👉MAN POWER(LABOUR) WORK IN THE SITE WITH THEIR FUNCTION
.
▶Mason=to work masonry world
.
▶forman=the right hand than work the site for the execution.
.
▶site Engineer=control all activity in the effort
.
▶Office Engineer=paper payment,take off and report
.
▶Store keeper = to control the materials in the store
.
▶chisseler = a person who works chisel work for the electrical installation.
.
▶carpenter = a person works form works
.
▶plasterer = work plastering works .
.
▶data collector = to collect data in the site .
.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
.
Join for more updates via the link below;
👇👇👇👇👇
http://t.me/ETCONp
👆👆👆👆👆
.
▶Mason=to work masonry world
.
▶forman=the right hand than work the site for the execution.
.
▶site Engineer=control all activity in the effort
.
▶Office Engineer=paper payment,take off and report
.
▶Store keeper = to control the materials in the store
.
▶chisseler = a person who works chisel work for the electrical installation.
.
▶carpenter = a person works form works
.
▶plasterer = work plastering works .
.
▶data collector = to collect data in the site .
.
ለሁሉም እንዲዳረስ ፖስቶቹን SHARE አድርጉልን።
.
Join for more updates via the link below;
👇👇👇👇👇
http://t.me/ETCONp
👆👆👆👆👆
Telegram
Ethio Construction Engineering
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
👉እንወያይበት .... @COTMp
.
▶️የግዥ አዋጅ ቁጥር 649/2001 ላይ የተሰጠ የማሻሻያ ሀሳብ (በተለይ ከግንባታ ስራዎች ግዥ አንጻር)...
.
1. በመሰረታዊነት ቢሻሻል/ቢቀየር የምለው ጉዳይ አዋጁ የግንባታ የግዥ ሂደትን ከሌሎች ግዥዎች ጋር በአንድ አዋጅ ለመጠቅለል ባይሞክር ነው:: *የግንባታ ግዥዎች ካላቸው ውስብስብ ባህሪና ልዩ የአፈፃፀም ስልት አንፃር ለብቻው (የግንባታውንና የማማከሩን ያካተተ) ዝርዝር አዋጅ ያስፈልገዋል ባይ ነኝ::
2. በአዋጁ ላይ ያለው መሰረታዊ ጉድለት ከኮንትራት አስተዳደር አንጻር ድንጋጌዎችን አለማካተቱ ነው። አዋጁን ተከትሎ በፋይናንስና ኢኮኖሚ ሚኒስቴር 2002 ዓም በወጣው የግዥ መመሪያ ላይ የተገለጹ የኮንትራት አስተዳደርና ከዋጋ ማሻሻያ ጋር የተያያዙ አንቀጾች ቢኖሩም፤ በአዋጁ ላይ ስላልተደነገጉ አሻሚ ለሆኑ አተረጓጎሞችና አፈጻጸሞች ሲዳረጉ ይስተዋላል።
ለማሳያ ያክል በመመሪያው ላይ ከአንቀጽ 28 እስከ 30 ድረስ ስለ ውል አስተዳደር የተቀመጡ መመሪያዎች ቢኖሩም በአዋጁ ላይ መሰረት (Reference) የሚሆን ነገር አልተደነገገም። በተጨማሪም በመመሪያው አንቀጽ 16 ላይ የተጠቀሱት የዋጋ ማሻሻያ መመሪያዎች በአዋጁ ላይ አስገዳጅ ድንጋጌዎች ባለመኖራቸው ትግበራው ላይ ጉልበት እንዲያንሳቸው ምክኒያት ሆኗል። ምንም እንኳን በመመሪያው ላይ በዝርዝር መሻሻል የሚኖርባቸው ቢሆንም በዋስትና (Guarantee) እና መያዣ ገንዘብ (Retention) አተገባበር ላይም አመላካች ድንጋጌዎችን ማስቀመጡ ጠቃሚ ነው።
በአጠቃላይ በተለይ የግንባታ ስራ ግዥ ሂደት ተጠናቀቀ የሚባለው መቼ ነው የሚለው ትርጓሜ ላይ መግባባት ያስፈልጋል። በእኔ እምነት ሂደቱ ተጠናቀቀ የሚባለው የስራ ተቋራጮችን መረጣ ጨርሶ ውለታ ሲታሰር መሆን የለበትም። ሂደቱ ተጠናቀቀ የሚባለው የሚፈለገው የፕሮጀክት ስራ ውለታ ሲጠናቀቅ ነው። ይሄ ደግሞ የኮንትራት አስተዳደርንም ይጨምራል።
*ስለሆነም የግዥ አዋጁ ከላይ ለማሳያነት የተጠቀሱትን ጨምሮ ሌሎች የኮንትራት አስተዳደር ጉዳዮች ላይ አስገዳጅ ድንጋጌዎችን ማካተት ይኖርበታል።
*በህግ ቅደም ተከተል ደረጃ መርህም የግዥ መመሪያው የአዋጁ ውላጅ (subordinate) በመሆኑ መጣጣምና መናበብ ይኖርባቸዋል።
*የግዥ ደንቡም (SBD) አዋጁንና መመሪያውን ተከትሎ የሚዘጋጅ የማስፈጸሚያ ሰነድ (Standard Document) መሆኑ ይታወቃል።
.
