Ethio Construction Engineering
32.4K subscribers
6.23K photos
359 videos
1.99K files
3.2K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
✴️ጨረታ

አዲስ ዘመን መስከረም 14 ቀን 2019
ዓ. ም ዕትም ላይ የተወሰደ

https://t.me/ETCONpWORK

@ETCONP
👍2❤1
​✴️ ጨረታ ማስታወቂያ
​አዲስ ዘመን መስከረም 14 ቀን 2019 ዓ.ም

https://t.me/ETCONpWORK

​@ETCONP
❤5
🏗️ የኤድጅት ቪሌጅ ግንባታ ┃ 🏗️ Edget Village Construction Update

🗓 በሰኔ ወር የተጀመረ ┃ 📅 Started in June
🏗 አሁን፡ መዋቅሩ ሊጠናቀቅ ተቃርቧል ┃ 🏢 Now: Almost structurally complete
⚙️ የአሉሚኒየም ፎርምወርክ ቴክኖሎጂ ┃ ⚙️ Aluminium Formwork Technology
✨ የG+22 አርክቴክቸር ድንቅ ┃ ✨ G+22 Architectural Marvel
🏙️ ራዕይ ወደ እውነታ ┃ 🏙️ Vision to Reality

ከሰኔ ወር ጀምሮ በአሉሚኒየም ፎርምወርክ ቴክኖሎጂ ተገንብቶ አሁን G+22 ደረጃ ላይ የደረሰው የኤድጅት ቪሌጅ ፕሮጀክት መዋቅራዊ ስራውን ሊጨርስ ተቃርቧል።
┃
From its June inception to reaching the G+22 mark using Aluminium Formwork technology, the Edget Village project is on the verge of completing its structural phase.

@ETCONP
❤6👍3🔥1
🏗️ Construction Project Management & Cost Control System

🇪🇹የግንባታ ፕሮጀክትዎን BOQ፣ Cost፣ Payment፣ IPC፣ EVM፣ Cash Flow፣ Variation፣ Risk & Progress በአንድ የ Excel System ያስተዳድሩ👇

https://ye-buna.com/etconp?ref=product_detail&product=6ab379e956fc3_etconp
👏3❤1🥰1
👉RCC Isolated Column Footing – Reinforcement Details

An RCC isolated column footing (pad footing) is designed to safely transfer the column load to the supporting soil while controlling bearing pressure, bending, shear, and settlement.

🚥Key Components

1. Column reinforcement – Vertical bars transfer column loads into the footing.

2. Pedestal – Provided where required to support the column and improve load transfer.

3. Top reinforcement – Distribution reinforcement as required by structural design.

4. Bottom reinforcement – Main footing reinforcement, generally placed near the bottom.

5. Lateral ties / edge bars – Help maintain reinforcement arrangement and provide confinement where detailed.

6. Cover blocks – Maintain the specified concrete cover.

7. PCC levelling course – Provides a clean and level base below the footing.

8. Brick/block edge shuttering – Temporary/permanent edge restraint where appropriate.

9. Compacted soil – Prepared and compacted foundation subgrade.

Important Construction Points

Reinforcement bar diameter and spacing must follow the structural drawings.

Maintain the specified concrete cover; the illustration shows 50 mm as a typical footing value.

Use proper cover blocks/chairs rather than placing reinforcement directly on PCC or soil.

Provide adequate development length and anchorage for column and footing reinforcement.

Column ties should have the required hooks and spacing according to the applicable design standard.

PCC provides a clean, level working surface; it is not a substitute for structural footing concrete.

Check footing dimensions, thickness, reinforcement, punching shear, one-way shear, and soil bearing capacity before construction.

Concrete grade, reinforcement grade, footing size, and reinforcement spacing must be determined by structural design and the applicable local code.

Note: The values shown in the poster are typical/reference values only.

Actual footing dimensions, reinforcement, cover, concrete grade, and bar spacing must be based on structural calculations, soil conditions, loads, and the applicable design code.

