âď¸ Airport Runway â Construction Concept
An airport runway is a highly engineered pavement system designed to safely support repeated aircraft movements under heavy loads.
This conceptual Text presents the complete structural and infrastructure layout of a flexible runway pavement, including the pavement layers, shoulders, drainage system, taxiway connection, terminal facilities, cross-section, and construction sequence.
đš Runway Dimensions: 3000 m long Ă 30 m wide
đš Shoulders: 7.5 m on each side
đš Total Formation Width: 45 m
đš Pavement Type: Flexible Pavement
đš Design Aircraft: A320 / B737
đš Design Life: 20 years
đš Cross Slope: 2.5% from centreline toward the edges
đŁď¸ Pavement Layer System
The runway pavement is constructed in multiple layers to distribute aircraft loads safely to the underlying soil:
1. Asphalt Wearing Course â 50 mm
2. Asphalt Binder Course â 70 mm
3. Asphalt Base Course â 100 mm
4. Crushed Aggregate Base â 250 mm
5. Subbase Course â 300 mm
6. Compacted Subgrade
đ Total Pavement Thickness: 770 mm
đ§ď¸ Drainage System
Proper drainage is essential for runway safety and pavement durability. Side drainage channels collect and carry away surface runoff, preventing water accumulation and protecting the pavement structure from moisture damage.
đď¸ Main Construction Elements
âď¸ Runway pavement
âď¸ Asphalt shoulders
âď¸ Drainage channels
âď¸ Taxiway connection
âď¸ Airport terminal and services
âď¸ Runway markings and lighting
âď¸ Compacted subgrade and granular layers
đ¨ Typical Construction Sequence
1ď¸âŁ Clearing and grubbing
2ď¸âŁ Earthworks and subgrade preparation
3ď¸âŁ Subbase and base laying
4ď¸âŁ Asphalt pavement construction
5ď¸âŁ Shoulder construction
6ď¸âŁ Drainage channel construction
7ď¸âŁ Runway marking and lighting installation
8ď¸âŁ Quality control and commissioning
This infographic provides a clear overview of how different civil engineering, pavement engineering, geotechnical, drainage, and airport infrastructure components work together to create a safe and durable airport runway.
âđáá°á¨á᪠áá¨á áĽá ááá˝ á¨áŽááľáľáŤáá˝á ááá áááὠᨠYouTube ááá˝á á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
An airport runway is a highly engineered pavement system designed to safely support repeated aircraft movements under heavy loads.
This conceptual Text presents the complete structural and infrastructure layout of a flexible runway pavement, including the pavement layers, shoulders, drainage system, taxiway connection, terminal facilities, cross-section, and construction sequence.
đš Runway Dimensions: 3000 m long Ă 30 m wide
đš Shoulders: 7.5 m on each side
đš Total Formation Width: 45 m
đš Pavement Type: Flexible Pavement
đš Design Aircraft: A320 / B737
đš Design Life: 20 years
đš Cross Slope: 2.5% from centreline toward the edges
đŁď¸ Pavement Layer System
The runway pavement is constructed in multiple layers to distribute aircraft loads safely to the underlying soil:
1. Asphalt Wearing Course â 50 mm
2. Asphalt Binder Course â 70 mm
3. Asphalt Base Course â 100 mm
4. Crushed Aggregate Base â 250 mm
5. Subbase Course â 300 mm
6. Compacted Subgrade
đ Total Pavement Thickness: 770 mm
đ§ď¸ Drainage System
Proper drainage is essential for runway safety and pavement durability. Side drainage channels collect and carry away surface runoff, preventing water accumulation and protecting the pavement structure from moisture damage.
đď¸ Main Construction Elements
âď¸ Runway pavement
âď¸ Asphalt shoulders
âď¸ Drainage channels
âď¸ Taxiway connection
âď¸ Airport terminal and services
âď¸ Runway markings and lighting
âď¸ Compacted subgrade and granular layers
đ¨ Typical Construction Sequence
1ď¸âŁ Clearing and grubbing
2ď¸âŁ Earthworks and subgrade preparation
3ď¸âŁ Subbase and base laying
4ď¸âŁ Asphalt pavement construction
5ď¸âŁ Shoulder construction
6ď¸âŁ Drainage channel construction
7ď¸âŁ Runway marking and lighting installation
8ď¸âŁ Quality control and commissioning
This infographic provides a clear overview of how different civil engineering, pavement engineering, geotechnical, drainage, and airport infrastructure components work together to create a safe and durable airport runway.
âđáá°á¨á᪠áá¨á áĽá ááá˝ á¨áŽááľáľáŤáá˝á ááá áááὠᨠYouTube ááá˝á á¨áłá˝ áŁáá ááá á áááŁáľ SubScribe á ááá á¤á°á°áĽ áááđ
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
â¤10đ3
Ethio Construction Engineering
đá°áá ááľ á¤á°á°áŚáťá˝á áĽááá˝ á á á¨áášá áá°á¨áľ ᨠETABS á˛áśááŤá áŞáľáŽ á á ááá ááá ᨠintroduction ááᎠAnalysis áĽá Design áŁáŤá°á ááἠáŞáľáŽ áŁááá
á°ááášááᢠđŤľáĽáá áᏠááá 1 áááááš ááĽá°ááđ https://youtu.be/yB1KO_nYByc @etconp
YouTube
đ ETABS Full Course 2026 â Part 10 | á¨áá᪠áĽáľá¨ Advanced | ETABS Tutorial á á ááá đď¸đ
đ ETABS Full Course â Part 10 | Structural Design & Analysis Tutorial
Continue the complete ETABS Full Course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 10, we continue the ETABSâŚ
Continue the complete ETABS Full Course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 10, we continue the ETABSâŚ
đ2â¤1đ1
đá áľá°áłá˝ áá ááá
áťáá á¤á°á°áŚá˝
âĄď¸3 áááľ ááŠáľ
đá á˛áľ á ááľ ááááŤáľ á áá¨á ᨠáˇááá 1 ááᎠáĽáľá¨ áˇááá 5 á¨ááá Quantity Surveying áĽá Ms Project áŚáááá áŽááśá˝ áľáá á ᨠ25% á áá˝ á ááááđ
đŠáááááἠ@Philemona7 ááááá
đQs ááááľáą ETABS áŚááľ áĽáá°á°á á á ááđ
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
áááŤá á á˛áľ á ááľđ
@etconp
âĄď¸3 áááľ ááŠáľ
đá á˛áľ á ááľ ááááŤáľ á áá¨á ᨠáˇááá 1 ááᎠáĽáľá¨ áˇááá 5 á¨ááá Quantity Surveying áĽá Ms Project áŚáááá áŽááśá˝ áľáá á ᨠ25% á áá˝ á ááááđ
đŠáááááἠ@Philemona7 ááááá
đQs ááááľáą ETABS áŚááľ áĽáá°á°á á á ááđ
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
áááŤá á á˛áľ á ááľđ
@etconp
â¤5đĽ°2đ1
đá˛ááá á˘áľ á˘áŠááľ(Design bid build)(DBB) áĽá á˛ááá á˘áŠááľ(Design build)(DB)
đá˛ááá_á˘áľ_á˘áŠááľ(Design bid build)(DBB)
