๐แแฌ แแญแฅ แแ
แแ แญแแแแน แแฅแฐแแ
๐Quantity Surveying & Specification๐
๐แจQuantity Surveying แฅแ Building Construction Estimation แจ แ แ แตแจ แ แฝแแณแแ แ แฐแแฃแซแ แแณแแแฝ แจแแซแณแตแแ แต แแญแฅ แแ แแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6a8dd294cbaa9_etconp
๐Quantity Surveying & Specification๐
๐แจQuantity Surveying แฅแ Building Construction Estimation แจ แ แ แตแจ แ แฝแแณแแ แ แฐแแฃแซแ แแณแแแฝ แจแแซแณแตแแ แต แแญแฅ แแ แแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6a8dd294cbaa9_etconp
โค1๐1
๐๏ธ CAST-IN-PLACE PILE: CONSTRUCTION PROCEDURE
A cast-in-place pile is a deep foundation constructed by drilling a borehole and filling it with reinforced concrete to transfer structural loads to stronger soil layers.
๐น 1. Drilling: Excavate the borehole to the required depth and diameter using a drilling rig.
๐น 2. Reinforcement: Lower the reinforcement cage and install spacers to maintain concrete cover.
๐น 3. Concreting: Place concrete into the borehole, using a tremie pipe where required.
๐น 4. Quality Control: Check borehole depth, cleanliness, reinforcement positioning, concrete quality, and perform specified pile tests.
๐น Main Equipment: Drilling rig, auger, reinforcement cage, concrete mixer truck, and tremie pipe.
๐ Note: Construction procedures depend on soil conditions, groundwater levels, and project specifications.
@etconp
A cast-in-place pile is a deep foundation constructed by drilling a borehole and filling it with reinforced concrete to transfer structural loads to stronger soil layers.
๐น 1. Drilling: Excavate the borehole to the required depth and diameter using a drilling rig.
๐น 2. Reinforcement: Lower the reinforcement cage and install spacers to maintain concrete cover.
๐น 3. Concreting: Place concrete into the borehole, using a tremie pipe where required.
๐น 4. Quality Control: Check borehole depth, cleanliness, reinforcement positioning, concrete quality, and perform specified pile tests.
๐น Main Equipment: Drilling rig, auger, reinforcement cage, concrete mixer truck, and tremie pipe.
๐ Note: Construction procedures depend on soil conditions, groundwater levels, and project specifications.
@etconp
โค2๐1
๐๏ธ TWIN-CELL PRECAST CONCRETE BOX CULVERT
A twin-cell box culvert is a drainage structure with two openings that allow water to flow beneath roads and embankments.
๐ TYPICAL DIMENSIONS:
- Number of Cells: 2
- Internal Width: 3.0 m each
- Internal Height: 2.0 m
- Wall & Slab Thickness: 300 mm
- Concrete Grade: C35/45
๐น CONSTRUCTION STEPS:
1๏ธโฃ Site preparation and excavation.
2๏ธโฃ Foundation preparation and compaction.
3๏ธโฃ Precast unit installation.
4๏ธโฃ Joint sealing.
5๏ธโฃ Backfilling and compaction.
6๏ธโฃ Road pavement construction.
7๏ธโฃ Inlet and outlet protection.
8๏ธโฃ Final inspection.
๐น KEY COMPONENTS:
- Precast concrete units
- Reinforcement
- Gravel foundation
- Granular backfill
- Geotextile
- Riprap protection
๐ Applications: Highways, road crossings, stormwater drainage, and flood control.
โ ๏ธ Note: Final dimensions and reinforcement must be verified through structural and hydraulic design.
@etconp
A twin-cell box culvert is a drainage structure with two openings that allow water to flow beneath roads and embankments.
๐ TYPICAL DIMENSIONS:
- Number of Cells: 2
- Internal Width: 3.0 m each
- Internal Height: 2.0 m
- Wall & Slab Thickness: 300 mm
- Concrete Grade: C35/45
๐น CONSTRUCTION STEPS:
1๏ธโฃ Site preparation and excavation.
2๏ธโฃ Foundation preparation and compaction.
3๏ธโฃ Precast unit installation.
4๏ธโฃ Joint sealing.
5๏ธโฃ Backfilling and compaction.
6๏ธโฃ Road pavement construction.
7๏ธโฃ Inlet and outlet protection.
8๏ธโฃ Final inspection.
๐น KEY COMPONENTS:
- Precast concrete units
- Reinforcement
- Gravel foundation
- Granular backfill
- Geotextile
- Riprap protection
๐ Applications: Highways, road crossings, stormwater drainage, and flood control.
โ ๏ธ Note: Final dimensions and reinforcement must be verified through structural and hydraulic design.
@etconp
โค3๐2
๐๏ธแแญแฅ แจ Concrete Mix Design & Quality Tests แจแซแ แ
โ แSite & Laboratory แตแซ แฐแตแแ
โ Fully Editable Excel Files
โ Absolute Volume Method
โ Aggregate & Impact Value Tests แซแจแฐแฐ แแญแฅ แแญแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6abe0bfb157ef_etconp
โ แSite & Laboratory แตแซ แฐแตแแ
โ Fully Editable Excel Files
โ Absolute Volume Method
โ Aggregate & Impact Value Tests แซแจแฐแฐ แแญแฅ แแญแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6abe0bfb157ef_etconp
โค4๐1
๐ REQUEST FOR INFORMATION (RFI) โ WHEN SHOULD IT BE USED?
A Request for Information, or RFI, is a formal communication used to seek clarification about project documents, specifications, site conditions, or other issues requiring a response.
๐น When Might an RFI Be Needed?
๐ Conflicting dimensions between drawings.
๐๏ธ Missing information needed to complete work.
๐งฑ Differences between actual site conditions and the documents.
๐ง Unclear coordination between building services and structural elements.
๐ Unspecified details that affect construction.
๐น What Should an RFI Include?
1๏ธโฃ Project and reference information.
2๏ธโฃ A clear description of the issue.
3๏ธโฃ Relevant drawing or specification references.
4๏ธโฃ Supporting photographs or sketches, where useful.
5๏ธโฃ The clarification required.
6๏ธโฃ The response deadline or schedule impact, where relevant.
โ ๏ธ An RFI does not automatically authorize a design change.
Follow the contract and project procedures for approval and implementation.
@etconp
A Request for Information, or RFI, is a formal communication used to seek clarification about project documents, specifications, site conditions, or other issues requiring a response.