👉የ RC ዲዛይን ላይ ሙሉ ቴምፕሌቶች ከፈለጉ ማለትም

⏺Calculation of Design Coefficients
⏺‎Design of Slabs
⏺‎Design of Flat Slabs
⏺‎Design of Beams
⏺‎Design of Sections Under M & N
⏺‎Shear Design & Checks
⏺‎Design for Torsion
⏺‎Design of Rectangular Columns
⏺‎Design of Circular Columns
⏺‎Design of Isolated Footings
‎Isolated Footings Under Moment እና ሌሎች👇

https://ye-buna.com/etconp?ref=product_detail&product=6a7bf1e6dcc09_etconp
❤9🥰2
🏗️ 7 COMMON CONCRETE PROBLEMS YOU SHOULD NEVER IGNORE

Concrete problems can affect the strength, durability, and appearance of a structure.

🔹 Honeycombing

🔹 Cracking

🔹 Segregation

🔹 Bleeding

🔹 Poor compaction

🔹 Cold joints

🔹 Poor curing

📌 Important: The cause should be identified before deciding on a repair method.

🏗️ Follow @ETCONP for more practical construction knowledge.

#Construction #Concrete #CivilEngineering #Engineering
❤8🥰1
🚧Road Construction – Surveying, Setting Out & Earthworks

Road construction begins with accurate surveying and setting out, followed by proper earthwork, grading, drainage, pavement-layer construction, and compaction.

Each stage must be controlled to achieve the required alignment, levels, crossfall, and pavement performance.

Key elements shown:

1. Centerline Stake – Establishes the road alignment and chainage reference.

2. Staff / Leveling Rod – Used with a level instrument for taking accurate elevation readings.

3. Auto Level – Determines differences in elevation and helps establish design levels.

4. Grading & Leveling – A grader or dozer shapes the formation to the required profile.

5. Sub-base Layer – Granular material placed and compacted over the prepared subgrade.

6. Base Layer – Stronger granular pavement layer supporting the surface course.

7. Side Drain – Provides drainage and prevents water accumulation within the pavement and formation.

8. Compaction – Rollers compact soil and pavement materials to achieve the specified density.

📐 Typical Road Cross-Section

A typical pavement structure may consist of:

Natural ground

Compacted subgrade

Granular sub-base

Base course

Surface course

Shoulders

Camber/crossfall for drainage

📍 Setting-Out Procedure

1. Study drawings and alignment data.

2. Establish benchmarks and reference points.

3. Set out the centerline and chainages.

4. Take level readings and establish formation levels.

5. Check cross-sections and road width.

6. Proceed with earthwork, compaction, and pavement layers.

7. Carry out continuous quality and level checks.

Important: Actual layer thicknesses, materials, compaction requirements, camber, drainage dimensions, and design levels should be determined from the approved road design, geotechnical investigation, specifications, and applicable standards.

👉ባሁኑ ባለው ዋጋ የተሰራ፣ጨረታ ስትሞሉም የሚጠቅማቹ የመንገድ ስራ BOQ ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6aa4f7a526f13_etconp
❤5👏2🙏1
🔧 Common Hand Tools Used in Construction

Common construction hand tools include spanners, wrenches, ratchets, torque wrenches, Allen keys, socket sets, and pipe wrenches. They are used for tightening, loosening, gripping, and adjusting nuts, bolts, pipes, and fittings.

🦺 Tool Safety & Care

Use the right tool for the job.

Inspect tools before use.

Keep tools clean and properly stored.

Use the correct size.
Never use damaged tools.

Wear appropriate PPE, such as gloves and eye protection.

Right Tools → Better Work → Stronger Structures.

@ETCONP
❤5
🏗️ Building Construction – የህንፃ ግንባታ አጋዥ መጽሐፍ!

