🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
Dubai marina UAE 🇦🇪
ውብ ምሽት ተመኘን
Seoul South Korea 🇰🇷
ውብ ምሽት ተመኘን
Forwarded from Ethio Construction Engineering (FILA)
👉ELEMENTS OF AN ASPHALT CONCRETE
PAVEMENT @COTMp
.
➡Asphalt concrete pavements also called flexible pavements are pavements built from asphalt- concrete (asphalt, coarse aggregate, filler (optional) , and fine aggregate).
They transmit loads imposed on the surface through lateral distribution of the applied loads over depth.
.
➡The elements of an asphalt concrete pavement are:👇
.
▶Surfacing: This is the uppermost layer of the
pavement. The primary function of the surfacing is
to provide a safe and comfortable riding surface for the traffic. It is also expected to protect the layers underneath from the effects of natural elements
(wind, rain, ice etc.) as well as the disintegrating
effects from vehicles skidding and braking on the roadway. In this regard, it should be impervious so
as to waterproof the underlying layers. In higher
types of roads, it may consist of two distinct sub
layers known as a wearing course and a base
course.
.
▶ Base: this is the most important and normally the thickest layer of an asphalt concrete pavement on which the surfacing rests. It is the main load
spreading layer of the pavement. It bears the burden of distributing the applied surface loads in such a manner that the bearing Capacity of the subgrade is not exceeded. It should therefore be built from high quality materials capable of withstanding the applied loads on the surface. It consist of either: crushed stone or gravel, gravelly soils, decomposed rocks, sands or sand-clays stabilized with cement, lime or bitumen.
.
▶Sub-base: The sub-base is the secondary load
spreading layer of the pavement underlying the
base. It may or may not be present in a pavement
depending on the purpose for which it is to be
used. It helps to distribute the applied loads to the
subgrade. Its stresses are less than those of the
base. Therefore its materials can be of lower quality than those of the base but must always be stronger than those of the subgrade. It is usually coarse grained or granular to act as a drainage layer for passage of any moisture which falls during
construction or after construction to the highway drainage system.
.
▶Subgrade: this is the upper layer of the natural soil over which the pavement is being built. It may be undisturbed local material exposed by excavation or soil excavated elsewhere and placed into an embankment. It is usually compacted during
construction to give added stability.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👉ROLES OF A QUANTITY SURVEYOR @COTMp
~~~~~~~~~~~~~~~
▶Quantity surveyor calculates the cost by calculating the quantity of material required for any and every activity involved in construction.
He/She is also involved:in planning and contracting related job which is
mainly involved in the construction cost calculation.
➡The role of a quantity surveyor are listed below:👇
1. Estimating.
2. Cost planning.
3. Preparing, negotiating and analyzing costs for
tenders and contracts.
4. Procurement advice.
5. Preparing Bill of Quantities (BOQ).
6. Monitoring Budget.
7. Preparation of Payment Invoice and certification.
8. Assessment of variations
9. Dispute resolution.
10. Preparing feasibility studies.
11. Cost control.
12. Value engineering.
13. Advice on cost limits and budgets
14. Whole life cycle costing.
15. Valuation for insurance purposes.
16. Project management.
17. Advice on contractual disputes.
18. Preparation of final account.
19. Site visits, assessments, and projections for
future work.
20. Analysing completed work and arranging
payment to contractors.
21. Allocating upcoming work to contractors.
Besides these, quantity surveyors may choose to
specialize in a specific area of the construction
industry and focus on areas like costing advice,
property taxation, application to funding sources, maintenance of existing buildings, etc.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
❤1
Forwarded from Ethio Construction Engineering (FILA)
👉ኣሁን ደሞ Unit Weight Of Building Materials እንይ @COTMp
.