๐น When Might an RFI Be Needed?
๐ Conflicting dimensions between drawings.
๐๏ธ Missing information needed to complete work.
๐งฑ Differences between actual site conditions and the documents.
๐ง Unclear coordination between building services and structural elements.
๐ Unspecified details that affect construction.
๐น What Should an RFI Include?
1๏ธโฃ Project and reference information.
2๏ธโฃ A clear description of the issue.
3๏ธโฃ Relevant drawing or specification references.
4๏ธโฃ Supporting photographs or sketches, where useful.
5๏ธโฃ The clarification required.
6๏ธโฃ The response deadline or schedule impact, where relevant.
โ ๏ธ An RFI does not automatically authorize a design change.
Follow the contract and project procedures for approval and implementation.
@etconp
โค3
แฐแแญ แแแต แฅแ แแฆแแต แ แ
แซแข
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแแจแซ แแฅแปแ แแ แแซ แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แฅแแ แแแ แฅแแฒแแ แฅแแฅแแแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แฅแแฐแซแแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณ
Telegram https://t.me/heavenic1
tiktok.com/@blessedase1
๐แแแตแ แแฆแแต แ แแแแต แ แญแแต แจแฐแแแ แ แแ
โ๏ธแแแซ แแแจแซ แแฅแปแ แแ แแซ แแฝแแฝ แ แแ
๐แแฎ (แถแแฒแ) แฅแญแต แฅแแ แแแ แฅแแฒแแ แฅแแฅแแแ
๐แแแแแแ แจแแฐแแญ แตแซแแฝแ แฅแแฐแซแแ
๐แขแตแฎแตแซ แแตแฅ แจแตแ แฅแแแญแแณ
Telegram https://t.me/heavenic1
tiktok.com/@blessedase1
โค1๐1๐ฅฐ1
๐๏ธ 18M ร 6M STEEL CANTILEVER CANOPY SHED DESIGN
A single-slope steel canopy designed for parking, warehouse loading bays, workshops, and industrial storage.
๐ KEY DIMENSIONS:
- Total Length: 18 m
- Width / Cantilever Span: 6 m
- Clear Height: 6.0 m
- Total Bays: 5 ร 3.6 m
- Roof Slope: Approximately 5ยฐ
- Bracing Level: 3.2 m
๐น MAIN STRUCTURAL COMPONENTS:
1. ISMB Steel Columns
2. ISMB Rafter Beams
3. Z-Purlins
4. Corrugated GI / Galvalume Roofing Sheets
5. X-Cross Bracing
6. Gusset and Cleat Plates
7. Base Plates with Anchor Bolts
8. RCC Pedestal Foundations
๐น IMPORTANT CONNECTIONS:
- Bolted column base connections.
- Rafter-to-column connections.
- Purlin-to-rafter connections.
- Gusset plate bracing connections.
๐ ENGINEERING NOTES:
- Structural steel framework.
- Reinforced concrete pedestal foundations.
- Grade 8.8 bolts and galvanized roofing fasteners.
- Proper wind-load, stability, and foundation design are essential.
@etconp
A single-slope steel canopy designed for parking, warehouse loading bays, workshops, and industrial storage.
๐ KEY DIMENSIONS:
- Total Length: 18 m
- Width / Cantilever Span: 6 m
- Clear Height: 6.0 m
- Total Bays: 5 ร 3.6 m
- Roof Slope: Approximately 5ยฐ
- Bracing Level: 3.2 m
๐น MAIN STRUCTURAL COMPONENTS:
1. ISMB Steel Columns
2. ISMB Rafter Beams
3. Z-Purlins
4. Corrugated GI / Galvalume Roofing Sheets
5. X-Cross Bracing
6. Gusset and Cleat Plates
7. Base Plates with Anchor Bolts
8. RCC Pedestal Foundations
๐น IMPORTANT CONNECTIONS:
- Bolted column base connections.
- Rafter-to-column connections.
- Purlin-to-rafter connections.
- Gusset plate bracing connections.
๐ ENGINEERING NOTES:
- Structural steel framework.
- Reinforced concrete pedestal foundations.
- Grade 8.8 bolts and galvanized roofing fasteners.
- Proper wind-load, stability, and foundation design are essential.
@etconp
โค3๐1
๐๏ธ แแฎแแฝแแ CV แฅแ Cover Letter๐
๐ผ แตแซ แฅแจแแแ แแ? แจแแซแตแฐแแ CV แญแแ แแแฃแชแแฝ แญแ แจแก!
๐ฅ 30 แจแฐแแซแฉ แแฎแแฝแแ CV แฅแ Cover Letter แดแแแแถแฝ แ แ แแต แฅแ แ!
โ แCivil Engineersแฃ Site Engineersแฃ Architectsแฃ Quantity Surveyorsแฃ Safety Officers แฅแ แแแฝ แจแฎแแตแตแซแญแฝแ แฃแแแซแแฝ
โ ERAแฃ AACRAแฃ UNแฃ AU แฅแ แแแฝ แฐแแแต แจCV แแญแแถแฝ
โ แ Microsoft Word แแ แ แแ แจแแตแฐแซแจแ
โ แแ แฒแต แฐแแซแแแฝแ แแแต แแแธแ แฃแแแซแแฝ
๐ฏ แแแแ แญแแฅแกแค CVแแ แ แแฎแแฝแแ แแแแต แแแแแแต แจแณแฝ แฃแแ แแแญ แแญแ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ad07d3c7ba5f_etconp
๐ผ แตแซ แฅแจแแแ แแ? แจแแซแตแฐแแ CV แญแแ แแแฃแชแแฝ แญแ แจแก!
๐ฅ 30 แจแฐแแซแฉ แแฎแแฝแแ CV แฅแ Cover Letter แดแแแแถแฝ แ แ แแต แฅแ แ!
โ แCivil Engineersแฃ Site Engineersแฃ Architectsแฃ Quantity Surveyorsแฃ Safety Officers แฅแ แแแฝ แจแฎแแตแตแซแญแฝแ แฃแแแซแแฝ
โ ERAแฃ AACRAแฃ UNแฃ AU แฅแ แแแฝ แฐแแแต แจCV แแญแแถแฝ
โ แ Microsoft Word แแ แ แแ แจแแตแฐแซแจแ
โ แแ แฒแต แฐแแซแแแฝแ แแแต แแแธแ แฃแแแซแแฝ
๐ฏ แแแแ แญแแฅแกแค CVแแ แ แแฎแแฝแแ แแแแต แแแแแแต แจแณแฝ แฃแแ แแแญ แแญแ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ad07d3c7ba5f_etconp
โค1๐ฅฐ1๐1
๐CONSTRUCTION MATERIALS TESTING MANUAL
๐๏ธแจแแแฃแณ แฅแฌ แแแแฝแ แจแฅแซแต แแญแแซ (Material Testing) แ แฐแแฃแญ แแแญ แญแแแแ?
