😂😂😂 ለ ፈገግታ 😂😂😂 👉ፍቅር በኮንስትራክሽንኛ 💌ከ PROJECT-A ለ PROJECT-B የተፃፈ የ ፍቅር ደብዳቤ ================== 🏷ይድረስ Good Aesthetic view ላለሽ ውድ ፍቅረኛየ ከምን እንደምጀምር ኣላውቅም ግን site ላይ ካየሁሽ ጀምሮ ፍቅርሽ ልቤ ውስጥ cast ሆኗል እናም ብዙ ጊዜ ኣንቺን ለማየት እዛ site ብመላለስም curing እንደ ጠማው concrete ደርቄ…
😂😂😂 ለ ፈገግታ 😂😂😂
🚧ከ ትላንት የቀጠለ ክፍል ሁለት
👉ፍቅር በ ኮንስትራክሽንኛ
💌ከ PROJECT- 2 ለ PROJECT- 1 የተፃፈ የመልስ ደብዳቤ
የፃፍክልኝ ደብዳቤ ኣንቢቤዋለሁ ብዙ የገባ bid ቢኖርም ያንተ evaluate ሳደርገው ግን ለፍቅር ያለህ technical እና financial ፍላጎት በተለየ ስቦኛል፡፡
እናም G+2 terrace ላይ ወጥቼ ይሄን letter of award ስፅፍልህ ፊቴ paint እንደተደረገ wall ፈክቶ ነው፡፡
ደግሞ መልሱ time ሳልበላ ምፅፍልህ delay ኣድርጎ በliquidated damage እንዳትቀጣ ብየ ነው፡፡
በእውነት እኔን ለማግኘት እንደ supervisor ኣስሬ site እየመጣህ visit ስታደርግ ኣሁን ላይ ሁኜ ሳስበው ይገርመኛል፡፡
ለፍቅር ያለህ ፅናት ከ C-30 Concrete ይበልጣል፡፡
ይህ እንደ 4mm thick clear glass የሚያበራ ፊትህ እንደ bar የረዘመው ሎጋ ቁመትህ በጣም ነው የምወደው፡፡
ደግሞ ቁመናህ ሳያው እኮ ፈጣሪ structuraህ እንዴት design እንዳደረገህ ነው የሚገርመኝ፡፡
እኔም ለቀጣይ ሳስብ እንደ roof ጥላ ሆነሀኝ በማይናወጥ foundation የተመሠረተ ፍቅር እንዲኖረን አልማለሁ፡፡
ደግሞ ፍቅራችን ኣብረን manage እያደረግን durable የሆነ ህይወት እንዲኖረን ምኞቴ ነው፡፡
Credit To መምህር መድሃንየ ሕሉፍ
🙏መልካም በዓል❤️
@etconp
🚧ከ ትላንት የቀጠለ ክፍል ሁለት
👉ፍቅር በ ኮንስትራክሽንኛ
💌ከ PROJECT- 2 ለ PROJECT- 1 የተፃፈ የመልስ ደብዳቤ
የፃፍክልኝ ደብዳቤ ኣንቢቤዋለሁ ብዙ የገባ bid ቢኖርም ያንተ evaluate ሳደርገው ግን ለፍቅር ያለህ technical እና financial ፍላጎት በተለየ ስቦኛል፡፡
እናም G+2 terrace ላይ ወጥቼ ይሄን letter of award ስፅፍልህ ፊቴ paint እንደተደረገ wall ፈክቶ ነው፡፡
ደግሞ መልሱ time ሳልበላ ምፅፍልህ delay ኣድርጎ በliquidated damage እንዳትቀጣ ብየ ነው፡፡
በእውነት እኔን ለማግኘት እንደ supervisor ኣስሬ site እየመጣህ visit ስታደርግ ኣሁን ላይ ሁኜ ሳስበው ይገርመኛል፡፡
ለፍቅር ያለህ ፅናት ከ C-30 Concrete ይበልጣል፡፡
ይህ እንደ 4mm thick clear glass የሚያበራ ፊትህ እንደ bar የረዘመው ሎጋ ቁመትህ በጣም ነው የምወደው፡፡
ደግሞ ቁመናህ ሳያው እኮ ፈጣሪ structuraህ እንዴት design እንዳደረገህ ነው የሚገርመኝ፡፡
እኔም ለቀጣይ ሳስብ እንደ roof ጥላ ሆነሀኝ በማይናወጥ foundation የተመሠረተ ፍቅር እንዲኖረን አልማለሁ፡፡
ደግሞ ፍቅራችን ኣብረን manage እያደረግን durable የሆነ ህይወት እንዲኖረን ምኞቴ ነው፡፡
Credit To መምህር መድሃንየ ሕሉፍ
🙏መልካም በዓል❤️
@etconp
👉HOW TO BUILD A PROJECT SCHEDULE IN 5 EASY STEPS
🚧Step One: Define Activities
➡️The goal of the activity definition step is to identify all the tasks required to accomplish the product.
*⃣This frequently results in identifying all the work products and deliverables that comprise the project.
*⃣These deliverables are found as the components of a Work Breakdown Structure (WBS).
*⃣The project schedule further decomposes these deliverables into the actual activities required to complete the work.
*⃣If the project team doesn't have an established scope statement, WBS, or sufficient scope definition, you may need to host a workshop or two to gather the requirements and further develop the project schedule Since you need to produce a project schedule by next week, you will likely create tasks in your project schedule for "Analysis" or "Scope Definition."
*⃣At this point in the project, it is OK to not have all the project details.
*⃣You can build activities in your project schedule to gather the information.
*⃣It is perfectly acceptable to build a plan for the analysis of the project before committing to the implementation or delivery phase of the project.
*⃣Assume for now you either have a WBS available or have enough information to build a sample set of tasks to further define the scope. *⃣Once you have all the activities defined, the next step is the sequence the activities.
🚧Step Two: Sequence Activities
➡️At this point you've entered all the task names and have further decomposed the deliverables listed in the WBS.
*⃣The next step is to sequence the activities with dependencies During this step, you'll identify any dependencies of related tasks and document them in the project schedule.
*⃣You'll need to analyse each of the tasks to understand which task has a dependency on additional tasks.
*⃣In your favourite project schedule development book, be sure to read about the different types of dependency include Finish-to-Start and Start-to Start dependencies.
*⃣These relationships will impact your task start and finish dates.
🚧Step Three: Estimate Activity Resources
➡️The next step is to identify the resources and their availability to your project.
*⃣Remember that not all team members will be 100% available to your project as some team members will be working on multiple projects.
*⃣In this step, you'll also assign resources to each of the tasks I usually assign resource to tasks using the standard Gantt Chart view in Microsoft Project.
*⃣For each task at the lowest point in the WBS, click on the drop down box in the Resource Names column and select the available team member.
I recommend breaking down the tasks so you can assign one task to one resource to avoid adding multiple resources to a given task. It creates a larger project schedule, but it allows me better control in allocating and tracking resources as the project executes.
🚧Step Four: Estimate Activity Durations
With resources assigned
➡️The next step is to estimate each task's duration.