*Water- 1000 Kg/ m3
*Bricks (broken) - 1420 Kg/ m3
*Bricks(common) -1600 Kg/ m3
*Cement(ordinary)- 1440 Kg/ m3
*Cement (rapid hardening)- 1250 Kg/ m3
*Cement Mortar - 2000 Kg/ m3
*Cement Concrete (Plain) - 2400 Kg/ m3
*Cement Concrete (Reinforced) -2500 Kg/ m3
*Glass - 2500 Kg/ m3
*Lime Concrete - 1900 Kg/ m3
*Cement Plaster - 2000 Kg/ m3
*Lime Plaster - 1700 Kg/ m3
*Stones (Ballast) - 1720 Kg/ m3
*Stones (Aggregates)- 1750 Kg/ m3
*Stones (Basalt)- 2850 Kg/ m3
*Stones (Granite) - 2450 Kg/ m3
*Stones (Marble)- 2650 Kg/ m3
*Timber (Oak, Sal) - 510 Kg/ m3
*Timber (Mango) - 650 Kg/ m3
*Timber (Teak)- 625 Kg/ m3
*Coal- 600 Kg/ m3 *Plastics- 1250 Kg/ m3
*Oils- 800 Kg/ m3
*Ashes- 650 Kg/ m3
*Clinker- 750 Kg/ m3
*Rubber- 1300 Kg/ m3
*Slag- 1500 Kg/ m3
*Clay Soil- 1900 Kg/ m3
*Sand (dry) - 1540 to 1600 Kg/ m3
*Sand (wet)- 1760 to 2000 Kg/ m3
*Steel- 7850 Kg/ m3
*Chalk- 2100 Kg/ m3
*Bitumen- 1040 Kg/ m3
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Evolution tower Moscow Russia 🇷🇺
ውብ ምሽት ተመኘን
Arrows are forces on hinges
Santiago bernabu Madrid Spain 🇪🇸
👉 Concrete cover Spacing According to IS (Indian Standard) @COTMp
👉 Insight on Tower crane movements @COTMp

Hoisting - Vertical movement of the crane hook block.

Trolling - Horizontal movement of the hook block forward or backward movement.

Traveling - Horizontal movement of the base to change the position (to optain better site coverage through rail mounted or traveling crane)

Slewing - Rotational movement of the jib (superstructure). By the help of slewing ring.

https://t.me/COTMp
Cost Breadown Example.pdf
1.2 MB
👉ብዝዎቻቹ በጠየቃቹሁን መሠረት
፡
▶️Cost Breakdown አዘጋጅተንላቹዋል
👍1
👉Water we used for mixing Concrete @COTMp
.
◇ water is needed for two purposes:
1. Chemical Reaction with cement
2. Workability
□ water is good for preventing plastic shirnkage
cracking and workability.
.
■ Water is bad for permeability, strength, durability.
.
● Impurities in mixing water may cause:
○ Abnormal setting time
○ decreased strength
○ Volume changes
○ Efflorescence
○ Corrosion of reinforcement
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👉Are you supervisor/Inspector/Resident Engineer??
▶What are good quality of them. @COTMp
.
♡ supervision is important to ensure the structure
being executed are constructed according to Design, Specification, code requirement as well as accepted practice.
.
♡ these are quality of Good supervisor
.
1. Observation Skill:
2. Technical skill: Familiar with current technology
and code standard
3. Communication Skill: Written and oral, Listening
and speaking.
4. Negotiating: about Scope, cost or schedule
objective, resource assignment.
5. Problem solving skill: decision making at the
right time
6. Analytical skills: looking at the big picture while
at the same time separately understanding critical elements.
.
🚩ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👉MAIN TECHNICAL DATA ON ABAY DAM
.
Height: 155 m
.
Length: 1,800 m
.
Excavations: 3,500,000 m³
.
Volume: 10,400,000 m³
.
⚡POWERHOUSES (x2)
.
Right riverbank: 10 Francis turbines, each offering 375 MW
.
Left riverbank: 6 Francis turbines, each offering 375 MW
.
⚡POWER & ENERGY
.
Installed power: 6,000 MW
.
Generation capacity: 15,000 GWh/year
.
▶ROCKFILL SADDLE DAM

Height: 50 m

Length: 5,000 m

Rock fill Volume: 16,500,000 m³
👉7 meter is there any limit for cantilever?
.
▶️Put ur answer on our Discussion Group @COTMp