๐แญแ แแ แจแแซ แแแชแซ แจแฒแแแถแฃ แ แแชแแตแฃ แฎแแญแชแตแฃ แกแฅแฃ แฅแแญแฃ แฅแจแตแฃ แ แแญแฃ แแญแ แฅแ แจแแ แแจแแจแซ แแณแแถแฝแ แจแแญแแซ แแดแแฝ แญแแแข
โ แCivil แฅแ Material Engineers
โ แLaboratory Technicians
โ แQA/QC Engineers
โ แSite Engineers
โ แ COTEM แฅแ Civil Engineering Students
๐ฏ แจแแซ แฅแแแตแแ แซแณแตแแค แจแแแฃแณ แฅแซแตแ แซแจแแแก!
๐ฅแญแ แแญแฅ แแแญแซ แแ แแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ae709e5de7bd_etconp
๐๏ธแจแแแฃแณ แฅแฌ แแแแฝแ แจแฅแซแต แแญแแซ (Material Testing) แ แฐแแฃแญ แแแญ แญแแแแ?
๐แญแ แแ แจแแซ แแแชแซ แจแฒแแแถแฃ แ แแชแแตแฃ แฎแแญแชแตแฃ แกแฅแฃ แฅแแญแฃ แฅแจแตแฃ แ แแญแฃ แแญแ แฅแ แจแแ แแจแแจแซ แแณแแถแฝแ แจแแญแแซ แแดแแฝ แญแแแข
โ แCivil แฅแ Material Engineers
โ แLaboratory Technicians
โ แQA/QC Engineers
โ แSite Engineers
โ แ COTEM แฅแ Civil Engineering Students
๐ฏ แจแแซ แฅแแแตแแ แซแณแตแแค แจแแแฃแณ แฅแซแตแ แซแจแแแก!
๐ฅแญแ แแญแฅ แแแญแซ แแ แแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ae709e5de7bd_etconp
๐3โค2
๐ฝ๏ธ L-SHAPED KITCHEN DESIGN โ STANDARD DIMENSIONS
An L-shaped kitchen uses two adjoining walls to create an efficient cooking, washing, and preparation area while maximizing available space.
๐ Key Dimensions:
1๏ธโฃ Window Width: 1.20 m
2๏ธโฃ Right Arm Length: 2.50 m
3๏ธโฃ Countertop Depth: 0.60 m
4๏ธโฃ Countertop Height: 0.90 m
5๏ธโฃ Base Cabinet Depth: 0.60 m
6๏ธโฃ Countertop Thickness: 25โ40 mm
๐๏ธ Design Considerations:
- Position the sink near the window.
- Separate cooking and washing zones.
- Provide adequate storage and ventilation.
- Maintain sufficient working space.
- Use durable, moisture-resistant materials.
๐ Note: Dimensions are typical references and should be adjusted to suit project requirements and user needs.
@etconp
An L-shaped kitchen uses two adjoining walls to create an efficient cooking, washing, and preparation area while maximizing available space.
๐ Key Dimensions:
1๏ธโฃ Window Width: 1.20 m
2๏ธโฃ Right Arm Length: 2.50 m
3๏ธโฃ Countertop Depth: 0.60 m
4๏ธโฃ Countertop Height: 0.90 m
5๏ธโฃ Base Cabinet Depth: 0.60 m
6๏ธโฃ Countertop Thickness: 25โ40 mm
๐๏ธ Design Considerations:
- Position the sink near the window.
- Separate cooking and washing zones.
- Provide adequate storage and ventilation.
- Maintain sufficient working space.
- Use durable, moisture-resistant materials.
๐ Note: Dimensions are typical references and should be adjusted to suit project requirements and user needs.
@etconp
โค3๐2
๐ก MODERN BEDROOM FEATURE WALL DESIGN
A stylish bedroom feature wall combining vertical fluted panels, decorative square mouldings, an elegant mirror, and an integrated wardrobe for a luxurious modern look.
๐ Key Design Details:
Vertical fluted panels with 60 mm spacing.
Symmetrical decorative wall mouldings.
Integrated mirror (800 ร 1320 mm).
Minimalist built-in wardrobe.
Warm wood and beige finishes.
False ceiling with recessed LED lighting.
โจ Design Highlights: A perfect combination of elegance, functionality, and modern interior detailing.
@etconp
A stylish bedroom feature wall combining vertical fluted panels, decorative square mouldings, an elegant mirror, and an integrated wardrobe for a luxurious modern look.
๐ Key Design Details:
Vertical fluted panels with 60 mm spacing.
Symmetrical decorative wall mouldings.
Integrated mirror (800 ร 1320 mm).
Minimalist built-in wardrobe.
Warm wood and beige finishes.
False ceiling with recessed LED lighting.
โจ Design Highlights: A perfect combination of elegance, functionality, and modern interior detailing.
@etconp
โค4๐1
๐๏ธ SUBCONTRACTOR COMPLETE TOOLKIT
แแณแฅ แฎแแตแซแญแฐแฎแฝ แแ แจแแแ แแแต แฒแตแฐแ!
๐ฆ แ แ แแต แแฌแ แฆ
โ 61+ แแฝ แแแแ
โ Advanced Excel Management System
โ 10 Subcontract Agreements
โ 40 Professional Letters
โ 30 Management Forms
โ G+4 Practical Case Study
๐ แฎแแตแซแตแฃ BOQแฃ แญแแซแฃ แแชแ แจแแฎแแญแต แตแซแแ แ แฐแฐแซแ แแซแ แตแญแแต แญแแฃแ แฉ!
๐ฅ แ แแแ แซแแญแฑ๐
https://ye-buna.com/etconp?ref=product_detail&product=6afea46cb1aff_etconp
แแณแฅ แฎแแตแซแญแฐแฎแฝ แแ แจแแแ แแแต แฒแตแฐแ!