á áŽááľáľáŤáá˝á ááłá á á áĽááá á áááŤá˝á á¨áá°áŤá áľ á¨ááŽáááľ á áááľ á˛áááá á á°áŞá á áŤáą ááááľ áĽáá˛ááá áŤá°á¨á á áá áááŁáłáá á á°ááŤá áĽáá˛á¨ááá á¨ááŤá°ááá áľ ááá˘áááá á˛ááá á˘áľ á˘áŠááľ(Design bid build)(DBB) á ááŁá ááłááááĄáĄá áá á¨ááŽáááľ á áááľ á¨áłáá°áá áááŁáł á˛áááá á á°áŞá á áŤáą á ááá´ááľ ááá á áá áśáľá°á ááá/ á áá á ááá´ááľ áľáá áľ/ áĽáá˛á¨ááá áŤá°ááááĄáĄá ááá áá á á°áááá á˛ááá áá°á¨áľ áááŁáłáá á¨ááŤá¨ááá á°ááŤá áá°ááá¨áĽ áá°áľ áááŁááĄáĄá¨áááŁáłá áŁáá¤áľ á¨ááááľáľ ááľáŞáŤ á¤áľ á¨áá áĽáá°áá áááŁáłáá á¨ááŤá¨ááá á°ááŤá á¨ááá¨áĄ áľáŤ á¨áá¨áááá á áἠá á áá°á¨áľ áááááĄáĄáá á áááą ááŽáááľ á áááŤá˝á á¨á°ááá° áááĄáĄ
đá˛ááá á˘áŠááľ(Design build)(DB)
á áá á áŠá á°áá á°ááŤáŠ á˛áááá áĽá áááŁáłáá á áŤáą á¨ááŤá¨áááá áľ á¨ááŽáááľ á áááľá á áá˘áááá á˛ááá á˘áŠááľ(Design build)(DB) ááŁáááĄáĄá áá á¨ááŽáááľ á áááľ á°ááŤáŠ á¨áłáá°áá áááŁáł á˛áááá á áŤáą á ááá´ááľ ááá á áá á¨á ááá´ááľ áľáá áľ á ááŤáááľ áŤá¨áááááĄáĄá¨á ááá´ááľ áľáŤá á¨ááŤáľá¨áľáá áááááľ á¨á°ááŤáŠ áááááĄáĄá¨á˛ááá áľáŤá áá á¨á°áŤáŤá á˝áá á¨ááŤáľá¨áľáá áááááľ á á°áŞáá/á¨áááŁáłáá áŁáá¤áľ á áááŤáááĄáĄ
ááá á°ááŤáŠ á˛áááá áŤá°áŤá á áá á¨á ááá´ááľ áľáá áľ á ááŤáááľ á¨áá áĽáá°áá á¨á ááá´áá¸á áľáŤá áá á á°áŤáŤá á°ááŤáŠ áá á°áŞá á¨áááá áľ áááááľ áĽáá°á°á á á áá á ááá´ááąá áá°ááŤáŠ á ááľááĽáá á á áľááĽáááľ áľáŤ áá á á°á°áááá á ááŁáĽ áááááľ áááá áłá áááľ áááĄáĄ
á áá á áááľ ááŽáááľ á¨áááŁáłá áŁáá¤áľ/á á°áŞá áá á áá á¨áŽááľáľáŤáá˝á áľááśá˝á/risks/ áá° á°ááŤáŠ áŤáľá°áááááĄáĄ
áá áááľ á á°áŞá áá¤áąá áááľá áááŁáłáá á ááááŞáŤ á áá¨á ááľ á˛ááá á ááŁáĽ á áĽáŤáľ á°á¨áááááľ á¨áá¨á¨áĽá á áá á¨á°ááá áá á¨áááŁáł áá á¨áááá áŁáá ááá¸áá á áááľ áááááľ á áááá áľá áááľ áááĄáĄáá áĽááľ áááĽááľ áŤá á á¨á˘áľáŽá˝áŤ ááááśá˝ áŁááľááŁá(ERA) á˛ááá á˘áŠááľ á¨ááááľ ááŽáááľ á˛áá¨á á°ááłáłáŞ á°ááŤáŽá˝ á¨á°áá¨á¨áááá á˛ááá áľáŤáá˝á á áŤáłá¸á á¨á°áŠ á áá á áá áááłá°áŤááĄáĄ
á°ááŤáŽáš á˛áááá á˛á°áŠ á áŽá áľááľáŽá˝ áŤá áĽá á°á ááá á á á˛áľ áľááľá á¨áĽáŤáľ á°á¨á ááľá¨áľ á¨áá˝á á¨áá á°ááŤáŽá˝ áĽáá°á¨ááááłá¸áá ááŤá ááááŤá¸á/ááááŤáłá¸á á°á áá áľááľá áĽá á á á˛áľ á¨áááᣠáľááľá áĽáŤá á áááá á á˛ááá á áŤá°á á¨ááŤááᥠá˛áá ááá áá áá á áá¤áľ á°á¨á á á°áŞá á ááááá á¨áĽáŤáľ á°á¨á/áľáłááłááľ ááááŁáą áĽá áááá á á ááŤáŞá áá¨ááᥠáá á¨ááľ áááĄáĄááááŁáľ á°á áá á ááááá á¨áĽáŤáľ á°á¨á áá°ááłá á¨á°áŁáá á áŽá áľááľá á áĽáá áá áľ á˘áááľ áĽááł á á°áŞáá áá፠á¨áá¨áá áááááľ á áŤáľá¨áľáá áľááĄáĄáľááá á˛ááá á˘áŠááľ ááŽáááľ áá á°áŞáá˝ áŞáľá ááŞ/á¨áľááľ ááť á¨áá á¨ááŽáááľ á áááľ áááĄáĄ
ááá áááąá á¨ááŽáááľ á áááśá˝ ááŽááľáľáŤáá˝á ááá¸á á¨áá áááľ áááŤá áŽáá˛á˝á á¨á°ááŤá¨ ááá˘
FIDIC á áá á¨ááľ á¨áááŁáł áá ááá áľá á áá áá áá ááá˝á áľáá áľáŚáł ááᢠá áá áá፠á á°áŞá á°ááŤá á á¨á ááłááą áá ááá áľ áá áľ á ááá á¨áá áááłáá˝ áá áá°áŤá°áá áá ááá¸á áá áá˘
áᏠáá áá ááá áĽá á áá á¨ááááá áááŤá áŽáá˛á˝á á áľááááś FIDIC á¨áá˝á áá¨áŁ áĽá á áľááťá áŽáá˛á˝á áŚá áŽááľáŤááľ á ááŤá°áą ááĽáŚá˝ áá áĽáť áááŤá¨áľ á á ááá˘
á á°á¨ááŞá á á˛ááá á˘áŠááľ ááŽáááľ á¨áŽááľáľáŤáá˝á áľááľ/áŞáľá áá á áá áá° á°ááŤáŠ á¨áá°ááá á ááá áአá¨ááľáľá á˝áá áŤáľááááááĄáĄ
áľáááá á°ááŤáŠ á áááŁáłá áá áá All risk insurance áĽáá˛áᣠáĽá áá˛ááá áľá á°áľáŁááľáŤá áĽáá˝áľá á á°ááŤáŠ áŁáááŤáá˝ á¨áľáŤ áľá á°áľ ááá¨á°áľ ááłáľá áŞáłáŤ á°áá professional indemnity insurance áĽáá˛áᣠFIDIC á˛ááá á˘áŠááľ ááŽáááľ áŽááá´áĽá á¨ááá á°áá᪠áááŤá áŽáá˛á˝á áá´áł áŤáľáááŁáá˘
á áááŤá˝á á˛ááá á˘áŠááľ á¨áŽááľáľáŤáá˝á ááŽáááľ áĽáá á¨á°ááá° á áá°ááá˘
ááá á ááááľ áááŁáł ááá˝ á¨á˘áľáŽáľáŤ ááááśá˝ áŁááľááŁá á áá á áá áá ááá áłáá˘
á á á ááá á áááŤá˝á á áŽáá°áľáŤáá˝á á˛ááááá áĽá á¨áá á áľá°áłá°á á¨ááľ á°á á¨áĽáááľ ááá°áľ áŤá á ááá áĽá ááŽáááśá˝ á á°áŤááá¸á ááá áááἠá¨ááá áááá áľ áááł á á°áá á¨ááľá°áá áĽáá°ááá áá á¨áŽááľáľáŤáá˝á áŞáľá/áľááľ áá° á°ááŤáŠ á ááľá°ááá ááááľáłá áááŁáłáá˝á á á˛ááá á˘áŠááľ á¨ááŽáááľ á áááľ áĽáá˛á¨ááá ááľá¨á á¨á°áťá á ááŤá áá á°áĽá ááłáááá˘
@etconp
đá˛ááá_á˘áľ_á˘áŠááľ(Design bid build)(DBB)
á áŽááľáľáŤáá˝á ááłá á á áĽááá á áááŤá˝á á¨áá°áŤá áľ á¨ááŽáááľ á áááľ á˛áááá á á°áŞá á áŤáą ááááľ áĽáá˛ááá áŤá°á¨á á áá áááŁáłáá á á°ááŤá áĽáá˛á¨ááá á¨ááŤá°ááá áľ ááá˘áááá á˛ááá á˘áľ á˘áŠááľ(Design bid build)(DBB) á ááŁá ááłááááĄáĄá áá á¨ááŽáááľ á áááľ á¨áłáá°áá áááŁáł á˛áááá á á°áŞá á áŤáą á ááá´ááľ ááá á áá áśáľá°á ááá/ á áá á ááá´ááľ áľáá áľ/ áĽáá˛á¨ááá áŤá°ááááĄáĄá ááá áá á á°áááá á˛ááá áá°á¨áľ áááŁáłáá á¨ááŤá¨ááá á°ááŤá áá°ááá¨áĽ áá°áľ áááŁááĄáĄá¨áááŁáłá áŁáá¤áľ á¨ááááľáľ ááľáŞáŤ á¤áľ á¨áá áĽáá°áá áááŁáłáá á¨ááŤá¨ááá á°ááŤá á¨ááá¨áĄ áľáŤ á¨áá¨áááá á áἠá á áá°á¨áľ áááááĄáĄáá á áááą ááŽáááľ á áááŤá˝á á¨á°ááá° áááĄáĄ
đá˛ááá á˘áŠááľ(Design build)(DB)
á áá á áŠá á°áá á°ááŤáŠ á˛áááá áĽá áááŁáłáá á áŤáą á¨ááŤá¨áááá áľ á¨ááŽáááľ á áááľá á áá˘áááá á˛ááá á˘áŠááľ(Design build)(DB) ááŁáááĄáĄá áá á¨ááŽáááľ á áááľ á°ááŤáŠ á¨áłáá°áá áááŁáł á˛áááá á áŤáą á ááá´ááľ ááá á áá á¨á ááá´ááľ áľáá áľ á ááŤáááľ áŤá¨áááááĄáĄá¨á ááá´ááľ áľáŤá á¨ááŤáľá¨áľáá áááááľ á¨á°ááŤáŠ áááááĄáĄá¨á˛ááá áľáŤá áá á¨á°áŤáŤá á˝áá á¨ááŤáľá¨áľáá áááááľ á á°áŞáá/á¨áááŁáłáá áŁáá¤áľ á áááŤáááĄáĄ
ááá á°ááŤáŠ á˛áááá áŤá°áŤá á áá á¨á ááá´ááľ áľáá áľ á ááŤáááľ á¨áá áĽáá°áá á¨á ááá´áá¸á áľáŤá áá á á°áŤáŤá á°ááŤáŠ áá á°áŞá á¨áááá áľ áááááľ áĽáá°á°á á á áá á ááá´ááąá áá°ááŤáŠ á ááľááĽáá á á áľááĽáááľ áľáŤ áá á á°á°áááá á ááŁáĽ áááááľ áááá áłá áááľ áááĄáĄ
á áá á áááľ ááŽáááľ á¨áááŁáłá áŁáá¤áľ/á á°áŞá áá á áá á¨áŽááľáľáŤáá˝á áľááśá˝á/risks/ áá° á°ááŤáŠ áŤáľá°áááááĄáĄ
áá áááľ á á°áŞá áá¤áąá áááľá áááŁáłáá á ááááŞáŤ á áá¨á ááľ á˛ááá á ááŁáĽ á áĽáŤáľ á°á¨áááááľ á¨áá¨á¨áĽá á áá á¨á°ááá áá á¨áááŁáł áá á¨áááá áŁáá ááá¸áá á áááľ áááááľ á áááá áľá áááľ áááĄáĄáá áĽááľ áááĽááľ áŤá á á¨á˘áľáŽá˝áŤ ááááśá˝ áŁááľááŁá(ERA) á˛ááá á˘áŠááľ á¨ááááľ ááŽáááľ á˛áá¨á á°ááłáłáŞ á°ááŤáŽá˝ á¨á°áá¨á¨áááá á˛ááá áľáŤáá˝á á áŤáłá¸á á¨á°áŠ á áá á áá áááłá°áŤááĄáĄ
á°ááŤáŽáš á˛áááá á˛á°áŠ á áŽá áľááľáŽá˝ áŤá áĽá á°á ááá á á á˛áľ áľááľá á¨áĽáŤáľ á°á¨á ááľá¨áľ á¨áá˝á á¨áá á°ááŤáŽá˝ áĽáá°á¨ááááłá¸áá ááŤá ááááŤá¸á/ááááŤáłá¸á á°á áá áľááľá áĽá á á á˛áľ á¨áááᣠáľááľá áĽáŤá á áááá á á˛ááá á áŤá°á á¨ááŤááᥠá˛áá ááá áá áá á áá¤áľ á°á¨á á á°áŞá á ááááá á¨áĽáŤáľ á°á¨á/áľáłááłááľ ááááŁáą áĽá áááá á á ááŤáŞá áá¨ááᥠáá á¨ááľ áááĄáĄááááŁáľ á°á áá á ááááá á¨áĽáŤáľ á°á¨á áá°ááłá á¨á°áŁáá á áŽá áľááľá á áĽáá áá áľ á˘áááľ áĽááł á á°áŞáá áá፠á¨áá¨áá áááááľ á áŤáľá¨áľáá áľááĄáĄáľááá á˛ááá á˘áŠááľ ááŽáááľ áá á°áŞáá˝ áŞáľá ááŞ/á¨áľááľ ááť á¨áá á¨ááŽáááľ á áááľ áááĄáĄ
