๐Ÿ‘‰COMMON CONCRETE PROBLEMS AND THEIR
PREVENTION @COTMp
.
โฉThere are many problems we might be facing during and after concreting.
*To produce high quality
concrete we must take some precautions to avoid
those common problems during concreting. In this
article, we will discuss on common concrete
problems and how to prevent them.
A) BLEEDING:
Bleeding refers to as a tendency of water to appear on the top surface of concrete after finishing. Due to bleeding some measure of water (with sand particles and other cementing materials) appears at the surface of the concrete.
*Following precautions should be taken to reduce
bleeding in concrete.
1. Design the mix appropriately.
2. Include least water content in the mix.
3. Use greater amount of cement content.
4. Use greater amount of fine particles.
5. Utilize a little measure of air entraining
admixture.
B) SEGREGATION:
Segregation means separation of coarse aggregates from the concrete surface due to poor compaction.
It is generally seen in the plastic stage of concrete.
As a result honeycomb, laitance, scaling, porous
layer, bond failure etc. can be formed in concrete.
Following precautions should be adopted to prevent segregation in concrete.
1. Design the mix appropriately.
2. Never use excessive water content.
3. Take care of handling, placing, and proper
compaction of concrete.
4. Do not allow the concrete to be dropped from more heights.
5. Use air entraining admixture.
6. Keep the formwork to be watertight.
C) LAITANCE:
The appearance of cement-sand particles on the
surface of freshly placed concrete is known as
laitance. It is mainly occurred due to the bad effect of bleeding and segregation of concrete. The bond between subsequent layers of concrete becomes
weaker and as a result, laitance is developed.
Following precautions can be taken to stop the
occurrence of laitance in concrete.
1. Clay, dust, silt content etc should be removed
before mixing the concrete.
2. Water-cement ratio should be maintained
properly.
3. Water should not be sprayed on the concrete
surface during finishing work.
4. Use well graded fine aggregates in the mix.
5. Add little amount of water reducing admixture in the concrete mix.
D) SCALING:
Scaling is the physical deterioration of concrete in
which the surface layer of concrete broke down,
pitted or flaked away. Due to this effect concrete
surface becomes worse. Scaling can be prevented
by taking same precautions adopted for laitance.
E) PLASTIC SHRINKAGE CRACKS:
When the evaporation rate of water mixed in the
concrete is greater than the bleed water of concrete,
plastic shrinkage cracks are developed on the
surface of the concrete. Basically, this type of
cracks occurs in very hot climate.
F) DUSTING:
Dusting can be prevented by taking following
precautions.
1. Maintain a suitable water/cement ratio in the
concrete.
2. Utilize dust free aggregates in the mix.
3. Guarantee appropriate hydration of concrete.
4. Avoid early surface finishing of concrete.
.
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
โค1
๐Ÿ‘‰แ‹แ‹ต แ‹จ @COTMp แ‰ฐแŠจแ‰ณแ‹ฎแ‰ฝ แŠฅแŠ•แ‹ดแ‰ต แŠ“แ‰ฝแˆ แ‹›แˆฌ แ‹ฐแˆž แŠจแ‰ณแ‰ฝ แ‹ซแˆ‰ แŒฅแ‹ซแ‰„แ‹Žแ‰ฝ แŠฃแ‹˜แŒ‹แŒ…แ‰ฐแŠ“แˆ แˆ˜แˆแˆณแ‰น Discussion แˆ‹แ‹ญ แ‰ แˆšแŒˆแŠแ‹ Group แˆ‹แ‹ญ แŠฃแˆตแ‰€แˆแŒกแˆแŠ• แˆ›แˆˆแ‰ตแˆ แ‰ แ‹šแˆ…..
โžก @COTMp แ‹ญแˆ˜แˆแˆฑ แŠฅแŠ“ แŠฅแŠ•แˆ›แˆ›แˆญแข
.
โฉtry these questions...
.
1. List at least four factors that affect design of
concrete mix?
2. Write procedures of laying of rising main pipes in a water supply project.
3. Estimate the quantities of brickwork and
plastering required in a wall 4 m long, 3 m high
and 30 cm thick.