📚ከBuilding Drawing እስከ Foundation, Floor, Wall, Roof, Stairs, Finishing, Formwork እና Site Safety ድረስ የሚያካትት ሙሉ መመሪያ

👷 ለCivil Engineering Students, Engineers, Architects, QS & Contractors ጠቃሚ ነው ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6abccc8ece63c_etconp
❤3🥰2👍1
🔩 BEFORE CONCRETE POURING — CHECK THESE 10 THINGS

Before casting concrete, inspect:

✅ Rebar diameter

✅ Bar spacing

✅ Lap lengths

✅ Concrete cover

✅ Beam and slab dimensions

✅ Stirrups/ties

✅ Formwork alignment

✅ Formwork cleanliness

✅ Openings and embedded items

✅ Supports and props

⚠️ Never rush a concrete pour before inspection is complete.

#ConstructionSite #Reinforcement #Concrete #Engineering

@etconp
❤5🥰2
👉እንደ ባለቤት ህንፃ ከማስገንባትዎ በፊት መከተል የሚገባዎት አጭር ሂደቶች፡- ━━━━━━━━━━━━━
1 . የመሬት ሰነድ ማረጋገጥ – የቦታውን የባለቤትነት ሰነድና የአጠቃቀም ዓላማ ማረጋገጥ።

2. የህንፃ ፕላን ማዘጋጀት – Architectural, Structural, Electrical, Sanitary/Plumbing ዲዛይኖች።

3. የአፈር ምርመራ (Soil Investigation) – በተለይ ለብዙ ወለል ህንፃ።

4. የወጪ ግምት (BOQ & Cost Estimate) – የግንባታ በጀትን በቅድሚያ ማወቅ።

5. የግንባታ ፈቃድ (Building Permit) – ከሚመለከተው የከተማ/ማዘጋጃ ቤት ማግኘት።

6. ብቁ ባለሙያ መምረጥ – Architect, Structural Engineer, Surveyor እና ተገቢውን Contractor።

7. Setting Out – የህንፃውን ዘንጎች፣ ድንበሮችና የFoundation ቦታ በSurveying ትክክለኛ ማስቀመጥ።

8. ግንባታ መጀመር – በተፈቀደው ዲዛይን፣ የጥራት መመሪያና የHSE መስፈርት መሠረት።

🌟In Short፦መሬት → ምርመራ → ዲዛይን → BOQ/በጀት → ፈቃድ → ባለሙያ/Contractor → Setting Out → ግንባታ።

━━━━━━━━━━━━━━
🏗️ የህንፃ ዲዛይን እና የግንባታ ፈቃድ Approval Checklist 📋

🏛በኢትዮጵያ የህንፃ ዲዛይን ለማስፀደቅ አስፈላጊ የሆኑ ሰነዶችንና የDrawing መስፈርቶችን ሳይረሱ ለመፈተሽ የተዘጋጀ Professional PDF Checklist

✅ Architectural Design Checklist
✅ Structural Design & Drawing Checklist
✅ Electrical Design Checklist
✅ Sanitary / Plumbing Checklist
✅ Building Permit & Submission Requirements
✅ አስፈላጊ ሰነዶችና Drawing Requirements
✅ ዲዛይኑ ሙሉ መሆኑን ከSubmission በፊት ለመፈተሽ
✅ ለኢትዮጵያ የግንባታ ፈቃድ ሂደት ጠቃሚ የሆነ Practical Reference

⏱️ ጊዜዎን ይቆጥቡ! አስፈላጊ ሰነድ እንዳይረሳ ያድርጉ!

🗂ይህን በ PDF ፋይል ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6a76b89233390_etconp
❤5🥰4
📢VACANCY ANNOUNCEMENT — JOIN OUR PROFESSIONAL TEAM

🏗️ BENOL CONSTRUCTION

Benol Construction is expanding its building construction operations and is seeking qualified, dynamic, and experienced professionals to fill the positions listed below. All positions are for building construction projects only.