ááá áááąá á¨ááŽáááľ á áááśá˝ ááŽááľáľáŤáá˝á ááá¸á á¨áá áááľ áááŤá áŽáá˛á˝á á¨á°ááŤá¨ ááá˘
FIDIC á áá á¨ááľ á¨áááŁáł áá ááá áľá á áá áá áá ááá˝á áľáá áľáŚáł ááᢠá áá áá፠á á°áŞá á°ááŤá á á¨á ááłááą áá ááá áľ áá áľ á ááá á¨áá áááłáá˝ áá áá°áŤá°áá áá ááá¸á áá áá˘
áᏠáá áá ááá áĽá á áá á¨ááááá áááŤá áŽáá˛á˝á á áľááááś FIDIC á¨áá˝á áá¨áŁ áĽá á áľááťá áŽáá˛á˝á áŚá áŽááľáŤááľ á ááŤá°áą ááĽáŚá˝ áá áĽáť áááŤá¨áľ á á ááá˘
á á°á¨ááŞá á á˛ááá á˘áŠááľ ááŽáááľ á¨áŽááľáľáŤáá˝á áľááľ/áŞáľá áá á áá áá° á°ááŤáŠ á¨áá°ááá á ááá áአá¨ááľáľá á˝áá áŤáľááááááĄáĄ
áľáááá á°ááŤáŠ á áááŁáłá áá áá All risk insurance áĽáá˛áᣠáĽá áá˛ááá áľá á°áľáŁááľáŤá áĽáá˝áľá á á°ááŤáŠ áŁáááŤáá˝ á¨áľáŤ áľá á°áľ ááá¨á°áľ ááłáľá áŞáłáŤ á°áá professional indemnity insurance áĽáá˛áᣠFIDIC á˛ááá á˘áŠááľ ááŽáááľ áŽááá´áĽá á¨ááá á°áá᪠áááŤá áŽáá˛á˝á áá´áł áŤáľáááŁáá˘
á áááŤá˝á á˛ááá á˘áŠááľ á¨áŽááľáľáŤáá˝á ááŽáááľ áĽáá á¨á°ááá° á áá°ááá˘
ááá á ááááľ áááŁáł ááá˝ á¨á˘áľáŽáľáŤ ááááśá˝ áŁááľááŁá á áá á áá áá ááá áłáá˘
á á á ááá á áááŤá˝á á áŽáá°áľáŤáá˝á á˛ááááá áĽá á¨áá á áľá°áłá°á á¨ááľ á°á á¨áĽáááľ ááá°áľ áŤá á ááá áĽá ááŽáááśá˝ á á°áŤááá¸á ááá áááἠá¨ááá áááá áľ áááł á á°áá á¨ááľá°áá áĽáá°ááá áá á¨áŽááľáľáŤáá˝á áŞáľá/áľááľ áá° á°ááŤáŠ á ááľá°ááá ááááľáłá áááŁáłáá˝á á á˛ááá á˘áŠááľ á¨ááŽáááľ á áááľ áĽáá˛á¨ááá ááľá¨á á¨á°áťá á ááŤá áá á°áĽá ááłáááá˘
@etconp
â¤7đ5đĽ°2đ2đĽ1
Forwarded from Kelemat Ads
áá áĽááłá°áĄáľ á áá°áá!
á¨áááľáá áĽáŤáąá á áá°áá á ááľááá ááŞáá áĽáá!
ááĽáłááľáá áááááŁáľ á á ááľ áá á¨áá°áŠ 7 á¨-AI á¤áááśá˝á áĽáá ááááᢠá˛áááᣠá˝ááᣠáŽá˛áá ááá á á ááľ áá áá¨ááááᢠáľáá teamᣠá°á¨á᪠áá፠á¨áá á ááĽáá áĽáť! ááá˝áá áĽá á á áá˝ áŤá°á¨áá áá¸á ááá˘
áá¤áąáľ?
á 48 á°ááłáľ ááľáĽ ááľáŤ ááá á¨áá ááŽáá˝áá ááĽáłááľá˘ á´ááááľ á áá°ááᤠá¨á°ááŁá á áľáŤá á áá°ááᢠáĄáľáá˝á áĽá¨ááľ áľáááŤáá á á¨áá°á ááĽááľ á¨á°ááᣠáĽááá°á ááĽáłááľ!
7AI Studio
ááĽáłááłá˝á áá á áááŁáľ ááá : https://sebat.oriix.net
áá áá áá¨á
âď¸ Phone Number: +251957323634
đą Telegram @Oriix_Support
á¨áááľáá áĽáŤáąá á áá°áá á ááľááá ááŞáá áĽáá!
ááĽáłááľáá áááááŁáľ á á ááľ áá á¨áá°áŠ 7 á¨-AI á¤áááśá˝á áĽáá ááááᢠá˛áááᣠá˝ááᣠáŽá˛áá ááá á á ááľ áá áá¨ááááᢠáľáá teamᣠá°á¨á᪠áá፠á¨áá á ááĽáá áĽáť! ááá˝áá áĽá á á áá˝ áŤá°á¨áá áá¸á ááá˘
áá¤áąáľ?
á 48 á°ááłáľ ááľáĽ ááľáŤ ááá á¨áá ááŽáá˝áá ááĽáłááľá˘ á´ááááľ á áá°ááᤠá¨á°ááŁá á áľáŤá á áá°ááᢠáĄáľáá˝á áĽá¨ááľ áľáááŤáá á á¨áá°á ááĽááľ á¨á°ááᣠáĽááá°á ááĽáłááľ!
7AI Studio
ááĽáłááłá˝á áá á áááŁáľ ááá : https://sebat.oriix.net
áá áá áá¨á
âď¸ Phone Number: +251957323634
đą Telegram @Oriix_Support
â¤2đĽ1
đTENDER EVALUATION CHALLENGE | á¨á¨á¨áł áááá áá°á
áśáľáľ á°ááŤáŽá˝ á¨á¨áł á áá¨áĄá˘
Technical Evaluation = 30%
Financial Evaluation = 70%
đš Contractor A
- Technical = 26%
- Financial = 95 Million Birr
đš Contractor B
- Technical = 29%
- Financial = 100 Million Birr
đš Contractor C
- Technical = 24%
- Financial = 90 Million Birr
â áĽáŤááá˝
1ď¸âŁ Determine the Financial Score
á¨áĽáŤááłááąá á°áŤáŤá˝ á¨áááááťá áá¤áľ áŤáľáá˘
Formula:
Financial Score = Lowest Bid á Bidder's Bid à 100
2ď¸âŁ Compute the Final Weighted Score
á¨áá¨á¨áťáá á¨ááĽá°áľ ááĽáĽ áŤáľáá˘
Formula:
Final Score = (Technical Ă 30%) + (Financial Ă 70%)
3ď¸âŁ Rank the Contractors
đĽ 1st
đĽ 2nd
đĽ 3rd
4ď¸âŁ đ Recommend the Winning Bidder
á¨áľáá á°ááŤá á¨ááááŞáŤ á°á¨á áŤááá?
đĄ BONUS QUESTION:
áá á°á áá áŤáá¨á á°ááŤá áááá á á¸áá áááá?
đ Your answer? Calculate it before checking the solution!
âđ á°á¨á᪠áááá áá¨ááá˝á áĽá á¨áłáááąá á¨áŽááľáľáŤáá˝á áááá˝ áááááľ âá¨ááľáĄá ááá˝á áááĽáđ
https://www.facebook.com/profile.php?id=61592085774934
@etconp
áśáľáľ á°ááŤáŽá˝ á¨á¨áł á áá¨áĄá˘
Technical Evaluation = 30%
Financial Evaluation = 70%
đš Contractor A
- Technical = 26%
- Financial = 95 Million Birr
đš Contractor B
- Technical = 29%
- Financial = 100 Million Birr
đš Contractor C
- Technical = 24%
- Financial = 90 Million Birr
â áĽáŤááá˝
1ď¸âŁ Determine the Financial Score
á¨áĽáŤááłááąá á°áŤáŤá˝ á¨áááááťá áá¤áľ áŤáľáá˘
Formula:
Financial Score = Lowest Bid á Bidder's Bid à 100
2ď¸âŁ Compute the Final Weighted Score
á¨áá¨á¨áťáá á¨ááĽá°áľ ááĽáĽ áŤáľáá˘
Formula:
Final Score = (Technical Ă 30%) + (Financial Ă 70%)
3ď¸âŁ Rank the Contractors
đĽ 1st
đĽ 2nd
đĽ 3rd
4ď¸âŁ đ Recommend the Winning Bidder
á¨áľáá á°ááŤá á¨ááááŞáŤ á°á¨á áŤááá?
đĄ BONUS QUESTION:
áá á°á áá áŤáá¨á á°ááŤá áááá á á¸áá áááá?
đ Your answer? Calculate it before checking the solution!
âđ á°á¨á᪠áááá áá¨ááá˝á áĽá á¨áłáááąá á¨áŽááľáľáŤáá˝á áááá˝ áááááľ âá¨ááľáĄá ááá˝á áááĽáđ
https://www.facebook.com/profile.php?id=61592085774934
@etconp
Facebook
Ethio Construction Engineering - ETCONp | Addis Ababa
Ethio Construction Engineering - ETCONp, Addis Ababa. 715 followers ¡ 49 talking about this. World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and...
Latest updates, tips, and tutorials on building, civil engineering, and...
â¤11đ3
đáľá ááľááľ á ááá´áá¸á áĽá áááŁáł á á°ááŁá áááá á¨áá¨áł 4 ááἠáá
áá á á ááľ áá á ááá
á°ááđ
đ á¨ááŤáŤáľá°ááŚ
â Mosque Architecture
â Concept & Geometry
â Space Planning
â Design Synthesis & Form
â á¨á ááá´áá¸áŤá áĽá Structural Drawings á¨ááłá ááŽáááśá˝
â ááááá áááŽáááľ ááŁááť á¨ááá áááá ááĽáŤáŞáŤáá˝ áŤáá ááđ
đŤáĽááá áá áá á¨ááá á¨áłá˝ áŁáá ááá áŤáááąáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6a8fbfb8b8611_etconp
đ á¨ááŤáŤáľá°ááŚ
â Mosque Architecture
â Concept & Geometry
â Space Planning
â Design Synthesis & Form
â á¨á ááá´áá¸áŤá áĽá Structural Drawings á¨ááłá ááŽáááśá˝
â ááááá áááŽáááľ ááŁááť á¨ááá áááá ááĽáŤáŞáŤáá˝ áŤáá ááđ
đŤáĽááá áá áá á¨ááá á¨áłá˝ áŁáá ááá áŤáááąáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6a8fbfb8b8611_etconp
đ1
đColumn Formwork â Key Construction Details
đColumn formwork provides the temporary mould required to cast reinforced-concrete columns to the specified dimensions, alignment, and shape.
