Construction of Box Girder Bridge
If made of concrete, box girder bridges may be cast in place using falsework supports, removed after completion, or in sections if a segmental bridge. Box girders may also be prefabricated in a fabrication yard, then transported and emplaced using cranes. For steel box girders, the girders are normally fabricated off-site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast-in-place using temporary falsework supported by the steel girder.
@etconp
If made of concrete, box girder bridges may be cast in place using falsework supports, removed after completion, or in sections if a segmental bridge. Box girders may also be prefabricated in a fabrication yard, then transported and emplaced using cranes. For steel box girders, the girders are normally fabricated off-site and lifted into place by crane, with sections connected by bolting or welding. If a composite concrete bridge deck is used, it is often cast-in-place using temporary falsework supported by the steel girder.
@etconp
Applications of box girder bridge
1- It is used for modern elevated structures of light rail transport.
2- Box girders are used for the construction of a cable-supported bridge, curved bridge, and footbridges.
3- It is rarely used in buildings, but they may be used in special circumstances, such as when loads are carried eccentrically to the beam axis.
@etconp
1- It is used for modern elevated structures of light rail transport.
2- Box girders are used for the construction of a cable-supported bridge, curved bridge, and footbridges.
3- It is rarely used in buildings, but they may be used in special circumstances, such as when loads are carried eccentrically to the beam axis.
@etconp
Thinking about building a house?
We can provide all the attractive designs. May the house built with your hard earned money be beautiful and safe. Ensuring proper use of land, our main goal is to build attractive and safe homes by managing green and natural ventilation. Every man has a dream to have a very attractive and loving home.
What work have you started by designing correctly? The first condition for every home's construction is to get design work done with experienced architecture and engineering institutions. Design is the first step to a homework. This is where the decision is basically taken how the house will be, how much budget and how much work will be done.
The first thing to do before designing is to visit your land. Designing without seeing the land is like throwing dirt in the dark with your eyes closed. You can or may not if you need it. But the right design establishment will visit your land first and take pictures and video. If necessary, you will do the maintenance or you will get the survey done by a surveying company. And then the design work begins.
Design is basically what we explain to the collection of many designs. These designs are:
1) Architectural Design
Architectural design is the first step of building design. This will be an architect. Especially in highrise and duplex design. First there will be briefing on what design the homeowner wants and what the design wants then start the architect design work. Initially a design will change on top after showing it and after some cuts the design will be finalized for the next job. Remember engineers never work as architects. In many local areas, the engineer himself designs the architectural to explain something to the client. Which is completely wrong and an incomplete job.
2) After 2D Design Architectural Design will go to 2 D Visualizer. Sometimes the architects design by themselves. But when visualizer works, the beauty of the work maintains. visualizer's main job is to bring a beautiful home shape. Often visualizer does some extra work on design with the permission of the architect that later adjusts the architect in the design.
3) Structural Design
Structural Designer's job is to design details of columns, beams and slabs and design foundation details..etc. To do this, you must take the help of the Soil Test Report. No structural design is acceptable without the soil Test Report.
4) Electrical Design The next step is to design electrical based on this design. Electrical design is important because,
Often it is seen that beam columns are cut for electrical wiring after building is built. Which destroys the long-time stability of the building and destroys the stability. So every point will have details like Lights, Fans, Switching Point, AC Point, Adjust Fans, TV Lines, Internet and PABX Line.
5) Plumbing Design
Plumbing design will work next. After making a house all the pipes come out naked that makes your beautiful home naked and a full sight. So need to design the plumbing. Plumbing designs will have geysers in each bathroom. Hot and cold piping all over the bathroom and all arrangements to decorate the bathrooms. There will also be a different design for kitchen lines and other piping.
6) Fire Safety Design It's basically needed for highrise buildings. Fire safety design work will basically be done by an experienced Engineer in fire. Often it is seen that this design is not given any importance that is later responsible for all the horrific accidents in the building.
@etconp
.......Continued
We can provide all the attractive designs. May the house built with your hard earned money be beautiful and safe. Ensuring proper use of land, our main goal is to build attractive and safe homes by managing green and natural ventilation. Every man has a dream to have a very attractive and loving home.
What work have you started by designing correctly? The first condition for every home's construction is to get design work done with experienced architecture and engineering institutions. Design is the first step to a homework. This is where the decision is basically taken how the house will be, how much budget and how much work will be done.
