Ethio Construction Engineering
👉SOME QUESTIONS ASKED FROM OUR MEMBERS (PART-3) 1⃣What is civil engineering? 🚧It is a professional engineering discipline that deals with the construction, design and maintenance of the built environment, including public works for example roads, dams, bridges…
1⃣5⃣What is honey comb in concrete?
🚧Honey comb is actually the voids or air pocks in concrete.
1⃣6⃣What is the distance between railway tracks?
🚧The distance between railway track is 4 feet.
1⃣7⃣Why the pressure increases under soil?
🚧Soil pressure increases because of its self–weight. The pressure of soil is directly proportional to the depth of soil.
1⃣8⃣Name the structures which is subjected to the fatigue?
🚧The structures which is subjected to the fatigue are:
🚩Bridges
🚩Hydraulic presses
🚩Burner trains
1⃣9⃣What is gravity flow?
🚧When the fluid is flowing due to the force gravity but not on applied pressure is known as gravity flow.
2⃣0⃣What is Kip?
🚧1 Kip is equal to 1000 ponds.
2⃣1⃣What is aggregate?
🚧The composite material used to resist the compressive stress.
*⃣Aggregates are classified in two main types:
🔨Fine Aggregate
🔨Coarse Aggregate
2⃣2⃣Please tell us about soil reinforcement?
🚧Soil reinforcement are used to improve soil strength and have ability to support more load.
2⃣3⃣Please tell the tallest man made structure?
🚧The tallest man made structure is Burj ul khalifa. The height of burj ul khalifa is 828 meter.
2⃣4⃣Which units are used for the measurement of concrete?
🚧Cubic meter (m3), cubic foot (ft3), cubic yard (y3).
2⃣5⃣What are the causes of building collapse?
🚧The causes of building collapse are:
🔸Weak foundation
🔸Passage of time
🔸Demolition
🔸Bombing
🔸Natural disaster
2⃣6⃣What is the final setting time of concrete?
🚧The final setting time of ordinary concrete is 10 hours.
2⃣7⃣What is initial setting Time of concrete?
🚧The initial setting time of ordinary concrete is 30 minutes.
2⃣8⃣Please tell us about the types of beam?
🚧The types of beam base on supports are:
〽️Simply supported beam
〽️Continuous beam
〽️Over hanging beam
〽️Double over hanging
〽️Cantilever beam
〽️Fixed beam
〽️Trussed beam
2⃣9⃣Please tell us about the types of load?
🚧The types of load are:
🚼dead load
🚼live load
🚼snow load
🚼impact load
🚼Wind load
🚼Earth quacke
🚼Environmental load
3⃣0⃣What is minimum number of bars used in rectangular or square column?
🚧4 minimum number of bars can be used in rectangular or square column.
@etconp
🚧Honey comb is actually the voids or air pocks in concrete.
1⃣6⃣What is the distance between railway tracks?
🚧The distance between railway track is 4 feet.
1⃣7⃣Why the pressure increases under soil?
🚧Soil pressure increases because of its self–weight. The pressure of soil is directly proportional to the depth of soil.
1⃣8⃣Name the structures which is subjected to the fatigue?
🚧The structures which is subjected to the fatigue are:
🚩Bridges
🚩Hydraulic presses
🚩Burner trains
1⃣9⃣What is gravity flow?
🚧When the fluid is flowing due to the force gravity but not on applied pressure is known as gravity flow.
2⃣0⃣What is Kip?
🚧1 Kip is equal to 1000 ponds.
2⃣1⃣What is aggregate?
🚧The composite material used to resist the compressive stress.
*⃣Aggregates are classified in two main types:
🔨Fine Aggregate
🔨Coarse Aggregate
2⃣2⃣Please tell us about soil reinforcement?
🚧Soil reinforcement are used to improve soil strength and have ability to support more load.
2⃣3⃣Please tell the tallest man made structure?
🚧The tallest man made structure is Burj ul khalifa. The height of burj ul khalifa is 828 meter.
2⃣4⃣Which units are used for the measurement of concrete?
🚧Cubic meter (m3), cubic foot (ft3), cubic yard (y3).
2⃣5⃣What are the causes of building collapse?
🚧The causes of building collapse are:
🔸Weak foundation
🔸Passage of time
🔸Demolition
🔸Bombing
🔸Natural disaster
2⃣6⃣What is the final setting time of concrete?
🚧The final setting time of ordinary concrete is 10 hours.
2⃣7⃣What is initial setting Time of concrete?
🚧The initial setting time of ordinary concrete is 30 minutes.
2⃣8⃣Please tell us about the types of beam?
🚧The types of beam base on supports are:
〽️Simply supported beam
〽️Continuous beam
〽️Over hanging beam
〽️Double over hanging
〽️Cantilever beam
〽️Fixed beam
〽️Trussed beam
2⃣9⃣Please tell us about the types of load?
🚧The types of load are:
🚼dead load
🚼live load
🚼snow load
🚼impact load
🚼Wind load
🚼Earth quacke
🚼Environmental load
3⃣0⃣What is minimum number of bars used in rectangular or square column?
🚧4 minimum number of bars can be used in rectangular or square column.
@etconp
👉The Largest Hotel in the World, Abraj Kudai with a staggering...
🚧10,000 Rooms
🚧4 helipads
🚧Can accommodate 30,000 guest at a time
🚧Spanning 1.4 million square meters is currently under construction in Saudi Arabia.
@etconp
🚧10,000 Rooms
🚧4 helipads
🚧Can accommodate 30,000 guest at a time
🚧Spanning 1.4 million square meters is currently under construction in Saudi Arabia.