Key components:
Formwork boards: Typically timber panels used to contain fresh concrete.
Walers: Horizontal members that stiffen and hold the formwork panels together.
Props/struts: Diagonal supports that maintain stability and plumb alignment.
Base plates/soles: Provide a firm bearing surface for props.
Wedges/cleats: Used for adjustment, tightening, and securing the support system.
Column reinforcement: Steel bars and ties positioned inside the formwork according to the structural design.
Important site checks:
Verify column dimensions and reinforcement before closing the formwork.
Check verticality, line, level, and rigidity.
Maintain the specified reinforcement cover using suitable spacers.
Ensure joints are tight enough to prevent excessive grout leakage.
Apply an appropriate form-release agent without contaminating reinforcement.
Secure all braces and supports before concrete placement.
Inspect the formwork again immediately before pouring.
Do not remove formwork based only on a fixed time period; stripping should follow the project specifications and the concreteâs achieved strength.
Note: The dimensions shown in an infographic are illustrative. Actual board sizes, waler spacing, column dimensions, reinforcement, cover, and stripping requirements must be determined from the structural drawings, design calculations, and applicable construction standards.
@etconp
đColumn formwork provides the temporary mould required to cast reinforced-concrete columns to the specified dimensions, alignment, and shape.
Key components:
Formwork boards: Typically timber panels used to contain fresh concrete.
Walers: Horizontal members that stiffen and hold the formwork panels together.
Props/struts: Diagonal supports that maintain stability and plumb alignment.
Base plates/soles: Provide a firm bearing surface for props.
Wedges/cleats: Used for adjustment, tightening, and securing the support system.
Column reinforcement: Steel bars and ties positioned inside the formwork according to the structural design.
Important site checks:
Verify column dimensions and reinforcement before closing the formwork.
Check verticality, line, level, and rigidity.
Maintain the specified reinforcement cover using suitable spacers.
Ensure joints are tight enough to prevent excessive grout leakage.
Apply an appropriate form-release agent without contaminating reinforcement.
Secure all braces and supports before concrete placement.
Inspect the formwork again immediately before pouring.
Do not remove formwork based only on a fixed time period; stripping should follow the project specifications and the concreteâs achieved strength.
Note: The dimensions shown in an infographic are illustrative. Actual board sizes, waler spacing, column dimensions, reinforcement, cover, and stripping requirements must be determined from the structural drawings, design calculations, and applicable construction standards.
@etconp
â¤5đ2
đá á˛áľ áŁáá á¨áá ፠áá á¨á°á°áŤ á¨á
áá Cost BreakDown Analysis áĽá BOQ á¨ááá á¨áłá˝ áŁáá ááá áŤáááąđ
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
đ3â¤1
đŁď¸ á¨ááááľ áááŁáł áĽáŤ áááá (Road Construction BOQ)đˇââď¸đ
âââââââââââââ
á¨ááááľ áááŁáł á áľáááá á¨áĽáŤ áá áᣠááłááľ áĽá á¨á᪠áľááľ áá á¨á°áá°á¨á° ááá˘
á¨BOQ (Bill of Quantities) áááá á¨áĽáŤááłááąá á¨áĽáŤ ááááľáŁ áá á áĽá áááŞáŤ ááá á ááá˝ áŤáłáŤáᢠđđ
đš Earthwork â á¨ááŹáľ áááŽá áááľ
đš Subgrade Preparation â á¨ááááľ áá á¨áľ ááá áľ
đš Sub-base â á¨áłá˝áá á¨áá á¨áľ ááĽááĽá
đš Base Course â áá á¨áá á¨áľ ááĽááĽá
đš Prime Coat & Tack Coat â á¨á áľáááľ ááĽááĽáŽá˝á áááŁá á
đš Asphalt Concrete â á¨áá¨á¨áť á¨á áľáááľ ááŁá
đš Drainage Works â á¨áá ááľááá áĽáŤáá˝
đš Shoulder & Road Furniture â á¨ááááľ ááᣠááááśá˝á ááá˝ ááłáŞáŤáá˝ đŁď¸
đ M², MÂł, ML áĽá KG á¨ááááľ áááŁáł áĽáŤáá˝á ááááŤáľá á¨ááŽáááąá á᪠áááľááľ á áĽááľ á¨áá áá áááŞáŤáá˝ áá¸áá˘
đˇââď¸áľáááá á¨ááááľ á˛ááá + áĽáŤáľ áŤáá ááłááľ + áľáááá á ááťá¸á = ááá ááááľ! đď¸â đŞđš
âđ á°á¨á᪠áááá áá¨ááá˝á áĽá á¨áłáááąá á¨áŽááľáľáŤáá˝á áááá˝ áááááľ âá¨ááľáĄá ááá˝á áááĽáđ
https://www.facebook.com/profile.php?id=61592085774934
@etconp
âââââââââââââ
á¨ááááľ áááŁáł á áľáááá á¨áĽáŤ áá áᣠááłááľ áĽá á¨á᪠áľááľ áá á¨á°áá°á¨á° ááá˘
á¨BOQ (Bill of Quantities) áááá á¨áĽáŤááłááąá á¨áĽáŤ ááááľáŁ áá á áĽá áááŞáŤ ááá á ááá˝ áŤáłáŤáᢠđđ
đš Earthwork â á¨ááŹáľ áááŽá áááľ
đš Subgrade Preparation â á¨ááááľ áá á¨áľ ááá áľ
đš Sub-base â á¨áłá˝áá á¨áá á¨áľ ááĽááĽá
đš Base Course â áá á¨áá á¨áľ ááĽááĽá
đš Prime Coat & Tack Coat â á¨á áľáááľ ááĽááĽáŽá˝á áááŁá á
đš Asphalt Concrete â á¨áá¨á¨áť á¨á áľáááľ ááŁá
đš Drainage Works â á¨áá ááľááá áĽáŤáá˝
đš Shoulder & Road Furniture â á¨ááááľ ááᣠááááśá˝á ááá˝ ááłáŞáŤáá˝ đŁď¸
đ M², MÂł, ML áĽá KG á¨ááááľ áááŁáł áĽáŤáá˝á ááááŤáľá á¨ááŽáááąá á᪠áááľááľ á áĽááľ á¨áá áá áááŞáŤáá˝ áá¸áá˘
đˇââď¸áľáááá á¨ááááľ á˛ááá + áĽáŤáľ áŤáá ááłááľ + áľáááá á ááťá¸á = ááá ááááľ! đď¸â đŞđš
âđ á°á¨á᪠áááá áá¨ááá˝á áĽá á¨áłáááąá á¨áŽááľáľáŤáá˝á áááá˝ áááááľ âá¨ááľáĄá ááá˝á áááĽáđ
https://www.facebook.com/profile.php?id=61592085774934
@etconp
Facebook
Ethio Construction Engineering - ETCONp | Addis Ababa
Ethio Construction Engineering - ETCONp, Addis Ababa. 715 followers ¡ 49 talking about this. World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and...
Latest updates, tips, and tutorials on building, civil engineering, and...
â¤7
đConstruction Safety & Compliance Kit â ááŽáá˝áá Safety Templates áĽá
á ááááá?đŚş
đ Safety Checklists
đŁď¸ Toolbox Talk Templates
đ Incident Report Forms
â ď¸ JSA Templates
𼞠PPE Inspection Sheets
â Editable Word Documentđ
https://ye-buna.com/etconp?ref=product_detail&product=6a88471586c15_etconp
đ Safety Checklists
đŁď¸ Toolbox Talk Templates
đ Incident Report Forms
â ď¸ JSA Templates
𼞠PPE Inspection Sheets
â Editable Word Documentđ
https://ye-buna.com/etconp?ref=product_detail&product=6a88471586c15_etconp
đĽ°2
đá¨áłááľ ááá¨áłá á¨á˘ááááŞáá áĽáŤááŚ
đá á áἠáá á ááŤáł ááłá á°áá á áŤáŁá˘ á áááá˝ áá áŤá¨ááľ á¨áááá´á˝á áľá á°áľ!
đĽá á áᥠá ááŤáł ááłá á°áá á áŤáŁá˘ á áááᥠá áááá˝ áá á¨áłááĽáłá¸áá áááľ áá áá á¨áŽááľáľáŤáá˝á áľá á°áśá˝ á áľááá¨áś á¨ááááź ááá¨á áá áĽáŤá ááŤá ááá˝ áĽáá°áá¨á°áá á ááá áźáááá˘
á á°áá á á¨á°áá˝á áĽá¨á°áľáá áŁá áááŁáłáá˝ áá á°ááłáłá á˝ááŽá˝ áĽááłáá°áá ááá ááŤááá á¨ááᣠááĽáĽ ááá˘
1ď¸âŁ á á ááľ áá 2 ááľá selected material áááś áŽááááľ ááľá¨á áľááá áá? áá°ááľáľ á ááá áá áá ááá áŤá?
â áľá á°áąáŚ áá á á°áŤá áášá áľá á°áľá á¨áŽááľáľáŤáá˝á áľáłááłááľá á¨áŁá° ááᢠá¨áŽáááá˝á ááŁáŞáŤáá˝ (Plate compactor ááá Rammer) á ááá á áĽáŤáľ áá áŁá á á¨áá˝ááľ á˘á á á¨15cm áĽáľá¨ 20cm (á¨áá°áá 30cm) á áá°ááľ ááĽááĽá (layer) áĽáť ááᢠá á ááľ áá 2 ááľá á áá á°áááś á¨áá áĽáť á˛á¨áἠá¨áĽá áŤáá á áá áłáá áĽá ááá°áľ (air voids) áĽáá°áŤá áááŤáá˘
â ď¸ áá°ááľ á¨ááá á¨á á á°ááŚ
Differential Settlement (áĽáŠá áŤááá á¨ááľáἠá á°á)ጠá ááá á°áááĽáś á˛áŤáá á á¨ááĽá°áľ áŤá á˛áŤááá áľáŁ áłáá áĽá á¨áá¨áá 2 ááľá á áá áĽá¨á°áŤááá áĽáŤá°áá á áááłáá˘
á¨ááľááłá á¨áľáľáŤáá¸á áľááŁáጠá¨ááŹáľ ááá (Ground Slab) ááľááĽáŁ á¨ááá á´áŤáááľ áááłáľáŁ ááľááłáá˝á Beam/Column á áŤáŁá˘ Structural Cracks áĽáá˛áá አáŤá°áááá˘
2ď¸âŁ foundation ááľáĽ áá áłááᣠá áá ááááľá á¨áĽáá¨áľ áľáŤáśá˝ (Formwork) áłáááą áá á á áá á˝áá áŤááŁá?
