๐Ÿšจ WHY DO REINFORCED CONCRETE BEAMS DEVELOP CRACKS?

Cracks in reinforced concrete beams can develop for several reasons.

Understanding their cause is essential before deciding whether monitoring, repair, or structural intervention is required.

๐Ÿ”น 1. Flexural Cracking
These cracks develop when bending stresses cause the concrete to crack, commonly in the tension zone of a beam.

๐Ÿ”น 2. Shear Cracking
Diagonal cracks may develop due to shear stresses. Their significance depends on their location, pattern, width, and structural conditions.

๐Ÿ”น 3. Shrinkage Cracking
Concrete can shrink as it loses moisture and undergoes hydration-related volume changes. Restraint can contribute to cracking.

๐Ÿ”น 4. Excessive Loading
Loads beyond the intended design conditions may contribute to excessive deflection or cracking.

๐Ÿ”น 5. Reinforcement Corrosion
Corrosion products can expand and cause cracking, delamination, and concrete cover deterioration.

๐Ÿ”น 6. Poor Construction Practices
Inadequate curing, poor compaction, unsuitable construction joints, or incorrect reinforcement placement may contribute to defects.

๐Ÿ”น 7. Foundation Movement
Differential settlement or other structural movements can introduce stresses that were not anticipated in the original design.

โš ๏ธ Important: Not every crack indicates structural failure.

However, new, widening, diagonal, or recurring cracks should be assessed by a qualified structural professional.

Do not conceal cracks before their cause is understood.

๐Ÿ—๏ธ Remember: Diagnose first. Repair second.

@ETCONP
โค10๐Ÿฅฐ1
แŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆˆแ‰ฑแˆญแŠฉ แˆตแˆซ แ‰ฐแ‰‹แˆซแŒญ แ‹ซแ’ แˆ˜แˆญแŠจแ‹š แŠฉแ‰ฃแŠ•แ‹ซ 213 แАแŒฅแ‰ฅ 7 แˆšแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แŠฅแŠ•แ‹ตแ‰ตแŠจแแˆ แ‰ฐแ‹ˆแˆฐแА!

แˆˆแ‹ซแ’ แˆ˜แˆญแŠจแ‹š แŠฉแ‰ฃแŠ•แ‹ซ แŠฅแŠ•แ‹ฒแŠจแˆแˆˆแ‹ แŠจแ‰ฐแ‹ˆแˆฐแАแˆˆแ‰ต แ‹แˆตแŒฅ 89 แˆšแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แ‰ แˆฐแˆœแŠ• แŠขแ‰ตแ‹ฎแŒตแ‹ซ แŒฆแˆญแАแ‰ต แ‹ˆแ‰…แ‰ต แˆˆแ‹ฐแˆจแˆฑ แŒ‰แ‹ณแ‰ถแ‰ฝ แ‹จแˆšแŠจแˆแˆ แАแ‹ แ‰ฐแ‰ฅแˆแˆแข

แ‰ แŠ แ‹‹แˆฝ แŠฎแˆแ‰ฆแˆแ‰ป แ‹ˆแˆแ‹ฐแ‹ซ แˆ€แˆซ แŒˆแ‰ แ‹ซ แ‹จแ‰ฃแ‰กแˆญ แˆ˜แˆตแˆ˜แˆญ แŒแŠ•แ‰ฃแ‰ณ แŠญแˆญแŠญแˆญ แŒ‰แ‹ณแ‹ญ แ‰ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แŠฅแŠ“ แ‰ แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แ‹ซแ’ แˆ˜แˆญแŠจแ‹š แˆ˜แŠซแŠจแˆ แˆฒแŠซแˆ„แ‹ต แ‹จแ‰†แ‹จแ‹ แ‹จแŠญแˆต แˆ‚แ‹ฐแ‰ต แ‰ฐแŒ แŠ“แ‰‹แˆแกแก

แˆˆแŠ•แ‹ฐแŠ• แ‰ แˆšแŒˆแŠ˜แ‹ แ‹จแ‹“แˆˆแˆ แŠ แ‰€แ แŒแˆแŒแˆ แ‹ณแŠแАแ‰ต แ‹จแ‰ฐแŠซแˆ„แ‹ฐแ‹ แŠญแˆญแŠญแˆญ 392 แŠชแˆŽ แˆœแ‰ตแˆญ แ‹จแˆšแˆจแ‹แˆ˜แ‹แŠ• แ•แˆฎแŒ€แŠญแ‰ต แ‰ 1 แАแŒฅแ‰ฅ 7 แ‰ขแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แˆˆแˆ˜แŒˆแŠ•แ‰ฃแ‰ต แŠจแŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆแ‹ตแˆญ แ‰ฃแ‰กแˆญ แŠฎแˆญแ–แˆฌแˆฝแŠ• แ‰ แ‰ฐแ‹ฐแˆจแŒˆแ‹ แ‹จแˆตแˆซ แ‹แˆ แŠ แˆแŒปแŒธแˆ แˆ‹แ‹ญ แŠ แˆˆแˆ˜แŒแ‰ฃแ‰ฃแ‰ต แˆ˜แАแˆณแ‰ฑแŠ• แ‰ฐแŠจแ‰ตแˆŽ แАแ‰ แˆญแกแก

แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แ‹ซแ’ แˆ˜แˆญแŠจแ‹š แŠฉแ‰ฃแŠ•แ‹ซ แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆ˜แŠ•แŒแˆตแ‰ต แˆˆแ‹ฐแˆจแˆฐแ‰ แ‰ต แŒ‰แ‹ณแ‰ต แŠจ1 แ‰ขแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แ‰ แˆ‹แ‹ญ แŠซแˆณ แŠฅแŠ•แ‹ฒแŠจแˆแˆˆแ‹ แˆ˜แŒ แ‹จแ‰แŠ• แ‰ฐแŠจแ‰ตแˆŽ แŠญแˆญแŠญแˆฉ แˆฒแŠซแˆ„แ‹ต แˆ˜แ‰†แ‹จแ‰ฑ แ‰ฐแŒˆแˆแŒฟแˆแกแก

แŠขแ‰ตแ‹ฎแŒตแ‹ซ แ‹จแ‹ซแ’ แˆ˜แˆญแŠจแ‹š แŠญแˆตแŠ• แ‰ฐแŠจแ‰ตแˆŽ 400 แˆšแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แŠซแˆณ แˆˆแˆ˜แŠญแˆแˆ แŒฅแ‹ซแ‰„ แŠ แ‰…แˆญแ‰ฃ แŠฅแŠ•แ‹ฐแАแ‰ แˆญ แŠซแ’แ‰ณแˆ แŠจแŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆแ‹ตแˆญ แ‰ฃแ‰กแˆญ แŠฎแˆญแ–แˆฌแˆฝแŠ• แˆฐแˆแ‰ณแˆˆแ‰ฝแกแก