@etconp
Ethio Construction Engineering
👉ስለ Takeoff sheet ኣዘገጃጀት ➡️ቴክ ኦፍ ሺት ስናዘጋጅ አራት ኮለመኖች አሉን እነሱም👇 🏠Colum 1 🚧ይህ ኮለመን Timsing ይባላል ጥቅሙም ተመሳሳይ የሆኑ ስራዎች ላለመደጋገም ማባዣ ፋክተር ሁኖ ባንዴ ለመስራት ያገለግላል። 🏠Column 2 🚧ይህ ደሞ Dimension የባላል ማለትም ቁመት ጎን እና ርቀት የምናሰፍርበት ኮለመን ነው:: 🏠Column 3 🚧ይህ Squaring ይባላል…
👉ከ ትላንት የቀጠለ ስለ QUANTITY SURVEYING
➡️ኳንቲቲ ስንሠራ ሁሌም የምንሠራው የኮንስትራክሽን እስቴፑን ተከትለን ነው፡፡
➡️ለምሳሌ መጀመሪያ Substructure ነው የምንሠራው ከዛ ውስጥ site clearance, pit excavation, trench excavation, bulk excavation, backfill, cartway, concrete work ወዘተ ይኖራሉ፡፡
➡️በመቀጠልም Superstructure ውስጥ ያሉትን ስራዎች ከላይ በገለፅነው መሰረት ነው የምንሠራው::
🏷ብረትን በተመለከተ ደሞ ለምሳሌ የ ስትራክቸሩ የ ብረት መጠን እና ብዛት ስንሠራ ለአሠራር እንዲቀለን ለብቻው Bar schedule ፎርማት ውስጥ ገብተን የሚያስፈልገውን ዳታ ከ ድሮዊንግ እያነበብን እናስቀምጣለን፡፡
✌ለዛሬ እስቲ ለተለያዩ ስራዎች የምንጠቀምባቸውን Units Of Measurement እንይ
🚧1)Site clearance = m2
🚧2)Pit and Trench xcvn = m3
🚧3)Bulk xcvn= ከ30 ሳንቲም በታች ከሆነ m2 በላይ ከሆነ m3
🚧4)Backfill= m3
🚧5)Cart away = m3
🚧6)Lean concrete= m2
🚧7)Reinforcement = kg
🚧8)All Concrete Works (except Ribbed slab and
grouting) =m3
🚧9)Ribbed slab = m2
🚧10)Grouting & filling to holes = in number
🚧11)Formwork= m2
🚧12)Stone masonry= m3
🚧13)Brick masonry= m2
🚧14)Block masonry (HCB, SCB)= m2
🚧15)Roof cover & side cladding = m2
🚧16)Flashing & down pipes = m
🚧17)Plastering & pointing = m2
🚧18)Floor finish ( terrazzo, pvc, marble, etc.) = m2
🚧19)Skirting= m
🚧20)Glazing = m2
🚧21)Painting = m2
🚧22)Sanitary = in number
🚧23)Electrical Installation = length/ number
⚡ከላይ የተዘረዘሩት በጠቅላላ ዩኒታቸውን ብቻ ነው የጠቀስነው ከዚህ ጎን ለጎን ግን የስራዎቹ ዝርዝር ሊገለፅ ይገባዋል፡፡
🏷ለምሳሌ HCB በሜትር እስኩዌር ቢገለፅም Description Row ላይ ቲክነሱም አብሮ መጠቀስ አለበት፡፡
#QuantitySurveying
@etconp
➡️ኳንቲቲ ስንሠራ ሁሌም የምንሠራው የኮንስትራክሽን እስቴፑን ተከትለን ነው፡፡
➡️ለምሳሌ መጀመሪያ Substructure ነው የምንሠራው ከዛ ውስጥ site clearance, pit excavation, trench excavation, bulk excavation, backfill, cartway, concrete work ወዘተ ይኖራሉ፡፡
➡️በመቀጠልም Superstructure ውስጥ ያሉትን ስራዎች ከላይ በገለፅነው መሰረት ነው የምንሠራው::
🏷ብረትን በተመለከተ ደሞ ለምሳሌ የ ስትራክቸሩ የ ብረት መጠን እና ብዛት ስንሠራ ለአሠራር እንዲቀለን ለብቻው Bar schedule ፎርማት ውስጥ ገብተን የሚያስፈልገውን ዳታ ከ ድሮዊንግ እያነበብን እናስቀምጣለን፡፡
✌ለዛሬ እስቲ ለተለያዩ ስራዎች የምንጠቀምባቸውን Units Of Measurement እንይ
🚧1)Site clearance = m2
🚧2)Pit and Trench xcvn = m3
🚧3)Bulk xcvn= ከ30 ሳንቲም በታች ከሆነ m2 በላይ ከሆነ m3
🚧4)Backfill= m3
🚧5)Cart away = m3
🚧6)Lean concrete= m2
🚧7)Reinforcement = kg
🚧8)All Concrete Works (except Ribbed slab and
grouting) =m3
🚧9)Ribbed slab = m2
🚧10)Grouting & filling to holes = in number
🚧11)Formwork= m2
🚧12)Stone masonry= m3
🚧13)Brick masonry= m2
🚧14)Block masonry (HCB, SCB)= m2
🚧15)Roof cover & side cladding = m2
🚧16)Flashing & down pipes = m
🚧17)Plastering & pointing = m2
🚧18)Floor finish ( terrazzo, pvc, marble, etc.) = m2
🚧19)Skirting= m
🚧20)Glazing = m2
🚧21)Painting = m2
🚧22)Sanitary = in number
🚧23)Electrical Installation = length/ number
⚡ከላይ የተዘረዘሩት በጠቅላላ ዩኒታቸውን ብቻ ነው የጠቀስነው ከዚህ ጎን ለጎን ግን የስራዎቹ ዝርዝር ሊገለፅ ይገባዋል፡፡
🏷ለምሳሌ HCB በሜትር እስኩዌር ቢገለፅም Description Row ላይ ቲክነሱም አብሮ መጠቀስ አለበት፡፡
#QuantitySurveying
@etconp
❤1
Cool Environments
As the earth's temperature increases, controlling heat has become a very important part of the design process. Some design features to combat heat are:
· High Thermal Resistance Building Materials
· Atriums
· Pools
· External Shades
· Air freeways
Pearl Academy of Fashion - Morphogenesis Studios
🌍 https://goo.gl/maps/Ha1ZFpVhZG6XWNTJ9
#architecture #design #heat #globalwarming
@etconp
As the earth's temperature increases, controlling heat has become a very important part of the design process. Some design features to combat heat are:
· High Thermal Resistance Building Materials
· Atriums
· Pools
· External Shades
· Air freeways
Pearl Academy of Fashion - Morphogenesis Studios
🌍 https://goo.gl/maps/Ha1ZFpVhZG6XWNTJ9
#architecture #design #heat #globalwarming
@etconp
This media is not supported in your browser
VIEW IN TELEGRAM
👉ይህ በዚህ ቪድዮ የምታዪት ግንብ የተገነባው ጃፓንን ከሱናሚ አደጋ ለመታደግ ታስቦ ነው።
🚧The great wall of Japan to protect Japan against tsunamis.
