๐๏ธ REINFORCEMENT QUANTITY CALCULATION FOR A FOUNDATION
โโโโโโโโโโโโโโโโโโโโ
๐ GIVEN DATA
Foundation Length (L) = 15 m
Foundation Width (B) = 8 m
Number of Longitudinal Bars = 4
Stirrup Size = 15 cm ร 15 cm
Stirrup Spacing (S) = 15 cm = 0.15 m
Hook Length = 7.5 cm = 0.075 m
Standard Bar Length = 12 m
Wastage Allowance = 10%
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 1: CALCULATION OF FOUNDATION PERIMETER
Formula:
P = 2 ร (L + B)
Substitute the values:
P = 2 ร (15 + 8)
P = 2 ร 23
โ Total Perimeter = 46 m
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 2: CALCULATION OF LONGITUDINAL REINFORCEMENT
Number of Longitudinal Bars = 4
Formula:
Total Length = Perimeter ร Number of Bars
Total Length = 46 ร 4
โ Total Length = 184 m
๐ Number of 12 m Bars:
Number of Bars = Total Length รท Standard Bar Length
Number of Bars = 184 รท 12
Number of Bars = 15.33 โ 16 bars
Including 10% Wastage:
Required Length = 184 ร 1.10
Required Length = 202.40 m
Number of Bars = 202.40 รท 12
Number of Bars = 16.87 โ 17 bars
โ Provide 17 bars of 12 m, subject to proper lap lengths, anchorage, cutting arrangements, and detailing.
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 3: CALCULATION OF NUMBER OF STIRRUPS
Given:
Perimeter = 46 m
Spacing = 0.15 m
Formula:
Number of Spaces = Perimeter รท Spacing
Number of Spaces = 46 รท 0.15
Number of Spaces = 306.67
For a closed perimeter, the number of stirrups depends on the actual layout and spacing arrangement.
โ Preliminary Estimate = 307 stirrups
Note: Confirm the final number from the reinforcement layout and required spacing at corners and along each side.
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 4: CALCULATION OF LENGTH OF ONE STIRRUP
Given:
Stirrup Length = 15 cm
Stirrup Width = 15 cm
Hook Length = 7.5 cm at each end
Formula:
Length of Stirrup = 2 ร (Length + Width) + 2 ร Hook Length
Substitute the values:
Length = 2 ร (15 + 15) + 2 ร 7.5
Length = 60 + 15
Length = 75 cm
Convert to meters:
Length = 75 รท 100
โ Length of One Stirrup = 0.75 m
Note: This is a simplified geometric calculation. Actual cutting length must account for bend geometry, concrete cover, and the applicable reinforcement detailing requirements.
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 5: TOTAL LENGTH OF STIRRUPS
Formula:
Total Length = Number of Stirrups ร Length of One Stirrup
Total Length = 307 ร 0.75
โ Total Length = 230.25 m
Number of 12 m Bars:
Number of Bars = 230.25 รท 12
Number of Bars = 19.19 โ 20 bars
โ Provide approximately 20 bars of 12 m, before considering additional cutting waste and the final stirrup cutting schedule.
โโโโโโโโโโโโโโโโโโโโ
๐ FINAL SUMMARY
โ Foundation Perimeter = 46 m
โ Longitudinal Reinforcement = 184 m
โ Longitudinal Bars = Approximately 17 bars of 12 m, including 10% wastage
โ Estimated Number of Stirrups = 307
โ Length of One Stirrup = 0.75 m
โ Total Stirrup Length = 230.25 m
โ Stirrup Reinforcement = Approximately 20 bars of 12 m
โโโโโโโโโโโโโโโโโโโโ
โ ๏ธ IMPORTANT ENGINEERING NOTE
These calculations are preliminary estimates. Actual reinforcement quantities depend on the structural drawings, concrete cover, bar diameter, lap lengths, anchorage, bending details, and reinforcement spacing requirements.
Follow the approved structural drawings and applicable design standards before ordering or placing reinforcement.
@ETCONp
โโโโโโโโโโโโโโโโโโโโ
๐ GIVEN DATA
Foundation Length (L) = 15 m
Foundation Width (B) = 8 m
Number of Longitudinal Bars = 4
Stirrup Size = 15 cm ร 15 cm
Stirrup Spacing (S) = 15 cm = 0.15 m
Hook Length = 7.5 cm = 0.075 m
Standard Bar Length = 12 m
Wastage Allowance = 10%
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 1: CALCULATION OF FOUNDATION PERIMETER
Formula:
P = 2 ร (L + B)
Substitute the values:
P = 2 ร (15 + 8)
P = 2 ร 23
โ Total Perimeter = 46 m
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 2: CALCULATION OF LONGITUDINAL REINFORCEMENT
Number of Longitudinal Bars = 4
Formula:
Total Length = Perimeter ร Number of Bars
Total Length = 46 ร 4
โ Total Length = 184 m
๐ Number of 12 m Bars:
Number of Bars = Total Length รท Standard Bar Length
Number of Bars = 184 รท 12
Number of Bars = 15.33 โ 16 bars
Including 10% Wastage:
Required Length = 184 ร 1.10
Required Length = 202.40 m
Number of Bars = 202.40 รท 12
Number of Bars = 16.87 โ 17 bars
โ Provide 17 bars of 12 m, subject to proper lap lengths, anchorage, cutting arrangements, and detailing.
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 3: CALCULATION OF NUMBER OF STIRRUPS
Given:
Perimeter = 46 m
Spacing = 0.15 m
Formula:
Number of Spaces = Perimeter รท Spacing
Number of Spaces = 46 รท 0.15
Number of Spaces = 306.67
For a closed perimeter, the number of stirrups depends on the actual layout and spacing arrangement.
โ Preliminary Estimate = 307 stirrups
Note: Confirm the final number from the reinforcement layout and required spacing at corners and along each side.
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 4: CALCULATION OF LENGTH OF ONE STIRRUP
Given:
Stirrup Length = 15 cm
Stirrup Width = 15 cm
Hook Length = 7.5 cm at each end
Formula:
Length of Stirrup = 2 ร (Length + Width) + 2 ร Hook Length
Substitute the values:
Length = 2 ร (15 + 15) + 2 ร 7.5
Length = 60 + 15
Length = 75 cm
Convert to meters:
Length = 75 รท 100
โ Length of One Stirrup = 0.75 m
Note: This is a simplified geometric calculation. Actual cutting length must account for bend geometry, concrete cover, and the applicable reinforcement detailing requirements.
โโโโโโโโโโโโโโโโโโโโ
๐น STEP 5: TOTAL LENGTH OF STIRRUPS
Formula:
Total Length = Number of Stirrups ร Length of One Stirrup
Total Length = 307 ร 0.75
โ Total Length = 230.25 m
Number of 12 m Bars:
Number of Bars = 230.25 รท 12
Number of Bars = 19.19 โ 20 bars
โ Provide approximately 20 bars of 12 m, before considering additional cutting waste and the final stirrup cutting schedule.
โโโโโโโโโโโโโโโโโโโโ
๐ FINAL SUMMARY
โ Foundation Perimeter = 46 m
โ Longitudinal Reinforcement = 184 m
โ Longitudinal Bars = Approximately 17 bars of 12 m, including 10% wastage
โ Estimated Number of Stirrups = 307
โ Length of One Stirrup = 0.75 m
โ Total Stirrup Length = 230.25 m
โ Stirrup Reinforcement = Approximately 20 bars of 12 m
โโโโโโโโโโโโโโโโโโโโ
โ ๏ธ IMPORTANT ENGINEERING NOTE
These calculations are preliminary estimates. Actual reinforcement quantities depend on the structural drawings, concrete cover, bar diameter, lap lengths, anchorage, bending details, and reinforcement spacing requirements.
