👉Different Types Of Loads On Building
.
📌Types of loads

▶️External loads on a structure may be classified in several different ways.
.
🚧In one classification, they may be considered as static or dynamic.
.
🔵Static loads are forces that are applied slowly and then remain nearly constant.
.
🚧One example is the weight, or dead load, of a floor or roof system.
.
🔵Dynamic loads vary with time.
*They include repeated and impact loads.
.
➡️Repeated loads are forces that are applied a number of times, causing a variation in the magnitude, and sometimes also in the sense, of the internal forces.
*A good example is an off balance motor.
.
➡️Impact loads are forces that require a structure or its components to absorb energy in a short interval of time.
*An example is the dropping of a heavy weight on a floor slab, or the shock wave from an explosion striking the walls and roof of a building.

🚧External forces may also be classified as uniformly distributed and concentrated.

🟠Uniformly distributed loads are forces that are, or for practical purposes may be considered, constant over a surface area of the supporting member.
*Dead weight of a rolled steel beam is a good example.
.
🟠Concentrated loads are forces that have such a small contact area as to be negligible compared with the entire surface area of the supporting member.
*A beam supported on a girder, for example, may be considered, for all practical purposes, a concentrated load on the girder.
.
⏩Another common classification for external forces labels them axial, eccentric, and torsional.
.
⏺An axial load is a force whose resultant passes through the centroid of a section under consideration and is perpendicular to the plane of the section.
.
⏺An eccentric load is a force perpendicular to the plane of the section under consideration but not passing through the centroid of the section, thus bending the supporting member.
.
⏺Torsional loads are forces that are offset from the shear center of the section under consideration and are inclined to or in the plane of the section, thus twisting the supporting member.

📌Also, building codes classify loads in accordance with the nature of the source.
.
🚧Dead loads include materials, equipment, constructions, or other elements of weight supported in, on, or by a building, including its own weight, that are intended to remain permanently in place.
.
🚧Live loads include all occupants, materials, equipment, constructions, or other elements of weight supported in, on, or by a building and that will or are likely to be moved or relocated during the expected life of the building.
.
🚧Impact loads are a fraction of the live loads used to account for additional stresses and deflections resulting from movement of the live loads.
.
🚧Wind loads are maximum forces that may be applied to a building by wind in a mean recurrence interval, or a set of forces that will produce equivalent stresses.
.
🚧Snow loads are maximum forces that may be applied by snow accumulation in a mean recurrence interval.
.
🚧Seismic loads are forces that produce maximum stresses or deformations in a building during an earthquake.

@etconp
Ethio Construction Engineering
Photo
#2 . Shanghai Tower

➪ Height :- 632 meters
➪ Floor count :- 134
➪ Floor above the ground :- 130
➪ Floor below the ground :- 3
➪ Number of lift shaft :- 97
➪ Floor area :- 380,000 m²
➪ Structural system:- composite
structure RC and steel
➪ Elevator speed :- 76 km/h
➪ Construction started :- 21 November
2008
➪ Completed :- 2 September 2014
➪ Cost :- CN¥15.7 billion
➪ Architect :- jun xia
➪ Engineer:- Thornton Tomasetti
Cosentini Associates
➪ Contractor:- Shanghai Construction
Group
➪ Owner :- Shanghai Tower Construction and Development

Shanghai China 🇨🇳

Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
❤1
👉የመስቀል አደባባይ ፕሮጀክት በታቀደለት ጊዜ ለመጨረስ ለሊትም ጭምር እየተሰራ ነው።

