.....con't
1. Linearly plastic analysis is based on Robert Hooks law which states zat zer is a linear relationship between stress and strain of a material. Modules of elasticity is equal to stress divided by strain.
2. Linear elastic analysis with moment redistribution states zat X-section can't yield simply by implying z maximum moment but zey distribute z moment beyond z first yield or after first plastic hinge formation towards less loaded x-sections.
3. Plastic analysis is based on z plastic stage of moment or it is similar with zat of linear elastic analysis but zis is after a formation of plastic hinge. In indeterminate structures zer will be more zan two plastic hinge zat can form collapse mechanism.
4. Non linear analysis can be categorized as geometric non linearity and material non linearity.
4.1 geometric non linearity is a property which is related to deformation of material with load. E.g
p - delta effect or second order effect
4.2 material non linearity is due to non uniform or non linear relationship of stress and strain of material
.
What is Plastic hing?

Ans.. Plastic hinge is a yielded zone which is yielded by an application of higher stress beyond its elastic limit( after first yielding)
.
.
Join us
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
t.me/COTMp
โ˜โ˜โ˜โ˜โ˜โ˜โ˜โ˜โ˜โ˜

https://www.facebook.com/etconp/
แˆ‹แˆŠแ‰ แˆ‹ โค
.
แ‹แ‰ฅ แˆˆแˆŠแ‰ต แ‰ฐแˆ˜แŠแŠ•แข @COTMp
๐Ÿ‘‰ADMIXTURES @COTMp
~~~~~~~~~~~~~~~~~
โžกAdmixtures are the special ingredients added during concrete mixing to enhance the properties and performance of fresh concrete. Various types of
admixtures are available in the market which is
used in construction work.
โ–ถFUNCTION OF ADMIXTURES:
1. To accelerate or retard the setting time of fresh
concrete.
2. To improve the workability or flow ability of concrete.
3. To increase the strength and durability of concrete.
4. To reduce the heat of hydration.
5. To reduce the segregation and bleeding.
6. To decrease the permeability.
7. To achieve other desired properties.
โ–ถTYPES OF ADMIXTURES:
1. ACCELERATING ADMIXTURES:
This admixture is added in concrete or mortar for
increasing the rate of hydration of hydraulic cement and for shortening the setting time. Calcium
chloride (CaCl2) is the most widely used
accelerating admixture.
2. RETARDING ADMIXTURES:
Retarding admixtures delay the initial rate of
hydration of cement and extend the setting time of
cement paste. This admixture can be used in high temperature and where the concrete has to be transported to a long distance. It is also suitable for using in grouting oil wells.
3. AIR-ENTRAINING ADMIXTURES:
Air entraining admixtures help to produce a certain
amount of air bubbles in the concrete mixture. The
main goal of this admixture is to increase the resistance against freeze-thaw degradation and cohesion. It also improves the workability of fresh concrete without changing the setting or the rate of hardening.
4. WATER REDUCING ADMIXTURES:
As the name suggest, water reducers are added to a concrete mixture, mortar or grout to increase the flow ability without increasing the water content.
Advantages Of Water Reducing Admixtures:
1. The rate of concrete placement is faster.
2. Strength, durability, density etc. are significantly improved.
3. Segregation, permeability, and cracking are reduced.
SPECIAL ADMIXTURES:
1. Super plasticizing admixtures.
2. Corrosion-inhibiting admixtures.
3. Grouting admixtures.
4. Coloring admixtures etc.
.
โšกแˆˆแˆแˆ‰แˆ แŠฅแŠ•แ‹ฒแ‹ณแˆจแˆต แ–แˆตแ‰ถแ‰นแŠ• SHARE แŠ แ‹ตแˆญแŒ‰แˆแŠ•แข
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
๐Ÿ‘‰แˆตแˆˆ แˆแˆ˜แˆญ แ‰ดแˆตแ‰ต @COTMp
โžกแˆแˆ˜แˆญ แ‰ดแˆตแ‰ต/Hammer test/ แŠ แแˆซแˆฝ แ‹ซแˆแˆ†แА (Non destructive) แ‹จแŠ แˆญแˆ›แ‰ณ แŒฅแŠ•แŠซแˆฌ แ‹ฐแˆจแŒƒ แˆ›แ‹ˆแ‰‚แ‹ซ แแ‰ฐแˆป แˆฒแˆ†แŠ• แ‰ตแŠญแŠญแˆˆแŠ› แŠฅแŠ“ แˆแŒฃแŠ• แˆ˜แˆ˜แˆญแˆ˜แˆชแ‹ซ แ‹˜แ‹ด แАแ‹แข
.