Follow the approved structural drawings and applicable design standards before ordering or placing reinforcement.
@ETCONp
โค4๐ฅฐ1๐1
๐The incredible anatomy of a highway retaining wall
๐ฅDive deep into the cross-section of gabion wall structures, road foundations, and backfill layers๐ทโโ๏ธ๐ ๏ธ
@ETCONP
๐ฅDive deep into the cross-section of gabion wall structures, road foundations, and backfill layers๐ทโโ๏ธ๐ ๏ธ
@ETCONP
โค3๐ฅฐ2๐1
๐๏ธ แแฎแแตแตแซแญแฝแ แฉแฃแแซแแฝ แฅแ แแฅแแ
แ แจแขแแแต แฃแแคแถแฝ แแฉ แจแแแ
แแแต แฒแตแฐแ แ แแแแแแน๐
โ แจแฐแซแฐแแฝ แฅแ แจแฐแแแ แ แตแฐแณแฐแญ
โ แจแแฎแแญแต แแชแ แจแแญแแแต แแฅแฅแญ
โ แจแแณแฅแฃ แจแแขแ แจแฝแซแญ แ แตแฐแณแฐแญ
โ แ แแถแแฒแญ แตแแตแ แจแชแแญแต แแแแ แจแแแฝ แ แแ แแธแฎแฝ แแ แ แแ แแตแฐแซแจแ แจแแปแ Excel แฒแตแฐแ แแ
๐ฅ แแแแ แจแตแญแ แตแแ แฅแซแแฝ แ แ แแต แฆแณ แ แแแ แซแตแฐแณแตแฉ!
๐แญแ แแ แตแแ แฒแตแฐแ แ 50% แ แแฝ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
โ แจแฐแซแฐแแฝ แฅแ แจแฐแแแ แ แตแฐแณแฐแญ
โ แจแแฎแแญแต แแชแ แจแแญแแแต แแฅแฅแญ
โ แจแแณแฅแฃ แจแแขแ แจแฝแซแญ แ แตแฐแณแฐแญ
โ แ แแถแแฒแญ แตแแตแ แจแชแแญแต แแแแ แจแแแฝ แ แแ แแธแฎแฝ แแ แ แแ แแตแฐแซแจแ แจแแปแ Excel แฒแตแฐแ แแ
๐ฅ แแแแ แจแตแญแ แตแแ แฅแซแแฝ แ แ แแต แฆแณ แ แแแ แซแตแฐแณแตแฉ!
๐แญแ แแ แตแแ แฒแตแฐแ แ 50% แ แแฝ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
๐ฅฐ2โค1๐1
๐๏ธ Interlocking Pavement โ Main Layers
๐น Layers (Top to Bottom):
Concrete Edge Restraint
Concrete Pavers (60โ100 mm)
Joint Sand
Bedding Sand (20โ40 mm)
Crushed Stone Base (100โ150
mm)
Sub-base (150โ300 mm)
Compacted Subgrade
โ Key Tips:
โข Compact all layers properly.
โข Ensure proper drainage (1โ2% slope).
โข Select layer thickness based on traffic load and soil conditions.
@ETCONP
๐น Layers (Top to Bottom):
Concrete Edge Restraint
Concrete Pavers (60โ100 mm)
Joint Sand
Bedding Sand (20โ40 mm)
Crushed Stone Base (100โ150
mm)
Sub-base (150โ300 mm)
Compacted Subgrade
โ Key Tips:
โข Compact all layers properly.
โข Ensure proper drainage (1โ2% slope).
โข Select layer thickness based on traffic load and soil conditions.
@ETCONP
โค4๐ฅฐ2๐1
๐ฃ๏ธ แจแแ แฒแแแถ แแฅแชแซ - แแ แแแ แจแฒแแแถ แฎแแญแชแต แแแแต แแแฃแณ แ แญแ แฐแแแจ
โ๐ แแแฃแณแ แจแแจแแแแ แต แฆแณแก แ แฅแญแ แฐแแ แธแ แแแฃ แฅแแณแฎ แแจแณ
แจแ แซแฃแขแแ แแ แ แซแแ แขแฎแแแซแ แตแตแตแญ แจแแ แแจแญ แฃแแ แแขแแฑแตแตแช แแฅแแต แ แ แญแฆแต แจแแฐแ แแญแณ แจแแแจแ แจแแ แฒแแแถ แแฅแชแซ - แแ แแแ แจแฒแแแถ แฎแแญแชแต แแแแต แจแแแฃแณ แแฎแแญแต แ แญแ แฐแแแฏแแข
โแจแแแฃแณ แฅแซแแ แจแแตแแญ แ แแญ แแฅแฐแชแซ แแตแจแญ แแญ แจแฐแแ แธแ แแแ แจแฅแแณแฎ แแจแณ แจแแฐแ แ แแซแฎแฝแฃ แจแแแญ แฝแแแแแฝแฃ แจแขแตแฎแตแซ แแแแถแฝ แ แตแฐแณแฐแญ แจแฐแฅแจ แฅแญแแ แ แซแฃแข แแฎแแญแถแฝ แแแ แแแต แฝแแแต แคแต แแแแแฝ แฅแแฒแแ แจแแ แฒแแแถ แแฅแชแซ แฐแแซแฎแฝ แฐแแแฐแแแข
โ๐ แจแแฎแแญแฑ แแ แแ แแญแแฎแฝ
โแญแแแแก 20 แชแ แแตแญ โแจแแแแต แแญแแตแก แจแฒแแแถ แฎแแญแชแต แแแแต
โแจแแ แตแแตแก แ แแ แ แแแแซแแฝ 12 แแตแญแค แ แแ แญ แ แซแฃแขแแฝ แจ8 แฅแตแจ 10 แแตแญ
โแจแฅแซ แฐแแซแญแก แแฅแญ แฎแแตแตแซแญแฝแ แฎแญแแฌแฝแ (แจแแแแฅแต แจแแแต แตแญแ แต)
โแ แแซแช แแแแฒแตแก แจแขแตแฎแตแซ แขแแ แแชแแ แฎแญแแฌแฝแ
โแจแแ แแแแซ แแแก แ แฎแแตแซแต แแ แแ แจแต แ 14 แแซแต แแตแฅ แญแ แแแแ แฐแฅแ แญแ แ แแแข
โ๐ก แจแแฎแแญแฑ แตแแแ แแญแณแแฝแก
โแแแ แฒแแแถ แแฅแชแซ แแแ แฅแฌ แแแแฝ แจแแแตแ แจแแซ แตแแแญ แฅแ แแแฐแ แ แจแแฐแ แแฅแแตแ แ แแฅแแ แแแแแ แซแตแฝแแแข
แ แแ แจแฐแ แแชแซแ แ แฐแฅแจ แฅแญแแ แจแฐแ แแฐแแแก แแฅแชแซแแฝ แจแขแแฑแตแตแช แแฅแแถแฝแ แแแ แจแฅ แตแแ แ แตแฐแแฝแฆ แ แแแข
โแจแแ-แ แแแจแฐแ -แฐแแ แจแแแแต แแฎแแญแต แ แซแ แ แแแ แจแ แซแฃแขแแ แแ แ แจแฐแฅ แ แแ แ แซแแ แขแฎแแแซแ แตแตแตแญ แ แฅแแถ แซแ แแญแซแแข
