👉ሸገር ፓርክ ነገ ይመረቃል
➡️በጠቅላይ ሚንስትር ዶክተር አብይ አህመድ አስተባባሪነት እየተገነባ ያለው የሸገር ፓርክ ነገ ይመረቃል ተብሏል።
🚧የሸገር ፓርክ ግንባታ ከአንድ ኣመት በፊት "ገበታ ለሸገር" በሚል በተሰናዳ የገቢ ማሰባሰቢያ ፕሮግራም ላይ በተሰበሰበ ገንዘብ መገንባቱ ይታወሳል።
🚧የፓርኩ ዋና ዋና ግንባታ በመገባደዱ ምክንያት ከ2013 ዓ.ም ጀምሮ ለጎብኚዎች ክፍት እንደሚሆን ይጠበቃል።
@etconp
➡️በጠቅላይ ሚንስትር ዶክተር አብይ አህመድ አስተባባሪነት እየተገነባ ያለው የሸገር ፓርክ ነገ ይመረቃል ተብሏል።
🚧የሸገር ፓርክ ግንባታ ከአንድ ኣመት በፊት "ገበታ ለሸገር" በሚል በተሰናዳ የገቢ ማሰባሰቢያ ፕሮግራም ላይ በተሰበሰበ ገንዘብ መገንባቱ ይታወሳል።
🚧የፓርኩ ዋና ዋና ግንባታ በመገባደዱ ምክንያት ከ2013 ዓ.ም ጀምሮ ለጎብኚዎች ክፍት እንደሚሆን ይጠበቃል።
@etconp
👉Profile Levelling, Longitudinal and Cross Sectioning in Surveying
➡️What is Profile levelling?
▶️Profile leveling is one of the most common applications of running levels and vertical distance measurement for the surveyor.
▶️The results are plotted in the form of a profile, which is a drawing that shows a vertical cross section. Profiles are required for the design and construction of roads, curbs, sidewalks, pipelines, etc. In short, profile leveling refers to the process of determining the elevation of points on the ground at mostly uniform intervals along a continuous line.
➡️Equipment used for profile leveling
⏺Dumpy level
⏺Leveling staff
⏺Tripod Staff
⏺bubble Chain or Tape
➡️Procedure for profile levelling
🚧1.Longitudinal levelling
⏹Profile leveling is essentially the same as benchmark leveling, with one basic difference.
⏹At each instrument position, where an HI is determined by a back sight rod reading on a benchmark or turning point, several additional foresight readings may be taken on as many points as desired.
⏹These additional readings are called rod shots, and the elevation of all those points is determined by subtracting the rod shot from the HI at that instrument
location.
➡️Plotting the Profile
▶️The profile drawing is basically a graph of elevations, plotted on the vertical axis, as a function of stations, plotted on horizontal axis.
▶️A gridded sheet called profile paper is used to plot the profile data from the field book.
▶️All profile drawings must have a proper title block, and both axes must be fully labeled with stations and elevations.
▶️The elevation or elevation scale is typically exaggerated; that is, it is ‘stretched’ in comparison to the horizontal scale.
▶️For example the vertical scale might be 10 times larger.
▶️The horizontal line at the bottom of the profile does not necessary have to start at zero elevation
🚧2.Cross sectioning levelling
▶️Cross sectioning levelling is another method in profile levelling. The term cross-section generally refers to a relatively short profile view of the ground, which is drawn perpendicular to the route centerline of a highway or other types of linear projects.
▶️Cross-sectional drawings are particularly important for estimating the earthwork volumes needed to construct a roadway; they show the existing ground elevations, the proposed cut or fill side slopes, and the grade elevation for the road base.
▶️There is really no difference in procedure between profile and cross-section leveling except for the form of the field notes. Cross-section rod shots are usually taken during the route profile survey from the same instrument positions used to take rod shots along the centerline.
▶️Cross-section data are obtained at the same locations along the route that are used for the profile rod-shot stations.
🚧(a) Top view showing the route center line and the line for cross-section leveling at station 1+ 50.
🚧(b) The cross-section showing ground elevations at points left and right of the centerline.
#Surveying
@etconp
➡️What is Profile levelling?
▶️Profile leveling is one of the most common applications of running levels and vertical distance measurement for the surveyor.
▶️The results are plotted in the form of a profile, which is a drawing that shows a vertical cross section. Profiles are required for the design and construction of roads, curbs, sidewalks, pipelines, etc. In short, profile leveling refers to the process of determining the elevation of points on the ground at mostly uniform intervals along a continuous line.
➡️Equipment used for profile leveling
⏺Dumpy level
⏺Leveling staff
⏺Tripod Staff
⏺bubble Chain or Tape
➡️Procedure for profile levelling
🚧1.Longitudinal levelling
⏹Profile leveling is essentially the same as benchmark leveling, with one basic difference.
⏹At each instrument position, where an HI is determined by a back sight rod reading on a benchmark or turning point, several additional foresight readings may be taken on as many points as desired.
⏹These additional readings are called rod shots, and the elevation of all those points is determined by subtracting the rod shot from the HI at that instrument
location.
➡️Plotting the Profile
▶️The profile drawing is basically a graph of elevations, plotted on the vertical axis, as a function of stations, plotted on horizontal axis.
▶️A gridded sheet called profile paper is used to plot the profile data from the field book.
▶️All profile drawings must have a proper title block, and both axes must be fully labeled with stations and elevations.
▶️The elevation or elevation scale is typically exaggerated; that is, it is ‘stretched’ in comparison to the horizontal scale.
▶️For example the vertical scale might be 10 times larger.
▶️The horizontal line at the bottom of the profile does not necessary have to start at zero elevation
🚧2.Cross sectioning levelling
▶️Cross sectioning levelling is another method in profile levelling. The term cross-section generally refers to a relatively short profile view of the ground, which is drawn perpendicular to the route centerline of a highway or other types of linear projects.
▶️Cross-sectional drawings are particularly important for estimating the earthwork volumes needed to construct a roadway; they show the existing ground elevations, the proposed cut or fill side slopes, and the grade elevation for the road base.
▶️There is really no difference in procedure between profile and cross-section leveling except for the form of the field notes. Cross-section rod shots are usually taken during the route profile survey from the same instrument positions used to take rod shots along the centerline.
▶️Cross-section data are obtained at the same locations along the route that are used for the profile rod-shot stations.
🚧(a) Top view showing the route center line and the line for cross-section leveling at station 1+ 50.
🚧(b) The cross-section showing ground elevations at points left and right of the centerline.