แˆตแˆ›แ‰ธแ‹ แŠฅแŠ•แ‹ณแ‹ญแŒ แ‰€แˆต แ‹จแˆแˆˆแŒ‰ แ‹จแŠฎแˆญแ–แˆฌแˆฝแŠ‘ แŠจแแ‰ฐแŠ› แŠ แˆ˜แˆซแˆญ แŠฅแŠ•แ‹ณแˆ‰แ‰ต แˆ‹แˆˆแ‰แ‰ต แŠ แˆซแ‰ต แ‹“แˆ˜แ‰ณแ‰ต แ‰ แˆˆแŠ•แ‹ฐแŠ• แˆฒแŠซแˆ„แ‹ต แ‹จแ‰†แ‹จแ‹ แŠญแˆญแŠญแˆญ แ‰ฃแˆณแˆˆแแАแ‹ แˆ˜แˆตแŠจแˆจแˆ 23 แ‰€แŠ• 2026 แ‰ฐแŒ แŠ“แ‰‹แˆแกแก

แ‰ แ‹šแˆ… แ‹แˆณแŠ” แˆ˜แˆฐแˆจแ‰ตแˆ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆˆแ‹ซแ’ แˆ˜แˆญแŠจแ‹š แ‹จแ‹˜แŒ แŠ แ‰ แˆ˜แ‰ถ แ‹ˆแˆˆแ‹ตแŠ• แŒจแˆแˆฎ 242 แˆšแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แ‹จแŒ‰แ‹ณแ‰ต แŠซแˆณ แŠฅแŠ•แ‹ตแ‰ตแŠจแแˆ แ‰ฐแ‹ˆแˆตแŠ—แˆแข

แŠจแ‹šแˆ… แ‹แˆตแŒฅ แŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆˆแ‹ซแ’ แˆ˜แˆญแŠจแ‹š แŠฉแ‰ฃแŠ•แ‹ซ แ‰ แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ แˆ˜แˆแŠฉ แˆˆแŠฉแ‰ฃแŠ•แ‹ซแ‹ แŠจแแˆ‹แ‹ แ‹จแАแ‰ แˆจแ‹ 29 แАแŒฅแ‰ฅ 1 แˆšแˆŠแ‹ฎแŠ• แ‹ถแˆ‹แˆญ แŠฅแŠ•แ‹ฒแˆ˜แˆˆแˆตแˆ‹แ‰ตแˆ แ‰ฐแ‹ˆแˆตแŠ—แˆแกแก

Via Capital

@etconp
โค6๐Ÿ˜ฑ3๐Ÿฅฐ1
๐ŸŸ  NEXORA | uPVC PIPES & FITTINGS โšช

๐Ÿ—๏ธ Strong Connections. Lasting Solutions.

Looking for reliable uPVC pipes and fittings? Nexora has the solutions for your construction needs!

๐Ÿ”น uPVC Pipes for Water Supply & Electrical Conduits
๐Ÿ”น Drainage Pipes & Fittings
๐Ÿ”น Elbows (45ยฐ & 90ยฐ), Tees & Couplings
๐Ÿ”น Sockets, Reducers & End Caps
๐Ÿ”น Rubber Rings, PVC Cement & Accessories

โœ… Quality & Durability
โœ… Competitive Prices
โœ… Reliable Plumbing Solutions

๐Ÿ“ Urael, Humera Plaza, 2nd Floor, Addis Ababa
๐Ÿ“ž Call / WhatsApp: 0935 143 836

NEXORA โ€” Quality You Can Trust. ๐ŸŸ 

#Nexora #uPVC #PVCFittings #PlumbingSolutions #ConstructionMaterials
โค3๐Ÿฅฐ2
๐Ÿ‘‰CALCULATION OF REINFORCEMENT QUANTITY

Foundation: 15 m ร— 8 m
Perimeter: 2(15 + 8) = 46 m
Main bars: 4
Stirrup size: 15 ร— 15 cm
Stirrup spacing: 15 cm
Hook length: 7.5 cm each

๐Ÿ”น 1. Longitudinal Bars (Main Steel)

Total length: 46 ร— 4 = 184 m
12 m bars required: 184 รท 12 โ‰ˆ 16 bars
With 10% wastage: 18 bars

๐Ÿ”น 2. Stirrups (Ties)
Number: 46 รท 0.15 โ‰ˆ 307 stirrups
Length per stirrup: approximately 0.70 m
Total length: 307 ร— 0.70 = 214.9 m
12 m bars required: approximately 18 bars

๐Ÿ“Œ Note: These are preliminary estimates. Actual quantities depend on cover, bending details, lap lengths, and project specifications.

@ETCONP
โค4๐Ÿ‘1๐Ÿฅฐ1
๐Ÿ—๏ธ REINFORCEMENT QUANTITY CALCULATION FOR A FOUNDATION
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ“Œ GIVEN DATA
Foundation Length (L) = 15 m

Foundation Width (B) = 8 m

Number of Longitudinal Bars = 4

Stirrup Size = 15 cm ร— 15 cm

Stirrup Spacing (S) = 15 cm = 0.15 m

Hook Length = 7.5 cm = 0.075 m

Standard Bar Length = 12 m

Wastage Allowance = 10%
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ”น STEP 1: CALCULATION OF FOUNDATION PERIMETER
Formula:
P = 2 ร— (L + B)
Substitute the values:
P = 2 ร— (15 + 8)
P = 2 ร— 23
โœ… Total Perimeter = 46 m
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ”น STEP 2: CALCULATION OF LONGITUDINAL REINFORCEMENT
Number of Longitudinal Bars = 4
Formula:
Total Length = Perimeter ร— Number of Bars
Total Length = 46 ร— 4
โœ… Total Length = 184 m
๐Ÿ“Œ Number of 12 m Bars:
Number of Bars = Total Length รท Standard Bar Length
Number of Bars = 184 รท 12
Number of Bars = 15.33 โ‰ˆ 16 bars
Including 10% Wastage:
Required Length = 184 ร— 1.10
Required Length = 202.40 m
Number of Bars = 202.40 รท 12
Number of Bars = 16.87 โ‰ˆ 17 bars
โœ… Provide 17 bars of 12 m, subject to proper lap lengths, anchorage, cutting arrangements, and detailing.
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ”น STEP 3: CALCULATION OF NUMBER OF STIRRUPS
Given:
Perimeter = 46 m

Spacing = 0.15 m
Formula:
Number of Spaces = Perimeter รท Spacing
Number of Spaces = 46 รท 0.15
Number of Spaces = 306.67
For a closed perimeter, the number of stirrups depends on the actual layout and spacing arrangement.
โœ… Preliminary Estimate = 307 stirrups
Note: Confirm the final number from the reinforcement layout and required spacing at corners and along each side.
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ”น STEP 4: CALCULATION OF LENGTH OF ONE STIRRUP
Given:
Stirrup Length = 15 cm

Stirrup Width = 15 cm

Hook Length = 7.5 cm at each end
Formula:
Length of Stirrup = 2 ร— (Length + Width) + 2 ร— Hook Length
Substitute the values:
Length = 2 ร— (15 + 15) + 2 ร— 7.5
Length = 60 + 15
Length = 75 cm
Convert to meters:
Length = 75 รท 100
โœ… Length of One Stirrup = 0.75 m
Note: This is a simplified geometric calculation. Actual cutting length must account for bend geometry, concrete cover, and the applicable reinforcement detailing requirements.
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ”น STEP 5: TOTAL LENGTH OF STIRRUPS
Formula:
Total Length = Number of Stirrups ร— Length of One Stirrup
Total Length = 307 ร— 0.75
โœ… Total Length = 230.25 m
Number of 12 m Bars:
Number of Bars = 230.25 รท 12
Number of Bars = 19.19 โ‰ˆ 20 bars
โœ… Provide approximately 20 bars of 12 m, before considering additional cutting waste and the final stirrup cutting schedule.
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿ“Š FINAL SUMMARY
โœ… Foundation Perimeter = 46 m
โœ… Longitudinal Reinforcement = 184 m
โœ… Longitudinal Bars = Approximately 17 bars of 12 m, including 10% wastage
โœ… Estimated Number of Stirrups = 307
โœ… Length of One Stirrup = 0.75 m
โœ… Total Stirrup Length = 230.25 m
โœ… Stirrup Reinforcement = Approximately 20 bars of 12 m
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
โš ๏ธ IMPORTANT ENGINEERING NOTE
These calculations are preliminary estimates. Actual reinforcement quantities depend on the structural drawings, concrete cover, bar diameter, lap lengths, anchorage, bending details, and reinforcement spacing requirements.
Follow the approved structural drawings and applicable design standards before ordering or placing reinforcement.