โแจแขแตแฎแตแซ แแแแถแฝ แ แตแฐแณแฐแญ แญแ แจแแแฃแณ แแฎแแญแต แ แฐแซแแแต แจแแ แฐแแณแ แฅแซแต แฅแแฒแ แแแ แจแแแแจแณแธแ แจแแฐแซแแฃ แจแญแแแฃ แจแแ แฅแ แจแแจแณ แแแ แฎแฝ แฅแแฒแแ แจแ แซแฃแขแ แแ แ แจแฐแฅ แ แตแแแแแ แตแแแ แตแฅแฅแญ แฅแแฒแซแฐแญแ แฅแช แ แ แญแงแแข
Via Ethio Con
@etconp
โ๐ แแแฃแณแ แจแแจแแแแ แต แฆแณแก แ แฅแญแ แฐแแ แธแ แแแฃ แฅแแณแฎ แแจแณ
แจแ แซแฃแขแแ แแ แ แซแแ แขแฎแแแซแ แตแตแตแญ แจแแ แแจแญ แฃแแ แแขแแฑแตแตแช แแฅแแต แ แ แญแฆแต แจแแฐแ แแญแณ แจแแแจแ แจแแ แฒแแแถ แแฅแชแซ - แแ แแแ แจแฒแแแถ แฎแแญแชแต แแแแต แจแแแฃแณ แแฎแแญแต แ แญแ แฐแแแฏแแข
โแจแแแฃแณ แฅแซแแ แจแแตแแญ แ แแญ แแฅแฐแชแซ แแตแจแญ แแญ แจแฐแแ แธแ แแแ แจแฅแแณแฎ แแจแณ แจแแฐแ แ แแซแฎแฝแฃ แจแแแญ แฝแแแแแฝแฃ แจแขแตแฎแตแซ แแแแถแฝ แ แตแฐแณแฐแญ แจแฐแฅแจ แฅแญแแ แ แซแฃแข แแฎแแญแถแฝ แแแ แแแต แฝแแแต แคแต แแแแแฝ แฅแแฒแแ แจแแ แฒแแแถ แแฅแชแซ แฐแแซแฎแฝ แฐแแแฐแแแข
โ๐ แจแแฎแแญแฑ แแ แแ แแญแแฎแฝ
โแญแแแแก 20 แชแ แแตแญ โแจแแแแต แแญแแตแก แจแฒแแแถ แฎแแญแชแต แแแแต
โแจแแ แตแแตแก แ แแ แ แแแแซแแฝ 12 แแตแญแค แ แแ แญ แ แซแฃแขแแฝ แจ8 แฅแตแจ 10 แแตแญ
โแจแฅแซ แฐแแซแญแก แแฅแญ แฎแแตแตแซแญแฝแ แฎแญแแฌแฝแ (แจแแแแฅแต แจแแแต แตแญแ แต)
โแ แแซแช แแแแฒแตแก แจแขแตแฎแตแซ แขแแ แแชแแ แฎแญแแฌแฝแ
โแจแแ แแแแซ แแแก แ แฎแแตแซแต แแ แแ แจแต แ 14 แแซแต แแตแฅ แญแ แแแแ แฐแฅแ แญแ แ แแแข
โ๐ก แจแแฎแแญแฑ แตแแแ แแญแณแแฝแก
โแแแ แฒแแแถ แแฅแชแซ แแแ แฅแฌ แแแแฝ แจแแแตแ แจแแซ แตแแแญ แฅแ แแแฐแ แ แจแแฐแ แแฅแแตแ แ แแฅแแ แแแแแ แซแตแฝแแแข
แ แแ แจแฐแ แแชแซแ แ แฐแฅแจ แฅแญแแ แจแฐแ แแฐแแแก แแฅแชแซแแฝ แจแขแแฑแตแตแช แแฅแแถแฝแ แแแ แจแฅ แตแแ แ แตแฐแแฝแฆ แ แแแข
โแจแแ-แ แแแจแฐแ -แฐแแ แจแแแแต แแฎแแญแต แ แซแ แ แแแ แจแ แซแฃแขแแ แแ แ แจแฐแฅ แ แแ แ แซแแ แขแฎแแแซแ แตแตแตแญ แ แฅแแถ แซแ แแญแซแแข
โแจแขแตแฎแตแซ แแแแถแฝ แ แตแฐแณแฐแญ แญแ แจแแแฃแณ แแฎแแญแต แ แฐแซแแแต แจแแ แฐแแณแ แฅแซแต แฅแแฒแ แแแ แจแแแแจแณแธแ แจแแฐแซแแฃ แจแญแแแฃ แจแแ แฅแ แจแแจแณ แแแ แฎแฝ แฅแแฒแแ แจแ แซแฃแขแ แแ แ แจแฐแฅ แ แตแแแแแ แตแแแ แตแฅแฅแญ แฅแแฒแซแฐแญแ แฅแช แ แ แญแงแแข
Via Ethio Con
@etconp
โค4๐3๐ฅฐ2
๐๏ธ TYPES OF BEAMS IN CIVIL ENGINEERING
Beams carry loads and transfer them to columns, walls, or other supports.
๐น 1. Simply Supported Beam: Supported at both ends; commonly used in bridges and floors.
๐น 2. Cantilever Beam: Fixed at one end and free at the other; used in balconies and canopies.
๐น 3. Fixed Beam: Both ends are restrained against rotation; provides greater stiffness.
๐น 4. Continuous Beam: Extends over three or more supports; commonly used in buildings and bridges.
โ Engineering Note: Beam design must consider bending, shear, deflection, loading, and applicable design codes.
๐
@ETCONP
Beams carry loads and transfer them to columns, walls, or other supports.
๐น 1. Simply Supported Beam: Supported at both ends; commonly used in bridges and floors.
๐น 2. Cantilever Beam: Fixed at one end and free at the other; used in balconies and canopies.
๐น 3. Fixed Beam: Both ends are restrained against rotation; provides greater stiffness.
๐น 4. Continuous Beam: Extends over three or more supports; commonly used in buildings and bridges.
โ Engineering Note: Beam design must consider bending, shear, deflection, loading, and applicable design codes.
๐
@ETCONP
โค5๐2
๐๏ธ แแฎแแตแตแซแญแฝแ แฉแฃแแซแแฝ แฅแ แแฅแแ
แ แจแขแแแต แฃแแคแถแฝ แแฉ แจแแแ
แแแต แฒแตแฐแ แ แแแแแแน๐
โ แจแฐแซแฐแแฝ แฅแ แจแฐแแแ แ แตแฐแณแฐแญ
โ แจแแฎแแญแต แแชแ แจแแญแแแต แแฅแฅแญ
โ แจแแณแฅแฃ แจแแขแ แจแฝแซแญ แ แตแฐแณแฐแญ
โ แ แแถแแฒแญ แตแแตแ แจแชแแญแต แแแแ แจแแแฝ แ แแ แแธแฎแฝ แแ แ แแ แแตแฐแซแจแ แจแแปแ Excel แฒแตแฐแ แแ
๐ฅ แแแแ แจแตแญแ แตแแ แฅแซแแฝ แ แ แแต แฆแณ แ แแแ แซแตแฐแณแตแฉ!