#Surveying
@etconp
👉በኮንስትራክሽን ውል ጉዳይ የክፍያ ምስክር ወረቀት/payment certificate ምን ይላል? ©በ ጉባዔ ኣሰፋ
፡
▶️የክፍያ ምስክር ወረቀት/payment certificate/ በአሰሪው በሚመደብ አማካሪ/ተቆጣጣሪ መሀንዲስ እና በተቋራጩ ተረጋግጦና ተማምነውበት የሚፈረም ሲሆን ለተቋራጩ የሚከፈለውን የገንዘብ መጠንም በግልጽ ያስቀምጣል፡፡
*የክፍያ ምስክር ወረቀት ጋር ቴክ ኦፍ ሽት እና ግራንድ ሳመሪ አባሪ ተደርጐ ይያያዛል፡፡
*ቴክ ኦፍ ሽት የአሰሪው አማካሪ/ተቆጣጣሪ መሀንዲስ እና የተቋራጩ መሀንዲስ በግንባታ ቦታ በአካል የሳይት ቪዚት በማካሄድ የተሰራውን ስራ መጠን እና አይነት ከለቀሙ በኋላ በቢል ኦፍ ኳንቲቲ ከተመለከተው የእያንዳንዱ ስራ አይተም ዩኒት ሬት/ነጠላ ዋጋ አንጻር በዝርዝር በተናጠል በዋጋ የሚያስቀምጡበት የተሰራውን ስራ መጠን እና የገንዘብ መጠን ገላጭ ዝርዝር ሰነድ ነው፡፡
*ግራንድ ሳመሪ ደግሞ በዋናነት የግንባታወችን ዝርዝር/ብሎክ በማስቀመጥ የውሉን ዋጋ፣አስቀድሞ የተከናወነ ስራ መጠን፣አሁን የተከናወነ ስራ መጠን እና አጠቃላይ በተቋራጩ የተሰራውን የግንባታ ስራ መጠን ይጠቅሳል፡፡
*የክፍያ ሰርተፍኬት በአብዛኛው በአንድ ገጽ ተጠቃሎ የሚዘጋጅ ሲሆን በይዘት ደረጃ ግን ብዙ መረጃወችን አምቆ የያዘ ሰነድ ነው፡፡
*የክፍያ ሰርተፍኬት በተለይ ክፍያው የመጀመሪያ ዙር፣ሁለተኛ ዙር እያለ በሚታወቅበት መንገድ የሚዘጋጅ ሲሆን የመጨረሻ ዙር ክፍያ የሚባልም አለው፡፡
*የመጀመሪያ ዙር ክፍያ የሚፈጸመው በአብዛኛው ከቅድሚያ ክፍያ በኋላ ሲሆን ክፍያውም ለተሰራ ስራ የሚፈጸም ነው፡፡
*የመጨረሻ ዙር ክፍያ ደግሞ ግንባታው ተጠናቆ ጊዜአዊ ርክክብ/provisional acceptance/ ከተከናወነ በኋላ በህግ ከተቀመጡ ተቀናሾች በስተቀር ቀሪውን የስራ ክፍያ ጠቅልሎ አካቶ ወዲያውኑ በግንባታ ውሉ በተቀመጠው የጊዜ ገደብ ውስጥ የሚፈጸም ክፍያ ነው፡፡
*የክፍያ ሰርተፍኬት የፕሮጀክቱን ስም፣ቦታ፣አሰሪውን፣ተቋራጩን፣አማካሪውን ይጠቅሳል፡፡ ዋናውን የውል ገንዘብ መጠን፣ተቀጽላ ስራዎችን፣ቫሬሽንን እና የተከናወነውን የስራ መጠን ያመለክታል፡፡ውሉ የተደረገበትን ጊዜ እና ኮመንስመንት ዴት ይጠቁማል፡፡
*በተጨማሪም የቅድሚያ ክፍያ መጠን እና አድቫንስ ሪፔይ ያመለክታል በዚህም አስቀድሞ የነበሩ የክፍያ ቁጥሮችን ጭምር ይጠቁማል፡፡
*እንደዚሁም የሪቴንሽን መጠን እና የቅጣት መረጃንም የሚሰጥ ነው፡፡ እንግዲህ ይሄን ሁሉ መረጃ በያዘ የክፍያ ሰርተፍኬት ላይ አሰሪው/ተቆጣጣሪው/አማካሪው እና ተቋራጩ የሚፈራረሙበት ይሆናል፡፡
*ስለዚህ የክፍያ ሰርተፍኬት ጸደቀ ማለት በሰርተፍኬቱ ላይ የተመለከተው ስራ ስለመሰራቱ እና ዋጋውንም ጭምር አሰሪውና ተቋራጩ አምነውበታል ማለት ነው፡፡
*እዚህ ላይ መታወቅ ያለበት ነገር የአሰሪው ዋና ግዴታ ለተቋራጩ በወቅቱ ክፍያ መፈጸም ነው፡፡
*የፌዴራል ፕሮክዩርመንት ዳይሬክቲቭ ክሎስ 28.5 ላይ ስለኮንስትራክሽን ስራዎች ክፍያ እንዴት መፈጸም እንደሚገባው ይዘረዝራል፡፡
*በዚህ ረገድ በተለይ ክሎስ 28.5(a) ላይ የተቀመጠው እንደሚያስገነዝበው በኮንስትራክሽን ስራዎች ጉዳይ ክፍያ የሚፈጸመው በአማካሪው/ተቆጣጣሪው የተረጋገጠና የጸደቀ የክፍያ ምስክር ወረቀት/payment certificate/ እንዲቀርብ በማድረግ መሆኑን አስገዳጅ በሆነ ሁኔታ ይደነግጋል፡፡
*እንግዲህ የክፍያ ጥያቄ የሚያቀርብ በመጀመሪያ ተቋራጩ እንደመሆኑ አማካሪው/ተቆጣጣሪው መሀንዲስ የሳይት ቪዚት በማካሄድ የክፍያ ጥያቄውን ትክክለኛነት ካረጋገጠ በኋላ የክፍያ ሰርተፍኬቱን፣ቴክ ኦፍ ሽት እና ግራንድ ሳመሪውን ጨምሮ የሚያጸድቅና አረጋግጦ የሚፈርምበት እና በማህተምም የሚያረጋግጥ ይሆናል፡፡
*አማካሪው/ቶጣጣሪው በተቋራጩ የክፍያ ጥያቄ እንደቀረበለት በ7(ሰባት) ቀናት ውስጥ የማረጋገጡን ስራ ማጠናቀቅ እንደሚገባው በዳይሬክቲቩ ክሎስ 28.5(d) ላይ በአስገዳጅ ሁኔታ ተቀምጧል፡፡
*እንደዚሁም አሰሪው ደግሞ በአማካሪው/ተቆጣጣሪው የተረጋገጠ የክፍያ ሰርተፍኬት በደረሰው በ14(አስራ አራት) ቀናት ውስጥ ለተቋራጩ ክፍያውን መፈጸም እንደሚገባው በአስገዳጅ ሁኔታ ተደንግጓል፡፡
*እንግዲህ ተቋራጩ የክፍያ ሰርተፍኬት በእጁ ይዞ እያለ እና አሰሪውም ደርሶት እያለ ሳይከፍለው ያዘገየበት እንደሆነ በግንባታ ውሉ እና የውል አካል በሚያደርጉት ጀኔራል ኮንዲሽን በተመለከተው አግባብ ተቋራጩ ኪሳራ ከአሰሪው ላይ ለመጠየቅ እንደሚችል ዳይሬክቲቩ ክሎስ 28.5(g) በግልጽ እና በአስገዳጅ ሁኔታ ይደነግጋል፡፡
*ፒፒኤ 2011 ክሎስ 59 እንደዚሁ የኮንስትራክሽን ጉዳይ የስራ ክፍያ የሚፈጸመው በክፍያ ሰርተፍኬት አማካይነት ስለመሆኑ ይገልጻል፡፡
*በአጠቃላይ ከላይ የተመለከተው የክፍያ ሰርተፍኬት ባህሪ እና የፒፒኤ ድንጋጌ የሚያስገነዝበው ተቋራጩ የክፍያ ሰርተፍኬት በአማካሪው/ተቆጣጣሪው እስከጸደቀለት ድረስ ያለምንም ተጨማሪ ቅድመ ሁኔታ ክፍያ ሊፈጸምለት እንደሚገባ ነው፡፡ አመሰግናለሁ
#ConstructionLaw
@etconp
፡
▶️የክፍያ ምስክር ወረቀት/payment certificate/ በአሰሪው በሚመደብ አማካሪ/ተቆጣጣሪ መሀንዲስ እና በተቋራጩ ተረጋግጦና ተማምነውበት የሚፈረም ሲሆን ለተቋራጩ የሚከፈለውን የገንዘብ መጠንም በግልጽ ያስቀምጣል፡፡
*የክፍያ ምስክር ወረቀት ጋር ቴክ ኦፍ ሽት እና ግራንድ ሳመሪ አባሪ ተደርጐ ይያያዛል፡፡
*ቴክ ኦፍ ሽት የአሰሪው አማካሪ/ተቆጣጣሪ መሀንዲስ እና የተቋራጩ መሀንዲስ በግንባታ ቦታ በአካል የሳይት ቪዚት በማካሄድ የተሰራውን ስራ መጠን እና አይነት ከለቀሙ በኋላ በቢል ኦፍ ኳንቲቲ ከተመለከተው የእያንዳንዱ ስራ አይተም ዩኒት ሬት/ነጠላ ዋጋ አንጻር በዝርዝር በተናጠል በዋጋ የሚያስቀምጡበት የተሰራውን ስራ መጠን እና የገንዘብ መጠን ገላጭ ዝርዝር ሰነድ ነው፡፡
*ግራንድ ሳመሪ ደግሞ በዋናነት የግንባታወችን ዝርዝር/ብሎክ በማስቀመጥ የውሉን ዋጋ፣አስቀድሞ የተከናወነ ስራ መጠን፣አሁን የተከናወነ ስራ መጠን እና አጠቃላይ በተቋራጩ የተሰራውን የግንባታ ስራ መጠን ይጠቅሳል፡፡
*የክፍያ ሰርተፍኬት በአብዛኛው በአንድ ገጽ ተጠቃሎ የሚዘጋጅ ሲሆን በይዘት ደረጃ ግን ብዙ መረጃወችን አምቆ የያዘ ሰነድ ነው፡፡
*የክፍያ ሰርተፍኬት በተለይ ክፍያው የመጀመሪያ ዙር፣ሁለተኛ ዙር እያለ በሚታወቅበት መንገድ የሚዘጋጅ ሲሆን የመጨረሻ ዙር ክፍያ የሚባልም አለው፡፡
*የመጀመሪያ ዙር ክፍያ የሚፈጸመው በአብዛኛው ከቅድሚያ ክፍያ በኋላ ሲሆን ክፍያውም ለተሰራ ስራ የሚፈጸም ነው፡፡
*የመጨረሻ ዙር ክፍያ ደግሞ ግንባታው ተጠናቆ ጊዜአዊ ርክክብ/provisional acceptance/ ከተከናወነ በኋላ በህግ ከተቀመጡ ተቀናሾች በስተቀር ቀሪውን የስራ ክፍያ ጠቅልሎ አካቶ ወዲያውኑ በግንባታ ውሉ በተቀመጠው የጊዜ ገደብ ውስጥ የሚፈጸም ክፍያ ነው፡፡
