ-แแแต แแฎแแญแถแฝแ แจแแแตแฃแจแแแซแตแ แ แฐแซแแแธแ แแ แจแแ แแแ แ แ แแ แ แฐแจแฃแญ แจแแซแณแญ แแแข
แจแขแพแแฑ แ แแฎแแแ แแจแแซแ แญแ แแ แจแฝแแตแ แจแตแฌแต แแ แ แแ แฐแจแ แจแแฐแแ แญแแแแข
Via แขแแ
@etconp
โค4๐3
Ethio Construction Engineering
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแปแฝแ ๐ชง4แ แแญ แฆแแแญแ แตแแ แแแปแฝแ แแแแฃ แแแจแแ โแญแจแแต แฅแแแตแ แฅแ แแซแ แแณแ แญ แญแแแแ? ๐ซแฅแแแตแซแแต แจ ETABS แฅแ QUANTITY SURVEYING แแ แฆแแแญแ แฎแญแต แ 25 % แ
แแฝ แแแแฃ แแแจแแ แฅแแฒแแ แแแฑแ แฎแญแถแฝ แ แ แแต แแญ แแแแตแฑ แจ แฅแซแแณแแฑ แจ 40% แ
แแฝ แญแฐแจแแแนแแ๐ ๐ฉแแแแแแฅ @Philemona7 แญแแแแ แแญแโฆ
๐ทแแแแฃ แจแญแฐแแ๐
๐ชงDiscount แ แฅแ แฐแแ
๐ซแ "Quantity Surveying แฅแ ETABS" Full Course แ แฆแแแญแ แแแแญ แจแฐแแแแฃแน แ แแ แตแแ แญแณแน แ แตแญแแต แฅแแตแตแจแณแฐแ แฅแแ แญแแแโค
๐ฉแแ แแ แแจแ @Philemona7 แแญแ 0925446661 แญแฐแแ
@etconp
๐ชงDiscount แ แฅแ แฐแแ
๐ซแ "Quantity Surveying แฅแ ETABS" Full Course แ แฆแแแญแ แแแแญ แจแฐแแแแฃแน แ แแ แตแแ แญแณแน แ แตแญแแต แฅแแตแตแจแณแฐแ แฅแแ แญแแแโค
๐ฉแแ แแ แแจแ @Philemona7 แแญแ 0925446661 แญแฐแแ
@etconp
โค6๐4
The boundary layer on a flat plate is called laminar boundary layer if
Anonymous Quiz
44%
Re is less than 2000
28%
Re is less than 4000
21%
Re is less than 5 ร 10^5
7%
Nota
๐6โค1
The real image of an object formed by the objective,
Anonymous Quiz
22%
in the plane of cross hairs
16%
anywhere inside the telescope.
25%
at the centre of the telescope
37%
at the optical centre of the eye-piece
๐ฅฐ6โค2