โ–ถแˆแˆ˜แˆญ แ‰ดแˆตแ‰ต แ‹จแˆšแŠจแŠ“แ‹ˆแŠ•แ‰ แ‰ต แˆ˜แŠ•แŒˆแ‹ต แˆตแ•แˆชแŠ•แŒ แˆ˜แ‰†แŒฃแŒ แˆญแ‹ซ
แ‹ซแˆˆแ‹แŠ• แŠญแ‰ฅแ‹ฐแ‰ต แˆ˜แˆˆแŠชแ‹ซ แˆ˜แˆณแˆญแ‹ซ แŠจแˆ‹แ‹ญ แ‰ แˆแˆตแˆ แŠฅแŠ•แ‹ฐแˆšแ‰ณแ‹จแ‹
แ‹จแŠ แˆญแˆ›แ‰ณแ‹แŠ• แŒˆแ… แ‰ฐแŒญแŠ– แ‰ แˆ˜แ‹ซแ‹ แˆ˜แˆแˆถ แ‹จแˆšแˆ˜แ‰ณแ‰ แ‰ตแŠ• แŠ แˆ€แ‹
แˆแŠฌแ‰ต แˆ˜แ‹แŒแ‰ฆ แ‰ แˆ˜แ‹ซแ‹ แ‹ญแˆ†แŠ“แˆแข
.
โ–ถแ‹จแˆแˆ˜แˆญ แ‰ดแˆตแ‰ต แŠ แˆ‹แˆ›แ‹แˆ แŠจแ‹šแˆ… แ‰ แ‰ณแ‰ฝ แ‹จแ‰ฐแ‹˜แˆจแ‹˜แˆฉแ‰ตแŠ• แ‹ซแŠซแ‰ตแ‰ณแˆแค
1. แ‹จแŠ แˆญแˆ›แ‰ณ แ‹จแˆ˜แ‰ณแˆ˜แ‰… แŠ แ‰…แˆ/compressive strength/
แˆˆแˆ›แ‹ˆแ‰…แข
2. แ‹จแŠ แˆญแˆ›แ‰ณแ‹แŠ• แŠ แŠ•แ‹ต แŠ แ‹ญแАแ‰ตแАแ‰ต แ‹ˆแ‹ญแˆ แ‹ˆแŒฅแАแ‰ต แˆˆแˆ˜แŒˆแˆแŒˆแˆแข
3. แ‹จแŠ แˆญแˆ›แ‰ณแ‹แŠ• แŠญแ‰ฅแ‹ฐแ‰ต แ‹จแˆ˜แˆธแŠจแˆ แŠ แ‰…แˆแŠ• แŠจแ‰ฐแ‹ˆแˆฐแАแˆˆแ‰ต แ‹ฒแ‹›แ‹ญแŠ• แŠ แŠ•แƒแˆญ แ‰ตแŠญแŠญแˆ แˆ˜แˆ†แŠ‘แŠ• แˆˆแˆ›แˆจแŒ‹แŒˆแŒฅแข
.
โ–ถแ‹จแˆแˆ˜แˆญ แ‰ดแˆตแ‰ต แŠจแˆ›แˆฐแˆซแ‰ต แ‰ แŠแ‰ต แˆŠแ‹ฐแˆจแŒ แ‹จแˆšแŒˆแ‰ฃ แ‰…แ‹ตแˆ˜
แˆแŠ”แ‰ณแ‹Žแ‰ฝแค
1) แ‹จแŠ แˆญแˆ›แ‰ฐแ‹‰ แŒˆแ… แ‹จแˆˆแˆฐแˆˆแˆฐแฃแŠ•แแˆ… แŠฅแŠ“ แ‹ฐแˆจแ‰… แˆ˜แˆ†แŠ• แ‹ญแŒ แ‰ แ‰…แ‰ แ‰ณแˆ
2) แŠ“แˆ™แŠ“ แ‹จแˆšแ‹ˆแˆฐแ‹ฐแ‹ แ‰ฆแ‰ณ แ‰ขแ‹ซแŠ•แˆต 20แˆšแˆŠ แˆœแ‰ตแˆญ แŠจแŒ แˆญแ‹ แˆŠแˆญแ‰… แ‹ญแŒˆแ‰ แ‹‹แˆแข
3) แˆตแ‹ตแˆฐแ‰ต (6) แŠ•แ‰ฃแ‰ฅ แŠจแŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แ‹จแŠ แˆญแˆ›แ‰ณ แŠ แŠซแˆ แ‹ญแ‹ˆแˆฐแ‹ณแˆแค
แŠ แˆ›แŠซแ‹ญ แˆตแˆŒแ‰ต แ‰ฐแˆฐแˆญแ‰ถ แŒฅแŠ•แŠซแˆฌ แˆ˜แˆˆแŠชแ‹ซ แ‹ญแ‹ฐแˆจแŒ‹แˆแข
4) แŠ แˆญแ‰ฃ แŠ แˆแˆตแ‰ต(45) แ‰€แŠ• แ‹จแˆžแˆˆแ‹ แŠ แˆญแˆ›แ‰ณ แˆ˜แˆ†แŠ• แ‹ญแŒ แ‰ แ‰…แ‰ แ‰ณแˆแข
๐Ÿ‘1
๐Ÿ‘‰Kuriftu Resort & Spa
.