๐แญแ แแ แตแแ แฒแตแฐแ แ 50% แ แแฝ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
โ แจแฐแซแฐแแฝ แฅแ แจแฐแแแ แ แตแฐแณแฐแญ
โ แจแแฎแแญแต แแชแ แจแแญแแแต แแฅแฅแญ
โ แจแแณแฅแฃ แจแแขแ แจแฝแซแญ แ แตแฐแณแฐแญ
โ แ แแถแแฒแญ แตแแตแ แจแชแแญแต แแแแ แจแแแฝ แ แแ แแธแฎแฝ แแ แ แแ แแตแฐแซแจแ แจแแปแ Excel แฒแตแฐแ แแ
๐ฅ แแแแ แจแตแญแ แตแแ แฅแซแแฝ แ แ แแต แฆแณ แ แแแ แซแตแฐแณแตแฉ!
๐แญแ แแ แตแแ แฒแตแฐแ แ 50% แ แแฝ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
๐3โค1๐ฅฐ1
โ๏ธ SAFETY HELMET COLOURS IN CONSTRUCTION
๐น White: Engineers, managers, supervisors, and visitors.
๐น Blue: Electricians, plumbers, and technical workers.
๐น Red: Firefighters and emergency response teams.
๐น Green: Safety, environmental, or first-aid personnel.
๐น Gray: Visitors and trainees.
๐น Yellow: General construction workers and labourers.
๐น Brown: Welders and workers performing hot work.
โ ๏ธ Note: Helmet colour codes vary by country and construction site. Always follow site-specific safety rules.
@ETCONP
๐น White: Engineers, managers, supervisors, and visitors.
๐น Blue: Electricians, plumbers, and technical workers.
๐น Red: Firefighters and emergency response teams.
๐น Green: Safety, environmental, or first-aid personnel.
๐น Gray: Visitors and trainees.
๐น Yellow: General construction workers and labourers.
๐น Brown: Welders and workers performing hot work.
โ ๏ธ Note: Helmet colour codes vary by country and construction site. Always follow site-specific safety rules.
@ETCONP
๐ฅฐ4โค2
๐ CONSTRUCTION CALCULATION: HOW TO CALCULATE CONCRETE VOLUME
Concrete volume calculations are essential for estimating material requirements, preparing BOQs, planning concrete orders, and controlling construction costs.
๐น Formula for a Rectangular Element
Concrete Volume = Length ร Width ร Thickness or Height
The dimensions must be expressed in metres to obtain the volume in cubic metres (mยณ).
๐๏ธ Example: Calculate the Volume of a Slab
Given:-
Length = 5 m
Width = 4 m
Thickness = 150 mm = 0.15 m
Calculation:
Volume = 5 ร 4 ร 0.15
Required geometric volume = 3.00 mยณ
๐น Example: Calculate the Volume of a Beam
Given:
Length = 6 m
Width = 0.25 m
Height = 0.40 m
Volume = 6 ร 0.25 ร 0.40
Required geometric volume = 0.60 mยณ
๐ Important Considerations
โ Convert millimetres to metres before calculating.
โ Account for openings and intersecting elements where applicable.
โ Calculate each element separately when dimensions differ.
โ Consider ordering allowances according to site conditions and project procedures.
@ETCONP
Concrete volume calculations are essential for estimating material requirements, preparing BOQs, planning concrete orders, and controlling construction costs.
๐น Formula for a Rectangular Element
Concrete Volume = Length ร Width ร Thickness or Height
The dimensions must be expressed in metres to obtain the volume in cubic metres (mยณ).
๐๏ธ Example: Calculate the Volume of a Slab
Given:-
Length = 5 m
Width = 4 m
Thickness = 150 mm = 0.15 m
Calculation:
Volume = 5 ร 4 ร 0.15
Required geometric volume = 3.00 mยณ
๐น Example: Calculate the Volume of a Beam
Given:
Length = 6 m
Width = 0.25 m
Height = 0.40 m
Volume = 6 ร 0.25 ร 0.40
Required geometric volume = 0.60 mยณ
๐ Important Considerations
โ Convert millimetres to metres before calculating.
โ Account for openings and intersecting elements where applicable.
โ Calculate each element separately when dimensions differ.
โ Consider ordering allowances according to site conditions and project procedures.
@ETCONP
๐6โค3
๐๏ธ แจ แฎแแตแตแซแญแฝแ แตแซ แแ แฐแฅแณแคแแฝ แญแแแแ?
๐120+ แแตแซ แแแ แจแแ แตแณแแณแญแต แฐแฅแณแคแแฝ
โ แแฎแแตแซแญแฐแฎแฝแ แแ แแ แแซแชแแฝ แฐแแแ แถ แจแแจแ
โ แจ PPA 2025 แฅแ FIDIC Red Book 2017 แ แแฝ แแญ แแ แ แแ แจแฐแฃแฃแ
โ แ Microsoft Word แ แแแ แคแฒแต แจแแฐแจแ (Editable) แจแฐแจแแช PDF แแญแแฝ
๐ แจแฎแแตแซแต แ แตแฐแณแฐแญ แตแซแแ แแแแ แแฎแแฝแแ แแแตแจแ แแญแแน แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
๐120+ แแตแซ แแแ แจแแ แตแณแแณแญแต แฐแฅแณแคแแฝ
โ แแฎแแตแซแญแฐแฎแฝแ แแ แแ แแซแชแแฝ แฐแแแ แถ แจแแจแ
โ แจ PPA 2025 แฅแ FIDIC Red Book 2017 แ แแฝ แแญ แแ แ แแ แจแฐแฃแฃแ
โ แ Microsoft Word แ แแแ แคแฒแต แจแแฐแจแ (Editable) แจแฐแจแแช PDF แแญแแฝ
๐ แจแฎแแตแซแต แ แตแฐแณแฐแญ แตแซแแ แแแแ แแฎแแฝแแ แแแตแจแ แแญแแน แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
โค3๐ฅฐ1
๐๏ธ CONCRETE MIX RATIO 1:2:3
๐น Mix Proportion (by volume):
โข 1 part Cement
โข 2 parts Sand
โข 3 parts Gravel
๐น Approximate Materials for 1 mยณ of Concrete:
โข Cement: 7โ7.5 bags (50 kg each)
โข Sand: 0.51 mยณ
โข Gravel: 0.77 mยณ
๐น Key Quality Tips:
โ Use clean sand, gravel, and water.
โ Maintain the correct water-cement ratio.
โ Compact and cure concrete properly.
โ Use an approved mix design for structural work.
โ ๏ธ Note: A 1:2:3 nominal mix does not automatically guarantee M20 strength. Use a verified mix design and applicable standards for structural concrete.
๐ @ETCONP
๐น Mix Proportion (by volume):
โข 1 part Cement
โข 2 parts Sand
โข 3 parts Gravel
๐น Approximate Materials for 1 mยณ of Concrete:
โข Cement: 7โ7.5 bags (50 kg each)
โข Sand: 0.51 mยณ
โข Gravel: 0.77 mยณ
๐น Key Quality Tips:
โ Use clean sand, gravel, and water.
โ Maintain the correct water-cement ratio.
โ Compact and cure concrete properly.
โ Use an approved mix design for structural work.
โ ๏ธ Note: A 1:2:3 nominal mix does not automatically guarantee M20 strength. Use a verified mix design and applicable standards for structural concrete.
๐ @ETCONP
โค5๐ฅฐ2
๐๏ธ ISOLATED FOOTING vs. RAFT FOUNDATION
Foundations transfer structural loads safely to the supporting ground. The appropriate foundation depends on soil conditions, building loads, settlement requirements, groundwater, and engineering design.
๐น 1. Isolated Footing
An isolated footing generally supports one column and spreads its load over a larger area of soil.