@etconp
👉ማስተር ፕላን ምንድነው?
.
🚧ማስተር ፕላን ወይም የልማት ዕቅድ አሁን ያሉትን ሁኔታዎች ለማሻሻል እና የከተማዋን የወደፊት ዕድገት በተቀናጀ ሁኔታ ለመቆጣጠር የታቀዱ የተለያዩ ሀሳቦችን ሰማያዊ እትም ነው።
.
▶️ለተሳካ የከተማ ፕላን መላውን ከተማ እንደ አንድ ነጠላ አካል የሚገጥም እቅድ መኖር አለበት፡፡
.
▶️የከተማውን አጠቃላይ ሁኔታ በተቀናጀ ሁኔታ ለማሳካት ይህ አስፈላጊ ነው፡፡
.
▶️የከተሞች ልማት ወይም መስፋፋት ረጅም ጊዜ ይወስዳል፣ስለሆነም በእቅዱ መሠረት በማንኛውም ጊዜ ዕድገቱ ቁጥጥር ማድረግ ይጠበቅበታል፡፡
.
📌እንዲህ ዓይነቱ ዕቅድ ‹ማስተር ፕላን› ይባላል
.
▶️የከተማው የግለሰቦችን ማንነት በመጠበቅ ረገድ እንዲህ ያለ ዕቅድ ተጨባጭና የታሰበ መሆን አለበት፡፡
.
▶️የከተሞች ልማት ረጅም ሂደት ስለሆነ እቅዶቹ ጠንካራ መሆን አለባቸው እንጂ በተመሳሳይ ጊዜ በአዲሶቹ የልማት ለውጦች ውስጥ ያሉትን ፍላጎቶች ለማርካት ከጊዜ ወደ ጊዜ ማሻሻያ ማድረግ አለባቸው፡፡
.
▶️ማስተር ፕላኑ በአጠቃላይ የከተማዋን የድሮ ሁኔታ ለማሻሻል ይዘጋጃል ነገር ግን ለአዲሶቹ ከተሞች በድቅድቅ መሬት ላይ እንዲታቀፉ እና እንዲገነቡም እንዲሁ አስፈላጊ ነው፡፡

@etconp
👉Why corner columns have higher values of moments than other columns?
.
📌The corner columns are Axially loaded column with Biaxial Bending Moment.
.
🚧As interior columns have balanced bending moments because of adjacent loading conditions so the their bending moments gets compensated, but There are no such bending moments available to compensate the bending moments of corner columns.

@etconp
Ethio Construction Engineering
#2 . Shanghai Tower ➪ Height :- 632 meters ➪ Floor count :- 134 ➪ Floor above the ground :- 130 ➪ Floor below the ground :- 3 ➪ Number of lift shaft :- 97 ➪ Floor area :- 380,000 m² ➪ Structural system:- composite structure RC and steel ➪ Elevator…
#3. Abraj Al Bait

➪ Height:- 601 meters
➪ Number of story:- 124
➪ Number of lift :- 96
➪ Floor area :- 1,575,815 m2
➪ Structural system:- core structure (composite of RC and steel structure)
➪ Elevator speed:- 6m/s
➪ Floors below ground :- 3
➪ Floors above the ground:- 120
➪ Construction started:- 2004 G.C
➪ Completed:- 2012
➪ Cost :- $15 billion
➪ Architect and structural engineer :- SL Rasch GmbH and Dar Al-Handasah
➪ Contractor:- Saudi Binladin Group
➪ Client:- Saudi Arabia government

Mecca 🕋, Saudi Arabia 🇸🇦

Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
👉What will happen if the concrete will not be vibrated?
.
📌This is what happens when you do not properly compact concrete
.
▶️The reason behind this is the improper compaction.
.
▶️The height of column is minimum 3 m (considering single storey) and they are usually cast from floor to roof level as a single member in one stage (without any intermediate joints) So the concrete has to pass all the reinforcements and form homogeneous mixture to prevent honeycomb.
.
🚧So we compact the concrete by giving external energy to the mixture to eliminate the air voids.
.
📌Honeycomb also occurs due to bleeding of concrete from the sides and bottom of the formwork.
.
▶️Excess compaction also causes bleeding. So the compaction must be done neither too short (duration) nor too long.

