👉How to Calculate Quantity of Sand & Cement for Plastering
🪧Accurate estimation of cement and sand is essential for quality plastering and cost control.
💫First, calculate the plastering area (Length × Height), then multiply it by the plaster thickness to obtain the wet volume.
🚧Convert the wet volume to dry volume by multiplying it by 1.33
▶️Finally, use the selected mix ratio (such as 1:4 or 1:6) to determine the required quantities of cement and sand.
⏺Example (10 m × 10 m wall with 12 mm plaster):
✔️ Plaster Area = 100 m²
✔️ Wet Volume = 1.20 m³
✔️ Dry Volume = 1.596 m³
🧷For 1:4 Cement : Sand Mix
🔹 Cement = 0.319 m³ ≈ 9 bags ≈ 450 kg
🔹 Sand = 1.28 m³
📎For 1:6 Cement : Sand Mix
🔹 Cement = 0.228 m³ ≈ 6.5–7 bags ≈ 340 kg
🔹 Sand = 1.37 m³
▶️Important Notes:
1 cement bag = 50 kg
Dry volume factor = 1.33
Always add 5–10% extra for wastage and site variations.
Actual material consumption may vary depending on surface condition and workmanship.
@etconp
🪧Accurate estimation of cement and sand is essential for quality plastering and cost control.
💫First, calculate the plastering area (Length × Height), then multiply it by the plaster thickness to obtain the wet volume.
🚧Convert the wet volume to dry volume by multiplying it by 1.33
▶️Finally, use the selected mix ratio (such as 1:4 or 1:6) to determine the required quantities of cement and sand.
⏺Example (10 m × 10 m wall with 12 mm plaster):
✔️ Plaster Area = 100 m²
✔️ Wet Volume = 1.20 m³
✔️ Dry Volume = 1.596 m³
🧷For 1:4 Cement : Sand Mix
🔹 Cement = 0.319 m³ ≈ 9 bags ≈ 450 kg
🔹 Sand = 1.28 m³
📎For 1:6 Cement : Sand Mix
🔹 Cement = 0.228 m³ ≈ 6.5–7 bags ≈ 340 kg
🔹 Sand = 1.37 m³
▶️Important Notes:
1 cement bag = 50 kg
Dry volume factor = 1.33
Always add 5–10% extra for wastage and site variations.
Actual material consumption may vary depending on surface condition and workmanship.
@etconp
❤8
🏗️ Building Strong Structures Starts with Strong Columns!
Circular columns are widely used for their structural efficiency, durability, and architectural appeal.
This infographic walks you through the complete construction process—from site layout and reinforcement to concrete placement, curing, and final inspection.
Whether you're a civil engineering student, site engineer, contractor, or construction enthusiast, this guide is a practical resource for delivering safe and high-quality concrete columns. Save it, share it, and keep building excellence!
#CivilEngineering #StructuralEngineering #Construction #ConcreteConstruction #SiteEngineering
@etconp
Circular columns are widely used for their structural efficiency, durability, and architectural appeal.
This infographic walks you through the complete construction process—from site layout and reinforcement to concrete placement, curing, and final inspection.
Whether you're a civil engineering student, site engineer, contractor, or construction enthusiast, this guide is a practical resource for delivering safe and high-quality concrete columns. Save it, share it, and keep building excellence!
#CivilEngineering #StructuralEngineering #Construction #ConcreteConstruction #SiteEngineering
@etconp
👍2❤1
👉ሙሉ የ Quantity Surveying Full Course በቅናሽ ዋጋ በ ኦንላይን መማር ለምትፈልጉ 👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
🙏4
👉በታሪክ ውስጥ ከታዩት አስደናቂ የምህንድስና ድንቆች አንዱ በሮማኒያ አልባ ዩሊያ (Alba Iulia) ከተማ የተከናወነው ተአምራዊ ስራ ነው።
💫የከተማዋን መንገድ ለማስፋት ሲባል 7,600 ቶን የሚከ,ብድ ግዙፍ የመኖሪያ ህንፃን ከመሬት ላይ አፍርሶ ከመጣል ይልቅ፣ በምህንድስና ጥበብ ለሁለት ሰንጥቆ በመክፈልና ቦታውን በመቀየር የመንገድ ቦታን ክፍት የማድረግ አስደማሚ ተግባር ተፈፅሟል።
🚧የዚህ ታሪክ መነሻ እ.ኤ.አ. በ1980ዎቹ መጨረሻ በሮማኒያ የኮሙኒስት አስተዳደር ዘመን ከተካሄዱት የከተማ ማሻሻያ ፕሮጀክቶች ጋር የተያያዘ ነው።
🪧በወቅቱ የትራንሲልቫኒያ አቬኑን (Transylvania Avenue) ሰፊ መንገድ ለማስፋት ታቅዶ የነበረ ቢሆንም፣ ወደ 100 ሜትር ያህል ርዝመት ያለው ግዙፍ ባለፎቅ የመኖሪያ ህንፃ ግን በታቀደው የመንገድ መስመር መሃል ላይ አግድሞሽ ቀጥ ብሎ ቆሞ ነበር።
🧷በተለመደው የከተማ ልማት አካሄድ እንዲህ አይነት እንቅፋት ሲያጋጥም ህንፃውን አፍርሶ ነዋሪዎችን ወደሌላ ቦታ መውሰድ የመጀመሪያውና ቀላሉ ውሳኔ ይሆናል።
⏺ነገር ግን የፕሮጀክቱ መሪዎች ጉዳዩን በጥልቀት ሲመረምሩት ህንፃውን ሙሉ በሙሉ አፍርሶ ነዋሪዎችን በሌላ ቦታ መልሶ ከማስፈር ይልቅ፣ ህንፃውን አንስቶ ወደ ጎን ማንቀሳቀስ በእጅጉ አነስተኛ ወጪ የሚያስወጣ መሆኑን ተረዱ።