*የክፍያ ሰርተፍኬት የፕሮጀክቱን ስም፣ቦታ፣አሰሪውን፣ተቋራጩን፣አማካሪውን ይጠቅሳል፡፡ ዋናውን የውል ገንዘብ መጠን፣ተቀጽላ ስራዎችን፣ቫሬሽንን እና የተከናወነውን የስራ መጠን ያመለክታል፡፡ውሉ የተደረገበትን ጊዜ እና ኮመንስመንት ዴት ይጠቁማል፡፡
*በተጨማሪም የቅድሚያ ክፍያ መጠን እና አድቫንስ ሪፔይ ያመለክታል በዚህም አስቀድሞ የነበሩ የክፍያ ቁጥሮችን ጭምር ይጠቁማል፡፡
*እንደዚሁም የሪቴንሽን መጠን እና የቅጣት መረጃንም የሚሰጥ ነው፡፡ እንግዲህ ይሄን ሁሉ መረጃ በያዘ የክፍያ ሰርተፍኬት ላይ አሰሪው/ተቆጣጣሪው/አማካሪው እና ተቋራጩ የሚፈራረሙበት ይሆናል፡፡
*ስለዚህ የክፍያ ሰርተፍኬት ጸደቀ ማለት በሰርተፍኬቱ ላይ የተመለከተው ስራ ስለመሰራቱ እና ዋጋውንም ጭምር አሰሪውና ተቋራጩ አምነውበታል ማለት ነው፡፡
*እዚህ ላይ መታወቅ ያለበት ነገር የአሰሪው ዋና ግዴታ ለተቋራጩ በወቅቱ ክፍያ መፈጸም ነው፡፡
*የፌዴራል ፕሮክዩርመንት ዳይሬክቲቭ ክሎስ 28.5 ላይ ስለኮንስትራክሽን ስራዎች ክፍያ እንዴት መፈጸም እንደሚገባው ይዘረዝራል፡፡
*በዚህ ረገድ በተለይ ክሎስ 28.5(a) ላይ የተቀመጠው እንደሚያስገነዝበው በኮንስትራክሽን ስራዎች ጉዳይ ክፍያ የሚፈጸመው በአማካሪው/ተቆጣጣሪው የተረጋገጠና የጸደቀ የክፍያ ምስክር ወረቀት/payment certificate/ እንዲቀርብ በማድረግ መሆኑን አስገዳጅ በሆነ ሁኔታ ይደነግጋል፡፡
*እንግዲህ የክፍያ ጥያቄ የሚያቀርብ በመጀመሪያ ተቋራጩ እንደመሆኑ አማካሪው/ተቆጣጣሪው መሀንዲስ የሳይት ቪዚት በማካሄድ የክፍያ ጥያቄውን ትክክለኛነት ካረጋገጠ በኋላ የክፍያ ሰርተፍኬቱን፣ቴክ ኦፍ ሽት እና ግራንድ ሳመሪውን ጨምሮ የሚያጸድቅና አረጋግጦ የሚፈርምበት እና በማህተምም የሚያረጋግጥ ይሆናል፡፡
*አማካሪው/ቶጣጣሪው በተቋራጩ የክፍያ ጥያቄ እንደቀረበለት በ7(ሰባት) ቀናት ውስጥ የማረጋገጡን ስራ ማጠናቀቅ እንደሚገባው በዳይሬክቲቩ ክሎስ 28.5(d) ላይ በአስገዳጅ ሁኔታ ተቀምጧል፡፡
*እንደዚሁም አሰሪው ደግሞ በአማካሪው/ተቆጣጣሪው የተረጋገጠ የክፍያ ሰርተፍኬት በደረሰው በ14(አስራ አራት) ቀናት ውስጥ ለተቋራጩ ክፍያውን መፈጸም እንደሚገባው በአስገዳጅ ሁኔታ ተደንግጓል፡፡
*እንግዲህ ተቋራጩ የክፍያ ሰርተፍኬት በእጁ ይዞ እያለ እና አሰሪውም ደርሶት እያለ ሳይከፍለው ያዘገየበት እንደሆነ በግንባታ ውሉ እና የውል አካል በሚያደርጉት ጀኔራል ኮንዲሽን በተመለከተው አግባብ ተቋራጩ ኪሳራ ከአሰሪው ላይ ለመጠየቅ እንደሚችል ዳይሬክቲቩ ክሎስ 28.5(g) በግልጽ እና በአስገዳጅ ሁኔታ ይደነግጋል፡፡
*ፒፒኤ 2011 ክሎስ 59 እንደዚሁ የኮንስትራክሽን ጉዳይ የስራ ክፍያ የሚፈጸመው በክፍያ ሰርተፍኬት አማካይነት ስለመሆኑ ይገልጻል፡፡
*በአጠቃላይ ከላይ የተመለከተው የክፍያ ሰርተፍኬት ባህሪ እና የፒፒኤ ድንጋጌ የሚያስገነዝበው ተቋራጩ የክፍያ ሰርተፍኬት በአማካሪው/ተቆጣጣሪው እስከጸደቀለት ድረስ ያለምንም ተጨማሪ ቅድመ ሁኔታ ክፍያ ሊፈጸምለት እንደሚገባ ነው፡፡ አመሰግናለሁ
#ConstructionLaw
@etconp
🌼🌼 እንኳን አደረሳችሁ🌼🌼
➡️ውድ ቤተሰቦቻችን አዲሱ አመት የሰላም፤ የፍቅር፤ የአንድነት፤ የብልፅግናና የደስታ ይሆንላቹ ዘንድ ልባዊ ምኞታችን ነው!
🌼🌼መልካም አዲስ ዓመት 🌼🌼
@etconp
➡️ውድ ቤተሰቦቻችን አዲሱ አመት የሰላም፤ የፍቅር፤ የአንድነት፤ የብልፅግናና የደስታ ይሆንላቹ ዘንድ ልባዊ ምኞታችን ነው!
🌼🌼መልካም አዲስ ዓመት 🌼🌼
@etconp
😂😂😂 ለ ፈገግታ 😂😂😂
👉ፍቅር በኮንስትራክሽንኛ
💌ከ PROJECT-A ለ PROJECT-B የተፃፈ የ ፍቅር ደብዳቤ
==================
🏷ይድረስ Good Aesthetic view ላለሽ ውድ ፍቅረኛየ
ከምን እንደምጀምር ኣላውቅም ግን site ላይ ካየሁሽ ጀምሮ ፍቅርሽ ልቤ ውስጥ cast ሆኗል እናም ብዙ ጊዜ ኣንቺን ለማየት እዛ site ብመላለስም curing እንደ ጠማው concrete ደርቄ እስካሁን ስጠብቅሽ ኣለው፡፡
ኣንቺ ግን እንደ ኣሁኑ reinforcement bar በዛው ቀረሽ፡፡
እኔ ግን ምን ገጥሟት ይሆን በሚል defect ልቤን ልክ እንደ pile foundation በየቀኑ በሰቀቀን ይቆፍራል፡፡
ከብዙ ጊዚያት በኃላ ከብዙ tenderers በልጬ award ላደርግሽ ብሞክርም ኣንቺ ግን Flat slab ያለ Beam ይሰራ የለ እንዴ? የአብሮነታችን ትርጉም ምንድ ነው? ስትይኝ Compaction እንደበዛበት Concrete ኣይኔ Bleeding ሆነ ስራው::
በናትሽ Column ያለ Bar እንደማይቆመው ሁሉ እኔ እና ኣንቺ Mix ካልሆንም የልቤ crack መጠኑ እየሰፋ ይሄዳል::
ስለዚህ ከ Maintenance በፊት ያንቺ offer ያስፈልገኛል ኣሁንም መልስሽ እምቢ ከሆነ ግን ከ 3rd Floor Building ልክ እንደ falling out of plaster ራሴን እፈጠፍጥልሻለሁ
ኣሁን እዛው ላይ ነኝና መልስሽ በኣፋጣኝ በ Lift ላኪልኝ ወረቀቱ Wind Load እንዳይወስደው ኣደራ በ Gypsum ኣጣቢቅው::
መፅሀፉ እንኳ እንደዚህ ይል የለ "ፍቅር ግን ከሌለን Agro stone ነን" መፅሀፈ Construction 4ኛ ዓመት 1ኛሰሚስተር
፡
Credit To መምህር መድሃንየ ሕሉፍ
መልካም በዓል❤️
@etconp
👉ፍቅር በኮንስትራክሽንኛ
💌ከ PROJECT-A ለ PROJECT-B የተፃፈ የ ፍቅር ደብዳቤ
==================
🏷ይድረስ Good Aesthetic view ላለሽ ውድ ፍቅረኛየ
ከምን እንደምጀምር ኣላውቅም ግን site ላይ ካየሁሽ ጀምሮ ፍቅርሽ ልቤ ውስጥ cast ሆኗል እናም ብዙ ጊዜ ኣንቺን ለማየት እዛ site ብመላለስም curing እንደ ጠማው concrete ደርቄ እስካሁን ስጠብቅሽ ኣለው፡፡
ኣንቺ ግን እንደ ኣሁኑ reinforcement bar በዛው ቀረሽ፡፡
እኔ ግን ምን ገጥሟት ይሆን በሚል defect ልቤን ልክ እንደ pile foundation በየቀኑ በሰቀቀን ይቆፍራል፡፡
ከብዙ ጊዚያት በኃላ ከብዙ tenderers በልጬ award ላደርግሽ ብሞክርም ኣንቺ ግን Flat slab ያለ Beam ይሰራ የለ እንዴ? የአብሮነታችን ትርጉም ምንድ ነው? ስትይኝ Compaction እንደበዛበት Concrete ኣይኔ Bleeding ሆነ ስራው::
በናትሽ Column ያለ Bar እንደማይቆመው ሁሉ እኔ እና ኣንቺ Mix ካልሆንም የልቤ crack መጠኑ እየሰፋ ይሄዳል::
ስለዚህ ከ Maintenance በፊት ያንቺ offer ያስፈልገኛል ኣሁንም መልስሽ እምቢ ከሆነ ግን ከ 3rd Floor Building ልክ እንደ falling out of plaster ራሴን እፈጠፍጥልሻለሁ
ኣሁን እዛው ላይ ነኝና መልስሽ በኣፋጣኝ በ Lift ላኪልኝ ወረቀቱ Wind Load እንዳይወስደው ኣደራ በ Gypsum ኣጣቢቅው::
መፅሀፉ እንኳ እንደዚህ ይል የለ "ፍቅር ግን ከሌለን Agro stone ነን" መፅሀፈ Construction 4ኛ ዓመት 1ኛሰሚስተር
፡
Credit To መምህር መድሃንየ ሕሉፍ
መልካም በዓል❤️
@etconp
👉What do we mean by workability of concrete?