Common characteristics:
#Often used where soil can safely support the applied loads.
#Can be square, rectangular, or another designed shape.
#May be economical when columns are sufficiently separated and soil conditions are suitable.
๐น 2. Raft Foundation
A raft foundation is a large foundation slab that supports several columns and/or walls over a broad area.
Common characteristics:
#Distributes loads across a larger foundation area.
#May be considered where individual footings would cover a substantial portion of the building footprint.
#Can help manage differential settlement when properly designed.
Requires careful consideration of bending, punching shear, soil pressure, and groundwater conditions.
๐ Comparison
Isolated footing: Supports an individual column.
Raft foundation: Supports multiple structural elements across a larger area.
โ ๏ธ Engineering Tip: A raft foundation is not automatically better or safer. The selection must be supported by geotechnical information and structural calculations.
@ETCONP
Foundations transfer structural loads safely to the supporting ground. The appropriate foundation depends on soil conditions, building loads, settlement requirements, groundwater, and engineering design.
๐น 1. Isolated Footing
An isolated footing generally supports one column and spreads its load over a larger area of soil.
Common characteristics:
#Often used where soil can safely support the applied loads.
#Can be square, rectangular, or another designed shape.
#May be economical when columns are sufficiently separated and soil conditions are suitable.
๐น 2. Raft Foundation
A raft foundation is a large foundation slab that supports several columns and/or walls over a broad area.
Common characteristics:
#Distributes loads across a larger foundation area.
#May be considered where individual footings would cover a substantial portion of the building footprint.
#Can help manage differential settlement when properly designed.
Requires careful consideration of bending, punching shear, soil pressure, and groundwater conditions.
๐ Comparison
Isolated footing: Supports an individual column.
Raft foundation: Supports multiple structural elements across a larger area.
โ ๏ธ Engineering Tip: A raft foundation is not automatically better or safer. The selection must be supported by geotechnical information and structural calculations.
@ETCONP
โค4
๐ RATE ANALYSIS IN CONSTRUCTION โ A PRACTICAL GUIDE
Rate analysis is the process of determining the estimated cost of completing one unit of a construction activity.
It helps contractors prepare estimates, evaluate rates, develop tender prices, and understand where project costs come from.
๐น Main Components of Rate Analysis
1๏ธโฃ Materials: Cement, sand, aggregates, reinforcement, blocks, and other materials required for the work.
2๏ธโฃ Labour: Wages and associated costs for workers involved in the activity.
3๏ธโฃ Equipment: Machinery, tools, operation, and equipment-related costs.
4๏ธโฃ Transportation: Delivery and handling costs where applicable.
5๏ธโฃ Overheads: Relevant site and company operating expenses.
6๏ธโฃ Profit and Other Allowances: Included according to the estimating method and project requirements.
๐๏ธ Example: Concrete Work
For a concrete activity, the estimator considers the specified concrete grade or mix, material quantities, labour productivity, equipment, transport, and applicable overheads.
The total estimated cost is then divided by the quantity of work to establish a rate per unit.
๐ Why Is Rate Analysis Important?
โ Supports realistic cost estimates.
โ Helps prepare competitive tenders.
โ Identifies major cost components.
โ Supports budget planning and cost control.
โ Helps compare alternatives.
โ ๏ธ Actual rates depend on location, date, specifications, productivity, supplier prices, and contract conditions.
@ETCONP
Rate analysis is the process of determining the estimated cost of completing one unit of a construction activity.
It helps contractors prepare estimates, evaluate rates, develop tender prices, and understand where project costs come from.
๐น Main Components of Rate Analysis
1๏ธโฃ Materials: Cement, sand, aggregates, reinforcement, blocks, and other materials required for the work.
2๏ธโฃ Labour: Wages and associated costs for workers involved in the activity.
3๏ธโฃ Equipment: Machinery, tools, operation, and equipment-related costs.
4๏ธโฃ Transportation: Delivery and handling costs where applicable.
5๏ธโฃ Overheads: Relevant site and company operating expenses.
6๏ธโฃ Profit and Other Allowances: Included according to the estimating method and project requirements.
๐๏ธ Example: Concrete Work
For a concrete activity, the estimator considers the specified concrete grade or mix, material quantities, labour productivity, equipment, transport, and applicable overheads.
The total estimated cost is then divided by the quantity of work to establish a rate per unit.
๐ Why Is Rate Analysis Important?
โ Supports realistic cost estimates.
โ Helps prepare competitive tenders.
โ Identifies major cost components.
โ Supports budget planning and cost control.
โ Helps compare alternatives.
โ ๏ธ Actual rates depend on location, date, specifications, productivity, supplier prices, and contract conditions.
@ETCONP
โค3๐ฅฐ1
#Advertisement
๐๐ฅ แฅแแแแแแ แ แ แแญแ แญแแฉ! ๐ฌ๐ง๐ช๐น
๐ก แฅแแแแแ แแแญ แญแแแแ?
แฅแแแแแแ แแแแญ แฐแธแแจแแ? แจแฅแแแแแ แแแตแแ แ แจแแฐ แแแฎแฝแ แ แแแ แแจแณแต แญแแแแ?
๐ฏ แแแตแแ แฅแแ แ แ!
๐ แจแฅแแแแแ แแฐ แ แแญแ แจแฐแแแแแ แญแ แ แข-แแฝแแ แญแ แแแข
โ แฅแแแแแแ แ แ แแญแ แแแจแณแต แญแจแณแแณแแข
โ แ แณแฒแต แจแฅแแแแแ แแแตแ แแแแญ แซแแแแข
โ แจแแแ แฅแแแตแแ แแแณแฐแ แญแจแณแแข
โ แ แตแแญแ แแญ แ แแแ แแแ แฅ แญแฝแแแข
๐ แแฌ แญแแแฉ! แแ แจแฐแปแ แจแแแ แฅแแแต แญแแญแแต!
๐ฉ แจแฅแญแตแแ แ แ แแแแแต แ แแแ แซแแแ๐
https://ye-buna.com/ethiowisdom?ref=product_detail&product=6a909035df904_matoro27
๐๐ฅ แฅแแแแแแ แ แ แแญแ แญแแฉ! ๐ฌ๐ง๐ช๐น
๐ก แฅแแแแแ แแแญ แญแแแแ?
แฅแแแแแแ แแแแญ แฐแธแแจแแ? แจแฅแแแแแ แแแตแแ แ แจแแฐ แแแฎแฝแ แ แแแ แแจแณแต แญแแแแ?
๐ฏ แแแตแแ แฅแแ แ แ!
๐ แจแฅแแแแแ แแฐ แ แแญแ แจแฐแแแแแ แญแ แ แข-แแฝแแ แญแ แแแข
โ แฅแแแแแแ แ แ แแญแ แแแจแณแต แญแจแณแแณแแข
โ แ แณแฒแต แจแฅแแแแแ แแแตแ แแแแญ แซแแแแข
โ แจแแแ แฅแแแตแแ แแแณแฐแ แญแจแณแแข
โ แ แตแแญแ แแญ แ แแแ แแแ แฅ แญแฝแแแข
๐ แแฌ แญแแแฉ! แแ แจแฐแปแ แจแแแ แฅแแแต แญแแญแแต!
๐ฉ แจแฅแญแตแแ แ แ แแแแแต แ แแแ แซแแแ๐
https://ye-buna.com/ethiowisdom?ref=product_detail&product=6a909035df904_matoro27
โค2๐ฅฐ1
๐ CONSTRUCTION CALCULATION
๐ฅHOW TO CALCULATE CONCRETE VOLUME
Concrete volume calculations are essential for estimating material requirements, preparing BOQs, planning concrete orders, and controlling construction costs.