*⃣The activity's duration is the number of working periods required to complete the task.
*⃣In Microsoft Project, this can be defined in days, weeks, and even months It is also important to understand the difference of the different duration types including Fixed Work, Fixed Duration and Fixed Units.
*⃣Selecting the correct duration type impacts the resource availability and the forecasted task end date.
🚧Step Five: Develop Schedule
➡️The next step is to analyse the project schedule and examine the sequences, durations, resources and inevitable
*⃣scheduling constraints. The goal of this step is to validate the project schedule correctly models the planned work.
*⃣In this step you'll not only validate the duration estimates are accurate, but validate the resource allocations are correct.
*⃣Resource levelling is a key step in ensuring the project dates are realistic and the resources are appropriately assigned.
#ProjectManagement
@etconp
🚧Step One: Define Activities
➡️The goal of the activity definition step is to identify all the tasks required to accomplish the product.
*⃣This frequently results in identifying all the work products and deliverables that comprise the project.
*⃣These deliverables are found as the components of a Work Breakdown Structure (WBS).
*⃣The project schedule further decomposes these deliverables into the actual activities required to complete the work.
*⃣If the project team doesn't have an established scope statement, WBS, or sufficient scope definition, you may need to host a workshop or two to gather the requirements and further develop the project schedule Since you need to produce a project schedule by next week, you will likely create tasks in your project schedule for "Analysis" or "Scope Definition."
*⃣At this point in the project, it is OK to not have all the project details.
*⃣You can build activities in your project schedule to gather the information.
*⃣It is perfectly acceptable to build a plan for the analysis of the project before committing to the implementation or delivery phase of the project.
*⃣Assume for now you either have a WBS available or have enough information to build a sample set of tasks to further define the scope. *⃣Once you have all the activities defined, the next step is the sequence the activities.
🚧Step Two: Sequence Activities
➡️At this point you've entered all the task names and have further decomposed the deliverables listed in the WBS.
*⃣The next step is to sequence the activities with dependencies During this step, you'll identify any dependencies of related tasks and document them in the project schedule.
*⃣You'll need to analyse each of the tasks to understand which task has a dependency on additional tasks.
*⃣In your favourite project schedule development book, be sure to read about the different types of dependency include Finish-to-Start and Start-to Start dependencies.
*⃣These relationships will impact your task start and finish dates.
🚧Step Three: Estimate Activity Resources
➡️The next step is to identify the resources and their availability to your project.
*⃣Remember that not all team members will be 100% available to your project as some team members will be working on multiple projects.
*⃣In this step, you'll also assign resources to each of the tasks I usually assign resource to tasks using the standard Gantt Chart view in Microsoft Project.
*⃣For each task at the lowest point in the WBS, click on the drop down box in the Resource Names column and select the available team member.
I recommend breaking down the tasks so you can assign one task to one resource to avoid adding multiple resources to a given task. It creates a larger project schedule, but it allows me better control in allocating and tracking resources as the project executes.
🚧Step Four: Estimate Activity Durations
With resources assigned
➡️The next step is to estimate each task's duration.
*⃣The activity's duration is the number of working periods required to complete the task.
*⃣In Microsoft Project, this can be defined in days, weeks, and even months It is also important to understand the difference of the different duration types including Fixed Work, Fixed Duration and Fixed Units.
*⃣Selecting the correct duration type impacts the resource availability and the forecasted task end date.
🚧Step Five: Develop Schedule
➡️The next step is to analyse the project schedule and examine the sequences, durations, resources and inevitable
*⃣scheduling constraints. The goal of this step is to validate the project schedule correctly models the planned work.
*⃣In this step you'll not only validate the duration estimates are accurate, but validate the resource allocations are correct.
*⃣Resource levelling is a key step in ensuring the project dates are realistic and the resources are appropriately assigned.
#ProjectManagement
@etconp
❤1
👉why use green colors pipe during plumbing work?
🚧Green with White Lettering - Using a green label with white lettering means that the pipe contains potable water. It could be used for cooling, feeding boilers, or even going to drinking fountains or sinks.
🚧Blue with White Lettering - The blue labels with white lettering are used for pipes that transport compressed air.
🚧Red with White Lettering - This red label with white lettering is used for all fire quenching fluids. This could include water, but only if the pipe is used just for fire quenching.
🚧Orange with Black Lettering - Orange labels with black lettering are for toxic or corrosive fluids. Most acids will need to use this type of pipe marking.
🚧Brown with White Lettering - This option is for all combustible fluids
@etconp
🚧Green with White Lettering - Using a green label with white lettering means that the pipe contains potable water. It could be used for cooling, feeding boilers, or even going to drinking fountains or sinks.
🚧Blue with White Lettering - The blue labels with white lettering are used for pipes that transport compressed air.
🚧Red with White Lettering - This red label with white lettering is used for all fire quenching fluids. This could include water, but only if the pipe is used just for fire quenching.
🚧Orange with Black Lettering - Orange labels with black lettering are for toxic or corrosive fluids. Most acids will need to use this type of pipe marking.
🚧Brown with White Lettering - This option is for all combustible fluids
@etconp
👉DO YOU KNOW???
🚧The longest street in the world is Toronto’s Yonge Street, listed as 1,896 km in length roughly the distance from San Diego, California, to Seattle, Washington.
🚧A Construction engineer created the slippery part of the water slide Without the right flow of water, there is no ride.
🚧The Channel Tunnel is one of the greatest Construction engineering projects of the 20th century
*⃣has an ultimate design capacity of 600 trains per day each way under the English Channel.
🚧The Akashi-Kaikyo Bridge, also known as the Pearl Bridge, has the longest central span of any suspension bridge.
*⃣The central span is a staggering 1,991 meters, or 6,532 ft.
🚧It took a century to overcome deep waters, strong winds, and high chance of earthquakes to build the Rion-Antirion Bridge.
*⃣Completed in 2004, it spans the Gulf of Corinth and won an Outstanding Construction Engineering Achievement award.
🚧The Itaipu Dam, located at the Brazilian-Paraguayan border, is the largest operating hydroelectric facility in terms of annual generating capacity.
🚧The Golden Gate Bridge is one of the longest suspension bridges in the world and has become an internationally recognized symbol of San Francisco and California.
🚧The Empire State Building was built in just 18 months during the Great Depression and was one of the first to employ the ten new fast track construction technique.
*⃣Following the destruction of the World Trade Center in 2001, the Empire State Building again became the tallest building in New York City and New York State.
🚧the Hoover Dam, standing 726.4 feet high, is one of the tallest concrete dams ever built and created one of the largest man-made lakes in the U.S.
🚧The Burj Al Arab is a 5 star luxury hotel located in Dubai, United Arab Emirates.
*⃣At 321 m (1,053 ft), it is the fourth tallest hotel in the world.
*⃣The shape of the structure is designed to mimic the sail of a ⛵ ship
@etconp
🚧The longest street in the world is Toronto’s Yonge Street, listed as 1,896 km in length roughly the distance from San Diego, California, to Seattle, Washington.
