👉ሙሉ የኮንስትራክሽን ስራዎች ላይ ቼክ ሊስት ከፈለጉ ከታች ባለው ሊንክ አውርደው ይጠቀሙ👇
⬇️Construction Work Permit Cheaklist Package
✅Excavation & Earthwork Checklists
✅Foundation & Substructure Checklists
✅Reinforced Concrete (RC) Work Checklists
✅Formwork & Reinforcement Checklists
✅Concrete Casting Checklists
✅Masonry & Block Work Checklists እና ሌሎች ...
https://ye-buna.com/etconp?ref=product_detail&product=6a744a079bb13_etconp
⬇️Construction Work Permit Cheaklist Package
✅Excavation & Earthwork Checklists
✅Foundation & Substructure Checklists
✅Reinforced Concrete (RC) Work Checklists
✅Formwork & Reinforcement Checklists
✅Concrete Casting Checklists
✅Masonry & Block Work Checklists እና ሌሎች ...
https://ye-buna.com/etconp?ref=product_detail&product=6a744a079bb13_etconp
❤3🥰2
110. Gypsum plastering is not recommended in one of the following area:
Anonymous Quiz
3%
A. Living and dining
92%
B. Toilet
3%
C. Internal Corridor
3%
D. Bed Room
❤9🥰6
✈️ Airport Runway – Construction Concept
An airport runway is a highly engineered pavement system designed to safely support repeated aircraft movements under heavy loads.
This conceptual Text presents the complete structural and infrastructure layout of a flexible runway pavement, including the pavement layers, shoulders, drainage system, taxiway connection, terminal facilities, cross-section, and construction sequence.
🔹 Runway Dimensions: 3000 m long × 30 m wide
🔹 Shoulders: 7.5 m on each side
🔹 Total Formation Width: 45 m
🔹 Pavement Type: Flexible Pavement
🔹 Design Aircraft: A320 / B737
🔹 Design Life: 20 years
🔹 Cross Slope: 2.5% from centreline toward the edges
🛣️ Pavement Layer System
The runway pavement is constructed in multiple layers to distribute aircraft loads safely to the underlying soil:
1. Asphalt Wearing Course – 50 mm
2. Asphalt Binder Course – 70 mm
3. Asphalt Base Course – 100 mm
4. Crushed Aggregate Base – 250 mm
5. Subbase Course – 300 mm
6. Compacted Subgrade
📏 Total Pavement Thickness: 770 mm
🌧️ Drainage System
Proper drainage is essential for runway safety and pavement durability. Side drainage channels collect and carry away surface runoff, preventing water accumulation and protecting the pavement structure from moisture damage.
🏗️ Main Construction Elements
✔️ Runway pavement
✔️ Asphalt shoulders
✔️ Drainage channels
✔️ Taxiway connection
✔️ Airport terminal and services
✔️ Runway markings and lighting
✔️ Compacted subgrade and granular layers
🔨 Typical Construction Sequence
1️⃣ Clearing and grubbing
2️⃣ Earthworks and subgrade preparation
3️⃣ Subbase and base laying
4️⃣ Asphalt pavement construction
5️⃣ Shoulder construction
6️⃣ Drainage channel construction
7️⃣ Runway marking and lighting installation
8️⃣ Quality control and commissioning
This infographic provides a clear overview of how different civil engineering, pavement engineering, geotechnical, drainage, and airport infrastructure components work together to create a safe and durable airport runway.
🌐ለተጨማሪ መረጃ እና ሌሎች የኮንስትራክሽን ዘርፍ ዜናዎች የ YouTube ገፃችን ከታች ባለው ሊንክ በመግባት SubScribe አርገው ቤተሰብ ይሁኑ👇
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
An airport runway is a highly engineered pavement system designed to safely support repeated aircraft movements under heavy loads.
This conceptual Text presents the complete structural and infrastructure layout of a flexible runway pavement, including the pavement layers, shoulders, drainage system, taxiway connection, terminal facilities, cross-section, and construction sequence.
🔹 Runway Dimensions: 3000 m long × 30 m wide
🔹 Shoulders: 7.5 m on each side
🔹 Total Formation Width: 45 m
🔹 Pavement Type: Flexible Pavement
🔹 Design Aircraft: A320 / B737
🔹 Design Life: 20 years
🔹 Cross Slope: 2.5% from centreline toward the edges
🛣️ Pavement Layer System
The runway pavement is constructed in multiple layers to distribute aircraft loads safely to the underlying soil:
1. Asphalt Wearing Course – 50 mm
2. Asphalt Binder Course – 70 mm
3. Asphalt Base Course – 100 mm
4. Crushed Aggregate Base – 250 mm
5. Subbase Course – 300 mm
6. Compacted Subgrade
📏 Total Pavement Thickness: 770 mm
🌧️ Drainage System
Proper drainage is essential for runway safety and pavement durability. Side drainage channels collect and carry away surface runoff, preventing water accumulation and protecting the pavement structure from moisture damage.
🏗️ Main Construction Elements
✔️ Runway pavement
✔️ Asphalt shoulders
✔️ Drainage channels
✔️ Taxiway connection
✔️ Airport terminal and services
✔️ Runway markings and lighting
✔️ Compacted subgrade and granular layers
🔨 Typical Construction Sequence
1️⃣ Clearing and grubbing
2️⃣ Earthworks and subgrade preparation
3️⃣ Subbase and base laying
4️⃣ Asphalt pavement construction
5️⃣ Shoulder construction
6️⃣ Drainage channel construction
7️⃣ Runway marking and lighting installation
8️⃣ Quality control and commissioning
This infographic provides a clear overview of how different civil engineering, pavement engineering, geotechnical, drainage, and airport infrastructure components work together to create a safe and durable airport runway.
🌐ለተጨማሪ መረጃ እና ሌሎች የኮንስትራክሽን ዘርፍ ዜናዎች የ YouTube ገፃችን ከታች ባለው ሊንክ በመግባት SubScribe አርገው ቤተሰብ ይሁኑ👇
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
❤10🎉3
Ethio Construction Engineering
👉ሰላም ውድ ቤተሰቦቻችን ብዝዎች በጠየቃቹን መሰረት የ ETABS ቲቶርያል ቪድዮ በአማርኛ ቋንቋ ከ introduction ጀምሮ Analysis እና Design ኣካተን ምርጥ ቪድዮ ኣዘጋጅተንላቹዋል። 🫵እንሆ ዛሬ ክፍል 1 ይዘንላቹ መጥተናል👇 https://youtu.be/yB1KO_nYByc @etconp
YouTube
🚀 ETABS Full Course 2026 – Part 10 | ከጀማሪ እስከ Advanced | ETABS Tutorial በአማርኛ 🏗️📐
🚀 ETABS Full Course – Part 10 | Structural Design & Analysis Tutorial
Continue the complete ETABS Full Course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 10, we continue the ETABS…
Continue the complete ETABS Full Course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 10, we continue the ETABS…
👍2❤1👏1
👉አስደሳች ዜና ለዚህ ቻናል ቤተሰቦች
⚡️3 ቀናት ቀሩት
🌟አዲስ አመት ምክንያት በማረግ ከ ጷግሜን 1 ጀምሮ እስከ ጷግሜን 5 የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏
📩ለመመዝገብ @Philemona7 ይፃፉልን
👊Qs ለሚወስዱ ETABS ቦነስ እንደተጠበቀ ነው👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
መልካም አዲስ አመት🙏
@etconp
⚡️3 ቀናት ቀሩት
🌟አዲስ አመት ምክንያት በማረግ ከ ጷግሜን 1 ጀምሮ እስከ ጷግሜን 5 የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏
📩ለመመዝገብ @Philemona7 ይፃፉልን
👊Qs ለሚወስዱ ETABS ቦነስ እንደተጠበቀ ነው👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
መልካም አዲስ አመት🙏
@etconp
❤5🥰2👏1
👉ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) እና ዲዛይን ቢዩልድ(Design build)(DB)
🌟ዲዛይን_ቢድ_ቢዩልድ(Design bid build)(DBB)
በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
🌟ዲዛይን ቢዩልድ(Design build)(DB)
በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን/የግንባታውን ባለቤት አይነካውም፡፡
ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡
በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡
ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡
ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነው በአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እና በአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ የፕሮጀክት አይነት ነው፡፡
ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።
FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።
ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡
ስለዚሁም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemnity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ አይደለም።
ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን አልፎ አልፎ ይጠቀምበታል።
በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ነው ተብሎ ይታመናል።
@etconp
🌟ዲዛይን_ቢድ_ቢዩልድ(Design bid build)(DBB)
በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
🌟ዲዛይን ቢዩልድ(Design build)(DB)
በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን/የግንባታውን ባለቤት አይነካውም፡፡
ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡
በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡
ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡
ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነው በአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እና በአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ የፕሮጀክት አይነት ነው፡፡
ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።
FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።
ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡
ስለዚሁም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemnity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ አይደለም።
ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን አልፎ አልፎ ይጠቀምበታል።
በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ነው ተብሎ ይታመናል።
@etconp
❤7👍5🥰2👏2🔥1
Forwarded from Kelemat Ads
ቆይ እንዳሰቡት አይደለም!