๐ฆ แ แ แแต แแฌแ แฆ
โ 61+ แแฝ แแแแ
โ Advanced Excel Management System
โ 10 Subcontract Agreements
โ 40 Professional Letters
โ 30 Management Forms
โ G+4 Practical Case Study
๐ แฎแแตแซแตแฃ BOQแฃ แญแแซแฃ แแชแ แจแแฎแแญแต แตแซแแ แ แฐแฐแซแ แแซแ แตแญแแต แญแแฃแ แฉ!
๐ฅ แ แแแ แซแแญแฑ๐
https://ye-buna.com/etconp?ref=product_detail&product=6afea46cb1aff_etconp
๐2
๐ฑ SUSTAINABLE CONSTRUCTION โ BUILDING FOR THE LONG TERM
Sustainable construction considers the environmental, social, and economic effects of buildings and infrastructure throughout their lifecycle.
It aims to use resources responsibly while providing safe, durable, and functional structures.
๐น Key Principles
๐ฟ Resource Efficiency: Reduce unnecessary material use and waste.
๐ง Water Management: Use water efficiently and manage runoff appropriately.
โก Energy Efficiency: Improve building performance and reduce unnecessary energy demand.
๐งฑ Material Selection: Consider durability, embodied impacts, availability, and suitability.
โป๏ธ Waste Reduction: Plan material use and recycling where practical.
๐ข Long-Term Performance:
Design for durability, maintenance, and adaptation.
๐น Practical Examples
Designing for efficient natural lighting where suitable.
Improving insulation and shading.
Reducing material waste through better planning.
Selecting durable materials appropriate to local conditions.
Managing construction waste responsibly.
๐ Sustainable construction should balance environmental goals with safety, functionality, cost, and local requirements.
โโโโโโโโโโโโโโ
โ๐ แฐแจแแช แแญแแญ แแจแแแฝแ แฅแ แจแณแแแฑแ แจแฎแแตแตแซแญแฝแ แแแแฝ แแแแแต โแจแแตแกแญ แแแฝแ แญแแฅแ๐
https://www.facebook.com/profile.php?id=61592085774934
@etconp
Sustainable construction considers the environmental, social, and economic effects of buildings and infrastructure throughout their lifecycle.
It aims to use resources responsibly while providing safe, durable, and functional structures.
๐น Key Principles
๐ฟ Resource Efficiency: Reduce unnecessary material use and waste.
๐ง Water Management: Use water efficiently and manage runoff appropriately.
โก Energy Efficiency: Improve building performance and reduce unnecessary energy demand.
๐งฑ Material Selection: Consider durability, embodied impacts, availability, and suitability.
โป๏ธ Waste Reduction: Plan material use and recycling where practical.
๐ข Long-Term Performance:
Design for durability, maintenance, and adaptation.
๐น Practical Examples
Designing for efficient natural lighting where suitable.
Improving insulation and shading.
Reducing material waste through better planning.
Selecting durable materials appropriate to local conditions.
Managing construction waste responsibly.
๐ Sustainable construction should balance environmental goals with safety, functionality, cost, and local requirements.
โโโโโโโโโโโโโโ
โ๐ แฐแจแแช แแญแแญ แแจแแแฝแ แฅแ แจแณแแแฑแ แจแฎแแตแตแซแญแฝแ แแแแฝ แแแแแต โแจแแตแกแญ แแแฝแ แญแแฅแ๐
https://www.facebook.com/profile.php?id=61592085774934
@etconp
โค6
แ แณแแ แญแตแฐแตโผ๏ธ
แ แฎแแ แจแ แแ แแฐแญแแต แ แฐแ แฐแจแฐแฐโผ๏ธ
แ แ แณแญ 9/2019 แ.แ. แจแแแฑ 9 แฐแแต แ แซแฃแขแฃ แ แ แฒแต แ แ แฃ แฎแแแฃ แแซแแฎ แแจแณ 03แฃ แจแแซแญ แแฐ แตแแค แฐแแญ แ แแแตแฐแ แแแแตแฃ แจแแญ แซแ แจแ แฅแ แ แแ แซแต แแญ แจแแ แจ แ แแ แฐแฐแญแแทแแข
แ แแแ แจแแฌแต แแแแ แจแแฎ แจแแแแชแซแ แแแฐแ แแแน แแแแตแ แแแแชแซ แ แแแแแต แแแ แฅแแฐแแ แญ แฐแแแฟแแข
แ แ แฐแแแ แ แฐแ แ แญแแตแ แ แแฅแจแต แแญ แแณแต แฐแญแทแแข
แ แ แแแ แแตแฅ แจแแ แฉ แฐแแฝ แตแแต แฅแแฐแแฑ แแญแ แฅแแฐแฐแแฑ แฅแตแซแแ แฅแจแฐแฃแซ แแแข
แญแ แ แฐแ แจแแแฃแณ แฅแซแตแ แจแแฅแฅแญ แฅแญแแต แแณแญแ แ แ แตแธแณแญ แฅแแตแแแแจแต แซแณแตแฃแแข
แจแแแฃแณ แฐแจแแ แฐแ แแแต แแตแแญแถแฝแ แจแแซแแ แฅแซแแฝ แ แฐแแขแ แแแณ แแแฃแ แญ แ แแฃแธแแข
@etconp
แ แฎแแ แจแ แแ แแฐแญแแต แ แฐแ แฐแจแฐแฐโผ๏ธ
แ แ แณแญ 9/2019 แ.แ. แจแแแฑ 9 แฐแแต แ แซแฃแขแฃ แ แ แฒแต แ แ แฃ แฎแแแฃ แแซแแฎ แแจแณ 03แฃ แจแแซแญ แแฐ แตแแค แฐแแญ แ แแแตแฐแ แแแแตแฃ แจแแญ แซแ แจแ แฅแ แ แแ แซแต แแญ แจแแ แจ แ แแ แฐแฐแญแแทแแข
แ แแแ แจแแฌแต แแแแ แจแแฎ แจแแแแชแซแ แแแฐแ แแแน แแแแตแ แแแแชแซ แ แแแแแต แแแ แฅแแฐแแ แญ แฐแแแฟแแข
แ แ แฐแแแ แ แฐแ แ แญแแตแ แ แแฅแจแต แแญ แแณแต แฐแญแทแแข
แ แ แแแ แแตแฅ แจแแ แฉ แฐแแฝ แตแแต แฅแแฐแแฑ แแญแ แฅแแฐแฐแแฑ แฅแตแซแแ แฅแจแฐแฃแซ แแแข
แญแ แ แฐแ แจแแแฃแณ แฅแซแตแ แจแแฅแฅแญ แฅแญแแต แแณแญแ แ แ แตแธแณแญ แฅแแตแแแแจแต แซแณแตแฃแแข
แจแแแฃแณ แฐแจแแ แฐแ แแแต แแตแแญแถแฝแ แจแแซแแ แฅแซแแฝ แ แฐแแขแ แแแณ แแแฃแ แญ แ แแฃแธแแข
@etconp
๐ญ16โค3
๐ DRAWING REVISIONS โ WHY MUST SITE TEAMS CHECK THEM?
Construction drawings may change as designs are coordinated, clarified, or formally revised.