📋 OPEN POSITIONS

1️⃣ Project Manager
Department: Project Management

Quantity: 1
Role: Oversees project planning, execution, and delivery ensuring quality, time, and budget compliance.
Qualification: B.Sc. in Civil Engineering, Construction Management, or related field (M.Sc. is an added advantage).
Experience: 8+ years of relevant experience in building construction project management; experience handling multi-disciplinary teams.
Core Competencies: Project planning & control, team leadership, cost & time management, problem-solving, communication skills.

2️⃣ Site / Civil Engineer

Department: Construction Operations
Quantity: 2
Role: Responsible for site supervision, technical implementations, and quality control.
Qualification: B.Sc. in Civil Engineering (Professional license is advantageous).
Experience: 4+ years of experience in building construction site supervision; familiar with construction drawings and site execution.
Core Competencies: Structural analysis, site supervision, AutoCAD / BOQ, problem-solving, team coordination.

3️⃣ Tender & Procurement Officer
Department: Tender & Procurement

Quantity: 1
Role: Prepares bids, manages client relations, and procurement process.
Qualification: B.Sc. in Civil Engineering, Construction Management, or related field.
Experience: 3+ years of experience in tender preparation and procurement in building construction.
Core Competencies: Tender documentation, market analysis, client communication, negotiation skills, strategic thinking.

4️⃣ Finance & Accountant
Department: Finance & Administration

Quantity: 1
Role: Manages financial records, transactions, and reporting.
Qualification: B.Sc. in Accounting, Finance, or related field (Professional qualification like CPA/ACCA is an advantage).
Experience: 3+ years of relevant accounting and financial management experience.
Core Competencies: Financial reporting, tax and compliance, MS Excel / accounting software, analytical & numerical skills, attention to detail.

📩 HOW TO APPLY

Prepare an updated CV with relevant documents.
Submit your application through email or phone number.

Ensure all documents are attached in one PDF file (optional).

📞 Phone:- 0911270726

📧 Email:frezerbekele4@gmail.com

📍 Address: Addis Ababa, Ethiopia — CMC, MH Business Building, 2nd Floor, House no. 2-208

⏳ Application Deadline:October 05, 2026

@etconp
❤10👍2
🏗️ SLAB CASTING INSPECTION CHECKLIST

Before casting a slab, check:

☑️ Slab thickness
☑️ Reinforcement spacing
☑️ Main and distribution bars
☑️ Concrete cover
☑️ Beam reinforcement
☑️ Electrical conduits
☑️ Plumbing openings
☑️ Formwork level
☑️ Props and supports
☑️ Formwork cleanliness

📌 A proper inspection before casting can prevent expensive corrections later.

@ETCONP
❤12
👉SOIL BEARING CAPACITY CALCULATION

🚥Terzaghi Bearing Capacity Method – Study Note

1. What is Soil Bearing Capacity?

Soil bearing capacity is the maximum pressure that soil can safely support from a foundation without unacceptable shear failure or excessive settlement.

2. Terzaghi’s Bearing Capacity Equation

qᵤ = cN꜀ + γDᶠNq + 0.5γBNᵧ

Where:
qᵤ = ultimate bearing capacity (kN/m²)
c = soil cohesion (kN/m²)
γ = unit weight of soil (kN/m³)
Dᶠ = depth of foundation (m)
B = width of footing (m)
N꜀, Nq, Nᵧ = bearing-capacity factors, mainly dependent on the soil friction angle φ

3. Example Calculation – Square Footing

Given:
Cohesion, c = 20 kN/m²
Unit weight, γ = 18 kN/m³
Foundation depth, Dᶠ = 1.5 m
Footing width, B = 2.0 m
Angle of internal friction, φ = 30°
Factor of Safety = 3
For φ = 30° (illustrative values): N꜀ = 30.14, Nq = 18.40, Nᵧ = 16.02
For a square footing:
qᵤ = 1.3cN꜀ + γDᶠNq + 0.4γBNᵧ
qᵤ = 1.3(20)(30.14) + (18)(1.5)(18.40) + 0.4(18)(2.0)(16.02)
qᵤ = 783.64 + 496.80 + 230.38
qᵤ ≈ 1,510.82 kN/m²