➡️What factors do affect it?
➡️How do we know if a concrete is too workable?
➡️Is there any scientific way of knowing degree of workability of a concrete?
⏯Workability of concrete is defined as the ease and homogeneity with which a freshly mixed concrete or mortar can be mixed, placed, compacted and finished.
⏹Strictly, it is the amount of useful internal work necessary to produce 100% compaction.
▶️Another similar term used to describe a freshly prepared concrete is ‘consistency’ which is the ease with which it will flow. It is the wetness of the concrete and the measure of fluidity or mobility.
▶️Wet concretes are more workable than dry concrete, but concretes of the same consistency may vary in workability.
▶️A concrete which has high consistency and which is more mobile, need not be of right workability for a particular job.
▶️Type of work, thickness of section, reinforcements and mode of compaction are the aspects to be considered while specifying the workability for any particular job.
⏭Workable concrete shows very less internal friction between particles and overcomes the frictional resistance with just the amount of compacting efforts provided.
⏭Workability of the concrete depends on a number of interrelating factors.
⏹Water content, aggregate properties, use of admixtures, fineness of cement are the factors affecting workability.
⏺1. Water content: The increase in water content increases the fluidity of the
concrete thus providing greater lubrication.
⏺2. Size of aggregates: The surface area of bigger aggregates is less and hence less amount of water is required for lubricating the surface to reduce the friction.
*⃣Thus the concrete having large sized aggregate is more workable (of course, within certain limits) And other properties of aggregate will affect the workability of concrete.
⏺3. Mix proportions: Aggregate/cement ratio is the measure of how lean or rich the concrete is.
*⃣If aggregate/ cement ratio is higher, the concrete becomes leaner.
*⃣In lean concrete less paste is available for the lubrication of the aggregate, while in rich concrete with low a/c ratio, more paste is available which makes the mix more
cohesive and hence provides better workability.
⏺4. Use of admixtures: Use of admixtures in concrete is the major factor that affects the workability.
*⃣The use of plasticizers and super-plasticizers amply increase the workability of the concrete. Air entraining agents produce air bubbles which act as rollers between particles and provide better mobility thus improving the workability.
⏺5. Time and temperature: Fresh concrete gets stiffened as the time flows.
*⃣This is because some of the water used to mix the concrete gets evaporated and some gets absorbed by the aggregates.
*⃣Thus the workability of concrete reduces with time.
*⃣This loss of workability with time is known as slump loss.
➡️The effect of temperature on workability of concrete is noteworthy.
▶️As the temperature increases, the workability of the mix reduces.
➡️Measurements of Workability/ workability Tests:
▶️Slump Test
▶️Compacting Factor Test
▶️Vee-Bee Test
▶️Flow Test
▶️Kelly Ball Test
#ConcreteTechnology
@etconp
➡️What factors do affect it?
➡️How do we know if a concrete is too workable?
➡️Is there any scientific way of knowing degree of workability of a concrete?
⏯Workability of concrete is defined as the ease and homogeneity with which a freshly mixed concrete or mortar can be mixed, placed, compacted and finished.
⏹Strictly, it is the amount of useful internal work necessary to produce 100% compaction.
▶️Another similar term used to describe a freshly prepared concrete is ‘consistency’ which is the ease with which it will flow. It is the wetness of the concrete and the measure of fluidity or mobility.
▶️Wet concretes are more workable than dry concrete, but concretes of the same consistency may vary in workability.
▶️A concrete which has high consistency and which is more mobile, need not be of right workability for a particular job.
▶️Type of work, thickness of section, reinforcements and mode of compaction are the aspects to be considered while specifying the workability for any particular job.
⏭Workable concrete shows very less internal friction between particles and overcomes the frictional resistance with just the amount of compacting efforts provided.
⏭Workability of the concrete depends on a number of interrelating factors.
⏹Water content, aggregate properties, use of admixtures, fineness of cement are the factors affecting workability.
⏺1. Water content: The increase in water content increases the fluidity of the
concrete thus providing greater lubrication.
⏺2. Size of aggregates: The surface area of bigger aggregates is less and hence less amount of water is required for lubricating the surface to reduce the friction.
*⃣Thus the concrete having large sized aggregate is more workable (of course, within certain limits) And other properties of aggregate will affect the workability of concrete.
⏺3. Mix proportions: Aggregate/cement ratio is the measure of how lean or rich the concrete is.
*⃣If aggregate/ cement ratio is higher, the concrete becomes leaner.
*⃣In lean concrete less paste is available for the lubrication of the aggregate, while in rich concrete with low a/c ratio, more paste is available which makes the mix more
cohesive and hence provides better workability.
⏺4. Use of admixtures: Use of admixtures in concrete is the major factor that affects the workability.
*⃣The use of plasticizers and super-plasticizers amply increase the workability of the concrete. Air entraining agents produce air bubbles which act as rollers between particles and provide better mobility thus improving the workability.
⏺5. Time and temperature: Fresh concrete gets stiffened as the time flows.
*⃣This is because some of the water used to mix the concrete gets evaporated and some gets absorbed by the aggregates.
*⃣Thus the workability of concrete reduces with time.
*⃣This loss of workability with time is known as slump loss.
➡️The effect of temperature on workability of concrete is noteworthy.
▶️As the temperature increases, the workability of the mix reduces.