🚧A Construction engineer created the slippery part of the water slide Without the right flow of water, there is no ride.
🚧The Channel Tunnel is one of the greatest Construction engineering projects of the 20th century
*⃣has an ultimate design capacity of 600 trains per day each way under the English Channel.
🚧The Akashi-Kaikyo Bridge, also known as the Pearl Bridge, has the longest central span of any suspension bridge.
*⃣The central span is a staggering 1,991 meters, or 6,532 ft.
🚧It took a century to overcome deep waters, strong winds, and high chance of earthquakes to build the Rion-Antirion Bridge.
*⃣Completed in 2004, it spans the Gulf of Corinth and won an Outstanding Construction Engineering Achievement award.
🚧The Itaipu Dam, located at the Brazilian-Paraguayan border, is the largest operating hydroelectric facility in terms of annual generating capacity.
🚧The Golden Gate Bridge is one of the longest suspension bridges in the world and has become an internationally recognized symbol of San Francisco and California.
🚧The Empire State Building was built in just 18 months during the Great Depression and was one of the first to employ the ten new fast track construction technique.
*⃣Following the destruction of the World Trade Center in 2001, the Empire State Building again became the tallest building in New York City and New York State.
🚧the Hoover Dam, standing 726.4 feet high, is one of the tallest concrete dams ever built and created one of the largest man-made lakes in the U.S.
🚧The Burj Al Arab is a 5 star luxury hotel located in Dubai, United Arab Emirates.
*⃣At 321 m (1,053 ft), it is the fourth tallest hotel in the world.
*⃣The shape of the structure is designed to mimic the sail of a ⛵ ship
@etconp
👉ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB) እና ዲዛይን ቢዩልድ (Design build)(DB)
---------------------------
▶️ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB)
*በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ (Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡
*በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡
*የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
=========================
▶️ዲዛይን ቢዩልድ(Design build)(DB)
*በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።
*ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡
*በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡
*የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡
*ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን የግንባታውን ባለቤት አይነካውም፡፡
*ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡
*በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡
*ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡
*ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡
*ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነውበአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እናበአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡
*ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡
**ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ
የፕሮጀክት አይነት ነው፡፡
==========================
▶️ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።
*ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
▶️በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡
*ስለዚህም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት
ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemenity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
▶️በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ
አይደለም።
*ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን
አልፎ አልፎ ይጠቀምበታል።
▶️በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር
ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ሊሆን እንደሚችል ለመጠቆም እወዳለሁ።
በ ጉባኤ አሰፍ
#ConstructionLaw
@etconp
---------------------------
▶️ዲዛይን ቢድ ቢዩልድ(Design bid build)(DBB)
*በኮንስትራክሽን ጉዳይ በአብዛኛው በሀገራችን የሚሰራበት የፕሮጀክት አይነት ዲዛይኑን አሰሪው በራሱ መንገድ እንዲዘጋጅ ካደረገ በኃላ ግንባታውን በተቋራጭ እንዲከናወን የሚያደርግበት ነው።ይሄውም ዲዛይን ቢድ ቢዩልድ (Design bid build)(DBB) በመባል ይታወቃል፡፡በዚህ የፕሮጀክት አይነት የታቀደውን ግንባታ ዲዛይኑን አሰሪው በራሱ አርክቴክት ወይም በሌላ ሶስተኛ ወገን/ በሌላ አርክቴክት ድርጅት/ እንዲከናወን ያደርጋል፡፡
*በመቀጠልም በተዘጋጀው ዲዛይን መሰረት ግንባታውን የሚያከናውን ተቋራጭ ወደመምረጥ ሂደት ይገባል፡፡
*የግንባታው ባለቤት የመንግስት መስሪያ ቤት የሆነ እንደሆነ ግንባታውን የሚያከናውን ተቋራጭ የመምረጡ ስራ የሚከናወነው በግዥ ህግ መሰረት ይሆናል፡፡ ይሄ አይነቱ ፕሮጀክት በሀገራችን የተለመደ ነው፡፡
=========================
▶️ዲዛይን ቢዩልድ(Design build)(DB)
*በሌላ በኩል ደግሞ ተቋራጩ ዲዛይኑን እና ግንባታውን በራሱ የሚያከናውንበት የፕሮጀክት አይነትም አለ።
*ይሄውም ዲዛይን ቢዩልድ(Design build)(DB) ይባላል፡፡
*በዚህ የፕሮጀክት አይነት ተቋራጩ የታቀደውን ግንባታ ዲዛይኑን በራሱ አርክቴክት ወይም በሌላ የአርክቴክት ድርጅት አማካይነት ያከናውናል፡፡
*የአርክቴክት ስራው የሚያስከትለው ሀላፊነት የተቋራጩ ይሆናል፡፡