@etconp
🚧The great wall of Japan to protect Japan against tsunamis.
@etconp
✋ሰላም ውድ የቻናላችን ቤተሰቦች ዛሬ እስቲ ይቺ ከታች ያለችው ጥያቄ እንወያይባት
👉አንዳንድ የግንባታ ስራ ውሎች ላይ የፕሮጀክት የመዘግየት የጉዳት ካሳ (Liquidated Damage) ለማስላት 0.1% x የቀሪ ሰራዎችን (Remaining Works) የሚል ነገር ይካተታል።
🚧ለእንደነዚህ አይነት ውሎች የውል ጊዜያቸው ካለቀ በኋላ Interim payment ቢጠየቅ Liquidated Damage እንዴት ሊሰላ ይችላል?
🚧የውል ጊዜው ካለቀ በኋላ የተስሩ እና በክፍያ ሰነዱ ላይ በተካተቱት ስራዎች ላይ ብቻ ነው ወይስ አጠቃላይ የውል ጊዜው ካለቀ በኋላ በተሰሩትና ባልተሰሩትም (ወደፊት በሚሰሩት) ስራዎች ጭምር በማካተት?
#ConstructionLaw
📩ሀሳብ አስተያየትዎ ከታች ባለው ሊንክ ፃፉልን እና እንወያይበት
.
http://t.me/COTMp
👉አንዳንድ የግንባታ ስራ ውሎች ላይ የፕሮጀክት የመዘግየት የጉዳት ካሳ (Liquidated Damage) ለማስላት 0.1% x የቀሪ ሰራዎችን (Remaining Works) የሚል ነገር ይካተታል።
🚧ለእንደነዚህ አይነት ውሎች የውል ጊዜያቸው ካለቀ በኋላ Interim payment ቢጠየቅ Liquidated Damage እንዴት ሊሰላ ይችላል?
🚧የውል ጊዜው ካለቀ በኋላ የተስሩ እና በክፍያ ሰነዱ ላይ በተካተቱት ስራዎች ላይ ብቻ ነው ወይስ አጠቃላይ የውል ጊዜው ካለቀ በኋላ በተሰሩትና ባልተሰሩትም (ወደፊት በሚሰሩት) ስራዎች ጭምር በማካተት?
#ConstructionLaw
📩ሀሳብ አስተያየትዎ ከታች ባለው ሊንክ ፃፉልን እና እንወያይበት
.
http://t.me/COTMp
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
👉ዊዝ ሆልዲንግ ታክስ
➡️ዊዝ ሆልዲንግ ታክስ ማለት ከሚከፈሉ ክፍያዎች ላይ ወይም አንድ የ ኮንስትራክሽን ኮንትራክተር ለ እያንዳንዱ ለሰራው ስራ ክፍያ ሲከፈልበት ድርጅቱ ግብርን ቀንሶ በማስቀረትና ለመንግስት የሚከፈል የግብር አይነት ነው።
🚧ይህም ከሚፈጽሙት ጠቅላላ ክፍያ ላይ 2% ግብርን ተቀንሶ የሚቀር ነው።
🚧ዊዝሆልዲንግ ታክስ ከ10,000 ብር በላይ በሆነ እቃ ግዢ ላይ እና ከ3,000 ብር በላይ የአገልግሎት ክፍያ ላይ የሚቆረጥና ለመንግስት የሚከፈል የታክስ አይነት ነው።
#PaymentCertificate
@etconp
➡️ዊዝ ሆልዲንግ ታክስ ማለት ከሚከፈሉ ክፍያዎች ላይ ወይም አንድ የ ኮንስትራክሽን ኮንትራክተር ለ እያንዳንዱ ለሰራው ስራ ክፍያ ሲከፈልበት ድርጅቱ ግብርን ቀንሶ በማስቀረትና ለመንግስት የሚከፈል የግብር አይነት ነው።
🚧ይህም ከሚፈጽሙት ጠቅላላ ክፍያ ላይ 2% ግብርን ተቀንሶ የሚቀር ነው።
🚧ዊዝሆልዲንግ ታክስ ከ10,000 ብር በላይ በሆነ እቃ ግዢ ላይ እና ከ3,000 ብር በላይ የአገልግሎት ክፍያ ላይ የሚቆረጥና ለመንግስት የሚከፈል የታክስ አይነት ነው።
#PaymentCertificate
@etconp
👍1
👉የአዋሽ ወልዲያ የባቡር ፕሮጀክት!
