🚩ዛሬ ደሞ ስለ Contract Document ኣብረን እንይ 👇
.
👉Contract Document is used widely in the business and construction industry. these are the documents in which the contract for construction is based. contract documents include more than the drawings and technical specification and they consist of;
⛲Agreement /contract forms
⛲Conditions of contract
⛲Drawings
⛲Technical specifications and any required calculations
⛲Addendum/a changes made during the bidding process.
⛲Modifications to the contract (changes made after the owner and contractor have signed the contract for construction)
.
👉Contract is which one or more parties agree to do or not to do something and agrees setout in the contract.
.
📚PURPOSE OF CONTRACT DOCUMENT
📑Describe the scope of work
📑Establish the time frame
📑Establish cost and time provision
📑Set forth obligations and relationship
📑Manage multiple risks
📑Establish control mechanism
📑Minimizes disputes
📑Improve economic return on investment.
.
👉Contract document must fulfill seven requirements.
1. lawful and capable
2. Intent
3. Defined objectives
4. Legal and Distinct
5. standard
6. Valid considerations
7. Agreement.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👉ሸገር ኣዱ ገነት😍
.
🚩ውብ ለሊት ተመኝን @COTMp
TYPES OF STONES.
stones used for civil engineering works may be classified in the following three ways...
🗻Geological
🗻Physical
🗻Chemicaly classified.
GEOLOGICAL CLASSIFICATION ..based on their origin of famous stones are classified into three main groups-Igneous
-Sedimentary
-Metamorphic rocks
✔IGNEOUS ROCKS ..formed by cooling and solidifying of the rock masses from their molten magmatic condition of the earth.
...it is strong and durable like Granite,Trap,Basalt..etc.
...they also have crystalline surface like Granite.
...and also they are non-crystalline and glassy texture formed by cooling lava at the top surface of earth like Trap and Basalt.
✔SEDIMENTARY ROCKS..formed due to weathering action of water,wind and frost existing rocks disintegrates.
...deposited layers materials get consolidated under pressure and by heat.
...Rocks thus formed are more uniform,fine grained and compact in their nature. sand stones, lime stones,mud stones and etc.belong to this class of rock.
✔METAMORPHIC ROCKS..this type of rocks formed by action by pressure and internal heat of igneous and sedimentary rocks.
ex. Gressies and Trap changed into schist and laterite,lime stone changes into marble,sand stone becomes quartzite and mud stone becomes slate
👍1
PHYSICAL CLASSIFICATION..
Based on the structure,the rocks may be classified as
-Stratified
-UnStratified
- Foliated Rocks.
✔STRATIFIED ROCKS .. these rocks are having layered structure. they possess planes of stratification or cleavage.
...they are easily split along these planes. sand stones,lime stones,slate etc. are example of this class of stones.
✔UNSTRATIFIED ROCKS..these rocks are not stratified.
...they possess crystalline and compact grains.
...they can not split into thin slap.
...granite,Trap,marble arc
✔FOLIATED ROCKS.. the main constituent of these rocks is calcium carbonate.
...limestone is a calcareous rock of sedimentary origin while a marble is a calcareous rock of metamorphic origin.
✔CHEMICAL CLASSIFICATION
👉On the basis of their chemical composition engineers prefer to classify rocks as:
• Silicious rocks
• Argillaceous rocks and
• Calcareous rocks
(i) SILICIOUS ROCKS:The main content of these rocks is silica. They are hard and durable. Examples
of such rocks are granite, trap, sand stones etc.
(ii)ARGILLACEOUS ROCKS: The main constituent of these rocks is argil i.e., clay. These stones are
hard and durable but they are brittle. They cannot withstand shock. Slates and laterites are examples of
this type of rocks.
(iii) CALCAREOUS ROCKS: The main constituent of these rocks is calcium carbonate. Limestone is a
calcareous rock of sedimentary origin while marble is a calcareous rock of metamorphic origin
✔REQUIREMENT OF GOOD BUILDING STONES.
👉The following are the requirements of good building stones:
🏠STRENGTH: The stone should be able to resist the load coming on it. Ordinarilly this is not of
primary concern since all stones are having good strength. However in case of large structure, it may be
necessary to check the strength.
🏠 DURABILITY: Stones selected should be capable of resisting adverse effects of natural forces
like wind, rain and heat.
🏠HARDNESS: The stone used in floors and pavements should be able to resist abrasive forces
caused by movement of men and materials over them.