የቀነስነው ጥራቱን አይደለም አላስፈላጊ ወጪውን እንጂ!
ዌብሳይትዎን ለመገንባት በአንድ ጊዜ የሚሰሩ 7 የ-AI ኤጀንቶችን እንጠቀማለን። ዲዛይን፣ ጽሁፍ፣ ኮዲንግ ሁሉም በአንድ ጊዜ ይከናወናሉ። ትልቅ team፣ ተጨማሪ ክፍያ የለም ቅልጥፍና ብቻ! ዋጋችንን እጅግ ቅናሽ ያደረገው ይኸው ነው።
ውጤቱስ?
በ48 ሰዓታት ውስጥ ለስራ ዝግጁ የሆነ ፕሮፌሽናል ዌብሳይት። ቴምፕሌት አይደለም፤ የተቀጣጠለ ስራም አይደለም። ቡድናችን እረፍት ስለማያውቅ በከፍተኛ ፍጥነት የተገነባ እውነተኛ ዌብሳይት!
7AI Studio
ዌብሳይታችን ላይ በመግባት ይዘዙ : https://sebat.oriix.net
ለበለጠ መረጃ
☎️ Phone Number: +251957323634
📱 Telegram @Oriix_Support
የቀነስነው ጥራቱን አይደለም አላስፈላጊ ወጪውን እንጂ!
ዌብሳይትዎን ለመገንባት በአንድ ጊዜ የሚሰሩ 7 የ-AI ኤጀንቶችን እንጠቀማለን። ዲዛይን፣ ጽሁፍ፣ ኮዲንግ ሁሉም በአንድ ጊዜ ይከናወናሉ። ትልቅ team፣ ተጨማሪ ክፍያ የለም ቅልጥፍና ብቻ! ዋጋችንን እጅግ ቅናሽ ያደረገው ይኸው ነው።
ውጤቱስ?
በ48 ሰዓታት ውስጥ ለስራ ዝግጁ የሆነ ፕሮፌሽናል ዌብሳይት። ቴምፕሌት አይደለም፤ የተቀጣጠለ ስራም አይደለም። ቡድናችን እረፍት ስለማያውቅ በከፍተኛ ፍጥነት የተገነባ እውነተኛ ዌብሳይት!
7AI Studio
ዌብሳይታችን ላይ በመግባት ይዘዙ : https://sebat.oriix.net
ለበለጠ መረጃ
☎️ Phone Number: +251957323634
📱 Telegram @Oriix_Support
❤2🔥1
📝TENDER EVALUATION CHALLENGE | የጨረታ ግምገማ ፈተና
ሶስት ተቋራጮች ጨረታ አቀረቡ።
Technical Evaluation = 30%
Financial Evaluation = 70%
🔹 Contractor A
- Technical = 26%
- Financial = 95 Million Birr
🔹 Contractor B
- Technical = 29%
- Financial = 100 Million Birr
🔹 Contractor C
- Technical = 24%
- Financial = 90 Million Birr
❓ ጥያቄዎች
1️⃣ Determine the Financial Score
የእያንዳንዱን ተጫራች የፋይናንሻል ውጤት ያስሉ።
Formula:
Financial Score = Lowest Bid ÷ Bidder's Bid × 100
2️⃣ Compute the Final Weighted Score
የመጨረሻውን የክብደት ነጥብ ያስሉ።
Formula:
Final Score = (Technical × 30%) + (Financial × 70%)
3️⃣ Rank the Contractors
🥇 1st
🥈 2nd
🥉 3rd
4️⃣ 🏆 Recommend the Winning Bidder
የትኛው ተቋራጭ የመጀመሪያ ደረጃ ያገኛል?
💡 BONUS QUESTION:
ዝቅተኛ ዋጋ ያቀረበ ተቋራጭ ሁልጊዜ አሸናፊ ይሆናል?
👇 Your answer? Calculate it before checking the solution!
📌 ተጨማሪ ዝርዝር መረጃዎችን እና የሳምንቱን የኮንስትራክሽን ዜናዎች ለማግኘት የፌስቡክ ገፃችን ይጎብኙ👇
https://www.facebook.com/profile.php?id=61592085774934
@etconp
ሶስት ተቋራጮች ጨረታ አቀረቡ።
Technical Evaluation = 30%
Financial Evaluation = 70%
🔹 Contractor A
- Technical = 26%
- Financial = 95 Million Birr
🔹 Contractor B
- Technical = 29%
- Financial = 100 Million Birr
🔹 Contractor C
- Technical = 24%
- Financial = 90 Million Birr
❓ ጥያቄዎች
1️⃣ Determine the Financial Score
የእያንዳንዱን ተጫራች የፋይናንሻል ውጤት ያስሉ።
Formula:
Financial Score = Lowest Bid ÷ Bidder's Bid × 100
2️⃣ Compute the Final Weighted Score
የመጨረሻውን የክብደት ነጥብ ያስሉ።
Formula:
Final Score = (Technical × 30%) + (Financial × 70%)
3️⃣ Rank the Contractors
🥇 1st
🥈 2nd
🥉 3rd
4️⃣ 🏆 Recommend the Winning Bidder
የትኛው ተቋራጭ የመጀመሪያ ደረጃ ያገኛል?
💡 BONUS QUESTION:
ዝቅተኛ ዋጋ ያቀረበ ተቋራጭ ሁልጊዜ አሸናፊ ይሆናል?
👇 Your answer? Calculate it before checking the solution!
📌 ተጨማሪ ዝርዝር መረጃዎችን እና የሳምንቱን የኮንስትራክሽን ዜናዎች ለማግኘት የፌስቡክ ገፃችን ይጎብኙ👇
https://www.facebook.com/profile.php?id=61592085774934
@etconp
Facebook
Ethio Construction Engineering - ETCONp | Addis Ababa
Ethio Construction Engineering - ETCONp, Addis Ababa. 715 followers · 49 talking about this. World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and...
Latest updates, tips, and tutorials on building, civil engineering, and...