➡️Measurements of Workability/ workability Tests:
▶️Slump Test
▶️Compacting Factor Test
▶️Vee-Bee Test
▶️Flow Test
▶️Kelly Ball Test
#ConcreteTechnology
@etconp
👉በአፍሪካ ትልቁ እና እጅግ ግዙፍ የሆነው መስቀል በአዲስ አበባ ሊገነባ ነው።
🚧በአፍሪካ ትልቁ እና እጅግ ግዙፍ የሆነው መስቀል በአዲስ አበባ ሀገረ ስብከት በቀበና ደብረ ዕንቁ ልደታ ለማርያም ቤተ ክርስቲያን ይገነባል።
🚧መስቀሉ 64 ሜትር ከፍታ ያለው ፕሮጀክት በአዲስ አበባ የሚገነባ መሆኑ ተጠቁሟል።
🚧የደብረ ዕንቁ ልደታ ለማርያም ቤተ ክርስቲያን አስተዳዳሪ መልአከ ብርሃናት ቀሲስ አእምሮ ምስጋናው እንደገለፁት 164 ሜትር ከፍታ ያለው ግዙፍ መስቀል ሲሆን በውስጡ ፓራናሚክ ሊፍት ይገጠምለታል ብለዋል።
🚧በዚህ ግዙፍ መስቀል ላይ 40 ሜትር ከፍታ ላይ መላው አዲስ አበባን የሚያሳይ መሆኑን ገልፀዋል።
🚧በውስጡም ዓለም አቀፍ የጥናት እና ምርምር ማዕከል እንደሚገነባ የገለፁ ሲሆን ከተራራ ስር በግማሽ ተፈልፍሎ የሚሰራ የኢትዮጵያ ኦርቶዶክስ ተዋሕዶ ቤተ ክርስቲያንን ጥንታዊ ታሪክ የሚያስቃኝ ግዙፍ ሙዚየምንም እንደሚያጠቃልል ጠቁመዋል።
🚧በተጨማሪም ጎብኚዎች በቀጥታ እንዲከታተሉት የሚያስችል የአብነት ትምህርት ቤት እና ቤተ መፃህፍትን ያጠቃልላል።
🚧እንደ መልአከ ብርሃናት ቀሲስ አእምሮ ምስጋናው ገለፃ ይህ ግዙፍ ፕሮጀክት በቅድስት ቤተ ክርስቲያናችን ልጆች የሚገነባ እና በሁለት ዓመታት ውሰጥ የሚጠናቀቅ ሲሆን ከፕሮጀክቱ መጠናቀቅ በኋላ ለቅድስት ቤተክርስቲያናችንም ሆነ ለከተማ ከፍተኛ ማኅበራዊ እና ኢኮኖሚያዊ አስተዋፅኦ የሚያኖረው መሆኑ ተገልጿል።
🚧ለፕሮጀክቱ ጅማሮ የመሰረት ድንጋይ በብፁዕ አቡነ አረጋዊ የድሬዳዋ ሀገረ ስብከት የብፁዕ ወቅዱስ ፓትርያርክ ልዩ ጽ/ቤት እና የውጭ ግንኙነት መምሪያ የበላይ ኃላፊ ሊቀ ጳጳስ ተቀምጧል።
ምንጭ:-በኢትዮጵያ ኦርቶዶክስ ቤተክርስቲያን የምዕራብ አርሲ ሀገረ ስብከት
@etconp
🚧በአፍሪካ ትልቁ እና እጅግ ግዙፍ የሆነው መስቀል በአዲስ አበባ ሀገረ ስብከት በቀበና ደብረ ዕንቁ ልደታ ለማርያም ቤተ ክርስቲያን ይገነባል።
🚧መስቀሉ 64 ሜትር ከፍታ ያለው ፕሮጀክት በአዲስ አበባ የሚገነባ መሆኑ ተጠቁሟል።
🚧የደብረ ዕንቁ ልደታ ለማርያም ቤተ ክርስቲያን አስተዳዳሪ መልአከ ብርሃናት ቀሲስ አእምሮ ምስጋናው እንደገለፁት 164 ሜትር ከፍታ ያለው ግዙፍ መስቀል ሲሆን በውስጡ ፓራናሚክ ሊፍት ይገጠምለታል ብለዋል።
🚧በዚህ ግዙፍ መስቀል ላይ 40 ሜትር ከፍታ ላይ መላው አዲስ አበባን የሚያሳይ መሆኑን ገልፀዋል።
🚧በውስጡም ዓለም አቀፍ የጥናት እና ምርምር ማዕከል እንደሚገነባ የገለፁ ሲሆን ከተራራ ስር በግማሽ ተፈልፍሎ የሚሰራ የኢትዮጵያ ኦርቶዶክስ ተዋሕዶ ቤተ ክርስቲያንን ጥንታዊ ታሪክ የሚያስቃኝ ግዙፍ ሙዚየምንም እንደሚያጠቃልል ጠቁመዋል።
🚧በተጨማሪም ጎብኚዎች በቀጥታ እንዲከታተሉት የሚያስችል የአብነት ትምህርት ቤት እና ቤተ መፃህፍትን ያጠቃልላል።
🚧እንደ መልአከ ብርሃናት ቀሲስ አእምሮ ምስጋናው ገለፃ ይህ ግዙፍ ፕሮጀክት በቅድስት ቤተ ክርስቲያናችን ልጆች የሚገነባ እና በሁለት ዓመታት ውሰጥ የሚጠናቀቅ ሲሆን ከፕሮጀክቱ መጠናቀቅ በኋላ ለቅድስት ቤተክርስቲያናችንም ሆነ ለከተማ ከፍተኛ ማኅበራዊ እና ኢኮኖሚያዊ አስተዋፅኦ የሚያኖረው መሆኑ ተገልጿል።
🚧ለፕሮጀክቱ ጅማሮ የመሰረት ድንጋይ በብፁዕ አቡነ አረጋዊ የድሬዳዋ ሀገረ ስብከት የብፁዕ ወቅዱስ ፓትርያርክ ልዩ ጽ/ቤት እና የውጭ ግንኙነት መምሪያ የበላይ ኃላፊ ሊቀ ጳጳስ ተቀምጧል።
ምንጭ:-በኢትዮጵያ ኦርቶዶክስ ቤተክርስቲያን የምዕራብ አርሲ ሀገረ ስብከት
@etconp
Ethio Construction Engineering
😂😂😂 ለ ፈገግታ 😂😂😂 👉ፍቅር በኮንስትራክሽንኛ 💌ከ PROJECT-A ለ PROJECT-B የተፃፈ የ ፍቅር ደብዳቤ ================== 🏷ይድረስ Good Aesthetic view ላለሽ ውድ ፍቅረኛየ ከምን እንደምጀምር ኣላውቅም ግን site ላይ ካየሁሽ ጀምሮ ፍቅርሽ ልቤ ውስጥ cast ሆኗል እናም ብዙ ጊዜ ኣንቺን ለማየት እዛ site ብመላለስም curing እንደ ጠማው concrete ደርቄ…
😂😂😂 ለ ፈገግታ 😂😂😂
🚧ከ ትላንት የቀጠለ ክፍል ሁለት
👉ፍቅር በ ኮንስትራክሽንኛ
💌ከ PROJECT- 2 ለ PROJECT- 1 የተፃፈ የመልስ ደብዳቤ
የፃፍክልኝ ደብዳቤ ኣንቢቤዋለሁ ብዙ የገባ bid ቢኖርም ያንተ evaluate ሳደርገው ግን ለፍቅር ያለህ technical እና financial ፍላጎት በተለየ ስቦኛል፡፡
እናም G+2 terrace ላይ ወጥቼ ይሄን letter of award ስፅፍልህ ፊቴ paint እንደተደረገ wall ፈክቶ ነው፡፡
ደግሞ መልሱ time ሳልበላ ምፅፍልህ delay ኣድርጎ በliquidated damage እንዳትቀጣ ብየ ነው፡፡
በእውነት እኔን ለማግኘት እንደ supervisor ኣስሬ site እየመጣህ visit ስታደርግ ኣሁን ላይ ሁኜ ሳስበው ይገርመኛል፡፡
ለፍቅር ያለህ ፅናት ከ C-30 Concrete ይበልጣል፡፡
ይህ እንደ 4mm thick clear glass የሚያበራ ፊትህ እንደ bar የረዘመው ሎጋ ቁመትህ በጣም ነው የምወደው፡፡
ደግሞ ቁመናህ ሳያው እኮ ፈጣሪ structuraህ እንዴት design እንዳደረገህ ነው የሚገርመኝ፡፡
እኔም ለቀጣይ ሳስብ እንደ roof ጥላ ሆነሀኝ በማይናወጥ foundation የተመሠረተ ፍቅር እንዲኖረን አልማለሁ፡፡
ደግሞ ፍቅራችን ኣብረን manage እያደረግን durable የሆነ ህይወት እንዲኖረን ምኞቴ ነው፡፡
Credit To መምህር መድሃንየ ሕሉፍ
🙏መልካም በዓል❤️
@etconp
🚧ከ ትላንት የቀጠለ ክፍል ሁለት
👉ፍቅር በ ኮንስትራክሽንኛ
💌ከ PROJECT- 2 ለ PROJECT- 1 የተፃፈ የመልስ ደብዳቤ
የፃፍክልኝ ደብዳቤ ኣንቢቤዋለሁ ብዙ የገባ bid ቢኖርም ያንተ evaluate ሳደርገው ግን ለፍቅር ያለህ technical እና financial ፍላጎት በተለየ ስቦኛል፡፡
እናም G+2 terrace ላይ ወጥቼ ይሄን letter of award ስፅፍልህ ፊቴ paint እንደተደረገ wall ፈክቶ ነው፡፡
ደግሞ መልሱ time ሳልበላ ምፅፍልህ delay ኣድርጎ በliquidated damage እንዳትቀጣ ብየ ነው፡፡
በእውነት እኔን ለማግኘት እንደ supervisor ኣስሬ site እየመጣህ visit ስታደርግ ኣሁን ላይ ሁኜ ሳስበው ይገርመኛል፡፡
ለፍቅር ያለህ ፅናት ከ C-30 Concrete ይበልጣል፡፡
ይህ እንደ 4mm thick clear glass የሚያበራ ፊትህ እንደ bar የረዘመው ሎጋ ቁመትህ በጣም ነው የምወደው፡፡
ደግሞ ቁመናህ ሳያው እኮ ፈጣሪ structuraህ እንዴት design እንዳደረገህ ነው የሚገርመኝ፡፡
እኔም ለቀጣይ ሳስብ እንደ roof ጥላ ሆነሀኝ በማይናወጥ foundation የተመሠረተ ፍቅር እንዲኖረን አልማለሁ፡፡
ደግሞ ፍቅራችን ኣብረን manage እያደረግን durable የሆነ ህይወት እንዲኖረን ምኞቴ ነው፡፡
Credit To መምህር መድሃንየ ሕሉፍ
🙏መልካም በዓል❤️
@etconp
👉HOW TO BUILD A PROJECT SCHEDULE IN 5 EASY STEPS
🚧Step One: Define Activities
➡️The goal of the activity definition step is to identify all the tasks required to accomplish the product.
*⃣This frequently results in identifying all the work products and deliverables that comprise the project.
*⃣These deliverables are found as the components of a Work Breakdown Structure (WBS).
