Ethio Construction Engineering
32.3K subscribers
6.27K photos
359 videos
1.99K files
3.33K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
Herewith to this post is the 3D animation video of a school project under construction in the emirate of Abudhabi, UAE in which I am involved in. The project name is " Abudhabi future school program phase 8 package 5". It is a mixed gender school for KG and cycle 1 students. As per the UAE education curriculum, cycle 1 refers to grades from 1-6. It is my second project here in the UAE and I am currently working as a civil site Engineer in this school project. I will be sharing once In a while some informative journals regarding what it looks like working on a construction project. It is a 2 years project with project completion expected to be in August 2021. I hope it will be helpful and means of encouragement for all construction enthusiasts and upcoming construction professionals.👷‍♂️✌

@etconp
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉DIFFERENCE BETWEEN PERT AND CPM @COTMp
.
➡PERT and CPM are most commonly used methods
for project management. In this article, I will discuss the differences between PERT and CPM.
°°°°°°°°°°°°°°°°°°
▶WHAT IS PERT?
*PERT or Programme Evaluation and Review
Technique is an event oriented method of network planning. In it, the emphasis is focused on start and completion events rather than on activities.
The activities taking place between events are not
specified.
*In PERT network, the events fall in logical
sequence. But the logic of events may be different
for different planners. Hence PERT network may
vary from planner to planner depending upon their decision as which event to precede or occur
concurrently.
*In PERT network the start circle is omitted and only
the completed event is recorded. PERT helps in
identifying critical area which threatens the
completion of the work. It provides the means to
determine how resources can be transferred from
one job to another job.
::::::::::::::::::::::::::
▶WHAT IS CPM?
CPM is also network comprising events and
activities. This network is activity based. The
activities are represented by arrowed lines and
events by circles. The activities are connected in
logical sequence. The time allotted to each activity
is related to cost.
➡DIFFERENCE BETWEEN PERT AND CPM:
1. PERT is event oriented whereas CPM is activity
oriented. In simple words, in PERT network interest
is focused upon start or completion of events and
not on activities themselves.
2. In CPM network no allowance is made for
uncertainties in the duration of time involved
whereas in PERT network uncertainty is considered.
3. In PERT, time is not related to cost whereas in
CPM the object is to develop an optimum time
cost relationship. However, PERT has since been
extended in this direction and the line dividing
PERT/CPM is gradually fading out.
4. In CPM duration of activity is estimated with a
fair degree of accuracy. In PERT duration of
activities are not so accurate and definite.
5. In CPM both time and cost can be controlled
during planning. Pert is basically a tool for
planning.
6. PERT is used in research and development
project, basically for non-repetitive type projects.
CPM is widely used in construction projects.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Your comment