*ከዲዛይን ስራው ጋር የተያያዘ ችግር የሚያስከትለው ሀላፊነት አሰሪውን የግንባታውን ባለቤት አይነካውም፡፡
*ሆኖም ተቋራጩ ዲዛይኑን ያሰራው በሌላ የአርክቴክት ድርጅት አማካይነት የሆነ እንደሆነ ከአርክቴክቸር ስራው ጋር በተያያዘ ተቋራጩ ለአሰሪው የሚኖርበት ሀላፊነት እንደተጠበቀ ሆኖ አርክቴክቱም ለተቋራጩ በፍትሀብሄር ህጉ ስለእውቀት ስራ ውል በተደነገገው አግባብ ሀላፊነት ይኖርበታል ማለት ነው፡፡
*በዚህ አይነት ፕሮጀክት የግንባታው ባለቤት/አሰሪው ሙሉ በሙሉ የኮንስትራክሽን ስጋቶችን/risks/ ወደ ተቋራጩ ያስተላልፋል፡፡
*ይህ ማለት አሰሪው ውጤቱን ማለትም ግንባታውን በመጀመሪያ በቀረበለት ዲዛይን አግባብ በጥራት ተከናውኖለት ከመረከብና በውሉ የተቀመጠውን የግንባታ ዋጋ ከመክፈል ባለፈ ማናቸውም አይነት ሀላፊነት አይኖርበትም ማለት ነው፡፡
*ለአብነት ለመጥቀስ ያህል የኢትዮጽያ መንገዶች ባለስልጣን(ERA) ዲዛይን ቢዩልድ የመንገድ ፕሮጀክት ሲኖረው ተወዳዳሪ ተቋራጮች የሰርቨየይንግና ዲዛይን ስራዎችን በራሳቸው ከሰሩ በኋላ በዋጋ ይወዳደራሉ፡፡
*ተቋራጮቹ ዲዛይኑን ሲሰሩ አሮጌ ድልድዮች ካሉ እና ተጠግነውበአዲስ ድልድይ የጥራት ደረጃ መድረስ የሚችሉ ከሆነ ተቋራጮች እንደየፍላጐታቸውና ሙያዊ ምርመራቸው/ምክንያታቸው ተጠጋኝ ድልድይ እናበአዲስ የሚገነባ ድልድይ እያሉ በዝርዝር በዲዛይን አካተው የሚያቀርቡ ሲሆን ምንም ሆነ ምን በውጤት ደረጃ አሰሪው በሚፈልገው የጥራት ደረጃ/ስታንዳርድ መገንባቱ እና ይሄውም በአማካሪው መረጋገጡ ግን የግድ ነው፡፡
*ምናልባት ተጠግኖ በሚፈለገው የጥራት ደረጃ ይደርሳል የተባለው አሮጌ ድልድይ በጥገና ወቅት ቢፈርስ እንኳ አሰሪውን ክፍያ የመጨመር ሀላፊነት አያስከትልበትም፡፡
**ስለዚህ ዲዛይን ቢዩልድ ፕሮጀክት ለአሰሪዎች ሪስክ ፍሪ/ከስጋት ነጻ የሆነ
የፕሮጀክት አይነት ነው፡፡
==========================
▶️ሌላው ሁለቱም የፕሮጀክት አይነቶች ለኮንስትራክሽን ውላቸው የሚጠቀሙት ጀኔራል ኮንዲሽን የተለያየ ነው።FIDIC በዚህ ረገድ የግንባታ ውል ዝግጅትን በማቅለል ለአለማችን ትልቅ ስጦታ ነው። አለበለዚያ አሰሪና ተቋራጭ በየአንዳንዱ ውል ዝግጅት ወቅት በሁሉም የውል ሁኔታወች ላይ መደራደርን ይጠይቃቸው ነበር።
*ዛሬ ላይ ግን ለውሉ ጥቅም ላይ የሚውለውን ጀኔራል ኮንዲሽን አስመልክቶ FIDIC ቨርሽን መረጣ እና በስፔሻል ኮንዲሽን ኦፍ ኮንትራክት በሚካተቱ ነጥቦች ላይ ብቻ መወያየት በቂ ነው።
▶️በተጨማሪም በዲዛይን ቢዩልድ ፕሮጀክት የኮንስትራክሽን ስጋት/ሪስክ ሙሉ በሙሉ ወደ ተቋራጩ የሚተላለፍ በመሆኑ ልዩ የዋስትና ሽፋን ያስፈልገዋል፡፡
*ስለዚህም ተቋራጩ በግንባታው ዋጋ ልክ All risk insurance እንዲገባ እና ለዲዛይን ስህተት፣ለስራው ብልሽትና በተቋራጩ ባለሙያወች የስራ ስህተት
ለሚከሰት ጉዳትና ኪሳራ ደግሞ professional indemenity insurance እንዲገባ FIDIC ዲዛይን ቢዩልድ ፕሮጀክት ኮምፖቴብል የሆነው ተርንኪ ጀኔራል ኮንዲሽን ግዴታ ያስቀምጣል።
▶️በሀገራችን ዲዛይን ቢዩልድ የኮንስትራክሽን ፕሮጀክት ብዙም የተለመደ
አይደለም።
*ሆኖም በመንገድ ግንባታ ውሎች የኢትዮጵያ መንገዶች ባለስልጣን
አልፎ አልፎ ይጠቀምበታል።
▶️በአጠቃላይ በሀገራችን በኮንሰትራክሽን ዲዛይኒንግ እና የውል አስተዳደር
ረገድ ሰፊ የእውቀት ክፍተት ያለ በመሆኑ እና ፕሮጀክቶች በተያዘላቸው ጊዜና ገንዘብ የማይጠናቀቁበት ሁኔታ በሰፊው የሚስተዋል እንደመሆኑ ሙሉ የኮንስትራክሽን ሪስክ/ስጋት ወደ ተቋራጩ በማስተላለፍ መንግስታዊ ግንባታዎችን በዲዛይን ቢዩልድ የፕሮጀክት አይነት እንዲከናወኑ ማድረግ የተሻለ አማራጭ ሊሆን እንደሚችል ለመጠቆም እወዳለሁ።
በ ጉባኤ አሰፍ
#ConstructionLaw
@etconp
👉How to select suitable type of foundations?
🚧1. ADEQUATE DEPTH
➡️The foundation must have an adequate depth to prevent frost damage.
*⃣For such foundations as bridge piers, the depth of the foundation must be sufficient to prevent undermining by scour.
🚧2. BEARING CAPACITY FAILURE
➡️The foundation must be safe against a bearing capacity failure.
🚧3. SETTLEMENT
➡️The foundation must not settle to such an extent that it damages the structure.
🚧4. QUALITY
➡️The foundation must be of adequate quality so that it is not subjected to deterioration, such as from sulfate attack.
🚧5. ADEQUATE STRENGTH
➡️The foundation must be designed with sufficient strength that it does not fracture or break apart under the applied superstructure loads.
*⃣The foundation must also be properly constructed in conformance with the design specifications.
🚧6. ADVERSE SOIL CHANGES
➡️The foundation must be able to resist long-term adverse soil changes.
*⃣An example is expansive soil, which could expand or shrink causing movement of the foundation and damage to the structure.
🚧7. SEISMIC FORCES
➡️The foundation must be able to support the structure during an earthquake without excessive settlement or lateral movement.
#FoundationEngineering
@etconp
🚧1. ADEQUATE DEPTH
➡️The foundation must have an adequate depth to prevent frost damage.
*⃣For such foundations as bridge piers, the depth of the foundation must be sufficient to prevent undermining by scour.
🚧2. BEARING CAPACITY FAILURE
➡️The foundation must be safe against a bearing capacity failure.
🚧3. SETTLEMENT
➡️The foundation must not settle to such an extent that it damages the structure.
🚧4. QUALITY
➡️The foundation must be of adequate quality so that it is not subjected to deterioration, such as from sulfate attack.
🚧5. ADEQUATE STRENGTH
➡️The foundation must be designed with sufficient strength that it does not fracture or break apart under the applied superstructure loads.
*⃣The foundation must also be properly constructed in conformance with the design specifications.
🚧6. ADVERSE SOIL CHANGES
➡️The foundation must be able to resist long-term adverse soil changes.
*⃣An example is expansive soil, which could expand or shrink causing movement of the foundation and damage to the structure.
🚧7. SEISMIC FORCES
➡️The foundation must be able to support the structure during an earthquake without excessive settlement or lateral movement.
#FoundationEngineering
@etconp
👉የዱለቻ - አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ግንባታ ተቋረጠ!