➡️በአዋሽ ወልዲያ የባቡር ፕሮጀክት ላይ የሚገኙ የ12ቱም ዋሻዎች ሥራ ሙሉ በሙሉ ተጠናቀዉ ለአገልግሎት ዝግጁ መሆናቸውን የትራንስፖርት ሚኒስቴር አስታወቀ።
🚧የ12ቱም ዋሻዎች አጠቃላይ ርዝመኔ ከ10 ኪ.ሜ በላይ ሲሆን ከሁሉም በጣም ረዥሙ በወልዲያና ወሎ አከባቢ የሚገኘዉ ዋሻ ደግሞ 2.03 ኪ.ሜ ርዝመት እንዳለው ገልጿል።
🚧የፕሮጀክቱ ወቅታዊ የአፈጻጸም ደረጃም 91.88% መድረሱን ነው ያስታወቀው።
#TunnelConstruction
@etconp
➡️በአዋሽ ወልዲያ የባቡር ፕሮጀክት ላይ የሚገኙ የ12ቱም ዋሻዎች ሥራ ሙሉ በሙሉ ተጠናቀዉ ለአገልግሎት ዝግጁ መሆናቸውን የትራንስፖርት ሚኒስቴር አስታወቀ።
🚧የ12ቱም ዋሻዎች አጠቃላይ ርዝመኔ ከ10 ኪ.ሜ በላይ ሲሆን ከሁሉም በጣም ረዥሙ በወልዲያና ወሎ አከባቢ የሚገኘዉ ዋሻ ደግሞ 2.03 ኪ.ሜ ርዝመት እንዳለው ገልጿል።
🚧የፕሮጀክቱ ወቅታዊ የአፈጻጸም ደረጃም 91.88% መድረሱን ነው ያስታወቀው።
#TunnelConstruction
@etconp
👉Prestressed Concrete
➡️A member where the concrete is prestressed by the longitudinal reinforcing steel (tendons) before being subject to external loading is described as prestressed concrete.
➡️The tendons are of high strength steel (1000 to 2000MPa) and the concrete, a also at high strength (50 to 90MPa).
🏷There are two methods of manufacturing:
1⃣Pretensioning the tendons before casting the concrete.
2⃣Post tensioning the tendons after casting the concrete.
🚧A pretensioned member is manufactured by, first, pretensioning the steel tendons over the length of the casting bed, and anchoring the steel to rigid anchor blocks at either end.
▶️The tendons are generally in the form of straight high tensile steel wires varying in diameter from 2 to 7 mm.
▶️The concrete is then cast around the tendons using shuttering to form the required shape of cross section of the member.
▶️Generally within 3 days, using accelerated curing techniques, the concrete has gained sufficient strength to be able to transfer the prestressing force to the concrete by releasing the anchorages.
▶️The shuttering is then removed and the casting bed can be used again.
🚧Post tensioned member is manufactured by first preparing the shuttering which supports sheaths or ducts.
▶️The ducts contain unstressed tendons in the form of straight or curved cables or bars, which are free to move in the direction of their length but are restrained to prevent movement transversely.
▶️The concrete is then poured into the mould and allowed to gain strength.
▶️There is less urgency in this methods of manufacture and the shuttering is removed after a few days.
▶️Later, when the concrete has matured the steel is stressed by jacking against the ends of the beam and anchored using wedges for cables, or nuts on threaded rods for bars.
▶️The method is suitable for members of different cross section and for members which are cast in place on the construction sites where road access us difficult.
🏷The advantages of prestressed concrete
➡️as compared with ordinary reinforced concrete are:
✅Reduced self weight of members
✅No cracks at service load and consequently better durability
✅Increased shear resistance
🏷The disadvantage of prestressed concrete as compared with ordinary reinforced concrete are:
❎Increased cost of materials and shuttering
❎Greater supervision required to ensure concrete strength and magnitude of prestressed forces.
❎Design calculations are more extensive.
#ConcreteTechnology
@etconp
➡️A member where the concrete is prestressed by the longitudinal reinforcing steel (tendons) before being subject to external loading is described as prestressed concrete.
➡️The tendons are of high strength steel (1000 to 2000MPa) and the concrete, a also at high strength (50 to 90MPa).
🏷There are two methods of manufacturing:
1⃣Pretensioning the tendons before casting the concrete.
2⃣Post tensioning the tendons after casting the concrete.
🚧A pretensioned member is manufactured by, first, pretensioning the steel tendons over the length of the casting bed, and anchoring the steel to rigid anchor blocks at either end.
▶️The tendons are generally in the form of straight high tensile steel wires varying in diameter from 2 to 7 mm.
▶️The concrete is then cast around the tendons using shuttering to form the required shape of cross section of the member.
▶️Generally within 3 days, using accelerated curing techniques, the concrete has gained sufficient strength to be able to transfer the prestressing force to the concrete by releasing the anchorages.
▶️The shuttering is then removed and the casting bed can be used again.
🚧Post tensioned member is manufactured by first preparing the shuttering which supports sheaths or ducts.