đ áá áłááᣠá áá ááááľáŚ
á áá á¨áá áá á˛á°áŁáá áá° Mud/Slurry (áá) ááá¨áŤáᢠá¨áá áá á á¨á áľááá (Optimum Moisture Content áľáá á) ááá ááááľ á¨áŽáááá˝á áĽáŤáľ á ááá¨ááá˘
á áአá¨áá¸á¨á á á áá (Bearing Capacity) áŤáŁáᢠááá á áá°áľ á˛á°áá á á˛á°á á áአáŽáááľ á ááľá¨á á¨áá°á á¨ááľáἠá á°á áŤááĽááá˘
áááľááጠáááá á ááá (Dewatering Pump) áá á áá á ááĽáśáŁ á¨áłá˝ááá áá áŤá¸áą á áá áĽáť á ááĽááĽá ááááľ áá á¨á áľá˘
𪾠á¨áĽáá¨áľ áááľáᣠá¨á¨áŁáľá áááááá áłáááą á¨Pad ááŞáŤ ááá ááŚ
á¨áĽáá¨áľ áá áľá áľ (Wood Decay)ጠá áá ááľáĽ á¨áᨠáĽáá¨áľ á áĽááĽá áľá á áŁáá´áŞáŤ ááááŤáľ á¨áá á áá áá á°áĽáłáá˘
áľááá ááá°áśá˝ ááá á (Void Creation)ጠáĽáá¨áą á áľáĽáś á˛á á á Pad ááŞáŤ áľááá áŁáś ááá°áśá˝ áááŤáá˘
á¨áááá´á˝á ááá¸áŤá°áľáŚ á¨ááľ áááá´á˝á ááŞáŤáá á á°áἠá¨á°á á á á á áá áľáá (Lateral Support) ááááľ á áá áľá˘ áĽáá¨áą á áľáĽáś ááá°áľ á˛ááĽá ááą á¨áááŽá˝ áľáá á áĽáś á¨ááá¸áŤá°áľá á¨ááááľ á á°á áŤááĽáááá˘
đĄ áá áááŤáŚáĽááá á áááľ á¨áłááľ ááĽáĽá áľáááśá˝ (Poor Site Supervision) á¨á áááá á¨á¨á á áá á°á áááľá áĽááŤáŹ á á°á áá á¨ááĽá á áááá¸áᣠá áłááľ áááá˛áąá á áąáááŤááአá áľá¸áłá á¨á´ááá ááľá°áŤá¨áŤ áĽááá ááá°áľáŁá¸á áááŁáá˘
á°ááłáłá á¨á áá áááŁáł áĽáŤááá˝ ááá á áľá°áŤá¨áśá˝ áŤáá˝á á¨áłá˝ á áŽáááľ á ááŠá!
@etconp
đá á áἠáá á ááŤáł ááłá á°áá á áŤáŁá˘ á áááá˝ áá áŤá¨ááľ á¨áááá´á˝á áľá á°áľ!
đĽá á áᥠá ááŤáł ááłá á°áá á áŤáŁá˘ á áááᥠá áááá˝ áá á¨áłááĽáłá¸áá áááľ áá áá á¨áŽááľáľáŤáá˝á áľá á°áśá˝ á áľááá¨áś á¨ááááź ááá¨á áá áĽáŤá ááŤá ááá˝ áĽáá°áá¨á°áá á ááá áźáááá˘
á á°áá á á¨á°áá˝á áĽá¨á°áľáá áŁá áááŁáłáá˝ áá á°ááłáłá á˝ááŽá˝ áĽááłáá°áá ááá ááŤááá á¨ááᣠááĽáĽ ááá˘
1ď¸âŁ á á ááľ áá 2 ááľá selected material áááś áŽááááľ ááľá¨á áľááá áá? áá°ááľáľ á ááá áá áá ááá áŤá?
â áľá á°áąáŚ áá á á°áŤá áášá áľá á°áľá á¨áŽááľáľáŤáá˝á áľáłááłááľá á¨áŁá° ááᢠá¨áŽáááá˝á ááŁáŞáŤáá˝ (Plate compactor ááá Rammer) á ááá á áĽáŤáľ áá áŁá á á¨áá˝ááľ á˘á á á¨15cm áĽáľá¨ 20cm (á¨áá°áá 30cm) á áá°ááľ ááĽááĽá (layer) áĽáť ááᢠá á ááľ áá 2 ááľá á áá á°áááś á¨áá áĽáť á˛á¨áἠá¨áĽá áŤáá á áá áłáá áĽá ááá°áľ (air voids) áĽáá°áŤá áááŤáá˘
â ď¸ áá°ááľ á¨ááá á¨á á á°ááŚ
Differential Settlement (áĽáŠá áŤááá á¨ááľáἠá á°á)ጠá ááá á°áááĽáś á˛áŤáá á á¨ááĽá°áľ áŤá á˛áŤááá áľáŁ áłáá áĽá á¨áá¨áá 2 ááľá á áá áĽá¨á°áŤááá áĽáŤá°áá á áááłáá˘
á¨ááľááłá á¨áľáľáŤáá¸á áľááŁáጠá¨ááŹáľ ááá (Ground Slab) ááľááĽáŁ á¨ááá á´áŤáááľ áááłáľáŁ ááľááłáá˝á Beam/Column á áŤáŁá˘ Structural Cracks áĽáá˛áá አáŤá°áááá˘
2ď¸âŁ foundation ááľáĽ áá áłááᣠá áá ááááľá á¨áĽáá¨áľ áľáŤáśá˝ (Formwork) áłáááą áá á á áá á˝áá áŤááŁá?
đ áá áłááᣠá áá ááááľáŚ
á áá á¨áá áá á˛á°áŁáá áá° Mud/Slurry (áá) ááá¨áŤáᢠá¨áá áá á á¨á áľááá (Optimum Moisture Content áľáá á) ááá ááááľ á¨áŽáááá˝á áĽáŤáľ á ááá¨ááá˘
á áአá¨áá¸á¨á á á áá (Bearing Capacity) áŤáŁáᢠááá á áá°áľ á˛á°áá á á˛á°á á áአáŽáááľ á ááľá¨á á¨áá°á á¨ááľáἠá á°á áŤááĽááá˘
áááľááጠáááá á ááá (Dewatering Pump) áá á áá á ááĽáśáŁ á¨áłá˝ááá áá áŤá¸áą á áá áĽáť á ááĽááĽá ááááľ áá á¨á áľá˘
𪾠á¨áĽáá¨áľ áááľáᣠá¨á¨áŁáľá áááááá áłáááą á¨Pad ááŞáŤ ááá ááŚ
á¨áĽáá¨áľ áá áľá áľ (Wood Decay)ጠá áá ááľáĽ á¨áᨠáĽáá¨áľ á áĽááĽá áľá á áŁáá´áŞáŤ ááááŤáľ á¨áá á áá áá á°áĽáłáá˘
áľááá ááá°áśá˝ ááá á (Void Creation)ጠáĽáá¨áą á áľáĽáś á˛á á á Pad ááŞáŤ áľááá áŁáś ááá°áśá˝ áááŤáá˘
á¨áááá´á˝á ááá¸áŤá°áľáŚ á¨ááľ áááá´á˝á ááŞáŤáá á á°áἠá¨á°á á á á á áá áľáá (Lateral Support) ááááľ á áá áľá˘ áĽáá¨áą á áľáĽáś ááá°áľ á˛ááĽá ááą á¨áááŽá˝ áľáá á áĽáś á¨ááá¸áŤá°áľá á¨ááááľ á á°á áŤááĽáááá˘
đĄ áá áááŤáŚáĽááá á áááľ á¨áłááľ ááĽáĽá áľáááśá˝ (Poor Site Supervision) á¨á áááá á¨á¨á á áá á°á áááľá áĽááŤáŹ á á°á áá á¨ááĽá á áááá¸áᣠá áłááľ áááá˛áąá á áąáááŤááአá áľá¸áłá á¨á´ááá ááľá°áŤá¨áŤ áĽááá ááá°áľáŁá¸á áááŁáá˘
á°ááłáłá á¨á áá áááŁáł áĽáŤááá˝ ááá á áľá°áŤá¨áśá˝ áŤáá˝á á¨áłá˝ á áŽáááľ á ááŠá!