🚧የአዋሽ ወንዝ ሙላት ያደረሰው የጎርፍ ማጥለቅለቅ በኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን ተቋራጭነት በግንባታ ላይ የሚገኘውን የዱለቻ አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ሥራ መቆሙን የኢትዮጵያ ኮንስትራክሽን ስራዎች ኮርፖሬሽን አስታወቀ።
🚧በኢትዮጵያ በተለያዩ ቦታዎች በተለይም በአፋር ክልል የክረምት ዝናብ በመብዛቱ ከፍተኛ የሚባል የጎፍ መጥለቅለቅ አጋጥሞ እስካሁንም ድረስ ብዙ ዜጎች ተጎጅ ሆነዋል።
🚧በዚሁ የጎርፍ መጥለቅለቅ በአፋር ክልል በአዋሽ ተፋሰስ አካባቢ እየተገነባ ያለው የዱለቻ አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ከነሀሴ 26/2012 ጀምሮ የግንባታ ስራው እንደተቋረጠ የኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን የህዝብ ግነኙነት ኃላፊ ጥንፉ ሙጬ ለአዲስ ማለዳ ተናግረዋል።
Via Addis Maleda
@etconp
🚧የአዋሽ ወንዝ ሙላት ያደረሰው የጎርፍ ማጥለቅለቅ በኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን ተቋራጭነት በግንባታ ላይ የሚገኘውን የዱለቻ አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ሥራ መቆሙን የኢትዮጵያ ኮንስትራክሽን ስራዎች ኮርፖሬሽን አስታወቀ።
🚧በኢትዮጵያ በተለያዩ ቦታዎች በተለይም በአፋር ክልል የክረምት ዝናብ በመብዛቱ ከፍተኛ የሚባል የጎፍ መጥለቅለቅ አጋጥሞ እስካሁንም ድረስ ብዙ ዜጎች ተጎጅ ሆነዋል።
🚧በዚሁ የጎርፍ መጥለቅለቅ በአፋር ክልል በአዋሽ ተፋሰስ አካባቢ እየተገነባ ያለው የዱለቻ አዋሽ አርባ መንገድ ግንባታ ፕሮጀክት ከነሀሴ 26/2012 ጀምሮ የግንባታ ስራው እንደተቋረጠ የኢትዮጵያ ኮንስትራክሽን ሥራዎች ኮርፖሬሽን የህዝብ ግነኙነት ኃላፊ ጥንፉ ሙጬ ለአዲስ ማለዳ ተናግረዋል።
Via Addis Maleda
@etconp
👉How do I avoid cracks on concrete?
➡️We can call cracks always as the headache for Construction engineer’s but it can be prevented if several measures are taken.
▶️Generally cracks may form in plastic stage or in harden stage of concrete.
*⃣in case of plastic stage the climate plays vital role,to prevent cracks in early stage of concreting you have to consider the temperature variation of that area and you may vary W/C ratio accordingly.
*⃣In area of high temperature one can use wet gunny bags after the initial setting is reached it will reduce the escape of water causing shrinkage cracks And it will be better to concreting in early morning or evening as the temperature be low.
▶️Good workmanship and proper supervision is necessary if you are preparing concrete manually of machine mix at site,and it is not required in ready mixed concrete.
▶️Sometimes improper mixing concrete becomes porous and sometimes it becomes very stiff due to deficiency of water so that it must be mixed thoroughly as per mix design.
▶️If there is discontinuity in placing of concrete then the crack may form at that place so whenever discontinuity exist cement slurry must be poured up to 1 cm.
▶️Removal of voids is also necessary for that compaction of fresh concrete must be done sufficiently and over compaction should be avoided.
▶️Pozzolanic materials can be used and suitable admixture can be added and nowadays there is many synthetic binders are available in market which will increase the tensile strength of concrete and it depends on work condition and desired quality of the work.
▶️After all you have to take technical approach to avoid cracking of concrete and it includes
🚧Proper mix design of concrete.
🚧Preparation of concrete according to mix design.
🚧Placing of concrete before final setting takes place and avoiding the free fall of concrete when placing.
🚧Sufficient compaction by adopting proper method.
🚧Providing minimum specified cover by Standard code.
🚧Providing minimum reinforcements as per Standard code.
🚧Arranging proper formwork for the specified duration with proper supports.
🚧By avoiding the placing of any load before final setting time.
🚧Proper curing for at least seven days.
#ConcreteTechnology
@etconp
➡️We can call cracks always as the headache for Construction engineer’s but it can be prevented if several measures are taken.
▶️Generally cracks may form in plastic stage or in harden stage of concrete.
*⃣in case of plastic stage the climate plays vital role,to prevent cracks in early stage of concreting you have to consider the temperature variation of that area and you may vary W/C ratio accordingly.
*⃣In area of high temperature one can use wet gunny bags after the initial setting is reached it will reduce the escape of water causing shrinkage cracks And it will be better to concreting in early morning or evening as the temperature be low.
▶️Good workmanship and proper supervision is necessary if you are preparing concrete manually of machine mix at site,and it is not required in ready mixed concrete.
▶️Sometimes improper mixing concrete becomes porous and sometimes it becomes very stiff due to deficiency of water so that it must be mixed thoroughly as per mix design.
▶️If there is discontinuity in placing of concrete then the crack may form at that place so whenever discontinuity exist cement slurry must be poured up to 1 cm.
▶️Removal of voids is also necessary for that compaction of fresh concrete must be done sufficiently and over compaction should be avoided.
▶️Pozzolanic materials can be used and suitable admixture can be added and nowadays there is many synthetic binders are available in market which will increase the tensile strength of concrete and it depends on work condition and desired quality of the work.
▶️After all you have to take technical approach to avoid cracking of concrete and it includes
🚧Proper mix design of concrete.
🚧Preparation of concrete according to mix design.
🚧Placing of concrete before final setting takes place and avoiding the free fall of concrete when placing.
🚧Sufficient compaction by adopting proper method.
🚧Providing minimum specified cover by Standard code.
🚧Providing minimum reinforcements as per Standard code.
🚧Arranging proper formwork for the specified duration with proper supports.
🚧By avoiding the placing of any load before final setting time.
🚧Proper curing for at least seven days.
#ConcreteTechnology
@etconp
👉እየተወያየን እንማማር
➡️በመንግስት የኮንስትራክሽን ውል አንድ አሰሪ መ/ቤት የግንባታ ግዜው ከመጠናቀቁ በፊት ውል ማቋረጥ ይችላልን?
➡️የማጠናቀቂያ ግዜው አልፎ ነገር ግን ግዜ ለማራዘም በቂ ምክንያት መኖሩ ታምኖበት እያለስ ይሄው ግዜ ሳያልፍስ አሰሪው ውል ማቋረጥ ይችላልን?
➡️ተቋራጩንስ ጥፋተኛ ሊያደርግ የሚችል የህግ ሁኔታ አለ?
📩ሀሳቦቻቹ በ መወያያ ግሩፓቹ ላይ ገብታቹ ፃፉልን።👇
https://t.me/COTMp
➡️በመንግስት የኮንስትራክሽን ውል አንድ አሰሪ መ/ቤት የግንባታ ግዜው ከመጠናቀቁ በፊት ውል ማቋረጥ ይችላልን?
➡️የማጠናቀቂያ ግዜው አልፎ ነገር ግን ግዜ ለማራዘም በቂ ምክንያት መኖሩ ታምኖበት እያለስ ይሄው ግዜ ሳያልፍስ አሰሪው ውል ማቋረጥ ይችላልን?
➡️ተቋራጩንስ ጥፋተኛ ሊያደርግ የሚችል የህግ ሁኔታ አለ?
📩ሀሳቦቻቹ በ መወያያ ግሩፓቹ ላይ ገብታቹ ፃፉልን።👇
https://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
👉What does it mean by 95% compaction?