@etconp
👉ROLES OF A QUANTITY SURVEYOR @COTMp
~~~~~~~~~~~~~~~
▶Quantity surveyor calculates the cost by calculating the quantity of material required for any and every activity involved in construction.
He/She is also involved:in planning and contracting related job which is
mainly involved in the construction cost calculation.
➡The role of a quantity surveyor are listed below:👇
1. Estimating.
2. Cost planning.
3. Preparing, negotiating and analyzing costs for
tenders and contracts.
4. Procurement advice.
5. Preparing Bill of Quantities (BOQ).
6. Monitoring Budget.
7. Preparation of Payment Invoice and certification.
8. Assessment of variations
9. Dispute resolution.
10. Preparing feasibility studies.
11. Cost control.
12. Value engineering.
13. Advice on cost limits and budgets
14. Whole life cycle costing.
15. Valuation for insurance purposes.
16. Project management.
17. Advice on contractual disputes.
18. Preparation of final account.
19. Site visits, assessments, and projections for
future work.
20. Analysing completed work and arranging
payment to contractors.
21. Allocating upcoming work to contractors.
Besides these, quantity surveyors may choose to
specialize in a specific area of the construction
industry and focus on areas like costing advice,
property taxation, application to funding sources, maintenance of existing buildings, etc.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
❤1
What is the name of this on-site Geotechnical Investigation?
Anonymous Quiz
25%
Cone penetration test
12%
Plate load test
49%
Standard penetration test
13%
Proctor Compaction test
This is called a standard penetration test (SPT test)

Every construction works begin with a Geotechnical and geophysical investigation. SPT test is one of the Geotechnical subsurface exploration performed on site to measure the penetration resistance of soil surface. It involves correlating the blow count( N value) to the engineering property of soil. A total of 3 layers, 45 cm penetration is performed. The first 15cm is neglected during analysis assuming it is a disturbed soil. The sum of the the remaining 2 layers, 30cm which is termed as the "N value" is used for Geotechnical analysis.

A sampler tube with outside diameter of 51cm and length of 650mm is driven into the ground and is hammered with a mass of 64kg at a free fall of 75cm. Penetration marking will be in the drilling rod to check the amount of Penetration.

The SPT test together with other subsurface soil investigations helps the Geotechnical Engineer understand the condition of the site. Using this informations, the Geotechnical engineer will propose and recommend the foundation type to be used and other technical issues.

Things to know regarding SPT test are
-SPT test alone is not useful to determine the subsurface condition of a site.
-SPT test is an approximate analysis and may not necessarily implicate the site condition.
- SPT tests can be performed at any depth.

Part of The Geotechnical report below is from our project and it clearly shows the depth vs SPT N value vs Borehole name.👷‍♂️✌

@etconp
👉TYPES OF DRAWINGS USED IN BUILDING
CONSTRUCTION @COTMp
~~~~~~~~~~~~~~~~
⏩Drawings are the most important things we need to start any construction project. There are different
types of drawings for different purposes. In this
article, we will discuss different types of
construction drawings (also known as working
drawing).
*Construction drawings provide detail measurements and clear section of every building parts.
After reviewing, the drawings are justified and modified and finally approved for construction. *The different types of construction drawings are listed below.👇
.
1 ARCHITECTURAL DRAWING: This type of drawing provides complete view of a building. It demonstrates the location of building and all building parts where they will be placed.
*There are different types of architectural drawings
with different names such as plan, elevation, section
etc.
.
2 STRUCTURAL DRAWING:
As the name suggests, this type of drawing provides information about structure, like strength of
different structural elements, structural materials, grade, size and placement of reinforcement etc.
.
3 ELECTRICAL DRAWING:
This type of drawings provide the details and
location of electrical wiring, fixtures, substation
etc. The electrical load calculation is also given in
the drawing.
.
4 PLUMBING AND SANITARY DRAWINGS:
These drawings give the location of sanitary, piping
for water supply system, fixture, and the process to
connect every fixture etc.
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Check out our digital library link below

Digital library’ኣችንን ለመጎብኘት እታች ያለውን link ይጫኑ

@ETCONpDigitalLibrary_Bot
Forwarded from Ethio Construction Engineering (Fîłmøñ Łûël)
👉ኣሁን ደሞ Unit Weight Of Building Materials እንይ @COTMp
.
*Water- 1000 Kg/ m3
*Bricks (broken) - 1420 Kg/ m3
*Bricks(common) -1600 Kg/ m3
*Cement(ordinary)- 1440 Kg/ m3
*Cement (rapid hardening)- 1250 Kg/ m3
*Cement Mortar - 2000 Kg/ m3
*Cement Concrete (Plain) - 2400 Kg/ m3
*Cement Concrete (Reinforced) -2500 Kg/ m3
*Glass - 2500 Kg/ m3
*Lime Concrete - 1900 Kg/ m3
*Cement Plaster - 2000 Kg/ m3
*Lime Plaster - 1700 Kg/ m3
*Stones (Ballast) - 1720 Kg/ m3
*Stones (Aggregates)- 1750 Kg/ m3
*Stones (Basalt)- 2850 Kg/ m3
*Stones (Granite) - 2450 Kg/ m3
*Stones (Marble)- 2650 Kg/ m3
*Timber (Oak, Sal) - 510 Kg/ m3
*Timber (Mango) - 650 Kg/ m3
*Timber (Teak)- 625 Kg/ m3
*Coal- 600 Kg/ m3 *Plastics- 1250 Kg/ m3
*Oils- 800 Kg/ m3
*Ashes- 650 Kg/ m3
*Clinker- 750 Kg/ m3
*Rubber- 1300 Kg/ m3
*Slag- 1500 Kg/ m3
*Clay Soil- 1900 Kg/ m3
*Sand (dry) - 1540 to 1600 Kg/ m3
*Sand (wet)- 1760 to 2000 Kg/ m3
*Steel- 7850 Kg/ m3
*Chalk- 2100 Kg/ m3
*Bitumen- 1040 Kg/ m3
.
👇👇👇👇👇
Join for more updates via the link below;
t.me/COTMp
👆👆👆👆👆
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
👉Water we used for mixing Concrete @COTMp
.
◇ water is needed for two purposes:
1. Chemical Reaction with cement
2. Workability
□ water is good for preventing plastic shirnkage
cracking and workability.
.
■ Water is bad for permeability, strength, durability.
.
● Impurities in mixing water may cause:
○ Abnormal setting time
○ decreased strength
○ Volume changes
○ Efflorescence
○ Corrosion of reinforcement
.
⚡ አሁኑኑ Join በማረግ እና ለጓደኛዎ እና ለሚያቁት ሁሉ ሼር ያድርጉ።
Properties of R.C.C./✔Requirement of Good R.C.C.
1. It should be capable of resisting expected tensile, compressive, bending and shear forces.
2. It should not show excessive deflection and spoil serviceability requirement.
3. There should be proper cover to the reinforcement, so that the corrossion is prevented.
4. The hair cracks developed should be within the permissible limit.
5. It is a good fire resistant material.
6. When it is fresh, it can be moulded to any desired shape and size.
7. Durability is very good.
8. R.C.C. structure can be designed to take any load.
What is the name of these test performed on a ground surface?
Anonymous Quiz
33%
Field density test
37%
Plate load test
18%
Proctor compaction test
12%
Cone penetration test
It is called a plate load test/ plate bearing test.