@ETCONp
โค4๐Ÿฅฐ1๐Ÿ‘1
๐Ÿ‘‰The incredible anatomy of a highway retaining wall

๐ŸšฅDive deep into the cross-section of gabion wall structures, road foundations, and backfill layers๐Ÿ‘ทโ€โ™‚๏ธ๐Ÿ› ๏ธ

@ETCONP
โค3๐Ÿฅฐ2๐Ÿ‘1
๐Ÿ—๏ธ แˆˆแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แŠฉแ‰ฃแŠ•แ‹ซแ‹Žแ‰ฝ แŠฅแŠ“ แˆˆแŒฅแ‰ƒแ‰…แŠ• แ‹จแ‰ขแ‹แАแˆต แ‰ฃแˆˆแ‰คแ‰ถแ‰ฝ แˆแ‹ฉ แ‹จแˆ›แŠ”แŒ…แˆ˜แŠ•แ‰ต แˆฒแˆตแ‰ฐแˆ แŠ แ‹˜แŒ‹แŒ€แŠ•แˆ‹แ‰น๐Ÿ“Š

โœ… แ‹จแˆฐแˆซแ‰ฐแŠžแ‰ฝ แŠฅแŠ“ แ‹จแ‹ฐแˆ˜แ‹ˆแ‹ แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ
โœ… แ‹จแ•แˆฎแŒ€แŠญแ‰ต แ‹ˆแŒชแŠ“ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‰แŒฅแŒฅแˆญ
โœ… แ‹จแˆ‚แˆณแ‰ฅแฃ แ‹จแŒแ‹ขแŠ“ แ‹จแˆฝแ‹ซแŒญ แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ
โœ… แŠ แ‹แ‰ถแˆ›แ‰ฒแŠญ แˆตแˆŒแ‰ตแŠ“ แ‹จแˆชแ–แˆญแ‰ต แˆ›แ‹˜แŒ‹แŒƒ แŠจแˆŒแˆŽแ‰ฝ แŒ แ‰ƒแˆš แŠแ‰ธแˆฎแ‰ฝ แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แˆ›แˆตแ‰ฐแŠซแŠจแˆ แ‹จแˆšแ‰ปแˆ Excel แˆฒแˆตแ‰ฐแˆ แАแ‹

๐Ÿ”ฅ แˆแˆ‰แŠ•แˆ แ‹จแ‹ตแˆญแŒ…แ‰ตแ‹ŽแŠ• แˆฅแˆซแ‹Žแ‰ฝ แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แ‰ แ‰€แˆ‹แˆ‰ แ‹ซแˆตแ‰ฐแ‹ณแ‹ตแˆฉ!

๐ŸŒŸแ‹ญแˆ…แŠ•แŠ• แ‹ตแŠ•แ‰… แˆฒแˆตแ‰ฐแˆ แ‰  50% แ‰…แŠ“แˆฝ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
๐Ÿฅฐ2โค1๐Ÿ™1
๐Ÿ—๏ธ Interlocking Pavement โ€“ Main Layers

๐Ÿ”น Layers (Top to Bottom):

Concrete Edge Restraint

Concrete Pavers (60โ€“100 mm)
Joint Sand

Bedding Sand (20โ€“40 mm)

Crushed Stone Base (100โ€“150
mm)

Sub-base (150โ€“300 mm)
Compacted Subgrade

โœ… Key Tips:

โ€ข Compact all layers properly.

โ€ข Ensure proper drainage (1โ€“2% slope).

โ€ข Select layer thickness based on traffic load and soil conditions.

@ETCONP
โค4๐Ÿฅฐ2๐Ÿ‘1
๐Ÿ›ฃ๏ธ แ‹จแˆˆแˆš แˆฒแˆšแŠ•แ‰ถ แ‹แ‰ฅแˆชแŠซ - แŒ€แˆ› แ‹ˆแŠ•แ‹ แ‹จแˆฒแˆšแŠ•แ‰ถ แŠฎแŠ•แŠญแˆชแ‰ต แˆ˜แŠ•แŒˆแ‹ต แŒแŠ•แ‰ฃแ‰ณ แ‰ แ‹ญแ‹ แ‰ฐแŒ€แˆ˜แˆจ

โ€‹๐Ÿ“ แŒแŠ•แ‰ฃแ‰ณแ‹ แ‹จแˆšแŠจแŠ“แ‹ˆแŠ•แ‰ แ‰ต แ‰ฆแ‰ณแก แŠ แ‰ฅแŠญแˆ˜ แˆฐแˆœแŠ• แˆธแ‹‹ แ‹žแŠ•แฃ แŠฅแŠ•แˆณแˆฎ แ‹ˆแˆจแ‹ณ
แ‹จแŠ แŠซแ‰ฃแ‰ขแ‹แŠ• แˆ›แŠ…แ‰ แˆซแ‹ŠแŠ“ แŠขแŠฎแŠ–แˆšแ‹ซแ‹Š แ‰ตแˆตแˆตแˆญ แŠจแˆ›แŒ แŠ“แŠจแˆญ แ‰ฃแˆˆแˆ แˆˆแŠขแŠ•แ‹ฑแˆตแ‰ตแˆช แŒแ‰ฅแ‹“แ‰ต แŠ แ‰…แˆญแ‰ฆแ‰ต แŠจแแ‰ฐแŠ› แ‹แ‹ญแ‹ณ แ‹จแˆšแŠ–แˆจแ‹ แ‹จแˆˆแˆš แˆฒแˆšแŠ•แ‰ถ แ‹แ‰ฅแˆชแŠซ - แŒ€แˆ› แ‹ˆแŠ•แ‹ แ‹จแˆฒแˆšแŠ•แ‰ถ แŠฎแŠ•แŠญแˆชแ‰ต แˆ˜แŠ•แŒˆแ‹ต แ‹จแŒแŠ•แ‰ฃแ‰ณ แ•แˆฎแŒ€แŠญแ‰ต แ‰ แ‹ญแ‹ แ‰ฐแŒ€แˆแˆฏแˆแข