➡️There are two compaction tests we familiar with, standard Procter and the modified Procter.
*⃣These tests are preformed in a lab on bulk soil samples that are being considered to be used as fill material.
*⃣The test gives the engineer a baseline of how the optimal moisture content and achievable density for a specific compaction effort.
*⃣95% compaction means that the soil on the construction site has been compacted to 95% of the maximum density achieved in the lab.
⏹Remember the test in the lab uses a specific compaction effort so it is possible to achieve compaction above 100% in the field.
⏺I have seen airstrip plans that specified 105% compaction of a modified Marshal Proctor It means that when you conduct compaction test(in the laboratory) on a small soil sample of a particular site You get some value of maximum dry unit weight at certain moisture content.
#GeotechnicalEngineering
@etcono
➡️There are two compaction tests we familiar with, standard Procter and the modified Procter.
*⃣These tests are preformed in a lab on bulk soil samples that are being considered to be used as fill material.
*⃣The test gives the engineer a baseline of how the optimal moisture content and achievable density for a specific compaction effort.
*⃣95% compaction means that the soil on the construction site has been compacted to 95% of the maximum density achieved in the lab.
⏹Remember the test in the lab uses a specific compaction effort so it is possible to achieve compaction above 100% in the field.
⏺I have seen airstrip plans that specified 105% compaction of a modified Marshal Proctor It means that when you conduct compaction test(in the laboratory) on a small soil sample of a particular site You get some value of maximum dry unit weight at certain moisture content.
#GeotechnicalEngineering
@etcono
👉SOME HIGHWAY NOTES
🏷1. Explain The Purpose Of Super Elevation &Widening?
🚧Super elevation used to counterbalance centrifugal force &resists overturning of vehicles.
➡️Factors of supper elevation are👇
⏺Climate condition
⏺Terrain types
⏺Types of area (rural or urban)
⏺Types of facility
🚧Widening used to for visibility of an object on circular curve for psychological & off tracking vehicle.
🏷2. Write The Types Of Terrain & The Difference Between Them?
🚧Types of terrains are
➡️Flat terrain is offer a few obstacle to the construction of road, having continuous unrestricted horizontal & vertical alignment & traverse slope is 0-5%
➡️Rolling ፦slope generally rise & fall moderately ,some restriction in alignment & its traverse slope is 5-25%
➡️Mountainous ፦definet restriction of alignment & ssd ,has steep grade and their traverse slope is 25-50%
➡️Escarpment ፦inclusive of switch back roadway section & traverse slope is >50%
🏷3. Write The Types Of Sight Distance & Explain Them?
🚧SD is distance visible to the driver s o f a passenger’s car.
▶️The types of SD is
⏺SSD is visible to the drivers to stop the passenger’s car before collapsed.
*⃣D=0.278vt+v2/254f
⏺PSD is a minimum SD on the two ways single road way that must be available to enable that the driver of one vehicles to another vehicles safely without interfering with the speed of on coming vehicles at the design speed.
*⃣D1=0.278t1(v-m+at1/2)
*⃣D2=0.278vt2
*⃣D4 =2/3(d2)
⏭PSD=d1+d2 +d3 +d4
⏹where is the speed d/ce b/n passed vehicle & passing vehicles
#HighwayEngineering
@etconp
🏷1. Explain The Purpose Of Super Elevation &Widening?
🚧Super elevation used to counterbalance centrifugal force &resists overturning of vehicles.
➡️Factors of supper elevation are👇
⏺Climate condition
⏺Terrain types
⏺Types of area (rural or urban)
⏺Types of facility
🚧Widening used to for visibility of an object on circular curve for psychological & off tracking vehicle.
🏷2. Write The Types Of Terrain & The Difference Between Them?
🚧Types of terrains are
➡️Flat terrain is offer a few obstacle to the construction of road, having continuous unrestricted horizontal & vertical alignment & traverse slope is 0-5%
➡️Rolling ፦slope generally rise & fall moderately ,some restriction in alignment & its traverse slope is 5-25%
➡️Mountainous ፦definet restriction of alignment & ssd ,has steep grade and their traverse slope is 25-50%
➡️Escarpment ፦inclusive of switch back roadway section & traverse slope is >50%
🏷3. Write The Types Of Sight Distance & Explain Them?
🚧SD is distance visible to the driver s o f a passenger’s car.
▶️The types of SD is
⏺SSD is visible to the drivers to stop the passenger’s car before collapsed.
*⃣D=0.278vt+v2/254f
⏺PSD is a minimum SD on the two ways single road way that must be available to enable that the driver of one vehicles to another vehicles safely without interfering with the speed of on coming vehicles at the design speed.
*⃣D1=0.278t1(v-m+at1/2)
*⃣D2=0.278vt2
*⃣D4 =2/3(d2)
⏭PSD=d1+d2 +d3 +d4
⏹where is the speed d/ce b/n passed vehicle & passing vehicles
#HighwayEngineering
@etconp
Soil mechanics quiz
What’s the active earth pressure for a soil of height 3 meter , unit weight of 20 kN/m³ and angel of internal friction 30⁰ ?
1️⃣. 15kN/m
2️⃣. 20KN/m
3️⃣. 25kN/m
4️⃣. 30kN/m
If more that 5 members participate @cotmp we will attach the answer
ከ 5 በላይ ቤተሰቦች በ @cotmp ከተሳፋችሁ መልሱን እንለቀዋለን
Telegram:- @etconp
Instagram:- https://instagram.com/etconp?igshid=xja0115f44k8
What’s the active earth pressure for a soil of height 3 meter , unit weight of 20 kN/m³ and angel of internal friction 30⁰ ?
1️⃣. 15kN/m
2️⃣. 20KN/m
3️⃣. 25kN/m
4️⃣. 30kN/m
If more that 5 members participate @cotmp we will attach the answer
ከ 5 በላይ ቤተሰቦች በ @cotmp ከተሳፋችሁ መልሱን እንለቀዋለን
Telegram:- @etconp
Instagram:- https://instagram.com/etconp?igshid=xja0115f44k8
👉Some Stress Distributions In Hydraulics
▪Direct Stress Distribution is Uniform At sections Reasonably Away from Point of application of load.
▪Bending stress Distribution is Linear being zero at Neutral axis & maximum at extreme Fibres.
▪Transverse shear stress (Tangential stress) Distribution is Parabolic being Zero at extreme Fibres & Maximum at Neutral axis.
▪Torsional Shear stress Distribution is Linear being zero at neutral axis and Maximum at extreme Fibres.
▪In Turbulent Flow velocity profile is logarithmic.
▪In Laminar Flow velocity profile is Parabolic.
▪Laminar Sublayer Exist In Turbulent zone and the velocity profile in Laminar Sublayer is Parabolic.
▪Shear stress distribution is linear in both Laminar and Turbulent flows.
▪Average shear Stress Distribution is always Uniform (rectangular).
▪Average velocity distribution is always Uniform in both Laminar and Turbulent Flow situations (rectangular).
#StressDistributions
#Hydraulics
@etconp
▪Direct Stress Distribution is Uniform At sections Reasonably Away from Point of application of load.