@etconp
â¤13đ3đ1
Ethio Construction Engineering
đá°áá ááľ á¤á°á°áŚáťá˝á áĽááá˝ á á á¨áášá áá°á¨áľ ᨠETABS á˛áśááŤá áŞáľáŽ á á ááá ááá ᨠintroduction ááᎠAnalysis áĽá Design áŁáŤá°á ááἠáŞáľáŽ áŁááá
á°ááášááᢠđŤľáĽáá áᏠááá 1 áááááš ááĽá°ááđ https://youtu.be/yB1KO_nYByc @etconp
YouTube
đ ETABS Full Course 2026 â Part 11 | á¨áá᪠áĽáľá¨ Advanced | ETABS Tutorial á á ááá đď¸đ
đ ETABS Full Course â Part 11 | Structural Design & Analysis Tutorial
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 11, we continue the ETABS workflowâŚ
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 11, we continue the ETABS workflowâŚ
â¤2
đá áľá°áłá˝ áá ááá
áťáá á¤á°á°áŚá˝
âĄď¸3 áááľ ááŠáľ
đá á˛áľ á ááľ ááááŤáľ á áá¨á ᨠáˇááá 1 ááᎠáĽáľá¨ áˇááá 5 á¨ááá Quantity Surveying áĽá Ms Project áŚáááá áŽááśá˝ áľáá á ᨠ25% á áá˝ á ááááđ
đŠáááááἠ@Philemona7 ááááá
đQs ááááľáą ETABS áŚááľ áĽáá°á°á á á ááđ
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
áááŤá á á˛áľ á ááľđ
@etconp
âĄď¸3 áááľ ááŠáľ
đá á˛áľ á ááľ ááááŤáľ á áá¨á ᨠáˇááá 1 ááᎠáĽáľá¨ áˇááá 5 á¨ááá Quantity Surveying áĽá Ms Project áŚáááá áŽááśá˝ áľáá á ᨠ25% á áá˝ á ááááđ
đŠáááááἠ@Philemona7 ááááá
đQs ááááľáą ETABS áŚááľ áĽáá°á°á á á ááđ
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
áááŤá á á˛áľ á ááľđ
@etconp
đ3â¤1đ1
âá áááŤáś á¨ááááŁá á¨2,500 áááá áąáá˝ áá ááŽáááľ áá áá
âá¨áá´áŤá á¤áśá˝ áŽáááŹá˝á á áááŤáś áŁá áá ፠á áŤáŁá˘ á¨10,000 á áá ááá˝ á¨áĽáŤ ááľá á¨ááŤááá áľ áĽá 2,500 áááá á¨áááľ áąáá˝á á¨ááŤá ááá á á˛áľ á¨áááŁáł ááŽáááľ á áľááá¨á˘
â 1 ááĽáĽ 8 áááłá áľááľ áŁáá ááŹáľ áá á 10 áłááśá˝ á¨áá¨áááá áá ááŽáááľ áŁá 5 ááá áááťáá˝áᣠá á á¨áááŞáá áŚáłáá˝á áĽá á¨á¨á°ááá áľáłááłááľ á¨á á á áááá ááá áŽá˝á áŤáŤá°á° ááá˘
âá¨á°áá áᢠááťáťáŤáĄ á¨áŽáááŹá˝á áá áĽáŤ á áľááťá áś/á á¨áťáľ á¨áá á áááŁáł ááľáááŞáŤá áá áĽáá°ááášáľá¤ áŽáááŹá˝á áŁá°á¨áá á ááŤáŤ áŞááá áááłá áá˘áá á¨áá á¨á áľ 300 áááŽá áĽá áá° 12.5 á˘ááŽá áĽá ááłá°á á˝ááá˘
âááááŁáł á˛áŁá á¨áá¨áą á¨ááľááášá 230 áąáá˝ á°ááś á¨áŽáááŹá˝áá áᢠáááľáá áᣠá°á¨á᪠399 á áłá˛áľ áąáá˝ á áááŤáś á áłáŤá˝ áá ፠á áŤáŁá˘ á á áá áá á°áááĽá°á á ááŹá áááľ á áááááľ ááľá áľ ááá¨ááá˘
âááŽáááą á áᎠá˘áá¨áľáľáááľá á¨áá áŁáááĽáśá˝á á áłáłá á ááľá¨á á¨á ááľ áááľ áŁáá° áá ááľáĽ áá á áá á°á ááá áá áááááľ áĽáá°áá á áłáááá˘
âáááŁáłá áá á˛áľ á á ᣠá¨á°á áŽáŞá°á áááľá áááá áá˝áł áááŁáł áľáá á áľá°áá˝áŚ á¨ááŤá á¨ááľ á˛ááᤠáŽáááŹá˝á áĽá ááá á¨áá á áááá˝ á á፠áááĽáŤáľ áĽáŞ á á áá§áá˘
@etconp
âá¨áá´áŤá á¤áśá˝ áŽáááŹá˝á á áááŤáś áŁá áá ፠á áŤáŁá˘ á¨10,000 á áá ááá˝ á¨áĽáŤ ááľá á¨ááŤááá áľ áĽá 2,500 áááá á¨áááľ áąáá˝á á¨ááŤá ááá á á˛áľ á¨áááŁáł ááŽáááľ á áľááá¨á˘
â 1 ááĽáĽ 8 áááłá áľááľ áŁáá ááŹáľ áá á 10 áłááśá˝ á¨áá¨áááá áá ááŽáááľ áŁá 5 ááá áááťáá˝áᣠá á á¨áááŞáá áŚáłáá˝á áĽá á¨á¨á°ááá áľáłááłááľ á¨á á á áááá ááá áŽá˝á áŤáŤá°á° ááá˘
âá¨á°áá áᢠááťáťáŤáĄ á¨áŽáááŹá˝á áá áĽáŤ á áľááťá áś/á á¨áťáľ á¨áá á áááŁáł ááľáááŞáŤá áá áĽáá°ááášáľá¤ áŽáááŹá˝á áŁá°á¨áá á ááŤáŤ áŞááá áááłá áá˘áá á¨áá á¨á áľ 300 áááŽá áĽá áá° 12.5 á˘ááŽá áĽá ááłá°á á˝ááá˘
âááááŁáł á˛áŁá á¨áá¨áą á¨ááľááášá 230 áąáá˝ á°ááś á¨áŽáááŹá˝áá áᢠáááľáá áᣠá°á¨á᪠399 á áłá˛áľ áąáá˝ á áááŤáś á áłáŤá˝ áá ፠á áŤáŁá˘ á á áá áá á°áááĽá°á á ááŹá áááľ á áááááľ ááľá áľ ááá¨ááá˘
âááŽáááą á áᎠá˘áá¨áľáľáááľá á¨áá áŁáááĽáśá˝á á áłáłá á ááľá¨á á¨á ááľ áááľ áŁáá° áá ááľáĽ áá á áá á°á ááá áá áááááľ áĽáá°áá á áłáááá˘
âáááŁáłá áá á˛áľ á á ᣠá¨á°á áŽáŞá°á áááľá áááá áá˝áł áááŁáł áľáá á áľá°áá˝áŚ á¨ááŤá á¨ááľ á˛ááᤠáŽáááŹá˝á áĽá ááá á¨áá á áááá˝ á á፠áááĽáŤáľ áĽáŞ á á áá§áá˘
@etconp
â¤9đ1đ1
đá á˛áľ á¨áááŁáł ááŽáááľ á áŤáá á ááťá¸á áááá áĽáááľ áá áá
á á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áŁááĽááŁáᣠá áŽááľáľáŤáá˝á ááá áááľ á˘ááľá˛áľáŠáľ áĽá á ááľáŽá á ááá´ááśá˝á áááá˛áśá˝ áľáĽáĽá á áááá áá´á á¨áááŁáł ááŽáááľ á áŤáá á ááťá¸á á á˛áľ áááá áá áŤá°áŽá¨ áĽáá á á°áŤáá°á˘
á¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áĽáŤ á°ááŤáŽá˝ áá á á á¨áĽáá áá áááŁáľ á áá áŁááŁá áá áá፠áĽááłáľáłáááᣠá á˛áą áĽáááľ á¨áááŁáł ááŽáááśá˝ á áŤáá á ááťá¸á á áááľ áłááá ááá˝áŁ áá¨ááἠá¨áá˝áá áἠá áá ááááľ áĽáá˛á፠á¨ááŤáľá˝á ááá˘
âá á á˛áą áááá áá á¨áľ á¨áĽáŤ á ááťá¸á á á°á ááá áĽá áá˝á á°ááľ áľááľ (Man-Hour/Machine-Hour Weightage) áĽáá˛áá á á˘.áŚ.áŞáŠ (BOQ) á¨áĽáŤ áá á áĽá ááĽá°áľ áá ááá á¨áłáá˘
á¨áá á á á°á¨á᪠á¨ááŽáááľ á áŤáá á ááťá¸á á¨áááááşáŤá á ááťá¸á á°áááś á ááľá¨á á°á°áá áá á¨áĽ áĽááłáá áľ áĽá á¨áľááá á¨á˘.áŚ.áŞáŠ áĽáŤ áá°áĽ á¨100 á ááś á áá ááááἠáĽáá°ááá˝á á°ááááˇáá˘
á¨ááá á˘.áŚ.áŞáŠ á áá á¨áá አáĽáŤáá˝ áĽáá° ááŠááľ ááá á¨ááἠáľááá (Variation/Change Order) áĽáť áááŤáľ á ááŁá¸áá˘
âáá á አá°ááŤáŽá˝ á¨á¨ááŠá á¨áĽáŤ á ááťá¸á áŞáááľáŁ á¨áá፠áĽáŤááá˝ áĽá á¨áá á°ááł ááťáťáŤáá˝á á á á˛áą áááá áá á¨áľ áĽáá˛áŤáááá á áľááááá áá¨á á áĽááá áĽáá˛áá á áłáľá§áá˘
@etconp
á á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áŁááĽááŁáᣠá áŽááľáľáŤáá˝á ááá áááľ á˘ááľá˛áľáŠáľ áĽá á ááľáŽá á ááá´ááśá˝á áááá˛áśá˝ áľáĽáĽá á áááá áá´á á¨áááŁáł ááŽáááľ á áŤáá á ááťá¸á á á˛áľ áááá áá áŤá°áŽá¨ áĽáá á á°áŤáá°á˘
á¨á˘áľáŽáľáŤ áŽááľáľáŤáá˝á áĽáŤ á°ááŤáŽá˝ áá á á á¨áĽáá áá áááŁáľ á áá áŁááŁá áá áá፠áĽááłáľáłáááᣠá á˛áą áĽáááľ á¨áááŁáł ááŽáááśá˝ á áŤáá á ááťá¸á á áááľ áłááá ááá˝áŁ áá¨ááἠá¨áá˝áá áἠá áá ááááľ áĽáá˛á፠á¨ááŤáľá˝á ááá˘
âá á á˛áą áááá áá á¨áľ á¨áĽáŤ á ááťá¸á á á°á ááá áĽá áá˝á á°ááľ áľááľ (Man-Hour/Machine-Hour Weightage) áĽáá˛áá á á˘.áŚ.áŞáŠ (BOQ) á¨áĽáŤ áá á áĽá ááĽá°áľ áá ááá á¨áłáá˘
á¨áá á á á°á¨á᪠á¨ááŽáááľ á áŤáá á ááťá¸á á¨áááááşáŤá á ááťá¸á á°áááś á ááľá¨á á°á°áá áá á¨áĽ áĽááłáá áľ áĽá á¨áľááá á¨á˘.áŚ.áŞáŠ áĽáŤ áá°áĽ á¨100 á ááś á áá ááááἠáĽáá°ááá˝á á°ááááˇáá˘
á¨ááá á˘.áŚ.áŞáŠ á áá á¨áá አáĽáŤáá˝ áĽáá° ááŠááľ ááá á¨ááἠáľááá (Variation/Change Order) áĽáť áááŤáľ á ááŁá¸áá˘
âáá á አá°ááŤáŽá˝ á¨á¨ááŠá á¨áĽáŤ á ááťá¸á áŞáááľáŁ á¨áá፠áĽáŤááá˝ áĽá á¨áá á°ááł ááťáťáŤáá˝á á á á˛áą áááá áá á¨áľ áĽáá˛áŤáááá á áľááááá áá¨á á áĽááá áĽáá˛áá á áłáľá§áá˘
@etconp
đ4â¤2
đᨠáŽááľáľáŤáá˝á áá áĽá áŁáááśáš
đ§1. Lump sum contract
đŤá¨á ááľ áá áľáá áá á á ááľ áá áŽááľáŤáľ ááľáĽ á¨ááá áľáŤáá˝ á á ááá áá ááŽáááą á¨áááአá ááľ á áľááľá á°ááľáá::
áŽááľáŤáá°áŠ ááŽáááąá á áá áá ááá ááá á°áľáááˇá áá á á á á ááá á¨áĽáŤ áá°á áĽá áááá ááááŤáá˝ áá á¨á°áá°á¨á° áá::
á ááŽáááą áá á¨áá°á¨á ááá¸áá áááŚá˝ ááá ááťáťáŤáá˝ á°á¨á᪠ááŞáá˝á ááŤáľá¨áľá áĽá á¨ááἠáľááá áááá áá˝ááá˘
đ§2.Bill of Quantity Or Unit Rate Contract
đŤá¨á˘á áá áá˝ ááá á¨ááĽá á°áá áŽááľáŤáľ: á áá á ááá á ááá á°áá áá ááľáĽ ááŽáááą áá° á°ááŤáŠ áááá˝ á¨á°á¨ááá á˛áá ááĽáŤááłááą á áŤá á¨á°áá°á áá á áĽá á¨ááá á°ááá˝ áŽááľáŤáá°áŠ á¨áá¨ááá á á°á áááá á¨áĽáŤ áá á áá á áááľá¨áľ á ááá á°ááá˝ á°áŁááś ááá˘
áá ááááą áá á áá á ááŁáĽ áá á¨á áá á°ááááááľ áĽá ááá˝ááľ áá°áŁáá˘
đ§3.Cost Plus Fixed Fee Contract
đŤá¨á᪠áĽá áá áá፠áá á á᪠áĽá áá áá፠áá áŽááľáŤáá°áŠ ááŽáááąá ááá ááá áááŁá áľáááá á᪠áĽá á áľááľá á¨á°áá°á áá፠ááá á¨áľáá á áłá áá¨áááá˘
áá ááááą áá á á°áááś á¨áĽáŤá áá°á áĽááá á á ááááá áľ áá ááá á áá°á áá á áááá áľ áá áĽá á áá áááá áĽá á¨á᪠áá¨ááá á á°áá áá° áŁáá¤áą ááááŁá.