Plate load test is used for determining the ultimate bearing capacity of the ground and the likely settlement under a given load.

After backfilling and compacting the built up ground surface with a structural fill material upto the formation level, Plate load test is performed to check the amount of settlement under proposed design load.

A plate diameter of 457mm,loading jack and dial guages are used. A heavy loader machinery is used as a reaction load. An incremental loading and unloading is applyed by a means of a loading jack. A technician will be holding a timer and each loading/unloading will change every 15 mins. The corresponding settlement Is read from a dial gauge. 3 dial gauges at different angles are placed and the average reading from this dial guage is used as a governing reading.

A graph is drawn showing the load vs settlement. The corresponding settlement at the allowable bearing pressure is taken.

The settlement obtained is checked whether it is below the allowable settlement . For instance the allowable settlement for a raft foundation is 75mm.

Note regarding PLT
-performing PLT below a shallow foundation prior to construction is important.
-if the result of test is not satisfactory, all the structural fill material is removed and replaced with another material and compacted again.
- PLT is approximate analysis. It gives bearing capacity of soil upto limited depth only.

The part of report is from our project is shown below and clearly shows settlement vs the load.👷‍♂️✌

@etconp
👍1
📖✔IMPORTANT POINTS FROM THERNAL STRESSES (STRENGTH_OF_MATERIALS)

✔ Stresses produced due to change in temperatures(Rise/Fall) are called as thermal stresses

✔ Actual meaning of coefficient of thermal expansion is strain produced per unit change in temperature

✔Unit of Coefficient of thermal expansion = per degree celcius

✔ Coefficient of thermal expansion for different materials
✴ Aluminium = 24 x 10^(-6)
✴ Copper = 17.5 x 10^(-6)
✴ Steel = 12 x 10^(-6)

✔Higher the value of coefficient of thermal expansion, more will be the material sensitive for temperature change

✔For the bar free to expand, with change in temperature (rise/fall), no stress is developed

✔Prismatic bar with rigidly supported at both ends
✔ As temperature increases, compressive stresses are developes on bar
✔ As temperature decreases, tensile stresses are developes on bar

✔ Copper bar is in series with steel bar
✔ As temperature increases, compressive stresses are developed on both copper and steel bar
✔ As temperature decreases, tensile stresses are developed on both copper and steel bar

✔ Copper plate is in parallel with steel plate and form a composite
✔ As temperature increases, compressive stress developed on copper and tensile stress developed on steel
✔ As temperature decreases, tensile stress developed on copper and compressive stress developed on steel

✔ Copper rod is enclosed in steel tube and both are rigidly fixed at ends
✔As temperature increases, Compressive stresses are developes on both copper and steel
✔ As temperature decreases, tensile stresses are developes on both copper and steel.
👍1