❤11👍3
🕌ስለ መስጊድ አርክቴክቸር እና ግንባታ በተግባር ለመማር የሚረዳ 4 ምርጥ መፅሐፍ በአንድ ላይ አዘጋጅተናል📚
📐 የሚያካትተው፦
✅ Mosque Architecture
✅ Concept & Geometry
✅ Space Planning
✅ Design Synthesis & Form
✅ የአርክቴክቸራል እና Structural Drawings የምሳሌ ፕሮጀክቶች
✅ ለመማርና ለፕሮጀክት ማጣቀሻ የሚሆኑ ዝርዝር ማብራሪያዎች ያለው ነው🌙
💫እነዚህ መፅሐፍ ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a8fbfb8b8611_etconp
📐 የሚያካትተው፦
✅ Mosque Architecture
✅ Concept & Geometry
✅ Space Planning
✅ Design Synthesis & Form
✅ የአርክቴክቸራል እና Structural Drawings የምሳሌ ፕሮጀክቶች
✅ ለመማርና ለፕሮጀክት ማጣቀሻ የሚሆኑ ዝርዝር ማብራሪያዎች ያለው ነው🌙
💫እነዚህ መፅሐፍ ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a8fbfb8b8611_etconp
👌1
👉Column Formwork – Key Construction Details
🌟Column formwork provides the temporary mould required to cast reinforced-concrete columns to the specified dimensions, alignment, and shape.
Key components:
Formwork boards: Typically timber panels used to contain fresh concrete.
Walers: Horizontal members that stiffen and hold the formwork panels together.
Props/struts: Diagonal supports that maintain stability and plumb alignment.
Base plates/soles: Provide a firm bearing surface for props.
Wedges/cleats: Used for adjustment, tightening, and securing the support system.
Column reinforcement: Steel bars and ties positioned inside the formwork according to the structural design.
Important site checks:
Verify column dimensions and reinforcement before closing the formwork.
Check verticality, line, level, and rigidity.
Maintain the specified reinforcement cover using suitable spacers.
Ensure joints are tight enough to prevent excessive grout leakage.
Apply an appropriate form-release agent without contaminating reinforcement.
Secure all braces and supports before concrete placement.
Inspect the formwork again immediately before pouring.
Do not remove formwork based only on a fixed time period; stripping should follow the project specifications and the concrete’s achieved strength.
Note: The dimensions shown in an infographic are illustrative. Actual board sizes, waler spacing, column dimensions, reinforcement, cover, and stripping requirements must be determined from the structural drawings, design calculations, and applicable construction standards.
@etconp
🌟Column formwork provides the temporary mould required to cast reinforced-concrete columns to the specified dimensions, alignment, and shape.
Key components:
Formwork boards: Typically timber panels used to contain fresh concrete.
Walers: Horizontal members that stiffen and hold the formwork panels together.
Props/struts: Diagonal supports that maintain stability and plumb alignment.
Base plates/soles: Provide a firm bearing surface for props.
Wedges/cleats: Used for adjustment, tightening, and securing the support system.
Column reinforcement: Steel bars and ties positioned inside the formwork according to the structural design.
Important site checks:
Verify column dimensions and reinforcement before closing the formwork.
Check verticality, line, level, and rigidity.
Maintain the specified reinforcement cover using suitable spacers.
Ensure joints are tight enough to prevent excessive grout leakage.
Apply an appropriate form-release agent without contaminating reinforcement.
Secure all braces and supports before concrete placement.
Inspect the formwork again immediately before pouring.
Do not remove formwork based only on a fixed time period; stripping should follow the project specifications and the concrete’s achieved strength.
Note: The dimensions shown in an infographic are illustrative. Actual board sizes, waler spacing, column dimensions, reinforcement, cover, and stripping requirements must be determined from the structural drawings, design calculations, and applicable construction standards.
@etconp
❤5👍2
👉አዲስ ባሁን የገበያ ዋጋ የተሰራ የህንፃ Cost BreakDown Analysis እና BOQ ከፈለጉ ከታች ባለው ሊንክ ያውርዱ👇
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
👏3❤1
🛣️ የመንገድ ግንባታ ሥራ ዝርዝር (Road Construction BOQ)👷♂️📐
━━━━━━━━━━━━━
የመንገድ ግንባታ በትክክለኛ የሥራ መጠን፣ ቁሳቁስ እና የወጪ ስሌት ላይ የተመሰረተ ነው።
የBOQ (Bill of Quantities) ዝርዝር የእያንዳንዱን የሥራ ዓይነት፣ መጠን እና መለኪያ ክፍል በግልጽ ያሳያል። 📋📊
🔹 Earthwork — የመሬት ቁፋሮና ሙሌት
🔹 Subgrade Preparation — የመንገድ መሠረት ዝግጅት
🔹 Sub-base — የታችኛው የመሠረት ንብርብር
🔹 Base Course — ዋና የመሠረት ንብርብር
🔹 Prime Coat & Tack Coat — የአስፋልት ንብርብሮችን ለማጣበቅ
🔹 Asphalt Concrete — የመጨረሻ የአስፋልት ንጣፍ
🔹 Drainage Works — የውሃ ማስወገጃ ሥራዎች
🔹 Shoulder & Road Furniture — የመንገድ ጎን፣ ምልክቶችና ሌሎች መሳሪያዎች 🛣️
📏 M², M³, ML እና KG የመንገድ ግንባታ ሥራዎችን ለመለካትና የፕሮጀክቱን ወጪ ለማስላት በብዛት የሚጠቀሙ መለኪያዎች ናቸው።
👷♂️ትክክለኛ የመንገድ ዲዛይን + ጥራት ያለው ቁሳቁስ + ትክክለኛ አፈጻጸም = ዘላቂ መንገድ! 🏗️✅🇪🇹
📌 ተጨማሪ ዝርዝር መረጃዎችን እና የሳምንቱን የኮንስትራክሽን ዜናዎች ለማግኘት የፌስቡክ ገፃችን ይጎብኙ👇
https://www.facebook.com/profile.php?id=61592085774934
@etconp
━━━━━━━━━━━━━
የመንገድ ግንባታ በትክክለኛ የሥራ መጠን፣ ቁሳቁስ እና የወጪ ስሌት ላይ የተመሰረተ ነው።
የBOQ (Bill of Quantities) ዝርዝር የእያንዳንዱን የሥራ ዓይነት፣ መጠን እና መለኪያ ክፍል በግልጽ ያሳያል። 📋📊
🔹 Earthwork — የመሬት ቁፋሮና ሙሌት
🔹 Subgrade Preparation — የመንገድ መሠረት ዝግጅት
🔹 Sub-base — የታችኛው የመሠረት ንብርብር
🔹 Base Course — ዋና የመሠረት ንብርብር
🔹 Prime Coat & Tack Coat — የአስፋልት ንብርብሮችን ለማጣበቅ
🔹 Asphalt Concrete — የመጨረሻ የአስፋልት ንጣፍ
🔹 Drainage Works — የውሃ ማስወገጃ ሥራዎች
🔹 Shoulder & Road Furniture — የመንገድ ጎን፣ ምልክቶችና ሌሎች መሳሪያዎች 🛣️
📏 M², M³, ML እና KG የመንገድ ግንባታ ሥራዎችን ለመለካትና የፕሮጀክቱን ወጪ ለማስላት በብዛት የሚጠቀሙ መለኪያዎች ናቸው።
👷♂️ትክክለኛ የመንገድ ዲዛይን + ጥራት ያለው ቁሳቁስ + ትክክለኛ አፈጻጸም = ዘላቂ መንገድ! 🏗️✅🇪🇹
📌 ተጨማሪ ዝርዝር መረጃዎችን እና የሳምንቱን የኮንስትራክሽን ዜናዎች ለማግኘት የፌስቡክ ገፃችን ይጎብኙ👇
https://www.facebook.com/profile.php?id=61592085774934
@etconp
Facebook
Ethio Construction Engineering - ETCONp | Addis Ababa
Ethio Construction Engineering - ETCONp, Addis Ababa. 715 followers · 49 talking about this. World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and...
Latest updates, tips, and tutorials on building, civil engineering, and...