*⃣The project schedule further decomposes these deliverables into the actual activities required to complete the work.
*⃣If the project team doesn't have an established scope statement, WBS, or sufficient scope definition, you may need to host a workshop or two to gather the requirements and further develop the project schedule Since you need to produce a project schedule by next week, you will likely create tasks in your project schedule for "Analysis" or "Scope Definition."
*⃣At this point in the project, it is OK to not have all the project details.
*⃣You can build activities in your project schedule to gather the information.
*⃣It is perfectly acceptable to build a plan for the analysis of the project before committing to the implementation or delivery phase of the project.
*⃣Assume for now you either have a WBS available or have enough information to build a sample set of tasks to further define the scope. *⃣Once you have all the activities defined, the next step is the sequence the activities.
🚧Step Two: Sequence Activities
➡️At this point you've entered all the task names and have further decomposed the deliverables listed in the WBS.
*⃣The next step is to sequence the activities with dependencies During this step, you'll identify any dependencies of related tasks and document them in the project schedule.
*⃣You'll need to analyse each of the tasks to understand which task has a dependency on additional tasks.
*⃣In your favourite project schedule development book, be sure to read about the different types of dependency include Finish-to-Start and Start-to Start dependencies.
*⃣These relationships will impact your task start and finish dates.
🚧Step Three: Estimate Activity Resources
➡️The next step is to identify the resources and their availability to your project.
*⃣Remember that not all team members will be 100% available to your project as some team members will be working on multiple projects.
*⃣In this step, you'll also assign resources to each of the tasks I usually assign resource to tasks using the standard Gantt Chart view in Microsoft Project.
*⃣For each task at the lowest point in the WBS, click on the drop down box in the Resource Names column and select the available team member.
I recommend breaking down the tasks so you can assign one task to one resource to avoid adding multiple resources to a given task. It creates a larger project schedule, but it allows me better control in allocating and tracking resources as the project executes.
🚧Step Four: Estimate Activity Durations
With resources assigned
➡️The next step is to estimate each task's duration.
*⃣The activity's duration is the number of working periods required to complete the task.
*⃣In Microsoft Project, this can be defined in days, weeks, and even months It is also important to understand the difference of the different duration types including Fixed Work, Fixed Duration and Fixed Units.
*⃣Selecting the correct duration type impacts the resource availability and the forecasted task end date.
🚧Step Five: Develop Schedule
➡️The next step is to analyse the project schedule and examine the sequences, durations, resources and inevitable
*⃣scheduling constraints. The goal of this step is to validate the project schedule correctly models the planned work.
*⃣In this step you'll not only validate the duration estimates are accurate, but validate the resource allocations are correct.
*⃣Resource levelling is a key step in ensuring the project dates are realistic and the resources are appropriately assigned.
#ProjectManagement
@etconp
🚧Step One: Define Activities
➡️The goal of the activity definition step is to identify all the tasks required to accomplish the product.
*⃣This frequently results in identifying all the work products and deliverables that comprise the project.
*⃣These deliverables are found as the components of a Work Breakdown Structure (WBS).
*⃣The project schedule further decomposes these deliverables into the actual activities required to complete the work.
*⃣If the project team doesn't have an established scope statement, WBS, or sufficient scope definition, you may need to host a workshop or two to gather the requirements and further develop the project schedule Since you need to produce a project schedule by next week, you will likely create tasks in your project schedule for "Analysis" or "Scope Definition."
*⃣At this point in the project, it is OK to not have all the project details.
*⃣You can build activities in your project schedule to gather the information.
*⃣It is perfectly acceptable to build a plan for the analysis of the project before committing to the implementation or delivery phase of the project.
*⃣Assume for now you either have a WBS available or have enough information to build a sample set of tasks to further define the scope. *⃣Once you have all the activities defined, the next step is the sequence the activities.
🚧Step Two: Sequence Activities
➡️At this point you've entered all the task names and have further decomposed the deliverables listed in the WBS.
*⃣The next step is to sequence the activities with dependencies During this step, you'll identify any dependencies of related tasks and document them in the project schedule.
*⃣You'll need to analyse each of the tasks to understand which task has a dependency on additional tasks.
*⃣In your favourite project schedule development book, be sure to read about the different types of dependency include Finish-to-Start and Start-to Start dependencies.
*⃣These relationships will impact your task start and finish dates.
🚧Step Three: Estimate Activity Resources
➡️The next step is to identify the resources and their availability to your project.
*⃣Remember that not all team members will be 100% available to your project as some team members will be working on multiple projects.
*⃣In this step, you'll also assign resources to each of the tasks I usually assign resource to tasks using the standard Gantt Chart view in Microsoft Project.
*⃣For each task at the lowest point in the WBS, click on the drop down box in the Resource Names column and select the available team member.
I recommend breaking down the tasks so you can assign one task to one resource to avoid adding multiple resources to a given task. It creates a larger project schedule, but it allows me better control in allocating and tracking resources as the project executes.
🚧Step Four: Estimate Activity Durations
With resources assigned
➡️The next step is to estimate each task's duration.
*⃣The activity's duration is the number of working periods required to complete the task.
*⃣In Microsoft Project, this can be defined in days, weeks, and even months It is also important to understand the difference of the different duration types including Fixed Work, Fixed Duration and Fixed Units.
*⃣Selecting the correct duration type impacts the resource availability and the forecasted task end date.
🚧Step Five: Develop Schedule
➡️The next step is to analyse the project schedule and examine the sequences, durations, resources and inevitable
*⃣scheduling constraints. The goal of this step is to validate the project schedule correctly models the planned work.
*⃣In this step you'll not only validate the duration estimates are accurate, but validate the resource allocations are correct.
*⃣Resource levelling is a key step in ensuring the project dates are realistic and the resources are appropriately assigned.
#ProjectManagement
@etconp
❤1
👉why use green colors pipe during plumbing work?
🚧Green with White Lettering - Using a green label with white lettering means that the pipe contains potable water. It could be used for cooling, feeding boilers, or even going to drinking fountains or sinks.
🚧Blue with White Lettering - The blue labels with white lettering are used for pipes that transport compressed air.
🚧Red with White Lettering - This red label with white lettering is used for all fire quenching fluids. This could include water, but only if the pipe is used just for fire quenching.
🚧Orange with Black Lettering - Orange labels with black lettering are for toxic or corrosive fluids. Most acids will need to use this type of pipe marking.
🚧Brown with White Lettering - This option is for all combustible fluids
@etconp
🚧Green with White Lettering - Using a green label with white lettering means that the pipe contains potable water. It could be used for cooling, feeding boilers, or even going to drinking fountains or sinks.
🚧Blue with White Lettering - The blue labels with white lettering are used for pipes that transport compressed air.
🚧Red with White Lettering - This red label with white lettering is used for all fire quenching fluids. This could include water, but only if the pipe is used just for fire quenching.
🚧Orange with Black Lettering - Orange labels with black lettering are for toxic or corrosive fluids. Most acids will need to use this type of pipe marking.
🚧Brown with White Lettering - This option is for all combustible fluids
@etconp
👉DO YOU KNOW???
🚧The longest street in the world is Toronto’s Yonge Street, listed as 1,896 km in length roughly the distance from San Diego, California, to Seattle, Washington.
🚧A Construction engineer created the slippery part of the water slide Without the right flow of water, there is no ride.
🚧The Channel Tunnel is one of the greatest Construction engineering projects of the 20th century
*⃣has an ultimate design capacity of 600 trains per day each way under the English Channel.
🚧The Akashi-Kaikyo Bridge, also known as the Pearl Bridge, has the longest central span of any suspension bridge.
*⃣The central span is a staggering 1,991 meters, or 6,532 ft.
🚧It took a century to overcome deep waters, strong winds, and high chance of earthquakes to build the Rion-Antirion Bridge.
*⃣Completed in 2004, it spans the Gulf of Corinth and won an Outstanding Construction Engineering Achievement award.
🚧The Itaipu Dam, located at the Brazilian-Paraguayan border, is the largest operating hydroelectric facility in terms of annual generating capacity.
🚧The Golden Gate Bridge is one of the longest suspension bridges in the world and has become an internationally recognized symbol of San Francisco and California.
🚧The Empire State Building was built in just 18 months during the Great Depression and was one of the first to employ the ten new fast track construction technique.
*⃣Following the destruction of the World Trade Center in 2001, the Empire State Building again became the tallest building in New York City and New York State.
🚧the Hoover Dam, standing 726.4 feet high, is one of the tallest concrete dams ever built and created one of the largest man-made lakes in the U.S.
🚧The Burj Al Arab is a 5 star luxury hotel located in Dubai, United Arab Emirates.
*⃣At 321 m (1,053 ft), it is the fourth tallest hotel in the world.
*⃣The shape of the structure is designed to mimic the sail of a ⛵ ship
@etconp
🚧The longest street in the world is Toronto’s Yonge Street, listed as 1,896 km in length roughly the distance from San Diego, California, to Seattle, Washington.
🚧A Construction engineer created the slippery part of the water slide Without the right flow of water, there is no ride.