🏠TOUGHNESS: Building stones should be tough enough to sustain stresses developed due to
vibrations. The vibrations may be due to the machinery mounted over them or due to the loads moving
over them. The stone aggregates used in the road constructions should be tough.
🏠SPECIFIC GRAVITY: Heavier variety of stones should be used for the construction of dams,
retaining walls, docks and harbours. The specific gravity of good building stone is between 2.4 and 2.8.
🏠POROSITY and ABSORPTION: Building stone should not be porous. If it is porous rain water
enters into the pour and reacts with stone and crumbles it. In higher altitudes, the freezing of water in
pores takes place and it results into the disintegration of the stone.
🏠DRESSING: Giving required shape to the stone is called dressing. It should be easy to dress so
that the cost of dressing is reduced. However the care should be taken so that, this is not be at the cost of
the required strength and the durability. 🏠APPEARANCE: In case of the stones to be used for face works, where appearance is a primary
requirement, its colour and ability to receive polish is an important factor .
🏠SEASONING: Good stones should be free from the quarry sap. Laterite stones should not be
used for 6 to 12 months after quarrying. They are allowed to get rid of quarry sap by the action of
nature. This process of removing quarry sap is called seasoning.
🏠COST: Cost is an important consideration in selecting a building material. Proximity of the
quarry to building site brings down the cost of transportation and hence the cost of stones comes down.
However it may be noted that not a single stone can satisfy all the requirements of a good
building stones, since one requirement may contradict another.🔨 For example, strength and durability
requirement contradicts ease of dressing requirement. Hence it is necessary that site engineer looks into
the properties required for the inteded work and selects the stone
🏠COMMON BUILDING STONES
✔The following are the some of commonly used stones:
⛲BASALT AND TRAP
⛲GRANITE
⛲ SAND STONES
⛲ SLATES
⛲LATERITE
⛲MARBLE
⛲ GNEISS QUARTZITE
🗻USES OF STONES
✔Stones are used in the following civil engineering constructions:
🏠Stone masonry is used for the construction of foundations, walls, columns and arches.
🏠Stones are used for flooring.
🏠Stone slabs are used as damp proof courses, lintels and even as roofing materials.
🏠Stones with good appearance are used for the face works of buildings. Polished marbles and
granite are commonly used for face works.
🏠Stones are used for paving of roads, footpaths and open spaces round the buildings.
🏠Stones are also used in the constructions of piers and abutments of bridges, dams and retaining
walls.
🏠Crushed stones with graved are used to provide base course for roads. When mixed with tar
they form finishing coat.
🏠Crushed stones are used in the following works also:
✴ As a basic inert material in concrete
✴For making artificial stones and building blocks
✴As railway ballast
Preparing and Placing of Concrete
The following steps are involved in the concreting:
1. Batching
2. Mixing
3. Transporting and placing and
4. Compacting.
1. Batching: The measurement of materials for making concrete is known as batching. The
following two methods of batching is practiced:
(a) Volume batching
(b) Weight batching.
(a) Volume Batching: In this method cement, sand and concrete are batched by volume. A gauge
box is made with wooden plates, its volume being equal to that of one bag of cement. One bag of cement
has volume of 35 litres. The required amount of sand and coarse aggregate is added by measuring on to
the gauge box. The quantity of water required for making concrete is found after deciding water cement
ratio. For example, if water cement ratio is 0.5, for one bag of cement (50 kg), water required is 0.5 × 50
= 25 kg, which is equal to 25 litres. Suitable measure is used to select required quantity of water.
Volume batching is not ideal method of batching. Wet sand has higher volume for the same
weight of dry sand. It is called bulking of sand. Hence it upsets the calculated volume required.
(b) Weight Batching: This is the recommended method of batching. A weighing platform is
used in the field to pick up correct proportion of sand and coarse aggregates. Large weigh batching
plants have automatic weighing equipments.
2. Mixing: To produce uniform and good concrete, it is necessary to mix cement, sand and
coarse aggregate, first in dry condition and then in wet condition after adding water.
The following methods are practiced:
(a) Hand Mixing
(b) Machine Mixing.
(a) Hand Mixing: Required amount of coarse aggregate for a batch is weighed and is spread on
an impervious platform. Then the sand required for the batch is spread over coarse aggregate. They are
mixed in dry condition by overturning the mix with shovels. Then the cement required for the batch is
spread over the dry mix and mixed by shovels. After uniform texture is observed water is added gradually
and mixing is continued. Full amount of water is added and mixing is completed when uniform colour
and consistancy is observed. The process of mixing is completed in 6–8 minutes of adding water. This
method of mixing is not very good but for small works it is commonly adopted.