▪Bending stress Distribution is Linear being zero at Neutral axis & maximum at extreme Fibres.
▪Transverse shear stress (Tangential stress) Distribution is Parabolic being Zero at extreme Fibres & Maximum at Neutral axis.
▪Torsional Shear stress Distribution is Linear being zero at neutral axis and Maximum at extreme Fibres.
▪In Turbulent Flow velocity profile is logarithmic.
▪In Laminar Flow velocity profile is Parabolic.
▪Laminar Sublayer Exist In Turbulent zone and the velocity profile in Laminar Sublayer is Parabolic.
▪Shear stress distribution is linear in both Laminar and Turbulent flows.
▪Average shear Stress Distribution is always Uniform (rectangular).
▪Average velocity distribution is always Uniform in both Laminar and Turbulent Flow situations (rectangular).
#StressDistributions
#Hydraulics
@etconp
👉Factor of safety
➡️Factor of safety is define as the ratio of yield stress to working Stress.
*⃣According to designing point of view, none of the material is 100 % reliable, we design the structure member for given working Stress and keep the Stress in such a way that they can not reached or exceed there permissible values because ones the material of the members reaches to there permissible values then yielding get start and the structure is treated as failed structure.
*⃣When We design the structure member with in the proportional limit and If the materials subjected to the Stress which is equal to permissible values and more than this , Hence structural member get fail.
▶️So as a designer When we design the structure including some factor of safety And design the member in such a way that material of members keeps with in its proportional limit by the help of factors of safety
▶️For example, In case of RCC design the factor of safety for concrete is taken as 1.5 and for steel it is 1.15.
@etconp
➡️Factor of safety is define as the ratio of yield stress to working Stress.
*⃣According to designing point of view, none of the material is 100 % reliable, we design the structure member for given working Stress and keep the Stress in such a way that they can not reached or exceed there permissible values because ones the material of the members reaches to there permissible values then yielding get start and the structure is treated as failed structure.
*⃣When We design the structure member with in the proportional limit and If the materials subjected to the Stress which is equal to permissible values and more than this , Hence structural member get fail.
▶️So as a designer When we design the structure including some factor of safety And design the member in such a way that material of members keeps with in its proportional limit by the help of factors of safety
▶️For example, In case of RCC design the factor of safety for concrete is taken as 1.5 and for steel it is 1.15.
@etconp
👉Some Important Definitions
🚧 Water content : Ratio of the weight of water to the weight of solids.
🚧Void Ratio : Ratio of the volume of voids to the volume of solids.
🚧Porosity : Ratio of the volume of voids to the total volume of the soil.
🚧Degree of saturation : Ratio of the volume of water to the volume of voids.
🚧Air content : Ratio of volume of air voids to the volume of voids.
🚧Percentage air voids : Ratio of the volume of air voids expressed as a percentage of total volume of the soil.
🚧Unit weight : It is the weight per unit volume.
🚧Bulk Unit weight : Total weight of soil mass, per unit of total volume.
🚧Dry unit weight : Weight of solids per unit of total volume.
🚧Saturated unit weight : Ratio of total weight of a fully saturated soil, to its total volume.
🚧Submerged unit weight : Ratio of the submerged weight of soil, to its total volume.
🚧Unit weight of solids : Ratio of the weight of solids, to the volume of solids.
🚧Specific gravity : Ratio of the weight of a given volume of solids to the weight of an equivalent volume of water at 4°C.
🚧Apparent or Mass specific gravity : Ratio of the total weight of a given mass of soil to the weight of an equivalent volume of water.
#ConstructionNotes
#SoilMechanics
@etconp
🚧 Water content : Ratio of the weight of water to the weight of solids.
🚧Void Ratio : Ratio of the volume of voids to the volume of solids.
🚧Porosity : Ratio of the volume of voids to the total volume of the soil.
🚧Degree of saturation : Ratio of the volume of water to the volume of voids.
🚧Air content : Ratio of volume of air voids to the volume of voids.
🚧Percentage air voids : Ratio of the volume of air voids expressed as a percentage of total volume of the soil.
🚧Unit weight : It is the weight per unit volume.
🚧Bulk Unit weight : Total weight of soil mass, per unit of total volume.
🚧Dry unit weight : Weight of solids per unit of total volume.
🚧Saturated unit weight : Ratio of total weight of a fully saturated soil, to its total volume.
🚧Submerged unit weight : Ratio of the submerged weight of soil, to its total volume.
🚧Unit weight of solids : Ratio of the weight of solids, to the volume of solids.
🚧Specific gravity : Ratio of the weight of a given volume of solids to the weight of an equivalent volume of water at 4°C.
🚧Apparent or Mass specific gravity : Ratio of the total weight of a given mass of soil to the weight of an equivalent volume of water.
#ConstructionNotes
#SoilMechanics
@etconp
👉ፓራሜትሪክ ስነ-ህንጻ ንድፍ
➡️ፓራሜትሪክ ስነ-ህንፃ በንድፍ መስፈርቶች እና በዚህ ሂደት የመጨረሻ ንድፍ ውጤት ምርት መካከል ያለውን ግንኙነት የሚገልፁ እና የሚያቀናጁ መለኪያዎች እና ደንቦችን መጠቀም የሚያስችል በአልጎሪዝም መርሃግብር ላይ የተመሠረተ አሁናዊና አለም የደረሰበት የንድፍ ሂደት ነው፡፡
🚧በዚህም ባብላጫው የኮምፒውተር ስሌት እርዳታ የሚያስፈልግ ሲሆን ባገራችን እስካሁን ይሄንን የተገበረ ህንጻ የለም።
🚧የባህር ማዶ ህንጻ ምሳሌ ከላይ ኣያይዘንላቹዋል።
#Architecture
@etconp
➡️ፓራሜትሪክ ስነ-ህንፃ በንድፍ መስፈርቶች እና በዚህ ሂደት የመጨረሻ ንድፍ ውጤት ምርት መካከል ያለውን ግንኙነት የሚገልፁ እና የሚያቀናጁ መለኪያዎች እና ደንቦችን መጠቀም የሚያስችል በአልጎሪዝም መርሃግብር ላይ የተመሠረተ አሁናዊና አለም የደረሰበት የንድፍ ሂደት ነው፡፡
🚧በዚህም ባብላጫው የኮምፒውተር ስሌት እርዳታ የሚያስፈልግ ሲሆን ባገራችን እስካሁን ይሄንን የተገበረ ህንጻ የለም።
🚧የባህር ማዶ ህንጻ ምሳሌ ከላይ ኣያይዘንላቹዋል።
#Architecture
@etconp
👉What Are The Sources of Water-Surface and Subsurface Sources of Water
➡️Water is the main constituent of the earth surface.
➡️You know that the chemical formula of water is H2O Water occurs in liquid, solid(ice) and gas( water vapour).
🚧There are mainly two sources of water, surface source water and subsurface source water.
🏷1.Surface sources of water
⏺Storage reservoirs
*⃣Storage reservoirs are the main sources of water for a city or town Because storage reservoirs always have sufficient amount of water available during the summer and as well as in winter season.