⏺ይህንን ፈታኝና ድፍረት የተሞላበት ውሳኔ በተግባር ለመተርጎም በኢንጅነር ዩጂን ዮርዳቼስኩ (Eugen Iordăchescu) የሚመራው የምህንድስና ቡድን ወደ ሥራ ገባ።
⏺በመጀመሪያ ደረጃ ከግዙፉ ህንፃ ስር የመሬት ቁፋሮ በማካሄድ የ7,600 ቶኑን ክብደት መሸከም እና እኩል ማደላደል የሚችል ጠንካራ የብረትና የኮንክሪት መዋቅር (framework) ከህንፃው ስር ዘረጉ።
⏺ከዚህ ከተዘረጋው መዋቅር ስር ደግሞ ህንፃውን የሚያንቀሳቅሱ ሀዲዶች እና የሚሽከረከሩ መሳሪያዎች ተገጠሙ።
▶️የህንፃውን ሚዛን ለመጠበቅና እንቅስቃሴውን ሙሉ በሙሉ በቁጥጥር ስር ለማድረግ በፈሳሽ ግፊት የሚሠሩ የሃይድሮሊክ ጃኮች (hydraulic jacks) ሥራ ላይ የዋሉ ሲሆን፣ በዚህም ህንፃው ከተሠራበት የመጀመሪያ የመሬት መሰረት ተላቆ በኢንጅነሮቹ ተንቀሳቃሽ መዋቅር ላይ እንዲያርፍ ተደረገ።
❇️100 ሜትር ያህል ርዝመት ያለውን ግዙፍ ህንፃ በአንድ ጊዜ እንደ አንድ ሙሉ አካል ማንቀሳቀስ አስቸጋሪ በመሆኑ፣ ኢንጅነሮቹ ህንፃውን ለሁለት ራሳቸውን የቻሉ ክፍሎች ሰንጥቀው ለመክፈል ወሰኑ።
⏺ስትራቴጂውም አንደኛውን አጋማሽ ወደ አንደኛው የመንገድ ጎን፣ ሁለተኛውን ደግሞ ወደ ተቃራኒው ጎን በሀዲድ በመጎተት በመሃላቸው ለአቬኑው የሚያስፈልገውን የ55 ሜትር ክፍተት መፍጠር ነበር።
▶️የዚህ አስደናቂ ክስተት ይበልጥ ህሊናን የሚስበው ክፍል ደግሞ ህንፃው ተሰንጥቆ በሀዲድ ላይ በሚንቀሳቀስበት ቅጽበት በውስጡ የሚኖሩት 80 ቤተሰቦች ከቤታቸው አለመውጣታቸው ነው።
▶️ነዋሪዎቹ እቃቸውን ሳይሰበስቡና ቀኗን እንኳን ሳይለቁ በየአፓርታማቸው ውስጥ ሆነው ህንፃቸው ለሁለት ተከፍሎ ሲጓዝ በግርምት ይከታተሉ ነበር።
▶️በሥራው ወቅት ነዋሪዎችን ከሁሉም በላይ ያስደመማቸው ሌላው ነገር የመሰረተ ልማት አገልግሎቶች አለመቋረጣቸው ነው። በዝውውሩ ሂደት በሙሉ የውሃ፣ የጋዝ፣ የኤሌክትሪክ፣ የስልክ እና የፍሳሽ ማስወገጃ (sewage) መስመሮች በተለዋዋጭ የመያያዣ ዘዴዎች አማካኝነት አገልግሎት መስጠታቸውን ሳያቋርጡ ከህንፃው ጋር አብረው እንዲጓዙ ተደርገዋል።
⏺ዋናው የህንፃው ዝውውር እንቅስቃሴ እ.ኤ.አ. ግንቦት 27 ቀን 1987 ጠዋት ላይ የተጀመረ ሲሆን፣ ሙሉ ስራውም ከስድስት ሰዓታት ባነሰ ጊዜ ውስጥ ያለ ምንም አይነት የቴክኒክ አደጋ ወይም መስተጓጎል ተጠናቀቀ። በዚያች አጭር ጊዜ ውስጥ ሁለቱም የህንፃው ክፍሎች የታቀደላቸውን የ55 ሜትር ጉዞ በሰላም አጠናቀው በአዲሱ ቦታቸው ላይ በፅኑ ተተከሉ።
❇️ይህ በአልባ ዩሊያ ከተማ የተከናወነው የምህንድስና ገድል በከተማ ፕላን ታሪክ ውስጥ የማይረሳ ትምህርት ጥሎ አልፏል።
❇️ከተማዋ ምንም አይነት የፍርስራሽ ቆሻሻ ሳታመርት፣ አላስፈላጊ ወጪ ሳታወጣ እና 80 ቤተሰቦችን መኖሪያ ሳታሳጣ ሰፊውን የትራንሲልቫኒያ አቬኑ መንገድ መክፈት የቻለች ሲሆን፣ ሁለቱ የህንፃ ክፍሎችም ዛሬም ድረስ በመንገዱ ሁለት ጎን ላይ እንደ ጥበብ ምልክት ቆመው ይገኛሉ።
@etconp
💫የከተማዋን መንገድ ለማስፋት ሲባል 7,600 ቶን የሚከ,ብድ ግዙፍ የመኖሪያ ህንፃን ከመሬት ላይ አፍርሶ ከመጣል ይልቅ፣ በምህንድስና ጥበብ ለሁለት ሰንጥቆ በመክፈልና ቦታውን በመቀየር የመንገድ ቦታን ክፍት የማድረግ አስደማሚ ተግባር ተፈፅሟል።
🚧የዚህ ታሪክ መነሻ እ.ኤ.አ. በ1980ዎቹ መጨረሻ በሮማኒያ የኮሙኒስት አስተዳደር ዘመን ከተካሄዱት የከተማ ማሻሻያ ፕሮጀክቶች ጋር የተያያዘ ነው።
🪧በወቅቱ የትራንሲልቫኒያ አቬኑን (Transylvania Avenue) ሰፊ መንገድ ለማስፋት ታቅዶ የነበረ ቢሆንም፣ ወደ 100 ሜትር ያህል ርዝመት ያለው ግዙፍ ባለፎቅ የመኖሪያ ህንፃ ግን በታቀደው የመንገድ መስመር መሃል ላይ አግድሞሽ ቀጥ ብሎ ቆሞ ነበር።
🧷በተለመደው የከተማ ልማት አካሄድ እንዲህ አይነት እንቅፋት ሲያጋጥም ህንፃውን አፍርሶ ነዋሪዎችን ወደሌላ ቦታ መውሰድ የመጀመሪያውና ቀላሉ ውሳኔ ይሆናል።
⏺ነገር ግን የፕሮጀክቱ መሪዎች ጉዳዩን በጥልቀት ሲመረምሩት ህንፃውን ሙሉ በሙሉ አፍርሶ ነዋሪዎችን በሌላ ቦታ መልሶ ከማስፈር ይልቅ፣ ህንፃውን አንስቶ ወደ ጎን ማንቀሳቀስ በእጅጉ አነስተኛ ወጪ የሚያስወጣ መሆኑን ተረዱ።
⏺ይህንን ፈታኝና ድፍረት የተሞላበት ውሳኔ በተግባር ለመተርጎም በኢንጅነር ዩጂን ዮርዳቼስኩ (Eugen Iordăchescu) የሚመራው የምህንድስና ቡድን ወደ ሥራ ገባ።
⏺በመጀመሪያ ደረጃ ከግዙፉ ህንፃ ስር የመሬት ቁፋሮ በማካሄድ የ7,600 ቶኑን ክብደት መሸከም እና እኩል ማደላደል የሚችል ጠንካራ የብረትና የኮንክሪት መዋቅር (framework) ከህንፃው ስር ዘረጉ።
⏺ከዚህ ከተዘረጋው መዋቅር ስር ደግሞ ህንፃውን የሚያንቀሳቅሱ ሀዲዶች እና የሚሽከረከሩ መሳሪያዎች ተገጠሙ።
▶️የህንፃውን ሚዛን ለመጠበቅና እንቅስቃሴውን ሙሉ በሙሉ በቁጥጥር ስር ለማድረግ በፈሳሽ ግፊት የሚሠሩ የሃይድሮሊክ ጃኮች (hydraulic jacks) ሥራ ላይ የዋሉ ሲሆን፣ በዚህም ህንፃው ከተሠራበት የመጀመሪያ የመሬት መሰረት ተላቆ በኢንጅነሮቹ ተንቀሳቃሽ መዋቅር ላይ እንዲያርፍ ተደረገ።
❇️100 ሜትር ያህል ርዝመት ያለውን ግዙፍ ህንፃ በአንድ ጊዜ እንደ አንድ ሙሉ አካል ማንቀሳቀስ አስቸጋሪ በመሆኑ፣ ኢንጅነሮቹ ህንፃውን ለሁለት ራሳቸውን የቻሉ ክፍሎች ሰንጥቀው ለመክፈል ወሰኑ።
⏺ስትራቴጂውም አንደኛውን አጋማሽ ወደ አንደኛው የመንገድ ጎን፣ ሁለተኛውን ደግሞ ወደ ተቃራኒው ጎን በሀዲድ በመጎተት በመሃላቸው ለአቬኑው የሚያስፈልገውን የ55 ሜትር ክፍተት መፍጠር ነበር።
▶️የዚህ አስደናቂ ክስተት ይበልጥ ህሊናን የሚስበው ክፍል ደግሞ ህንፃው ተሰንጥቆ በሀዲድ ላይ በሚንቀሳቀስበት ቅጽበት በውስጡ የሚኖሩት 80 ቤተሰቦች ከቤታቸው አለመውጣታቸው ነው።
▶️ነዋሪዎቹ እቃቸውን ሳይሰበስቡና ቀኗን እንኳን ሳይለቁ በየአፓርታማቸው ውስጥ ሆነው ህንፃቸው ለሁለት ተከፍሎ ሲጓዝ በግርምት ይከታተሉ ነበር።
▶️በሥራው ወቅት ነዋሪዎችን ከሁሉም በላይ ያስደመማቸው ሌላው ነገር የመሰረተ ልማት አገልግሎቶች አለመቋረጣቸው ነው። በዝውውሩ ሂደት በሙሉ የውሃ፣ የጋዝ፣ የኤሌክትሪክ፣ የስልክ እና የፍሳሽ ማስወገጃ (sewage) መስመሮች በተለዋዋጭ የመያያዣ ዘዴዎች አማካኝነት አገልግሎት መስጠታቸውን ሳያቋርጡ ከህንፃው ጋር አብረው እንዲጓዙ ተደርገዋል።
⏺ዋናው የህንፃው ዝውውር እንቅስቃሴ እ.ኤ.አ. ግንቦት 27 ቀን 1987 ጠዋት ላይ የተጀመረ ሲሆን፣ ሙሉ ስራውም ከስድስት ሰዓታት ባነሰ ጊዜ ውስጥ ያለ ምንም አይነት የቴክኒክ አደጋ ወይም መስተጓጎል ተጠናቀቀ። በዚያች አጭር ጊዜ ውስጥ ሁለቱም የህንፃው ክፍሎች የታቀደላቸውን የ55 ሜትር ጉዞ በሰላም አጠናቀው በአዲሱ ቦታቸው ላይ በፅኑ ተተከሉ።
❇️ይህ በአልባ ዩሊያ ከተማ የተከናወነው የምህንድስና ገድል በከተማ ፕላን ታሪክ ውስጥ የማይረሳ ትምህርት ጥሎ አልፏል።
❇️ከተማዋ ምንም አይነት የፍርስራሽ ቆሻሻ ሳታመርት፣ አላስፈላጊ ወጪ ሳታወጣ እና 80 ቤተሰቦችን መኖሪያ ሳታሳጣ ሰፊውን የትራንሲልቫኒያ አቬኑ መንገድ መክፈት የቻለች ሲሆን፣ ሁለቱ የህንፃ ክፍሎችም ዛሬም ድረስ በመንገዱ ሁለት ጎን ላይ እንደ ጥበብ ምልክት ቆመው ይገኛሉ።
@etconp
❤9👏8
191_የኮንስትራክሽን_ማዕድን_ፈቃድ_አፈጻጸም_መመሪያ_ቁጥር_191_2018.pdf
283.2 KB
👉በአዲስ አበባበኮንስትራክሽን ማዕድን ሥራ ላይየተሰማራችሁ አልሚዎችና ተቋራጮች❗️
🏷ሰኔ 2018የወጣውን አዲሱን መመሪያ
ሰምታችኋል?
