Forwarded from Ethiopian Construction Vacancy & Tender (Dawit)
We are looking for a freelance Civil/Structural designer
1. Interested for freelance jobs.
2. Must have experience of producing structural drawings and structural designs of one of the following projects:- Residential, Apartment, Mixed Use and Relative Building projects.
3. Applicants will be registered to apply for variety of building projects, when a client post in a virtual platform.
Experience: 1 year and above
Applicants should submit :
โข Resume or CV
โข At least 3 of a project he/she did
โข Education document of completion(tempo) or any design certificate or Design License
โข Kebele ID or Driving licence or Passport (Only needed for verification)
Applicants should have
โข Proven design certificate or Tempo or Professional Licence
If you are interested send us the required documents via telegram @ZetseatBM
Number of Applicants are not limited, more number is required
1. Interested for freelance jobs.
2. Must have experience of producing structural drawings and structural designs of one of the following projects:- Residential, Apartment, Mixed Use and Relative Building projects.
3. Applicants will be registered to apply for variety of building projects, when a client post in a virtual platform.
Experience: 1 year and above
Applicants should submit :
โข Resume or CV
โข At least 3 of a project he/she did
โข Education document of completion(tempo) or any design certificate or Design License
โข Kebele ID or Driving licence or Passport (Only needed for verification)
Applicants should have
โข Proven design certificate or Tempo or Professional Licence
If you are interested send us the required documents via telegram @ZetseatBM
Number of Applicants are not limited, more number is required
๐13
แแตแญ แแตแฅ แฅแป แจแฐแแแฃแ แจแแแแฝแ แฅแแ แแดแ
แแตแญ แแตแฅ แฅแป แจแฐแแแฃแ แจแแแแฝแ แฅแแ แแดแ แจแตแแตแ แณแ แฒแแจแญ แจแฐแฐแแ แแดแ แจแแฌแต แแฐ แแตแฅ 154 แแตแญ แญแแต แแญ แฐแแแฅแถ แแแแ แแต แ แตแฅแ แแ แญแกแก
แ แแ แฐแแ แ แแแต แแฐ แแตแฅ 419 แแตแญ แญแแต แแญ แจแฐแแแฃ แแดแ แจแ แแต แแญ แ แแต แฐแแญแแแกแก
แแดแ แ แฐแแญแ แ แณแ แแฝแต แแญ แจแ แณแญ แแแณ แ แแแแแต แแตแ แต แจแแแจ แฒแแ แแ แแต แ แณแญแ 688 แถแแญ แฅแแฐแแซแตแจแแ แ แตแณแแแแกแก
แแดแ แ แฅแแต แจแแช แแญแ แดแญแ แแญ แ แแแแแต แจแแฐแฅ แฒแแ แ แณแแ แ แฐแแจ แแแแต แแแแแต แแแแแ แฐแแ แแฝ แแ แแฉ แ แแแแแต แฅแแฐแแฐแฅ แแแฟแแกแก
แแแ แแแญ แ แแญแฐแแ แต แฅแแ แแตแแต แแตแฅ แจแฐแแแฃแ แญแ แแดแ แ แซแต แฅแแต แ แแแแฝ แซแแต แฒแแ แจแแฌแต แแฐ แแดแ แแแแฃแต แ แแฌแต แแตแฅ แแฐแแฐแ แฐแแแแฝ แ แฅแแญ แแแ แจแแต แแ แฐแฅแแแกแก
แแดแ แแตแญ แแตแฅ แแแแฃแฑแ แฐแจแตแ แ แแแแ แแฐแแ แแฝ แ แแบ แแ แแแแฃแฑ แจแฐแแแธ แฒแแ แตแแฝ แแฅ แซแ แแแญ แฅแป แแ แฃแต แฅแแฐแแแแต แฐแแแฟแแกแก
แจ4แ แขแแฐแญแแตแฃ แแ แแแฎแฝ แฅแ แแแฝ แจแแดแ แ แแแแแถแฝแ แแฐแแ แแน แแตแ แต แจแแแจแ แญแ แแดแ แ แ แญแญ แแ แแตแฅ แฐแแ แแน แฐแญแฐแแแณแ แฐแฅแแแกแก
@etconp
แแตแญ แแตแฅ แฅแป แจแฐแแแฃแ แจแแแแฝแ แฅแแ แแดแ แจแตแแตแ แณแ แฒแแจแญ แจแฐแฐแแ แแดแ แจแแฌแต แแฐ แแตแฅ 154 แแตแญ แญแแต แแญ แฐแแแฅแถ แแแแ แแต แ แตแฅแ แแ แญแกแก
แ แแ แฐแแ แ แแแต แแฐ แแตแฅ 419 แแตแญ แญแแต แแญ แจแฐแแแฃ แแดแ แจแ แแต แแญ แ แแต แฐแแญแแแกแก
แแดแ แ แฐแแญแ แ แณแ แแฝแต แแญ แจแ แณแญ แแแณ แ แแแแแต แแตแ แต แจแแแจ แฒแแ แแ แแต แ แณแญแ 688 แถแแญ แฅแแฐแแซแตแจแแ แ แตแณแแแแกแก
แแดแ แ แฅแแต แจแแช แแญแ แดแญแ แแญ แ แแแแแต แจแแฐแฅ แฒแแ แ แณแแ แ แฐแแจ แแแแต แแแแแต แแแแแ แฐแแ แแฝ แแ แแฉ แ แแแแแต แฅแแฐแแฐแฅ แแแฟแแกแก
แแแ แแแญ แ แแญแฐแแ แต แฅแแ แแตแแต แแตแฅ แจแฐแแแฃแ แญแ แแดแ แ แซแต แฅแแต แ แแแแฝ แซแแต แฒแแ แจแแฌแต แแฐ แแดแ แแแแฃแต แ แแฌแต แแตแฅ แแฐแแฐแ แฐแแแแฝ แ แฅแแญ แแแ แจแแต แแ แฐแฅแแแกแก
แแดแ แแตแญ แแตแฅ แแแแฃแฑแ แฐแจแตแ แ แแแแ แแฐแแ แแฝ แ แแบ แแ แแแแฃแฑ แจแฐแแแธ แฒแแ แตแแฝ แแฅ แซแ แแแญ แฅแป แแ แฃแต แฅแแฐแแแแต แฐแแแฟแแกแก
แจ4แ แขแแฐแญแแตแฃ แแ แแแฎแฝ แฅแ แแแฝ แจแแดแ แ แแแแแถแฝแ แแฐแแ แแน แแตแ แต แจแแแจแ แญแ แแดแ แ แ แญแญ แแ แแตแฅ แฐแแ แแน แฐแญแฐแแแณแ แฐแฅแแแกแก
@etconp
โค9๐6
๐งDynamic compaction
โจDynamic compaction involves the controlled impact of a crane hoisted weight, of around 10-12 tonnes, falling in a pre-determined grid pattern to improve loose, granular and mixed soils and fills.
๐Common uses
โจIncrease bearing capacity Decrease settlement Mitigate liquefaction Avoid major below-ground obstruction removal
Process
โจDynamic compaction is a ground improvement technique that densifies soils and fill materials by using a drop weight.
๐Advantages
โช Capable of compacting a wide variety of weak soils
โช Increased bearing capacity
โช Reduced settlement
โช Sustainable technique using limited material import
โช Can improve soil conditions on marginal sites to the extent that shallow foundations can be used without deep excavation or piling
โช Removal of compressible, contaminated fills can sometimes be avoided
Facebook:- https://www.facebook.com/etconp/
Telegram:- https://t.me/ETCONpWORK
YouTube:- https://youtube.com/@Etconp432
Admin @ETCONpADMIN
โก ใ ค โใ ค โใ ค โฒ
หกแถฆแตแต แถแตแตแตแตโฟแต หขแตแตแต หขสฐแตสณแต
โโโโโโ
๐ join ๐
@ETCONp
@COTMp
โโโ โโโโโโโโโโโ
โจDynamic compaction involves the controlled impact of a crane hoisted weight, of around 10-12 tonnes, falling in a pre-determined grid pattern to improve loose, granular and mixed soils and fills.