@etconp
👉How do high rise building resist sinking into the ground due to their mass?
.
📌All structures including skyscrapers resist sinking into the soil beneath them despite their heavy load due to their well-designed foundation that takes into account the load of the superstructure and the bearing capacity of the soil available at a particular stratum at which the foundation rests.
.
▶️Due to correct assumptions, predictions and design of foundation by geotechnical and structural experts no such failure of foundation occurs and really heavy structures can continue to stand for centuries.
.
▶️To elaborate this, let me give a brief description about the bearing capacity of soil and other concepts of foundation design.
.
▶️Bearing capacity of soil is the maximum amount of vertical stress it can bear before failing in either shear or excessive settlement.
.
▶️This bearing capacity is estimated using experiments such as plate load test or ascertained using formulae involving bearing capacity factors.
.
📌Different types of structures and soil conditions require different types of foundations.
.
🚧Shallow foundations:These are used when sufficient bearing capacity is m available at shallow depth. *For normal few storey residential buildings that are not framed structures, continuous strip footings beneath the walls are used.
*For normal few storey residential framed structures isolated footings under columns are usually used.
*Raft/mat foundations are used in places where lack of bearing capacity is taken care of by increasing area of footing to a continuous raft or mat designed as an inverted slab.
.
🚧Deep foundations:When sufficient bearing capacity for a soil is not available at shallow depths, pile or well foundations are used to transfer load of structure via a stiff pile or rubble filled well to a deeper hard stratum.
*These foundations also advantageously use the friction b/w pile and surrounding soil to carry part or whole of the load in addition to point bearing resistance available at large depths.
.
🚧Compensated raft (Floating footing):It is observed that soil experiences settlement or shear failure only at loads over and above that which it is initially subjected to due to overburden.
*Hence, if overburden pressure is removed by excavating the soil up to a particular level and not backfilled, that much load equal to overburden pressure can be applied without stressing the soil at that level.
*Such technique helps in designing extremely stable and strong foundation that experiences little to no settlement and creates room for basements as well.
*Since the soil is completely unstressed the footing is said to simply float on the soil.
.
📌In case of skyscrapers a combination of traditional and/or innovative techniques are used for foundation design.
.
▶️Shallow foundations are almost never used except in rare cases where hard rock stratum is available at shallow depths.
*Usually a combination of compensated raft and pile foundation is used to ensure non sinking, non tilting foundation.
*Compensated raft at large depth provides good bearing without over stressing the soil and pile foundation provides increased stability against differential settlement and tilting by virtue of its skin friction.
*It is preferable to sink piles up to a hard rock stratum to maximise the available point bearing resistance.

@etconp
👍2
👉What is the standard size of a column for building?
.
📌The size of the columns is depends on the total load on the columns.
.
▶️The minimum size of the column should not be less than 9”x9”
.
📌Distance between the columns:-
⏺Try to maintain equal distance between the centres of two columns. Always plan a column layout on a grid.
⏺The distance between two columns of size 9”x9” should not be more than 4m centre to centre of column.
⏺If larger barrier free distances are required then going for larger column size is to be used.
.
📌The size of the columns increase because of two factors:

🚧Increase in the distance between two columns (This increases the dimensions of the columns as well the depth of the beam.)
🚧Height of the building (Increase in the number of floors is directly proportional to the dimensions of the columns.
.
📌Alignment of Columns
.
➡️A rectangular grid is to be made for placing the columns. This helps in avoiding mistakes and placing in columns can be done in the right way.
.
👉The columns can preferably be arranged in two different fashions:

➡️In a straight line with the help of a grid
➡️In a circular fashion for circular buildings.
.
📌Zigzag arrangement of columns is an absolutely wrong way of working out Structural design. It should be remembered that when columns are erected, beams are laid connecting the columns.
.
👉The Zigzag column placement causes three major issues:

⏺Unbalanced load transfer
⏺Problems in wall construction
⏺Problems in laying beams

@etconp
👉Our Voice for Our Dam
.
🚧8100 ላይ A ብለን በመላክ ደስታችንን እንግለፅ!
.
#ግድቡየኔነው
💚💛❤
#ItsMyDam

@etconp
Ethio Construction Engineering via @like
#3. Abraj Al Bait ➪ Height:- 601 meters ➪ Number of story:- 124 ➪ Number of lift :- 96 ➪ Floor area :- 1,575,815 m2 ➪ Structural system:- core structure (composite of RC and steel structure) ➪ Elevator speed:- 6m/s ➪ Floors below ground :- 3 ➪ Floors above…
#4. Lotte World Tower