*Calculate also the cost if the rate of brickwork is
320.00birr per cu m and of plastering is 8.50 birr
per sq m.
4. Given 10m3 Concrete C โ€“ 15 Mechanical mixes
with mix ratio 1:2:4. Assuming that 30% shrinkage and 5% wastage and also take density of cement as 1400kg/m3.
Calculate the amount of cement required to make
10m3 of 1:2:4 concrete in kilograms.
*Calculate the volume of sand in cubic meter .
*Calculate the volume of gravel (crushed stone) in
cubic meter.
.
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข แŠฅแŠ“แˆ˜แˆฐแŒแŠ“แˆˆแŠ•๐Ÿ˜
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†แˆธแŒˆแˆญ แŠฃแ‹ฑ แŒˆแАแ‰ต๐Ÿ˜
.
๐Ÿšฉแ‹แ‰ฅ แˆˆแˆŠแ‰ต แ‰ฐแˆ˜แŠแŠ• @COTMp
๐Ÿ‘‰แ‹แ‹ต แ‹จ @COTMp แ‰ฐแŠจแ‰ณแ‹ฎแ‰ฝ แŠฅแŠ•แ‹ดแ‰ต แŠ“แ‰ฝแˆ แ‹›แˆฌ แ‹ฐแˆž แˆตแˆˆ แŠซแˆซแŠญแ‰ฐแˆญแˆตแ‰ฒแŠญ แŠฅแˆตแ‰ตแˆฌแŠ•แŒแ‹ แŠฅแŠ“ แŠซแˆซแŠญแ‰ฐแˆญแˆตแ‰ฒแŠญ แˆŽแ‹ต แˆแŠ•แ‹ตแŠ•แАแ‹ แŠฃแ‰ฅแˆจแŠ• แŠฅแŠ•แ‹ญแข
.
โžกCharacteristic Strength-แˆ›แˆˆแ‰ต แ‹จแŠฎแŠ•แŠญแˆชแ‰ต แ‹ˆแ‹ญแˆ แ‹จแ‰ฅแˆจแ‰ต แ‰ดแˆตแ‰ต แŠ แ‹ตแˆญแŒˆแŠ• แˆˆแŠฅแ‹ซแŠ•แ‹ณแŠ•แ‹ฑ แ‰ดแˆตแ‰ต แŠซแŒˆแŠ˜แŠ“แ‰ธแ‹ แ‹แŒคแ‰ถแ‰ฝ แ‹แˆตแŒฅ แŠ แˆแˆตแ‰ต แแˆญแˆฐแŠ•แ‰ฑแŠ• แ‰ฅแ‰ป แ‹จแˆšแ‰ แˆแŒฅ แ‹แŒคแ‰ต แАแ‹ แŠซ - แŠฅแˆตแ‰ตแˆฌแŠ•แŒแ‹ แˆ›แˆˆแ‰ตแกแก แ‹ˆแ‹ญแˆ แ‹ฐแŒแˆž 95 แแˆญแˆฐแŠ•แ‰ฑ แ‹จแ‰ดแˆตแ‰ต แ‹แŒคแ‰ถแ‰ฝ แ‹จแˆšแ‰ แˆแŒกแ‰ต แ‹แŒคแ‰ต แАแ‹แกแก แ‰ตแŠ•แˆน แŠฅแˆตแ‰ตแˆฌแŠ•แŒแ‹ แАแ‹ แˆ›แˆˆแ‰ตแ‹ญแ‰ปแˆ‹แˆแกแก
โฉแŽแˆญแˆ™แˆ‹แ‹แˆ- [ fc = (mean strength)- 1.64(standard
deviation) ]
.
โžกCharacteristic Load-แˆ›แˆˆแ‰ต แˆ…แŠ•แƒแ‹ แ‰ แ‹˜แˆ˜แŠ‘ แ‹ซแŒ‹แŒฅแˆ˜แ‹‹แˆ แ‰ฐแ‰ฅแˆŽ แŠจแˆšแ‰ณแˆฐแ‰ แ‹ แ‹แˆตแŒฅ แŠ แˆแˆตแ‰ต แแˆญแˆฐแŠ•แ‰ฑ แ‰ฅแ‰ป แ‹จแˆšแ‰ แˆแŒกแ‰ต load แАแ‹แกแก
โฉแŽแˆญแˆ™แˆ‹แ‹แˆ - [ fk = (mean load) + 1.64(standard
deviation) ]
.