๐Common uses
โจIncrease bearing capacity Decrease settlement Mitigate liquefaction Avoid major below-ground obstruction removal
Process
โจDynamic compaction is a ground improvement technique that densifies soils and fill materials by using a drop weight.
๐Advantages
โช Capable of compacting a wide variety of weak soils
โช Increased bearing capacity
โช Reduced settlement
โช Sustainable technique using limited material import
โช Can improve soil conditions on marginal sites to the extent that shallow foundations can be used without deep excavation or piling
โช Removal of compressible, contaminated fills can sometimes be avoided
Facebook:- https://www.facebook.com/etconp/
Telegram:- https://t.me/ETCONpWORK
YouTube:- https://youtube.com/@Etconp432
Admin @ETCONpADMIN
โก ใ ค โใ ค โใ ค โฒ
หกแถฆแตแต แถแตแตแตแตโฟแต หขแตแตแต หขสฐแตสณแต
โโโโโโ
๐ join ๐
@ETCONp
@COTMp
โโโ โโโโโโโโโโโ
๐5โค2
๐แตแฅแฅแญแ แตแแแ แจแ
แญแแแจแณแ
โแคแ แญแตแฅแแ แจแแ แปแแ แคแฐแฐแฆแฝ แจ แฎแแตแตแซแญแฝแ แฐแแช แแ แ แ แแ แแ แต BSc แแแ แแแ แจแแแจแแซ แฅแแต แ แแตแซแต แแญ แฅแแแแ แแแ แ แญแจแณแ แแแต แจแแ แปแแ แคแฐแฐแฅ แญแ แจแณแฝ แซแแ แแญแ แฅแแตแตแแแแ แ แ แญแฅแฎแต แฅแ แญแแแ แค แ แ แตแแซ แแแณแฐแญแแแ แตแฅแฅแญ แฅแ แ แ แฃแ แ แแฐแแแแแข
แแแฉ แจแแ แ แณแฝ แจแฐแแแ แ แแ
https://forms.gle/MGzNP3SddFQDCqox8
โแคแ แญแตแฅแแ แจแแ แปแแ แคแฐแฐแฆแฝ แจ แฎแแตแตแซแญแฝแ แฐแแช แแ แ แ แแ แแ แต BSc แแแ แแแ แจแแแจแแซ แฅแแต แ แแตแซแต แแญ แฅแแแแ แแแ แ แญแจแณแ แแแต แจแแ แปแแ แคแฐแฐแฅ แญแ แจแณแฝ แซแแ แแญแ แฅแแตแตแแแแ แ แ แญแฅแฎแต แฅแ แญแแแ แค แ แ แตแแซ แแแณแฐแญแแแ แตแฅแฅแญ แฅแ แ แ แฃแ แ แแฐแแแแแข
แแแฉ แจแแ แ แณแฝ แจแฐแแแ แ แแ
https://forms.gle/MGzNP3SddFQDCqox8
Google Docs
Research on On-Site Documentation
On-site documentation can include various forms of information, such as work logs, daily reports, inspection reports, daily progress reports, photographs, test results, change orders, and requirements.
๐5
๐COMMON CONCRETE PROBLEMS AND THEIR
PREVENTION
โฉThere are many problems we might be facing during and after concreting.
โบTo produce high quality concrete we must take some precautions to avoid those common problems during concreting.
โบIn this article, we will discuss on common concrete problems and how to prevent them.
A) BLEEDING
โบBleeding refers to as a tendency of water to appear on the top surface of concrete after finishing. Due to bleeding some measure of water (with sand particles and other cementing materials) appears at the surface of the concrete.
โถ๏ธFollowing precautions should be taken to reduce bleeding in concrete.
1. Design the mix appropriately.
2. Include least water content in the mix.
3. Use greater amount of cement content.
4. Use greater amount of fine particles.
5. Utilize a little measure of air entraining
admixture
โบB) SEGREGATION
โถ๏ธSegregation means separation of coarse aggregates from the concrete surface due to poor compaction.
โถ๏ธIt is generally seen in the plastic stage of concrete.
โถ๏ธAs a result honeycomb, laitance, scaling, porous
layer, bond failure etc.
โบcan be formed in concrete.
โถ๏ธFollowing precautions should be adopted to prevent segregation in concrete.
1. Design the mix appropriately.
2. Never use excessive water content.
3. Take care of handling, placing, and proper
compaction of concrete.
4. Do not allow the concrete to be dropped from more heights.
5. Use air entraining admixture.
6. Keep the formwork to be watertight.
โบC) LAITANCE
โถ๏ธThe appearance of cement sand particles on the
surface of freshly placed concrete is known as
laitance.
โถ๏ธIt is mainly occurred due to the bad effect of bleeding and segregation of concrete.
โถ๏ธThe bond between subsequent layers of concrete becomes weaker and as a result, laitance is developed.
Following precautions can be taken to stop the occurrence of laitance in concrete.
1. Clay, dust, silt content etc should be removed
before mixing the concrete.
2. Water-cement ratio should be maintained
properly.
3. Water should not be sprayed on the concrete
surface during finishing work.
4. Use well graded fine aggregates in the mix.
5. Add little amount of water reducing admixture in the concrete mix.
โบD) SCALING
โถ๏ธScaling is the physical deterioration of concrete in
which the surface layer of concrete broke down,
pitted or flaked away. Due to this effect concrete
surface becomes worse. Scaling can be prevented
by taking same precautions adopted for laitance.
โบE) PLASTIC SHRINKAGE CRACKS:
โถ๏ธWhen the evaporation rate of water mixed in the concrete is greater than the bleed water of concrete, plastic shrinkage cracks are developed on the surface of the concrete. Basically, this type of cracks occurs in very hot climate.
โบF) DUSTING:
โถ๏ธDusting can be prevented by taking following precautions.
1. Maintain a suitable water/cement ratio in the
concrete.
2. Utilize dust free aggregates in the mix.
3. Guarantee appropriate hydration of concrete.
4. Avoid early surface finishing of concrete.
@etconp
PREVENTION
โฉThere are many problems we might be facing during and after concreting.
โบTo produce high quality concrete we must take some precautions to avoid those common problems during concreting.
โบIn this article, we will discuss on common concrete problems and how to prevent them.
A) BLEEDING
โบBleeding refers to as a tendency of water to appear on the top surface of concrete after finishing. Due to bleeding some measure of water (with sand particles and other cementing materials) appears at the surface of the concrete.
โถ๏ธFollowing precautions should be taken to reduce bleeding in concrete.
1. Design the mix appropriately.
2. Include least water content in the mix.
3. Use greater amount of cement content.
4. Use greater amount of fine particles.
5. Utilize a little measure of air entraining
admixture
โบB) SEGREGATION
โถ๏ธSegregation means separation of coarse aggregates from the concrete surface due to poor compaction.
โถ๏ธIt is generally seen in the plastic stage of concrete.
โถ๏ธAs a result honeycomb, laitance, scaling, porous
layer, bond failure etc.
โบcan be formed in concrete.
โถ๏ธFollowing precautions should be adopted to prevent segregation in concrete.
1. Design the mix appropriately.
2. Never use excessive water content.
3. Take care of handling, placing, and proper
compaction of concrete.
4. Do not allow the concrete to be dropped from more heights.
5. Use air entraining admixture.
6. Keep the formwork to be watertight.
โบC) LAITANCE
โถ๏ธThe appearance of cement sand particles on the
surface of freshly placed concrete is known as
laitance.