โ€‹แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆฅแˆซแ‹แŠ• แ‹จแˆ˜แˆตแˆ˜แˆญ แŒ…แˆแˆญ แˆ›แ‰ฅแˆฐแˆชแ‹ซ แˆ˜แ‹ตแˆจแŠญ แˆ‹แ‹ญ แ‹จแˆฐแˆœแŠ• แˆธแ‹‹ แ‹žแŠ•แŠ“ แ‹จแŠฅแŠ•แˆณแˆฎ แ‹ˆแˆจแ‹ณ แŠจแแ‰ฐแŠ› แŠ แˆ˜แˆซแˆฎแ‰ฝแฃ แ‹จแˆ€แŒˆแˆญ แˆฝแˆ›แŒแˆŒแ‹Žแ‰ฝแฃ แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆ˜แŠ•แŒˆแ‹ถแ‰ฝ แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แ‹จแ‹ฐแ‰ฅแˆจ แ‰ฅแˆญแˆƒแŠ• แŠ แŠซแ‰ฃแ‰ข แ•แˆฎแŒ€แŠญแ‰ถแ‰ฝ แˆ›แŠ”แŒ…แˆ˜แŠ•แ‰ต แŒฝแˆ•แˆแ‰ต แ‰คแ‰ต แŠƒแˆ‹แŠแ‹Žแ‰ฝ แŠฅแŠ•แ‹ฒแˆแˆ แ‹จแˆˆแˆš แˆฒแˆšแŠ•แ‰ถ แ‹แ‰ฅแˆชแŠซ แ‰ฐแ‹ˆแŠซแ‹ฎแ‰ฝ แ‰ฐแŒˆแŠแ‰ฐแ‹‹แˆแข

โ€‹๐Ÿ“Š แ‹จแ•แˆฎแŒ€แŠญแ‰ฑ แ‹‹แŠ“ แ‹‹แŠ“ แ‹แˆญแ‹แˆฎแ‰ฝ

โ€‹แˆญแ‹แˆ›แŠ”แก 20 แŠชแˆŽ แˆœแ‰ตแˆญ โ€‹แ‹จแˆ˜แŠ•แŒˆแ‹ต แ‹“แ‹ญแАแ‰ตแก แ‹จแˆฒแˆšแŠ•แ‰ถ แŠฎแŠ•แŠญแˆชแ‰ต แˆ˜แŠ•แŒˆแ‹ต

โ€‹แ‹จแŒŽแŠ• แˆตแ‹แ‰ตแก แ‰ แ‰€แ‰ แˆŒ แˆ˜แ‰€แˆ˜แŒซแ‹Žแ‰ฝ 12 แˆœแ‰ตแˆญแค แ‰ แŒˆแŒ แˆญ แŠ แŠซแ‰ฃแ‰ขแ‹Žแ‰ฝ แŠจ8 แŠฅแˆตแŠจ 10 แˆœแ‰ตแˆญ

โ€‹แ‹จแˆฅแˆซ แ‰ฐแ‰‹แˆซแŒญแก แˆ•แ‰ฅแˆญ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แŠฎแˆญแ–แˆฌแˆฝแŠ• (แ‹จแˆ˜แŠ•แŒแˆฅแ‰ต แ‹จแˆแˆ›แ‰ต แ‹ตแˆญแŒ…แ‰ต)
โ€‹แŠ แˆ›แŠซแˆช แˆ˜แˆแŠ•แ‹ฒแˆตแก แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แŠขแŠ•แŒ…แАแˆชแŠ•แŒ แŠฎแˆญแ–แˆฌแˆฝแŠ•

โ€‹แ‹จแˆ›แŒ แŠ“แ‰€แ‰‚แ‹ซ แŒŠแ‹œแก แ‰ แŠฎแŠ•แ‰ตแˆซแ‰ต แ‹แˆ‰ แˆ˜แˆ แˆจแ‰ต แ‰ 14 แ‹ˆแˆซแ‰ต แ‹แˆตแŒฅ แ‹ญแŒ แŠ“แ‰€แ‰ƒแˆ แ‰ฐแ‰ฅแˆŽ แ‹ญแŒ แ‰ แ‰ƒแˆแข

โ€‹๐Ÿ’ก แ‹จแ•แˆฎแŒ€แŠญแ‰ฑ แ‰ตแˆแˆแ‰… แ‹แ‹ญแ‹ณแ‹Žแ‰ฝแก

โ€‹แˆˆแˆˆแˆš แˆฒแˆšแŠ•แ‰ถ แ‹แ‰ฅแˆชแŠซ แ‹‹แАแŠ› แŒฅแˆฌ แ‹•แ‰ƒแ‹Žแ‰ฝ แ‹จแˆ†แŠ‘แ‰ตแŠ• แ‹จแŠ–แˆซ แ‹ตแŠ•แŒ‹แ‹ญ แŠฅแŠ“ แŒ‚แ•แˆฐแˆ แ‰ แŠจแแ‰ฐแŠ› แแŒฅแАแ‰ตแŠ“ แ‰…แˆแŒฅแแŠ“ แˆˆแˆ›แŒ“แŒ“แ‹ แ‹ซแˆตแ‰ฝแˆ‹แˆแข

แ‰ แˆˆแˆš แŠจแ‰ฐแˆ› แ‹™แˆชแ‹ซแŠ“ แ‰ แ‹ฐแ‰ฅแˆจ แ‰ฅแˆญแˆƒแŠ• แŠจแ‰ฐแˆ› แˆˆแ‰ฐแŒˆแАแ‰ก แ‹แ‰ฅแˆชแŠซแ‹Žแ‰ฝ แ‹จแŠขแŠ•แ‹ฑแˆตแ‰ตแˆช แŒแ‰ฅแ‹“แ‰ถแ‰ฝแŠ• แˆˆแˆ›แ‰…แˆจแ‰ฅ แ‰ตแˆแ‰… แŠ แˆตแ‰ฐแ‹‹แŒฝแŠฆ แŠ แˆˆแ‹แข

โ€‹แ‹จแˆˆแˆš-แŠ แˆˆแˆแŠจแ‰ฐแˆ› -แ‹ฐแŒŽแˆŽ แ‹จแˆ˜แŠ•แŒˆแ‹ต แ•แˆฎแŒ€แŠญแ‰ต แŠ แŠซแˆ แ‰ แˆ˜แˆ†แŠ‘ แ‹จแŠ แŠซแ‰ฃแ‰ขแ‹แŠ• แˆ›แŠ…แ‰ แˆจแˆฐแ‰ฅ แ‰ แˆ›แŠ…แ‰ แˆซแ‹ŠแŠ“ แŠขแŠฎแŠ–แˆšแ‹ซแ‹Š แ‰ตแˆตแˆตแˆญ แŠ แ‰ฅแ‹แ‰ถ แ‹ซแŒ แŠ“แŠญแˆซแˆแข