*แŠซแˆซแŠญแ‰ฐแˆญแˆตแ‰ฒแŠญ แˆŽแ‹ฑแŠ•แˆ แˆ†แА แŠฅแˆตแ‰ตแˆฌแŠ•แŒแ‹™แŠ• แˆตแŠ•แ‹ˆแˆตแ‹ต แ‰ แˆแˆˆแ‰ฑแˆ แ‰ แŠฉแˆ แˆ…แŠ•แƒแ‹ แˆดแ แАแ‹:: แˆแŠญแŠ•แ‹ซแ‰ฑแˆ แŠฅแˆตแ‰ตแˆฌแŠ•แŒแ‹™แŠ• แˆตแŠ•แ‹ˆแˆตแ‹ต แˆ…แŠ•แƒแ‹ แ‰ตแŠ•แˆฝแ‹ฌ แŠฅแˆตแ‰ตแˆฌแŠ•แŒแ‹ แŠ แˆˆแ‹ แ‰ฅแˆˆแŠ• แАแ‹ แ‹จแˆแŠ•แ‹ˆแˆตแ‹ฐแ‹...
*แˆŽแ‹ต แˆตแŠ•แ‹ˆแˆตแ‹ต แ‹ฐแŒแˆž แˆˆแ‰ตแˆแ‰ แˆŽแ‹ต แАแ‹ แ‹จแˆแŠ•แ‹ฐแ‹แАแ‹..
แแˆฎแ‰ฃแ‰ฅแˆŠแ‰ฒ แ“แˆซแˆœแ‰ตแˆฎแ‰นแŠ• ( แˆšแŠ•แŠ“ แˆตแ‰ณแŠ•แ‹ณแˆญแ‹ต แ‹ฒแ‰ญแ‹ฌแˆฝแŠ•) แ‹จแˆแŠ•แ‹ˆแˆตแ‹ฐแ‹ แŠจแ‰ดแˆตแ‰ต แˆชแ‹›แˆแ‰ถแ‰ฝ แ‹แˆตแŒฅ แАแ‹แกแก
.
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข แŠฅแŠ“แˆ˜แˆฐแŒแŠ“แˆˆแŠ•๐Ÿ˜
๐Ÿ‘‰แ‹›แˆฌ แ‹ฐแˆž แˆตแˆˆ แ‹จ cement แŠฃแ‹ญแАแ‰ถแ‰ฝ แŠฅแŠ•แˆ›แˆ›แˆญ @COTMp
.
โฉThere are various types of cement used in concrete construction. Each type of cement has its own properties, uses and advantages based on composition materials used during its manufacture.
โฉ13 Types of Cement and their Uses๐Ÿ‘‡
1. Ordinary Portland Cement (OPC)
2. Portland Pozzolana Cement (PPC)
3. Rapid Hardening Cement
4. Quick setting cement
5. Low Heat Cement
6. Sulphates resisting cement
7. Blast Furnace Slag Cement
8. High Alumina Cement
9. White Cement
10. Coloured cement
11. Air Entraining Cement
12. Expansive cement
13. Hydrographic cement
.
โ–ถ1. Ordinary Portland Cement (OPC)
Ordinary Portland cement is the most widely used type of cement which is
suitable for all general concrete construction.
It is most widely produced
and used type of cement around the world with annual global production of around 3.8 million cubic meters per year.
*This cement is suitable for all type of concrete construction.
โ–ถ2. Portland Pozzolana Cement (PPC)
*Portland pozzolana cement is prepared by
grinding pozzolanic clinker with Portland
cement. It is also produced by adding pozzolana with the addition of gypsum or
calcium sulfate or by intimately and uniformly blending portland cement and fine pozzolana.