4. Allowable Bearing Capacity

Allowable bearing capacity is obtained by applying an appropriate factor of safety:
qₐₗₗ = qᵤ / F.S.
qₐₗₗ = 1,510.82 / 3 ≈ 503.61 kN/m²
Allowable bearing capacity ≈ 504 kN/m²

5. Important Points

Use soil properties obtained from a proper geotechnical investigation.

Bearing-capacity factors depend on the soil friction angle φ and the selected theory.

Footing shape affects the bearing-capacity equation through shape factors.

A suitable factor of safety must be selected according to the applicable design code and project requirements.

Bearing capacity and settlement are separate checks; both must be considered in foundation design.

Groundwater conditions, foundation depth, eccentricity, inclination, and nearby loads may affect the final design.

6. Design Reminder

The numerical example is for educational illustration. Actual foundation design should be based on site-specific soil investigation, structural loads, groundwater conditions, settlement analysis, and the applicable foundation design code.

👉መሰረታዊ የ ፋውንዴሽን ኢንጅነሪንግ የምትስረዳ ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱ👇

🌟Foundation Engineering Fundamentals – Complete Introductory Ebook

https://ye-buna.com/etconp?ref=product_detail&product=6a8743a519501_etconp
❤7👏1
#ADVERTISEMENT

ጎጆ Shine የጽዳት አገልግሎት - የንፅህና አጋርዎ!
/ Your trusted cleaning partner./

*ለ መኖሪያ ቤቶች
*ለ ሆቴሎች
*ለ ሬስቶራንቶች
*ለ ካፌዎች
*ለ Guest house
*ለ ሱፐር ማርኬቶች
*ለ ቢሮዎች
*ለ ትምህርት ቤቶች
*ለ ሆስፒታሎች
*ለ construction ሳይቶች
*ለ GYM ቤቶች
*ለ event አዳራሾች ሙሉ የ ቤት ጽዳት አገልግሎት እንሰጣለን።


ቤትዎ ወይም የመስሪያ ቦታዎ ንጹህ፣ ማራኪ እና ምቹ እንዲሆን ይፈልጋሉ? ጎጆ Shine ዘመናዊ በሆኑ ማሽኖች እና በሰለጠኑ ባለሙያዎች ጥራት ያለው የጽዳት አገልግሎት ይሰጥዎታል።

□ የምንሰጣቸው አገልግሎቶች፦
🛋️ የሶፋ እና የ ፍራሽ እጥበት
🧹 የምንጣፍ እጥበት እና የአረቢያን መጅሊስ እጥበት
🏢 የቤት እና የቢሮ ጽዳት
✨ ጥልቅ ጽዳት (Deep Cleaning)
🏗️ ከግንባታ በኋላ ጽዳት
🪟 የመስኮትና መስታወት ጽዳት
🚗 የመኪና እጥበት (Car Wash)

ያሉበት ድረስ መጥተን በታማኝነትና በጥራት እናገለግላለን!

📞 አሁኑኑ ይደውሉልን፦
📱 0986416457
📱 0965635149
📱 0704982721

🔻Website:- http://gojoshine.vercel.app

#የጽዳትአገልግሎት #GojoShine #CleaningService #AddisAbaba #Ethiopia
❤3🥰3
🌍 WHY IS SOIL INVESTIGATION IMPORTANT?
A building doesn't only depend on what you see above the ground.
Soil investigation helps engineers understand:
🔹 Soil layers

🔹 Bearing capacity

🔹 Groundwater conditions

🔹 Settlement potential

🔹 Foundation requirements

🔹 Problematic soil conditions
🏗️ Good construction starts with understanding the ground beneath the structure.