3. በነባሩ አዋጅ ላይ ቢሻሻሉ የምላቸው ነጥቦች በተለይ ከቅሬታ አቀራረብ ጋር የተደነገገው አንቀጽ 73 እና 74 ላይ ነው አንቀጽ 73.1(ሐ) ብዥታን የሚፈጥር ስለሆነ ቢሰረዝ ወይንም ተሻሽሎ ግልጽነት ባለው መልኩ ቢቀመጥ
*አንቀጽ 74.2 ለግዥ ፈጻሚው የቅሬታ ማቅረቢያ ጊዜ ከ5 ወደ 10 ቢሻሻል
*አንቀጽ 74.3 ቅሬታ የቀረበበት የመንግስት መስሪያ ቤት መልሱን በጽሁፍ ከመመለሱ በፊት ከቅሬታ አቅራቢው ድርጅት ጋር ውይይት የማድረግ አስገዳጅነት ቢካተት
*አንቀጽ 74.4 ለቡርዱ የቅሬታ ማቅረቢያ ጊዜ ከ5 ወደ 10 ቢሻሻል
.
👉ተወያዩበት👇👇👇
http://t.me/COTMp
.
▶️የግዥ አዋጅ ቁጥር 649/2001 ላይ የተሰጠ የማሻሻያ ሀሳብ (በተለይ ከግንባታ ስራዎች ግዥ አንጻር)...
.
1. በመሰረታዊነት ቢሻሻል/ቢቀየር የምለው ጉዳይ አዋጁ የግንባታ የግዥ ሂደትን ከሌሎች ግዥዎች ጋር በአንድ አዋጅ ለመጠቅለል ባይሞክር ነው:: *የግንባታ ግዥዎች ካላቸው ውስብስብ ባህሪና ልዩ የአፈፃፀም ስልት አንፃር ለብቻው (የግንባታውንና የማማከሩን ያካተተ) ዝርዝር አዋጅ ያስፈልገዋል ባይ ነኝ::
2. በአዋጁ ላይ ያለው መሰረታዊ ጉድለት ከኮንትራት አስተዳደር አንጻር ድንጋጌዎችን አለማካተቱ ነው። አዋጁን ተከትሎ በፋይናንስና ኢኮኖሚ ሚኒስቴር 2002 ዓም በወጣው የግዥ መመሪያ ላይ የተገለጹ የኮንትራት አስተዳደርና ከዋጋ ማሻሻያ ጋር የተያያዙ አንቀጾች ቢኖሩም፤ በአዋጁ ላይ ስላልተደነገጉ አሻሚ ለሆኑ አተረጓጎሞችና አፈጻጸሞች ሲዳረጉ ይስተዋላል።
ለማሳያ ያክል በመመሪያው ላይ ከአንቀጽ 28 እስከ 30 ድረስ ስለ ውል አስተዳደር የተቀመጡ መመሪያዎች ቢኖሩም በአዋጁ ላይ መሰረት (Reference) የሚሆን ነገር አልተደነገገም። በተጨማሪም በመመሪያው አንቀጽ 16 ላይ የተጠቀሱት የዋጋ ማሻሻያ መመሪያዎች በአዋጁ ላይ አስገዳጅ ድንጋጌዎች ባለመኖራቸው ትግበራው ላይ ጉልበት እንዲያንሳቸው ምክኒያት ሆኗል። ምንም እንኳን በመመሪያው ላይ በዝርዝር መሻሻል የሚኖርባቸው ቢሆንም በዋስትና (Guarantee) እና መያዣ ገንዘብ (Retention) አተገባበር ላይም አመላካች ድንጋጌዎችን ማስቀመጡ ጠቃሚ ነው።