*This cement has high resistance to various
chemical attacks on concrete compared
with ordinary portland cement and thus it
is widely used. It is used in marine structures, sewage works, sewage works
and for laying concrete under water such
as bridges, piers, dams and mass concrete
works etc.
โ–ถ3. Rapid Hardening Cement
*Rapid hardening cement attains high strength in early days it is used in
concrete where formworks are removed at an early stage and is similar to ordinary portland cement (OPC). This cement has
increased lime content and contains higher c3s content and finer grinding which gives greater strength development
than OPC at an early stage.
*The strength of rapid hardening cement at
the 3 days is similar to 7 days strength of
OPC with the same water-cement ratio.
Thus, advantage of this cement is that
formwork can be removed earlier which increases the rate of construction and
decreases cost of construction by saving
formwork cost.
*Rapid hardening cement is used in prefabricated concrete construction, road works, etc.
โ–ถ4. Quick setting cement
The difference between the quick setting cement and rapid hardening cement is
that quick setting cement sets earlier while rate of gain of strength is similar to Ordinary Portland Cement, while rapid
hardening cement gains strength quickly.
Form works in both cases can be removed
earlier.
*Quick setting cement is used where works is to be completed in very short period and for concreting in static or running water.
โ–ถ5. Low Heat Cement
*Low heat cement is prepared by maintaining the percentage of tricalcium Almunate below 6% by increasing the proportion of C2S. This makes the concrete to produce low heat of hydration and thus is used in mass concrete
*construction like gravity dams, as the low heat of hydration prevents the cracking of concrete due to heat.
*This cement has increased power against sulphates and is less reactive and initial
setting time is greater than OPC.
โ–ถ6. Sulphates Resisting Cement
*Sulfate resisting cement is used to reduce the risk of sulphate attack on concrete and thus is used in construction of foundations where soil has high sulphate content.
*This cement has reduced
contents of C3A and C4AF.
Sulfate resisting cement is used in construction exposed to severe sulphate
action by water and soil in places like canals linings, culverts, retaining walls, siphons etc. ...
.
โžกแ‹ญแ‰€แŒฅแˆ‹แˆ ...
.
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘† แŠจ แ‰…แ‹ตแˆ แ‹จแ‰€แŒ แˆˆ @COTMp
.
โ–ถ7. Blast Furnace Slag Cement
*Blast furnace slag cement is obtained by grinding the clinkers with about 60% slag and resembles more or less in properties of Portland cement. It can be used for works economic considerations is predominant.
โ–ถ8. High Alumina Cement
*High alumina cement is obtained by melting mixture of bauxite and lime and grinding with the clinker.
It is a rapid hardening cement with initial and final setting time of about 3.5 and 5 hours respectively.
*The compressive strength of this cement is very high and more workable than
ordinary portland cement and is used in
*works where concrete is subjected to high temperatures, frost, and acidic action.
โ–ถ9. White Cement
*It is prepared from raw materials free from Iron oxide and is a type of ordinary portland cement which is white in color.
*It is costlier and is used for architectural purposes such as precast curtain wall and facing panels, terrazzo surface etc. and for interior and exterior
decorative work like external renderings of buildings, facing slabs, floorings, ornamental concrete products, paths of gardens, swimming pools etc.
โ–ถ10. Colored cement
*It is produced by mixing 5- 10% mineral pigments with ordinary cement. They are widely used for decorative works in floors.
โ–ถ11. Air Entraining Cement
*Air entraining cement is produced by adding indigenous air entraining agents such as resins, glues, sodium salts of
sulphates etc. during the grinding of clinker.
*This type of cement is especially suited to improve the workability with smaller water cement ratio and to improve frost
resistance of concrete.
โ–ถ12. Expansive Cement
*Expansive cement expands slightly with time and does not shrink during and after the time of hardening.
*This cement is mainly used for grouting anchor bolts and prestressed concrete ducts.
โ–ถ13. Hydrographic cement
*Hydrographic cement is prepared by mixing water repelling chemicals and has high workability and strength.