โฉWater park
.
๐Ÿšฉแ‹ฐแ‰ แˆจ แ‹˜แ‹ญแ‰ต๐Ÿ˜
COLUMN
column is a vertical compression member zar used to transfer z loads from intermediate floors and roofs towards z foundation.
TYPES OF COLUMN
A. Based on shape of cross section
1.L shaped
2.square
3.circular
B.based on lateral load resisting system ( bracing)
1.braced column:.able to carry horizontal or lateral loading like earth quick and wind load. Zer r different bracing like K bracing, X bracing, diagonal bracing....
2.unbraced column
C.based on sensitivity of P delta effect (second order effect)
1.sway column:. Is a column which shows a significant horizontal displacement. Mostly zis type of column has no bracing system
2. Non sway column:. Is a column having a lateral load resisting system and shows no lateral displacement
D. Based on load on z column
1.axially loaded column:. Carry pure axial load. Zey r columns with out eccentricity.
2.uniaxially loaded column:. Carry an axial load having eccentricity only in one axis (either along x or y)
3.biaxially loaded column:. Carry axial load having eccentricity in both direction.
E. Based on lateral support of bar
1.tied column:are column with longitudinal or main reinforcement supported by a ties having a particular spacing.
2. Spiral column:.a column with longitudinal or main reinforcement bar supported in a manner of helical spring
F. Based on length (slenderness)
1.short column:. a column with small or less slenderness ration. E.g pedestal column
2.long or slender column:. a column with hign slenderness ration.
G. based on material composition
1. Composit column:.a column cross sections in which composed of concrete and steel. In zis case steel is incased by concrete.
2. Infilled column:.a column type when concrete is poured in steel.
.
.
.le hulum endiders le guadegnochachihu share adirgulin and join us on
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
t.me/COTMp
โ˜โ˜โ˜โ˜โ˜โ˜โ˜โ˜โ˜
๐Ÿ‘1
....con't
Behaviour of tied and spiral column

Tied columns r mostly used column type of column in non seismic region( non earth quick area). In zis region occasionally we use spiral column if higher strength( ductility is required). In another case zis means we use spiral column in seismic zones mostly and zey can carry higher load before failure.

Advantages of lateral rebates
๐Ÿ‘‰ tieng or supporting of longitudinal bar from buckling out or in ward.
๐Ÿ‘‰ to support core of z concrete
๐Ÿ‘‰ used as shear reinforcement for lateral loads.
๐Ÿ‘‰ for the ductility of z column etc.
๐Ÿ‘1
Master Schedule vs Milestone Schedule

Project schedule, baseline schedule, master schedule, milestone schedule and work schedule are widely used concepts in the field of time management. Project teams create work schedules in order to understand what work will be completed in which period.

Basically, a project cannot be performed without a proper work schedule. Because scheduling establishes a system to manage the activities, resources, deliverables and the project goals in a timeline.

In project management, master schedule, project schedule and milestone schedule are three different schedules used for coordinating and tracking all of the different components of a project. Although each type of schedule plays an important role in completing a project on time and budget, they are different concepts.

In this article, we will discuss important time management concepts and their key differences.

For better understanding, letโ€™s take a glance at the definitions.

Master Schedule, Milestone Schedule, Project Schedule

Before to start, letโ€™s discuss the basic terms used in time management.

Milestone
According to PMBOK Guide, a milestone is โ€œa significant event in the project usually completion of a major deliverable.โ€

โˆดMilestones have a fixed date but no duration.