▶️The ducts contain unstressed tendons in the form of straight or curved cables or bars, which are free to move in the direction of their length but are restrained to prevent movement transversely.
▶️The concrete is then poured into the mould and allowed to gain strength.
▶️There is less urgency in this methods of manufacture and the shuttering is removed after a few days.
▶️Later, when the concrete has matured the steel is stressed by jacking against the ends of the beam and anchored using wedges for cables, or nuts on threaded rods for bars.
▶️The method is suitable for members of different cross section and for members which are cast in place on the construction sites where road access us difficult.
🏷The advantages of prestressed concrete
➡️as compared with ordinary reinforced concrete are:
✅Reduced self weight of members
✅No cracks at service load and consequently better durability
✅Increased shear resistance
🏷The disadvantage of prestressed concrete as compared with ordinary reinforced concrete are:
❎Increased cost of materials and shuttering
❎Greater supervision required to ensure concrete strength and magnitude of prestressed forces.
❎Design calculations are more extensive.
#ConcreteTechnology
@etconp
👉ውድ የቻናላችን ቤተሰቦች
🚧ይህ ቻናላቹ ለ እናንተ ተማሪዎች እና ባለሞያዎች ጠቃሚ የ ኮንስትራክሽን ኖቶች፣የተመረጡ መፅሃፍቶች እና ቪድዮዎች በማስተላለፍ እንዲሁም አርሰበርሳችን እየተማማርን እንዳለን ይታወቃል።
🚧ስለዚህ ተደራሽነቱን ከዚህ ይበልጥ ለማስፋት የ FACEBOOK ፔጅ ከፍተናል
🏷ከዚህ በታች ባለው ሊንክ ይቀላቀሉን👇
https://m.facebook.com/etconp/?ref=opera_speed_dial&__tn__=%2Cg
🚧ይህ ቻናላቹ ለ እናንተ ተማሪዎች እና ባለሞያዎች ጠቃሚ የ ኮንስትራክሽን ኖቶች፣የተመረጡ መፅሃፍቶች እና ቪድዮዎች በማስተላለፍ እንዲሁም አርሰበርሳችን እየተማማርን እንዳለን ይታወቃል።
🚧ስለዚህ ተደራሽነቱን ከዚህ ይበልጥ ለማስፋት የ FACEBOOK ፔጅ ከፍተናል
🏷ከዚህ በታች ባለው ሊንክ ይቀላቀሉን👇
https://m.facebook.com/etconp/?ref=opera_speed_dial&__tn__=%2Cg
Facebook
Log in to Facebook
Log in to Facebook to start sharing and connecting with your friends, family and people you know.
👉Some important facts
🚧1. Weight of one cement bag = 50 kg
🚧2. Minimum thickness of slab = 125 mm
🚧3. Minimum lintel thickness =15 cm
🚧4. Minimum diameter of bars used in slab= 8 mm
🚧5. Minimum diameter of bars Used in column = 12 mm
🚧6. Maximum diameter of bars in slab= 1/8x(thickness of slab )
🚧7. Maximum chair spacing = 1m
🚧8. Initial setting time of cement = 30 min
🚧9. Final setting time = 10 hrs ( 600 minutes )
🚧10. DPR = Detailed Project Report
🚧11. Unit weight
▶RCC = 25 KN/ m3
▶PCC = 24 KN/ m3
▶Steel = 7850 kg/ m3
🚧12. Minimum number of bars For square column or rectangular = 4 bars & For circular column = 6 bars
🚧13. Weight of steel = D2/162.2 kg/m.
🚧14. Slope of staircase = 25° -40° from horizontal.
🚧15. Size of concrete testing cube= (150x150x150)mm.
🚧16. Concrete cube is filled in 3 layers.
🚧17. Slump cone is filled in 4 layers.
🚧18. Cement should be used within three months of manufacturing.
🚧19. Minimum thickness of shear wall = 150 mm.
🚧20. Maximum thickness of shear wall = 400 mm.
🚧21. Universal testing machine is used for compression Test of concrete and tensile test of steel reinforcement.
🚧22. Minimum curing period of normal weather conditions is = 7 days
🚧23. Minimum curing period of dry and hot weather conditions is = 10 days
🚧24. Minimum percentage of steel in column = 0.8% of the cross section.
🚧25. Normal cover
➡️Footing = 50 mm
➡️Column = 25 mm
➡️Slab = 15 mm
➡️Beam = 25 mm
🚧26. Number Of Clear span stirrups in beam = Center to Center length /Total Length +1
🚧27. RCC is affected by water because of the corrosion of reinforcement bars.
🚧28. PCC is not affected by the water
🚧29. Maximum free fall of concrete = 1.5 m
🚧30. Air voids left in concrete is called as Honey Combing.
🚧31. The transverse reinforcement of column are called TIES.
🚧32. The transverse reinforcement in beams are called STIRRUPS.
🚧33. Cement ingredients are Burnt @ 1400°C temperature
🚧34. Short columns fail in Crushing.
🚧35. Long columns fail in Buckling.
🚧36. Intermediate columns can fail both in Buckling and Crushing.
🚧37. Strength of reinforcement shouldn't be less than 15 % of its designated strength.
🚧38. Compressive strength of bricks
▶️1st class bricks = 105 kg/cm2.
▶️2nd class bricks = 70 kg/cm2.
▶️3rd class bricks = 35 kg/cm2.
🚧39. PH value of water used concrete should not be less than 6.
🚧40. Riser = (150 - 200) mm.
🚧41. Tread = (250 - 300) mm.
🚧42. Height of parapet wall should be= 1m.
🚧43. TMT - Thermo mechanically treated bars.