በአጠቃላይ በተለይ የግንባታ ስራ ግዥ ሂደት ተጠናቀቀ የሚባለው መቼ ነው የሚለው ትርጓሜ ላይ መግባባት ያስፈልጋል። በእኔ እምነት ሂደቱ ተጠናቀቀ የሚባለው የስራ ተቋራጮችን መረጣ ጨርሶ ውለታ ሲታሰር መሆን የለበትም። ሂደቱ ተጠናቀቀ የሚባለው የሚፈለገው የፕሮጀክት ስራ ውለታ ሲጠናቀቅ ነው። ይሄ ደግሞ የኮንትራት አስተዳደርንም ይጨምራል።
*ስለሆነም የግዥ አዋጁ ከላይ ለማሳያነት የተጠቀሱትን ጨምሮ ሌሎች የኮንትራት አስተዳደር ጉዳዮች ላይ አስገዳጅ ድንጋጌዎችን ማካተት ይኖርበታል።
*በህግ ቅደም ተከተል ደረጃ መርህም የግዥ መመሪያው የአዋጁ ውላጅ (subordinate) በመሆኑ መጣጣምና መናበብ ይኖርባቸዋል።
*የግዥ ደንቡም (SBD) አዋጁንና መመሪያውን ተከትሎ የሚዘጋጅ የማስፈጸሚያ ሰነድ (Standard Document) መሆኑ ይታወቃል።
.
3. በነባሩ አዋጅ ላይ ቢሻሻሉ የምላቸው ነጥቦች በተለይ ከቅሬታ አቀራረብ ጋር የተደነገገው አንቀጽ 73 እና 74 ላይ ነው አንቀጽ 73.1(ሐ) ብዥታን የሚፈጥር ስለሆነ ቢሰረዝ ወይንም ተሻሽሎ ግልጽነት ባለው መልኩ ቢቀመጥ
*አንቀጽ 74.2 ለግዥ ፈጻሚው የቅሬታ ማቅረቢያ ጊዜ ከ5 ወደ 10 ቢሻሻል
*አንቀጽ 74.3 ቅሬታ የቀረበበት የመንግስት መስሪያ ቤት መልሱን በጽሁፍ ከመመለሱ በፊት ከቅሬታ አቅራቢው ድርጅት ጋር ውይይት የማድረግ አስገዳጅነት ቢካተት
*አንቀጽ 74.4 ለቡርዱ የቅሬታ ማቅረቢያ ጊዜ ከ5 ወደ 10 ቢሻሻል
.
👉ተወያዩበት👇👇👇
http://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
▶️የ ምሽቱ ጉርሻ ... @ETCONp
:
👉አብዛኛዎቻቹ በጠየቃችሁን መሰረት እንዲሁም ኣሁን ለምትሰሩት THESIS ኣጋዥ ይሆናሉ ብለን ያሰብናቸው የ THESIS SAMPLE እንካቹ ብለናል፡፡
፡
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
.
👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇
:
👉አብዛኛዎቻቹ በጠየቃችሁን መሰረት እንዲሁም ኣሁን ለምትሰሩት THESIS ኣጋዥ ይሆናሉ ብለን ያሰብናቸው የ THESIS SAMPLE እንካቹ ብለናል፡፡
፡
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
.
👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇👇
thesis-I.pdf
958.8 KB
▶️Thesis samples on Telegram @COTMp
2007 Gondar W.supply Pdf thesis.pdf
2.4 MB
▶️Thesis samples on Telegram @COTMp
Abubeker Jemal.pdf
689 KB
▶️Thesis samples on Telegram @COTMp
How-to-Write-a-Better-Thesis.pdf
1.8 MB
▶️How To Write Best Thesis @COTMp
MSc Thesis - Tadesse.pdf
731.8 KB
▶️Thesis samples on Telegram @COTMp
RAHEL NEGUSSE FINAL.pdf
1.8 MB
▶️Thesis on Telegram @COTMp
👆👆👆👆👆👆👆👆👆👆
▶️የ ምሽቱ ጉርሻ ... @ETCONp
:
👉አብዛኛዎቻቹ በጠየቃችሁን መሰረት እንዲሁም ኣሁን ለምትሰሩት THESIS ኣጋዥ ይሆናሉ ብለን ያሰብናቸው የ THESI SAMPLE እንካቹ ብለናል፡፡
፡
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
▶️የ ምሽቱ ጉርሻ ... @ETCONp
:
👉አብዛኛዎቻቹ በጠየቃችሁን መሰረት እንዲሁም ኣሁን ለምትሰሩት THESIS ኣጋዥ ይሆናሉ ብለን ያሰብናቸው የ THESI SAMPLE እንካቹ ብለናል፡፡
፡
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
This media is not supported in your browser
VIEW IN TELEGRAM
Charles bridge 🌉
Charles bridge is historic bridge that crosses the vltrava river in Prague , Czech Republic 🇨🇿 . It’s construction started in 1357 under auspices of king 👑 Charles IV , and finished in the beginning of the 15th century. The bridge replaced the old Judith bridge built in 1158-1172 that had been badly damaged by flood in 1342. This new bridge was originally called stone bridge or Prague bridge but has been renamed “Charles bridge “ since 1870. As the only means of crossing the river vltrva (moldau) until 1841, Charles bridge was the most important connection between Prague castle 🏰 the city’s old town and adjacent areas. This “solid-land” connection made Prague important as a trade route between eastern and Western Europe.
Pargue Czech Republic 🇨🇿
ፋይሉ 6.1MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል
#brige
@ETCONp
https://t.me/ETCONp
Charles bridge is historic bridge that crosses the vltrava river in Prague , Czech Republic 🇨🇿 . It’s construction started in 1357 under auspices of king 👑 Charles IV , and finished in the beginning of the 15th century. The bridge replaced the old Judith bridge built in 1158-1172 that had been badly damaged by flood in 1342. This new bridge was originally called stone bridge or Prague bridge but has been renamed “Charles bridge “ since 1870. As the only means of crossing the river vltrva (moldau) until 1841, Charles bridge was the most important connection between Prague castle 🏰 the city’s old town and adjacent areas. This “solid-land” connection made Prague important as a trade route between eastern and Western Europe.
Pargue Czech Republic 🇨🇿
ፋይሉ 6.1MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል
#brige
@ETCONp
https://t.me/ETCONp
Ethio Construction Engineering
Photo
Gate tower building is 16 floor office building in Fukushima-ku , Osaka Japan. It’s notable for the highway offramp at umeda exist that pass through the building.
The building has a double core construction, with a circular cross section. The umeda exist of ikea route of the hanshin expressway system (when existing the highway form the direction of ikeda) passes between the fifth through seventh floor of this pass through this building . The highway is the tenant of this floors . The elevator by floor 8. The elevator pass through the floors without stopping , floor 4 being followed elevator stairways and machinery. The highway 🛣 does not make contact with the building. It passes through as a bridge , held up by supporters next to the building. The highway is surrounded by structure to protect the building from noise and vibration. The roof has a helipad
Official name .......Gate tower building
Other names........Beehive
Structure type .......building
Status.................completed
Country ........... Japan 🇯🇵
City ............ Osaka
Building function......office
Structural material....... composite
Completion.............1992
Height architectural..........71.9meter
Height:helipad..................71.9 meter
Floors above ground .......16
Floors below the ground ......2
Tower GFA............7,956m2
https://t.me/ETCONp
The building has a double core construction, with a circular cross section. The umeda exist of ikea route of the hanshin expressway system (when existing the highway form the direction of ikeda) passes between the fifth through seventh floor of this pass through this building . The highway is the tenant of this floors . The elevator by floor 8. The elevator pass through the floors without stopping , floor 4 being followed elevator stairways and machinery. The highway 🛣 does not make contact with the building. It passes through as a bridge , held up by supporters next to the building. The highway is surrounded by structure to protect the building from noise and vibration. The roof has a helipad
Official name .......Gate tower building
Other names........Beehive
Structure type .......building
Status.................completed
Country ........... Japan 🇯🇵
City ............ Osaka
Building function......office
Structural material....... composite
Completion.............1992
Height architectural..........71.9meter
Height:helipad..................71.9 meter
Floors above ground .......16
Floors below the ground ......2
Tower GFA............7,956m2
https://t.me/ETCONp
Telegram
Ethio Construction Engineering
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
📨 @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp