Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
rebar calculation @etconp.pdf
1.2 MB
Bar calculation
👉🏿It’s very import lecture note 📝 for students who are wondering for different types of bar calculations here you go (እጅግ በጣም አስፈላጊ የሆነ lecture notes 📝 የተለያዩ አይነት bar length calculation ይፈልጋሉ ይኸውሎት)
👉🏿 worked examples ( የተሰሩ ጥያቄዎች )
👉🏿 content(ይዘት):-
1.90° bend
2.180° bend
3. Overlap
4. for bent up bars
5. Lateral ties or vertical stirrups
6. Bent up and hook
ይህን ለጓደኞቾ ይጋግሩት
1.2MB PDF file
#share_it_with_your_friends
#rebar
#calculation
#worked_example
@etconp
👉🏿It’s very import lecture note 📝 for students who are wondering for different types of bar calculations here you go (እጅግ በጣም አስፈላጊ የሆነ lecture notes 📝 የተለያዩ አይነት bar length calculation ይፈልጋሉ ይኸውሎት)
👉🏿 worked examples ( የተሰሩ ጥያቄዎች )
👉🏿 content(ይዘት):-
1.90° bend
2.180° bend
3. Overlap
4. for bent up bars
5. Lateral ties or vertical stirrups
6. Bent up and hook
ይህን ለጓደኞቾ ይጋግሩት
1.2MB PDF file
#share_it_with_your_friends
#rebar
#calculation
#worked_example
@etconp
Usefulness of Modal Analysis
Modeshapes tell us how the structure tends to deform at the specific natural frequencies. It shows also which regions would experience high stresses if the deformed shape is similar to the modeshape. This is useful because we generally do not want the weld regions to be the region of high stress as it can affect the fatigue life of the structure. Further, the mode participation factor tell us which modes would be excited the most.
#Structural Engineering (Structural Dynamics)
@etconp
Modeshapes tell us how the structure tends to deform at the specific natural frequencies. It shows also which regions would experience high stresses if the deformed shape is similar to the modeshape. This is useful because we generally do not want the weld regions to be the region of high stress as it can affect the fatigue life of the structure. Further, the mode participation factor tell us which modes would be excited the most.
#Structural Engineering (Structural Dynamics)
@etconp
Forwarded from Ethio Construction Engineering (Yonathan)
Let us say you are a site enginner for a given site. your structural plan drawing instruct you to place a dia 20 reinforcement bar c/c 15cm, but dia 20 bar is not available in the market because of some reasons. what would you do if you can't get it in the market?
Discuss @cotmp
#siteengineers #civil #reinforcment
@etconp
Discuss @cotmp
#siteengineers #civil #reinforcment
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Civil engineer ሆነው ስራ ለመቀጠር ስትሄዱ እነዚህን ጥያቄዎች ጠብቁ!
If you’re civil engineer when you go to job interview expect this questions
#share_ it_with_your_friends
#civilengineer
#jobinterview
@etconp
Facebook:- https://www.facebook.com/115479406977628/posts/132531038605798/?d=n
Instagram:- https://instagram.com/etconp?igshid=uli38lyrkzx9
If you’re civil engineer when you go to job interview expect this questions
#share_ it_with_your_friends
#civilengineer
#jobinterview
@etconp
Facebook:- https://www.facebook.com/115479406977628/posts/132531038605798/?d=n
Instagram:- https://instagram.com/etconp?igshid=uli38lyrkzx9
Forwarded from Ethio Construction Engineering (Yonathan)
Track structures
Sleepers
Functions:
➡️hold the rails in correct gauge
➡️ act as an elastic medium between the ballast and rail to absorb the blows snd vibrations of moving loads.
➡️ they also add to the longtiudinal and lateral stability of the permanent track on the whole.
➡️ they also provide means to rectify track gemotry during the service life.
Rails
Functions:
➡️ Support the loads of the train and guides their wheel movement.
➡️ Provide a surface with smaller resistance.
➡️ bear the force of the wheels and spread it to sleeper.
➡️ used as track circuit in electrified railways and automatic block segments.
Ballast
Functions:
➡️ for distributing the load from the sleepers to the formations.
➡️For providing draniage.
➡️Gives longtiudinal and lateral stability to the track.
➡️ provide energy absorption for the track
➡️ facilitate the adjustment of track geomotry.
➡️ hold sleppers in place during passage of trains.
#RAILWAYENGINEERING #AALRT
@ETconp
Sleepers
Functions:
➡️hold the rails in correct gauge
➡️ act as an elastic medium between the ballast and rail to absorb the blows snd vibrations of moving loads.
➡️ they also add to the longtiudinal and lateral stability of the permanent track on the whole.
➡️ they also provide means to rectify track gemotry during the service life.
Rails
Functions:
➡️ Support the loads of the train and guides their wheel movement.
➡️ Provide a surface with smaller resistance.
➡️ bear the force of the wheels and spread it to sleeper.
➡️ used as track circuit in electrified railways and automatic block segments.
Ballast
Functions:
➡️ for distributing the load from the sleepers to the formations.
➡️For providing draniage.
➡️Gives longtiudinal and lateral stability to the track.
➡️ provide energy absorption for the track
➡️ facilitate the adjustment of track geomotry.
➡️ hold sleppers in place during passage of trains.
#RAILWAYENGINEERING #AALRT
@ETconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Media is too big
VIEW IN TELEGRAM
Time lapse :30- story building built in 15 days
How much can you accomplish in 360 hours?
T30 hotel constructed in 15 days.
The feat was achieve by using pre cast components, so on site is just assembly exercise.
15 ቀን ተገንብቶ የተጠናቀቀው ባለ 30 ወል ህንፃ T30 ሆቴል ይባላል መገኛው ቻይና ነው፣ ይህ ህንፃ በ15 ቀን የተጠናቀቀው የህንፃውን አካላት በፋብሪካ ውስጥ በማምረት ወደግንባታ ቦታ ወስዶ በመገጣጠም ነው።
የዚህ ህንፃ ገፅታዎች/ features of this building
✅Magnitude 9 earthquake resistant ✅ 5times more earthquake resistant than conventional buildings
✅ 5 times more energy efficient
✅ 20 times purer air
✅ 3 stage air filtration
Standardization was key for this to happen
Discussion point / መወያያ ነጥቦች
👉🏿ኢትዮጵያስ ምን ያህል ተቋጭ ድርጅቶች የprecast ልምድ አላቸው ?
አስተውሉ እምቅ ሀይል ( potential ) አይደለም ያልኩት ልምድ(experience)
👉🏿 ከዚህ ህንፃ ጋር ተያይዞ ስለ learning curve (LC) አስተያየት ብትሰጡበት
ፋይሉ 21.1MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል።
It’s more preferable if you use WiFi
© Source:- mrbeeblebroxx(youtube)
Presented by :- @etconp
Join us on telegram:- @etconp
How much can you accomplish in 360 hours?
T30 hotel constructed in 15 days.
The feat was achieve by using pre cast components, so on site is just assembly exercise.
15 ቀን ተገንብቶ የተጠናቀቀው ባለ 30 ወል ህንፃ T30 ሆቴል ይባላል መገኛው ቻይና ነው፣ ይህ ህንፃ በ15 ቀን የተጠናቀቀው የህንፃውን አካላት በፋብሪካ ውስጥ በማምረት ወደግንባታ ቦታ ወስዶ በመገጣጠም ነው።
የዚህ ህንፃ ገፅታዎች/ features of this building
✅Magnitude 9 earthquake resistant ✅ 5times more earthquake resistant than conventional buildings
✅ 5 times more energy efficient
✅ 20 times purer air
✅ 3 stage air filtration
Standardization was key for this to happen
Discussion point / መወያያ ነጥቦች
👉🏿ኢትዮጵያስ ምን ያህል ተቋጭ ድርጅቶች የprecast ልምድ አላቸው ?