๐น Formula for a Rectangular Element
Concrete Volume = Length ร Width ร Thickness or Height
The dimensions must be expressed in metres to obtain the volume in cubic metres (mยณ).
๐๏ธ Example: Calculate the Volume of a Slab
Given:
Length = 5 m
Width = 4 m
Thickness = 150 mm = 0.15 m
Calculation:
Volume = 5 ร 4 ร 0.15
Required geometric volume = 3.00 mยณ
๐น Example: Calculate the Volume of a Beam
Given:
Length = 6 m
Width = 0.25 m
Height = 0.40 m
Volume = 6 ร 0.25 ร 0.40
Required geometric volume = 0.60 mยณ
๐ Important Considerations
โ Convert millimetres to metres before calculating.
โ Account for openings and intersecting elements where applicable.
โ Calculate each element separately when dimensions differ.
โ Consider ordering allowances according to site conditions and project procedures.
@ETCONP
๐ฅHOW TO CALCULATE CONCRETE VOLUME
Concrete volume calculations are essential for estimating material requirements, preparing BOQs, planning concrete orders, and controlling construction costs.
๐น Formula for a Rectangular Element
Concrete Volume = Length ร Width ร Thickness or Height
The dimensions must be expressed in metres to obtain the volume in cubic metres (mยณ).
๐๏ธ Example: Calculate the Volume of a Slab
Given:
Length = 5 m
Width = 4 m
Thickness = 150 mm = 0.15 m
Calculation:
Volume = 5 ร 4 ร 0.15
Required geometric volume = 3.00 mยณ
๐น Example: Calculate the Volume of a Beam
Given:
Length = 6 m
Width = 0.25 m
Height = 0.40 m
Volume = 6 ร 0.25 ร 0.40
Required geometric volume = 0.60 mยณ
๐ Important Considerations
โ Convert millimetres to metres before calculating.
โ Account for openings and intersecting elements where applicable.
โ Calculate each element separately when dimensions differ.
โ Consider ordering allowances according to site conditions and project procedures.
@ETCONP
โค5
Forwarded from Ethiopian Construction Vacancy & Tender
๐๏ธ แ แแแ แจแฎแแตแตแซแญแฝแ แแดแชแซแ แแ แซ
๐ แแแฆ 07/02/2019
โโโโโโโโโโโโโโโ
โ แฐแฅ แตแตแซแญแธแญ แแดแชแซแ แแ
๐ แฅแจแต
โข แฃแ 8 โ 900.00
โข แฃแ 10 โ 1,406.00
โข แฃแ 12 โ 2,025.00
โข แฃแ 14 โ 2,758.00
โข แฃแ 16 โ 3,600.00
โข แฃแ 20 โ 5,633.00
โข แฃแ 24 โ 8,105.00
๐งต แจแตแณแ แฝแฆ (แ แชแ)
โข 1.5 โ 350.00
โข 2.5 โ 350.00
๐ แแตแแญ (แ แชแ)
โข แแซแญแแ แ แจแแแญ โ 270.00 - 360.00
โข แ แแ แธแญแปแช โ 340.00 - 400.00
โข แ แแ แ แจแแแญ (3-4) โ 248.80
โข แ แแ แ แจแแแญ (5-15) โ 228.80
๐ แแญแแฎ (DH Geda)
โข G-28 โ 2,480.00
โข 30 แแฅแญ โ 1,980.00
โข 32 แแฅแญ โ 1,530.00
โข 35 แแฅแญ โ 1,170.00
โโโโโโโโโโโโโโโ
๐ฐ แแญแแฝ
๐น PPR (Rack)
โข แฃแ 25 โ 950.00
โข 32 โ 1,800.00
โข 40 โ 2,500.00
โข 50 โ 3,500.00
โข 63 โ 5,800.00
โข 75 โ 12,500.00
โข 90 โ โ
โข 110 โ โ
๐น PPR (Roxi)
โข แฃแ 25 โ 1,450.00
โข 32 โ 2,500.00
โข 40 โ 4,500.00
โข 50 โ 7,000.00
โข 63 โ 8,500.00
โข 75 โ 14,000.00
โข 90 โ 25,000.00
โข 110 โ 28,000.00
๐น HDPE
โข 20 โ 80.00
โข 25 โ 160.00
โข 32 โ 235.00
โข 40 โ 385.00
โข 50 โ 506.00
โข 63 โ 740.00
โข 75 โ โ
โข 90 โ โ
โข 110 โ โ
๐น U-PVC (PN 4)
โข 50แ.แ โ 1,000.00
โข 75แ.แ โ 1,550.00
โข 110แ.แ โ 2,300.00
โข 160แ.แ โ 4,800.00
โข 200แ.แ โ 7,500.00
๐น U-PVC (PN 6)
โข 50แ.แ โ 1,300.00
โข 75แ.แ โ 2,000.00
โข 110แ.แ โ 3,200.00
โข 125แ.แ โ 5,800.00
โข 160แ.แ โ 7,000.00
โข 200แ.แ โ โ
โข 250แ.แ โ 25,000.00
๐น U-PVC (PN 10)
โข 90แ.แ โ 6,700.00
โข 110แ.แ โ 7,000.00
โข 160แ.แ โ 15,000.00
โข 200แ.แ โ 21,000.00
โข 250แ.แ โ โ
โข 380แ.แ โ 35,000.00
๐น U-PVC (PN 16)
โข 20แ.แ โ 2,200.00
โข 25แ.แ โ 2,800.00
โข 50แ.แ โ 3,500.00
โโโโโโโโโโโโโโโ
โก แคแแญแตแชแญ แฅแแแฝ
๐ แแฎแฎ แฎแแตแฉแต (แ แแตแญ)
โข แฃแ 13 โ 1,500.00
โข แฃแ 16 โ 2,000.00
โข 19 โ 2,400.00
โข 20 โ 2,500.00
โข 25 โ 2,500.00
๐ แแญแแ แฎแแตแฉแต (แ แแตแญ)
โข แฃแ 16 โ 80.00
โข 19 โ 110.00
โข 25 โ 130.00
๐ก แแจแญ แฅแ แ (Wire Rolls)
โช๏ธ แฉแฎ แฌแฅแ
โข 1.5 โ 8,800.00
โข 2.5 โ 13,200.00
โข 4.0 โ 22,500.00
โช๏ธ แฉ.แคแ (UF)
โข 1.5 โ 7,800.00
โข 2.5 โ 10,300.00
โข 4.0 โ 18,700.00
โช๏ธ แขแแต (Bmet)
โข 1.5 โ 8,600.00
โข 2.5 โ 13,000.00
โข 4.0 โ 21,900.00
โช๏ธ Blue Nile
โข 1.5 โ 7,000.00
โข 2.5 โ 7,250.00
โข 4.0 โ 10,800.00
โช๏ธ Addis Cable
โข 1.5 โ 7,500.00
โข 2.5 โ 12,000.00
โข 4.0 โ 19,300.00