Below are some examples of milestones in a project

โ€ŒProject Start and End
โ€ŒStart and Completion of each phase and/or discipline
โ€ŒKick of Meeting
โ€ŒSite Handover
โ€ŒSign of Contract


Schedule
A schedule represents the planned dates for performing activities and for meeting deliverables.

A schedule is a communication tool used to discuss what work needs to be done in order to complete the project.

Schedules are typically created at the beginning of a project and updated and reported regularly.

Project Scheduling Steps
An executable schedule can be created by following the project scheduling steps given below;

โ€ŒCreating and developing the Work Breakdown Structure (WBS) of the project
โ€ŒDefining work packages and major project deliverables
โ€ŒDefining the tasks
โ€ŒDefining relationships
โ€ŒDefining and assigning resources
โ€ŒAnalyzing the critical path of the project

Development of the work breakdown structure (WBS) is one of the most important steps in scheduling. Because it creates a framework for a proper schedule.

Work packages are represented as the lowest level of detail within the WBS and the activities are grouped and listed under the work packages.

Activities are the actions which have a specific start date, end date, and duration. Relationships are the logic ties between the activities. They determine which activity will start or finish first in what type of logic.

Resources are materials, labor, and machinery required to perform the activities. Once they are estimated, they are assigned to the activities.

The last step is analyzing the schedule if it is realistic or not. You analyze and control the critical path of the schedule.

1. Milestone Schedule

A Milestone Schedule is a summary level schedule, which identifies the major project milestones.

Milestone planning focuses on milestones instead of activities. Major deliverables, significant events, contractual obligations, and the companyโ€™s strategic goals are demonstrated in milestone schedules.

Milestone schedules are one of the most important schedules that must be maintained and referred through the project life cycle. Simply put, a milestone schedule is a summary level schedule that helps the project team to review and track all the major project milestones that may exist during the execution of the project.

2. Master Schedule & Why is a Master Schedule Important?

A project managerโ€™s primary responsibility is to complete the project on time and budget along with meeting the clientโ€™s requirements. Therefore scheduling the activities and resources efficiently plays a key role in any projectโ€™s success. The project master schedule is one of the most effective tools that help the project manager to perform his business.



Master Schedule is a summary level project schedule which includes the major p
๐Ÿ‘3
roject deliverables, work breakdown structure components, and key project milestones.

A project master schedule is an early communication tool among stakeholders which shows the major deliverables, key milestones, and summary of work breakdown structure activities.

Simply put, a master schedule is prepared for tracking the project at a summary level.

3. Project Schedule

A Project Schedule represents the planned dates for performing activities and the planned dates for meeting milestones.
The project schedule details what work needs to be done and which resources must be assigned in order to perform the tasks in a given time period. Engineering, Procurement, and Execution parts are detailed in Project Schedules.

The project schedule should be updated regularly in order to monitor the projectโ€™s performance.

Master Schedule vs Milestone Schedule

The detail level of a milestone schedule is lower than the detail level of a master schedule.

A milestone schedule includes major project milestones. On the other hand, a master schedule is a summary level project schedule which includes milestones, major deliverables, and work breakdown schedule components.

Summary
In order to keep track of all of the different components of a project, project teams create a number of schedules in different detail levels. Milestone Schedules and Master Schedules are summary level schedules prepared for early communication among stakeholders. These schedules are used to demonstrate the main strategy of the project. On the other hand, a project schedule is a detailed schedule which is prepared to show the detailed tasks required to complete the project and updated regularly to monitor the projectโ€™s performance.

In this article, we discuss the concept; master schedule vs milestone schedule. We hope that it will be useful for professionals and team members working in the field of time management.
@henokbirhanu

http://t.me/COTMp
๐Ÿ‘1
Self cleannig road
Bmw office munic ,germany
๐Ÿ‘1
*Stress* vs *strain*
Stress is the ratio of applied force F to a cross section area - defined as "force per unit area".
tensile stress - stress that tends to stretch or lengthen the material - acts normal to the stressed area
compressive stress - stress that tends to compress or shorten the material - acts normal to the stressed area

shearing stress - stress that tends to shear the material - acts in plane to the stressed area at right-angles to
compressive or tensile stress

Tensile or Compressive Stress - Normal Stress

Tensile or compressive stress normal to the plane is usually denoted "normal stress " or "direct stress " and can be
expressed as
ฯƒ = F n / A (1)
where
ฯƒ = normal stress (Pa (N/m 2 ), psi (lb f /in 2 ))
F n = normal force acting perpendicular to the area (N, lb f)
A = area (m 2 , in 2 )
a kip is an imperial unit of force - it equals 1000 lb f (pounds-force)
1 kip = 4448.2216 Newtons (N) = 4.4482216 kilo Newtons (kN)

A normal force acts perpendicular to area and is developed whenever external loads tends to push or pull the two segments of a body.