đ§4. Cost Plus Percentage of Cost Contract
đŤá¨á᪠áŽááľáŤáľ ááśá á á᪠áĽá á¨á᪠áá ááśá ᣠáŽááľáŤáá°áŠ ááŽáááąá ááá ááá áááŁá áľáááá á᪠áĽá á¨á á áá ááŞáá˝ ááśá áĽáá° áľáá á áłá áá¨áááá˘
áŽááľáŤáá°áŠ áľááá¸áá ááá¨áá ááŞáá˝á ááá¨áá áá á¨áłáť ááá¨á áľááá˝á áá ááááą áá á¨áĽá á áááľ á¨ááá á á á á á ááá˘
đ§5. Item Rate or Schedule of Rates Contract
đŤá¨ááĽá á°áá ááá á¨áá ááá ááĽá áŽááľáŤáľ á ááĽá á°áá ááá á¨áá ááá ááĽá áá ááľáĽ ᣠá¨á°ááŤáŠ á¨áľáŤ áĽááá˝ áá á áŽááľáŤáá°áŠ á áá¨á á á¨áá á°ááł ááľáĽ á áľááľá á¨á°áááš áá¸áá˘
áŽááľáŤáá°áŠ á¨áá¨ááá á áĽáŤááłááą á¨á°á áááá á¨áĽáŤ áá áá á á áááá¨áłá¸á á°ááá˝ á°áŁááś ááá˘
áá ááááą áá áá°ááŤáŠ á¨ááŽáááą á áŤááľ á¨áá á á°áŁáĽ áá ááá˝ááľ áá°áŁá::
đ§6.Labour Contract
đŤá¨á áŤá°á áá - á á áŤá°á áá ááľáĽ áŽááľáŤáá°áŠ á¨á áŤá°á á áááááśá˝á áĽáť áá°áŁá áĽá áááŽáááą á¨ááŤáľááá ááłááśá˝ áĽá ááłáŞáŤáá˝ á áŁáá¤áą áá°áŁá::
áŽááľáŤáá°áŠ á¨áá¨ááá á á°áľáááľ á¨á°ááľ á°ááá˝ ááá ááá°á á á¨á áŤá°á á áááááľ á°áá ááá˘
đ§7.Hybrid Contract
đŤá¨á°ááŤáŠ á¨áŽááľáŤáľ ááááśá˝á á áŤááľá á ááŁáá á¨ááŽáááąá áአááááľ áááááľ áááłá á¨áááąáľ á¨á°ááŤáŠ áŽááľáŤáá°áŽá˝ á¨á ááľ áá áľáá áá áĽá á¨á᪠áĽá á¨áá áá፠ááá ááŤáŤáľáľ áá˝ááá˘
áá ááááą áá á áá áĽá á á á°á áá°áŁ áá á°ááááááľá ááá áłáá˘
đ§8. Special Contract
đŤáአáá - áአáá áá ááľ á¨á°áá°á ááŽáááľ áአááľáááśá˝ á¨á°ááá áá ááá˘
áአáŽááľáŤáśá˝ á áá°á á á¨áŽááľáŤáľ á ážá˝ ááľáĽ á¨áááá á¨á°áá°á á ááážá˝á ᣠááá˝á áĽá áááłáá˝á ááŤáŤáľáą áá˝ááá˘
áá ááááą áá á¨á°áá°á á¨ááŽáááľ ááááśá˝á áĽá áłáłá˘áá˝á áááľá°áááľ áŤáľá˝ááá˘
âáľá áŽááľáľáŤáá˝á áá áá áἠááá¨áłáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
đ§1. Lump sum contract
đŤá¨á ááľ áá áľáá áá á á ááľ áá áŽááľáŤáľ ááľáĽ á¨ááá áľáŤáá˝ á á ááá áá ááŽáááą á¨áááአá ááľ á áľááľá á°ááľáá::
áŽááľáŤáá°áŠ ááŽáááąá á áá áá ááá ááá á°áľáááˇá áá á á á á ááá á¨áĽáŤ áá°á áĽá áááá ááááŤáá˝ áá á¨á°áá°á¨á° áá::
á ááŽáááą áá á¨áá°á¨á ááá¸áá áááŚá˝ ááá ááťáťáŤáá˝ á°á¨á᪠ááŞáá˝á ááŤáľá¨áľá áĽá á¨ááἠáľááá áááá áá˝ááá˘
đ§2.Bill of Quantity Or Unit Rate Contract
đŤá¨á˘á áá áá˝ ááá á¨ááĽá á°áá áŽááľáŤáľ: á áá á ááá á ááá á°áá áá ááľáĽ ááŽáááą áá° á°ááŤáŠ áááá˝ á¨á°á¨ááá á˛áá ááĽáŤááłááą á áŤá á¨á°áá°á áá á áĽá á¨ááá á°ááá˝ áŽááľáŤáá°áŠ á¨áá¨ááá á á°á áááá á¨áĽáŤ áá á áá á áááľá¨áľ á ááá á°ááá˝ á°áŁááś ááá˘
áá ááááą áá á áá á ááŁáĽ áá á¨á áá á°ááááááľ áĽá ááá˝ááľ áá°áŁáá˘
đ§3.Cost Plus Fixed Fee Contract
đŤá¨á᪠áĽá áá áá፠áá á á᪠áĽá áá áá፠áá áŽááľáŤáá°áŠ ááŽáááąá ááá ááá áááŁá áľáááá á᪠áĽá á áľááľá á¨á°áá°á áá፠ááá á¨áľáá á áłá áá¨áááá˘
áá ááááą áá á á°áááś á¨áĽáŤá áá°á áĽááá á á ááááá áľ áá ááá á áá°á áá á áááá áľ áá áĽá á áá áááá áĽá á¨á᪠áá¨ááá á á°áá áá° áŁáá¤áą ááááŁá.
đ§4. Cost Plus Percentage of Cost Contract
đŤá¨á᪠áŽááľáŤáľ ááśá á á᪠áĽá á¨á᪠áá ááśá ᣠáŽááľáŤáá°áŠ ááŽáááąá ááá ááá áááŁá áľáááá á᪠áĽá á¨á á áá ááŞáá˝ ááśá áĽáá° áľáá á áłá áá¨áááá˘
áŽááľáŤáá°áŠ áľááá¸áá ááá¨áá ááŞáá˝á ááá¨áá áá á¨áłáť ááá¨á áľááá˝á áá ááááą áá á¨áĽá á áááľ á¨ááá á á á á á ááá˘
đ§5. Item Rate or Schedule of Rates Contract
đŤá¨ááĽá á°áá ááá á¨áá ááá ááĽá áŽááľáŤáľ á ááĽá á°áá ááá á¨áá ááá ááĽá áá ááľáĽ ᣠá¨á°ááŤáŠ á¨áľáŤ áĽááá˝ áá á áŽááľáŤáá°áŠ á áá¨á á á¨áá á°ááł ááľáĽ á áľááľá á¨á°áááš áá¸áá˘
áŽááľáŤáá°áŠ á¨áá¨ááá á áĽáŤááłááą á¨á°á áááá á¨áĽáŤ áá áá á á áááá¨áłá¸á á°ááá˝ á°áŁááś ááá˘
áá ááááą áá áá°ááŤáŠ á¨ááŽáááą á áŤááľ á¨áá á á°áŁáĽ áá ááá˝ááľ áá°áŁá::
đ§6.Labour Contract
đŤá¨á áŤá°á áá - á á áŤá°á áá ááľáĽ áŽááľáŤáá°áŠ á¨á áŤá°á á áááááśá˝á áĽáť áá°áŁá áĽá áááŽáááą á¨ááŤáľááá ááłááśá˝ áĽá ááłáŞáŤáá˝ á áŁáá¤áą áá°áŁá::
áŽááľáŤáá°áŠ á¨áá¨ááá á á°áľáááľ á¨á°ááľ á°ááá˝ ááá ááá°á á á¨á áŤá°á á áááááľ á°áá ááá˘
đ§7.Hybrid Contract
đŤá¨á°ááŤáŠ á¨áŽááľáŤáľ ááááśá˝á á áŤááľá á ááŁáá á¨ááŽáááąá áአááááľ áááááľ áááłá á¨áááąáľ á¨á°ááŤáŠ áŽááľáŤáá°áŽá˝ á¨á ááľ áá áľáá áá áĽá á¨á᪠áĽá á¨áá áá፠ááá ááŤáŤáľáľ áá˝ááá˘
áá ááááą áá á áá áĽá á á á°á áá°áŁ áá á°ááááááľá ááá áłáá˘
đ§8. Special Contract
đŤáአáá - áአáá áá ááľ á¨á°áá°á ááŽáááľ áአááľáááśá˝ á¨á°ááá áá ááá˘
áአáŽááľáŤáśá˝ á áá°á á á¨áŽááľáŤáľ á ážá˝ ááľáĽ á¨áááá á¨á°áá°á á ááážá˝á ᣠááá˝á áĽá áááłáá˝á ááŤáŤáľáą áá˝ááá˘
áá ááááą áá á¨á°áá°á á¨ááŽáááľ ááááśá˝á áĽá áłáłá˘áá˝á áááľá°áááľ áŤáľá˝ááá˘
âáľá áŽááľáľáŤáá˝á áá áá áἠááá¨áłáľđ
https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
â¤10đ2đ1đą1
đá¨ááá áŽáááŞáľ á ááľ á¨áááľáŽá áľááľá á áłááľ áá!