โถ๏ธIt is mainly occurred due to the bad effect of bleeding and segregation of concrete.
โถ๏ธThe bond between subsequent layers of concrete becomes weaker and as a result, laitance is developed.
Following precautions can be taken to stop the occurrence of laitance in concrete.
1. Clay, dust, silt content etc should be removed
before mixing the concrete.
2. Water-cement ratio should be maintained
properly.
3. Water should not be sprayed on the concrete
surface during finishing work.
4. Use well graded fine aggregates in the mix.
5. Add little amount of water reducing admixture in the concrete mix.
โบD) SCALING
โถ๏ธScaling is the physical deterioration of concrete in
which the surface layer of concrete broke down,
pitted or flaked away. Due to this effect concrete
surface becomes worse. Scaling can be prevented
by taking same precautions adopted for laitance.
โบE) PLASTIC SHRINKAGE CRACKS:
โถ๏ธWhen the evaporation rate of water mixed in the concrete is greater than the bleed water of concrete, plastic shrinkage cracks are developed on the surface of the concrete. Basically, this type of cracks occurs in very hot climate.
โบF) DUSTING:
โถ๏ธDusting can be prevented by taking following precautions.
1. Maintain a suitable water/cement ratio in the
concrete.
2. Utilize dust free aggregates in the mix.
3. Guarantee appropriate hydration of concrete.
4. Avoid early surface finishing of concrete.
@etconp
๐11
๐Construction Engineering Abbreviation Tips
๐งThe common abbreviation used in Our Industry๐
๐ท A.A.S.H.T.O โ American Association of state highway Transport Official.
๐ท A.C.I โ American Concrete Institute.
๐ท A.R.E.A โ American Railway Engineering Association.
๐ท A.B โ Anchor Bolt Or Asbestos Board
๐ท AC โ Asphalt Concrete
๐ท A.S.C โ Allowable Stress of concrete.
๐ท A.S.T.M โ American society for testing materials
๐ท AC โ Asbestos Cement.
๐ท AE โ Assistant Engineer
๐ท APM โ Assistant Project Manager
๐ท B.M โ Benchmark
๐ท B.M โ Bending Moment.
๐ท BLK โ Block Work
๐ท BOQ โ Bill Of Quantities
๐ท BRW โ Brick Retaining Wall
๐ท BWK โ Brick Work
๐ท B.O.F โ Bottom Of Foundation
๐ท BHK โ Bedroom, Hall, Kitchen
๐ท C.I.Pipe โ Cast iron pipe.
๐ท C.I.Sheet โ Corrugated Iron sheet.
๐ทCL- Centre Line
๐ทCRW โ Concrete Retaining Wall
๐ท CBW โ Concrete Block Wall
๐ท CIP โ Cast In Place
๐ท CMU โ Concrete Masonry Unit
๐ท CJ โ Construction Joint
๐ท CC โ Centre To Centre
๐ท CC โ Cement concrete.
๐ท CE โ Chief Engineer
๐ท CP โ Cement plaster.
๐ท CPM โ Critical path method.
๐ท CS โ Comparative statement.
๐ท D โ Diameter
๐ท DL โ Development Length
๐ท Dia โ Diameter
๐ท DIM โ Dimension
๐ท D.L โ Dead load.
๐ท DPC โ Damp proof course.
๐ท DPR โ Daily Progress Report
๐ท DRG โ Drawings
๐ท DWLS โ Dowels
๐ท EJ โ Expansion Joint
๐ท E.L โ Environmental load.
๐ท EL โ Existing Load
๐ท EGL โ Existing ground level.
๐ท ELCB โ Earth Leak Circuit Breaker
๐ท F.M โ Fineness Modulus.
๐ท Ft โ Foot Or Feet
๐ท FL โ Floor Level
๐ท FGL โ Formation ground level.
๐ท FOC โ Factor Of Safety
๐ท GL โ Ground Level
๐ท GL โ Ground level.
๐ท GP โ Ground plane.
๐ท HFL โ Highest Flood Level.
๐ท HAC โ High Alumina Cement
๐ท HP โ Horizontal plane.
๐ท IOM โ Inter Office Memo
๐ท ISI โ Indian standard institute.
๐ท JE โ Junior Engineer
๐ท JST โ Joist
๐ท Kg โ Kilogram.
๐ท L.L โ Live load.
๐ท LW โ Light Weight
๐ท LWC โ light Weight Concrete
๐ท LC โ Lime concrete.
๐ท M โ Meter
๐ท MM โ Millimeter.
๐ท MB โ Measurement book.
๐ท MCB โ Miniature Circuit Breaker
๐ท MEP โ Mechanical Electrical Plumbing
๐ท MFL โ Maximum Flood Level
๐ท MRC โ Material Receipt Challan
๐ท MT โ Metric Tonnes
๐ท N โ Newton
๐ท NCF โ Neat cement finishing.
๐ท OPC โ Ordinary Portland Cement
๐ท OGL โ Original ground level.
๐ท OSR โ Open Soace Reservation Area
๐ท PC โ Pile Cap
๐ท PC โ Precast Concrete
๐ท PCC โ Plain Cement Concrete
๐ท PERT โ Programme Evaluation and Review Technique.
๐ท PL โ Plinth level.
๐ท PM โ Project Manager
๐ท PO โ Purchase Order
๐ท PPE โ Personal Protective Equipment
๐ท PPR โ Poly Propylene Random.
๐ท PVC โ Poly vinyl choloride .
๐ท PVC โ Polyvinyl Chloride
๐ท PSF โ Pound Per Square Foot
๐ท PSI โ Pound Per Square Inch
๐ท PWD โ Permanent Works Engineer
๐ท QC โ Quality control
๐ท QS โ Quantity Surveyor
๐ท RC โ Reinforced Concrete
๐ท R.B.W โ Reinforced brick work.
๐ท RBC โ Reinforced Brick concrete.
๐ท RCC โ Reinforced Cement Concrete
๐ท RMC โ Ready Mixed Concrete concrete.
๐ท RL โ Reduced level.
๐ท SCC โ Self Compacting Concrete
๐ท STP โ Sewage Treatment Plant
๐ท SRC โ Sulphate Resisting Cement
๐ท SWG โ Standard wire gauge.
๐ท TB โ Tie Beam
๐ท TBM โ Tunnel Boring Machine
๐ท TDS โ Total Dissolved Solids
๐ท TOB โ Top Of Beam
๐ท TMT โ Thermo Mechanical Treatment
๐ท TOC โ Top Of Concrete
๐ท TOW โ Top Of Wall
๐ท U.S.C โ Ultimate stress of concrete.
๐ท UPVC โ Unplasticized Polyvinyl chloride.
๐ท USD โ Ultimate strength design.
๐ท VP โ Vertical plane.
๐ท W.C โ Water closet.
๐ท WL โ Working Level
๐ท W.S.D โ Working stress Design
๐ท WO โ Work Order
@etconp
๐งThe common abbreviation used in Our Industry๐
๐ท A.A.S.H.T.O โ American Association of state highway Transport Official.
๐ท A.C.I โ American Concrete Institute.
๐ท A.R.E.A โ American Railway Engineering Association.
๐ท A.B โ Anchor Bolt Or Asbestos Board
๐ท AC โ Asphalt Concrete
๐ท A.S.C โ Allowable Stress of concrete.
๐ท A.S.T.M โ American society for testing materials
๐ท AC โ Asbestos Cement.
๐ท AE โ Assistant Engineer
๐ท APM โ Assistant Project Manager
๐ท B.M โ Benchmark
๐ท B.M โ Bending Moment.
๐ท BLK โ Block Work
๐ท BOQ โ Bill Of Quantities
๐ท BRW โ Brick Retaining Wall
๐ท BWK โ Brick Work
๐ท B.O.F โ Bottom Of Foundation
๐ท BHK โ Bedroom, Hall, Kitchen
๐ท C.I.Pipe โ Cast iron pipe.