አስተውሉ እምቅ ሀይል ( potential ) አይደለም ያልኩት ልምድ(experience)
👉🏿 ከዚህ ህንፃ ጋር ተያይዞ ስለ learning curve (LC) አስተያየት ብትሰጡበት
ፋይሉ 21.1MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል።
It’s more preferable if you use WiFi
© Source:- mrbeeblebroxx(youtube)
Presented by :- @etconp
Join us on telegram:- @etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Rebound hammer test
It’s a non- destructive (NDT test of concrete) and simple concrete test which is used to test the compressive strength of concrete without any damage. Moreover the best part of rebound hammer test is concrete can be tested in real time at site instead of going to the lab without any damage.
#concrete #hammertest
@etconp
It’s a non- destructive (NDT test of concrete) and simple concrete test which is used to test the compressive strength of concrete without any damage. Moreover the best part of rebound hammer test is concrete can be tested in real time at site instead of going to the lab without any damage.
#concrete #hammertest
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Design_of_Reinforced_Concrete @etconp.pdf
70.4 MB
Design of reinforced concrete structures
This book has two parts
Part I- THEORY
1. Analysis of composite sections by elastic theory
2. Singly reinforced beams
3. Doubly reinforced beams
4. Shear in beams
5. Bond
6. Reinforcement
7. T- beams
8. Axially loaded columns
9. Combined bending and direct stress
Part II- Design
10. Slab
11. Beam
12. Foundations
13. Retaining walls
14. Stair cases
And other hydraulic structures
የ ፋይሉ መጠን 70.4MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል
ለሁሉም civil engineer ሊኖር የሚገባ መፅሀፍ
1476 ገፆች አሉት
© S. RAMAMRUTHAM
@etconp
This book has two parts
Part I- THEORY
1. Analysis of composite sections by elastic theory
2. Singly reinforced beams
3. Doubly reinforced beams
4. Shear in beams
5. Bond
6. Reinforcement
7. T- beams
8. Axially loaded columns
9. Combined bending and direct stress
Part II- Design
10. Slab
11. Beam
12. Foundations
13. Retaining walls
14. Stair cases
And other hydraulic structures
የ ፋይሉ መጠን 70.4MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል
ለሁሉም civil engineer ሊኖር የሚገባ መፅሀፍ
1476 ገፆች አሉት
© S. RAMAMRUTHAM
@etconp
👍1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Corbels
Corbels are structural members commonly used to transfer vertical and horizontal forces from beam to walls or columns in precast structures and reinforced concrete structures.
A corbel is typically characterized by a shear span-to-depth ratio lower than unity and by complex flow of internal structure.
#corbels #precast
@etconp
Corbels are structural members commonly used to transfer vertical and horizontal forces from beam to walls or columns in precast structures and reinforced concrete structures.
A corbel is typically characterized by a shear span-to-depth ratio lower than unity and by complex flow of internal structure.
#corbels #precast
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
This media is not supported in your browser
VIEW IN TELEGRAM
Answer
➡️ ESCALATOR
Escalator
An escalator is one of vertical circulation and mechanical system of a building.
It helps for movement from one floor to another.
Most escalators in Adiss Ababa are not functioning it’s because the consumption of electricity is high.
Installation of an escalator is a bit difficult because it requires winch and tower crane to install and the constraints of enough space to install it in might make it almost impossible.
You can see how escalator works.
ብዙ ጊዜ አዲስአበባ ውስጥ ያሉ escalator’ዎች አገልግሎት አይሰጡም ይህም የሆነበት ምክንያት ብዙ የ ኤሌትሪክ ሀይል ስለሚጠቀም ነው።
Escalator ለመግጠም winch እና tower crane ስለሚያስፈልግ ጠባብ ቦታዎች ላይ ለመግጠም እጅግ ያዳግታል።
Escalator እንዴት እንደሚሰራ ተመልከቱ።
ፋይሉ 8.8MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል።
@etconp
➡️ ESCALATOR
Escalator
An escalator is one of vertical circulation and mechanical system of a building.
It helps for movement from one floor to another.
Most escalators in Adiss Ababa are not functioning it’s because the consumption of electricity is high.
Installation of an escalator is a bit difficult because it requires winch and tower crane to install and the constraints of enough space to install it in might make it almost impossible.
You can see how escalator works.
ብዙ ጊዜ አዲስአበባ ውስጥ ያሉ escalator’ዎች አገልግሎት አይሰጡም ይህም የሆነበት ምክንያት ብዙ የ ኤሌትሪክ ሀይል ስለሚጠቀም ነው።
Escalator ለመግጠም winch እና tower crane ስለሚያስፈልግ ጠባብ ቦታዎች ላይ ለመግጠም እጅግ ያዳግታል።
Escalator እንዴት እንደሚሰራ ተመልከቱ።
ፋይሉ 8.8MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል።
@etconp
Forwarded from Ethio Construction Engineering (Prakriti)
❌Piping failure of earthen dams❌
➡️Piping (also called internal erosion)of an earth dam takes place when water that seeps through the dam carries soil particles away from the embankment, filters, drains, foundation or abutments of the dam. If the seepage that discharges at the downstream side of the dam carries particles of soil, an elongated cavity or “pipe” may be eroded backward (working upstream) toward the reservoir through the embankment, foundation or abutment. When a backward-eroding pipe reaches the reservoir, a catastrophic breaching of the dam can occur.
➡️Internal erosion usually takes place in episodes of erosion and discharge of muddy water interspersed with periods of clear-water discharge or no discharge at all depending on head and flow. Internal erosion may be taking place even if there is no visible discharge of water or if the water that is discharging from the soil on the downstream side of a dam is not muddy.
Join us on telegram:- @etconp
Follow us on Instagram:- @etconp
➡️Piping (also called internal erosion)of an earth dam takes place when water that seeps through the dam carries soil particles away from the embankment, filters, drains, foundation or abutments of the dam. If the seepage that discharges at the downstream side of the dam carries particles of soil, an elongated cavity or “pipe” may be eroded backward (working upstream) toward the reservoir through the embankment, foundation or abutment. When a backward-eroding pipe reaches the reservoir, a catastrophic breaching of the dam can occur.
➡️Internal erosion usually takes place in episodes of erosion and discharge of muddy water interspersed with periods of clear-water discharge or no discharge at all depending on head and flow. Internal erosion may be taking place even if there is no visible discharge of water or if the water that is discharging from the soil on the downstream side of a dam is not muddy.
Join us on telegram:- @etconp
Follow us on Instagram:- @etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
This media is not supported in your browser
VIEW IN TELEGRAM
Timber Construction process
ይህ የምትመለከቱት የTimber Construction ዘዴ Timber platform frame ይባላል ማለትም load bearing structure ነው ማለት ነው።
In this video the Timber Construction method is platform frame
Steps
1. Excavation
2. Foundation ( in the video they used pile foundation)
3. Grade beam (it’s like pile cap)
4. The grade beam coated asphalt in order to protect the timber from moisture and water droplets)
5. Lay DPC
6. Fix the sole plate
7. Angle bracket (L- shape) to give extra strength to the sole plate and to firm the sole plate
8. Fitting modular panel ( most of the time panels are 60cm wide its standard)
9. Head binder is nailed on the top of the panel to bind the joist with the panel the. We will repeat the same thing
Timber Construction እጅግ በጣም standardization ሚጠይቅ የግንባታ ዘይቤ ነው።
በቪዲዮ ላይ ምትመለከቱት diameter’ኣቸው አነስ ያሉ pile’ዎች ናቸው።
በሀገራችን auger boring machine በቀላሉ ስለማናገኝ pile foundation የመስራት ሁኔታ ትንሽ ያዳግታል።
ፋይሉ 8.8MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል
#timber #platformframe
Join us on :- @etconp
ይህ የምትመለከቱት የTimber Construction ዘዴ Timber platform frame ይባላል ማለትም load bearing structure ነው ማለት ነው።
In this video the Timber Construction method is platform frame
Steps
1. Excavation
2. Foundation ( in the video they used pile foundation)
3. Grade beam (it’s like pile cap)
4. The grade beam coated asphalt in order to protect the timber from moisture and water droplets)
5. Lay DPC
6. Fix the sole plate
7. Angle bracket (L- shape) to give extra strength to the sole plate and to firm the sole plate
8. Fitting modular panel ( most of the time panels are 60cm wide its standard)
9. Head binder is nailed on the top of the panel to bind the joist with the panel the. We will repeat the same thing
Timber Construction እጅግ በጣም standardization ሚጠይቅ የግንባታ ዘይቤ ነው።
በቪዲዮ ላይ ምትመለከቱት diameter’ኣቸው አነስ ያሉ pile’ዎች ናቸው።
በሀገራችን auger boring machine በቀላሉ ስለማናገኝ pile foundation የመስራት ሁኔታ ትንሽ ያዳግታል።
ፋይሉ 8.8MB ስለሆነ WiFi ቢጠቀሙ ይመረጣል
#timber #platformframe
Join us on :- @etconp
Forwarded from Ethio Construction Engineering (Yonathan)
@etconp-Pile-Foundation-Design - SD.pdf
4.7 MB
FOUNDATION ENGINEERING
በጠየቃችሁን መሰረት pile foundation design ይዘንላችሁ መተናል
Classification of piles
1. End bearing piles
2. Friction piles
3. Combination of friction and cohesion piles
ይህን Pile foundation design ለጓደኞቻችው በማጋራት አጋርነታችሁን አሳዩን 🙏
#pilefoundation #foundationengieering
@etconp
በጠየቃችሁን መሰረት pile foundation design ይዘንላችሁ መተናል
Classification of piles
1. End bearing piles
2. Friction piles
3. Combination of friction and cohesion piles
ይህን Pile foundation design ለጓደኞቻችው በማጋራት አጋርነታችሁን አሳዩን 🙏
#pilefoundation #foundationengieering
@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Estimate that he quantity of plaster!
Given:- 3 meter height
5 meter width
0.015 meter thickness
መልሱን በኋላ ሰርተን <600KB በpdf file ስለምንለቀው አሁን ተሳተፉ
#estimation #plastering
@etconp
Given:- 3 meter height
5 meter width
0.015 meter thickness
መልሱን በኋላ ሰርተን <600KB በpdf file ስለምንለቀው አሁን ተሳተፉ
#estimation #plastering
@etconp
Ethio Construction Engineering
Estimate that he quantity of plaster! Given:- 3 meter height 5 meter width 0.015 meter thickness መልሱን በኋላ ሰርተን <600KB በpdf file ስለምንለቀው አሁን ተሳተፉ #estimation #plastering @etconp
Telegram
Ethiopian Construction Work Professionals - ETCONp
Solution for this question 👆🏾👆🏾
✅Volume of cement
✅ bag of cement
✅ mass of cement
✅volume of sand
@etconp
✅Volume of cement
✅ bag of cement
✅ mass of cement
✅volume of sand
@etconp
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉የ ህንፃ ስራ ሂደቶች @ETCONp
.
1.Foundation
*ፋውንዴሽን የሕንፃው በጣም አስፈላጊ ክፍል ነው፡፡
*የግንባታ እንቅስቃሴ የሚጀምረው ለመሠረት መሬትን በመቆፈር እና ከዚያ በመገንባት ነው፡፡
*እሱ የሕንፃው የታችኛው ክፍል ነው።
.
2. plinth:- በመሬት ደረጃ እና በመሬቱ ወለል መካከል ያለው የግድግዳ ክፍል ነው፡፡
*plinth ብዙውን ጊዜ የድንጋይ ንጣፍ ስራ ነው።
*መሠረቱም በእንጨት ላይ ከሆነ ፣ከወለል ወለል በላይ ግድግዳውን ለመደገፍ አንድ ክፈፍ ጣውላ ይጣላል።
*በፕሌይ አናት ላይ እርጥብ ማረጋገጫ ኮርስ ይሰጣል፡፡
*እሱ ብዙውን ጊዜ ከ 75 ሚ.ሜ ውፍረት ያለው የኮንክሪት ኮርስ ነው ፡፡
.
3. Walls and columns
*የ wall እና የcolumn ተግባር የመሠረቱን ጭነት ወደ ታች ለማስተላለፍ የህንፃውን ጭነት በአቀባዊ ወደ ታች ማስተላለፍ ነው ፡፡
.