โ€‹แ‹จแŠขแ‰ตแ‹ฎแŒตแ‹ซ แˆ˜แŠ•แŒˆแ‹ถแ‰ฝ แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แ‹ญแˆ… แ‹จแŒแŠ•แ‰ฃแ‰ณ แ•แˆฎแŒ€แŠญแ‰ต แ‰ แ‰ฐแ‹ซแ‹˜แˆˆแ‰ต แ‹จแŒŠแ‹œ แˆฐแˆŒแ‹ณแŠ“ แŒฅแˆซแ‰ต แŠฅแŠ•แ‹ฒแŒ แŠ“แ‰€แ‰… แ‹จแˆšแˆ˜แˆˆแŠจแ‰ณแ‰ธแ‹ แ‹จแŒแ‹ฐแˆซแˆแฃ แ‹จแŠญแˆแˆแฃ แ‹จแ‹žแŠ• แŠฅแŠ“ แ‹จแ‹ˆแˆจแ‹ณ แˆ˜แ‹‹แ‰…แˆฎแ‰ฝ แŠฅแŠ•แ‹ฒแˆแˆ แ‹จแŠ แŠซแ‰ฃแ‰ขแ‹ แˆ›แŠ…แ‰ แˆจแˆฐแ‰ฅ แŠ แˆตแˆแˆ‹แŒŠแ‹แŠ• แ‹ตแŒ‹แแŠ“ แ‰ตแ‰ฅแ‰ฅแˆญ แŠฅแŠ•แ‹ฒแ‹ซแ‹ฐแˆญแŒ‰ แŒฅแˆช แŠ แ‰…แˆญแ‰งแˆแข

Via Ethio Con

@etconp
โค4๐Ÿ‘3๐Ÿฅฐ2
๐Ÿ—๏ธ TYPES OF BEAMS IN CIVIL ENGINEERING

Beams carry loads and transfer them to columns, walls, or other supports.

๐Ÿ”น 1. Simply Supported Beam: Supported at both ends; commonly used in bridges and floors.

๐Ÿ”น 2. Cantilever Beam: Fixed at one end and free at the other; used in balconies and canopies.

๐Ÿ”น 3. Fixed Beam: Both ends are restrained against rotation; provides greater stiffness.

๐Ÿ”น 4. Continuous Beam: Extends over three or more supports; commonly used in buildings and bridges.

โœ… Engineering Note: Beam design must consider bending, shear, deflection, loading, and applicable design codes.
๐Ÿ“š

@ETCONP
โค5๐Ÿ‘2
๐Ÿ—๏ธ แˆˆแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แŠฉแ‰ฃแŠ•แ‹ซแ‹Žแ‰ฝ แŠฅแŠ“ แˆˆแŒฅแ‰ƒแ‰…แŠ• แ‹จแ‰ขแ‹แАแˆต แ‰ฃแˆˆแ‰คแ‰ถแ‰ฝ แˆแ‹ฉ แ‹จแˆ›แŠ”แŒ…แˆ˜แŠ•แ‰ต แˆฒแˆตแ‰ฐแˆ แŠ แ‹˜แŒ‹แŒ€แŠ•แˆ‹แ‰น๐Ÿ“Š

โœ… แ‹จแˆฐแˆซแ‰ฐแŠžแ‰ฝ แŠฅแŠ“ แ‹จแ‹ฐแˆ˜แ‹ˆแ‹ แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ
โœ… แ‹จแ•แˆฎแŒ€แŠญแ‰ต แ‹ˆแŒชแŠ“ แ‹จแ‹แ‹ญแŠ“แŠ•แˆต แ‰แŒฅแŒฅแˆญ
โœ… แ‹จแˆ‚แˆณแ‰ฅแฃ แ‹จแŒแ‹ขแŠ“ แ‹จแˆฝแ‹ซแŒญ แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ
โœ… แŠ แ‹แ‰ถแˆ›แ‰ฒแŠญ แˆตแˆŒแ‰ตแŠ“ แ‹จแˆชแ–แˆญแ‰ต แˆ›แ‹˜แŒ‹แŒƒ แŠจแˆŒแˆŽแ‰ฝ แŒ แ‰ƒแˆš แŠแ‰ธแˆฎแ‰ฝ แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แˆ›แˆตแ‰ฐแŠซแŠจแˆ แ‹จแˆšแ‰ปแˆ Excel แˆฒแˆตแ‰ฐแˆ แАแ‹

๐Ÿ”ฅ แˆแˆ‰แŠ•แˆ แ‹จแ‹ตแˆญแŒ…แ‰ตแ‹ŽแŠ• แˆฅแˆซแ‹Žแ‰ฝ แ‰ แŠ แŠ•แ‹ต แ‰ฆแ‰ณ แ‰ แ‰€แˆ‹แˆ‰ แ‹ซแˆตแ‰ฐแ‹ณแ‹ตแˆฉ!

๐ŸŒŸแ‹ญแˆ…แŠ•แŠ• แ‹ตแŠ•แ‰… แˆฒแˆตแ‰ฐแˆ แ‰  50% แ‰…แŠ“แˆฝ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
๐Ÿ‘3โค1๐Ÿฅฐ1
โ›‘๏ธ SAFETY HELMET COLOURS IN CONSTRUCTION

๐Ÿ”น White: Engineers, managers, supervisors, and visitors.

๐Ÿ”น Blue: Electricians, plumbers, and technical workers.

๐Ÿ”น Red: Firefighters and emergency response teams.

๐Ÿ”น Green: Safety, environmental, or first-aid personnel.

๐Ÿ”น Gray: Visitors and trainees.

๐Ÿ”น Yellow: General construction workers and labourers.

๐Ÿ”น Brown: Welders and workers performing hot work.

โš ๏ธ Note: Helmet colour codes vary by country and construction site. Always follow site-specific safety rules.

@ETCONP
๐Ÿฅฐ4โค2
๐Ÿ“ CONSTRUCTION CALCULATION: HOW TO CALCULATE CONCRETE VOLUME

Concrete volume calculations are essential for estimating material requirements, preparing BOQs, planning concrete orders, and controlling construction costs.

๐Ÿ”น Formula for a Rectangular Element

Concrete Volume = Length ร— Width ร— Thickness or Height
The dimensions must be expressed in metres to obtain the volume in cubic metres (mยณ).

๐Ÿ—๏ธ Example: Calculate the Volume of a Slab

Given:-

Length = 5 m
Width = 4 m
Thickness = 150 mm = 0.15 m
Calculation:
Volume = 5 ร— 4 ร— 0.15

Required geometric volume = 3.00 mยณ

๐Ÿ”น Example: Calculate the Volume of a Beam

Given:

Length = 6 m
Width = 0.25 m
Height = 0.40 m
Volume = 6 ร— 0.25 ร— 0.40

Required geometric volume = 0.60 mยณ

๐Ÿ“Œ Important Considerations

โœ… Convert millimetres to metres before calculating.

โœ… Account for openings and intersecting elements where applicable.

โœ… Calculate each element separately when dimensions differ.

โœ… Consider ordering allowances according to site conditions and project procedures.

@ETCONP
๐Ÿ‘6โค3
๐Ÿ—๏ธ แ‹จ แŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆตแˆซ แ‹แˆ แ‹ฐแ‰ฅแ‹ณแ‰คแ‹Žแ‰ฝ แ‹ญแˆแˆแŒ‹แˆ‰?