@ETCONP
👍7❤4
👉ምርጥ የ ኢንተርየር ዲዛይን አማርኛ መፅሃፍ ከፈለጉ ከታች ባለው ሊንክ አውርደዉ ይጠቀሙበት👇

https://ye-buna.com/ethiowisdom?ref=product_detail&product=6abe09836d352_ethiowisdom
🥰3
👉ስለ (Isolated / Pad Footing) ግንባታ ሙሉ እና ዝርዝር መረጃ!

🌟Isolated Footing / Pad Footing በህንፃ ግንባታ ላይ በጣም የተለመደና በስፋት ጥቅም ላይ የሚውል የጥልቀት ዝቅተኛ መሰረት (Shallow Foundation) አይነት ነው።

☄ዋና ዓላማውም የእያንዳንዱን ዓምድ (Column) ጭነት ለብቻው ወደ ታችኛው አፈር ማስተላለፍ ነው።

📌 1. Isolated መሰረት መቼ ጥቅም ላይ ይውላል?

🔹 ጥሩ የአፈር የመሸከም አቅም ሲኖር፦
የመሬቱ አፈር የመሸከም አቅም (Safe Bearing Capacity of Soil) ከፍተኛ ወይም አጥጋቢ በሚሆንበት ጊዜ።

🔹 የአዕማድ እርቀት ሰፊ ሲሆን፦
በአዕማድ መካከል ያለው ርቀት ሰፊ ሆኖ የመሰረት ብረቶች እርስ በእርስ የማይደራረቡ ከሆነ።

🔹 ዝቅተኛ እና መካከለኛ ህንፃዎች ላይ፦
ለቪላዎች፣ ለመኖሪያ ቤቶች (G+0, G+1, G+2) እና ዝቅተኛ ጭነት ላላቸው ህንፃዎች በጣም ኢኮኖሚያዊ የመሰረት አማራጭ ሊሆን ይችላል።

📌 2. በሳይት ላይ Isolated Footing የሚሰራበት ቅደም ተከተል (Step-by-Step Construction Process)

1️⃣ Excavation – የመሰረት ቁፋሮ

• በዲዛይኑ መሰረት የመሰረቱ ስፋትና ጥልቀት ተለክቶ ይቆፈራል።
• ቁፋሮው ከተጠናቀቀ በኋላ የአፈሩ የታችኛው ክፍል በደንብ ይደቀደቃል (Compacted Bottom)።

2️⃣ Lean Concrete / Blinding Concrete – የብላይንዲንግ ኮንክሪት

• የብረት አፅሙ ከቆሻሻና ከአፈር ጋር እንዳይገናኝ ከ 5–10 cm ውፍረት ያለው ዝቅተኛ የኮንክሪት ጥንካሬ ያለው (C-15/C-20) ቀጭን ኮንክሪት ይፈሳል።

3️⃣ Reinforcement Placement – የብረት ዝርጋታ

• በዲዛይኑ መሰረት የታችኛው የብረት መረብ (Bottom Rebar Mat) ይዘጋጃል።
• ብረቱ ከአፈር ወይም ከብላይንዲንግ ጋር እንዳይነካካ በቂ የኮንክሪት ከቨር (Concrete Cover ≈ 50 mm) በብሎኬት/Spacer ማሰሪያዎች ይዘጋጃል።

4️⃣ Column Starter Bars Setup – የዓምድ መያዣ ብረቶች

• የዓምዱ ብረቶች ከመሰረቱ ጋር ተያይዘው በ 90° L-hook ታጥፈው ከመሰረቱ ብረት ጋር በቅርበት ይታሰራሉ።
• የዓምዱ መሃል መስመር (Centerline/Gridline) እንዳይዛነፍ በቴዎዶላይት ወይም በሹሩብ ይረጋገጣል።