The first thing to do before designing is to visit your land. Designing without seeing the land is like throwing dirt in the dark with your eyes closed. You can or may not if you need it. But the right design establishment will visit your land first and take pictures and video. If necessary, you will do the maintenance or you will get the survey done by a surveying company. And then the design work begins.
Design is basically what we explain to the collection of many designs. These designs are:
1) Architectural Design
Architectural design is the first step of building design. This will be an architect. Especially in highrise and duplex design. First there will be briefing on what design the homeowner wants and what the design wants then start the architect design work. Initially a design will change on top after showing it and after some cuts the design will be finalized for the next job. Remember engineers never work as architects. In many local areas, the engineer himself designs the architectural to explain something to the client. Which is completely wrong and an incomplete job.
2) After 2D Design Architectural Design will go to 2 D Visualizer. Sometimes the architects design by themselves. But when visualizer works, the beauty of the work maintains. visualizer's main job is to bring a beautiful home shape. Often visualizer does some extra work on design with the permission of the architect that later adjusts the architect in the design.
3) Structural Design
Structural Designer's job is to design details of columns, beams and slabs and design foundation details..etc. To do this, you must take the help of the Soil Test Report. No structural design is acceptable without the soil Test Report.
4) Electrical Design The next step is to design electrical based on this design. Electrical design is important because,
Often it is seen that beam columns are cut for electrical wiring after building is built. Which destroys the long-time stability of the building and destroys the stability. So every point will have details like Lights, Fans, Switching Point, AC Point, Adjust Fans, TV Lines, Internet and PABX Line.
5) Plumbing Design
Plumbing design will work next. After making a house all the pipes come out naked that makes your beautiful home naked and a full sight. So need to design the plumbing. Plumbing designs will have geysers in each bathroom. Hot and cold piping all over the bathroom and all arrangements to decorate the bathrooms. There will also be a different design for kitchen lines and other piping.
6) Fire Safety Design It's basically needed for highrise buildings. Fire safety design work will basically be done by an experienced Engineer in fire. Often it is seen that this design is not given any importance that is later responsible for all the horrific accidents in the building.
@etconp
.......Continued
7) Estimating and Casting After all the whole project will go to the estimator. Every design company has an experienced estimator. Whose job is to do a proper estimate and costing of each project. We understand the meaning of estimate and costing that how much money is spent. Actually this is wrong. The estimate has two different parts. One is the quantity of the goods and the other is the current market rate calculated. The quantity of goods here is real. The real work is to calculate how much the goods of each item is on each floor. This calculation works for buying building goods and auditing. Almost corruption in building construction works which can be easily prevented in the primary way if correctly estimated and costing.
8) Approval Design
Approval Design is now an essential job.
@etconp
8) Approval Design
Approval Design is now an essential job.
@etconp
What is Diaphragm???
👉 Diaphragm is a structural element that transmits lateral loads to the vertical resisting elements of a structure (such as shear walls or frames).
👉 The diaphragm of a structure often does double duty as the floor system or roof system in a building, or the deck of a bridge, which simultaneously supports gravity loads.
👉 A structural element has to have a minmum of 80mm thickness to be called as diaphragm.
#structuralengineering
@etconp
👉 Diaphragm is a structural element that transmits lateral loads to the vertical resisting elements of a structure (such as shear walls or frames).
👉 The diaphragm of a structure often does double duty as the floor system or roof system in a building, or the deck of a bridge, which simultaneously supports gravity loads.
👉 A structural element has to have a minmum of 80mm thickness to be called as diaphragm.
#structuralengineering
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
❤1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
What idols the cause of Bending?