🚧44. TMX - Thermax powered bars
🚧45. SDB - Super ductile bars.
#ConstructionNotes
@etconp
🚧1. Weight of one cement bag = 50 kg
🚧2. Minimum thickness of slab = 125 mm
🚧3. Minimum lintel thickness =15 cm
🚧4. Minimum diameter of bars used in slab= 8 mm
🚧5. Minimum diameter of bars Used in column = 12 mm
🚧6. Maximum diameter of bars in slab= 1/8x(thickness of slab )
🚧7. Maximum chair spacing = 1m
🚧8. Initial setting time of cement = 30 min
🚧9. Final setting time = 10 hrs ( 600 minutes )
🚧10. DPR = Detailed Project Report
🚧11. Unit weight
▶RCC = 25 KN/ m3
▶PCC = 24 KN/ m3
▶Steel = 7850 kg/ m3
🚧12. Minimum number of bars For square column or rectangular = 4 bars & For circular column = 6 bars
🚧13. Weight of steel = D2/162.2 kg/m.
🚧14. Slope of staircase = 25° -40° from horizontal.
🚧15. Size of concrete testing cube= (150x150x150)mm.
🚧16. Concrete cube is filled in 3 layers.
🚧17. Slump cone is filled in 4 layers.
🚧18. Cement should be used within three months of manufacturing.
🚧19. Minimum thickness of shear wall = 150 mm.
🚧20. Maximum thickness of shear wall = 400 mm.
🚧21. Universal testing machine is used for compression Test of concrete and tensile test of steel reinforcement.
🚧22. Minimum curing period of normal weather conditions is = 7 days
🚧23. Minimum curing period of dry and hot weather conditions is = 10 days
🚧24. Minimum percentage of steel in column = 0.8% of the cross section.
🚧25. Normal cover
➡️Footing = 50 mm
➡️Column = 25 mm
➡️Slab = 15 mm
➡️Beam = 25 mm
🚧26. Number Of Clear span stirrups in beam = Center to Center length /Total Length +1
🚧27. RCC is affected by water because of the corrosion of reinforcement bars.
🚧28. PCC is not affected by the water
🚧29. Maximum free fall of concrete = 1.5 m
🚧30. Air voids left in concrete is called as Honey Combing.
🚧31. The transverse reinforcement of column are called TIES.
🚧32. The transverse reinforcement in beams are called STIRRUPS.
🚧33. Cement ingredients are Burnt @ 1400°C temperature
🚧34. Short columns fail in Crushing.
🚧35. Long columns fail in Buckling.
🚧36. Intermediate columns can fail both in Buckling and Crushing.
🚧37. Strength of reinforcement shouldn't be less than 15 % of its designated strength.
🚧38. Compressive strength of bricks
▶️1st class bricks = 105 kg/cm2.
▶️2nd class bricks = 70 kg/cm2.
▶️3rd class bricks = 35 kg/cm2.
🚧39. PH value of water used concrete should not be less than 6.
🚧40. Riser = (150 - 200) mm.
🚧41. Tread = (250 - 300) mm.
🚧42. Height of parapet wall should be= 1m.
🚧43. TMT - Thermo mechanically treated bars.
🚧44. TMX - Thermax powered bars
🚧45. SDB - Super ductile bars.
#ConstructionNotes
@etconp
👍3
👉ለኢትዮጵያ ኮንስትራክሽን ሥራ ተቋራጮች ማሕበር አባላት በሙሉ
➡️የኢትዮጵያ ኮንስትራክሽን ሥራ ተቋራጮች ማሕበር ዓመታዊ ጠቅላላ ጉባዔውን ህዳር 17 ቀን 2013 ዓ.ም ከጠዋቱ 2፡00 ሰዓት ጀምሮ በኢንተር ኮንቲኔንታል ሆቴል የመሰብሳቢያ አዳራሽ ያካሂዳል፡፡
🚧በዚህ ጠቅላላ ጉባዔ ላይም አሁን ያለው የዳይሬክተሮች ቦርድ የሥራ ጊዜውን የሚያልቅ በመሆኑ የዳይሬክተሮች ቦርድ ምርጫ የሚካሄድበት ይሆናል፡፡
🚧ስለሆነም እርስዎም በዚሁ ጉባዔ ላይ እንዲገኙ የማሕበራችን የዳይሬክተሮች ቦርድ የአክብሮት ጥሪውን ያስተላልፋል፡፡
🚧የእርስዎ በዚህ ጠቅላላ ጉባዔ ላይ መሳተፍ አሁን በ ኮንስትራክሽን ኢንዱስትሪው ተዋንያን ላይ የተጋረጠውን ተግዳሮት ለመቋቋም የሚያስችል የአመራር ቡድን ለመፍጠር ስለሚያግዝ በጉባዔው ላይ መሳተፍዎ ከመሳተፍም በላይ እንደሆነ እንዲገነዘቡት በዚህ አጋጣሚ አበክረን ለማሳሰብ እንወዳለን፡፡
📩የኢትዮጵያ ኮንስትራክሽን ሥራ ተቋራጮች ማሕበር የዳይሬክተሮች ቦርድ
@etconp
➡️የኢትዮጵያ ኮንስትራክሽን ሥራ ተቋራጮች ማሕበር ዓመታዊ ጠቅላላ ጉባዔውን ህዳር 17 ቀን 2013 ዓ.ም ከጠዋቱ 2፡00 ሰዓት ጀምሮ በኢንተር ኮንቲኔንታል ሆቴል የመሰብሳቢያ አዳራሽ ያካሂዳል፡፡
🚧በዚህ ጠቅላላ ጉባዔ ላይም አሁን ያለው የዳይሬክተሮች ቦርድ የሥራ ጊዜውን የሚያልቅ በመሆኑ የዳይሬክተሮች ቦርድ ምርጫ የሚካሄድበት ይሆናል፡፡
🚧ስለሆነም እርስዎም በዚሁ ጉባዔ ላይ እንዲገኙ የማሕበራችን የዳይሬክተሮች ቦርድ የአክብሮት ጥሪውን ያስተላልፋል፡፡
🚧የእርስዎ በዚህ ጠቅላላ ጉባዔ ላይ መሳተፍ አሁን በ ኮንስትራክሽን ኢንዱስትሪው ተዋንያን ላይ የተጋረጠውን ተግዳሮት ለመቋቋም የሚያስችል የአመራር ቡድን ለመፍጠር ስለሚያግዝ በጉባዔው ላይ መሳተፍዎ ከመሳተፍም በላይ እንደሆነ እንዲገነዘቡት በዚህ አጋጣሚ አበክረን ለማሳሰብ እንወዳለን፡፡
📩የኢትዮጵያ ኮንስትራክሽን ሥራ ተቋራጮች ማሕበር የዳይሬክተሮች ቦርድ
@etconp
👉this picture is not from Europe, or Americas. Yes this is Africa! Bay Luanda Waterfront, Luanda, Angola.