🚧The Channel Tunnel is one of the greatest Construction engineering projects of the 20th century
*⃣has an ultimate design capacity of 600 trains per day each way under the English Channel.
🚧The Akashi-Kaikyo Bridge, also known as the Pearl Bridge, has the longest central span of any suspension bridge.
*⃣The central span is a staggering 1,991 meters, or 6,532 ft.
🚧It took a century to overcome deep waters, strong winds, and high chance of earthquakes to build the Rion-Antirion Bridge.
*⃣Completed in 2004, it spans the Gulf of Corinth and won an Outstanding Construction Engineering Achievement award.
🚧The Itaipu Dam, located at the Brazilian-Paraguayan border, is the largest operating hydroelectric facility in terms of annual generating capacity.
🚧The Golden Gate Bridge is one of the longest suspension bridges in the world and has become an internationally recognized symbol of San Francisco and California.
🚧The Empire State Building was built in just 18 months during the Great Depression and was one of the first to employ the ten new fast track construction technique.
*⃣Following the destruction of the World Trade Center in 2001, the Empire State Building again became the tallest building in New York City and New York State.
🚧the Hoover Dam, standing 726.4 feet high, is one of the tallest concrete dams ever built and created one of the largest man-made lakes in the U.S.
🚧The Burj Al Arab is a 5 star luxury hotel located in Dubai, United Arab Emirates.
*⃣At 321 m (1,053 ft), it is the fourth tallest hotel in the world.
*⃣The shape of the structure is designed to mimic the sail of a ⛵ ship
@etconp
👉ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) እና ዲዛይን ቢዩልድ (Design build)(DB)
---------------------------
▶️ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB)
*በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ (Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡
*በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡
*የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
=========================
▶️ዲዛይን ቢዩልድ(Design build)(DB)
*በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።
*ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡
*በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡
*የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡
*ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን የግንባታውን ባለቤት አይነካውም፡፡
*ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡
*በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡
*ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡
*ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡
*ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነውበአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እናበአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡
*ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡
**ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ
የፕሮጀክት አይነት ነው፡፡
==========================
▶️ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።
*ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
▶️በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡
*ስለዚህም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት
ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemenity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
▶️በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ
አይደለም።
*ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን
አልፎ አልፎ ይጠቀምበታል።
▶️በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር
ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ሊሆን እንደሚችል ለመጠቆም እወዳለሁ።
በ ጉባኤ አሰፍ
#ConstructionLaw
@etconp
---------------------------
▶️ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB)
*በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ (Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡
*በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡
*የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
=========================
▶️ዲዛይን ቢዩልድ(Design build)(DB)
*በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።
*ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡
*በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡
*የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡
*ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን የግንባታውን ባለቤት አይነካውም፡፡
*ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡
*በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡
*ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡
*ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡
*ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነውበአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እናበአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡
*ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡
**ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ
የፕሮጀክት አይነት ነው፡፡
==========================
▶️ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።
*ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
▶️በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡
*ስለዚህም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት
ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemenity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
▶️በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ
አይደለም።
*ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን
አልፎ አልፎ ይጠቀምበታል።
▶️በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር
ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ሊሆን እንደሚችል ለመጠቆም እወዳለሁ።
በ ጉባኤ አሰፍ
#ConstructionLaw
@etconp
👉How to select suitable type of foundations?
🚧1. ADEQUATE DEPTH
➡️The foundation must have an adequate depth to prevent frost damage.
*⃣For such foundations as bridge piers, the depth of the foundation must be sufficient to prevent undermining by scour.
🚧2. BEARING CAPACITY FAILURE
➡️The foundation must be safe against a bearing capacity failure.
🚧3. SETTLEMENT
➡️The foundation must not settle to such an extent that it damages the structure.
🚧4. QUALITY
➡️The foundation must be of adequate quality so that it is not subjected to deterioration, such as from sulfate attack.
🚧5. ADEQUATE STRENGTH
➡️The foundation must be designed with sufficient strength that it does not fracture or break apart under the applied superstructure loads.
*⃣The foundation must also be properly constructed in conformance with the design specifications.
🚧6. ADVERSE SOIL CHANGES
➡️The foundation must be able to resist long-term adverse soil changes.
*⃣An example is expansive soil, which could expand or shrink causing movement of the foundation and damage to the structure.
🚧7. SEISMIC FORCES
➡️The foundation must be able to support the structure during an earthquake without excessive settlement or lateral movement.
#FoundationEngineering
@etconp
🚧1. ADEQUATE DEPTH
➡️The foundation must have an adequate depth to prevent frost damage.
*⃣For such foundations as bridge piers, the depth of the foundation must be sufficient to prevent undermining by scour.
🚧2. BEARING CAPACITY FAILURE
➡️The foundation must be safe against a bearing capacity failure.
🚧3. SETTLEMENT
➡️The foundation must not settle to such an extent that it damages the structure.
🚧4. QUALITY
➡️The foundation must be of adequate quality so that it is not subjected to deterioration, such as from sulfate attack.
🚧5. ADEQUATE STRENGTH
➡️The foundation must be designed with sufficient strength that it does not fracture or break apart under the applied superstructure loads.
*⃣The foundation must also be properly constructed in conformance with the design specifications.
🚧6. ADVERSE SOIL CHANGES
➡️The foundation must be able to resist long-term adverse soil changes.
*⃣An example is expansive soil, which could expand or shrink causing movement of the foundation and damage to the structure.
🚧7. SEISMIC FORCES
➡️The foundation must be able to support the structure during an earthquake without excessive settlement or lateral movement.
#FoundationEngineering
@etconp
👉የዱለቻ - አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ግንባታ ተቋረጠ!
🚧የአዋሽ ወንዝ ሙላት ያደረሰው የጎርፍ ማጥለቅለቅ በኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን ተቋራጭነት በግንባታ ላይ የሚገኘውን የዱለቻ አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ሥራ መቆሙን የኢትዮጵያ ኮንስትራክሽን ስራዎች ኮርፖሬሽን አስታወቀ።
🚧በኢትዮጵያ በተለያዩ ቦታዎች በተለይም በአፋር ክልል የክረምት ዝናብ በመብዛቱ ከፍተኛ የሚባል የጎፍ መጥለቅለቅ አጋጥሞ እስካሁንም ድረስ ብዙ ዜጎች ተጎጅ ሆነዋል።
🚧በዚሁ የጎርፍ መጥለቅለቅ በአፋር ክልል በአዋሽ ተፋሰስ አካባቢ እየተገነባ ያለው የዱለቻ አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ከነሀሴ 26/2012 ጀምሮ የግንባታ ስራው እንደተቋረጠ የኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን የህዝብ ግነኙነት ኃላፊ ጥንፉ ሙጬ ለአዲስ ማለዳ ተናግረዋል።
Via Addis Maleda
@etconp
🚧የአዋሽ ወንዝ ሙላት ያደረሰው የጎርፍ ማጥለቅለቅ በኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን ተቋራጭነት በግንባታ ላይ የሚገኘውን የዱለቻ አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ሥራ መቆሙን የኢትዮጵያ ኮንስትራክሽን ስራዎች ኮርፖሬሽን አስታወቀ።
🚧በኢትዮጵያ በተለያዩ ቦታዎች በተለይም በአፋር ክልል የክረምት ዝናብ በመብዛቱ ከፍተኛ የሚባል የጎፍ መጥለቅለቅ አጋጥሞ እስካሁንም ድረስ ብዙ ዜጎች ተጎጅ ሆነዋል።
🚧በዚሁ የጎርፍ መጥለቅለቅ በአፋር ክልል በአዋሽ ተፋሰስ አካባቢ እየተገነባ ያለው የዱለቻ አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ከነሀሴ 26/2012 ጀምሮ የግንባታ ስራው እንደተቋረጠ የኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን የህዝብ ግነኙነት ኃላፊ ጥንፉ ሙጬ ለአዲስ ማለዳ ተናግረዋል።
Via Addis Maleda
@etconp
👉How do I avoid cracks on concrete?
➡️We can call cracks always as the headache for Construction engineer’s but it can be prevented if several measures are taken.
▶️Generally cracks may form in plastic stage or in harden stage of concrete.
*⃣in case of plastic stage the climate plays vital role,to prevent cracks in early stage of concreting you have to consider the temperature variation of that area and you may vary W/C ratio accordingly.
*⃣In area of high temperature one can use wet gunny bags after the initial setting is reached it will reduce the escape of water causing shrinkage cracks And it will be better to concreting in early morning or evening as the temperature be low.
▶️Good workmanship and proper supervision is necessary if you are preparing concrete manually of machine mix at site,and it is not required in ready mixed concrete.
▶️Sometimes improper mixing concrete becomes porous and sometimes it becomes very stiff due to deficiency of water so that it must be mixed thoroughly as per mix design.
▶️If there is discontinuity in placing of concrete then the crack may form at that place so whenever discontinuity exist cement slurry must be poured up to 1 cm.
▶️Removal of voids is also necessary for that compaction of fresh concrete must be done sufficiently and over compaction should be avoided.