âá ááľá áá áĽáá°ááłá¨á áááá áŽáááŞáľ ááá áľ á¨ááá á¨áľááá áľááľá (Hardcore Soling Layer) á¨á°áá¨á á˛ááᣠá á áŤáŁá˘á á¨á áááľ áĽá¨áśá˝ á°á°ááá ááłáŤáá˘
âđ á ááľá áá á¨ááłáŠ áá áá á¨áá ááľáľá ááĽáŚá˝áŚ
âđš Hardcore Soling Layerጠá¨á°á°áŁá አáľáááŽá˝ á¨ááááá áá ááĽááĽá á¨áłá˝ á¨áááŁáá áĽááĽá áľ ááááłáľ áĽá á¨áááá á¨áá¸á¨á á á á ááá áá¨á áŤáááááá˘
âđš Chipping & Blinding Preparationጠá áľáááŽáš ááŤá¨á áŤááľá ááá°áśá˝ (Voids) áľááá˝ á á áŽá˝á (Chippings/Aggregates) áĽá á á¸á á áá áá á¨ááááľ áĽá á°á¨ááá á¨áá á á áľáŤ áŤáľáááááá˘
âđš Column Starter Bars Placementጠá¨á áĽá áĽá á¨á ááá áá á áŤá áá á¨áááá á áááśá˝ á áŚáłá¸á á°á°ááá áááŁá á¨áŽáááŞáľ áľáŤ á°ááá á°ááá˘
ââ ď¸ ááĽáŤáľ á¨áá¨áą á¨áłááľ ááľáłááťáá˝áŚ
1ď¸âŁ Void Filling & Compactionጠá áľáááŽáš ááŤá¨á áŤá ááá°áśá˝ á á á á ááááľ áĽá á á°áἠáááἠ(Compaction) á ááŁá¸áᤠá áá áá፠áŽáááŞáľ á˛ááľ áá° áľá á°áá á áááŁáľ á¨áŽáááŞáľ áá á áĽáááľ áŤááŁáá˘
2ď¸âŁ Damp Proof Membrane (DPM)ጠá¨áŽáááŞáľ áľáŤá á ááľ á áááľáŽáŠ áá á˘áŤááľ 0.5 mm (500 micron) ááá¨áľ áŤáá á¨áááľá˛á ááĽááĽá (Polythene Sheet) áááááľ á áá áľá˘
3ď¸âŁ Reinforcement Mesh (BRC) & Cover Blocksጠáááá áŽáááŞáą á¨ááá á¨áĽá¨áľ áá¨áĽ (Welded Wire Mesh / BRC Mesh) á°ááááś á¨áľá á¨áŽáááŞáľ á¨á¨á áĽááŽá˝ áá°á¨á á ááŁá¸áá˘
@etconp
âá ááľá áá áĽáá°ááłá¨á áááá áŽáááŞáľ ááá áľ á¨ááá á¨áľááá áľááľá (Hardcore Soling Layer) á¨á°áá¨á á˛ááᣠá á áŤáŁá˘á á¨á áááľ áĽá¨áśá˝ á°á°ááá ááłáŤáá˘
âđ á ááľá áá á¨ááłáŠ áá áá á¨áá ááľáľá ááĽáŚá˝áŚ
âđš Hardcore Soling Layerጠá¨á°á°áŁá አáľáááŽá˝ á¨ááááá áá ááĽááĽá á¨áłá˝ á¨áááŁáá áĽááĽá áľ ááááłáľ áĽá á¨áááá á¨áá¸á¨á á á á ááá áá¨á áŤáááááá˘
âđš Chipping & Blinding Preparationጠá áľáááŽáš ááŤá¨á áŤááľá ááá°áśá˝ (Voids) áľááá˝ á á áŽá˝á (Chippings/Aggregates) áĽá á á¸á á áá áá á¨ááááľ áĽá á°á¨ááá á¨áá á á áľáŤ áŤáľáááááá˘
âđš Column Starter Bars Placementጠá¨á áĽá áĽá á¨á ááá áá á áŤá áá á¨áááá á áááśá˝ á áŚáłá¸á á°á°ááá áááŁá á¨áŽáááŞáľ áľáŤ á°ááá á°ááá˘
ââ ď¸ ááĽáŤáľ á¨áá¨áą á¨áłááľ ááľáłááťáá˝áŚ
1ď¸âŁ Void Filling & Compactionጠá áľáááŽáš ááŤá¨á áŤá ááá°áśá˝ á á á á ááááľ áĽá á á°áἠáááἠ(Compaction) á ááŁá¸áᤠá áá áá፠áŽáááŞáľ á˛ááľ áá° áľá á°áá á áááŁáľ á¨áŽáááŞáľ áá á áĽáááľ áŤááŁáá˘
2ď¸âŁ Damp Proof Membrane (DPM)ጠá¨áŽáááŞáľ áľáŤá á ááľ á áááľáŽáŠ áá á˘áŤááľ 0.5 mm (500 micron) ááá¨áľ áŤáá á¨áááľá˛á ááĽááĽá (Polythene Sheet) áááááľ á áá áľá˘
3ď¸âŁ Reinforcement Mesh (BRC) & Cover Blocksጠáááá áŽáááŞáą á¨ááá á¨áĽá¨áľ áá¨áĽ (Welded Wire Mesh / BRC Mesh) á°ááááś á¨áľá á¨áŽáááŞáľ á¨á¨á áĽááŽá˝ áá°á¨á á ááŁá¸áá˘
@etconp
đ7â¤4đ2
Forwarded from Kelemat Ads
đ á¨PENTHOUSES á˝áŤá á áááá á áá á°áááŻá!
đĽ á¨10% áĽáľá¨ 35% á áá˝! á¨á áááá á¤áľ á ááá áŤáá! đĽ
á á˛áľ á¤áľ áááááľ áĽáŤá°áĄ áá? áááá°á ááá á áá áá! đĽ
đ áááá
đ˘ Penthouses â 209 áŤáŹ áááŽ
đ 1â3 Bedroom â 69 áŤáŹ áĽáľá¨ 145 áŤáŹ
đ áłáá¤áľ
đ 1â3 Bedroom â 73 áŤáŹ áĽáľá¨ 175 áŤáŹ
đ áĄáááŞáŤ
đ 1â3 Bedroom â 68 áŤáŹ áĽáľá¨ 142 áŤáŹ
đ á ááŹ
đ 1 áĽá 3 Bedroom â 80 áŤáŹ áĽáľá¨ 157 áŤáŹ
đ á áŤáľ 49
đ 3 Bedroom â 146 áŤáŹ áĽá 180 áŤáŹ
đ áááááľ
đ 3 Bedroom â 139 áŤáŹ
đ ááŤáł
đ 3 Bedroom â 132 áŤáŹ áĽá 136 áŤáŹ
đ ááŹáá áá°áá â á¨áááááľ á¤áľ áłáá¸áĽ áŤáľáá!
+251998878106
ᨠ80 á áá á áááľáááśá˝áŁ á¨áááľ áąáá˝ áĽá á˘áŽáá˝ áá áá¨á áááááľ á¨áłá˝ áŤááá áá°áá áŞáŤ áá ááᢠđ
http://t.me/realtorbisrat_bot/realtorbisrat
đĽ á¨10% áĽáľá¨ 35% á áá˝! á¨á áááá á¤áľ á ááá áŤáá! đĽ
á á˛áľ á¤áľ áááááľ áĽáŤá°áĄ áá? áááá°á ááá á áá áá! đĽ
đ áááá
đ˘ Penthouses â 209 áŤáŹ áááŽ
đ 1â3 Bedroom â 69 áŤáŹ áĽáľá¨ 145 áŤáŹ
đ áłáá¤áľ
đ 1â3 Bedroom â 73 áŤáŹ áĽáľá¨ 175 áŤáŹ
đ áĄáááŞáŤ
đ 1â3 Bedroom â 68 áŤáŹ áĽáľá¨ 142 áŤáŹ
đ á ááŹ
đ 1 áĽá 3 Bedroom â 80 áŤáŹ áĽáľá¨ 157 áŤáŹ
đ á áŤáľ 49
đ 3 Bedroom â 146 áŤáŹ áĽá 180 áŤáŹ
đ áááááľ
đ 3 Bedroom â 139 áŤáŹ
đ ááŤáł
đ 3 Bedroom â 132 áŤáŹ áĽá 136 áŤáŹ
đ ááŹáá áá°áá â á¨áááááľ á¤áľ áłáá¸áĽ áŤáľáá!
+251998878106
ᨠ80 á áá á áááľáááśá˝áŁ á¨áááľ áąáá˝ áĽá á˘áŽáá˝ áá áá¨á áááááľ á¨áłá˝ áŤááá áá°áá áŞáŤ áá ááᢠđ
http://t.me/realtorbisrat_bot/realtorbisrat
â¤6
đá áľá°áłá˝ áá ááá
áťáá á¤á°á°áŚá˝
âĄď¸2 áááľ ááŠáľ
đá á˛áľ á ááľ ááááŤáľ á áá¨á ᨠáˇááá 1 ááᎠáĽáľá¨ áˇááá 5 á¨ááá Quantity Surveying áĽá Ms Project áŚáááá áŽááśá˝ áľáá á ᨠ25% á áá˝ á ááááđ
đŠáááááἠ@Philemona7 ááááá
đQs ááááľáą ETABS áŚááľ áĽáá°á°á á á ááđ
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
áááŤá á á˛áľ á ááľđ
@etconp
âĄď¸2 áááľ ááŠáľ
đá á˛áľ á ááľ ááááŤáľ á áá¨á ᨠáˇááá 1 ááᎠáĽáľá¨ áˇááá 5 á¨ááá Quantity Surveying áĽá Ms Project áŚáááá áŽááśá˝ áľáá á ᨠ25% á áá˝ á ááááđ
đŠáááááἠ@Philemona7 ááááá
đQs ááááľáą ETABS áŚááľ áĽáá°á°á á á ááđ
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
áááŤá á á˛áľ á ááľđ
@etconp
đĽ°3â¤2