๐ท C.I.Sheet โ Corrugated Iron sheet.
๐ทCL- Centre Line
๐ทCRW โ Concrete Retaining Wall
๐ท CBW โ Concrete Block Wall
๐ท CIP โ Cast In Place
๐ท CMU โ Concrete Masonry Unit
๐ท CJ โ Construction Joint
๐ท CC โ Centre To Centre
๐ท CC โ Cement concrete.
๐ท CE โ Chief Engineer
๐ท CP โ Cement plaster.
๐ท CPM โ Critical path method.
๐ท CS โ Comparative statement.
๐ท D โ Diameter
๐ท DL โ Development Length
๐ท Dia โ Diameter
๐ท DIM โ Dimension
๐ท D.L โ Dead load.
๐ท DPC โ Damp proof course.
๐ท DPR โ Daily Progress Report
๐ท DRG โ Drawings
๐ท DWLS โ Dowels
๐ท EJ โ Expansion Joint
๐ท E.L โ Environmental load.
๐ท EL โ Existing Load
๐ท EGL โ Existing ground level.
๐ท ELCB โ Earth Leak Circuit Breaker
๐ท F.M โ Fineness Modulus.
๐ท Ft โ Foot Or Feet
๐ท FL โ Floor Level
๐ท FGL โ Formation ground level.
๐ท FOC โ Factor Of Safety
๐ท GL โ Ground Level
๐ท GL โ Ground level.
๐ท GP โ Ground plane.
๐ท HFL โ Highest Flood Level.
๐ท HAC โ High Alumina Cement
๐ท HP โ Horizontal plane.
๐ท IOM โ Inter Office Memo
๐ท ISI โ Indian standard institute.
๐ท JE โ Junior Engineer
๐ท JST โ Joist
๐ท Kg โ Kilogram.
๐ท L.L โ Live load.
๐ท LW โ Light Weight
๐ท LWC โ light Weight Concrete
๐ท LC โ Lime concrete.
๐ท M โ Meter
๐ท MM โ Millimeter.
๐ท MB โ Measurement book.
๐ท MCB โ Miniature Circuit Breaker
๐ท MEP โ Mechanical Electrical Plumbing
๐ท MFL โ Maximum Flood Level
๐ท MRC โ Material Receipt Challan
๐ท MT โ Metric Tonnes
๐ท N โ Newton
๐ท NCF โ Neat cement finishing.
๐ท OPC โ Ordinary Portland Cement
๐ท OGL โ Original ground level.
๐ท OSR โ Open Soace Reservation Area
๐ท PC โ Pile Cap
๐ท PC โ Precast Concrete
๐ท PCC โ Plain Cement Concrete
๐ท PERT โ Programme Evaluation and Review Technique.
๐ท PL โ Plinth level.
๐ท PM โ Project Manager
๐ท PO โ Purchase Order
๐ท PPE โ Personal Protective Equipment
๐ท PPR โ Poly Propylene Random.
๐ท PVC โ Poly vinyl choloride .
๐ท PVC โ Polyvinyl Chloride
๐ท PSF โ Pound Per Square Foot
๐ท PSI โ Pound Per Square Inch
๐ท PWD โ Permanent Works Engineer
๐ท QC โ Quality control
๐ท QS โ Quantity Surveyor
๐ท RC โ Reinforced Concrete
๐ท R.B.W โ Reinforced brick work.
๐ท RBC โ Reinforced Brick concrete.
๐ท RCC โ Reinforced Cement Concrete
๐ท RMC โ Ready Mixed Concrete concrete.
๐ท RL โ Reduced level.
๐ท SCC โ Self Compacting Concrete
๐ท STP โ Sewage Treatment Plant
๐ท SRC โ Sulphate Resisting Cement
๐ท SWG โ Standard wire gauge.
๐ท TB โ Tie Beam
๐ท TBM โ Tunnel Boring Machine
๐ท TDS โ Total Dissolved Solids
๐ท TOB โ Top Of Beam
๐ท TMT โ Thermo Mechanical Treatment
๐ท TOC โ Top Of Concrete
๐ท TOW โ Top Of Wall
๐ท U.S.C โ Ultimate stress of concrete.
๐ท UPVC โ Unplasticized Polyvinyl chloride.
๐ท USD โ Ultimate strength design.
๐ท VP โ Vertical plane.
๐ท W.C โ Water closet.
๐ท WL โ Working Level
๐ท W.S.D โ Working stress Design
๐ท WO โ Work Order
@etconp
๐23โค2๐1๐1
Here are most popular project management methodologies and their applications:
1. Waterfall: follows a linear, sequential approach where each phase is completed before progressing to the next. It is not commonly used in construction due to its inflexibility in accommodating changes during the project.
2. Agile: Agile emphasizes flexibility, collaboration, and iterative improvements. Agile can be applied to construction by breaking the project into smaller tasks and frequently reassessing progress. Examples include Scrum and Kanban.
3. Critical Path Method (CPM): CPM is widely used in construction, as it identifies the most crucial tasks and helps in optimizing the project schedule. It allows for efficient resource allocation and improved project monitoring.
4. Program Evaluation and Review Technique (PERT): PERT is a statistical method used to estimate project completion time based on the analysis of task duration and dependencies. It is well-suited for construction projects with uncertain activity durations.
5. Lean Construction: Inspired by lean manufacturing principles, LC focuses on minimizing waste and enhancing value through continuous process improvement. This methodology optimizes project performance and resource efficiency.
6. Project Management Body of Knowledge (PMBOK): PMBOK is a set of standardized best practices and processes applicable to various industries, including construction. It covers areas like risk management, quality control, and cost estimation.
7. Integrated Project Delivery (IPD): IPD is a collaborative approach specifically designed for the construction industry. It involves all project stakeholders (owners, designers, contractors) working together from project inception to completion, which fosters teamwork, communication, and shared responsibility for project success.
@etconp
1. Waterfall: follows a linear, sequential approach where each phase is completed before progressing to the next. It is not commonly used in construction due to its inflexibility in accommodating changes during the project.
2. Agile: Agile emphasizes flexibility, collaboration, and iterative improvements. Agile can be applied to construction by breaking the project into smaller tasks and frequently reassessing progress. Examples include Scrum and Kanban.
3. Critical Path Method (CPM): CPM is widely used in construction, as it identifies the most crucial tasks and helps in optimizing the project schedule. It allows for efficient resource allocation and improved project monitoring.
4. Program Evaluation and Review Technique (PERT): PERT is a statistical method used to estimate project completion time based on the analysis of task duration and dependencies. It is well-suited for construction projects with uncertain activity durations.
5. Lean Construction: Inspired by lean manufacturing principles, LC focuses on minimizing waste and enhancing value through continuous process improvement. This methodology optimizes project performance and resource efficiency.
6. Project Management Body of Knowledge (PMBOK): PMBOK is a set of standardized best practices and processes applicable to various industries, including construction. It covers areas like risk management, quality control, and cost estimation.
7. Integrated Project Delivery (IPD): IPD is a collaborative approach specifically designed for the construction industry. It involves all project stakeholders (owners, designers, contractors) working together from project inception to completion, which fosters teamwork, communication, and shared responsibility for project success.
@etconp
๐16โค3๐1
PMBOK 7th Edition.pdf
30.1 MB
The Standard For Project Management and A Guide To The Project Management Body of Knowledge (PMBOK) 7th Edition
Construction Extension to the PMBOK.pdf
5.8 MB
I have shared with you a book on the project management Guide pmbok. I hope you find it helpful for your field.
โฆ โโโโโโโ โฆ
@etconp
โฆ โโโโโโโ โฆ
โฆ โโโโโโโ โฆ
@etconp
โฆ โโโโโโโ โฆ
๐9โค4
๐Thinking about building a house?
๐ฐWe can provide all the attractive designs. May the house built with your hard earned money be beautiful and safe. Ensuring proper use of land, our main goal is to build attractive and safe homes by managing green and natural ventilation. Every man has a dream to have a very attractive and loving home.
๐ฐWhat work have you started by designing correctly? The first condition for every home's construction is to get design work done with experienced architecture and engineering institutions. Design is the first step to a homework. This is where the decision is basically taken how the house will be, how much budget and how much work will be done.
๐ฐThe first thing to do before designing is to visit your land. Designing without seeing the land is like throwing dirt in the dark with your eyes closed. You can or may not if you need it. But the right design establishment will visit your land first and take pictures and video. If necessary, you will do the maintenance or you will get the survey done by a surveying company. And then the design work begins.
๐ฐDesign is basically what we explain to the collection of many designs. These designs are:
1โฃ Architectural Design
Architectural design is the first step of building design. This will be an architect. Especially in highrise and duplex design. First there will be briefing on what design the homeowner wants and what the design wants then start the architect design work. Initially a design will change on top after showing it and after some cuts the design will be finalized for the next job. Remember engineers never work as architects. In many local areas, the engineer himself designs the architectural to explain something to the client. Which is completely wrong and an incomplete job.
2โฃ After 2D Design Architectural Design will go to 2 D Visualizer. Sometimes the architects design by themselves. But when visualizer works, the beauty of the work maintains. visualizer's main job is to bring a beautiful home shape. Often visualizer does some extra work on design with the permission of the architect that later adjusts the architect in the design.
3โฃ Structural Design
Structural Designer's job is to design details of columns, beams and slabs and design foundation details..etc. To do this, you must take the help of the Soil Test Report. No structural design is acceptable without the soil Test Report.
4โฃ Electrical Design The next step is to design electrical based on this design. Electrical design is important because,
Often it is seen that beam columns are cut for electrical wiring after building is built. Which destroys the long-time stability of the building and destroys the stability. So every point will have details like Lights, Fans, Switching Point, AC Point, Adjust Fans, TV Lines, Internet and PABX Line.
5โฃ Plumbing Design
Plumbing design will work next. After making a house all the pipes come out naked that makes your beautiful home naked and a full sight. So need to design the plumbing. Plumbing designs will have geysers in each bathroom. Hot and cold piping all over the bathroom and all arrangements to decorate the bathrooms. There will also be a different design for kitchen lines and other piping.
6โฃ Fire Safety Design It's basically needed for highrise buildings. Fire safety design work will basically be done by an experienced Engineer in fire. Often it is seen that this design is not given any importance that is later responsible for all the horrific accidents in the building.
@etconp
๐ฐWe can provide all the attractive designs. May the house built with your hard earned money be beautiful and safe. Ensuring proper use of land, our main goal is to build attractive and safe homes by managing green and natural ventilation. Every man has a dream to have a very attractive and loving home.
๐ฐWhat work have you started by designing correctly? The first condition for every home's construction is to get design work done with experienced architecture and engineering institutions. Design is the first step to a homework. This is where the decision is basically taken how the house will be, how much budget and how much work will be done.
๐ฐThe first thing to do before designing is to visit your land. Designing without seeing the land is like throwing dirt in the dark with your eyes closed. You can or may not if you need it. But the right design establishment will visit your land first and take pictures and video. If necessary, you will do the maintenance or you will get the survey done by a surveying company. And then the design work begins.
๐ฐDesign is basically what we explain to the collection of many designs. These designs are:
1โฃ Architectural Design
Architectural design is the first step of building design. This will be an architect. Especially in highrise and duplex design. First there will be briefing on what design the homeowner wants and what the design wants then start the architect design work. Initially a design will change on top after showing it and after some cuts the design will be finalized for the next job. Remember engineers never work as architects. In many local areas, the engineer himself designs the architectural to explain something to the client. Which is completely wrong and an incomplete job.
2โฃ After 2D Design Architectural Design will go to 2 D Visualizer. Sometimes the architects design by themselves. But when visualizer works, the beauty of the work maintains. visualizer's main job is to bring a beautiful home shape. Often visualizer does some extra work on design with the permission of the architect that later adjusts the architect in the design.
3โฃ Structural Design
Structural Designer's job is to design details of columns, beams and slabs and design foundation details..etc. To do this, you must take the help of the Soil Test Report. No structural design is acceptable without the soil Test Report.
4โฃ Electrical Design The next step is to design electrical based on this design. Electrical design is important because,
Often it is seen that beam columns are cut for electrical wiring after building is built. Which destroys the long-time stability of the building and destroys the stability. So every point will have details like Lights, Fans, Switching Point, AC Point, Adjust Fans, TV Lines, Internet and PABX Line.
5โฃ Plumbing Design
Plumbing design will work next. After making a house all the pipes come out naked that makes your beautiful home naked and a full sight. So need to design the plumbing. Plumbing designs will have geysers in each bathroom. Hot and cold piping all over the bathroom and all arrangements to decorate the bathrooms. There will also be a different design for kitchen lines and other piping.
6โฃ Fire Safety Design It's basically needed for highrise buildings. Fire safety design work will basically be done by an experienced Engineer in fire. Often it is seen that this design is not given any importance that is later responsible for all the horrific accidents in the building.
@etconp
๐14โค5๐ข1
๐ฐBasic terms for Mechanics๐ฐ
โป๏ธ1.Torque or Turning Force
โ It is the total amount of force which is required to create acceleration on moving substance.
โป๏ธ2.Couple
โ Two forces those acts on equally, parallely & oppositely on two separate points of same material.
โป๏ธ3.Moment
โ It is the amount of moving effect which is gained for action of turning force.
โป๏ธ4.Stress
โ It is the force that can prevent equal & opposite force.
โ That means, it is the preventing force.
โ If one force acts on outside of a material, then a reactive force automatically acts to protest that force.
โ The amount of reactive force per unit area is called stress.
โ For instance:- Tensile Stress, Compressive Stress, Thermal Stress.
โป๏ธ5.Strain
โ If a force acts on a substance, then in that case if the substance would deform.
โ Then the amount of deformation per unit length of that substance is called strain.
โป๏ธ6.Spring
โ It is one type of device which is being distorted under certain amount of load & also can also go to its original face after the removal of that load.
Its function
โi. To store energy
โii. To absorb energy
โiii. To control motion of two
elements
โป๏ธ7.Stiffness
โ Load per unit deflection. The amount of load required to resist the deflection.
โป๏ธ8.Specific Weight
โ Weight per unit volume of the fluid.
โป๏ธ9.Specific Volume
โ Volume per unit mass of the fluid.
โป๏ธ10.Specific Gravity
โป๏ธIt is the ratio of specific weight of required substance to specific weight of pure water at 4 degree centigrade temperature.
________
Facebook:- https://www.facebook.com/etconp/
Telegram:- https://t.me/ETCONpWORK
YouTube:- https://youtube.com/@Etconp432
Admin @ETCONpADMIN
โก ใ ค โใ ค โใ ค โฒ
หกแถฆแตแต แถแตแตแตแตโฟแต หขแตแตแต หขสฐแตสณแต
โโโโโโ
๐ join ๐
@ETCONp
@COTMp
โโโ โโโโโโโโโโโ
โป๏ธ1.Torque or Turning Force
โ It is the total amount of force which is required to create acceleration on moving substance.
โป๏ธ2.Couple
โ Two forces those acts on equally, parallely & oppositely on two separate points of same material.
โป๏ธ3.Moment
โ It is the amount of moving effect which is gained for action of turning force.
โป๏ธ4.Stress
โ It is the force that can prevent equal & opposite force.
โ That means, it is the preventing force.
โ If one force acts on outside of a material, then a reactive force automatically acts to protest that force.
โ The amount of reactive force per unit area is called stress.
โ For instance:- Tensile Stress, Compressive Stress, Thermal Stress.
โป๏ธ5.Strain
โ If a force acts on a substance, then in that case if the substance would deform.
โ Then the amount of deformation per unit length of that substance is called strain.
โป๏ธ6.Spring
โ It is one type of device which is being distorted under certain amount of load & also can also go to its original face after the removal of that load.
Its function
โi. To store energy
โii. To absorb energy
โiii. To control motion of two
elements
โป๏ธ7.Stiffness
โ Load per unit deflection. The amount of load required to resist the deflection.
โป๏ธ8.Specific Weight
โ Weight per unit volume of the fluid.
โป๏ธ9.Specific Volume
โ Volume per unit mass of the fluid.
โป๏ธ10.Specific Gravity
โป๏ธIt is the ratio of specific weight of required substance to specific weight of pure water at 4 degree centigrade temperature.
________
Facebook:- https://www.facebook.com/etconp/
Telegram:- https://t.me/ETCONpWORK
YouTube:- https://youtube.com/@Etconp432
Admin @ETCONpADMIN
โก ใ ค โใ ค โใ ค โฒ
หกแถฆแตแต แถแตแตแตแตโฟแต หขแตแตแต หขสฐแตสณแต
โโโโโโ
๐ join ๐
@ETCONp
@COTMp
โโโ โโโโโโโโโโโ
๐5๐3
๐Common Thesis Defense
Questions You Should Be Prepared For Defense
1. The most common question you may be asked is what you learned from the study you have done. You have to sum up your entire study in a few sentences and remember the technical terms you have mentioned in your research because that is what your examiner wants to hear from you.
2. The next question to follow by default is why you chose this particular topic or what your Inspiration behind this study?.
This is one of the trickiest questions as you have to prove your convenience power to the panel of the teachers that what you did is valuable for the society and was worth their time.
3. What is the importance of your study or how will it contribute or add up to the existing body of knowledge?
4. You may be asked to summarize your key findings of the research.
5. What type of background research have you done for the study?
6. What are the limitations you have faced while writing?
7, Why did you choose this particular method or sample for the study?
8. What will you include if you are told to add something extra to the study?
9. What are the recommendations of your study??
10, Who formed your sample and why did you select this particular age group?
11. What was your hypothesis and how did you frame it?
12. If given a chance, would like to do something different with your work?
13. What are the limitations you faced while dealing with your samples?
14. How did you relate your study to the existing theories?
15. What is the future scope of this study?
16. What do you plan to do with your work after you have completed your degree?
17. What are the research variables you used?
18. Do you have any questions to be asked?
19. Did you evaluate your work?
20. How would you Improve your work?
@etconp
Questions You Should Be Prepared For Defense
1. The most common question you may be asked is what you learned from the study you have done. You have to sum up your entire study in a few sentences and remember the technical terms you have mentioned in your research because that is what your examiner wants to hear from you.
2. The next question to follow by default is why you chose this particular topic or what your Inspiration behind this study?.
This is one of the trickiest questions as you have to prove your convenience power to the panel of the teachers that what you did is valuable for the society and was worth their time.
3. What is the importance of your study or how will it contribute or add up to the existing body of knowledge?
4. You may be asked to summarize your key findings of the research.
5. What type of background research have you done for the study?
6. What are the limitations you have faced while writing?
7, Why did you choose this particular method or sample for the study?
8. What will you include if you are told to add something extra to the study?
9. What are the recommendations of your study??
10, Who formed your sample and why did you select this particular age group?
11. What was your hypothesis and how did you frame it?
12. If given a chance, would like to do something different with your work?
13. What are the limitations you faced while dealing with your samples?
14. How did you relate your study to the existing theories?
15. What is the future scope of this study?
16. What do you plan to do with your work after you have completed your degree?
17. What are the research variables you used?
18. Do you have any questions to be asked?
19. Did you evaluate your work?
20. How would you Improve your work?
@etconp
๐14โค1๐1
๐Why is concrete strong in compression?
Concrete is a heterogeneous material which is made up of cement (15โ20%), Sand (25โ30%), Coarse Aggregate (55โ60%) and air (2โ4%).
Compressive strength of concrete is based on the least of the compressive strength of cement-sand mixture, coarse aggregate, and the bond between C/S mixture and coarse aggregate.
Usually all three of these are comparable in compressive strength and none of them are particularity weak in compression hence, compressive strength of concrete is quite high as compared to its strength in tension.
Moreover given the fact that coarse aggregate occupies largest volume in concrete, its has the largest effect on the compressive strength of concrete. Usually coarse aggregate is the strongest of the three components in concrete, unless it is a high strength concrete (fcโ>8,000 psi) in which case failure can occur due to shearing of coarse aggregates.
Facebook:- https://www.facebook.com/etconp/
Telegram:- https://t.me/ETCONpWORK
YouTube:- https://youtube.com/@Etconp432
Admin @ETCONpADMIN
โก ใ ค โใ ค โใ ค โฒ
หกแถฆแตแต แถแตแตแตแตโฟแต หขแตแตแต หขสฐแตสณแต
โโโโโโ
๐ join ๐
@ETCONp
@COTMp
โโโ โโโโโโโโโโโ
Concrete is a heterogeneous material which is made up of cement (15โ20%), Sand (25โ30%), Coarse Aggregate (55โ60%) and air (2โ4%).
Compressive strength of concrete is based on the least of the compressive strength of cement-sand mixture, coarse aggregate, and the bond between C/S mixture and coarse aggregate.
Usually all three of these are comparable in compressive strength and none of them are particularity weak in compression hence, compressive strength of concrete is quite high as compared to its strength in tension.
Moreover given the fact that coarse aggregate occupies largest volume in concrete, its has the largest effect on the compressive strength of concrete. Usually coarse aggregate is the strongest of the three components in concrete, unless it is a high strength concrete (fcโ>8,000 psi) in which case failure can occur due to shearing of coarse aggregates.
Facebook:- https://www.facebook.com/etconp/
Telegram:- https://t.me/ETCONpWORK
YouTube:- https://youtube.com/@Etconp432
Admin @ETCONpADMIN
โก ใ ค โใ ค โใ ค โฒ
หกแถฆแตแต แถแตแตแตแตโฟแต หขแตแตแต หขสฐแตสณแต
โโโโโโ
๐ join ๐
@ETCONp
@COTMp
โโโ โโโโโโโโโโโ
๐8โค5
๐แแตแณแแแซ
๐แ แแฃแญ แฅแ แ แ แฒแต แตแซ แฐแแซแฎแฝ แฅแ แแ แ แซแต แ แแ
โจแจแ แฒแต แ แ แฃ แคแถแฝ แแแต แฅแ แ แตแฐแณแฐแญ แขแฎ แจแคแถแฝ แแแต แฎแญแแฌแฝแ แ แแฃแญ แ แแต แ แแตแ แ แซแแ แแฐแ แ แฅแ แต แ แแแแตแต แฅแ แ แแ แ แแญแแต แจแคแต แแแต แแฎแแซแแฝ แ แฒแต แแแซแตแแแฃแธแ 120แบ แจแแซ แแแชแซ แคแถแฝ แ แฐแแซแฉ แแญแแฝ แ แแแฃแณ แฃ แ แ แแแแแต แฅแ แ แ แแซแฝ แแญแ แ แแฃแญ 5 แแซแต แจ4500 แ แแญ แแแแ แแแฝ แ แฒแต แจแตแซ แฅแตแ แแแแ แญ แ แแแ แต แแญ แฒแแ แ แแญแ แจแฐแ แแฉ แตแซ แฐแแซแฎแฝแแ แแ แ แซแตแ แ แณแณแ แ แตแญแ แแแตแซแต แ แตแงแแข
โจแ แแแแ แฐแแ แ แคแต แแแต แแณแฐแ แจแแแแ แ แณแณแต แฅแ แแฃแญ แจ2006 แ.แ แแฒแ แ แฐแแ แจแตแซ แแตแ แฐแแฅแฎแแธแ แ แฐแแแฝแ แฒแฐแฉ แจแแ แฉแตแ แฃแแตแญแป แ แซแแต แ แ แฒแต แแแญ แแแแแชแซ แแญ แแแแแแ แฅแแฒแแ แ แฐแซแฉแ แแแแแ แฅแแฒแซแตแฝแแ แ แฐแฐแซแ แฅแ แ แแแแ แ แแ แแแฉ แ แฒแต แฅแ แแแแ แจแแฅ แณแญแต แแแตแแญแ แ แแแ แถ แแจแแแฝแ แ แแฐแซแแตแ แ แแฅแซแต แแฐ แตแซ แแแแฃแต แแแ แฑแ แ แ แแแแกแก
โจแตแแแแ แ แ แญแก แ แฐแแ แตแจ-แแฝ แ แแแแแ แ แฒแต แแแต แแญแ แแ แแแแแฑ แแแ แ แแ แแแแฃ แตแแแแแญ แจแแฒแ แแแ แต แฅแแตแณแฐแญแ แฎแญแแฌแฝแ แฅแซแณแฐแ
๐แฐแแแแขแแฝ แจแณแฝ แซแแตแ แแจแแแฝ แ แฐแซแ แณแฝแ แฅแแตแตแ แฅแ แซแณแแแ
๐ แจแณแฐแฐ แแแต แแแต
๐ TIN NO
๐ แจแตแ แตแซแ แแแแฃ แฐแญแฐแแฌแต
๐ แจแฅแแต แแจแแแซ
๐ แจแตแซ แแแต แ แ แแต แ แฐแ แแแ แแฝ
๐ แจแตแซ แญแฅแฐแต แ แแแแฅ แฒแแจแญ แจแแซแณแฉ แแจแแแฝ แจ แแ 1 - 2
๐ แฅแ แแแฝ แตแซ แฐแแซแฉแ แฅแ แแ แ แซแฑแ แจแแแแฝ แฐแแถแฝแ แแธแแข
๐แจแ แฒแต แ แ แฃ แคแถแฝ แแแต แฅแ แ แตแฐแณแฐแญ แขแฎ แจแคแถแฝ แแแต แฎแญแแฌแฝแ
@etconp
๐แ แแฃแญ แฅแ แ แ แฒแต แตแซ แฐแแซแฎแฝ แฅแ แแ แ แซแต แ แแ
โจแจแ แฒแต แ แ แฃ แคแถแฝ แแแต แฅแ แ แตแฐแณแฐแญ แขแฎ แจแคแถแฝ แแแต แฎแญแแฌแฝแ แ แแฃแญ แ แแต แ แแตแ แ แซแแ แแฐแ แ แฅแ แต แ แแแแตแต แฅแ แ แแ แ แแญแแต แจแคแต แแแต แแฎแแซแแฝ แ แฒแต แแแซแตแแแฃแธแ 120แบ แจแแซ แแแชแซ แคแถแฝ แ แฐแแซแฉ แแญแแฝ แ แแแฃแณ แฃ แ แ แแแแแต แฅแ แ แ แแซแฝ แแญแ แ แแฃแญ 5 แแซแต แจ4500 แ แแญ แแแแ แแแฝ แ แฒแต แจแตแซ แฅแตแ แแแแ แญ แ แแแ แต แแญ แฒแแ แ แแญแ แจแฐแ แแฉ แตแซ แฐแแซแฎแฝแแ แแ แ แซแตแ แ แณแณแ แ แตแญแ แแแตแซแต แ แตแงแแข
โจแ แแแแ แฐแแ แ แคแต แแแต แแณแฐแ แจแแแแ แ แณแณแต แฅแ แแฃแญ แจ2006 แ.แ แแฒแ แ แฐแแ แจแตแซ แแตแ แฐแแฅแฎแแธแ แ แฐแแแฝแ แฒแฐแฉ แจแแ แฉแตแ แฃแแตแญแป แ แซแแต แ แ แฒแต แแแญ แแแแแชแซ แแญ แแแแแแ แฅแแฒแแ แ แฐแซแฉแ แแแแแ แฅแแฒแซแตแฝแแ แ แฐแฐแซแ แฅแ แ แแแแ แ แแ แแแฉ แ แฒแต แฅแ แแแแ แจแแฅ แณแญแต แแแตแแญแ แ แแแ แถ แแจแแแฝแ แ แแฐแซแแตแ แ แแฅแซแต แแฐ แตแซ แแแแฃแต แแแ แฑแ แ แ แแแแกแก
โจแตแแแแ แ แ แญแก แ แฐแแ แตแจ-แแฝ แ แแแแแ แ แฒแต แแแต แแญแ แแ แแแแแฑ แแแ แ แแ แแแแฃ แตแแแแแญ แจแแฒแ แแแ แต แฅแแตแณแฐแญแ แฎแญแแฌแฝแ แฅแซแณแฐแ
๐แฐแแแแขแแฝ แจแณแฝ แซแแตแ แแจแแแฝ แ แฐแซแ แณแฝแ แฅแแตแตแ แฅแ แซแณแแแ
๐ แจแณแฐแฐ แแแต แแแต
๐ TIN NO
๐ แจแตแ แตแซแ แแแแฃ แฐแญแฐแแฌแต
๐ แจแฅแแต แแจแแแซ
๐ แจแตแซ แแแต แ แ แแต แ แฐแ แแแ แแฝ
๐ แจแตแซ แญแฅแฐแต แ แแแแฅ แฒแแจแญ แจแแซแณแฉ แแจแแแฝ แจ แแ 1 - 2
๐ แฅแ แแแฝ แตแซ แฐแแซแฉแ แฅแ แแ แ แซแฑแ แจแแแแฝ แฐแแถแฝแ แแธแแข
๐แจแ แฒแต แ แ แฃ แคแถแฝ แแแต แฅแ แ แตแฐแณแฐแญ แขแฎ แจแคแถแฝ แแแต แฎแญแแฌแฝแ
@etconp
๐8โค1
This media is not supported in your browser
VIEW IN TELEGRAM
๐Sketch Up Steel Ware house
๐งFrom The Ground Up
Facebook:- https://www.facebook.com/etconp/
Telegram:- https://t.me/ETCONpWORK
YouTube:- https://youtube.com/@Etconp432
Admin @ETCONpADMIN
โก ใ ค โใ ค โใ ค โฒ
หกแถฆแตแต แถแตแตแตแตโฟแต หขแตแตแต หขสฐแตสณแต
โโโโโโ
๐ join ๐
@ETCONp
@COTMp
โโโ โโโโโโโโโโโ
๐งFrom The Ground Up
Facebook:- https://www.facebook.com/etconp/
Telegram:- https://t.me/ETCONpWORK
YouTube:- https://youtube.com/@Etconp432
Admin @ETCONpADMIN
โก ใ ค โใ ค โใ ค โฒ
หกแถฆแตแต แถแตแตแตแตโฟแต หขแตแตแต หขสฐแตสณแต
โโโโโโ
๐ join ๐
@ETCONp
@COTMp
โโโ โโโโโโโโโโโ
๐5๐1
Stairs are important building elements that are used to provide vertical circulation and access across different floor levels in a building. It is also recommended that when an access height exceeds 600mm, a staircase should be provided. For stairs in a building, the recommended slope for comfort is 27ยฐ, but for practical purposes, this can sometimes be extended to 35ยฐ.
Types of staircase
straight flight staircase, circular staircase, helical staircase, spiral staircase, or a combination of the above mentioned types.
@etconp
Types of staircase
straight flight staircase, circular staircase, helical staircase, spiral staircase, or a combination of the above mentioned types.