➪ Height:- 556 meters
➪ Number of story :- 130
➪ Floor above the ground:- 123
➪ Floor below the ground :- 6
➪ Number of elevator :- 58
➪ Speed of elevator :- 10m/s
➪ Structural system:- core structure (composite)
➪ Ground floor area :- 304,081 m²
➪ Construction started:- February 1, 2011
➪ Completed:- December 22, 2016
➪ Cost :- $3.4 billion
➪ Architect:- Kohn Pedersen Fox
➪ Structural engineer:- Leslie E. Robertson
Associates
➪ Contractor:- lotte Engineering and
construction
➪ Client :- lotte property and development

Seoul, South Korea 🇰🇷

Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
👉What are the basic safety features at any construction site?
.
📌Following type of accidents may occur at site.

⏺Falling down, Slipping from height.

⏺Falling of material from top.

⏺Fire

⏺Structural Collapse.

⏺Electrical Shocks.

⏺Any other injuries.
.
📌Why accidents occur ?
.
⏺No use of Safety tools i.e. Helmets, Safety Belts, Safety Shoes, Hand Glows, Goggles, Safety Nets, etc

⏺Not following of safety instructions.

⏺Electricity misuse.

⏺Negligence & Ignorance in following general safety rules

📌First Aid

⏺First Aid kit should be readily available.

⏺Administration of First-Aid.

⏺Information to ambulance.

⏺Shifting to nearby hospital.

⏺Information to corporate office.

⏺Information to other concerned agency.

⏺Police, Fire Brigade etc
.
📌Following Corrective Preventive Actions should be initiated by Project In Charge
.
➡️Proper training for all

➡️Contractor’s / owner have to be properly educated about safety.

➡️Role of Security Supervisor is to make people use safety tools.

➡️All are informed about the importance of safety and basic safety safe practices.

➡️Fire-Fighting equipments should be available at site and should be regularly checked.

➡️Electrical overloading or unauthorized connections should be avoided.

➡️Avoid working in night time

@etconp
🚩ውድ ቤተሰቦቻችን
.
🚧ዲጂታል ላይብረሪያችን እንዴት አገኙት...?📚
.
📌How Did You Get our Digital library 📚

@etconp
👉Why do we use development length in beam reinforcement?

📌Development Length is essentially provided to create a bond between steel and concrete in order to transfer the bar force without slip to prevent the bar from pulling out under tension.
.
🚧Image A: The development length is provided in the beam and column junction.
*Due to this the stresses developed are easily transferred by the bond created by steel and concrete.
.
🚧Image B: The development length is not provided in the beam and column junction.
*Due to this the stresses developed in the beams will not be able to transfer it to the column.
Ethio Construction Engineering via @like
#4. Lotte World Tower ➪ Height:- 556 meters ➪ Number of story :- 130 ➪ Floor above the ground:- 123 ➪ Floor below the ground :- 6 ➪ Number of elevator :- 58 ➪ Speed of elevator :- 10m/s ➪ Structural system:- core structure (composite) ➪ Ground floor area…
#5. One World Trade Center

➪ height:- 541.3 meters
➪ number of story :- 94
➪ floor above the ground:- 88
➪ floor below the ground:- 5
➪ floor area :- 325,279 m²
➪ elevators:- 73
➪ elevator speed :- 23mile/hour
➪ architect :- David childs
➪ Structural engineer:- WSP Cantor
➪ contractor :- Tishman construction
➪ cost :- $3.9 billion
➪ construction started :- April 27, 2006
➪ completed:- November 3, 2014

New York USA🇺🇸

Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
👉እስቲ ኣሁን ደሞ ስለ lap length , Development length,Anchorage length ትንሽ እንንገራቹ...
.
🚧ላፕ ሌንግዝ (lap length) - ተፈላጊ የብረት (ፌሮ) ርዝመት
ውጥረትን (stresses) ከአንድ ብረት ወደሌላ የሚተላለፍበት
.
🚧ደቨሎፕመንት ሌንግዝ (Development length) -ተፈላጊ
የብረት ርዝመት ውጥረትን (stresses) ከብረቱ ወደ ኮንክሪቱ
የሚተላለፍበት
.
🚧አንኮሬጅ ሌንግዝ (Anchorage length) - ይህ ርዝመት
አይነት በቂ የሆነ ደቨሎፕመንት ሌንግዝ (development
length ) በሌለባቸው በ Support / fixed ends ላይ
provide የምናረገው ርዝመት ነው::