๐Ÿ“‘120+ แˆˆแˆตแˆซ แ‹แŒแŒ แ‹จแˆ†แŠ‘ แˆตแ‰ณแŠ•แ‹ณแˆญแ‹ต แ‹ฐแ‰ฅแ‹ณแ‰คแ‹Žแ‰ฝ
โœ… แˆˆแŠฎแŠ•แ‰ตแˆซแŠญแ‰ฐแˆฎแ‰ฝแˆ แˆ†แА แˆˆแŠ แˆ›แŠซแˆชแ‹Žแ‰ฝ แ‰ฐแ‹˜แŒ‹แŒ…แ‰ถ แ‹จแ‰€แˆจแ‰ 
โœ… แŠจ PPA 2025 แŠฅแŠ“ FIDIC Red Book 2017 แˆ…แŒŽแ‰ฝ แŒ‹แˆญ แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แ‹จแ‰ฐแŒฃแŒฃแˆ˜
โœ… แ‰  Microsoft Word แ‰ แ‰€แˆ‹แˆ‰ แŠคแ‹ฒแ‰ต แ‹จแˆšแ‹ฐแˆจแŒ (Editable) แŠจแ‰ฐแŒจแˆ›แˆช PDF แ‹แ‹ญแˆŽแ‰ฝ

๐Ÿš€ แ‹จแŠฎแŠ•แ‰ตแˆซแ‰ต แŠ แˆตแ‰ฐแ‹ณแ‹ฐแˆญ แˆตแˆซแ‹ŽแŠ• แ‰€แˆ‹แˆแŠ“ แ•แˆฎแŒแˆฝแŠ“แˆ แˆˆแˆ›แ‹ตแˆจแŒ แ‹แ‹ญแˆŽแ‰น แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑแ‰ต๐Ÿ‘‡

https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
โค3๐Ÿฅฐ1
๐Ÿ—๏ธ CONCRETE MIX RATIO 1:2:3

๐Ÿ”น Mix Proportion (by volume):

โ€ข 1 part Cement

โ€ข 2 parts Sand

โ€ข 3 parts Gravel

๐Ÿ”น Approximate Materials for 1 mยณ of Concrete:

โ€ข Cement: 7โ€“7.5 bags (50 kg each)

โ€ข Sand: 0.51 mยณ

โ€ข Gravel: 0.77 mยณ

๐Ÿ”น Key Quality Tips:

โœ… Use clean sand, gravel, and water.

โœ… Maintain the correct water-cement ratio.

โœ… Compact and cure concrete properly.

โœ… Use an approved mix design for structural work.

โš ๏ธ Note: A 1:2:3 nominal mix does not automatically guarantee M20 strength. Use a verified mix design and applicable standards for structural concrete.

๐Ÿ“Œ @ETCONP
โค5๐Ÿฅฐ2
๐Ÿ—๏ธ ISOLATED FOOTING vs. RAFT FOUNDATION

Foundations transfer structural loads safely to the supporting ground. The appropriate foundation depends on soil conditions, building loads, settlement requirements, groundwater, and engineering design.

๐Ÿ”น 1. Isolated Footing

An isolated footing generally supports one column and spreads its load over a larger area of soil.

Common characteristics:

#Often used where soil can safely support the applied loads.

#Can be square, rectangular, or another designed shape.

#May be economical when columns are sufficiently separated and soil conditions are suitable.

๐Ÿ”น 2. Raft Foundation

A raft foundation is a large foundation slab that supports several columns and/or walls over a broad area.

Common characteristics:

#Distributes loads across a larger foundation area.

#May be considered where individual footings would cover a substantial portion of the building footprint.

#Can help manage differential settlement when properly designed.

Requires careful consideration of bending, punching shear, soil pressure, and groundwater conditions.

๐Ÿ“Š Comparison

Isolated footing: Supports an individual column.

Raft foundation: Supports multiple structural elements across a larger area.

โš ๏ธ Engineering Tip: A raft foundation is not automatically better or safer. The selection must be supported by geotechnical information and structural calculations.

@ETCONP
โค4
๐Ÿ“Š RATE ANALYSIS IN CONSTRUCTION โ€” A PRACTICAL GUIDE

Rate analysis is the process of determining the estimated cost of completing one unit of a construction activity.

It helps contractors prepare estimates, evaluate rates, develop tender prices, and understand where project costs come from.

๐Ÿ”น Main Components of Rate Analysis

1๏ธโƒฃ Materials: Cement, sand, aggregates, reinforcement, blocks, and other materials required for the work.

2๏ธโƒฃ Labour: Wages and associated costs for workers involved in the activity.

3๏ธโƒฃ Equipment: Machinery, tools, operation, and equipment-related costs.

4๏ธโƒฃ Transportation: Delivery and handling costs where applicable.

5๏ธโƒฃ Overheads: Relevant site and company operating expenses.

6๏ธโƒฃ Profit and Other Allowances: Included according to the estimating method and project requirements.

๐Ÿ—๏ธ Example: Concrete Work

For a concrete activity, the estimator considers the specified concrete grade or mix, material quantities, labour productivity, equipment, transport, and applicable overheads.

The total estimated cost is then divided by the quantity of work to establish a rate per unit.

๐Ÿ“Œ Why Is Rate Analysis Important?

โœ… Supports realistic cost estimates.
โœ… Helps prepare competitive tenders.
โœ… Identifies major cost components.
โœ… Supports budget planning and cost control.
โœ… Helps compare alternatives.

โš ๏ธ Actual rates depend on location, date, specifications, productivity, supplier prices, and contract conditions.

@ETCONP
โค3๐Ÿฅฐ1
#Advertisement
๐Ÿ“š๐Ÿ”ฅ แŠฅแŠ•แŒแˆŠแ‹แŠ›แŠ• แ‰ แŠ แˆ›แˆญแŠ› แ‹ญแˆ›แˆฉ! ๐Ÿ‡ฌ๐Ÿ‡ง๐Ÿ‡ช๐Ÿ‡น
๐Ÿ’ก แŠฅแŠ•แŒแˆŠแ‹แŠ› แˆ˜แˆ›แˆญ แ‹ญแˆแˆแŒ‹แˆ‰?

