Ethio Construction Engineering
32.3K subscribers
6.27K photos
359 videos
1.99K files
3.33K links
🔨 World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!

📨 @Philemona7 Or @ETCONpBOT

For Ad:- https://telega.io/c/etconp
Download Telegram
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
-2G+G+12-@ETCONP.dwg
2.8 MB
-2G +G +12

ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።

የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
-2G+G+12@ETCONP.dwg
1.8 MB
-2G +G +12 structural drawing (beams)

ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።

የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
PROJECT -2G+G+12 @ETCONP.dwg
2.4 MB
-2G +G +12

ይህን ህንፃ design ያረገው Dawit simret consultancy ነው።

የህንፃው አገልግሎት :- hotel
ግንባታው የተጀመረው :- 2010 ዓም
የግንባታ ሁኔታ :- ያልተጠናቀቀ
ተቋራጭ ፡ - ኪድማ ኮንስትራክሽን

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
-2G+G+12 SHEAR WALL RETAING WALL@ETCONP.xlsx
342.9 KB
-2G+G+12 project

Column and shear wall takeoff

@etconp
👍1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
SAMPLE HCB FLOOR @ETCONP.xlsx
35 KB
-2G+G+12 project

HCB and formwork for the ground floor
የዚህ xls. ፋይል format ትክክል አይደለም።
ካልኩሌሽኑ ግን ትክክለኛ ነው።

@etconp
Forwarded from Ethio Construction Engineering (Yonathan)
Track structures

Sleepers
Functions:
➡️hold the rails in correct gauge
➡️ act as an elastic medium between the ballast and rail to absorb the blows snd vibrations of moving loads.
➡️ they also add to the longtiudinal and lateral stability of the permanent track on the whole.
➡️ they also provide means to rectify track gemotry during the service life
.

Rails
Functions:
➡️ Support the loads of the train and guides their wheel movement.
➡️ Provide a surface with smaller resistance.
➡️ bear the force of the wheels and spread it to sleeper.
➡️ used as track circuit in electrified railways and automatic block segments
.

Ballast
Functions:
➡️ for distributing the load from the sleepers to the formations.
➡️For providing draniage.
➡️Gives longtiudinal and lateral stability to the track.
➡️ provide energy absorption for the track
➡️ facilitate the adjustment of track geomotry.
➡️ hold sleppers in place during passage of trains.


#RAILWAYENGINEERING #AALRT
@ETconp
👍1
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
G+1 ARCHITECTURAL@ETCONP.dwg
13.2 MB
Architectural drawing for holistic project you can see the pervious drawing(original one) and modified one

Prepared by:- AUTOCAD 2007

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Structural design etabs@etconp.EDB
110.2 KB
Structural design for holistic project . This design file is automated

Prepared by :- ETABS 2017

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
G+1 STRUCTURAL @ETCONP.dwg
4.5 MB
Structural drawings for holistic project

Prepared by :- 2007 autocad

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
3D

Prepared by sketch up 2016

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
3D

Prepared by sketch up 2016

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
boq final draft Holistic cost analysis .pdf
368.3 KB
Final BOQ draft for holistic project

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
BOQ for holistic .xlsx
610.1 KB
BOQ for holistic project

Prepared by excel 2019

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
Cost BOQ.xlsx
610.1 KB
Cost break down analysis

Prepared by MS excel 2019

@etconp
Forwarded from Ethio Construction Engineering (जॉर्डनो ג׳ורדנו ጆርዳኖ جوردانو จอร์แดโน่ JORDANO Ιορδάνοςஜார்டானோ)
holistic@etconp .mpp
928 KB
Project scheduling

Prepared by:- ms project 2019

@etconp