โช๏ธ Rhino
โข 1.5 โ 7,500.00
โข 2.5 โ 12,600.00
โข 4.0 โ 18,700.00
๐ แฅแฌแจแญ แฆแญแต
โข แฃแ 4 โ 600.00
โข แฃแ 6 โ 750.00
โข แฃแ 8 โ โ
โข แฃแ 12 โ 1,500.00
โข แฃแ 24 โ 2,100.00
โโโโโโโโโโโโโโโ
๐งฑ แฒแแแถแฃ แ แธแแฃ แตแแแญ แฅแ แ แ แญ
๐น แฒแแแถ
โข แณแแแด (PPC/OPC) โ โ
โข แแฝแแ PPC โ 1,740.00
โข แแฝแแ OPC โ โ
๐ แ แธแ
โข 16 แแตแญ แฉแฅ โ 120,000.00
โข แ แแตแญ แฉแฅ โ 4,000.00 - 8,000.00
โข แ แณแฅแ โ 1,000.00
โฐ แตแแแญ
โข 16 แแตแญ แฉแฅ โ 36,000.00
๐ชจ แ แ แญ
โข 16 แแตแญ แฉแฅ โ 95,000.00
โข แ แแตแญ แฉแฅ โ 5,000.00
โข แ แณแฅแ โ 700.00
โโโโโโโโโโโโโโโ
๐งฑ แฅแแฌแต
๐น แฅแแฌแต แญแแต
โข แญแแต A โ 126.00 - 200.00
โข แญแแต B โ 109.00 - 180.00
โข แญแแต C โ 138.00 - 165.00
๐น แฅแแฌแต แแซแ
โข แฃแ 20 โ 89.00
โข แฃแ 15 โ 75.00
โข แฃแ 10 โ 63.00
โโโโโโโโโโโโโโโ
๐ แ แฒแต แฃแแ แจแแ แซ แแ แจแฐแฐแซ แจแ แแ Cost BreakDown Analysis แฅแ BOQ แจแแแ แจแณแฝ แฃแแ แแแญ แซแแญแฑ๐
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
๐ แแแฆ 07/02/2019
โโโโโโโโโโโโโโโ
โ แฐแฅ แตแตแซแญแธแญ แแดแชแซแ แแ
๐ แฅแจแต
โข แฃแ 8 โ 900.00
โข แฃแ 10 โ 1,406.00
โข แฃแ 12 โ 2,025.00
โข แฃแ 14 โ 2,758.00
โข แฃแ 16 โ 3,600.00
โข แฃแ 20 โ 5,633.00
โข แฃแ 24 โ 8,105.00
๐งต แจแตแณแ แฝแฆ (แ แชแ)
โข 1.5 โ 350.00
โข 2.5 โ 350.00
๐ แแตแแญ (แ แชแ)
โข แแซแญแแ แ แจแแแญ โ 270.00 - 360.00
โข แ แแ แธแญแปแช โ 340.00 - 400.00
โข แ แแ แ แจแแแญ (3-4) โ 248.80
โข แ แแ แ แจแแแญ (5-15) โ 228.80
๐ แแญแแฎ (DH Geda)
โข G-28 โ 2,480.00
โข 30 แแฅแญ โ 1,980.00
โข 32 แแฅแญ โ 1,530.00
โข 35 แแฅแญ โ 1,170.00
โโโโโโโโโโโโโโโ
๐ฐ แแญแแฝ
๐น PPR (Rack)
โข แฃแ 25 โ 950.00
โข 32 โ 1,800.00
โข 40 โ 2,500.00
โข 50 โ 3,500.00
โข 63 โ 5,800.00
โข 75 โ 12,500.00
โข 90 โ โ
โข 110 โ โ
๐น PPR (Roxi)
โข แฃแ 25 โ 1,450.00
โข 32 โ 2,500.00
โข 40 โ 4,500.00
โข 50 โ 7,000.00
โข 63 โ 8,500.00
โข 75 โ 14,000.00
โข 90 โ 25,000.00
โข 110 โ 28,000.00
๐น HDPE
โข 20 โ 80.00
โข 25 โ 160.00
โข 32 โ 235.00
โข 40 โ 385.00
โข 50 โ 506.00
โข 63 โ 740.00
โข 75 โ โ
โข 90 โ โ
โข 110 โ โ
๐น U-PVC (PN 4)
โข 50แ.แ โ 1,000.00
โข 75แ.แ โ 1,550.00
โข 110แ.แ โ 2,300.00
โข 160แ.แ โ 4,800.00
โข 200แ.แ โ 7,500.00
๐น U-PVC (PN 6)
โข 50แ.แ โ 1,300.00
โข 75แ.แ โ 2,000.00
โข 110แ.แ โ 3,200.00
โข 125แ.แ โ 5,800.00
โข 160แ.แ โ 7,000.00
โข 200แ.แ โ โ
โข 250แ.แ โ 25,000.00
๐น U-PVC (PN 10)
โข 90แ.แ โ 6,700.00
โข 110แ.แ โ 7,000.00
โข 160แ.แ โ 15,000.00
โข 200แ.แ โ 21,000.00
โข 250แ.แ โ โ
โข 380แ.แ โ 35,000.00
๐น U-PVC (PN 16)
โข 20แ.แ โ 2,200.00
โข 25แ.แ โ 2,800.00
โข 50แ.แ โ 3,500.00
โโโโโโโโโโโโโโโ
โก แคแแญแตแชแญ แฅแแแฝ
๐ แแฎแฎ แฎแแตแฉแต (แ แแตแญ)
โข แฃแ 13 โ 1,500.00
โข แฃแ 16 โ 2,000.00
โข 19 โ 2,400.00
โข 20 โ 2,500.00
โข 25 โ 2,500.00
๐ แแญแแ แฎแแตแฉแต (แ แแตแญ)
โข แฃแ 16 โ 80.00
โข 19 โ 110.00
โข 25 โ 130.00
๐ก แแจแญ แฅแ แ (Wire Rolls)
โช๏ธ แฉแฎ แฌแฅแ
โข 1.5 โ 8,800.00
โข 2.5 โ 13,200.00
โข 4.0 โ 22,500.00
โช๏ธ แฉ.แคแ (UF)
โข 1.5 โ 7,800.00
โข 2.5 โ 10,300.00
โข 4.0 โ 18,700.00
โช๏ธ แขแแต (Bmet)
โข 1.5 โ 8,600.00
โข 2.5 โ 13,000.00
โข 4.0 โ 21,900.00
โช๏ธ Blue Nile
โข 1.5 โ 7,000.00
โข 2.5 โ 7,250.00
โข 4.0 โ 10,800.00
โช๏ธ Addis Cable
โข 1.5 โ 7,500.00
โข 2.5 โ 12,000.00
โข 4.0 โ 19,300.00
โช๏ธ Rhino
โข 1.5 โ 7,500.00
โข 2.5 โ 12,600.00
โข 4.0 โ 18,700.00
๐ แฅแฌแจแญ แฆแญแต
โข แฃแ 4 โ 600.00
โข แฃแ 6 โ 750.00
โข แฃแ 8 โ โ
โข แฃแ 12 โ 1,500.00
โข แฃแ 24 โ 2,100.00
โโโโโโโโโโโโโโโ
๐งฑ แฒแแแถแฃ แ แธแแฃ แตแแแญ แฅแ แ แ แญ
๐น แฒแแแถ
โข แณแแแด (PPC/OPC) โ โ
โข แแฝแแ PPC โ 1,740.00
โข แแฝแแ OPC โ โ
๐ แ แธแ
โข 16 แแตแญ แฉแฅ โ 120,000.00
โข แ แแตแญ แฉแฅ โ 4,000.00 - 8,000.00
โข แ แณแฅแ โ 1,000.00
โฐ แตแแแญ
โข 16 แแตแญ แฉแฅ โ 36,000.00
๐ชจ แ แ แญ
โข 16 แแตแญ แฉแฅ โ 95,000.00
โข แ แแตแญ แฉแฅ โ 5,000.00
โข แ แณแฅแ โ 700.00
โโโโโโโโโโโโโโโ
๐งฑ แฅแแฌแต
๐น แฅแแฌแต แญแแต
โข แญแแต A โ 126.00 - 200.00
โข แญแแต B โ 109.00 - 180.00
โข แญแแต C โ 138.00 - 165.00
๐น แฅแแฌแต แแซแ
โข แฃแ 20 โ 89.00
โข แฃแ 15 โ 75.00
โข แฃแ 10 โ 63.00
โโโโโโโโโโโโโโโ
๐ แ แฒแต แฃแแ แจแแ แซ แแ แจแฐแฐแซ แจแ แแ Cost BreakDown Analysis แฅแ BOQ แจแแแ แจแณแฝ แฃแแ แแแญ แซแแญแฑ๐
https://ye-buna.com/etconp?ref=product_detail&product=6a7d4cdc7b3de_etconp
โค9๐3๐ฅฐ1
๐๏ธ แจ แฎแแตแตแซแญแฝแ แตแซ แแ แฐแฅแณแคแแฝ แญแแแแ?