- ስራችሁ እንዳይስተጓጎል
እነዚህን አራት ወሳኝ ነጥቦች
በፍጥነት እወቁ!
አንደኛ፡ የፈቃድ ዘመን ገደብ ⏳
ለጥቁር ድንጋይ ማምረቻ ፈቃድ
ቢበዛ እስከ አምስት ዓመት፤
ለገረጋንቲ፣ ለአሸዋና ለነጭ ድንጋይ ደግሞ
እስከ ሁለት ዓመት ብቻ ነው የሚሰጠው።
በየዓመቱ መታደስም አለበት!
ሁለተኛ፡ ክልክል ቀጠናዎች
ከቤትዎ ወይም ከኮንስትራክሽን ሳይትዎ አጠገብ ማምረት አይችሉም!
ከመኖሪያ መንደርና ከኢንዱስትሪ ፓርክ
አምስት መቶ ሜትር፤ከከፍተኛ ኤሌክትሪክ መስመር ሃያ አምስት ሜትር፤ከወንዝ ዳርቻ ደግሞ ሰላሳ ሜትር ክልል ውስጥ ማዕድን ማምረት ሙሉ በሙሉ ክልክል ነው!
ሦስተኛ፡ አዲስ ፈቃድ ለማውጣት 📋
በአዲሱ አሰራር መሠረት ማመልከት ያለባችሁ በፖርታል ብቻ ነው!
በሕጋዊ አማካሪ የተና የአዋጭነት ጥናት እና
የአካባቢ ተፅዕኖ ግምገማ ማቅረብ
ግዴታችሁ ነው!
ለደረሰ ጉዳት ማስተካከያ የሚሆን
የፋይናንስ ዋስትናም በባንክ ማስገባት ይጠበቅባችኋል።
አራተኛ፡ የድንጋይ መፍጫ ማሽኖች ⚙️
የድንጋይ መፍጫ ማሽን ወይም ባቺንግ ፕላንት ለመትከል ፈቃድ የሚሰጠው፤የማዕድን ማምረት ፈቃድ ላለውና በካባው ውስጥ በቂ ቦታ ለሌለው ሰው ብቻ ነው!
የማሽን መትከያ ፈቃዱም ከማምረቻ ፈቃዱ ጋር አብሮ ያበቃል።
@etconp
🏷ሰኔ 2018የወጣውን አዲሱን መመሪያ
ሰምታችኋል?
- ስራችሁ እንዳይስተጓጎል
እነዚህን አራት ወሳኝ ነጥቦች
በፍጥነት እወቁ!
አንደኛ፡ የፈቃድ ዘመን ገደብ ⏳
ለጥቁር ድንጋይ ማምረቻ ፈቃድ
ቢበዛ እስከ አምስት ዓመት፤
ለገረጋንቲ፣ ለአሸዋና ለነጭ ድንጋይ ደግሞ
እስከ ሁለት ዓመት ብቻ ነው የሚሰጠው።
በየዓመቱ መታደስም አለበት!
ሁለተኛ፡ ክልክል ቀጠናዎች
ከቤትዎ ወይም ከኮንስትራክሽን ሳይትዎ አጠገብ ማምረት አይችሉም!
ከመኖሪያ መንደርና ከኢንዱስትሪ ፓርክ
አምስት መቶ ሜትር፤ከከፍተኛ ኤሌክትሪክ መስመር ሃያ አምስት ሜትር፤ከወንዝ ዳርቻ ደግሞ ሰላሳ ሜትር ክልል ውስጥ ማዕድን ማምረት ሙሉ በሙሉ ክልክል ነው!
ሦስተኛ፡ አዲስ ፈቃድ ለማውጣት 📋
በአዲሱ አሰራር መሠረት ማመልከት ያለባችሁ በፖርታል ብቻ ነው!
በሕጋዊ አማካሪ የተና የአዋጭነት ጥናት እና
የአካባቢ ተፅዕኖ ግምገማ ማቅረብ
ግዴታችሁ ነው!
ለደረሰ ጉዳት ማስተካከያ የሚሆን
የፋይናንስ ዋስትናም በባንክ ማስገባት ይጠበቅባችኋል።
አራተኛ፡ የድንጋይ መፍጫ ማሽኖች ⚙️
የድንጋይ መፍጫ ማሽን ወይም ባቺንግ ፕላንት ለመትከል ፈቃድ የሚሰጠው፤የማዕድን ማምረት ፈቃድ ላለውና በካባው ውስጥ በቂ ቦታ ለሌለው ሰው ብቻ ነው!
የማሽን መትከያ ፈቃዱም ከማምረቻ ፈቃዱ ጋር አብሮ ያበቃል።
@etconp
❤7👍2
👉50 important Site Engineer Interview Questions & Answers for civil/construction engineers
1. What is the role of a Site Engineer?
Answer: Supervising construction activities, ensuring quality, safety, progress, and compliance with drawings and specifications.
2. What is a BOQ?
Answer: Bill of Quantities, a document listing all work items with quantities for estimation and billing.
3. What is a BBS?
Answer: Bar Bending Schedule used for calculating reinforcement quantities.
4. What is the standard slump value for RCC?
Answer: Generally 75–125 mm depending on the structural element and method of placement.
5. What is M20 concrete?
Answer: Concrete with characteristic compressive strength of 20 MPa after 28 days.
6. What is cover in RCC?
Answer: Distance between reinforcement and concrete surface.
7. Why is concrete curing necessary?
Answer: To achieve strength, durability, and reduce cracking.
8. Minimum curing period for OPC concrete?
Answer: 7 days minimum (14 days preferred).
9. What is honeycombing?
Answer: Voids in concrete caused by poor compaction.
10. What is segregation?
Answer: Separation of coarse aggregates from concrete mix.
11. What is bleeding in concrete?
Answer: Upward movement of water after placing concrete.
12. Difference between PCC and RCC?
Answer: PCC has no reinforcement; RCC contains steel reinforcement.
13. What is a construction joint?
Answer: Joint provided when concrete placement is stopped and resumed later.
14. What is a cold joint?
Answer: Joint formed when fresh concrete is placed over hardened concrete.
15. What is the water-cement ratio?
Answer: Ratio of water weight to cement weight in concrete.
16. What is compaction?
Answer: Removal of air voids from concrete or soil.
17. What is soil compaction tested by?
Answer: Field Density Test (FDT).
18. What is OMC?
Answer: Optimum Moisture Content.
19. What is MDD?
Answer: Maximum Dry Density.
20. What is plinth beam?
Answer: Beam provided at plinth level to distribute loads and prevent differential settlement.
21. What is lap length?
Answer: Length required to transfer stress from one bar to another.
22. What is development length?
Answer: Length needed to develop full strength of reinforcement.
23. Why are stirrups provided?
Answer: To resist shear forces and hold main bars.
24. What is camber?
Answer: Upward curve provided in beams or roads.
25. What is shuttering?
Answer: Temporary formwork used for casting concrete.
26. What is deshuttering?
Answer: Removal of formwork after concrete gains sufficient strength.
27. What is the cube test?
Answer: Test conducted to determine compressive strength of concrete.
28. Why are cube tests done at 7 and 28 days?
Answer: To monitor early and final strength.
29. What is reinforcement spacing?
Answer: Distance between adjacent reinforcing bars.
30. What is a footing?
Answer: Foundation element that transfers structural load to soil.
31. Difference between isolated and combined footing?
Answer: Isolated supports one column; combined supports two or more columns.
32. What is raft foundation?
Answer: Large slab foundation supporting multiple columns.
33. What is pile foundation?
Answer: Deep foundation transferring load to deeper soil strata.
34. What is WMM?
Answer: Wet Mix Macadam used in road construction.
35. What is GSB?
Answer: Granular Sub-Base layer in pavement construction.
36. What is DPR?
Answer: Daily Progress Report.
37. What is an RFI?
Answer: Request for Inspection.
38. What is an ITP?
Answer: Inspection and Test Plan.
39. What is a QAP?
Answer: Quality Assurance Plan.
40. What is NCR?
Answer: Non-Conformance Report issued for quality deviations.