Example - Tensile Force acting on a Rod A force of 10 kN is acting on a circular rod with diameter 10 mm . The stress in the rod can be calculated as

ฯƒ = (10 10 3 N) / (ฯ€ ((10 10 -3 m) / 2) 2 )
= 127388535 (N/m 2 )
= 127 (MPa)

Example - Force acting on a Douglas Fir Square Post A compressive load of 30000 lb is acting on short square 6 x 6 in post of Douglas fir. The dressed size of the post is 5.5 x 5.5 in and the compressive stress can be calculated as

ฯƒ = (30000 lb) / ((5.5 in) (5.5 in))
= 991 (lb/in 2 , psi)

Shear Stress
Stress parallel to a plane is usually denoted as "shear stress "and can be expressed as

ฯ„ = F p / A (2)
where
ฯ„ = shear stress (Pa (N/m 2 ), psi (lb f /in 2 ))
F p = shear force in the plane of the area (N, lb f)
A = area (m 2 , in 2 )
A shear force lies in the plane of an area and is developed when external loads tend to cause the two segments of a body to slide over one another.
โค1๐Ÿ‘1
Strain (Deformation)

Strain is defined as "deformation of a solid due to stress".
Normal strain - elongation or contraction of a line segment
Shear strain - change in angle between two line segments originally perpendicular Normal strain and can be expressed as

ฮต = dl / l o
= ฯƒ / E (3)

where
dl = change of length (m, in)
l o = initial length (m, in)
ฮต = strain - unit-less
E = Young's modulus (Modulus of Elasticity) (Pa , (N/ m 2 ), psi (lb f /in 2 ))

Young's modulus can be used to predict the elongation or compression of an object when exposed to a force
Note that strain is a dimensionless unit since it is the ratio of two lengths. But it also common practice to state it as the ratio of two length units - like m/m or in/in .

Poisson's ratio is the ratio of relative contraction strain

Example - Stress and Change of Length
The rod in the example above is 2 m long and made of steel with Modulus of Elasticity 200 GPa (200 10 9 N/m 2 ) . The change of length can be calculated by transforming (3) to
dl = ฯƒ lo / E
= (127 10 6 Pa) (2 m) / (200 10 9 Pa)
= 0.00127 m
= 1.27 mm

Strain Energy
Stressing an object stores energy in it. For an axial load the energy stored can be expressed as
U = 1/2 F n dl
where
U = deformation energy (J (N m), ft lb)
๐Ÿ‘1
๐ŸŒผ๐ŸŒผ๐ŸŒผแˆ˜แˆแŠซแˆ แ‹“แ‹แ‹ฐ แ‹“แˆ˜แ‰ต แ‹แ‹ต แ‹จแ‰ปแŠ“แˆ‹แ‰ฝแŠ• แ‰ฐแŠจแ‰ณแ‹ฎแ‰ฝ แŠฅแŠ•แŠณแŠ• แŠ แ‹ฐแˆจแˆณแ‰ฝแˆ ๐ŸŒผ๐ŸŒผ๐ŸŒผ
Ethio Construction Engineering
Photo
๐Ÿ‘‰Advance Security and
Performance Security @COTMp ๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
.