Using an outdated drawing can lead to incorrect installation, rework, and contractual problems.
๐น What Should You Check?
๐ Drawing number and title.
๐ Revision identifier.
๐ Issue date and approval status.
๐ Revision notes or change descriptions.
๐ Whether the drawing is authorized for the intended use.
๐น Good Site Practice
1๏ธโฃ Obtain drawings through the approved document-control system.
2๏ธโฃ Verify the current revision before starting work.
3๏ธโฃ Remove obsolete copies from active work areas according to project procedures.
4๏ธโฃ Communicate relevant changes to the responsible team.
5๏ธโฃ Record questions and discrepancies.
โ ๏ธ Never assume that the newest file you find is automatically approved for construction.
Verify its status and authorization.
@etconp
Construction drawings may change as designs are coordinated, clarified, or formally revised.
Using an outdated drawing can lead to incorrect installation, rework, and contractual problems.
๐น What Should You Check?
๐ Drawing number and title.
๐ Revision identifier.
๐ Issue date and approval status.
๐ Revision notes or change descriptions.
๐ Whether the drawing is authorized for the intended use.
๐น Good Site Practice
1๏ธโฃ Obtain drawings through the approved document-control system.
2๏ธโฃ Verify the current revision before starting work.
3๏ธโฃ Remove obsolete copies from active work areas according to project procedures.
4๏ธโฃ Communicate relevant changes to the responsible team.
5๏ธโฃ Record questions and discrepancies.
โ ๏ธ Never assume that the newest file you find is automatically approved for construction.
Verify its status and authorization.
@etconp
โค4
๐๏ธ Building Construction โ แจแ
แแ แแแฃแณ แ แแฅ แแฝแแ!
๐แจBuilding Drawing แฅแตแจ Foundation, Floor, Wall, Roof, Stairs, Finishing, Formwork แฅแ Site Safety แตแจแต แจแแซแซแตแต แแ แแแชแซ
๐ท แCivil Engineering Students, Engineers, Architects, QS & Contractors แ แแ แแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6abccc8ece63c_etconp
๐แจBuilding Drawing แฅแตแจ Foundation, Floor, Wall, Roof, Stairs, Finishing, Formwork แฅแ Site Safety แตแจแต แจแแซแซแตแต แแ แแแชแซ
๐ท แCivil Engineering Students, Engineers, Architects, QS & Contractors แ แแ แแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6abccc8ece63c_etconp
โค2๐1
๐ HOW TO READ STRUCTURAL DRAWINGS โ A BEGINNER'S GUIDE
Structural drawings communicate the dimensions, reinforcement, materials, and construction details required for a building's structural system.
๐น Start With These Items
1๏ธโฃ Title Block: Identify the drawing title, number, revision, and relevant project information.
2๏ธโฃ Grid Lines: Understand the structural reference grid.
3๏ธโฃ Dimensions: Check spans, member sizes, levels, and positions.
4๏ธโฃ Sections and Details: Follow references to enlarged views and construction details.
5๏ธโฃ Reinforcement Notes: Review bar sizes, spacing, and arrangement.
6๏ธโฃ Schedules: Check beam, column, footing, and reinforcement schedules where provided.
7๏ธโฃ General Notes: Review material requirements, design references, and construction instructions.
โ ๏ธ Important: Do not interpret an isolated detail without checking its references and related drawings.
If information conflicts or is missing, seek clarification through the proper project process.
๐แจแ แแ แฒแแญแ แแแ แแแ แฅ แซแตแธแแฎแณแ?
๐แญแ Complete Guide to Reading Building Drawings แจแฐแฐแ แแญแฅ แแ แแ แจแ แแแ แตแฎแแแ แ แฐแแฃแญ แแแจแณแต แฅแ แตแ แ แ แแ แ แญแญแดแญแธแญ แณแญแแต แจแแณแตแต แแ แจแณแฝ แฃแแ แแแญ แซแแฉแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6aa7c4a30b34d_etconp
Structural drawings communicate the dimensions, reinforcement, materials, and construction details required for a building's structural system.
๐น Start With These Items
1๏ธโฃ Title Block: Identify the drawing title, number, revision, and relevant project information.
2๏ธโฃ Grid Lines: Understand the structural reference grid.
3๏ธโฃ Dimensions: Check spans, member sizes, levels, and positions.
4๏ธโฃ Sections and Details: Follow references to enlarged views and construction details.
5๏ธโฃ Reinforcement Notes: Review bar sizes, spacing, and arrangement.
6๏ธโฃ Schedules: Check beam, column, footing, and reinforcement schedules where provided.
7๏ธโฃ General Notes: Review material requirements, design references, and construction instructions.
โ ๏ธ Important: Do not interpret an isolated detail without checking its references and related drawings.
If information conflicts or is missing, seek clarification through the proper project process.
๐แจแ แแ แฒแแญแ แแแ แแแ แฅ แซแตแธแแฎแณแ?
๐แญแ Complete Guide to Reading Building Drawings แจแฐแฐแ แแญแฅ แแ แแ แจแ แแแ แตแฎแแแ แ แฐแแฃแญ แแแจแณแต แฅแ แตแ แ แ แแ แ แญแญแดแญแธแญ แณแญแแต แจแแณแตแต แแ แจแณแฝ แฃแแ แแแญ แซแแฉแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6aa7c4a30b34d_etconp
โค1๐1๐ฅฐ1๐ญ1
๐แจแแฌแต แซแฃ แจแแจแแแ แต แฅแ แฐแแบแแฝ แแแฐแ แจแแแแแ แตแ แแแณ แแแแฐแ แจแแก แ แแ
แฃ แฐแแฅ แฅแ แแแชแซแแฝ แแ แญแแ?