▶️Pozzolanic materials can be used and suitable admixture can be added and nowadays there is many synthetic binders are available in market which will increase the tensile strength of concrete and it depends on work condition and desired quality of the work.
▶️After all you have to take technical approach to avoid cracking of concrete and it includes
🚧Proper mix design of concrete.
🚧Preparation of concrete according to mix design.
🚧Placing of concrete before final setting takes place and avoiding the free fall of concrete when placing.
🚧Sufficient compaction by adopting proper method.
🚧Providing minimum specified cover by Standard code.
🚧Providing minimum reinforcements as per Standard code.
🚧Arranging proper formwork for the specified duration with proper supports.
🚧By avoiding the placing of any load before final setting time.
🚧Proper curing for at least seven days.
#ConcreteTechnology
@etconp
➡️We can call cracks always as the headache for Construction engineer’s but it can be prevented if several measures are taken.
▶️Generally cracks may form in plastic stage or in harden stage of concrete.
*⃣in case of plastic stage the climate plays vital role,to prevent cracks in early stage of concreting you have to consider the temperature variation of that area and you may vary W/C ratio accordingly.
*⃣In area of high temperature one can use wet gunny bags after the initial setting is reached it will reduce the escape of water causing shrinkage cracks And it will be better to concreting in early morning or evening as the temperature be low.
▶️Good workmanship and proper supervision is necessary if you are preparing concrete manually of machine mix at site,and it is not required in ready mixed concrete.
▶️Sometimes improper mixing concrete becomes porous and sometimes it becomes very stiff due to deficiency of water so that it must be mixed thoroughly as per mix design.
▶️If there is discontinuity in placing of concrete then the crack may form at that place so whenever discontinuity exist cement slurry must be poured up to 1 cm.
▶️Removal of voids is also necessary for that compaction of fresh concrete must be done sufficiently and over compaction should be avoided.
▶️Pozzolanic materials can be used and suitable admixture can be added and nowadays there is many synthetic binders are available in market which will increase the tensile strength of concrete and it depends on work condition and desired quality of the work.
▶️After all you have to take technical approach to avoid cracking of concrete and it includes
🚧Proper mix design of concrete.
🚧Preparation of concrete according to mix design.
🚧Placing of concrete before final setting takes place and avoiding the free fall of concrete when placing.
🚧Sufficient compaction by adopting proper method.
🚧Providing minimum specified cover by Standard code.
🚧Providing minimum reinforcements as per Standard code.
🚧Arranging proper formwork for the specified duration with proper supports.
🚧By avoiding the placing of any load before final setting time.
🚧Proper curing for at least seven days.
#ConcreteTechnology
@etconp
👉እየተወያየን እንማማር
➡️በመንግስት የኮንስትራክሽን ውል አንድ አሰሪ መ/ቤት የግንባታ ግዜው ከመጠናቀቁ በፊት ውል ማቋረጥ ይችላልን?
➡️የማጠናቀቂያ ግዜው አልፎ ነገር ግን ግዜ ለማራዘም በቂ ምክንያት መኖሩ ታምኖበት እያለስ ይሄው ግዜ ሳያልፍስ አሰሪው ውል ማቋረጥ ይችላልን?
➡️ተቋራጩንስ ጥፋተኛ ሊያደርግ የሚችል የህግ ሁኔታ አለ?
📩ሀሳቦቻቹ በ መወያያ ግሩፓቹ ላይ ገብታቹ ፃፉልን።👇
https://t.me/COTMp
➡️በመንግስት የኮንስትራክሽን ውል አንድ አሰሪ መ/ቤት የግንባታ ግዜው ከመጠናቀቁ በፊት ውል ማቋረጥ ይችላልን?
➡️የማጠናቀቂያ ግዜው አልፎ ነገር ግን ግዜ ለማራዘም በቂ ምክንያት መኖሩ ታምኖበት እያለስ ይሄው ግዜ ሳያልፍስ አሰሪው ውል ማቋረጥ ይችላልን?
➡️ተቋራጩንስ ጥፋተኛ ሊያደርግ የሚችል የህግ ሁኔታ አለ?
📩ሀሳቦቻቹ በ መወያያ ግሩፓቹ ላይ ገብታቹ ፃፉልን።👇
https://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
👉What does it mean by 95% compaction?
➡️There are two compaction tests we familiar with, standard Procter and the modified Procter.
*⃣These tests are preformed in a lab on bulk soil samples that are being considered to be used as fill material.
*⃣The test gives the engineer a baseline of how the optimal moisture content and achievable density for a specific compaction effort.
*⃣95% compaction means that the soil on the construction site has been compacted to 95% of the maximum density achieved in the lab.
⏹Remember the test in the lab uses a specific compaction effort so it is possible to achieve compaction above 100% in the field.
⏺I have seen airstrip plans that specified 105% compaction of a modified Marshal Proctor It means that when you conduct compaction test(in the laboratory) on a small soil sample of a particular site You get some value of maximum dry unit weight at certain moisture content.
#GeotechnicalEngineering
@etcono
➡️There are two compaction tests we familiar with, standard Procter and the modified Procter.
*⃣These tests are preformed in a lab on bulk soil samples that are being considered to be used as fill material.
*⃣The test gives the engineer a baseline of how the optimal moisture content and achievable density for a specific compaction effort.
*⃣95% compaction means that the soil on the construction site has been compacted to 95% of the maximum density achieved in the lab.
⏹Remember the test in the lab uses a specific compaction effort so it is possible to achieve compaction above 100% in the field.
⏺I have seen airstrip plans that specified 105% compaction of a modified Marshal Proctor It means that when you conduct compaction test(in the laboratory) on a small soil sample of a particular site You get some value of maximum dry unit weight at certain moisture content.
#GeotechnicalEngineering
@etcono
👉SOME HIGHWAY NOTES
🏷1. Explain The Purpose Of Super Elevation &Widening?
🚧Super elevation used to counterbalance centrifugal force &resists overturning of vehicles.
➡️Factors of supper elevation are👇
⏺Climate condition
⏺Terrain types
⏺Types of area (rural or urban)
⏺Types of facility
🚧Widening used to for visibility of an object on circular curve for psychological & off tracking vehicle.
🏷2. Write The Types Of Terrain & The Difference Between Them?
🚧Types of terrains are
➡️Flat terrain is offer a few obstacle to the construction of road, having continuous unrestricted horizontal & vertical alignment & traverse slope is 0-5%
➡️Rolling ፦slope generally rise & fall moderately ,some restriction in alignment & its traverse slope is 5-25%
➡️Mountainous ፦definet restriction of alignment & ssd ,has steep grade and their traverse slope is 25-50%
➡️Escarpment ፦inclusive of switch back roadway section & traverse slope is >50%
🏷3. Write The Types Of Sight Distance & Explain Them?
🚧SD is distance visible to the driver s o f a passenger’s car.
▶️The types of SD is
⏺SSD is visible to the drivers to stop the passenger’s car before collapsed.
*⃣D=0.278vt+v2/254f
⏺PSD is a minimum SD on the two ways single road way that must be available to enable that the driver of one vehicles to another vehicles safely without interfering with the speed of on coming vehicles at the design speed.
*⃣D1=0.278t1(v-m+at1/2)
*⃣D2=0.278vt2
*⃣D4 =2/3(d2)
⏭PSD=d1+d2 +d3 +d4
⏹where is the speed d/ce b/n passed vehicle & passing vehicles
#HighwayEngineering
@etconp
🏷1. Explain The Purpose Of Super Elevation &Widening?
🚧Super elevation used to counterbalance centrifugal force &resists overturning of vehicles.
➡️Factors of supper elevation are👇
⏺Climate condition
⏺Terrain types
⏺Types of area (rural or urban)
⏺Types of facility
🚧Widening used to for visibility of an object on circular curve for psychological & off tracking vehicle.
🏷2. Write The Types Of Terrain & The Difference Between Them?
🚧Types of terrains are
➡️Flat terrain is offer a few obstacle to the construction of road, having continuous unrestricted horizontal & vertical alignment & traverse slope is 0-5%
➡️Rolling ፦slope generally rise & fall moderately ,some restriction in alignment & its traverse slope is 5-25%
➡️Mountainous ፦definet restriction of alignment & ssd ,has steep grade and their traverse slope is 25-50%
➡️Escarpment ፦inclusive of switch back roadway section & traverse slope is >50%
🏷3. Write The Types Of Sight Distance & Explain Them?
🚧SD is distance visible to the driver s o f a passenger’s car.
▶️The types of SD is
⏺SSD is visible to the drivers to stop the passenger’s car before collapsed.
*⃣D=0.278vt+v2/254f
⏺PSD is a minimum SD on the two ways single road way that must be available to enable that the driver of one vehicles to another vehicles safely without interfering with the speed of on coming vehicles at the design speed.
*⃣D1=0.278t1(v-m+at1/2)
*⃣D2=0.278vt2
*⃣D4 =2/3(d2)
⏭PSD=d1+d2 +d3 +d4
⏹where is the speed d/ce b/n passed vehicle & passing vehicles
#HighwayEngineering
@etconp