4. Sill እና lintels የመስኮት ክፈፍ በቀጥታ ከማሽኑ ላይ መቀመጥ የለበትም፡፡
*በመሬቱ ላይ ከ 50 ሚሊ ሜትር እስከ 75 ሚ.ሜ ውፍረት ያለው ተጨባጭ ኮንክሪት ኮርስ ይቀመጣል፡፡
*ይህ ኮርስ እንደ ሰል ይባላል Lintels R.C.C. ሊሆኑ ይችላሉ።
*የበሩ ወይም የመስኮት ክፈፉ ከልክ በላይ ጫና ያልተፈጠረ መሆኑን ለማየት በበሩ እና በመስኮቱ ክፍት ቦታዎች ላይ ጭኖቹን በማስተላለፍ ላይ የተቀረጹ የድንጋይ ንጣፎች ወይም የድንጋይ ንጣፎች።
*ለምሳሌ የአንድ ቤት ርዝመት 3ሜ ሊሆን ይችላል፡የአንድ በር ቁመት 2.10 ከሆነ 90 cm ከበሩ ወደላይ lintel beam ተጠቅመን wall መሥራት እንችላለን፡፡
.
5. Door & windows
-የበር ተግባር በህንፃው ውስጥ የተለያዩ ክፍሎች እንዲኖሩ እና አስፈላጊ ሆኖ ሲገኝ ተደራሽነትን መካድ ነው፡፡
*በሮች ቁጥር በተቻለ መጠን ዝቅተኛ መሆን አለበት ፡፡ የበሩን ስፋት እንደ በር ሊጠቀም የሚችል ትልቁን ነገር እንቅስቃሴ የሚያመቻች መሆን አለበት ፡፡
.
6. Floors -ወለሎች የሕንፃ አስፈላጊ አካል ናቸው፡፡
*ለሰራተኞቹ የሥራ / ጠቃሚ አካባቢ ይሰጣሉ የመሬቱ ወለል የተገነባው by filling brick bats, waste stones, gravel and well compacted እና በጥሩ ሁኔታ ከላይኛው ከ 100 ሚ.ሜ የማይበልጥ የአሸዋ ንብርብር በመሙላት ነው፡፡
*የ 1: 4: 8 ፣ 100 ሚሜ ውፍረት ያለው ተጨባጭ ኮንክሪት እንደ ምሣሌ ማየት ይቻላል፡፡
*በዚህ ላይ እርጥብ ማረጋገጫ ኮርስ ሊሰጥ ይችላል ፡፡
.
7.Roof
*ከፍታ ለህንፃው የላይኛው ሽፋን የሚሰጥ የህንፃው ከፍተኛ ክፍል ነው፡፡
*እንደ ጣሪያ እና እንደ ኤ.ሲ.ኤል. ወረቀት ያሉ ተንሸራታች ጣራ በቀላሉ የሚፈስ ሽፋን ይሰጣል። ነገር ግን ለተጨማሪ ወለል ግንባታ ዝግጅት አይሰጡም፡፡
*የታጠፈ ጣሪያ ጥሩ የሙቀት መከላከያ ይሰጣል፡፡
*ጠፍጣፋ ጣሪያዎች ለተጨማሪ ወለሎች አቅርቦት ይሰጣሉ ፡፡*terrace የነዋሪዎችን ምቾት ይጨምራል።
*የውሃ ታንኮች በቀላሉ ጠፍጣፋ ጣሪያዎቸ ላይ በቀላሉ ሊቀመጡ ይችላሉ ፡፡
8. step,stair,lift
-ደረጃዎች ከመሬት ወለል እስከ መሬት ወለል ደረጃ ምቹ ተደራሽነት ይሰጣሉ ፡፡ በውጭው ግድግዳ ላይ በሮች ያስፈልጋሉ ፡፡ ከ 250 እስከ 300 ሚ.ሜ ስፋት እና ከ 150 ሚ.ሜ ከፍታ ለደረጃዎች በጣም ጥሩ መጠን ነው ፡፡
*በምንም ዓይነት ሁኔታ ሁለት ተከታታይ ደረጃዎች መጠኑ የተለየ አይሆንም፡፡
*የሚፈለገው የእርምጃዎች ብዛት በመሬቱ እና በመሬቱ ደረጃዎች ልዩነት ላይ የተመሠረተ ነው።
.