*⃣The capacity of the storage tank is determined by several methods.
⏺Lakes
*⃣The lake water is pure compared to all other sources.
*⃣The fresh water comes from the rock or surrounding area always drive under the filtration of soil So impurities in lakes water will be less.
*⃣Lake water has algae, weeds and other vegetables.
*⃣It is one of the main surface sources of water.
⏺Rivers or streams
*⃣The main use of the river is navigation between land.
*⃣The river water is pure at mountains, but when it approaches plain area it will deteriorate due to the wastes from town or municipal areas.
*⃣The river water flows and it reaches the sea.
*⃣The main source of water to the wells is from runoff.
⏺Oceans
*⃣Ocean is the largest source of water in the earth.
*⃣They cannot be used drinking or construction purpose due to high salinity of the water.
*⃣The normal salt content for drinking purpose is 2 percent, but the salt content in sea water exceeds 3 percentage So sea water damage human kidney system.
⏺Precipitation
*⃣If you don’t know the meaning of precipitation, don’t worry Precipitation is rain.
*⃣Precipitation is also other pure water sources to the earth.
🏷2.Sub Surface sources of water
⏺Infiltration galleries
*⃣A horizontal tunnel usually rectangular in cross section.
*⃣Infiltration galleries have permeable boundaries so that water can be filtrate into them.
⏺Infiltration wells
*⃣It is shallow well constructed in series along the bank of the river.
*⃣The surface water flowing through the river flow towards the well constructed in the bank of the river.
*⃣These wells contain only pure water Because during their movement from the river to infiltration wills, the water purification takes place by filtration of soil.
⏺Well
*⃣Well is the main sub surface sources of water for houses Usually, they are rounded shape and usually having a depth more 8 meters.
*⃣The main sources of water to the wells are from infiltration of water through the soil.
➡️Two types of wells are there
🚧Open wells -They have large diameter and low yield.
🚧Tube wells -They have small diameter, long pipe sunk into the ground intercepting one or more water-bearing strata.
👌we hope you could understand surface and subsurface sources of water.
💌If you have any doubt, don’t shy to comment @ETCONp_Bot
👍If you like this Channel Don’t forget to share with your friends.
#WaterSupply
@etconp
➡️Water is the main constituent of the earth surface.
➡️You know that the chemical formula of water is H2O Water occurs in liquid, solid(ice) and gas( water vapour).
🚧There are mainly two sources of water, surface source water and subsurface source water.
🏷1.Surface sources of water
⏺Storage reservoirs
*⃣Storage reservoirs are the main sources of water for a city or town Because storage reservoirs always have sufficient amount of water available during the summer and as well as in winter season.
*⃣The capacity of the storage tank is determined by several methods.
⏺Lakes
*⃣The lake water is pure compared to all other sources.
*⃣The fresh water comes from the rock or surrounding area always drive under the filtration of soil So impurities in lakes water will be less.
*⃣Lake water has algae, weeds and other vegetables.
*⃣It is one of the main surface sources of water.
⏺Rivers or streams
*⃣The main use of the river is navigation between land.
*⃣The river water is pure at mountains, but when it approaches plain area it will deteriorate due to the wastes from town or municipal areas.
*⃣The river water flows and it reaches the sea.
*⃣The main source of water to the wells is from runoff.
⏺Oceans
*⃣Ocean is the largest source of water in the earth.
*⃣They cannot be used drinking or construction purpose due to high salinity of the water.
*⃣The normal salt content for drinking purpose is 2 percent, but the salt content in sea water exceeds 3 percentage So sea water damage human kidney system.
⏺Precipitation
*⃣If you don’t know the meaning of precipitation, don’t worry Precipitation is rain.
*⃣Precipitation is also other pure water sources to the earth.
🏷2.Sub Surface sources of water
⏺Infiltration galleries
*⃣A horizontal tunnel usually rectangular in cross section.
*⃣Infiltration galleries have permeable boundaries so that water can be filtrate into them.
⏺Infiltration wells
*⃣It is shallow well constructed in series along the bank of the river.
*⃣The surface water flowing through the river flow towards the well constructed in the bank of the river.
*⃣These wells contain only pure water Because during their movement from the river to infiltration wills, the water purification takes place by filtration of soil.
⏺Well
*⃣Well is the main sub surface sources of water for houses Usually, they are rounded shape and usually having a depth more 8 meters.
*⃣The main sources of water to the wells are from infiltration of water through the soil.
➡️Two types of wells are there
🚧Open wells -They have large diameter and low yield.
🚧Tube wells -They have small diameter, long pipe sunk into the ground intercepting one or more water-bearing strata.
👌we hope you could understand surface and subsurface sources of water.
💌If you have any doubt, don’t shy to comment @ETCONp_Bot
👍If you like this Channel Don’t forget to share with your friends.
#WaterSupply
@etconp
👉Terms related to Mass Haul Diagram
🚧Free haul distance
🔷Distance up to which the excavated material is hauled without any extra cost.
🚧Over haul distance
🔷Excess of haul distance beyond the free haul distance.
🚧Borrow
🔷Quantity of material ( in cubic meter) required for the embankment taken from borrow pits.
🚧Haul
🔷Sum of the products of each load by its respective haul distance.
🔷 Unit of haul is cum meter or station-meter.
🔷 1 station-meter is equal to 1 cubic meter of excavated material hauled through one station (30 meter distance)
🚧Economical Overhaul Distance or Limit of economical haul
🔷 Maximum distance to which the excavation obtained may be utilized in filing up any depression.
🔷 L = (B/O)+F
*⃣L = Economical Overhaul Distance
*⃣B = Cost of borrow per cubic meter at station
*⃣O= cost of overhaul per station-meter
*⃣F = Free haul distance
🚧Waste
🔷Material excavated from cuts but not used for embankment.
🚧Balancing line
🔷The horizontal line(base line) drawn on the mass haul diagram.
#ConstructionNotes
#HighwayEngineering
@etconp
🚧Free haul distance
🔷Distance up to which the excavated material is hauled without any extra cost.
🚧Over haul distance
🔷Excess of haul distance beyond the free haul distance.
🚧Borrow
🔷Quantity of material ( in cubic meter) required for the embankment taken from borrow pits.
🚧Haul
🔷Sum of the products of each load by its respective haul distance.
🔷 Unit of haul is cum meter or station-meter.
🔷 1 station-meter is equal to 1 cubic meter of excavated material hauled through one station (30 meter distance)
🚧Economical Overhaul Distance or Limit of economical haul
🔷 Maximum distance to which the excavation obtained may be utilized in filing up any depression.
🔷 L = (B/O)+F
*⃣L = Economical Overhaul Distance
*⃣B = Cost of borrow per cubic meter at station
*⃣O= cost of overhaul per station-meter
*⃣F = Free haul distance
🚧Waste
🔷Material excavated from cuts but not used for embankment.
🚧Balancing line
🔷The horizontal line(base line) drawn on the mass haul diagram.
#ConstructionNotes
#HighwayEngineering
@etconp