1. Advance security
*แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แˆˆแˆšแ‹ˆแˆตแ‹ฐแ‹ แ‹จแ‰…แ‹ตแˆ แŠญแแ‹ซ แŒˆแŠ•แ‹˜แ‰ฅ แ‰ แˆšแŠจแˆแˆˆแ‹ แ‹จแŒˆแŠ•แ‹˜แ‰ฅ แˆ˜แŒ แŠ• แˆแŠญ แ‹จแˆšแ‹ซแˆฒแ‹˜แ‹ แ‹จแ‰ฃแŠ•แŠญ แ‹‹แˆตแ‰ตแŠ“
แ‰ฆแŠ•แ‹ต แАแ‹แข
แŠฅแ‹แАแ‰ฐแŠ›แАแ‰ฑ แ‰ แ‰ฐแˆจแŒ‹แŒˆแŒ  แ‰ผแŠญแฃ แ‹ซแˆแ‰ฐแŒˆแ‹ฐแ‰  แ‹จแ‰ฃแŠ•แŠญ แ‹‹แˆตแ‰ตแŠ“ แ‹ˆแ‹ญแˆ แŠจแˆ…แŒ‹แ‹Š แŒฅแ‰ƒแ‰…แŠ• แˆ›แ‹ญแŠญแˆฎ แ‹แ‹ญแŠ“แŠ•แˆต แ‹จแ‰ฐแƒแˆ แ‹จแ‹‹แˆตแ‰ตแŠ“ แ‹ฐแ‰ฅแ‹ณแ‰ค แˆ›แˆตแ‹ซแ‹ แ‹ญแŠ–แˆญแ‰ แ‰ณแˆแข
แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แ‹จแ‹ˆแˆฐแ‹ฐแ‹แŠ• แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ แŠจแแˆŽ แŠฅแˆตแŠชแŒจแˆญแˆต แ‹ซแˆตแ‹ซแ‹˜แ‹ แ‹‹แˆตแ‰ตแŠ“ แŒแ‹œแ‹ แˆ›แˆˆแ‰…(Expire) แŠ แ‹ญแ‰ฝแˆแˆแข
แŠจแŠ แŠ•แ‹ต แ‹ˆแˆญ แ‰€แ‹ฐแˆ แ‰ฅแˆŽ แ‹จแ‹‹แˆตแ‰ตแŠ“ แ‰€แА แŒˆแ‹ฐแ‰ก แŠจแˆ›แˆˆแ‰ แ‰ แŠแ‰ต แŠจแŠ แˆ›แŠซแˆช แ‰ แˆšแƒแแˆˆแ‰ต แ‹ฐแ‰ฅแ‹ณแ‰ค แˆ˜แˆฐแˆจแ‰ต แˆŠแ‰ณแ‹ฐแˆต แ‹ญแŒˆแ‰ฃแˆแข
แАแŒˆแˆญ แŒแŠ• แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แ‹ซแˆตแ‹ซแ‹˜แ‹แŠ• แ‹‹แˆตแ‰ตแŠ“ แ‰€แА แŒˆแ‹ฐแ‰ก แŠ แˆแŽ แˆณแ‹ซแˆณแ‹ตแˆต แ‰ขแ‰€แˆญ แ‰€แˆช แ‹ซแˆแ‰ฐแŠจแˆแˆˆ แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ แˆ™แˆ‰ แˆˆแˆ™แˆ‰ แŠจแˆšแ‰€แŒฅแˆˆแ‹ แŠญแแ‹ซ แ‰…แ… แˆ‹แ‹ญ แ‰ฐแ‰€แŠ“แˆฝ แ‹ญแ‹ฐแˆจแŒ‹แˆแข
แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แ‹ซแˆตแ‹ซแ‹˜แ‹แŠ• แ‹‹แˆตแ‰ตแŠ“ แ‰…แ‹ตแˆ˜ แŠญแแ‹ซ แŒˆแŠ•แ‹˜แ‰ฅ แŠจแแˆŽ แŠฅแŠ•แ‹ฐแŒจแˆจแˆฐ แ‰ฐแˆ˜แˆ‹แˆฝ แ‹ญแ‹ฐแˆจแŒแˆˆแ‰ณแˆแข
แ‹จแ‰ฐแˆˆแ‹จ แ‹จแ‰…แ‹ตแˆ˜ แŠญแแ‹ซ แŠฅแŠ“ แ‹จแ‹‹แˆตแ‰ตแŠ“ แŠ แŠจแ‹แˆแˆ แŠ แŠซแˆ”แ‹ต แˆˆแ•แˆฎแŒ€แŠญแ‰ฑ แ‹จแ‰ฐแ‹˜แŒ‹แŒ€แ‹ แ‹แˆ/special condition of contract/ แ‹ญแ‰ฝแˆ‹แˆแข