9.Finishing
-የታችኛው ንጣፍ (ጣሪያ) ፣ ግድግዳዎች እና የወለል ንጣፍ ከፕላስተር ጋር ለስላሳ ማጠናቀሪያ ያስፈልጋቸዋል፡፡
.
10. የግንባታ አገልግሎቶች የውሃ አቅርቦት ፣ የአካባቢ ጽዳትና የግል ንፅህና ሥራዎች ፣ የኤሌክትሪክ አቅርቦት ሥራ እና የመጠጥ ሰሌዳዎች ግንባታ እና የማሳያ ጉዳዮች ዋና የግንባታ አገልግሎቶች ናቸው፡፡
.
ይቀጥላል..
.
#BuildingConstructionSteps
.
የተቀሩት ከታች ባለው ሊንክ ወይም Discussion ላይ ፃፉልን👇
.
t.me/COTMp
.
🅾በኢትዮጵያ ለመጀመሪያ ጊዜ
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
.
1.Foundation
*ፋውንዴሽን የሕንፃው በጣም አስፈላጊ ክፍል ነው፡፡
*የግንባታ እንቅስቃሴ የሚጀምረው ለመሠረት መሬትን በመቆፈር እና ከዚያ በመገንባት ነው፡፡
*እሱ የሕንፃው የታችኛው ክፍል ነው።
.
2. plinth:- በመሬት ደረጃ እና በመሬቱ ወለል መካከል ያለው የግድግዳ ክፍል ነው፡፡
*plinth ብዙውን ጊዜ የድንጋይ ንጣፍ ስራ ነው።
*መሠረቱም በእንጨት ላይ ከሆነ ፣ከወለል ወለል በላይ ግድግዳውን ለመደገፍ አንድ ክፈፍ ጣውላ ይጣላል።
*በፕሌይ አናት ላይ እርጥብ ማረጋገጫ ኮርስ ይሰጣል፡፡
*እሱ ብዙውን ጊዜ ከ 75 ሚ.ሜ ውፍረት ያለው የኮንክሪት ኮርስ ነው ፡፡
.
3. Walls and columns
*የ wall እና የcolumn ተግባር የመሠረቱን ጭነት ወደ ታች ለማስተላለፍ የህንፃውን ጭነት በአቀባዊ ወደ ታች ማስተላለፍ ነው ፡፡
.
4. Sill እና lintels የመስኮት ክፈፍ በቀጥታ ከማሽኑ ላይ መቀመጥ የለበትም፡፡
*በመሬቱ ላይ ከ 50 ሚሊ ሜትር እስከ 75 ሚ.ሜ ውፍረት ያለው ተጨባጭ ኮንክሪት ኮርስ ይቀመጣል፡፡
*ይህ ኮርስ እንደ ሰል ይባላል Lintels R.C.C. ሊሆኑ ይችላሉ።
*የበሩ ወይም የመስኮት ክፈፉ ከልክ በላይ ጫና ያልተፈጠረ መሆኑን ለማየት በበሩ እና በመስኮቱ ክፍት ቦታዎች ላይ ጭኖቹን በማስተላለፍ ላይ የተቀረጹ የድንጋይ ንጣፎች ወይም የድንጋይ ንጣፎች።
*ለምሳሌ የአንድ ቤት ርዝመት 3ሜ ሊሆን ይችላል፡የአንድ በር ቁመት 2.10 ከሆነ 90 cm ከበሩ ወደላይ lintel beam ተጠቅመን wall መሥራት እንችላለን፡፡
.
5. Door & windows
-የበር ተግባር በህንፃው ውስጥ የተለያዩ ክፍሎች እንዲኖሩ እና አስፈላጊ ሆኖ ሲገኝ ተደራሽነትን መካድ ነው፡፡
*በሮች ቁጥር በተቻለ መጠን ዝቅተኛ መሆን አለበት ፡፡ የበሩን ስፋት እንደ በር ሊጠቀም የሚችል ትልቁን ነገር እንቅስቃሴ የሚያመቻች መሆን አለበት ፡፡
.