❤7
👉Construction Safety & Compliance Kit – ፕሮፌሽናል Safety Templates ጥቅል ይፈልጋሉ?🦺
📋 Safety Checklists
🗣️ Toolbox Talk Templates
📝 Incident Report Forms
⚠️ JSA Templates
🥾 PPE Inspection Sheets
✅ Editable Word Document👇
https://ye-buna.com/etconp?ref=product_detail&product=6a88471586c15_etconp
📋 Safety Checklists
🗣️ Toolbox Talk Templates
📝 Incident Report Forms
⚠️ JSA Templates
🥾 PPE Inspection Sheets
✅ Editable Word Document👇
https://ye-buna.com/etconp?ref=product_detail&product=6a88471586c15_etconp
🥰2
👉የሳይት ምልከታና የኢንጂነሪንግ ጥያቄ፦
🏛በቅርብ ጊዜ በፒያሳ ገዳም ሰፈር አካባቢ ህንፃዎች ላይ ያየሁት የፋውንዴሽን ስህተት!
🚥በቅርቡ በፒያሳ ገዳም ሰፈር አካባቢ በሚገነቡ ህንፃዎች ላይ የታዘብኳቸውን ሁለት ዋና ዋና የኮንስትራክሽን ስህተቶች አስመልከቶ ከወገኖቼ ለቀረበልኝ ጥያቄ ሙያዊ ምላሽ እንደሚከተለው አዘጋጅቼዋለሁ።
በተለይ በከተማችን እየተስፋፉ ባሉ ግንባታዎች ላይ ተመሳሳይ ችግሮች እንዳይደገሙ ሁሉም ሊያውቀው የሚገባ ነጥብ ነው።
1️⃣ በአንድ ጊዜ 2 ሜትር selected material ሞልቶ ኮምፓክት ማድረግ ትክክል ነው? ወደፊትስ ህንፃው ላይ ምን ይፈጠራል?
❌ ስህተቱ፦ ይህ አሰራር ፍጹም ስህተትና የኮንስትራክሽን ስታንዳርድን የጣሰ ነው። የኮምፓክሽን መሣሪያዎች (Plate compactor ወይም Rammer) አፈርን በጥራት ማጠባበቅ የሚችሉት ቢበዛ ከ15cm እስከ 20cm (ከፍተኛው 30cm) በሚደርስ ንብርብር (layer) ብቻ ነው። በአንድ ጊዜ 2 ሜትር አፈር ተሞልቶ ከላይ ብቻ ሲረገጥ ከሥር ያለው አፈር ሳይጠብቅ ክፍተት (air voids) እንደያዘ ይቀራል።
⚠️ ወደፊት የሚፈጠረው አደጋ፦
Differential Settlement (እኩል ያልሆነ የመስመጥ አደጋ)፦ ህንፃው ተገንብቶ ሲያልቅና የክብደት ጫና ሲያርፍበት፣ ሳይጠብቅ የቀረውን 2 ሜትር አፈር እየተጫነውና እያሰመጠው ይሄዳል።
የግድግዳና የስትራክቸር ስንጣቂ፦ የመሬት ወለል (Ground Slab) መስመጥ፣ የወለል ሴራሚክስ መነሳት፣ ግድግዳዎችና Beam/Column አካባቢ Structural Cracks እንዲፈጠሩ ያደርጋል።
2️⃣ foundation ውስጥ ውሃ ሳይወጣ አፈር መሙላትና የእንጨት ትራሶች (Formwork) ሳይነሱ መቅበር ምን ችግር ያመጣል?
🌊 ውሃ ሳይወጣ አፈር መሙላት፦
አፈር ከውሃ ጋር ሲደባለቅ ወደ Mud/Slurry (ጭቃ) ይቀየራል። የውሃ መጠኑ ከፍ ስለሚል (Optimum Moisture Content ስላበቃ) ምንም ዓይነት የኮምፓክሽን ጥራት አይኖረውም።
አፈሩ የመሸከም አቅሙን (Bearing Capacity) ያጣል። ውሃው በሂደት ሲደርቅና ሲተን አፈሩ ኮላፕስ በማድረግ ከፍተኛ የመስመጥ አደጋ ያጋጥማል።
መፍትሔው፦ ውሃውን በፓምፕ (Dewatering Pump) ሙሉ በሙሉ አውጥቶ፣ የታችኛውን ጭቃ ካጸዱ በኋላ ብቻ በንብርብር መሙላት ነበረበት።
🪵 የእንጨት ግንድላ፣ ከረባትና ፎርምወርክ ሳይነሱ ከPad ዙሪያ መቀበር፦
የእንጨት መበስበስ (Wood Decay)፦ አፈር ውስጥ የቀረ እንጨት በእርጥበትና በባክቴሪያ ምክንያት ከጊዜ በኋላ ይበሰብሳል።
ትላልቅ ክፍተቶች መፈጠር (Void Creation)፦ እንጨቱ በስብሶ ሲጠፋ በPad ዙሪያ ትላልቅ ባዶ ክፍተቶች ይቀራሉ።
የፋውንዴሽን መንሸራተት፦ የፓድ ፋውንዴሽን ዙሪያውን በደንብ ከተጠጠበቀ አፈር ድጋፍ (Lateral Support) ማግኘት አለበት። እንጨቱ በስብሶ ክፍተት ሲፈጥር ፓዱ የጎንዮሽ ድጋፍ አጥቶ የመንሸራተትና የመናጋት አደጋ ያጋጥመዋል።
💡 ማጠቃለያ፦እነዚህ አይነት የሳይት ቁጥጥር ድክመቶች (Poor Site Supervision) የህንፃውን የረጅም ጊዜ ደህንነትና ጥንካሬ አደጋ ላይ የሚጥሉ በመሆናቸው፣ በሳይት መሃንዲሱና በሱፐርቫይዘሩ አስቸኳይ የቴክኒክ ማስተካከያ እርምጃ ሊወሰድባቸው ይገባል።
ተመሳሳይ የህንፃ ግንባታ ጥያቄዎች ወይም አስተያየቶች ካላችሁ ከታች በኮመንት አጋሩኝ!
@etconp
🏛በቅርብ ጊዜ በፒያሳ ገዳም ሰፈር አካባቢ ህንፃዎች ላይ ያየሁት የፋውንዴሽን ስህተት!
🚥በቅርቡ በፒያሳ ገዳም ሰፈር አካባቢ በሚገነቡ ህንፃዎች ላይ የታዘብኳቸውን ሁለት ዋና ዋና የኮንስትራክሽን ስህተቶች አስመልከቶ ከወገኖቼ ለቀረበልኝ ጥያቄ ሙያዊ ምላሽ እንደሚከተለው አዘጋጅቼዋለሁ።
በተለይ በከተማችን እየተስፋፉ ባሉ ግንባታዎች ላይ ተመሳሳይ ችግሮች እንዳይደገሙ ሁሉም ሊያውቀው የሚገባ ነጥብ ነው።
1️⃣ በአንድ ጊዜ 2 ሜትር selected material ሞልቶ ኮምፓክት ማድረግ ትክክል ነው? ወደፊትስ ህንፃው ላይ ምን ይፈጠራል?
❌ ስህተቱ፦ ይህ አሰራር ፍጹም ስህተትና የኮንስትራክሽን ስታንዳርድን የጣሰ ነው። የኮምፓክሽን መሣሪያዎች (Plate compactor ወይም Rammer) አፈርን በጥራት ማጠባበቅ የሚችሉት ቢበዛ ከ15cm እስከ 20cm (ከፍተኛው 30cm) በሚደርስ ንብርብር (layer) ብቻ ነው። በአንድ ጊዜ 2 ሜትር አፈር ተሞልቶ ከላይ ብቻ ሲረገጥ ከሥር ያለው አፈር ሳይጠብቅ ክፍተት (air voids) እንደያዘ ይቀራል።
⚠️ ወደፊት የሚፈጠረው አደጋ፦
Differential Settlement (እኩል ያልሆነ የመስመጥ አደጋ)፦ ህንፃው ተገንብቶ ሲያልቅና የክብደት ጫና ሲያርፍበት፣ ሳይጠብቅ የቀረውን 2 ሜትር አፈር እየተጫነውና እያሰመጠው ይሄዳል።
የግድግዳና የስትራክቸር ስንጣቂ፦ የመሬት ወለል (Ground Slab) መስመጥ፣ የወለል ሴራሚክስ መነሳት፣ ግድግዳዎችና Beam/Column አካባቢ Structural Cracks እንዲፈጠሩ ያደርጋል።
2️⃣ foundation ውስጥ ውሃ ሳይወጣ አፈር መሙላትና የእንጨት ትራሶች (Formwork) ሳይነሱ መቅበር ምን ችግር ያመጣል?