41. What safety PPE is mandatory on site?
Answer: Helmet, safety shoes, reflective jacket, gloves, and goggles.
42. What is a toolbox talk?
Answer: Short safety briefing before work starts.
43. What is a method statement?
Answer: Document describing how a work activity will be executed safely and correctly.
1. What is the role of a Site Engineer?
Answer: Supervising construction activities, ensuring quality, safety, progress, and compliance with drawings and specifications.
2. What is a BOQ?
Answer: Bill of Quantities, a document listing all work items with quantities for estimation and billing.
3. What is a BBS?
Answer: Bar Bending Schedule used for calculating reinforcement quantities.
4. What is the standard slump value for RCC?
Answer: Generally 75–125 mm depending on the structural element and method of placement.
5. What is M20 concrete?
Answer: Concrete with characteristic compressive strength of 20 MPa after 28 days.
6. What is cover in RCC?
Answer: Distance between reinforcement and concrete surface.
7. Why is concrete curing necessary?
Answer: To achieve strength, durability, and reduce cracking.
8. Minimum curing period for OPC concrete?
Answer: 7 days minimum (14 days preferred).
9. What is honeycombing?
Answer: Voids in concrete caused by poor compaction.
10. What is segregation?
Answer: Separation of coarse aggregates from concrete mix.
11. What is bleeding in concrete?
Answer: Upward movement of water after placing concrete.
12. Difference between PCC and RCC?
Answer: PCC has no reinforcement; RCC contains steel reinforcement.
13. What is a construction joint?
Answer: Joint provided when concrete placement is stopped and resumed later.
14. What is a cold joint?
Answer: Joint formed when fresh concrete is placed over hardened concrete.
15. What is the water-cement ratio?
Answer: Ratio of water weight to cement weight in concrete.
16. What is compaction?
Answer: Removal of air voids from concrete or soil.
17. What is soil compaction tested by?
Answer: Field Density Test (FDT).
18. What is OMC?
Answer: Optimum Moisture Content.
19. What is MDD?
Answer: Maximum Dry Density.
20. What is plinth beam?
Answer: Beam provided at plinth level to distribute loads and prevent differential settlement.
21. What is lap length?
Answer: Length required to transfer stress from one bar to another.
22. What is development length?
Answer: Length needed to develop full strength of reinforcement.
23. Why are stirrups provided?
Answer: To resist shear forces and hold main bars.
24. What is camber?
Answer: Upward curve provided in beams or roads.
25. What is shuttering?
Answer: Temporary formwork used for casting concrete.
26. What is deshuttering?
Answer: Removal of formwork after concrete gains sufficient strength.
27. What is the cube test?
Answer: Test conducted to determine compressive strength of concrete.
28. Why are cube tests done at 7 and 28 days?
Answer: To monitor early and final strength.
29. What is reinforcement spacing?
Answer: Distance between adjacent reinforcing bars.
30. What is a footing?
Answer: Foundation element that transfers structural load to soil.
31. Difference between isolated and combined footing?
Answer: Isolated supports one column; combined supports two or more columns.
32. What is raft foundation?
Answer: Large slab foundation supporting multiple columns.
33. What is pile foundation?
Answer: Deep foundation transferring load to deeper soil strata.
34. What is WMM?
Answer: Wet Mix Macadam used in road construction.
35. What is GSB?
Answer: Granular Sub-Base layer in pavement construction.
36. What is DPR?
Answer: Daily Progress Report.
37. What is an RFI?
Answer: Request for Inspection.
38. What is an ITP?
Answer: Inspection and Test Plan.
39. What is a QAP?
Answer: Quality Assurance Plan.
40. What is NCR?
Answer: Non-Conformance Report issued for quality deviations.
41. What safety PPE is mandatory on site?
Answer: Helmet, safety shoes, reflective jacket, gloves, and goggles.
42. What is a toolbox talk?
Answer: Short safety briefing before work starts.
43. What is a method statement?
Answer: Document describing how a work activity will be executed safely and correctly.
❤17👍2🎉1
44. How do you check brickwork quality?
Answer: Line, level, plumb, mortar thickness, and material quality.
45. What documents should be checked before starting work?
Answer: Drawings, specifications, BOQ, method statement, ITP, and approvals.