5️⃣ Formwork Installation – የፎርምወርክ/ሳጥን ስራ

• የመሰረቱ የጎን ፎርምወርክ፣ የእንጨት ወይም የብረት ሳጥን፣ በዲዛይኑ ልክ ተሰርቶ በጎን በኩል በጥንቃቄ ይደገፋል።

6️⃣ Concrete Pouring & Compaction – ኮንክሪት ማፍሰስና ማደቅደቅ

• የተዘጋጀው ስትራክቸራል ኮንክሪት (C-25 / C-30) ይፈሳል።
• በኮንክሪቱ ውስጥ አየርና ባዶ ቦታ (Honeycombing/Cavities) እንዳይቀር በቪብሬተር (Vibrator) በትክክል ይደቀደቃል።

⚠️ 3. ለጥራት ቁጥጥር (Quality Control) የሚረዱ ዋና ዋና የሳይት ቲፖች

🔹 Curing – ውሃ ማጠጣት፦
ኮንክሪት ከተፈሰሰ በኋላ በቂ የCuring ሂደት ማድረግ የኮንክሪቱን ጥንካሬና ጥራት ለማረጋገጥ ወሳኝ ነው።

🔹 Starter Bar Lapping፦
ወደ ላይ የሚወጡት የዓምድ መያዣ ብረቶች በቂ የመቀጠያ እርዝመት (Lap Length ≈ 40d–50d) ማሟላታቸውን ማረጋገጥ።

🔹 Backfilling – የአፈር ድቅደቃ፦
መሰረቱ በቂ ጥንካሬ ካገኘ በኋላ በዙሪያው የሚሞላው አፈር በጥሩ Selected Material በየ 15–20 cm ንብርብር እየተደቀደቀ (Compacted in Layers) መሞላት አለበት።

🏗️ በመጨረሻ፦ Isolated / Pad Footing ቀላል የሚመስል ቢሆንም፣ የመሰረቱ ስፋት፣ ጥልቀት፣ የብረት ዝርጋታ፣ Concrete Cover፣ Column Starter Bars እና Concrete Quality በዲዛይኑና በሳይት መመሪያው መሰረት በጥንቃቄ መፈተሽ አለባቸው።

👉የ Isolated Footing ዲዛይን ለማረግ የሚረዳ  እንዲሁም ስራቹ  የሚያቀልላቹ ምርጥ Excel ፋይል ከፈለጉ ከታች ባለው ሊንክ አውርደው ይጠቀሙ👇

https://ye-buna.com/etconp?ref=product_detail&product=6a5f6b3b1c816_etconp
❤6🙏4🥰1
👉 የኢሬቻ ሆራ ፊንፊኔ በዓልን ምክንያት በማድረግ የተወሰኑ መንገዶች ለተሽከርካሪዎች ዝግ ይደረጋሉ፡፡

የአዲስ አበባ ፖሊስ ዋና ጠቅላይ መምሪያ መስከረም 23 ቀን 2019 ዓ/ም በአዲስ አበባ ከተማ በሚከበረውን የኢሬቻ ሆራ ፊንፊኔ በዓል ምክንያት የተወሰኑ መንገዶች ለተሽከርካሪዎች ዝግ እንደሚሆኑ አስታወቀ፡፡

ነገ መስከረም 22 ቀን 2019 ዓ/ም ከረፋዱ 4፡00 ሠዓት ጀምሮ እስከ መርሀ ግብሩ ፍፃሜ ድረስ፡-

👉ከመገናኛ ወደ መስቀል አደባባይ (22 ወይም ጎላጎል አደባባይ ላይ እና ታች)

👉ከአድዋ ድልድይ ወደ ዘሪሁን ህንፃ እና ወደ ቅዱስ ዑራኤል አደባባይ (ዘሪሁን ህንፃ መስቀለኛ)

👉ከአትላስ መብራት ወደ ቅዱስ ዑራኤል አደባባይ (ፒኮክ መብራት)