*It has the property of repelling water and is unaffected during monsoon or rains. Hydrophobic cement is mainly used for the construction of water structures such dams, water tanks, spillways, water retaining structures etc.
.
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
โค1
๐Ÿ‘‰แˆธแŒˆแˆญ แŠฃแ‹ฑ แŒˆแАแ‰ต๐Ÿ˜
.
๐Ÿšฉแ‹แ‰ฅ แˆˆแˆŠแ‰ต แ‰ฐแˆ˜แŠแŠ• @COTMp
๐Ÿ‘‰Today Tip @COTMp
.
โžก แ‰  แŠ แŠ•แ‹ต แˆœแ‰ตแˆญ แŠซแˆฌ แˆแŠ• แ‹ซแˆ…แˆ แ‰ฅแˆŽแŠฌแ‰ต แŠฅแŠ•แŒ แ‰€แˆ›แˆˆแŠ•??
โฉแ‹จแ‰ฅแˆŽแŠฌแ‰ต๐Ÿ‘‡
โ–ถ แˆตแ‹แ‰ต =0.4แˆœ
โ–ถแ‰แˆ˜แ‰ต =0.2แˆœ
=1/(0.4*0.2)
=12.5
=~13
๐Ÿšฉแˆตแˆˆแ‹šแˆ… แ‰  แŠ แŠ•แ‹ต แˆœแ‰ตแˆญ แŠซแˆฌ 13 แแˆฌ แ‰ฅแˆŽแŠฌแ‰ต แŠฅแŠ•แŒ แ‰€แˆ›แˆˆแŠ• แˆ›แˆˆแ‰ต แАแ‹แข

Join on telegram:- @etconp

Follow us on Instagram:- @etconp
๐Ÿ‘‰Today Tip 2 @COTMp
.
โžก Question - แŠ แŠ•แ‹ต G+22 แ‹จแˆ†แА แˆ…แŠ•แƒ แŠฅแŠ•แ‹ดแ‰ต แАแ‹ แˆแŠ•แˆ แŠ แ‹ญแАแ‰ต Column แˆณแŠ•แŒ แ‰€แˆ แˆ˜แŒˆแŠ•แ‰ฃแ‰ต แ‹จแˆแŠ•แ‰ฝแˆˆแ‹??
.
โžกAnswer - Shear wall แ‰ แˆ˜แŒ แ‰€แˆ
.
โžก Question - แŠจ36 แˆš.แˆœ แ‰ แˆ‹แ‹ญ แˆˆแˆ†แŠ‘ แŒแˆฎแ‹Žแ‰ฝ แˆˆแˆแŠ•แ‹ตแАแ‹ Lapping แ‹จแˆ›แ‹ญแˆแ‰€แ‹ฐแ‹??
.
โžกAnswer - แŒแˆฎแ‹Žแ‰น แˆณแ‹ญแ‹›แ‰ธแ‹ แ‰ตแˆแˆแ‰… แˆตแˆˆแˆ†แА Lap แ‰ฅแŠ“แ‹ฐแˆญแŒ‹แ‰ธแ‹ แˆŽแ‹ต แ‰ตแˆซแŠ•แˆตแˆแˆญ แŠฅแŠ•แ‹ฒแŠ–แˆญ แˆ‹แ• แˆŒแŠ•แŒแ‹™ แˆจแŒ…แˆ แˆ˜แˆ†แŠ• แŠ แˆˆแ‰ แ‰ต แ‰ แ‰ฐแŒจแˆ›แˆชแˆ แˆแˆˆแ‰ฑแŠ• แŠ แŠ•แ‹ต แˆ‹แ‹ญ แˆ›แˆฐแˆชแ‹ซ แ‰ตแˆแ‰… แ‹ฒแ‹ซแˆœแ‰ตแˆญ แ‹ซแˆˆแ‹ แŒแˆฎ/ แˆฝแ‰ฆ แ‹ซแˆตแˆแˆแŒˆแŠ“แˆ - แŠ แˆตแ‰ธแŒ‹แˆช แАแ‹::
.