46. How do you calculate concrete quantity?
Answer: Length × Width × Depth.
47. How do you calculate steel quantity?
Answer: Number of bars × Length × Unit Weight.
48. How do you handle a delay in work?
Answer: Identify causes, allocate resources, revise schedule, and monitor closely.
49. How do you ensure quality on site?
Answer: Follow drawings, specifications, inspections, testing, and documentation.
50. Why should we hire you as a Site Engineer?
Answer: I possess strong technical knowledge, site supervision skills, quality control awareness, safety focus, and the ability to deliver projects on time and within budget.
@etconp
Answer: Line, level, plumb, mortar thickness, and material quality.
45. What documents should be checked before starting work?
Answer: Drawings, specifications, BOQ, method statement, ITP, and approvals.
46. How do you calculate concrete quantity?
Answer: Length × Width × Depth.
47. How do you calculate steel quantity?
Answer: Number of bars × Length × Unit Weight.
48. How do you handle a delay in work?
Answer: Identify causes, allocate resources, revise schedule, and monitor closely.
49. How do you ensure quality on site?
Answer: Follow drawings, specifications, inspections, testing, and documentation.
50. Why should we hire you as a Site Engineer?
Answer: I possess strong technical knowledge, site supervision skills, quality control awareness, safety focus, and the ability to deliver projects on time and within budget.
@etconp
❤14👍5
👉ሙሉ G+2 ህንፃ የምትፈልጉ ከታች ባለው ሊንክ በመግባት ያውርዱ🙏 👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5dc437caa02_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a5dc437caa02_etconp
Ye-Buna
Complete G+2 Building Plan 140 m² – Full AR, ST, EL,SN
❤4🙏2👍1😭1
አንዳንድ መሐንዲሶች ምህንድስናን በእውነቱ ይማሩ
ምህንድስና በመሠረቱ የችግር ፈቺ ሳይንስ ነው። ሳይንሳዊ እውቀትን፣ ሂሳብን፣ ቴክኖሎጂንና ፈጠራን በማዋሃድ ለሰው ልጅ ተጨባጭ መፍትሄዎችን የሚያመነጭ ሙያ ነው። በዓለም ዛሬ የምናያቸው ዘመናዊ ህንፃዎች፣ ድልድዮች፣ መንገዶች፣ የውኃና የኤሌክትሪክ መሠረተ ልማቶች ሁሉ በየቀኑ ችግሮችን በመለየት፣ በመተንተን እና በመፍታት የተገኙ የምህንድስና ስኬቶች ናቸው።
የህንፃ ቴክኖሎጂን ብንመለከት፣ በጥንት ዘመን ዝቅተኛ ህንፃዎች በቀላል መሣሪያዎች ይገነቡ ነበር። የግንባታ ቁመት ሲጨምር አዳዲስ የግንባታ ዘዴዎችና መሣሪያዎች ተፈጠሩ። ዛሬ ስካፎልዲንግ፣ ክሬን፣ ኮንክሪት ፓምፕ፣ ታወር ክሬን፣ ሊፍት እና ሌሎች ዘመናዊ ቴክኖሎጂዎች በመጠቀም በመቶዎች ሜትር ከፍታ ያላቸው ሰማይ ጠቀስ ህንፃዎች በደህንነትና በጥራት ይገነባሉ። ይህ ሁሉ የሆነው መሐንዲሶች "ችግር ሲያጋጥም መፍትሄ እንፈልጋለን" በሚል መንፈስ ስለሠሩ ነው።
ስለዚህ የመሐንዲስ ዋና ኃላፊነት ችግርን ማብዛት ሳይሆን መፍትሄን መፍጠር ነው። እውነተኛ መሐንዲስ ህግን፣ መመሪያን፣ ቴክኒካዊ ደረጃዎችንና የደህንነት መስፈርቶችን እያከበረ ሥራው እንዴት እንደሚሳካ ይፈልጋል። እንዴት እንደማይሳካ ምክንያት አይፈልግም።
በአገራችን ግን አንዳንድ ጊዜ የምናየው ችግር የምህንድስናን መሠረታዊ ፍልስፍና ከመርሳት የሚመነጭ ይመስላል።
አንዳንድ በቢሮ የተቀመጡ መሐንዲሶች ቴክኒካዊ ችግሮችን በሙያዊ እውቀት ከመፍታት ይልቅ የማይጠቅሙ የአሠራር እንቅፋቶችን በመፍጠር ፕሮጀክቶች እንዲዘገዩ፣ ወጪያቸው እንዲጨምር እና ጥራታቸው እንዲጓደል ሲያደርጉ ይታያል። ይህ የሙያውን መሠረታዊ አላማ የሚቃረን ነው። እርግጥ ነው፣ ይህን ችግር ለሁሉም መሐንዲሶች ማጠቃለል ትክክል አይሆንም። በታማኝነት፣ በብቃትና በፈጠራ አገራቸውን የሚያገለግሉ ብዙ መሐንዲሶች አሉ። ሆኖም ግን የቴክኒክ ዕውቀትን ከሙያ ሥነ-ምግባር ጋር ማጣመር ያልቻሉ ግለሰቦች መኖራቸው እውነታ ነው።
ይህ ችግር በአንዳንድ አማካሪ (Consultancy) ዘርፍም አንዳንድ ጊዜ ይስተዋላል። በመሠረቱ የአማካሪ ድርጅት ሚና ፕሮጀክትን ማወሳሰብ ሳይሆን ማቃለል ነው። አማካሪ የተቀጠረው በሙያዊ እውቀቱ ለባለቤቱ፣ ለተቋራጩና ለሌሎች ባለድርሻ አካላት መካከል ግልጽ፣ ትክክለኛና ፈጣን የቴክኒክ ውሳኔ እንዲሰጥ፣ አደጋዎችን እንዲቀንስ፣ ወጪና ጊዜን እንዲቆጥብ እና የፕሮጀክቱን ጥራት እንዲያረጋግጥ ነው።
ነገር ግን አንዳንድ አማካሪ ድርጅቶች የሚያሳዩት አሠራር የዚህን ተልዕኮ የሚቃረን ይመስላል። አስፈላጊ ያልሆኑ የሰነድ መመላለሶች፣ የውሳኔ መዘግየቶች፣ አላስፈላጊ የቢሮክራሲ ሂደቶች ወይም ቴክኒካዊ መፍትሄ ሊያገኙ የሚችሉ ጉዳዮችን ያለ ምክንያት በማጓተት የፕሮጀክት ጊዜንና ወጪን የሚያሳድጉ ሁኔታዎች ይታያሉ። እንዲህ ዓይነቱ አሠራር የአማካሪነትን መሠረታዊ ዓላማ አይወክልም። ከሙያዊ አገልግሎት ይልቅ ለፕሮጀክት እንቅፋት የሚሆን አካሄድ ነው።
እውነተኛ አማካሪ ማለት ችግር ሲፈጠር ከህግ፣ ከቴክኒክ ደረጃዎችና ከኮንትራት መስፈርቶች አንጻር ፈጣን፣ ተግባራዊና ፍትሃዊ መፍትሄ የሚያቀርብ ባለሙያ ነው። የአማካሪነት ስኬት የሚለካው የጻፈው ደብዳቤ ብዛት ሳይሆን፣ የፈታው ችግር፣ ያዳነው ጊዜ፣ የቆጠበው ወጪ እና ያረጋገጠው ጥራት ነው።
በመሆኑም የመፍትሄ አቅጣጫው ጥፋትን መውቀስ ብቻ ሳይሆን ቀጣይ የሙያ ማሻሻያ (Continuing Professional Development)፣ የሙያ ሥነ-ምግባር ስልጠና፣ በችግር ፈቺ አስተሳሰብ ላይ የተመሰረተ ስልጠና እና የተጠያቂነት ሥርዓት ማጠናከር ነው።
በመጨረሻም መሐንዲስነት ማለት ዲግሪ መያዝ ብቻ አይደለም። በሳይንሳዊ እውቀት፣ በፈጠራ አስተሳሰብ፣ በሙያ ሥነ-ምግባርና በሕዝብ ጥቅም ላይ ተመስርቶ ችግሮችን ወደ መፍትሄ የሚቀይር ኃላፊነት ነው። መሐንዲሶችም ሆኑ አማካሪዎች የተማሩትን የሙያ ቀለም ብቻ ሳይሆን መንፈሱንም ሊረዱ ይገባል። ምክንያቱም እውነተኛ ምህንድስናና እውነተኛ አማካሪነት የችግር ፈቺ እንጂ የችግር ፈጣሪ አይደሉምና።
Via Redi
@etconp
ምህንድስና በመሠረቱ የችግር ፈቺ ሳይንስ ነው። ሳይንሳዊ እውቀትን፣ ሂሳብን፣ ቴክኖሎጂንና ፈጠራን በማዋሃድ ለሰው ልጅ ተጨባጭ መፍትሄዎችን የሚያመነጭ ሙያ ነው። በዓለም ዛሬ የምናያቸው ዘመናዊ ህንፃዎች፣ ድልድዮች፣ መንገዶች፣ የውኃና የኤሌክትሪክ መሠረተ ልማቶች ሁሉ በየቀኑ ችግሮችን በመለየት፣ በመተንተን እና በመፍታት የተገኙ የምህንድስና ስኬቶች ናቸው።
የህንፃ ቴክኖሎጂን ብንመለከት፣ በጥንት ዘመን ዝቅተኛ ህንፃዎች በቀላል መሣሪያዎች ይገነቡ ነበር። የግንባታ ቁመት ሲጨምር አዳዲስ የግንባታ ዘዴዎችና መሣሪያዎች ተፈጠሩ። ዛሬ ስካፎልዲንግ፣ ክሬን፣ ኮንክሪት ፓምፕ፣ ታወር ክሬን፣ ሊፍት እና ሌሎች ዘመናዊ ቴክኖሎጂዎች በመጠቀም በመቶዎች ሜትር ከፍታ ያላቸው ሰማይ ጠቀስ ህንፃዎች በደህንነትና በጥራት ይገነባሉ። ይህ ሁሉ የሆነው መሐንዲሶች "ችግር ሲያጋጥም መፍትሄ እንፈልጋለን" በሚል መንፈስ ስለሠሩ ነው።