👉ከቦሌ ሩዋንዳ ድልድይ ወደ መስቀል አደባባይ (ወሎ ሠፈር አደባባይ ላይ እና ታች)

👉ከጋዜቦ አደባባይ በደንበል ህንፃ ጀርባ ወደ ፊላሚንጎ እንዲሁም ከጋዜቦ አደባባይ በአዲሱ መንገድ ወደ ለገሃር መብራት (ጋዜቦ አደባባይ)

👉ከቅዱስ ቂርቆስ ታቦት ማደሪያ ወደ ለገሃር መብራት (ቅዱስ ቂርቆስ ታቦት ማደሪያ መብራት)

👉ከቀድሞው ብርሃን ኢትዮጵያ መስቀለኛ በአዲሱ መንገድ ወደ ቅዱስ ቂርቆስ ቤ/ክርስቲያን (ብርሃን ኢትዮጵያ መስቀለኛ)

👉ከአፍሪካ ህብረት ቅዱስ ሚካኤል መስቀለኛ ወደ ሜክሲኮ አደባባይ (አፍሪካ ህብረት ቅዱስ ሚካኤል መስቀለኛ)

👉ከአፍሪካ ህብረት መብራት ወደ ሜክሲኮ አደባባይ (አፍሪካ ህብረት መብራት)

👉ከከፍተኛ ፍ/ቤት አደባባይ ወደ ሜክሲኮ አደባባይ (ከፍተኛ ፍ/ቤት አደባባይ)

👉ከሜክሲኮ አረቁ ፋብሪካ ወደ ሜክሲኮ አደባባይ (አረቄ ፋብሪካ መስቀለኛ)

👉ከሰንጋ ተራ 40/60 ቤቶች መገንጠያ ወደ ሠንጋ ተራ መብራት (ሠንጋ ተራ 40/60 መገንጠያ)

👉ከጎማ ቁጠባ መብራት ወደ  ብሔራዊ ቴአትር (ጎማ ቁጠባ መብራት)

👉ከሜትሮሎጂ መታጠፊያ  ወደ ፖስታ ቤት መብራት (ሜትዮሮሎጂ መታጠፊያ)

👉ከጥቁር አንበሳ ሼል ወደ ኤሚግሬሽን መብራት ( ጥቁር አንበሳ መስቀለኛ)

👉ከጎላ ቅዱስ ሚካኤል መስቀለኛ ወደ ኤሚግሬሽን መብራት (ጎላ ቅዱስ ሚካኤል መስቀለኛ)

👉ከቴዎድሮስ አደባባይ ወደ ኤሚግሬሽን መብራት (ቴዎድሮስ አደባባይ)

👉ከንግድ ማተሚያ መታጠፊያ ወደ ፍል ውሃ መስቀለኛ (ንግድ መታጠፊያ)

👉ከፓርላማ መብራት ወደ ውጭ ጉዳይ (ፓርላማ መብራት ላይ)

👉ከሴቶች አደባባይ ወደ ካዛንቺስ (ሴቶች አደባባይ)

ከረፋዱ 4:00 ሠዓት ጀምሮ የሚዘጋ ሲሆን አሽከርካሪዎች አስቀድመው አማራጭ መንገዶችን እንዲጠቀሙ የአዲስ አበባ ፖሊስ ዋና ጠቅላይ መምሪያ እያሳሰበ ከንጋቱ 12:00 ሠዓት ጀምሮ በተጠቀሱት መንገዶች ለአጭርም ሆነ ለረጅም ጊዜ ተሽከርካሪ ማቆም የተከለከለ መሆኑን አሳስቧል።

ህብረተሰቡ የፖሊስን አገልግሎት ለማግኘትም ሆነ ጥቆማ ለመስጠት  በ01-11-11-01-11 እና በ990 ነፃ የስልክ መስመር መጠቀም እንደሚቻል ፖሊስ  መልዕክቱን አስተላልፏል፡፡

Addis Ababa Police

@ETCONP
❤12