2. Performance Security
*แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แ‹แˆ แ‰ฐแ‰€แ‰ฅแˆŽ แ‰ฐแˆแƒแˆš แˆ›แ‹ตแˆจแŒ แ‹จแˆšแ‰ฝแˆแ‰ แ‰ตแŠ• แˆˆแ‰ฅแ‰ƒแ‰ต แˆ›แˆจแŒ‹แŒˆแŒซ แ‹จแˆšแ‹ซแˆฒแ‹˜แ‹ แ‹‹แˆตแ‰ตแŠ“ แАแ‹แข
แ‹แˆ แ‰ แ‰ฐแˆแˆซแˆจแˆ˜ แ‰ แŠ แˆตแˆซ แŠ แˆแˆตแ‰ต แ‰€แŠ“แ‰ต แ‹แˆตแŒฅ (15) แ‹แˆ‰ แ‹จแˆšแ‹ซแ‹˜แ‹แŠ• แˆ˜แŒ แŠ• แ‹‹แˆตแ‰ตแŠ“ แ‹ซแ‰€แˆญแ‰ฃแˆ แข
แ‹‹แˆตแ‰ตแŠ“แ‹ แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แ‰ แ‰ฐแŒˆแ‰ขแ‹ แˆ˜แŠ•แŒˆแ‹ต แ‹แˆ‰แŠ• แ‰ฐแˆแƒแˆš แˆณแ‹ซแ‹ฐแˆญแŒ แ‰ขแ‰€แˆญ แˆˆแ‹แˆ แˆฐแŒช (แ‰ฃแˆˆแ‰คแ‰ต) แŠฅแŠ•แ‹ฐ แŠซแˆณ แŠญแแ‹ซ แ‹ญแˆ†แŠ“แˆแข
แŠฅแ‹แАแ‰ฐแŠ›แАแ‰ฑ แ‰ แ‰ฐแˆจแŒ‹แŒˆแŒ  แ‰ผแŠญแฃ แ‹จแ‰ฃแŠ•แŠญ แ‹‹แˆตแ‰ตแŠ“ แ‹ˆแ‹ญแˆ แŠจแˆ…แŒ‹แ‹Š แŒฅแ‰ƒแ‰…แŠ• แˆ›แ‹ญแŠญแˆฎ แ‹แ‹ญแŠ“แŠ•แˆต แ‹จแ‰ฐแƒแˆ แ‹จแ‹‹แˆตแ‰ตแŠ“ แ‹ฐแ‰ฅแ‹ณแ‰ค แ‹แˆ‰ แˆ‹แ‹ญ
แ‰ แ‰ฐแ‰€แˆ˜แŒ แ‹ แŽแˆญแˆ›แ‰ต แˆ˜แˆฐแˆจแ‰ต แˆ›แˆตแ‹ซแ‹ แ‹ญแŠ–แˆญแ‰ แ‰ณแˆแข
แ‹ญแˆ… แ‹‹แˆตแ‰ตแŠ“ แˆณแ‹ญแ‰€แˆญแ‰ฅ แˆแŠ•แˆ แŠ แ‹ญแАแ‰ต แŠญแแ‹ญ แ‰ฐแˆแƒแˆš แˆŠแ‹ฐแˆจแŒ
แŠ แ‹ญแŒˆแ‰ฃแˆแข
แˆตแˆซแ‹ แ‰ฐแŒ แŠ“แ‰† แŠฅแˆตแŠชแ‹ซแˆแ‰… แ‹ญแˆ… แ‹‹แˆตแ‰ฐแŠ“ แ‰ฐแŒˆแ‰ข แŠฅแŠ“ แ‰€แА แŒˆแ‹ฐแ‰ก แˆณแ‹ซแˆแ‰… แˆ˜แ‰ณแ‹ฐแˆต แ‹ญแŒ แ‰ แ‰…แ‰ แ‰ณแˆแข แˆตแˆซแ‹ แ‰ฐแŒ แŠ“แ‰† แˆญแŠญแŠญแ‰ฅ แŠฅแŠ•แ‹ฐแ‰ฐแˆแ€แˆ˜ แ‰  แˆ€แ‹ซ แˆตแˆแŠ•แ‰ต(28) แ‰€แŠ“แ‰ต แ‹แˆตแŒฅ แˆˆแˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แˆŠแˆ˜แˆˆแˆตแˆˆแ‰ต แ‹ญแŒˆแ‰ฃแˆแข
.
โšกแˆˆแˆแˆ‰แˆ แŠฅแŠ•แ‹ฒแ‹ณแˆจแˆต แ–แˆตแ‰ถแ‰นแŠ• SHARE แŠ แ‹ตแˆญแŒ‰แˆแŠ•แข
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โค1๐Ÿ‘1
โšกแˆ˜แ‹ซแ‹ฅแ‹ซ แŒˆแŠ•แ‹˜แ‰ฅ (Retention money) @COTMp
.