🌊 ውሃ ሳይወጣ አፈር መሙላት፦
አፈር ከውሃ ጋር ሲደባለቅ ወደ Mud/Slurry (ጭቃ) ይቀየራል። የውሃ መጠኑ ከፍ ስለሚል (Optimum Moisture Content ስላበቃ) ምንም ዓይነት የኮምፓክሽን ጥራት አይኖረውም።
አፈሩ የመሸከም አቅሙን (Bearing Capacity) ያጣል። ውሃው በሂደት ሲደርቅና ሲተን አፈሩ ኮላፕስ በማድረግ ከፍተኛ የመስመጥ አደጋ ያጋጥማል።
መፍትሔው፦ ውሃውን በፓምፕ (Dewatering Pump) ሙሉ በሙሉ አውጥቶ፣ የታችኛውን ጭቃ ካጸዱ በኋላ ብቻ በንብርብር መሙላት ነበረበት።
🪵 የእንጨት ግንድላ፣ ከረባትና ፎርምወርክ ሳይነሱ ከPad ዙሪያ መቀበር፦
የእንጨት መበስበስ (Wood Decay)፦ አፈር ውስጥ የቀረ እንጨት በእርጥበትና በባክቴሪያ ምክንያት ከጊዜ በኋላ ይበሰብሳል።
ትላልቅ ክፍተቶች መፈጠር (Void Creation)፦ እንጨቱ በስብሶ ሲጠፋ በPad ዙሪያ ትላልቅ ባዶ ክፍተቶች ይቀራሉ።
የፋውንዴሽን መንሸራተት፦ የፓድ ፋውንዴሽን ዙሪያውን በደንብ ከተጠጠበቀ አፈር ድጋፍ (Lateral Support) ማግኘት አለበት። እንጨቱ በስብሶ ክፍተት ሲፈጥር ፓዱ የጎንዮሽ ድጋፍ አጥቶ የመንሸራተትና የመናጋት አደጋ ያጋጥመዋል።
💡 ማጠቃለያ፦እነዚህ አይነት የሳይት ቁጥጥር ድክመቶች (Poor Site Supervision) የህንፃውን የረጅም ጊዜ ደህንነትና ጥንካሬ አደጋ ላይ የሚጥሉ በመሆናቸው፣ በሳይት መሃንዲሱና በሱፐርቫይዘሩ አስቸኳይ የቴክኒክ ማስተካከያ እርምጃ ሊወሰድባቸው ይገባል።
ተመሳሳይ የህንፃ ግንባታ ጥያቄዎች ወይም አስተያየቶች ካላችሁ ከታች በኮመንት አጋሩኝ!
@etconp
❤13👏3🙏1
Ethio Construction Engineering
👉ሰላም ውድ ቤተሰቦቻችን ብዝዎች በጠየቃቹን መሰረት የ ETABS ቲቶርያል ቪድዮ በአማርኛ ቋንቋ ከ introduction ጀምሮ Analysis እና Design ኣካተን ምርጥ ቪድዮ ኣዘጋጅተንላቹዋል። 🫵እንሆ ዛሬ ክፍል 1 ይዘንላቹ መጥተናል👇 https://youtu.be/yB1KO_nYByc @etconp
YouTube
🚀 ETABS Full Course 2026 – Part 11 | ከጀማሪ እስከ Advanced | ETABS Tutorial በአማርኛ 🏗️📐
🚀 ETABS Full Course – Part 11 | Structural Design & Analysis Tutorial
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 11, we continue the ETABS workflow…
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 11, we continue the ETABS workflow…
❤2
👉አስደሳች ዜና ለዚህ ቻናል ቤተሰቦች
⚡️3 ቀናት ቀሩት
🌟አዲስ አመት ምክንያት በማረግ ከ ጷግሜን 1 ጀምሮ እስከ ጷግሜን 5 የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏
📩ለመመዝገብ @Philemona7 ይፃፉልን
👊Qs ለሚወስዱ ETABS ቦነስ እንደተጠበቀ ነው👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
መልካም አዲስ አመት🙏
@etconp
⚡️3 ቀናት ቀሩት
🌟አዲስ አመት ምክንያት በማረግ ከ ጷግሜን 1 ጀምሮ እስከ ጷግሜን 5 የሚቆይ Quantity Surveying እና Ms Project ኦንላይን ኮርሶች ስልጠና የ 25% ቅናሽ አርገናል🙏
📩ለመመዝገብ @Philemona7 ይፃፉልን
👊Qs ለሚወስዱ ETABS ቦነስ እንደተጠበቀ ነው👇
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
መልካም አዲስ አመት🙏
@etconp
👌3❤1👏1
በመርካቶ የሚገነባው የ2,500 ዘመናዊ ሱቆች ሜጋ ፕሮጀክት ይፋ ሆነ
የፌዴራል ቤቶች ኮርፖሬሽን በመርካቶ ጣና ገበያ አካባቢ ከ10,000 በላይ ዜጎች የሥራ ዕድል የሚያገኙበት እና 2,500 ዘመናዊ የንግድ ሱቆችን የሚያጠቃልል አዲስ የግንባታ ፕሮጀክት አስጀመረ።
1 ነጥብ 8 ሄክታር ስፋት ባለው መሬት ላይ በ10 ሳይቶች የሚከናወነው ይህ ፕሮጀክት ባለ 5 ወለል ሕንጻዎችን፣ በቂ የፓርኪንግ ቦታዎችን እና የከተማዋን ስታንዳርድ የጠበቁ ዘመናዊ መዋቅሮችን ያካተተ ነው።
የተቋሙ ገቢ ማሻሻያ፡ የኮርፖሬሽኑ ዋና ሥራ አስፈጻሚ ዶ/ር ረሻድ ከማል በግንባታ ማስጀመሪያው ላይ እንደገለጹት፤ ኮርፖሬሽኑ ባደረገው ጠንካራ ሪፎርም ዓመታዊ ገቢውን ከነበረበት 300 ሚሊዮን ብር ወደ 12.5 ቢሊዮን ብር ማሳደግ ችሏል።
ለግንባታ ሲባል የፈረሱ የቀድሞዎቹን 230 ሱቆች ተክቶ የኮርፖሬሽኑን ገቢ ለማስቀጠል፣ ተጨማሪ 399 አዳዲስ ሱቆች በመርካቶ አዳራሽ ገበያ አካባቢ በአጭር ጊዜ ተገንብተው በዛሬው ዕለት አገልግሎት መስጠት ጀምረዋል።
ፕሮጀክቱ በዜሮ ኢንቨስትመንትና የግል ባለሀብቶችን አሳታፊ በማድረግ ከአንድ ዓመት ባነሰ ጊዜ ውስጥ ሙሉ በሙሉ ተጠናቀው ለአገልግሎት እንደሚበቁ ታውቋል።
ግንባታው ለአዲስ አበባ ከተማ ኮሪደር ልማትና ዘመናዊ ገጽታ ግንባታ ትልቅ አስተዋጽኦ የሚያበረክት ሲሆን፤ ኮርፖሬሽኑ ብቁ ለሆኑ የግል አልሚዎች በጋራ ለመሥራት ጥሪ አቅርቧል።
@etconp
የፌዴራል ቤቶች ኮርፖሬሽን በመርካቶ ጣና ገበያ አካባቢ ከ10,000 በላይ ዜጎች የሥራ ዕድል የሚያገኙበት እና 2,500 ዘመናዊ የንግድ ሱቆችን የሚያጠቃልል አዲስ የግንባታ ፕሮጀክት አስጀመረ።
1 ነጥብ 8 ሄክታር ስፋት ባለው መሬት ላይ በ10 ሳይቶች የሚከናወነው ይህ ፕሮጀክት ባለ 5 ወለል ሕንጻዎችን፣ በቂ የፓርኪንግ ቦታዎችን እና የከተማዋን ስታንዳርድ የጠበቁ ዘመናዊ መዋቅሮችን ያካተተ ነው።
የተቋሙ ገቢ ማሻሻያ፡ የኮርፖሬሽኑ ዋና ሥራ አስፈጻሚ ዶ/ር ረሻድ ከማል በግንባታ ማስጀመሪያው ላይ እንደገለጹት፤ ኮርፖሬሽኑ ባደረገው ጠንካራ ሪፎርም ዓመታዊ ገቢውን ከነበረበት 300 ሚሊዮን ብር ወደ 12.5 ቢሊዮን ብር ማሳደግ ችሏል።
ለግንባታ ሲባል የፈረሱ የቀድሞዎቹን 230 ሱቆች ተክቶ የኮርፖሬሽኑን ገቢ ለማስቀጠል፣ ተጨማሪ 399 አዳዲስ ሱቆች በመርካቶ አዳራሽ ገበያ አካባቢ በአጭር ጊዜ ተገንብተው በዛሬው ዕለት አገልግሎት መስጠት ጀምረዋል።
ፕሮጀክቱ በዜሮ ኢንቨስትመንትና የግል ባለሀብቶችን አሳታፊ በማድረግ ከአንድ ዓመት ባነሰ ጊዜ ውስጥ ሙሉ በሙሉ ተጠናቀው ለአገልግሎት እንደሚበቁ ታውቋል።
ግንባታው ለአዲስ አበባ ከተማ ኮሪደር ልማትና ዘመናዊ ገጽታ ግንባታ ትልቅ አስተዋጽኦ የሚያበረክት ሲሆን፤ ኮርፖሬሽኑ ብቁ ለሆኑ የግል አልሚዎች በጋራ ለመሥራት ጥሪ አቅርቧል።
@etconp
❤9👍1👏1
👉አዲስ የግንባታ ፕሮጀክት አካላዊ አፈጻጸም መመዘኛ ሥርዓት ይፋ ሆነ
በኢትዮጵያ ኮንስትራክሽን ባለሥልጣን፣ በኮንስትራክሽን ማኔጅመንት ኢንስቲትዩት እና በሜድሮክ አርክቴክቶችና መሐንዲሶች ትብብር በሐርሞኒ ሆቴል የግንባታ ፕሮጀክት አካላዊ አፈጻጸም አዲስ መመዘኛ ላይ ያተኮረ ሥልጠና ተካሄደ።
የኢትዮጵያ ኮንስትራክሽን ሥራ ተቋራጮች ማህበር ከሥልጠናው መውጣት በኋላ ባወጣው ማጠቃለያ እንዳስታወቀው፣ አዲሱ ሥርዓት የግንባታ ፕሮጀክቶች አካላዊ አፈጻጸም በግምት ሳይሆን ግልጽ፣ ሊረጋገጥ የሚችልና ወጥ በሆነ መንገድ እንዲለካ የሚያስችል ነው።
በአዲሱ መመዘኛ መሠረት የሥራ አፈጻጸም በሰው ኃይል እና ማሽን ሰዓት ስሌት (Man-Hour/Machine-Hour Weightage) እንዲሁም በቢ.ኦ.ኪዩ (BOQ) የሥራ መጠን እና ክብደት ላይ ይመሠረታል።
ከዚህም በተጨማሪ የፕሮጀክት አካላዊ አፈጻጸም ከፋይናንሺያል አፈጻጸም ተለይቶ በማስረጃ ተደግፎ መቅረብ እንዳለበት እና የትኛውም የቢ.ኦ.ኪዩ ሥራ መደብ ከ100 በመቶ በላይ ሊመዘገብ እንደማይችል ተመላክቷል።
ከዋናው ቢ.ኦ.ኪዩ በላይ የሚሠሩ ሥራዎች እንደ ልዩነት ወይም የለውጥ ትዕዛዝ (Variation/Change Order) ብቻ መመራት አለባቸው።
ማህበሩ ተቋራጮች የየወሩን የሥራ አፈጻጸም ሪፖርት፣ የክፍያ ጥያቄዎች እና የጊዜ ሰሌዳ ማሻሻያዎችን በአዲሱ መመዘኛ መሠረት እንዲያዘጋጁና አስፈላጊውን መረጃ በጥንቃቄ እንዲይዙ አሳስቧል።
@etconp
በኢትዮጵያ ኮንስትራክሽን ባለሥልጣን፣ በኮንስትራክሽን ማኔጅመንት ኢንስቲትዩት እና በሜድሮክ አርክቴክቶችና መሐንዲሶች ትብብር በሐርሞኒ ሆቴል የግንባታ ፕሮጀክት አካላዊ አፈጻጸም አዲስ መመዘኛ ላይ ያተኮረ ሥልጠና ተካሄደ።
የኢትዮጵያ ኮንስትራክሽን ሥራ ተቋራጮች ማህበር ከሥልጠናው መውጣት በኋላ ባወጣው ማጠቃለያ እንዳስታወቀው፣ አዲሱ ሥርዓት የግንባታ ፕሮጀክቶች አካላዊ አፈጻጸም በግምት ሳይሆን ግልጽ፣ ሊረጋገጥ የሚችልና ወጥ በሆነ መንገድ እንዲለካ የሚያስችል ነው።
በአዲሱ መመዘኛ መሠረት የሥራ አፈጻጸም በሰው ኃይል እና ማሽን ሰዓት ስሌት (Man-Hour/Machine-Hour Weightage) እንዲሁም በቢ.ኦ.ኪዩ (BOQ) የሥራ መጠን እና ክብደት ላይ ይመሠረታል።
ከዚህም በተጨማሪ የፕሮጀክት አካላዊ አፈጻጸም ከፋይናንሺያል አፈጻጸም ተለይቶ በማስረጃ ተደግፎ መቅረብ እንዳለበት እና የትኛውም የቢ.ኦ.ኪዩ ሥራ መደብ ከ100 በመቶ በላይ ሊመዘገብ እንደማይችል ተመላክቷል።
ከዋናው ቢ.ኦ.ኪዩ በላይ የሚሠሩ ሥራዎች እንደ ልዩነት ወይም የለውጥ ትዕዛዝ (Variation/Change Order) ብቻ መመራት አለባቸው።
ማህበሩ ተቋራጮች የየወሩን የሥራ አፈጻጸም ሪፖርት፣ የክፍያ ጥያቄዎች እና የጊዜ ሰሌዳ ማሻሻያዎችን በአዲሱ መመዘኛ መሠረት እንዲያዘጋጁና አስፈላጊውን መረጃ በጥንቃቄ እንዲይዙ አሳስቧል።
@etconp
👍4❤2
👉የ ኮንስትራክሽን ውል እና ኣይነቶቹ
🚧1. Lump sum contract
💫የአንድ ጊዜ ድምር ውል በአንድ ጊዜ ኮንትራት ውስጥ የሁሉም ስራዎች አጠቃላይ ዋጋ ፕሮጀክቱ ከመጀመሩ በፊት አስቀድሞ ተወስኗል::
ኮንትራክተሩ ፕሮጀክቱን በቋሚ ዋጋ ለማጠናቀቅ ተስማምቷል ይህም በአጠቃላይ የሥራ ወሰን እና ዝርዝር መግለጫዎች ላይ የተመሰረተ ነው::
በፕሮጀክቱ ላይ የሚደረጉ ማናቸውም ለውጦች ወይም ማሻሻያዎች ተጨማሪ ወጪዎችን ሊያስከትሉ እና የለውጥ ትዕዛዝ ሊፈልጉ ይችላሉ።
🚧2.Bill of Quantity Or Unit Rate Contract
💫የቢል መጠኖች ወይም የንጥል ተመን ኮንትራት: በመጠን ወይም በክፍል ተመን ውል ውስጥ ፕሮጀክቱ ወደ ተለያዩ ክፍሎች የተከፋፈለ ሲሆን ለእያንዳንዱ አካል የተወሰነ መጠን እና የክፍል ተመኖች ኮንትራክተሩ የሚከፈለው በተጠናቀቀው የሥራ መጠን ላይ በመመስረት በክፍል ተመኖች ተባዝቶ ነው።
ይህ ዓይነቱ ውል በዋጋ አወጣጥ ላይ የበለጠ ተለዋዋጭነት እና ግልጽነት ይሰጣል።
🚧3.Cost Plus Fixed Fee Contract
💫የወጪ እና ቋሚ ክፍያ ውል በወጪ እና ቋሚ ክፍያ ውል ኮንትራክተሩ ፕሮጀክቱን ለማጠናቀቅ ለወጣው ትክክለኛ ወጪ እና አስቀድሞ የተወሰነ ክፍያ ወይም የትርፍ ህዳግ ይከፈላል።
ይህ ዓይነቱ ውል በተለምዶ የሥራው ወሰን እርግጠኛ በማይሆንበት ጊዜ ወይም በማደግ ላይ በሚሆንበት ጊዜ ጥቅም ላይ ይውላል እና የወጪ መጨናነቅ አደጋን ወደ ባለቤቱ ይለውጣል.
🚧4. Cost Plus Percentage of Cost Contract
💫የወጪ ኮንትራት መቶኛ በወጪ እና የወጪ ውል መቶኛ ፣ ኮንትራክተሩ ፕሮጀክቱን ለማጠናቀቅ ለወጣው ትክክለኛ ወጪ እና ከጠቅላላ ወጪዎች መቶኛ እንደ ትርፍ ህዳግ ይከፈላል።
ኮንትራክተሩ ትርፋቸውን ለመጨመር ወጪዎችን ለመጨመር ማበረታቻ ሊኖረው ስለሚችል ይህ ዓይነቱ ውል የጥቅም ግጭት የመፍጠር አቅም አለው።
🚧5. Item Rate or Schedule of Rates Contract
💫የንጥል ተመን ወይም የዋጋ መርሃ ግብር ኮንትራት በንጥል ተመን ወይም የዋጋ መርሃ ግብር ውል ውስጥ ፣ የተለያዩ የስራ እቃዎች ዋጋ በኮንትራክተሩ በቀረበው የጊዜ ሰሌዳ ውስጥ አስቀድሞ የተገለጹ ናቸው።
ኮንትራክተሩ የሚከፈለው በእያንዳንዱ የተጠናቀቀው የሥራ ዕቃ መጠን በሚመለከታቸው ተመኖች ተባዝቶ ነው።
ይህ ዓይነቱ ውል ለተለያዩ የፕሮጀክቱ አካላት የዋጋ አሰጣጥ ላይ ግልጽነት ይሰጣል::
🚧6.Labour Contract
💫የሠራተኛ ውል - በሠራተኛ ውል ውስጥ ኮንትራክተሩ የሠራተኛ አገልግሎቶችን ብቻ ይሰጣል እና ለፕሮጀክቱ የሚያስፈልጉ ቁሳቁሶች እና መሳሪያዎች በባለቤቱ ይሰጣሉ::
ኮንትራክተሩ የሚከፈለው በተስማሙት የሰዓት ተመኖች ወይም ለሚሰጠው የሠራተኛ አገልግሎት ደሞዝ ነው።
🚧7.Hybrid Contract
💫የተለያዩ የኮንትራት ዓይነቶችን አካላትን በማጣመር የፕሮጀክቱን ልዩ ፍላጎት ለማሟላት ለምሳሌ የሁለቱት የተለያዩ ኮንትራክተሮች የአንድ ጊዜ ድምር ውል እና የወጪ እና የቋሚ ክፍያ ውልን ሊያካትት ይችላል።
ይህ ዓይነቱ ውል በዋጋ እና በአደጋ ምደባ ላይ ተለዋዋጭነትን ይፈቅዳል።
🚧8. Special Contract
💫ልዩ ውል - ልዩ ውል ለአንድ የተወሰነ ፕሮጀክት ልዩ መስፈርቶች የተዘጋጀ ውል ነው።
ልዩ ኮንትራቶች በመደበኛ የኮንትራት ቅጾች ውስጥ የማይገኙ የተወሰኑ አንቀጾችን ፣ ውሎችን እና ሁኔታዎችን ሊያካትቱ ይችላሉ።
ይህ ዓይነቱ ውል የተወሰኑ የፕሮጀክት ፍላጎቶችን እና ታሳቢዎችን ለማስተናገድ ያስችላል።
☄ስለ ኮንስትራክሽን ውል ይበልጥ ለመረዳት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
🚧1. Lump sum contract
💫የአንድ ጊዜ ድምር ውል በአንድ ጊዜ ኮንትራት ውስጥ የሁሉም ስራዎች አጠቃላይ ዋጋ ፕሮጀክቱ ከመጀመሩ በፊት አስቀድሞ ተወስኗል::
ኮንትራክተሩ ፕሮጀክቱን በቋሚ ዋጋ ለማጠናቀቅ ተስማምቷል ይህም በአጠቃላይ የሥራ ወሰን እና ዝርዝር መግለጫዎች ላይ የተመሰረተ ነው::
በፕሮጀክቱ ላይ የሚደረጉ ማናቸውም ለውጦች ወይም ማሻሻያዎች ተጨማሪ ወጪዎችን ሊያስከትሉ እና የለውጥ ትዕዛዝ ሊፈልጉ ይችላሉ።
🚧2.Bill of Quantity Or Unit Rate Contract
💫የቢል መጠኖች ወይም የንጥል ተመን ኮንትራት: በመጠን ወይም በክፍል ተመን ውል ውስጥ ፕሮጀክቱ ወደ ተለያዩ ክፍሎች የተከፋፈለ ሲሆን ለእያንዳንዱ አካል የተወሰነ መጠን እና የክፍል ተመኖች ኮንትራክተሩ የሚከፈለው በተጠናቀቀው የሥራ መጠን ላይ በመመስረት በክፍል ተመኖች ተባዝቶ ነው።
ይህ ዓይነቱ ውል በዋጋ አወጣጥ ላይ የበለጠ ተለዋዋጭነት እና ግልጽነት ይሰጣል።
🚧3.Cost Plus Fixed Fee Contract
💫የወጪ እና ቋሚ ክፍያ ውል በወጪ እና ቋሚ ክፍያ ውል ኮንትራክተሩ ፕሮጀክቱን ለማጠናቀቅ ለወጣው ትክክለኛ ወጪ እና አስቀድሞ የተወሰነ ክፍያ ወይም የትርፍ ህዳግ ይከፈላል።
ይህ ዓይነቱ ውል በተለምዶ የሥራው ወሰን እርግጠኛ በማይሆንበት ጊዜ ወይም በማደግ ላይ በሚሆንበት ጊዜ ጥቅም ላይ ይውላል እና የወጪ መጨናነቅ አደጋን ወደ ባለቤቱ ይለውጣል.