แจแฅแแ แ แ แแแฅแแข แฅแซแ แค แจแ แณแแ แแฃ แแจแต แแแญ แฅแ แแแต แญแแญ แจแแแ แญแ แแจแ แแแแ แญแฐแญแต แแแต Share แ แแตแจแ แญแฐแฃแ แฉแข แแแซแแแต แแซแต แแแข
1.แแแแฅ แฅแ แ แฒแฃแ แจแแฌแต แญแแณ แจแแแแ แ แตแฃ แซแณ แจแแจแแแ แต แฅแ แฐแแบแแฝ แแแฐแ แจแแแแแ แตแ แแแณ แแแแฐแ แจแแฃ แ แแ แค
2. แแ แแฅ แฅแ แ แฒแฃแ แแฌแต แฒแแแ แตแแแจแแ แซแณ แฅแ แฐแแบ แตแแแแแ แจแแฃ แจแแแตแตแฎแฝ แแญแญ แคแต แฐแแฅ แคแฅแ
3.แ แ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แแฌแต แแ แแฅ แฅแ แ แฒแแแ แซแณแ แแตแญ แจแแฐแฅแ แต แฅแ แจแแแต แฐแแบแแฝ แแแฐแ แจแแแแแ แต แแแชแซ
1.แแแแฅ แฅแ แ แฒแฃแ แจแแฌแต แญแแณ แจแแแแ แ แตแฃ แซแณ แจแแจแแแ แต แฅแ แฐแแบแแฝ แแแฐแ แจแแแแแ แตแ แแแณ แแแแฐแ แจแแฃ แ แแ 1161/2011 แค
แแแแตแต แแแแฅ แ แแแแแต แแแซแจแแแแธแ แจแแแต แฅแซแแฝ แแฌแตแ แแ แแ แ แตแแแ แตแแแแค
แจแ แแชแฑ แจแฐแแฝ แจแแ แแฐ แแ แฅแซแฐแแ แจแแแชแแนแ แแฅแญ แฅแจแจแแจ แ แแแฑ แ แจแฐแแฝ แแแ แแ แจแต แแแแชแซ แคแต แแแฃแณแฃ แแแ แจแฐ แแแตแฃ แแขแแจแตแตแแแตแ แแแแฝ แ แแแแแถแฝ แจแแแ แจแจแฐแ แแฌแตแ แแแถ แแแแต แ แตแแแ แ แแแแฃแฅแแฒแแ แ แแ แญ แแแจแแแ แจแแแต แฅแซแแฝ แแฌแต แ แแแ แถ แแ แจแฅ แ แแตแแแแค
แจแแฌแต แญแแณ แฅแแฒแแ แแฐแฐแจแ แฃแแญแแณ แฐแแขแ แฐแแฃแฃแ แซแฃแ แจแฐแแฝ แตแแ แแแญแแ แแแต แแตแฅ แแแฃแต แจแแแฃแธแแ แแ แจแณแ แแญแแแฝแ แแญแถ แแแฐแ แ แแตแแแแค
แซแฃแแ แจแแฐแแแฃ แจแแญแแ แฅแ แฐแแบแแฝแ แแแถ แจแแแแ แฅแแฃแแ แแแแแต แซแแฃแธแแ แ แซแแต แ แแแฝ แแญแถ แแแแฐแ แ แแตแแแแค
แ แแฃแฉ แแ แซแแ แ แจแแ แญแแฐแถแฝแ แแแฝ แจแแฌแต แญแแณ แแแตแฐแซแจแแ แจแแแแ แ แตแ แฅแ แซแฃ แจแแจแแแ แต แฅแญแแฑแ แญแ แแฅ แแคแณแ แจแแซแฐแญแ แตแแแแแฝแ แแซแฐแต แ แตแแแ แแ แ แแแแฑแค
แจแญแแณ แแแณแตแ แซแณ แญแแซ แแญ แฐแซแญแ แตแแแแญ แจแ แฌแณ แ แแซแจแฅแ แแณแ แ แฐแฃแฅ แตแญแแต แ แแแฝ แแแฐแ แ แตแแแ แ แแแแค
แจแแฐแซแ แแแแฅแต แจแแฌแต แ แ แแแ แแ แจแแแฃแต แฅแแฃแ แฅแแณแแ แ แแ แแแแตแฑ แ แแแฝ 51(5) แ แแฐแแแแฃ แแ แแฅ แฅแ แ แฒแฃแ แจแแแแ แแฅแจแตแ แ แแแแจแต แฐแแฃแฃแ แซแฃ แ แ แตแแซ แฅแแฒแจแแ แ แ แแแฝ (8) แ แแฐแแแ แฅแแฒแแ แฐแแบแแฝ แ แแแแตแต แแญแณแณ แฅแแฒแแแ แ แ แแแฝ 44(2) แจแฐแแแ แแ แแ แจแฐ แแณแฅ แ แแญแแญ แแฐแแแ แ แแตแแแแค
แ แขแตแฎแตแซ แแฐแซแแ แฒแแญแซแฒแซแ แชแแฅแแญ แแ แแแแฅแต แ แแแฝ 55 (2)(แ) แแ แจแต แจแแจแฐแแ แณแแแแข
2.แแ แแฅ แฅแ แ แฒแฃแ แแฌแต แฒแแแ แตแแแจแแ แซแณ แฅแ แฐแแบ แตแแแแแ แจแแฃ แจแแแตแตแฎแฝ แแญแญ แคแต แฐแแฅ 472/2012 แค
แจแขแตแฎแตแซ แแฐแซแแ แฒแแญแซแฒแซแ แชแแฅแแญ แ แตแแแ แ แซแแตแ แฅแแฃแแ แฐแแฃแญ แแแแฐแ แ แแฃแ แ แแ แแฅแญ 1097/2011 แ แแแฝ 5 แฅแ แแแแฅ แฅแ แ แฒแฃแ แจแแฌแต แญแแณ แจแแแแ แ แตแแฃ แซแฃ แจแแจแแแ แตแ แฅแ แฐแแบแแฝ แแแฐแ แจแแแแแ แตแ แแแแฐแ แ แแฃแ แ แแ แแฅแญ 1161/2011 แ แแแฝ 26(1) แแ แจแต แจแแแตแตแฎแฝ แแญแญ แคแต แญแ แแ แฐแแฅ แ แแฅแทแแกแก
3.แ แ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แแฌแต แแ แแฅ แฅแ แ แฒแแแ แซแณแ แแตแญ แจแแฐแฅแ แต แฅแ แจแแแต แฐแแบแแฝ แแแฐแ แจแแแแแ แต แแแชแซ แแฅแญ 79/2014
๐แจแขแตแฎแตแซ แจแฎแแตแตแซแญแฝแ แแ แฅแ แ แฐแแฃแ แฉ | แจแฐแแฃแญ แแแชแซ แแ แแ แญแแแแ?