Anonymous Quiz
22%
Axial stress
39%
Flexural stress
10%
Shear stress
29%
All
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Vespertine tower
ይህ 510 ሜትር ስኩዌር ቦታ ላይ ያረፈ ህንፃ መገኛው California USA ነው።
ይህ ህንፃ አገልግሎቱ restaurant ነው።
California USA 🇺🇸
ውብ ምሽት ተመኘን
我們希望有一個美麗的夜晚
हमने एक खूबसूरत शाम की कामना की
We wished a beautiful evening
Мы пожелали прекрасного вечера
@ETCONp
ይህ 510 ሜትር ስኩዌር ቦታ ላይ ያረፈ ህንፃ መገኛው California USA ነው።
ይህ ህንፃ አገልግሎቱ restaurant ነው።
California USA 🇺🇸
ውብ ምሽት ተመኘን
我們希望有一個美麗的夜晚
हमने एक खूबसूरत शाम की कामना की
We wished a beautiful evening
Мы пожелали прекрасного вечера
@ETCONp
This media is not supported in your browser
VIEW IN TELEGRAM
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
rebar calculation @etconp.pdf
1.2 MB
Bar calculation
👉🏿It’s very import lecture note 📝 for students who are wondering for different types of bar calculations here you go (እጅግ በጣም አስፈላጊ የሆነ lecture notes 📝 የተለያዩ አይነት bar length calculation ይፈልጋሉ ይኸውሎት)
👉🏿 worked examples ( የተሰሩ ጥያቄዎች )
👉🏿 content(ይዘት):-
1.90° bend
2.180° bend
3. Overlap
4. for bent up bars
5. Lateral ties or vertical stirrups
6. Bent up and hook
ይህን ለጓደኞቾ ይጋግሩት
1.2MB PDF file
#share_it_with_your_friends
#rebar
#calculation
#worked_example
@etconp
👉🏿It’s very import lecture note 📝 for students who are wondering for different types of bar calculations here you go (እጅግ በጣም አስፈላጊ የሆነ lecture notes 📝 የተለያዩ አይነት bar length calculation ይፈልጋሉ ይኸውሎት)
👉🏿 worked examples ( የተሰሩ ጥያቄዎች )
👉🏿 content(ይዘት):-
1.90° bend
2.180° bend
3. Overlap
4. for bent up bars
5. Lateral ties or vertical stirrups
6. Bent up and hook
ይህን ለጓደኞቾ ይጋግሩት
1.2MB PDF file
#share_it_with_your_friends
#rebar
#calculation
#worked_example
@etconp
Usefulness of Modal Analysis
Modeshapes tell us how the structure tends to deform at the specific natural frequencies. It shows also which regions would experience high stresses if the deformed shape is similar to the modeshape. This is useful because we generally do not want the weld regions to be the region of high stress as it can affect the fatigue life of the structure. Further, the mode participation factor tell us which modes would be excited the most.
#Structural Engineering (Structural Dynamics)
@etconp
Modeshapes tell us how the structure tends to deform at the specific natural frequencies. It shows also which regions would experience high stresses if the deformed shape is similar to the modeshape. This is useful because we generally do not want the weld regions to be the region of high stress as it can affect the fatigue life of the structure. Further, the mode participation factor tell us which modes would be excited the most.
#Structural Engineering (Structural Dynamics)
@etconp
Forwarded from Ethio Construction Engineering (Yonathan)
Let us say you are a site enginner for a given site. your structural plan drawing instruct you to place a dia 20 reinforcement bar c/c 15cm, but dia 20 bar is not available in the market because of some reasons. what would you do if you can't get it in the market?
Discuss @cotmp
#siteengineers #civil #reinforcment
@etconp
Discuss @cotmp
#siteengineers #civil #reinforcment
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Civil engineer ሆነው ስራ ለመቀጠር ስትሄዱ እነዚህን ጥያቄዎች ጠብቁ!
If you’re civil engineer when you go to job interview expect this questions
#share_ it_with_your_friends
#civilengineer
#jobinterview
@etconp
Facebook:- https://www.facebook.com/115479406977628/posts/132531038605798/?d=n
Instagram:- https://instagram.com/etconp?igshid=uli38lyrkzx9
If you’re civil engineer when you go to job interview expect this questions
#share_ it_with_your_friends
#civilengineer
#jobinterview
@etconp
Facebook:- https://www.facebook.com/115479406977628/posts/132531038605798/?d=n
Instagram:- https://instagram.com/etconp?igshid=uli38lyrkzx9
Forwarded from Ethio Construction Engineering (Yonathan)
Track structures
Sleepers
Functions:
➡️hold the rails in correct gauge
➡️ act as an elastic medium between the ballast and rail to absorb the blows snd vibrations of moving loads.
➡️ they also add to the longtiudinal and lateral stability of the permanent track on the whole.
➡️ they also provide means to rectify track gemotry during the service life.
Rails
Functions:
➡️ Support the loads of the train and guides their wheel movement.
➡️ Provide a surface with smaller resistance.
➡️ bear the force of the wheels and spread it to sleeper.
➡️ used as track circuit in electrified railways and automatic block segments.
Ballast
Functions:
➡️ for distributing the load from the sleepers to the formations.
➡️For providing draniage.
➡️Gives longtiudinal and lateral stability to the track.
➡️ provide energy absorption for the track
➡️ facilitate the adjustment of track geomotry.
➡️ hold sleppers in place during passage of trains.