๐120+ แแตแซ แแแ แจแแ แตแณแแณแญแต แฐแฅแณแคแแฝ
โ แแฎแแตแซแญแฐแฎแฝแ แแ แแ แแซแชแแฝ แฐแแแ แถ แจแแจแ
โ แจ PPA 2025 แฅแ FIDIC Red Book 2017 แ แแฝ แแญ แแ แ แแ แจแฐแฃแฃแ
โ แ Microsoft Word แ แแแ แคแฒแต แจแแฐแจแ (Editable) แจแฐแจแแช PDF แแญแแฝ
๐ แจแฎแแตแซแต แ แตแฐแณแฐแญ แตแซแแ แแแแ แแฎแแฝแแ แแแตแจแ แแญแแน แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
๐120+ แแตแซ แแแ แจแแ แตแณแแณแญแต แฐแฅแณแคแแฝ
โ แแฎแแตแซแญแฐแฎแฝแ แแ แแ แแซแชแแฝ แฐแแแ แถ แจแแจแ
โ แจ PPA 2025 แฅแ FIDIC Red Book 2017 แ แแฝ แแญ แแ แ แแ แจแฐแฃแฃแ
โ แ Microsoft Word แ แแแ แคแฒแต แจแแฐแจแ (Editable) แจแฐแจแแช PDF แแญแแฝ
๐ แจแฎแแตแซแต แ แตแฐแณแฐแญ แตแซแแ แแแแ แแฎแแฝแแ แแแตแจแ แแญแแน แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
โค3๐1๐ฅฐ1
๐ MICROSOFT EXCEL SKILLS EVERY ASPIRING QUANTITY SURVEYOR SHOULD LEARN
Excel is a valuable tool for quantity estimation, cost calculations, BOQs, valuations, and construction reporting.
๐น Start With These Skills
1๏ธโฃ Basic formulas: addition, subtraction, multiplication, and division.
2๏ธโฃ SUM: Calculate totals.
3๏ธโฃ Percentage calculations: Work with tax, allowances, or percentage-based values where applicable.
4๏ธโฃ Cell references: Understand relative and absolute references.
5๏ธโฃ IF functions: Apply simple logical conditions.
6๏ธโฃ Sorting and filtering: Organize large datasets.
7๏ธโฃ Lookup functions: Retrieve relevant information from tables.
8๏ธโฃ Formatting: Make cost reports and BOQs easier to read.
๐๏ธ Practical Exercise
Create a small BOQ containing:
Item description.
Unit.
Quantity.
Unit rate.
Total amount.
Use a formula to calculate:
Amount = Quantity ร Unit Rate
Then calculate the overall total using the SUM function.
๐ Always verify quantities, formulas, units, and rounding. A spreadsheet can calculate incorrectly if its inputs or formulas are wrong.
@ETCONpWORK
Excel is a valuable tool for quantity estimation, cost calculations, BOQs, valuations, and construction reporting.
๐น Start With These Skills
1๏ธโฃ Basic formulas: addition, subtraction, multiplication, and division.
2๏ธโฃ SUM: Calculate totals.
3๏ธโฃ Percentage calculations: Work with tax, allowances, or percentage-based values where applicable.
4๏ธโฃ Cell references: Understand relative and absolute references.
5๏ธโฃ IF functions: Apply simple logical conditions.
6๏ธโฃ Sorting and filtering: Organize large datasets.
7๏ธโฃ Lookup functions: Retrieve relevant information from tables.
8๏ธโฃ Formatting: Make cost reports and BOQs easier to read.
๐๏ธ Practical Exercise
Create a small BOQ containing:
Item description.
Unit.
Quantity.
Unit rate.
Total amount.
Use a formula to calculate:
Amount = Quantity ร Unit Rate
Then calculate the overall total using the SUM function.
๐ Always verify quantities, formulas, units, and rounding. A spreadsheet can calculate incorrectly if its inputs or formulas are wrong.
@ETCONpWORK
โค6๐ฅฐ1
๐๏ธ RCC PARAPET WALL DETAIL
๐น Dimensions โข Height: 1200 mm โข Thickness: 200 mm โข Scale: 1:20
๐น Material Specifications โข Concrete: 21 MPa โข Main Reinforcement: ร12 mm bars โข Stirrups: ร8 mm @ 150 mm c/c โข Concrete Cover: Minimum 25 mm โข Haunch: 200 mm high, 1:2 cement mortar
๐น Key Construction Notes
โ Ensure proper bar anchorage at corners.
โ Follow structural reinforcement details.
โ Provide waterproofing on the top surface.
โ Comply with applicable building codes.
โ ๏ธ Note: Final dimensions and reinforcement must be verified by a qualified structural engineer.
@ETCONP
๐น Dimensions โข Height: 1200 mm โข Thickness: 200 mm โข Scale: 1:20
๐น Material Specifications โข Concrete: 21 MPa โข Main Reinforcement: ร12 mm bars โข Stirrups: ร8 mm @ 150 mm c/c โข Concrete Cover: Minimum 25 mm โข Haunch: 200 mm high, 1:2 cement mortar
๐น Key Construction Notes
โ Ensure proper bar anchorage at corners.
โ Follow structural reinforcement details.
โ Provide waterproofing on the top surface.
โ Comply with applicable building codes.
โ ๏ธ Note: Final dimensions and reinforcement must be verified by a qualified structural engineer.
@ETCONP
๐ฅฐ5โค4
๐แแญแฅ แฅแ แ แตแฐแแ แฒแตแฐแ
๐แจแแแฃแณ แแฎแแญแตแแ BOQแฃ แแชแฃ แจแฅแซ แ แแปแธแแฃ แญแแซแฃ Cash Flow แฅแ Profit/Loss แ แ แแต แแฎแแฝแแ Excel System แ แแแ แแแตแฐแณแฐแญ แจแแซแแ แฒแตแฐแ แซแตแแแแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6aaf8ac262672_etconp
๐แจแแแฃแณ แแฎแแญแตแแ BOQแฃ แแชแฃ แจแฅแซ แ แแปแธแแฃ แญแแซแฃ Cash Flow แฅแ Profit/Loss แ แ แแต แแฎแแฝแแ Excel System แ แแแ แแแตแฐแณแฐแญ แจแแซแแ แฒแตแฐแ แซแตแแแแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6aaf8ac262672_etconp
โค2๐ฅฐ1๐1