➡️The Bay of Luanda gave rise to the urban and architectural waterfront of the capital of Angola.
🚧Overtime, it has been the most important public space of the city and the social and economic epicenter of the country.
➡️It has a new green layer with trees, bushes and grass , a set of squares connected with public space system of the city and pedestrian and bike paths.
🚧It has places for civic meetings and places to rest, areas for sport activities, new urban services, equipment and furniture.
🚧It enables greater social interaction and boosts recreational and cultural activity.
@etconp
➡️The Bay of Luanda gave rise to the urban and architectural waterfront of the capital of Angola.
🚧Overtime, it has been the most important public space of the city and the social and economic epicenter of the country.
➡️It has a new green layer with trees, bushes and grass , a set of squares connected with public space system of the city and pedestrian and bike paths.
🚧It has places for civic meetings and places to rest, areas for sport activities, new urban services, equipment and furniture.
🚧It enables greater social interaction and boosts recreational and cultural activity.
@etconp
👉Field Compaction
➡️Ordinary compaction in the field is done by rollers. Of the several types of rollers used, the most common are
1⃣Smooth wheel rollers (or smooth drum rollers)
2⃣Pneumatic rubber tired rollers
3⃣Sheeps foot rollers
4⃣Vibratory rollers
🏷Let us brief it 🔓
🚧1⃣Smooth wheel rollers that can also create vertical vibration during compaction. Smooth wheel rollers are suitable for proof rolling subgrades and for finishing the construction of fills with sandy or clayey soils.
▶️They provide 100% coverage under the wheels, and the contact pressure can be as high as 300 to 400 kN/m2. However, they do not produce a uniform unit weight of compaction when used on thick layers.
🚧2⃣Pneumatic rubber tired rollers are better in many respects than smooth wheel rollers.
▶️Pneumatic rollers, which may weigh as much as 2000kN, consist of a heavily loaded wagon with several rows of tires.
▶️The tires are closely spaced four to six in a row. The contact pressure under the tires may range up to 600 to 700 kN/m2, and they give about 70 to 80% coverage.
▶️Pneumatic rollers, which can be used for sandy and clayey soil compaction, produce a communication of pressure and kneading action.
🚧3⃣Sheepsfoot rollers consist basically of drums with large numbers of projections.
▶️The area of each of the projections may be 25 to 90 cm2.
▶️These rollers are most effective in compacting cohesive soils.
▶️The contact pressure under the projections may range from 1500 to 7500kN/m2.
▶️During compaction in the field, the initial passes compact the lower portion of a lift.
▶️During compaction in the field, the initial passes compact the lower portion of a lift. Later, the middle and top of the lift are compacted.
🚧4⃣Vibratory rollers are efficient in compacting granular soils.
▶️Vibrators can be attached to smooth wheel, pneumatic rubber tired or sheepsfoot rollers to send vibrations into the soil being compacted.
🏷In general, compaction in the field depends on several factors, such as
🔨The type of compactor
🔨Types of soil
🔨Moisture content
🔨Lift thickness
🔨Towing speed of the compactor and
🔨Number of passes the roller makes.
@etconp
➡️Ordinary compaction in the field is done by rollers. Of the several types of rollers used, the most common are
1⃣Smooth wheel rollers (or smooth drum rollers)
2⃣Pneumatic rubber tired rollers
3⃣Sheeps foot rollers
4⃣Vibratory rollers
🏷Let us brief it 🔓
🚧1⃣Smooth wheel rollers that can also create vertical vibration during compaction. Smooth wheel rollers are suitable for proof rolling subgrades and for finishing the construction of fills with sandy or clayey soils.
▶️They provide 100% coverage under the wheels, and the contact pressure can be as high as 300 to 400 kN/m2. However, they do not produce a uniform unit weight of compaction when used on thick layers.
🚧2⃣Pneumatic rubber tired rollers are better in many respects than smooth wheel rollers.
▶️Pneumatic rollers, which may weigh as much as 2000kN, consist of a heavily loaded wagon with several rows of tires.
▶️The tires are closely spaced four to six in a row. The contact pressure under the tires may range up to 600 to 700 kN/m2, and they give about 70 to 80% coverage.
▶️Pneumatic rollers, which can be used for sandy and clayey soil compaction, produce a communication of pressure and kneading action.
🚧3⃣Sheepsfoot rollers consist basically of drums with large numbers of projections.
▶️The area of each of the projections may be 25 to 90 cm2.
▶️These rollers are most effective in compacting cohesive soils.
▶️The contact pressure under the projections may range from 1500 to 7500kN/m2.
▶️During compaction in the field, the initial passes compact the lower portion of a lift.
▶️During compaction in the field, the initial passes compact the lower portion of a lift. Later, the middle and top of the lift are compacted.
🚧4⃣Vibratory rollers are efficient in compacting granular soils.
▶️Vibrators can be attached to smooth wheel, pneumatic rubber tired or sheepsfoot rollers to send vibrations into the soil being compacted.
🏷In general, compaction in the field depends on several factors, such as
🔨The type of compactor
🔨Types of soil
🔨Moisture content
🔨Lift thickness
🔨Towing speed of the compactor and
🔨Number of passes the roller makes.
@etconp
👉የፕሮጀክቶች መጓተት በ4 ቢሊየን ብር የተጀመሩ ፕሮጀክቶች እስከ 16 ቢሊየን ብር ወጪ እንዲጠይቁ እያደረገ ነው
➡️የፕሮጀክቶች አስተዳደራዊ አፈጻጸም በጣም ዝቅተኛ በመሆኑ ምክንያት በ4 ቢሊየን ብር የተጀመሩ ፕሮጀክቶች እስከ 16 ቢሊየን የሚጠጋ ብር እንደሚጨርሱ በህዝብ ተወካዮች ምክር ቤት የተፈጥሮ ሀብት፣ መስኖና ኢነርጂ ጉዳዮች ቋሚ ኮሚቴ አስታወቀ።
🚧ቋሚ ኮሚቴው የውሃ፣ መስኖና ኢነርጂ ሚኒስቴርንና የተጠሪ ተቋማቱን የ2013 በጀት ዓመት አንደኛ ሩብ ዓመት እቅድ አፈጻጸም ገምግሟል፡፡
🚧በግምገማው ሚኒስቴር መስሪያ ቤቱ ከተጠሪ ተቋማት ጋር ተቀናጅቶ በመስራትና ቋሚ ኮሚቴው የሚሰጣቸውን ግብረ መልሶች በግብአትነት ከመጠቀም እንዲሁም፤ ሊያጋጥሙ የሚችሉ ወቅታዊ አደጋዎችና ችግሮችን ታሳቢ አድርጎ ከማቀድ አኳያ ውስንነት እንዳለበት ቋሚ ኮሚቴው በዝርዝር አንስቷል፡፡
🚧ከአፈፃፀም ዝቅተኛ መሆን ባሻገር አብዛኛዎቹ መሰረተ ድንጋይ ከማስቀመጥ ያለፈ ተጠናቀው ህብረተሰቡን ተጠቃሚ ሲያደርጉ አለመታየቱን የቋሚ ኮሚቴው አባላት አስረድተው በቀጣይ ትኩረት ሊሰጠው እንደሚገባ አጽንኦት ሰጥተዋል፡፡
🚧በመሆኑም በ2013 በጀት ዓመት ችግሩ ታሳቢ ተደርጎ መፍትሄ ሊቀመጥለት እንደሚገባ ቋሚ ኮሚቴው መግለፁን ከምክር ቤቱ ያገኘነው መረጃ ያመለክታል፡፡
Via FBC
@etconp
➡️የፕሮጀክቶች አስተዳደራዊ አፈጻጸም በጣም ዝቅተኛ በመሆኑ ምክንያት በ4 ቢሊየን ብር የተጀመሩ ፕሮጀክቶች እስከ 16 ቢሊየን የሚጠጋ ብር እንደሚጨርሱ በህዝብ ተወካዮች ምክር ቤት የተፈጥሮ ሀብት፣ መስኖና ኢነርጂ ጉዳዮች ቋሚ ኮሚቴ አስታወቀ።
🚧ቋሚ ኮሚቴው የውሃ፣ መስኖና ኢነርጂ ሚኒስቴርንና የተጠሪ ተቋማቱን የ2013 በጀት ዓመት አንደኛ ሩብ ዓመት እቅድ አፈጻጸም ገምግሟል፡፡
🚧በግምገማው ሚኒስቴር መስሪያ ቤቱ ከተጠሪ ተቋማት ጋር ተቀናጅቶ በመስራትና ቋሚ ኮሚቴው የሚሰጣቸውን ግብረ መልሶች በግብአትነት ከመጠቀም እንዲሁም፤ ሊያጋጥሙ የሚችሉ ወቅታዊ አደጋዎችና ችግሮችን ታሳቢ አድርጎ ከማቀድ አኳያ ውስንነት እንዳለበት ቋሚ ኮሚቴው በዝርዝር አንስቷል፡፡
🚧ከአፈፃፀም ዝቅተኛ መሆን ባሻገር አብዛኛዎቹ መሰረተ ድንጋይ ከማስቀመጥ ያለፈ ተጠናቀው ህብረተሰቡን ተጠቃሚ ሲያደርጉ አለመታየቱን የቋሚ ኮሚቴው አባላት አስረድተው በቀጣይ ትኩረት ሊሰጠው እንደሚገባ አጽንኦት ሰጥተዋል፡፡
🚧በመሆኑም በ2013 በጀት ዓመት ችግሩ ታሳቢ ተደርጎ መፍትሄ ሊቀመጥለት እንደሚገባ ቋሚ ኮሚቴው መግለፁን ከምክር ቤቱ ያገኘነው መረጃ ያመለክታል፡፡
Via FBC