แŠฅแŠ•แŒแˆŠแ‹แŠ›แŠ• แˆˆแˆ˜แˆ›แˆญ แ‰ฐแ‰ธแŒแˆจแ‹‹แˆ? แ‹จแŠฅแŠ•แŒแˆŠแ‹แŠ› แ‰ƒแˆ‹แ‰ตแŠ•แŠ“ แŠ แˆจแแ‰ฐ แАแŒˆแˆฎแ‰ฝแŠ• แ‰ แ‰€แˆ‹แˆ‰ แˆ˜แˆจแ‹ณแ‰ต แ‹ญแˆแˆแŒ‹แˆ‰?
๐ŸŽฏ แˆ˜แแ‰ตแˆ”แ‹ แŠฅแ‹šแˆ… แŠ แˆˆ!
๐Ÿ“– แŠจแŠฅแŠ•แŒแˆŠแ‹แŠ› แ‹ˆแ‹ฐ แŠ แˆ›แˆญแŠ› แ‹จแ‰ฐแ‹˜แŒ‹แŒ€แ‹แŠ• แ‹ญแˆ…แŠ• แŠข-แˆ˜แŒฝแˆแ แ‹ญแŒ แ‰€แˆ™แข
โœ… แŠฅแŠ•แŒแˆŠแ‹แŠ›แŠ• แ‰ แŠ แˆ›แˆญแŠ› แˆˆแˆ˜แˆจแ‹ณแ‰ต แ‹ญแˆจแ‹ณแ‹Žแ‰ณแˆแข
โœ… แŠ แ‹ณแ‹ฒแˆต แ‹จแŠฅแŠ•แŒแˆŠแ‹แŠ› แ‰ƒแˆ‹แ‰ตแŠ• แˆˆแˆ˜แˆ›แˆญ แ‹ซแŒแ‹›แˆแข
โœ… แ‹จแ‰‹แŠ•แ‰‹ แŠฅแ‹แ‰€แ‰ตแ‹ŽแŠ• แˆˆแˆ›แˆณแ‹ฐแŒ แ‹ญแˆจแ‹ณแˆแข
โœ… แ‰ แˆตแˆแŠญแ‹Ž แˆ‹แ‹ญ แ‰ แ‰€แˆ‹แˆ‰ แˆ›แŠ•แ‰ แ‰ฅ แ‹ญแ‰ฝแˆ‹แˆ‰แข
๐Ÿš€ แ‹›แˆฌ แ‹ญแŒ€แˆแˆฉ! แАแŒˆ แ‹จแ‰ฐแˆปแˆˆ แ‹จแ‰‹แŠ•แ‰‹ แŠฅแ‹แ‰€แ‰ต แ‹ญแŠ‘แˆญแ‹Žแ‰ต!
๐Ÿ“ฉ แ‹จแŠฅแˆญแˆตแ‹ŽแŠ• แ‰…แŒ‚ แˆˆแˆ›แŒแŠ˜แ‰ต แŠ แˆแŠ‘แŠ‘ แ‹ซแŒแŠ™แŠ•๐Ÿ‘‡
https://ye-buna.com/ethiowisdom?ref=product_detail&product=6a909035df904_matoro27
โค2๐Ÿฅฐ1
๐Ÿ“ CONSTRUCTION CALCULATION

๐ŸšฅHOW TO CALCULATE CONCRETE VOLUME


Concrete volume calculations are essential for estimating material requirements, preparing BOQs, planning concrete orders, and controlling construction costs.

๐Ÿ”น Formula for a Rectangular Element

Concrete Volume = Length ร— Width ร— Thickness or Height
The dimensions must be expressed in metres to obtain the volume in cubic metres (mยณ).

๐Ÿ—๏ธ Example: Calculate the Volume of a Slab

Given:

Length = 5 m
Width = 4 m
Thickness = 150 mm = 0.15 m
Calculation:
Volume = 5 ร— 4 ร— 0.15

Required geometric volume = 3.00 mยณ

๐Ÿ”น Example: Calculate the Volume of a Beam

Given:

Length = 6 m
Width = 0.25 m
Height = 0.40 m
Volume = 6 ร— 0.25 ร— 0.40

Required geometric volume = 0.60 mยณ

๐Ÿ“Œ Important Considerations

โœ… Convert millimetres to metres before calculating.

โœ… Account for openings and intersecting elements where applicable.

โœ… Calculate each element separately when dimensions differ.

โœ… Consider ordering allowances according to site conditions and project procedures.

@ETCONP
โค5
๐Ÿ—๏ธ แŠ แˆแŠ“แ‹Š แ‹จแŠฎแŠ•แˆตแ‰ตแˆซแŠญแˆฝแŠ• แˆ›แ‰ดแˆชแ‹ซแˆ แŒˆแ‰ แ‹ซ
๐Ÿ“… แ‰€แŠ•แฆ 07/02/2019
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
โ›“ แˆฐแ‰ฅ แˆตแ‰ตแˆซแŠญแ‰ธแˆญ แˆ›แ‰ดแˆชแ‹ซแˆ แ‹‹แŒ‹