โžก Question - แˆŠแแ‰ถแ‰ฝ แ‹แˆตแŒฅ แˆˆแˆแŠ•แ‹ตแАแ‹ แˆ˜แˆตแ‰ณแ‹ˆแ‰ต แ‹จแˆšแŒˆแŒ แˆ˜แ‹??
.
โžกAnswer - แ‰ แŒแ‹ตแŒแ‹ณ แ‹จแ‰ฐแŠจแ‰ แ‰  แ‰ แŒฃแˆ แŒ แ‰ฃแ‰ฅ แ‰คแ‰ต แ‹แˆตแŒฅ แ‹แˆ แ‰ฅแˆˆแŠ• แ‰ฅแŠ•แ‰†แˆ แˆแŠ• แ‹ญแˆฐแˆ›แŠ“แˆ??
แˆŠแแ‰ถแ‰ฝ แŠจแŒฅแ‰ แ‰ณแ‰ธแ‹ แ‰ แ‰ฐแŒจแˆ›แˆช แŠฅแŠ•แ‰…แˆตแ‰ƒแˆด แˆตแˆˆแˆšแ‹ซแ‹ฐแˆญแŒ‰ แˆฐแ‹Žแ‰ฝ แ‹ญแˆฐแŒ‹แˆ‰ แˆแŠ• แŠ แˆแ‰ฃแ‰ต แŠ แ‹ฐแŒ‹ แŠจแ‰ฐแŠจแˆฐแ‰ฐ แค แˆ˜แ‰ฅแˆซแ‰ต แŠจแŒ แ‹ l แˆแŠ“แˆแŠ• แ‰ฅแˆˆแ‹ - แŠฅแŠ“แˆ แˆฐแ‹Žแ‰ฝ แ€แŒ‰แˆซแ‰ธแ‹แŠ• แŠฅแ‹ซแˆตแ‰ฐแŠซแŠจแˆ‰ แค l แ‹แ‰ แ‰ณแ‰ธแ‹แŠ• แŠฅแ‹ซแ‹ฐแАแ‰ แˆแŠ“แˆแŠ• แˆแ‰ณ
แŠฅแŠ•แ‹ฒแˆ‰แŠ“ แˆƒแˆณแ‰ฃแ‰ธแ‹แŠ• แŠฅแŠ•แ‹ฒแˆฐแˆจแ‰… แАแ‹ แˆŠแแ‰ต แ‹แˆตแŒฅ แˆ˜แˆตแ‰ณแ‹ˆแ‰ต แ‹จแˆšแŒˆแŒ แˆ˜แ‹::
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข แŠฅแŠ“แˆ˜แˆฐแŒแŠ“แˆˆแŠ•แข
๐Ÿ‘1
๐Ÿ‘‰ แ‰ณแˆชแŠซแ‹Šแ‰ต แŠจแ‰ฐแˆ› แŒŽแŠ•แ‹ฐแˆญ๐Ÿ˜
.
๐Ÿšฉแ‹แ‰ฅ แˆแˆฝแ‰ต แ‰ฐแˆ˜แŠแŠ• @COTMp
Ethio Construction Engineering
Photo
๐Ÿ‘‰10 key terms of Project management and schedule
you should know. @COTMp ๐Ÿ‘†
.
1. WBS (Work Breakdown Structure): Is hierarchical that breaks down the work into manageable clods so that each level of WBS could be easily understood by the project team.
.
2. Milestone:
These are the significant points in time or an event
that mark important moments during the project.
These are mainly used for
โ— Starting phase
โ— Ending phase
โ— Fixed dates on plan
.
3. Baseline:
Is used to measure the performance of the project.
There are three baselines in project management.
These are โ€“
โ— Schedule baseline
โ— Cost baseline
โ— Scope baseline
4. Gantt Chart:
Is a bar chart that displays the scheduled
.
information graphically.
5. Critical Path Method (CPM) Critical Path Method (CPM) is a step by step approach in which one can analyze critical and non- critical tasks.
6. Dummy Activity:
dummy activity is a simulated activity of sorts, one that is of a zero duration.
.
7. Float:
Float, also called slack, is the amount of time a
task can slip before it bumps into another task.