🚧4. Cost Plus Percentage of Cost Contract
💫የወጪ ኮንትራት መቶኛ በወጪ እና የወጪ ውል መቶኛ ፣ ኮንትራክተሩ ፕሮጀክቱን ለማጠናቀቅ ለወጣው ትክክለኛ ወጪ እና ከጠቅላላ ወጪዎች መቶኛ እንደ ትርፍ ህዳግ ይከፈላል።
ኮንትራክተሩ ትርፋቸውን ለመጨመር ወጪዎችን ለመጨመር ማበረታቻ ሊኖረው ስለሚችል ይህ ዓይነቱ ውል የጥቅም ግጭት የመፍጠር አቅም አለው።
🚧5. Item Rate or Schedule of Rates Contract
💫የንጥል ተመን ወይም የዋጋ መርሃ ግብር ኮንትራት በንጥል ተመን ወይም የዋጋ መርሃ ግብር ውል ውስጥ ፣ የተለያዩ የስራ እቃዎች ዋጋ በኮንትራክተሩ በቀረበው የጊዜ ሰሌዳ ውስጥ አስቀድሞ የተገለጹ ናቸው።
ኮንትራክተሩ የሚከፈለው በእያንዳንዱ የተጠናቀቀው የሥራ ዕቃ መጠን በሚመለከታቸው ተመኖች ተባዝቶ ነው።
ይህ ዓይነቱ ውል ለተለያዩ የፕሮጀክቱ አካላት የዋጋ አሰጣጥ ላይ ግልጽነት ይሰጣል::
🚧6.Labour Contract
💫የሠራተኛ ውል - በሠራተኛ ውል ውስጥ ኮንትራክተሩ የሠራተኛ አገልግሎቶችን ብቻ ይሰጣል እና ለፕሮጀክቱ የሚያስፈልጉ ቁሳቁሶች እና መሳሪያዎች በባለቤቱ ይሰጣሉ::
ኮንትራክተሩ የሚከፈለው በተስማሙት የሰዓት ተመኖች ወይም ለሚሰጠው የሠራተኛ አገልግሎት ደሞዝ ነው።
🚧7.Hybrid Contract
💫የተለያዩ የኮንትራት ዓይነቶችን አካላትን በማጣመር የፕሮጀክቱን ልዩ ፍላጎት ለማሟላት ለምሳሌ የሁለቱት የተለያዩ ኮንትራክተሮች የአንድ ጊዜ ድምር ውል እና የወጪ እና የቋሚ ክፍያ ውልን ሊያካትት ይችላል።
ይህ ዓይነቱ ውል በዋጋ እና በአደጋ ምደባ ላይ ተለዋዋጭነትን ይፈቅዳል።
🚧8. Special Contract
💫ልዩ ውል - ልዩ ውል ለአንድ የተወሰነ ፕሮጀክት ልዩ መስፈርቶች የተዘጋጀ ውል ነው።
ልዩ ኮንትራቶች በመደበኛ የኮንትራት ቅጾች ውስጥ የማይገኙ የተወሰኑ አንቀጾችን ፣ ውሎችን እና ሁኔታዎችን ሊያካትቱ ይችላሉ።
ይህ ዓይነቱ ውል የተወሰኑ የፕሮጀክት ፍላጎቶችን እና ታሳቢዎችን ለማስተናገድ ያስችላል።
☄ስለ ኮንስትራክሽን ውል ይበልጥ ለመረዳት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
❤10👌2👍1😱1
👉ከወለል ኮንክሪት በፊት የሃርድኮር ድርድር በሳይት ላይ!
በምስሉ ላይ እንደሚታየው ለወለል ኮንክሪት ዝግጅት የሚሆን የድንጋይ ድርድር (Hardcore Soling Layer) የተዘረጋ ሲሆን፣ በአካባቢው የአዕማድ ብረቶች ተተክለው ይታያሉ።
📌 በምስሉ ላይ የሚታዩ ዋና ዋና የምህንድስና ነጥቦች፦
🔹 Hardcore Soling Layer፦ ከተሰባበሩ ድንጋዮች የሚዘጋጀው ይህ ንብርብር ከታች የሚመጣውን እርጥበት ለመግታት እና የወለሉን የመሸከም አቅም ለማጠናከር ያገለግላል።
🔹 Chipping & Blinding Preparation፦ በድንጋዮቹ መካከል ያሉትን ክፍተቶች (Voids) ትናንሽ ጠጠሮችን (Chippings/Aggregates) እና አሸዋ በመጠቀም የመሙላት እና ደረጃውን የመጠበቅ ስራ ያስፈልገዋል።
🔹 Column Starter Bars Placement፦ ከአጥር እና ከህንፃው ዋና አካል ጋር የሚገናኙ አዕማዶች በቦታቸው ተተክለው ለቀጣይ የኮንክሪት ስራ ተዘጋጅተዋል።
⚠️ ለጥራት የሚረዱ የሳይት ማስታወሻዎች፦
1️⃣ Void Filling & Compaction፦ በድንጋዮቹ መካከል ያሉ ክፍተቶች በጠጠር መሞላት እና በደንብ መወቀጥ (Compaction) አለባቸው፤ አለበለዚያ ኮንክሪት ሲፈስ ወደ ስር ሰርጎ በመግባት የኮንክሪት መጠን ብክነት ያመጣል።
2️⃣ Damp Proof Membrane (DPM)፦ ከኮንክሪት ስራው በፊት በሃርድኮሩ ላይ ቢያንስ 0.5 mm (500 micron) ውፍረት ያለው የፕላስቲክ ንብርብር (Polythene Sheet) መዘርጋት አለበት።
3️⃣ Reinforcement Mesh (BRC) & Cover Blocks፦ ለወለል ኮንክሪቱ የሚሆን የብረት መረብ (Welded Wire Mesh / BRC Mesh) ተዘርግቶ ከስር የኮንክሪት ከቨር ብሎኮች መደረግ አለባቸው።
@etconp
በምስሉ ላይ እንደሚታየው ለወለል ኮንክሪት ዝግጅት የሚሆን የድንጋይ ድርድር (Hardcore Soling Layer) የተዘረጋ ሲሆን፣ በአካባቢው የአዕማድ ብረቶች ተተክለው ይታያሉ።
📌 በምስሉ ላይ የሚታዩ ዋና ዋና የምህንድስና ነጥቦች፦
🔹 Hardcore Soling Layer፦ ከተሰባበሩ ድንጋዮች የሚዘጋጀው ይህ ንብርብር ከታች የሚመጣውን እርጥበት ለመግታት እና የወለሉን የመሸከም አቅም ለማጠናከር ያገለግላል።
🔹 Chipping & Blinding Preparation፦ በድንጋዮቹ መካከል ያሉትን ክፍተቶች (Voids) ትናንሽ ጠጠሮችን (Chippings/Aggregates) እና አሸዋ በመጠቀም የመሙላት እና ደረጃውን የመጠበቅ ስራ ያስፈልገዋል።
🔹 Column Starter Bars Placement፦ ከአጥር እና ከህንፃው ዋና አካል ጋር የሚገናኙ አዕማዶች በቦታቸው ተተክለው ለቀጣይ የኮንክሪት ስራ ተዘጋጅተዋል።
⚠️ ለጥራት የሚረዱ የሳይት ማስታወሻዎች፦
1️⃣ Void Filling & Compaction፦ በድንጋዮቹ መካከል ያሉ ክፍተቶች በጠጠር መሞላት እና በደንብ መወቀጥ (Compaction) አለባቸው፤ አለበለዚያ ኮንክሪት ሲፈስ ወደ ስር ሰርጎ በመግባት የኮንክሪት መጠን ብክነት ያመጣል።
2️⃣ Damp Proof Membrane (DPM)፦ ከኮንክሪት ስራው በፊት በሃርድኮሩ ላይ ቢያንስ 0.5 mm (500 micron) ውፍረት ያለው የፕላስቲክ ንብርብር (Polythene Sheet) መዘርጋት አለበት።
3️⃣ Reinforcement Mesh (BRC) & Cover Blocks፦ ለወለል ኮንክሪቱ የሚሆን የብረት መረብ (Welded Wire Mesh / BRC Mesh) ተዘርግቶ ከስር የኮንክሪት ከቨር ብሎኮች መደረግ አለባቸው።