6. Floors -ወለሎች የሕንፃ አስፈላጊ አካል ናቸው፡፡
*ለሰራተኞቹ የሥራ / ጠቃሚ አካባቢ ይሰጣሉ የመሬቱ ወለል የተገነባው by filling brick bats, waste stones, gravel and well compacted እና በጥሩ ሁኔታ ከላይኛው ከ 100 ሚ.ሜ የማይበልጥ የአሸዋ ንብርብር በመሙላት ነው፡፡
*የ 1: 4: 8 ፣ 100 ሚሜ ውፍረት ያለው ተጨባጭ ኮንክሪት እንደ ምሣሌ ማየት ይቻላል፡፡
*በዚህ ላይ እርጥብ ማረጋገጫ ኮርስ ሊሰጥ ይችላል ፡፡
.
7.Roof
*ከፍታ ለህንፃው የላይኛው ሽፋን የሚሰጥ የህንፃው ከፍተኛ ክፍል ነው፡፡
*እንደ ጣሪያ እና እንደ ኤ.ሲ.ኤል. ወረቀት ያሉ ተንሸራታች ጣራ በቀላሉ የሚፈስ ሽፋን ይሰጣል። ነገር ግን ለተጨማሪ ወለል ግንባታ ዝግጅት አይሰጡም፡፡
*የታጠፈ ጣሪያ ጥሩ የሙቀት መከላከያ ይሰጣል፡፡
*ጠፍጣፋ ጣሪያዎች ለተጨማሪ ወለሎች አቅርቦት ይሰጣሉ ፡፡*terrace የነዋሪዎችን ምቾት ይጨምራል።
*የውሃ ታንኮች በቀላሉ ጠፍጣፋ ጣሪያዎቸ ላይ በቀላሉ ሊቀመጡ ይችላሉ ፡፡
8. step,stair,lift
-ደረጃዎች ከመሬት ወለል እስከ መሬት ወለል ደረጃ ምቹ ተደራሽነት ይሰጣሉ ፡፡ በውጭው ግድግዳ ላይ በሮች ያስፈልጋሉ ፡፡ ከ 250 እስከ 300 ሚ.ሜ ስፋት እና ከ 150 ሚ.ሜ ከፍታ ለደረጃዎች በጣም ጥሩ መጠን ነው ፡፡
*በምንም ዓይነት ሁኔታ ሁለት ተከታታይ ደረጃዎች መጠኑ የተለየ አይሆንም፡፡
*የሚፈለገው የእርምጃዎች ብዛት በመሬቱ እና በመሬቱ ደረጃዎች ልዩነት ላይ የተመሠረተ ነው።
.
9.Finishing
-የታችኛው ንጣፍ (ጣሪያ) ፣ ግድግዳዎች እና የወለል ንጣፍ ከፕላስተር ጋር ለስላሳ ማጠናቀሪያ ያስፈልጋቸዋል፡፡
.
10. የግንባታ አገልግሎቶች የውሃ አቅርቦት ፣ የአካባቢ ጽዳትና የግል ንፅህና ሥራዎች ፣ የኤሌክትሪክ አቅርቦት ሥራ እና የመጠጥ ሰሌዳዎች ግንባታ እና የማሳያ ጉዳዮች ዋና የግንባታ አገልግሎቶች ናቸው፡፡
.
ይቀጥላል..
.
#BuildingConstructionSteps
.
የተቀሩት ከታች ባለው ሊንክ ወይም Discussion ላይ ፃፉልን👇
.
t.me/COTMp
.
🅾በኢትዮጵያ ለመጀመሪያ ጊዜ
🅾አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Telegram
ETCONp Discussion
📩ለማነኛውም ሀሳብ እና አስተያየት @Philemona7
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
✌️ይህ የ @etconp መወያያ ግሩፓቹ ነው።
✋This is discussion group of @ETCONpWORK
.
🔖ማሳሰብያ ...
.
⚡️ግሩፑ ላይ ማነኛውም ከ ኮንስትራክሽን ጉዳዮች ውጪ መለጠፍ በፍፁም አይፈቀድም!
@ETCONpBOT ፃፉልን እናመሰግናለን🙏
👍1