ስለዚህ የመሐንዲስ ዋና ኃላፊነት ችግርን ማብዛት ሳይሆን መፍትሄን መፍጠር ነው። እውነተኛ መሐንዲስ ህግን፣ መመሪያን፣ ቴክኒካዊ ደረጃዎችንና የደህንነት መስፈርቶችን እያከበረ ሥራው እንዴት እንደሚሳካ ይፈልጋል። እንዴት እንደማይሳካ ምክንያት አይፈልግም።
በአገራችን ግን አንዳንድ ጊዜ የምናየው ችግር የምህንድስናን መሠረታዊ ፍልስፍና ከመርሳት የሚመነጭ ይመስላል።
አንዳንድ በቢሮ የተቀመጡ መሐንዲሶች ቴክኒካዊ ችግሮችን በሙያዊ እውቀት ከመፍታት ይልቅ የማይጠቅሙ የአሠራር እንቅፋቶችን በመፍጠር ፕሮጀክቶች እንዲዘገዩ፣ ወጪያቸው እንዲጨምር እና ጥራታቸው እንዲጓደል ሲያደርጉ ይታያል። ይህ የሙያውን መሠረታዊ አላማ የሚቃረን ነው። እርግጥ ነው፣ ይህን ችግር ለሁሉም መሐንዲሶች ማጠቃለል ትክክል አይሆንም። በታማኝነት፣ በብቃትና በፈጠራ አገራቸውን የሚያገለግሉ ብዙ መሐንዲሶች አሉ። ሆኖም ግን የቴክኒክ ዕውቀትን ከሙያ ሥነ-ምግባር ጋር ማጣመር ያልቻሉ ግለሰቦች መኖራቸው እውነታ ነው።
ይህ ችግር በአንዳንድ አማካሪ (Consultancy) ዘርፍም አንዳንድ ጊዜ ይስተዋላል። በመሠረቱ የአማካሪ ድርጅት ሚና ፕሮጀክትን ማወሳሰብ ሳይሆን ማቃለል ነው። አማካሪ የተቀጠረው በሙያዊ እውቀቱ ለባለቤቱ፣ ለተቋራጩና ለሌሎች ባለድርሻ አካላት መካከል ግልጽ፣ ትክክለኛና ፈጣን የቴክኒክ ውሳኔ እንዲሰጥ፣ አደጋዎችን እንዲቀንስ፣ ወጪና ጊዜን እንዲቆጥብ እና የፕሮጀክቱን ጥራት እንዲያረጋግጥ ነው።
ነገር ግን አንዳንድ አማካሪ ድርጅቶች የሚያሳዩት አሠራር የዚህን ተልዕኮ የሚቃረን ይመስላል። አስፈላጊ ያልሆኑ የሰነድ መመላለሶች፣ የውሳኔ መዘግየቶች፣ አላስፈላጊ የቢሮክራሲ ሂደቶች ወይም ቴክኒካዊ መፍትሄ ሊያገኙ የሚችሉ ጉዳዮችን ያለ ምክንያት በማጓተት የፕሮጀክት ጊዜንና ወጪን የሚያሳድጉ ሁኔታዎች ይታያሉ። እንዲህ ዓይነቱ አሠራር የአማካሪነትን መሠረታዊ ዓላማ አይወክልም። ከሙያዊ አገልግሎት ይልቅ ለፕሮጀክት እንቅፋት የሚሆን አካሄድ ነው።
እውነተኛ አማካሪ ማለት ችግር ሲፈጠር ከህግ፣ ከቴክኒክ ደረጃዎችና ከኮንትራት መስፈርቶች አንጻር ፈጣን፣ ተግባራዊና ፍትሃዊ መፍትሄ የሚያቀርብ ባለሙያ ነው። የአማካሪነት ስኬት የሚለካው የጻፈው ደብዳቤ ብዛት ሳይሆን፣ የፈታው ችግር፣ ያዳነው ጊዜ፣ የቆጠበው ወጪ እና ያረጋገጠው ጥራት ነው።
በመሆኑም የመፍትሄ አቅጣጫው ጥፋትን መውቀስ ብቻ ሳይሆን ቀጣይ የሙያ ማሻሻያ (Continuing Professional Development)፣ የሙያ ሥነ-ምግባር ስልጠና፣ በችግር ፈቺ አስተሳሰብ ላይ የተመሰረተ ስልጠና እና የተጠያቂነት ሥርዓት ማጠናከር ነው።
በመጨረሻም መሐንዲስነት ማለት ዲግሪ መያዝ ብቻ አይደለም። በሳይንሳዊ እውቀት፣ በፈጠራ አስተሳሰብ፣ በሙያ ሥነ-ምግባርና በሕዝብ ጥቅም ላይ ተመስርቶ ችግሮችን ወደ መፍትሄ የሚቀይር ኃላፊነት ነው። መሐንዲሶችም ሆኑ አማካሪዎች የተማሩትን የሙያ ቀለም ብቻ ሳይሆን መንፈሱንም ሊረዱ ይገባል። ምክንያቱም እውነተኛ ምህንድስናና እውነተኛ አማካሪነት የችግር ፈቺ እንጂ የችግር ፈጣሪ አይደሉምና።
Via Redi
@etconp
👍26❤15🎉1
👉የ Isolated Footing ዲዛይን ስታደርጉ የሚሰራላቹ እና ስራቹ የሚያቀልላቹ ምርጥ Excel ፋይል ከፈለጉ ከታች ባለው ሊንክ አውርደው ይጠቀሙ👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5f6b3b1c816_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a5f6b3b1c816_etconp
Ye-Buna
Isolated Footing Design Excel
This Isolated Footing Design Excel spread sheet provides… 399 ETB · 5 sold. Instant download from Ethio Construction Engineering on Ye-Buna. Pay with…
👏4
አለምዓቀፍ ህንጻ ነዳፊ
ዛሀ ሀዲድ
እንዴት ህንጻ ነዳፊ ለመሆን እንደፈለገች ከተናገረችው።
"ዕድሜዬ ስድስት ዓመት እያለ፣ አክስቴ በሰሜን ኢራቅ በምትገኘው ሞሱል ከተማ ውስጥ ቤት ታሰራ ነበር። ህንጻ ነዳፊው የአባቴ የቅርብ ጓደኛ ስለነበረ የቤቱን ንድፎች እና ሞዴሎች ይዞ ወደ ቤታችን ይመጣ ነበር። ሞዴሉን በሳሎናችን ውስጥ ማየቴን አስታውሳለሁ፤ በውስጤ የሆነ ትልቅ ጉጉት ቀሰቀሰብኝ—የህይወት ጉዞዬ የጀመረው ያኔ ነበር።"
ዛሃ ሃዲድ
ዛሃ ሃዲድ በ2012 እ.አ.አ ከዘ ጋርዲያን (The Guardian) ጋዜጣ ጋር ባደረገችው ቃለ ምልልስ፣ ለህንፃ ንድፍ ፍላጎት እንዲያድርባት ስላደረጓት የቀድሞ ትዝታዎቿ ስታንጸባርቅ ከተናገረችው የተወሰደ።
Via Enez Desig Associates
🎬ሙሉ ታሪክዋ ማዳመጥ ከፈለጉ ከታች ባለዉ የ Youtube ቻናላችን ይመልከቱ👇
https://youtu.be/MEcXgWQQCIg?si=JBNpqMQ09zdEooG_
@etconp
ዛሀ ሀዲድ
እንዴት ህንጻ ነዳፊ ለመሆን እንደፈለገች ከተናገረችው።
"ዕድሜዬ ስድስት ዓመት እያለ፣ አክስቴ በሰሜን ኢራቅ በምትገኘው ሞሱል ከተማ ውስጥ ቤት ታሰራ ነበር። ህንጻ ነዳፊው የአባቴ የቅርብ ጓደኛ ስለነበረ የቤቱን ንድፎች እና ሞዴሎች ይዞ ወደ ቤታችን ይመጣ ነበር። ሞዴሉን በሳሎናችን ውስጥ ማየቴን አስታውሳለሁ፤ በውስጤ የሆነ ትልቅ ጉጉት ቀሰቀሰብኝ—የህይወት ጉዞዬ የጀመረው ያኔ ነበር።"
ዛሃ ሃዲድ
ዛሃ ሃዲድ በ2012 እ.አ.አ ከዘ ጋርዲያን (The Guardian) ጋዜጣ ጋር ባደረገችው ቃለ ምልልስ፣ ለህንፃ ንድፍ ፍላጎት እንዲያድርባት ስላደረጓት የቀድሞ ትዝታዎቿ ስታንጸባርቅ ከተናገረችው የተወሰደ።
Via Enez Desig Associates
🎬ሙሉ ታሪክዋ ማዳመጥ ከፈለጉ ከታች ባለዉ የ Youtube ቻናላችን ይመልከቱ👇
https://youtu.be/MEcXgWQQCIg?si=JBNpqMQ09zdEooG_
@etconp
❤29
👉 ለአዲስ አበባ ኮንስትራክሽን እና ሪል እስቴት ባለሙያዎችና ባለድርሻ አካላት የሚደርስ ጥብቅ መልዕክት! 🏗️⚠️
አዲስ አበባ ታጥረው ያለምንም አገልግሎት በተቀመጡ መሬቶች ላይ የመጨረሻ ዕርምጃ ልትወስድ መሆኑን የከተማ አስተዳደሩ አስታወቀ!
የአዲስ አበባ ከተማ አስተዳደር ከንቲባ አዳነች አቤቤ የ2018 በጀት ዓመት አፈጻጸም ግምገማ ማጠቃለያ መድረክ ላይ ባደረጉት ንግግር፤ ከተማዋ መሬት ታጥሮ የሚቀመጥባት እንዳልሆነች አፅንኦት ሰጥተው ገልጸዋል።
ቁልፍ ጉዳዮች እና የተወሰኑ ውሳኔዎች፡
በታጠሩ መሬቶች ላይ የሚወሰደው እርምጃ፦
አስፈላጊው ማጣራት ተደርጎ ቀደም ሲል የተደረሰውን መግባባት ጥሰው መሬት አጥረው በሚያስቀምጡ አካላት ላይ በሚቀጥሉት ሁለት ወራት ውስጥ ጥብቅ እርምጃዎች ይወሰዳሉ፤ ምንም ዓይነት ተጨማሪ ዕድልም አይሰጥም።
የገቢ አሰባሰብ አፈጻጸም፦
የከተማዋን ገቢ አሰባሰብ ለማዘመን በተከናወነው ሥራ፣ የአዲስ አበባ ገቢዎች ቢሮ ከአፍሪካ መልካም አሠራር አላቸው ከተባሉ 6 ከተሞች መካከል አንደኛ መውጣቱ ከአፍሪካ ኢኮኖሚክ ኮሚሽን ጥናት ተረጋግጧል።
የመሠረተ ልማት እና ጤና ዘርፍ እምርታ፦
ባለፉት አምስት ዓመታት የተከናወኑ የጤናና የመሠረተ ልማት ሥራዎች (በአልጋ ቁጥር፣ በሕክምና መሣሪያዎችና ተቋማት ይዘት) ከዚህ ቀደም ከተሠሩት ጋር ሲነፃፀሩ በእጥፍ ማደጋቸው ተገልጿል። እንዲሁም የከተማዋን ሰላም ለማስከበር የተሠሩ ማኅበረሰብ አቀፍ ሥራዎች በርካታ አገር አቀፍና ዓለም አቀፍ ኩነቶች በሰላም እንዲጠናቀቁ አስችለዋል።
ይህ የመሬት አጠቃቀም ቁጥጥር እና የከተማ አስተዳደሩ ጥብቅ አቋም በኮንስትራክሽንና ሪል እስቴት ዘርፍ ላይ ቀጥተኛ ተጽዕኖ የሚኖረው በመሆኑ፣ ባለሀብቶችና የዘርፉ ባለሙያዎች አስፈላጊውን ቅድመ ዝግጅት እንዲያደርጉ እናሳስባለን።
🚧ለተጨማሪ መረጃና የዘርፉ ትንታኔዎች ሌላኛው የቴሌግራም ቻናል ይቀላቀሉ👇
https://t.me/ETCONpWORK
አዲስ አበባ ታጥረው ያለምንም አገልግሎት በተቀመጡ መሬቶች ላይ የመጨረሻ ዕርምጃ ልትወስድ መሆኑን የከተማ አስተዳደሩ አስታወቀ!
የአዲስ አበባ ከተማ አስተዳደር ከንቲባ አዳነች አቤቤ የ2018 በጀት ዓመት አፈጻጸም ግምገማ ማጠቃለያ መድረክ ላይ ባደረጉት ንግግር፤ ከተማዋ መሬት ታጥሮ የሚቀመጥባት እንዳልሆነች አፅንኦት ሰጥተው ገልጸዋል።
ቁልፍ ጉዳዮች እና የተወሰኑ ውሳኔዎች፡
በታጠሩ መሬቶች ላይ የሚወሰደው እርምጃ፦
አስፈላጊው ማጣራት ተደርጎ ቀደም ሲል የተደረሰውን መግባባት ጥሰው መሬት አጥረው በሚያስቀምጡ አካላት ላይ በሚቀጥሉት ሁለት ወራት ውስጥ ጥብቅ እርምጃዎች ይወሰዳሉ፤ ምንም ዓይነት ተጨማሪ ዕድልም አይሰጥም።
የገቢ አሰባሰብ አፈጻጸም፦
የከተማዋን ገቢ አሰባሰብ ለማዘመን በተከናወነው ሥራ፣ የአዲስ አበባ ገቢዎች ቢሮ ከአፍሪካ መልካም አሠራር አላቸው ከተባሉ 6 ከተሞች መካከል አንደኛ መውጣቱ ከአፍሪካ ኢኮኖሚክ ኮሚሽን ጥናት ተረጋግጧል።
የመሠረተ ልማት እና ጤና ዘርፍ እምርታ፦
ባለፉት አምስት ዓመታት የተከናወኑ የጤናና የመሠረተ ልማት ሥራዎች (በአልጋ ቁጥር፣ በሕክምና መሣሪያዎችና ተቋማት ይዘት) ከዚህ ቀደም ከተሠሩት ጋር ሲነፃፀሩ በእጥፍ ማደጋቸው ተገልጿል። እንዲሁም የከተማዋን ሰላም ለማስከበር የተሠሩ ማኅበረሰብ አቀፍ ሥራዎች በርካታ አገር አቀፍና ዓለም አቀፍ ኩነቶች በሰላም እንዲጠናቀቁ አስችለዋል።
ይህ የመሬት አጠቃቀም ቁጥጥር እና የከተማ አስተዳደሩ ጥብቅ አቋም በኮንስትራክሽንና ሪል እስቴት ዘርፍ ላይ ቀጥተኛ ተጽዕኖ የሚኖረው በመሆኑ፣ ባለሀብቶችና የዘርፉ ባለሙያዎች አስፈላጊውን ቅድመ ዝግጅት እንዲያደርጉ እናሳስባለን።
🚧ለተጨማሪ መረጃና የዘርፉ ትንታኔዎች ሌላኛው የቴሌግራም ቻናል ይቀላቀሉ👇
https://t.me/ETCONpWORK
Telegram
Ethiopian Construction Vacancy & Tender
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World
Buy ads: https://telega.io/c/ETCONpWORK
📩 @Philemona7
❤6👏3
#ADVERTISEMENT
📲 አንድ ተች ብቻ፤ የእርስዎን ስራ እና ብቃት ያስተዋውቁ!
የቢዝነስ ካርዶች ማተም እና ማደስ አልፎበታል። በNFC ዲጂታል ቢዝነስ ካርድ የሚፈልጉትን ስልክ በማስነካት የእርስዎን ስልክ ቁጥር፣ WhatsApp፣ Telegram፣ Email፣ Portfolio እና ፕሮጀክቶች ወዲያውኑ ለደንበኞችዎ ያጋሩ።
ለኢንጂነሮች፣ ኮንትራክተሮች፣ ሪል እስቴት ሙያተኞች እና የቢዝነስ ባለቤቶች ተስማሚ !
📞 0931639484
ለማዘዝ እና ለተጨማሪ መረጃ ይደውሉ።
📲 አንድ ተች ብቻ፤ የእርስዎን ስራ እና ብቃት ያስተዋውቁ!
የቢዝነስ ካርዶች ማተም እና ማደስ አልፎበታል። በNFC ዲጂታል ቢዝነስ ካርድ የሚፈልጉትን ስልክ በማስነካት የእርስዎን ስልክ ቁጥር፣ WhatsApp፣ Telegram፣ Email፣ Portfolio እና ፕሮጀክቶች ወዲያውኑ ለደንበኞችዎ ያጋሩ።
ለኢንጂነሮች፣ ኮንትራክተሮች፣ ሪል እስቴት ሙያተኞች እና የቢዝነስ ባለቤቶች ተስማሚ !
📞 0931639484
ለማዘዝ እና ለተጨማሪ መረጃ ይደውሉ።
❤6
📐Derivation of Steel Bar Weight Formula (D²/162)
💫The formula D²/162 is a quick method used by civil engineers to calculate the weight of a steel reinforcement bar (rebar) per meter.
🚧Step-by-Step Derivation:
1. Area of Steel Bar
Steel bars have a circular cross-section.
Area = πD²/4
2. Volume of 1 Meter Steel Bar
Volume = Area × Length
Since 1 m = 1000 mm:
Volume = (πD²/4) × 1000 mm
3. Density of Steel
Standard density = 7850 kg/m³
4. Weight Calculation
Weight = Volume × Density
After simplifying and converting units:
Weight of 1 meter steel bar = D²/162 kg/m
🏷Example:
8 mm bar: 8²/162 = 0.395 kg/m
10 mm bar: 10²/162 = 0.617 kg/m
12 mm bar: 12²/162 = 0.889 kg/m
16 mm bar: 16²/162 = 1.58 kg/m
20 mm bar: 20²/162 = 2.47 kg/m
25 mm bar: 25²/162 = 3.86 kg/m
💡 Remember: This formula is widely used for estimating reinforcement steel quantities quickly during design, estimation, and site execution.
@etconp
💫The formula D²/162 is a quick method used by civil engineers to calculate the weight of a steel reinforcement bar (rebar) per meter.
🚧Step-by-Step Derivation:
1. Area of Steel Bar
Steel bars have a circular cross-section.
Area = πD²/4
2. Volume of 1 Meter Steel Bar
Volume = Area × Length
Since 1 m = 1000 mm:
Volume = (πD²/4) × 1000 mm
3. Density of Steel
Standard density = 7850 kg/m³
4. Weight Calculation
Weight = Volume × Density
After simplifying and converting units:
Weight of 1 meter steel bar = D²/162 kg/m
🏷Example:
8 mm bar: 8²/162 = 0.395 kg/m
10 mm bar: 10²/162 = 0.617 kg/m
12 mm bar: 12²/162 = 0.889 kg/m
16 mm bar: 16²/162 = 1.58 kg/m
20 mm bar: 20²/162 = 2.47 kg/m
25 mm bar: 25²/162 = 3.86 kg/m
💡 Remember: This formula is widely used for estimating reinforcement steel quantities quickly during design, estimation, and site execution.
@etconp
❤19👍12
👉𝗖𝗶𝘃𝗶𝗹 𝗘𝗻𝗴𝗶𝗻𝗲𝗲𝗿𝗶𝗻𝗴 𝗦𝗶𝘁𝗲 𝗞𝗻𝗼𝘄𝗹𝗲𝗱𝗴𝗲 | 𝗖𝗼𝗻𝗰𝗿𝗲𝘁𝗲 𝗣𝗹𝗮𝗰𝗲𝗺𝗲𝗻𝘁
✅𝗤𝘂𝗲𝘀𝘁𝗶𝗼𝗻 𝗼𝗳 𝘁𝗵𝗲 𝗗𝗮𝘆
What is the maximum allowable CONCRETE TEMPERATURE at placement?
🅰️ 25°C
🅱️ 30°C
🅲️ 32°C
🅳️ 35°C
Share your answer in the comments and explain why you selected it.
Let's see who has strong practical construction site knowledge!
𝗪𝗵𝘆 𝗧𝗵𝗶𝘀 𝗧𝗼𝗽𝗶𝗰 𝗜𝘀 𝗜𝗺𝗽𝗼𝗿𝘁𝗮𝗻𝘁
Concrete temperature at placement directly affects concrete quality, compressive strength, workability, setting time, durability, shrinkage, and crack resistance.
Every civil engineer, site engineer, QA/QC engineer, construction manager, concrete technologist, project engineer, and structural engineer should understand the recommended placement limits to ensure long-lasting RCC structures and successful construction projects.
Whether you work on building construction, bridge construction, highway engineering, commercial projects, industrial construction, foundation works, or infrastructure development, mastering concrete placement practices is an essential part of professional site engineering. Staying updated with practical site knowledge also improves construction quality control, inspection skills, and engineering decision-making.
𝗝𝗼𝗶𝗻 𝘁𝗵𝗲 𝗗𝗶𝘀𝗰𝘂𝘀𝘀𝗶𝗼𝗻
Comment your answer with a brief explanation, compare your knowledge with other engineers, and help create a valuable learning community for everyone interested in civil engineering and modern construction practices.
@etconp
✅𝗤𝘂𝗲𝘀𝘁𝗶𝗼𝗻 𝗼𝗳 𝘁𝗵𝗲 𝗗𝗮𝘆
What is the maximum allowable CONCRETE TEMPERATURE at placement?
🅰️ 25°C
🅱️ 30°C
🅲️ 32°C
🅳️ 35°C
Share your answer in the comments and explain why you selected it.
Let's see who has strong practical construction site knowledge!
𝗪𝗵𝘆 𝗧𝗵𝗶𝘀 𝗧𝗼𝗽𝗶𝗰 𝗜𝘀 𝗜𝗺𝗽𝗼𝗿𝘁𝗮𝗻𝘁
Concrete temperature at placement directly affects concrete quality, compressive strength, workability, setting time, durability, shrinkage, and crack resistance.
Every civil engineer, site engineer, QA/QC engineer, construction manager, concrete technologist, project engineer, and structural engineer should understand the recommended placement limits to ensure long-lasting RCC structures and successful construction projects.
Whether you work on building construction, bridge construction, highway engineering, commercial projects, industrial construction, foundation works, or infrastructure development, mastering concrete placement practices is an essential part of professional site engineering. Staying updated with practical site knowledge also improves construction quality control, inspection skills, and engineering decision-making.
𝗝𝗼𝗶𝗻 𝘁𝗵𝗲 𝗗𝗶𝘀𝗰𝘂𝘀𝘀𝗶𝗼𝗻
Comment your answer with a brief explanation, compare your knowledge with other engineers, and help create a valuable learning community for everyone interested in civil engineering and modern construction practices.
@etconp
❤13👍3🥰2
👉concerete mix design ለመስራት በጣም የሚጠቅማቹ ቴምፕሌት ነው አውርዳቹ ተጠቀሙበት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a61bcd2ebf1e_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a61bcd2ebf1e_etconp
Ye-Buna
Concrete Mix Design Excel Template | Professional Concrete Mix Calculator
Save time and design concrete mixes with confidence. This… 299 ETB · ★ 2.0 (2 reviews) · 15 sold. Instant download from Ethio Construction Engineering on…
👍3❤2👏1
👉How Many Days After Column Shuttering Can Be Removed According to ACI Code?
ACI 347.2R does not prescribe a fixed number of days for removing column formwork. Instead, it recommends removing formwork only after the concrete has gained enough strength to safely support its own weight and any applied loads.
The required time depends on several factors, including concrete mix design, cement type, curing conditions, ambient temperature, and member size.
As a general field practice, vertical formwork for columns can often be removed within 24–48 hours if the concrete has achieved adequate strength and there is no risk of damage.
However, structural engineers should always verify concrete strength through project specifications or strength tests before stripping formwork.
Key Points:
ACI emphasizes strength-based, not time-based, formwork removal.
Maintain proper curing even after shuttering is removed.
Never remove bracing or props prematurely if they provide structural stability.
Follow project specifications and the engineer's instructions for safe stripping.
> Note: The temperature-based table shown in the image is not an official ACI 347.2R requirement.
ACI guidance is based on achieving sufficient concrete strength rather than fixed removal times.
🫵ለተጨማሪ የኮንስትራክሽን ዘርፍ መረጃዎች እና ወቅታዊ የሪል ስቴት ዜናዎች 👇
https://www.facebook.com/profile.php?id=61592085774934
ACI 347.2R does not prescribe a fixed number of days for removing column formwork. Instead, it recommends removing formwork only after the concrete has gained enough strength to safely support its own weight and any applied loads.
The required time depends on several factors, including concrete mix design, cement type, curing conditions, ambient temperature, and member size.
As a general field practice, vertical formwork for columns can often be removed within 24–48 hours if the concrete has achieved adequate strength and there is no risk of damage.
However, structural engineers should always verify concrete strength through project specifications or strength tests before stripping formwork.
Key Points:
ACI emphasizes strength-based, not time-based, formwork removal.
Maintain proper curing even after shuttering is removed.
Never remove bracing or props prematurely if they provide structural stability.
Follow project specifications and the engineer's instructions for safe stripping.
> Note: The temperature-based table shown in the image is not an official ACI 347.2R requirement.
ACI guidance is based on achieving sufficient concrete strength rather than fixed removal times.
🫵ለተጨማሪ የኮንስትራክሽን ዘርፍ መረጃዎች እና ወቅታዊ የሪል ስቴት ዜናዎች 👇
https://www.facebook.com/profile.php?id=61592085774934
Facebook
Ethio Construction Engineering - ETCONp | Addis Ababa
Ethio Construction Engineering - ETCONp, Addis Ababa. 715 followers · 49 talking about this. World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and...
Latest updates, tips, and tutorials on building, civil engineering, and...
❤8👍6
ለኪነህንጻ የማይመጥን ግንባታ
አዲስአበባ ካሏት የዘመናዊ ዘይቤ ህንጻዎች ግንባር ቀደሙ በ1950ዎቹ መጨረሻ በእውቁ ፈረንሳዊ ህንጻ ነዳፊ በሄንሪ ሾሜት የተነደፈው የንግድ ባንክ ህንጻ ነው።
ይህ ህንጻ እስካሁን ያልተደገሙ የንድፍ እና የግንባታ ረቂቅ ጥበቦች ያሉበት ብርቅዬ የከተማችን ህንጻ ነው።
ከፊት ለፊቱ የማይመጥነው ግንባታ ባይገነባ ይመከራል።
ምስል ምንጭ ማህደር ገብረመድኅን
@etconp
አዲስአበባ ካሏት የዘመናዊ ዘይቤ ህንጻዎች ግንባር ቀደሙ በ1950ዎቹ መጨረሻ በእውቁ ፈረንሳዊ ህንጻ ነዳፊ በሄንሪ ሾሜት የተነደፈው የንግድ ባንክ ህንጻ ነው።
ይህ ህንጻ እስካሁን ያልተደገሙ የንድፍ እና የግንባታ ረቂቅ ጥበቦች ያሉበት ብርቅዬ የከተማችን ህንጻ ነው።
ከፊት ለፊቱ የማይመጥነው ግንባታ ባይገነባ ይመከራል።
ምስል ምንጭ ማህደር ገብረመድኅን
@etconp
👏24❤11👍2
#ADVERTISEMENT
📲 አንድ ተች ብቻ፤ የእርስዎን ስራ እና ብቃት ያስተዋውቁ!
የቢዝነስ ካርዶች ማተም እና ማደስ አልፎበታል። በNFC ዲጂታል ቢዝነስ ካርድ የሚፈልጉትን ስልክ በማስነካት የእርስዎን ስልክ ቁጥር፣ WhatsApp፣ Telegram፣ Email፣ Portfolio እና ፕሮጀክቶች ወዲያውኑ ለደንበኞችዎ ያጋሩ።
ለኢንጂነሮች፣ ኮንትራክተሮች፣ ሪል እስቴት ሙያተኞች እና የቢዝነስ ባለቤቶች ተስማሚ !
📞 0931639484
ለማዘዝ እና ለተጨማሪ መረጃ ይደውሉ።
📲 አንድ ተች ብቻ፤ የእርስዎን ስራ እና ብቃት ያስተዋውቁ!
የቢዝነስ ካርዶች ማተም እና ማደስ አልፎበታል። በNFC ዲጂታል ቢዝነስ ካርድ የሚፈልጉትን ስልክ በማስነካት የእርስዎን ስልክ ቁጥር፣ WhatsApp፣ Telegram፣ Email፣ Portfolio እና ፕሮጀክቶች ወዲያውኑ ለደንበኞችዎ ያጋሩ።
ለኢንጂነሮች፣ ኮንትራክተሮች፣ ሪል እስቴት ሙያተኞች እና የቢዝነስ ባለቤቶች ተስማሚ !
📞 0931639484
ለማዘዝ እና ለተጨማሪ መረጃ ይደውሉ።
❤4
👉ምርጥ 120 ካሬ ላይ የሚያርፍ የመኖርያ ቤት ሙሉ ዲዛይን የምትፈልጉ ከታች ባለው ሊንክ ያውርዱ👇
https://ye-buna.com/etconp?ref=product_detail&product=6a62fd7b49a15_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a62fd7b49a15_etconp
👌3❤1