๐Ÿ‘‰แˆตแˆซ แ‰ฐแ‰‹แˆซแŒฉ แ‹จแ‰ฐแˆฐแŒ แ‹แŠ• แˆตแˆซแ‹แŠ• แŒจแˆญแˆถ แ‹จแˆตแˆ…แ‰ฐแ‰ต แˆ›แˆตแ‰ฐแŠซแŠจแ‹ซ แŒแ‹œ แ‹ตแˆจแˆต/defect liability period / แˆ€แˆ‹แŠแАแ‰ต
แˆˆแˆ˜แ‹ˆแŒฃแ‰ฑ แˆ›แˆจแŒ‹แŒˆแŒซ แŠฅแŠ•แ‹ฒแˆ†แŠ• แŠจแŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แ‹จแŠญแแ‹ซ แ‰…แ… แ‹จแˆšแ‹ซแ‹
แŒˆแŠ•แ‹˜แ‰ฅ แАแ‹แข
โ–ถแŠจแŠญแแ‹ซ แ‰…แ… แˆแŠ• แ‹ซแˆ…แˆ แˆŠแ‰†แˆจแŒฅแ‰ แ‰ต แŠฅแŠ•แ‹ฐแˆšแŒˆแ‰ฃ แˆˆแ•แˆฎแŒ€แŠญแ‰ฑ แ‰ แˆแ‹ช แˆแŠ”แ‰ณ แ‹จแ‰ฐแ‹˜แŒ‹แŒ€แ‹ แ‹แˆ/special condition of contract/แ‰ แŒแˆแ… แˆŠแ‹ซแˆตแ‰€แˆแŒฅ แ‹ญแŒˆแ‰ฃแˆแข
โ–ถแˆ†แŠ–แˆ แŠจ แŠ แˆตแˆญ แแˆญแˆฐแŠ•แ‰ต (10%) แ‹จแ‰ แˆˆแŒ  แˆ˜แˆ†แŠ• แŠ แ‹ญแ‰ฝแˆแˆแข
โ–ถแ‰ แˆ€แŒˆแˆซแ‰ฝแŠ• แŠ แ‰ฅแ‹›แŠ›แ‹แŠ• แŒแ‹œ แŠ แˆแˆตแ‰ต แแˆญแˆฐแŠ•แ‰ต(5%) แ‰ฅแ‰ป แ‹จแ‰ฐแˆˆแˆ˜แ‹ฐ แАแ‹แข
แˆตแˆซแ‹ แŠฅแŠ•แ‹ฐแ‰ฐแŒ แŠ“แ‰€แ‰€ แŒแˆ›แˆน แŠจแˆ˜แŒจแˆจแˆป แŠญแแ‹ซ แŒ‹แˆญ แ‰€แˆชแ‹ แ‹ฐแŒแˆž แŠจแˆญแŠญแŠญแ‰ฅ แ‰ แŠ‹แˆ‹ แˆตแˆซแ‹ แˆ‹แ‹ญ แˆตแˆ…แ‰ฐแ‰ต แ‰ขแˆแŒ แˆญ แ‰ แ‹แˆ‰ แˆ‹แ‹ญ แ‹จแˆ›แˆตแ‰ฐแŠซแŠจแ‹ซ แ‰€แА แŒˆแ‹ฐแ‰ฅ แˆฒแŒ แŠ“แ‰€แ‰… แŠจแˆ˜แŒจแˆจแˆป แˆญแŠญแŠญแ‰ฅ แŒ‹แˆญ แ‰ 
แŠ แˆญแ‰ฃ แŠ แˆแˆตแ‰ต (45) แ‰€แŠ“แ‰ต แ‹แˆตแŒฅ แ‹ญแˆˆแ‰€แ‰…แˆˆแ‰ณแˆแข
.
๐Ÿšฉแˆˆแˆแˆ‰แˆ แŠฅแŠ•แ‹ฒแ‹ณแˆจแˆต แ–แˆตแ‰ถแ‰นแŠ• SHARE แŠ แ‹ตแˆญแŒ‰แˆแŠ•แข
๐Ÿ‘‰แŠจแ‰ฐแˆ› แˆฝแˆจ แŠฅแŠ•แ‹ณ แˆตแˆ‹แˆฐ๐Ÿ˜
.
๐Ÿšฉแ‹แ‰ฅ แˆˆแˆŠแ‰ต แ‰ฐแˆ˜แŠแŠ• @COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
.
๐Ÿšฉแ‹จแŠ“แŠ•แ‰ฐ แŠจแ‰ฐแˆ›แˆ แ‰ แ‹แˆตแŒฅ แˆ˜แˆตแˆ˜แˆญ แ‹ญแˆ‹แŠฉแˆ::