๐ แญแ แแ แแ แ แฎแแตแตแซแญแฝแ แฅแซ แแตแฅ แจแแแแจแฑ แจแแ แแณแฎแฝแ แ แแแแ แฐแแฃแซแ แแแฉ แแแจแณแต แญแจแณแแข
โบแจแฎแแตแตแซแญแฝแ แแ แแ แจแณแ แแแแค
โบแจแแแฃแณ แแฎแแญแต แแแ แ แฐแแฃแ แญ
โบแจแฐแแแญ แแแแฝ แแฅแตแ แแดแณ
โบแจแฎแแตแซแต แฅแ แจแตแแแแต แแณแฎแฝ
โบแจแแแฃแณ แฅแซ แแแแแตแ แฐแ แซแแแต
โบแ แแแฃแณ แฅแซ แแญ แจแแแ แฉ แจแแ แแณแฎแฝ แฅแ แแแฝ แฐแซแฐแแ๐
https://ye-buna.com/etconp?ref=product_detail&product=6a83e1c10064f_etconp
แจแฅแแ แ แ แแแฅแแข แฅแซแ แค แจแ แณแแ แแฃ แแจแต แแแญ แฅแ แแแต แญแแญ แจแแแ แญแ แแจแ แแแแ แญแฐแญแต แแแต Share แ แแตแจแ แญแฐแฃแ แฉแข แแแซแแแต แแซแต แแแข
1.แแแแฅ แฅแ แ แฒแฃแ แจแแฌแต แญแแณ แจแแแแ แ แตแฃ แซแณ แจแแจแแแ แต แฅแ แฐแแบแแฝ แแแฐแ แจแแแแแ แตแ แแแณ แแแแฐแ แจแแฃ แ แแ แค
2. แแ แแฅ แฅแ แ แฒแฃแ แแฌแต แฒแแแ แตแแแจแแ แซแณ แฅแ แฐแแบ แตแแแแแ แจแแฃ แจแแแตแตแฎแฝ แแญแญ แคแต แฐแแฅ แคแฅแ
3.แ แ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แแฌแต แแ แแฅ แฅแ แ แฒแแแ แซแณแ แแตแญ แจแแฐแฅแ แต แฅแ แจแแแต แฐแแบแแฝ แแแฐแ แจแแแแแ แต แแแชแซ
1.แแแแฅ แฅแ แ แฒแฃแ แจแแฌแต แญแแณ แจแแแแ แ แตแฃ แซแณ แจแแจแแแ แต แฅแ แฐแแบแแฝ แแแฐแ แจแแแแแ แตแ แแแณ แแแแฐแ แจแแฃ แ แแ 1161/2011 แค
แแแแตแต แแแแฅ แ แแแแแต แแแซแจแแแแธแ แจแแแต แฅแซแแฝ แแฌแตแ แแ แแ แ แตแแแ แตแแแแค
แจแ แแชแฑ แจแฐแแฝ แจแแ แแฐ แแ แฅแซแฐแแ แจแแแชแแนแ แแฅแญ แฅแจแจแแจ แ แแแฑ แ แจแฐแแฝ แแแ แแ แจแต แแแแชแซ แคแต แแแฃแณแฃ แแแ แจแฐ แแแตแฃ แแขแแจแตแตแแแตแ แแแแฝ แ แแแแแถแฝ แจแแแ แจแจแฐแ แแฌแตแ แแแถ แแแแต แ แตแแแ แ แแแแฃแฅแแฒแแ แ แแ แญ แแแจแแแ แจแแแต แฅแซแแฝ แแฌแต แ แแแ แถ แแ แจแฅ แ แแตแแแแค
แจแแฌแต แญแแณ แฅแแฒแแ แแฐแฐแจแ แฃแแญแแณ แฐแแขแ แฐแแฃแฃแ แซแฃแ แจแฐแแฝ แตแแ แแแญแแ แแแต แแตแฅ แแแฃแต แจแแแฃแธแแ แแ แจแณแ แแญแแแฝแ แแญแถ แแแฐแ แ แแตแแแแค
แซแฃแแ แจแแฐแแแฃ แจแแญแแ แฅแ แฐแแบแแฝแ แแแถ แจแแแแ แฅแแฃแแ แแแแแต แซแแฃแธแแ แ แซแแต แ แแแฝ แแญแถ แแแแฐแ แ แแตแแแแค
แ แแฃแฉ แแ แซแแ แ แจแแ แญแแฐแถแฝแ แแแฝ แจแแฌแต แญแแณ แแแตแฐแซแจแแ แจแแแแ แ แตแ แฅแ แซแฃ แจแแจแแแ แต แฅแญแแฑแ แญแ แแฅ แแคแณแ แจแแซแฐแญแ แตแแแแแฝแ แแซแฐแต แ แตแแแ แแ แ แแแแฑแค
แจแญแแณ แแแณแตแ แซแณ แญแแซ แแญ แฐแซแญแ แตแแแแญ แจแ แฌแณ แ แแซแจแฅแ แแณแ แ แฐแฃแฅ แตแญแแต แ แแแฝ แแแฐแ แ แตแแแ แ แแแแค
แจแแฐแซแ แแแแฅแต แจแแฌแต แ แ แแแ แแ แจแแแฃแต แฅแแฃแ แฅแแณแแ แ แแ แแแแตแฑ แ แแแฝ 51(5) แ แแฐแแแแฃ แแ แแฅ แฅแ แ แฒแฃแ แจแแแแ แแฅแจแตแ แ แแแแจแต แฐแแฃแฃแ แซแฃ แ แ แตแแซ แฅแแฒแจแแ แ แ แแแฝ (8) แ แแฐแแแ แฅแแฒแแ แฐแแบแแฝ แ แแแแตแต แแญแณแณ แฅแแฒแแแ แ แ แแแฝ 44(2) แจแฐแแแ แแ แแ แจแฐ แแณแฅ แ แแญแแญ แแฐแแแ แ แแตแแแแค
แ แขแตแฎแตแซ แแฐแซแแ แฒแแญแซแฒแซแ แชแแฅแแญ แแ แแแแฅแต แ แแแฝ 55 (2)(แ) แแ แจแต แจแแจแฐแแ แณแแแแข
2.แแ แแฅ แฅแ แ แฒแฃแ แแฌแต แฒแแแ แตแแแจแแ แซแณ แฅแ แฐแแบ แตแแแแแ แจแแฃ แจแแแตแตแฎแฝ แแญแญ แคแต แฐแแฅ 472/2012 แค
แจแขแตแฎแตแซ แแฐแซแแ แฒแแญแซแฒแซแ แชแแฅแแญ แ แตแแแ แ แซแแตแ แฅแแฃแแ แฐแแฃแญ แแแแฐแ แ แแฃแ แ แแ แแฅแญ 1097/2011 แ แแแฝ 5 แฅแ แแแแฅ แฅแ แ แฒแฃแ แจแแฌแต แญแแณ แจแแแแ แ แตแแฃ แซแฃ แจแแจแแแ แตแ แฅแ แฐแแบแแฝ แแแฐแ แจแแแแแ แตแ แแแแฐแ แ แแฃแ แ แแ แแฅแญ 1161/2011 แ แแแฝ 26(1) แแ แจแต แจแแแตแตแฎแฝ แแญแญ แคแต แญแ แแ แฐแแฅ แ แแฅแทแแกแก
3.แ แ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แแฌแต แแ แแฅ แฅแ แ แฒแแแ แซแณแ แแตแญ แจแแฐแฅแ แต แฅแ แจแแแต แฐแแบแแฝ แแแฐแ แจแแแแแ แต แแแชแซ แแฅแญ 79/2014
๐แจแขแตแฎแตแซ แจแฎแแตแตแซแญแฝแ แแ แฅแ แ แฐแแฃแ แฉ | แจแฐแแฃแญ แแแชแซ แแ แแ แญแแแแ?
๐ แญแ แแ แแ แ แฎแแตแตแซแญแฝแ แฅแซ แแตแฅ แจแแแแจแฑ แจแแ แแณแฎแฝแ แ แแแแ แฐแแฃแซแ แแแฉ แแแจแณแต แญแจแณแแข
โบแจแฎแแตแตแซแญแฝแ แแ แแ แจแณแ แแแแค
โบแจแแแฃแณ แแฎแแญแต แแแ แ แฐแแฃแ แญ
โบแจแฐแแแญ แแแแฝ แแฅแตแ แแดแณ
โบแจแฎแแตแซแต แฅแ แจแตแแแแต แแณแฎแฝ
โบแจแแแฃแณ แฅแซ แแแแแตแ แฐแ แซแแแต
โบแ แแแฃแณ แฅแซ แแญ แจแแแ แฉ แจแแ แแณแฎแฝ แฅแ แแแฝ แฐแซแฐแแ๐
https://ye-buna.com/etconp?ref=product_detail&product=6a83e1c10064f_etconp
โค5๐1
๐๏ธ SUBCONTRACTOR COMPLETE TOOLKIT
๐แแณแฅ แฎแแตแซแญแฐแฎแฝ แแ แจแแแ แแแต แฒแตแฐแ!
๐ฆ แ แ แแต แแฌแ แฆ
โ 61+ แแฝ แแแแ
โ Advanced Excel Management System
โ 10 Subcontract Agreements
โ 40 Professional Letters
โ 30 Management Forms
โ G+4 Practical Case Study
๐ แฎแแตแซแตแฃ BOQแฃ แญแแซแฃ แแชแ แจแแฎแแญแต แตแซแแ แ แฐแฐแซแ แแซแ แตแญแแต แญแแฃแ แฉ!
๐ฅ แ แแแ แจแณแฝ แฃแแ แแแญ แซแแญแฑ๐
https://ye-buna.com/etconp?ref=product_detail&product=6afea46cb1aff_etconp
๐แแณแฅ แฎแแตแซแญแฐแฎแฝ แแ แจแแแ แแแต แฒแตแฐแ!
๐ฆ แ แ แแต แแฌแ แฆ
โ 61+ แแฝ แแแแ
โ Advanced Excel Management System
โ 10 Subcontract Agreements
โ 40 Professional Letters
โ 30 Management Forms
โ G+4 Practical Case Study
๐ แฎแแตแซแตแฃ BOQแฃ แญแแซแฃ แแชแ แจแแฎแแญแต แตแซแแ แ แฐแฐแซแ แแซแ แตแญแแต แญแแฃแ แฉ!
๐ฅ แ แแแ แจแณแฝ แฃแแ แแแญ แซแแญแฑ๐
https://ye-buna.com/etconp?ref=product_detail&product=6afea46cb1aff_etconp
โค2๐1๐1
๐๏ธ แจ แฎแแตแตแซแญแฝแ แตแซ แแ แฐแฅแณแคแแฝ แญแแแแ?
๐120+ แแตแซ แแแ แจแแ แตแณแแณแญแต แฐแฅแณแคแแฝ
โ แแฎแแตแซแญแฐแฎแฝแ แแ แแ แแซแชแแฝ แฐแแแ แถ แจแแจแ
โ แจ PPA 2025 แฅแ FIDIC Red Book 2017 แ แแฝ แแญ แแ แ แแ แจแฐแฃแฃแ
โ แ Microsoft Word แ แแแ แคแฒแต แจแแฐแจแ (Editable) แจแฐแจแแช PDF แแญแแฝ
๐ แจแฎแแตแซแต แ แตแฐแณแฐแญ แตแซแแ แแแแ แแฎแแฝแแ แแแตแจแ แแญแแน แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
๐120+ แแตแซ แแแ แจแแ แตแณแแณแญแต แฐแฅแณแคแแฝ
โ แแฎแแตแซแญแฐแฎแฝแ แแ แแ แแซแชแแฝ แฐแแแ แถ แจแแจแ
โ แจ PPA 2025 แฅแ FIDIC Red Book 2017 แ แแฝ แแญ แแ แ แแ แจแฐแฃแฃแ
โ แ Microsoft Word แ แแแ แคแฒแต แจแแฐแจแ (Editable) แจแฐแจแแช PDF แแญแแฝ
๐ แจแฎแแตแซแต แ แตแฐแณแฐแญ แตแซแแ แแแแ แแฎแแฝแแ แแแตแจแ แแญแแน แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6ad26ce4d2235_etconp
โค3๐2