8. Chart Dependencies:
.
the predecessor is the first task; it controls the start
or end date for all related successor tasks. The
successor, by contrast, is the task whose start or
end date is controlled by the predecessor.
.
9. Types of relationship:
โ–  Finish to Start: Predecessor must finish before Successor can start.
โ–  Start to Start:Predecessor must start before Successor can start.
โ–  Finish to Finish: Predecessor must finish before Successor can finish.
โ–  Start to Finish: Predecessor must start before Successor can finish.
.
10. Lead time and Lag time: Lead time causes the successor task to begin
before its predecessor task concludes.
Lag time causes the successor task to begin some time after its predecessor task concludes.
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข
Structural_Analysis_by_R_C_Hibbeler.pdf
30.1 MB
Reinforced_Concrete_Design_by_S.pdf
14.4 MB
๐Ÿ‘‰Today Book Tip @COTMp ๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
.
๐ŸšฉSHARE SHARE SHARE
๐Ÿ˜ญ1
๐Ÿ‘‰Important points for a Construction Site Engineer @COTMp
.
โ–ถA site engineer has to perform a lot of activities on the site. His/her role involves a lot of responsibility which includes giving sufficient advice and supervision when there are any technical issues, or for proper management and for the preparation of day to day reports of the construction works.
*There are some works which are recurring and hence a few tips might be useful for a civil engineer if
they are remembered. They help in faster
*calculations as well as to address problems at
the site.
โฉPoints to Remember for Civil Site Engineer ๐Ÿ‘‡
:
โ–ถ36mm is the maximum diameter of the bars used for lapping.
*Bars having more than this diameter are not allowed.
โ–ถMaximum chair spacing is 1m and the minimum diameter used for these bars is 12mm.
โ–ถMinimum diameter used for dowels bars is
12mm.
โ–ถLongitudinal reinforcement should not be less than 0.8% of gross area of cross section
and not be more than 6% of the same.
โ–ถMinimum number of bars used for square
columns is 4 and that of a circle is 6.
โ–ถThe main bars used in the slabs should not
be less than 8mm when HYSD bars are used
and 10mm when plain bars are used.
โ–ถThe distribution bars in slabs should not less
than 8mm and not more than 1/8 of slab
thickness.
โ–ถMinimum thickness of slab is 125mm.
โ–ถMaximum free fall of concrete is allowed to
1.50m.
โ–ถLap slices not be employed for bars greater
than 36 mm.
โ–ถPH value of the water should not be less
than 6.
โ–ถCompressive strength of Bricks is 3.5 N/
mm
โ–ถWater absorption of bricks should not be
more than 15 %.
โ–ถ Binding wire required in steel reinforcement
is 8 kg per MT.
.

๐Ÿ‘‰ Density of Materials
*Bricks : 1600-1920kg/m
*Concrete block:1920kg/m
*Reinforced concrete :2310-2700kg/m
โฉDe shuttering time of different RCC Members
*For columns : 16-24 hrs.
*Soffit formwork to slabs : 3days
*Soffit to beams props : 7days
*Beams spanning upto 4.5m : 7days
.
๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡๐Ÿ‘‡
Join for more updates via the link below;
t.me/COTMp
๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†๐Ÿ‘†
โšก แŠ แˆแŠ‘แŠ‘ Join แ‰ แˆ›แˆจแŒ แŠฅแŠ“ แˆˆแŒ“แ‹ฐแŠ›แ‹Ž แŠฅแŠ“ แˆˆแˆšแ‹ซแ‰แ‰ต แˆแˆ‰ แˆผแˆญ แ‹ซแ‹ตแˆญแŒ‰แข แŠฅแŠ“แˆ˜แˆฐแŒแŠ“แˆˆแŠ•แข
๐Ÿ‘2
๐Ÿ‘‰แ‹แ‰ขแ‰ตแ‹‹ แ‰ฃแˆ…แˆญแ‹ณแˆญโค
.
๐ŸšฉแˆธแŒ‹ แˆแˆฝแ‰ต แˆˆแŠ“แŠ•แ‰ฐ แ‹ญแˆแŠ•แข @COTMp