@etconp
๐7๐1๐1
Functional parts of a staircase
Flight: A series of steps extending from floor to floor, or from a floor to an intermediate landing or platform.
Guard: Protective vertical barrier along edges of stairways, balconies, and floor openings.
Landings (platforms): Used where turns are necessary or to break up long climbs. Landings should be level, as wide as the stairs, and at least 1000mm long in the direction of travel.
Step: Combination of a riser and the tread immediately above.
Rise: Distance from floor to floor.
Run: Total length of stairs in a horizontal plane, including landings.
Riser: Vertical face of a step. Its height is generally taken as the vertical distance between treads.
Tread: Horizontal face of a step. Its width is usually taken as the horizontal distance between risers.
Nosing: Projection of a tread beyond the riser below.
Soffit: Underside of a stair.
Railing: Framework or enclosure supporting a handrail and serving as a safety barrier.
Baluster: Vertical member supporting the handrail in a railing.
Balustrade: A railing composed of balusters capped by a handrail.
Handrail: Protective bar placed at a convenient distance above the stairs for a handhold.
Ideas on the selection of staircase dimensions
Headroom
Ample headroom should be provided not only to prevent tall people from injuring their heads but to give a feeling of spaciousness. The minimum vertical distance from the nosing of a tread to overhead construction should preferably never be less than 2100 mm.
Stairway Width
The width of a stairway depends on its purpose and the number of persons to be accommodated in peak hours or emergencies. Also, there are building codes that regulate the geometric design of stairways. The following can be used as guidelines;
For residential flats between two to four storeys, use a minimum width of 900 mm, for flats more than 4 storeys, use a width of 1000 mm. For public buildings of under 200 persons per floor, use a width of 1000 mm, for buildings between 200 โ 400 persons per floor, use a width of 1500 mm. For over 400 persons, use a width between 1500 โ 3000 mm. However, when the width of a stairway exceeds 1800 mm, it is necessary to divide it using handrails.
Step Sizes
Risers and treads generally are proportioned for comfort and to meet accessibility standards for the handicapped. Treads should be at least 250 mm, exclusive of nosing. The most comfortable height of riser is 175 mm. Risers less than 100 mm and more than 200 mm high should not be used. The steeper the slope of the stairs, the greater the ratio of the riser to tread. In the design of stairs, account should be taken of the fact that there is always one less tread than riser per flight of stairs. No flight of stairs should contain less than three risers.
@etconp
Flight: A series of steps extending from floor to floor, or from a floor to an intermediate landing or platform.
Guard: Protective vertical barrier along edges of stairways, balconies, and floor openings.
Landings (platforms): Used where turns are necessary or to break up long climbs. Landings should be level, as wide as the stairs, and at least 1000mm long in the direction of travel.
Step: Combination of a riser and the tread immediately above.
Rise: Distance from floor to floor.
Run: Total length of stairs in a horizontal plane, including landings.
Riser: Vertical face of a step. Its height is generally taken as the vertical distance between treads.
Tread: Horizontal face of a step. Its width is usually taken as the horizontal distance between risers.
Nosing: Projection of a tread beyond the riser below.
Soffit: Underside of a stair.
Railing: Framework or enclosure supporting a handrail and serving as a safety barrier.
Baluster: Vertical member supporting the handrail in a railing.
Balustrade: A railing composed of balusters capped by a handrail.
Handrail: Protective bar placed at a convenient distance above the stairs for a handhold.
Ideas on the selection of staircase dimensions
Headroom
Ample headroom should be provided not only to prevent tall people from injuring their heads but to give a feeling of spaciousness. The minimum vertical distance from the nosing of a tread to overhead construction should preferably never be less than 2100 mm.
Stairway Width
The width of a stairway depends on its purpose and the number of persons to be accommodated in peak hours or emergencies. Also, there are building codes that regulate the geometric design of stairways. The following can be used as guidelines;
For residential flats between two to four storeys, use a minimum width of 900 mm, for flats more than 4 storeys, use a width of 1000 mm. For public buildings of under 200 persons per floor, use a width of 1000 mm, for buildings between 200 โ 400 persons per floor, use a width of 1500 mm. For over 400 persons, use a width between 1500 โ 3000 mm. However, when the width of a stairway exceeds 1800 mm, it is necessary to divide it using handrails.
Step Sizes
Risers and treads generally are proportioned for comfort and to meet accessibility standards for the handicapped. Treads should be at least 250 mm, exclusive of nosing. The most comfortable height of riser is 175 mm. Risers less than 100 mm and more than 200 mm high should not be used. The steeper the slope of the stairs, the greater the ratio of the riser to tread. In the design of stairs, account should be taken of the fact that there is always one less tread than riser per flight of stairs. No flight of stairs should contain less than three risers.
@etconp
๐11โค2
#แฅแแ
1 แแแฎแ แฅแญ แ แแซแธแแแ แจ Solve IT 2023 แจแแ แซ แแตแตแญ แญแณแฐแแข
แจแแ แซ แแณแฅ แซแแฝแ แแฃแถแฝ แจแณแฝ แ แฐแแแกแต แ แแซแฎแฝ แแแแแฅ แตแฝแแแฝแแข
แจแแตแตแฉ แแแแฃ แจแฐแแแจ แฒแแ 1 แแแฎแ แฅแญ แจแฅแซ แแแป (Seed Funding) แฐแธแแ แซแฐแญแแแข
แแแแแแฅ โญ https://solveit-et.com
แแ แแ แแจแ โญ
Telegram Bot: @solveit_et_bot
Email: contact@solveit-et.com
Phone No.: 0991440049
@etconp
1 แแแฎแ แฅแญ แ แแซแธแแแ แจ Solve IT 2023 แจแแ แซ แแตแตแญ แญแณแฐแแข
แจแแ แซ แแณแฅ แซแแฝแ แแฃแถแฝ แจแณแฝ แ แฐแแแกแต แ แแซแฎแฝ แแแแแฅ แตแฝแแแฝแแข
แจแแตแตแฉ แแแแฃ แจแฐแแแจ แฒแแ 1 แแแฎแ แฅแญ แจแฅแซ แแแป (Seed Funding) แฐแธแแ แซแฐแญแแแข
แแแแแแฅ โญ https://solveit-et.com
แแ แแ แแจแ โญ
Telegram Bot: @solveit_et_bot
Email: contact@solveit-et.com
Phone No.: 0991440049
@etconp
๐1๐1
๐Hangzhou Bay Bridge, Zhejiang, China
๐Believe it or not:
๐Approximately 600 experts were involved in designing the Hangzhou Bay Bridge. It took almost a decade to design and build.
๐Design & Engineering
๐The bridge leverages cable stayed bridge construction techniques. The project was built using this method because the cables are able to hold up against adverse conditions, including some of the highest tidal bore forces on earth. The bridge is also located in an area that experiences earthquakes, extremely high winds, and typhoons.
๐The Hangzhou Bay Bridge uses steel piles rather than concrete because experts proved theyโd hold up better against corrosion from the tidal forces in the bay.
๐The bridge made use of some novel construction technology and vehicles
#ConstructionTechnology
@etconp
๐Believe it or not:
๐Approximately 600 experts were involved in designing the Hangzhou Bay Bridge. It took almost a decade to design and build.
๐Design & Engineering
๐The bridge leverages cable stayed bridge construction techniques. The project was built using this method because the cables are able to hold up against adverse conditions, including some of the highest tidal bore forces on earth. The bridge is also located in an area that experiences earthquakes, extremely high winds, and typhoons.
๐The Hangzhou Bay Bridge uses steel piles rather than concrete because experts proved theyโd hold up better against corrosion from the tidal forces in the bay.
๐The bridge made use of some novel construction technology and vehicles
#ConstructionTechnology
@etconp
๐4