๐Ÿ“Œ แ‰ฅแˆจแ‰ต
โ€ข แ‰ฃแˆˆ 8 โ€” 900.00
โ€ข แ‰ฃแˆˆ 10 โ€” 1,406.00
โ€ข แ‰ฃแˆˆ 12 โ€” 2,025.00
โ€ข แ‰ฃแˆˆ 14 โ€” 2,758.00
โ€ข แ‰ฃแˆˆ 16 โ€” 3,600.00
โ€ข แ‰ฃแˆˆ 20 โ€” 5,633.00
โ€ข แ‰ฃแˆˆ 24 โ€” 8,105.00
๐Ÿงต แ‹จแˆตแ‰ณแ‹ แˆฝแ‰ฆ (แ‰ แŠชแˆŽ)
โ€ข 1.5 โ€” 350.00
โ€ข 2.5 โ€” 350.00
๐Ÿ“Œ แˆšแˆตแˆ›แˆญ (แ‰ แŠชแˆŽ)
โ€ข แˆ†แˆซแ‹ญแ‹˜แŠ• แŠ แŠจแ‹แ‹แ‹ญ โ€” 270.00 - 360.00
โ€ข แŠ แ–แˆŽ แ‰ธแˆญแ‰ปแˆช โ€” 340.00 - 400.00
โ€ข แŠ แ–แˆŽ แŠ แŠจแ‹แ‹แ‹ญ (3-4) โ€” 248.80
โ€ข แŠ แ–แˆŽ แŠ แŠจแ‹แ‹แ‹ญ (5-15) โ€” 228.80
๐Ÿ  แ‰†แˆญแ‰†แˆฎ (DH Geda)
โ€ข G-28 โ€” 2,480.00
โ€ข 30 แ‰แŒฅแˆญ โ€” 1,980.00
โ€ข 32 แ‰แŒฅแˆญ โ€” 1,530.00
โ€ข 35 แ‰แŒฅแˆญ โ€” 1,170.00
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿšฐ แ“แ‹ญแ–แ‰ฝ
๐Ÿ”น PPR (Rack)
โ€ข แ‰ฃแˆˆ 25 โ€” 950.00
โ€ข 32 โ€” 1,800.00
โ€ข 40 โ€” 2,500.00
โ€ข 50 โ€” 3,500.00
โ€ข 63 โ€” 5,800.00
โ€ข 75 โ€” 12,500.00
โ€ข 90 โ€” โ€”
โ€ข 110 โ€” โ€”
๐Ÿ”น PPR (Roxi)
โ€ข แ‰ฃแˆˆ 25 โ€” 1,450.00
โ€ข 32 โ€” 2,500.00
โ€ข 40 โ€” 4,500.00
โ€ข 50 โ€” 7,000.00
โ€ข 63 โ€” 8,500.00
โ€ข 75 โ€” 14,000.00
โ€ข 90 โ€” 25,000.00
โ€ข 110 โ€” 28,000.00
๐Ÿ”น HDPE
โ€ข 20 โ€” 80.00
โ€ข 25 โ€” 160.00
โ€ข 32 โ€” 235.00
โ€ข 40 โ€” 385.00
โ€ข 50 โ€” 506.00
โ€ข 63 โ€” 740.00
โ€ข 75 โ€” โ€”
โ€ข 90 โ€” โ€”
โ€ข 110 โ€” โ€”
๐Ÿ”น U-PVC (PN 4)
โ€ข 50แˆš.แˆœ โ€” 1,000.00
โ€ข 75แˆš.แˆœ โ€” 1,550.00
โ€ข 110แˆš.แˆœ โ€” 2,300.00
โ€ข 160แˆš.แˆœ โ€” 4,800.00
โ€ข 200แˆš.แˆœ โ€” 7,500.00
๐Ÿ”น U-PVC (PN 6)
โ€ข 50แˆš.แˆœ โ€” 1,300.00
โ€ข 75แˆš.แˆœ โ€” 2,000.00
โ€ข 110แˆš.แˆœ โ€” 3,200.00
โ€ข 125แˆš.แˆœ โ€” 5,800.00
โ€ข 160แˆš.แˆœ โ€” 7,000.00
โ€ข 200แˆš.แˆœ โ€” โ€”
โ€ข 250แˆš.แˆœ โ€” 25,000.00
๐Ÿ”น U-PVC (PN 10)
โ€ข 90แˆš.แˆœ โ€” 6,700.00
โ€ข 110แˆš.แˆœ โ€” 7,000.00
โ€ข 160แˆš.แˆœ โ€” 15,000.00
โ€ข 200แˆš.แˆœ โ€” 21,000.00
โ€ข 250แˆš.แˆœ โ€” โ€”
โ€ข 380แˆš.แˆœ โ€” 35,000.00
๐Ÿ”น U-PVC (PN 16)
โ€ข 20แˆš.แˆœ โ€” 2,200.00
โ€ข 25แˆš.แˆœ โ€” 2,800.00
โ€ข 50แˆš.แˆœ โ€” 3,500.00
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
โšก แŠคแˆŒแŠญแ‰ตแˆชแŠญ แŠฅแ‰ƒแ‹Žแ‰ฝ
๐ŸŒ€ แŒ‰แˆฎแˆฎ แŠฎแŠ•แ‹ตแ‹ฉแ‰ต (แ‰ แˆœแ‰ตแˆญ)
โ€ข แ‰ฃแˆˆ 13 โ€” 1,500.00
โ€ข แ‰ฃแˆˆ 16 โ€” 2,000.00
โ€ข 19 โ€” 2,400.00
โ€ข 20 โ€” 2,500.00
โ€ข 25 โ€” 2,500.00
๐Ÿ”Œ แŠ–แˆญแˆ›แˆ แŠฎแŠ•แ‹ตแ‹ฉแ‰ต (แ‰ แˆœแ‰ตแˆญ)
โ€ข แ‰ฃแˆˆ 16 โ€” 80.00
โ€ข 19 โ€” 110.00
โ€ข 25 โ€” 130.00
๐Ÿ’ก แ‹‹แ‹จแˆญ แŒฅแ‰…แˆ (Wire Rolls)
โ–ช๏ธ แ‹ฉแˆฎ แŠฌแ‰ฅแˆ
โ€ข 1.5 โ€” 8,800.00
โ€ข 2.5 โ€” 13,200.00
โ€ข 4.0 โ€” 22,500.00
โ–ช๏ธ แ‹ฉ.แŠคแ (UF)
โ€ข 1.5 โ€” 7,800.00
โ€ข 2.5 โ€” 10,300.00
โ€ข 4.0 โ€” 18,700.00
โ–ช๏ธ แ‰ขแˆœแ‰ต (Bmet)
โ€ข 1.5 โ€” 8,600.00
โ€ข 2.5 โ€” 13,000.00
โ€ข 4.0 โ€” 21,900.00
โ–ช๏ธ Blue Nile
โ€ข 1.5 โ€” 7,000.00
โ€ข 2.5 โ€” 7,250.00
โ€ข 4.0 โ€” 10,800.00
โ–ช๏ธ Addis Cable
โ€ข 1.5 โ€” 7,500.00
โ€ข 2.5 โ€” 12,000.00
โ€ข 4.0 โ€” 19,300.00
โ–ช๏ธ Rhino
โ€ข 1.5 โ€” 7,500.00
โ€ข 2.5 โ€” 12,600.00
โ€ข 4.0 โ€” 18,700.00
๐ŸŽ› แ‰ฅแˆฌแŠจแˆญ แ‰ฆแˆญแ‹ต
โ€ข แ‰ฃแˆˆ 4 โ€” 600.00
โ€ข แ‰ฃแˆˆ 6 โ€” 750.00
โ€ข แ‰ฃแˆˆ 8 โ€” โ€”
โ€ข แ‰ฃแˆˆ 12 โ€” 1,500.00
โ€ข แ‰ฃแˆˆ 24 โ€” 2,100.00
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿงฑ แˆฒแˆšแŠ•แ‰ถแฃ แŠ แˆธแ‹‹แฃ แ‹ตแŠ•แŒ‹แ‹ญ แŠฅแŠ“ แŒ แŒ แˆญ
๐Ÿ”น แˆฒแˆšแŠ•แ‰ถ
โ€ข แ‹ณแŠ•แŒŽแ‰ด (PPC/OPC) โ€” โ€”
โ€ข แŠ“แˆฝแŠ“แˆ PPC โ€” 1,740.00
โ€ข แŠ“แˆฝแŠ“แˆ OPC โ€” โ€”
๐Ÿ– แŠ แˆธแ‹‹
โ€ข 16 แˆœแ‰ตแˆญ แŠฉแ‰ฅ โ€” 120,000.00
โ€ข แ‰ แˆœแ‰ตแˆญ แŠฉแ‰ฅ โ€” 4,000.00 - 8,000.00
โ€ข แ‰ แˆณแŒฅแŠ• โ€” 1,000.00
โ›ฐ แ‹ตแŠ•แŒ‹แ‹ญ
โ€ข 16 แˆœแ‰ตแˆญ แŠฉแ‰ฅ โ€” 36,000.00
๐Ÿชจ แŒ แŒ แˆญ
โ€ข 16 แˆœแ‰ตแˆญ แŠฉแ‰ฅ โ€” 95,000.00
โ€ข แ‰ แˆœแ‰ตแˆญ แŠฉแ‰ฅ โ€” 5,000.00
โ€ข แ‰ แˆณแŒฅแŠ• โ€” 700.00
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”
๐Ÿงฑ แ‰ฅแˆŽแŠฌแ‰ต
๐Ÿ”น แ‰ฅแˆŽแŠฌแ‰ต แŠญแˆ‹แˆต
โ€ข แŠญแˆ‹แˆต A โ€” 126.00 - 200.00
โ€ข แŠญแˆ‹แˆต B โ€” 109.00 - 180.00
โ€ข แŠญแˆ‹แˆต C โ€” 138.00 - 165.00
๐Ÿ”น แ‰ฅแˆŽแŠฌแ‰ต แˆŽแŠซแˆ
โ€ข แ‰ฃแˆˆ 20 โ€” 89.00
โ€ข แ‰ฃแˆˆ 15 โ€” 75.00
โ€ข แ‰ฃแˆˆ 10 โ€” 63.00
โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”โ”

๐Ÿ‘‰ แŠ แ‹ฒแˆต แ‰ฃแˆแŠ• แ‹จแŒˆแ‰ แ‹ซ แ‹‹แŒ‹ แ‹จแ‰ฐแˆฐแˆซ แ‹จแˆ…แŠ•แƒ Cost BreakDown Analysis แŠฅแŠ“ BOQ แŠจแˆแˆˆแŒ‰ แŠจแ‰ณแ‰ฝ แ‰ฃแˆˆแ‹ แˆŠแŠ•แŠญ แ‹ซแ‹แˆญแ‹ฑ๐Ÿ‘‡
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
โค9๐Ÿ‘3๐Ÿฅฐ1