(b) Machine Mixing: In large and important works machine mixing is preferred. Required quantities if sand and coarse aggregates are placed in the
drum of the mixer. 4 to 5 rotations are made for dry mixing and then required quantity of cement is
added and dry mixing is made with another 4 to 5 rotations. Water is gradually added and drum is
rotated for 2 to 3 minutes during which period it makes about 50 rotations. At this stage uniform and homogeneous mix is obtained..
👍3
3. Transporting and Placing of Concrete. After mixing concrete should be transported to the
final position. In small works it is transported in iron pans from hand to hand of a set of workers. Wheel
barrow and hand carts also may be employed. In large scale concreting chutes and belt conveyors or
pipes with pumps are employed. In transporting care should be taken to see that seggregation of aggregate
from matrix of cement do not take place.
Concrete is placed on form works. The form works should be cleaned and properly oiled. If
concrete is to be placed for foundation, the soil bed should be compacted well and is made free from
loose soil.
Concrete should be dropped on its final position as closely as possible. If it is dropped from a
height, the coarse aggregates fall early and then mortar matrix. This segregation results into weaker
concrete.
4. Compaction of Concrete: In the process of placing concrete, air is entrapped. The entrapped
air reduces the strength of concrete up to 30%. Hence it is necessary to remove this entrapped air. This
is achieved by compacting the concrete after placing it in its final position. Compaction can be carried
out either by hand or with the help of vibrators.
(a) Hand Compaction: In this method concrete is compacted by ramming, tamping, spading or
by slicing with tools. In intricate portions a pointed steel rod of 16 mm diameter and about a metre long
is used for poking the concrete.
(b) Compaction by Vibrators: Concrete can be compacted by using high frequency vibrators.
Vibration reduces the friction between the particles and set the motion of particles. As a result entrapped
air is removed and the concrete is compacted. The use of vibrators reduces the compaction time
When vibrators are used for compaction, water cement ratio can be less, which also help in improving the
strength of concrete. Vibration should be stopped as soon as cement paste is seen on the surface of
concrete. Over vibration is not good for the concrete.
The following types of vibrators are commonly used in concreting:
(a) Needle or immersion vibrators
(b) Surface vibrators
(c) Form or shutter vibrators
(d) Vibrating tables.
Needle vibrators are used in concreting beams and columns. Surface vibrators and form vibrators
are useful in concreting slabs. Vibrating tables are useful in preparing precast concrete elements
👉ኣዲስ ኣበባ መስቀል ኣደባባይ❤
.
"ለመላው የክርስትና ዕምነት ተከታዮች እንኳን ለብርሃነ መስቀሉ ደመራ በዓል በሠላም አደረሳችሁ።
.
🚩በዓሉ የሠላም ፣ የጤና ፣ የፍቅር ፣ የአንድነት ፣ የብልፅግና እንዲሆን ፈጣሪ አምላክ ፍቃዱ ይሁን!" @COTMp
👉FIELD TESTS FOR AGGREGATE @COTMp
.
1. SURFACE MOISTURE CONTENT & ABSORPTION
*The surface moisture in the aggregate, influences the water cement ratio, strength and durability of the mix.
To determine the surface moisture of moist or wet aggregate, method is as follows- FRYING PAN METHOD
*The following apparatus are required:
A frying pan or metal tray,
Gas stove or an electric hair dryer, A metal or glass stirring rod and Scales to measures. The following procedure is followed during the test
1. For coarse aggregate 2 kg sample is adequate and for fine aggregate 0.5 kg sample is adequate.
2. The wet/moist sample is then weighed wet weight (W)
3. Heated very gently on the frying pan or metal plate and stirred with a glass or metallic rod to maintain uniform distribution of heat, until the sheen disappears from the surface.
*The fine aggregates become surface dry when
it just starts showing free flowing characteristics.
4. The aggregates is then cooled and reweighed. The
surface dry aggregate weight (W ) is noted. The
surface moisture is then calculated as follows-
Surface moisture = [(W – W ) / W ] x 100%
5. Overheating must be avoided, as it will not give the correct surface moisture .
6. If heating is continued either on the fry pan or in the oven till the aggregate is bone dry aggregate weight is then noted (Wbd) after continuous heating. The absorption (absorbed water content) is then calculated as follows-
Absorption = [(W – W ) / W ] x 100%
Similarly, if the dry aggregates are received on site and absorption capacity is to be determined then the aggregates are first soaked in water and then the above methods are
deployed to determine the absorption capacity of