@etconp
👍1
👉Concrete Technology 
.
➡️How to make concrete more crack resistant used for sidewalks and Any Structures?
.
📌The main reason why concrete cracks is because it shrinks.
*It shrinks as it loses water.
*Most of that happens because of evaporation when we let it dry.
.
🚧So, the first thing to do is to minimise the amount of water present in the mix.
*That is done by minimising the workability of the concrete, improving the mix design, using water reducers or high range water reducers.
.
🚧Another thing to do is to have jointing at realistic distances, and making those joints early.
.
🚧Some aggregates are more resistant to shrinkage than others. *yielding a lower shrinkage mix.
.
🚧Always put diagonal bars (plural) across reentrant corners, such as around drainage grates and other places where a diagonal crack is likely to form.
*The bars go at right angles to the expected crack, of course.
.
🚧Some other kinds of cement other than Portland cement can have a somewhat lower drying shrinkage than Portland cement.
.
🚧Concrete hardens by chemical reactions involving the cement and the water.
*Once the water is gone, strength gain, like Grandfather’s clock “stopped dead, never to go again”.😁
*Do not let your concrete dry out prematurely. *Keeping it moist is called “curing”.

#ConcreteTechnology 

@etconp
Ethio Construction Engineering via @like
#5. One World Trade Center ➪ height:- 541.3 meters ➪ number of story :- 94 ➪ floor above the ground:- 88 ➪ floor below the ground:- 5 ➪ floor area :- 325,279 m² ➪ elevators:- 73 ➪ elevator speed :- 23mile/hour ➪ architect :- David childs ➪ Structural…
#6. Taipei 101

➪ Height :- 509.2 meters
➪ Floor above the ground:- 101
➪ Floor below the ground:- 5
➪ Floor area :- 412,500 m²
➪ Number of elevator:- 61
➪ Speed of elevator:- 38 miles per hour
➪ structural system:- core (composite)
➪ Architect:- C.Y. Lee
➪ structural engineer:- Evergreen Consulting
➪ Contractor:- KTRT Joint Venture
➪ Cost :- $1.89 billion
➪ Owner:- Taipei finical center co.
The damper has become such a popular tourist attraction that the city contracted Sanrio to create a mascot: the Damper Baby. If you’re not familiar with damper open this link https://t.me/ETCONp/1129

Telegram:- @etconp
Instagram:- https://www.instagram.com/etconp
Types of Dam and their description

Can you name the components of a dam from A up to K ?

If more than 10 members participate In Our Discussion Group we will post the answer

@COTMp ላይ ተሳተፉ ከ 10 በላይ ቤተሰቦች ከተሳተፋችሁ መልሱን እንለቃለን።

@etconp
👉Why don’t we use circular beams in construction or in structures?
.
➡️RCC structures, the circular cross section of the RCC Beam is not adapted.
.
🚧Before we look at the reasons, please have a look at the framed structure where the conventional Rectangular section has been adapted :
.
🚧In context of the site photograph, let us have a look at some reasons :

1.Formwork :
.
▶️Very difficult It has to be made out of either MS sheets or Aluminum sections.
.
🚧Fixing it horizontally is more challenging since the base of the beam form work shall be semi circular.
.
🚧The Formwork shall need to have a provision on the top for pouring concrete.

2.The casting :

🚧Imagine that a conventional letter box is laid Horizontality and you have to pour concrete through the opening at the top.
.
🚧The concrete has to be high slump concrete so that it moves to all crevices of the section.
.
🚧Finishing the top portion of the beam shall be a highly skilled job.
.
3.The de shuttering :
.
🚧It shall not be possible to first strike off the sides and then the beam bottom .
.
🚧The form work shall have to be removed in two halves after the concrete attains the strength.
.
➡️Hope you’re clear with certain difficulties associated with the circular sections.

@etconp