#RAILWAYENGINEERING #AALRT
@ETconp
Sleepers
Functions:
➡️hold the rails in correct gauge
➡️ act as an elastic medium between the ballast and rail to absorb the blows snd vibrations of moving loads.
➡️ they also add to the longtiudinal and lateral stability of the permanent track on the whole.
➡️ they also provide means to rectify track gemotry during the service life.
Rails
Functions:
➡️ Support the loads of the train and guides their wheel movement.
➡️ Provide a surface with smaller resistance.
➡️ bear the force of the wheels and spread it to sleeper.
➡️ used as track circuit in electrified railways and automatic block segments.
Ballast
Functions:
➡️ for distributing the load from the sleepers to the formations.
➡️For providing draniage.
➡️Gives longtiudinal and lateral stability to the track.
➡️ provide energy absorption for the track
➡️ facilitate the adjustment of track geomotry.
➡️ hold sleppers in place during passage of trains.
#RAILWAYENGINEERING #AALRT
@ETconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Media is too big
VIEW IN TELEGRAM
Time lapse :30- story building built in 15 days
How much can you accomplish in 360 hours?
T30 hotel constructed in 15 days.
The feat was achieve by using pre cast components, so on site is just assembly exercise.
15 ቀን ተገንብቶ የተጠናቀቀው ባለ 30 ወል ህንፃ T30 ሆቴል ይባላል መገኛው ቻይና ነው፣ ይህ ህንፃ በ15 ቀን የተጠናቀቀው የህንፃውን አካላት በፋብሪካ ውስጥ በማምረት ወደግንባታ ቦታ ወስዶ በመገጣጠም ነው።
የዚህ ህንፃ ገፅታዎች/ features of this building
✅Magnitude 9 earthquake resistant ✅ 5times more earthquake resistant than conventional buildings
✅ 5 times more energy efficient
✅ 20 times purer air
✅ 3 stage air filtration
Standardization was key for this to happen
Discussion point / መወያያ ነጥቦች
👉🏿ኢትዮጵያስ ምን ያህል ተቋጭ ድርጅቶች የprecast ልምድ አላቸው ?
አስተውሉ እምቅ ሀይል ( potential ) አይደለም ያልኩት ልምድ(experience)
👉🏿 ከዚህ ህንፃ ጋር ተያይዞ ስለ learning curve (LC) አስተያየት ብትሰጡበት
ፋይሉ 21.1MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል።
It’s more preferable if you use WiFi
© Source:- mrbeeblebroxx(youtube)
Presented by :- @etconp
Join us on telegram:- @etconp
How much can you accomplish in 360 hours?
T30 hotel constructed in 15 days.
The feat was achieve by using pre cast components, so on site is just assembly exercise.
15 ቀን ተገንብቶ የተጠናቀቀው ባለ 30 ወል ህንፃ T30 ሆቴል ይባላል መገኛው ቻይና ነው፣ ይህ ህንፃ በ15 ቀን የተጠናቀቀው የህንፃውን አካላት በፋብሪካ ውስጥ በማምረት ወደግንባታ ቦታ ወስዶ በመገጣጠም ነው።
የዚህ ህንፃ ገፅታዎች/ features of this building
✅Magnitude 9 earthquake resistant ✅ 5times more earthquake resistant than conventional buildings
✅ 5 times more energy efficient
✅ 20 times purer air
✅ 3 stage air filtration
Standardization was key for this to happen
Discussion point / መወያያ ነጥቦች
👉🏿ኢትዮጵያስ ምን ያህል ተቋጭ ድርጅቶች የprecast ልምድ አላቸው ?
አስተውሉ እምቅ ሀይል ( potential ) አይደለም ያልኩት ልምድ(experience)
👉🏿 ከዚህ ህንፃ ጋር ተያይዞ ስለ learning curve (LC) አስተያየት ብትሰጡበት
ፋይሉ 21.1MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል።
It’s more preferable if you use WiFi
© Source:- mrbeeblebroxx(youtube)
Presented by :- @etconp
Join us on telegram:- @etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Rebound hammer test
It’s a non- destructive (NDT test of concrete) and simple concrete test which is used to test the compressive strength of concrete without any damage. Moreover the best part of rebound hammer test is concrete can be tested in real time at site instead of going to the lab without any damage.
#concrete #hammertest
@etconp
It’s a non- destructive (NDT test of concrete) and simple concrete test which is used to test the compressive strength of concrete without any damage. Moreover the best part of rebound hammer test is concrete can be tested in real time at site instead of going to the lab without any damage.
#concrete #hammertest