Ethiopian Construction Vacancy & Tender
18.1K subscribers
4.59K photos
56 videos
536 files
3.81K links
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World

Buy ads: https://telega.io/c/ETCONpWORK

๐Ÿ“ฉ @Philemona7
Download Telegram
๐Ÿ‘‰Correct Pipe Slope Matters in Drainage Systems

Proper pipe slope is essential for efficient drainage and long-term system performance. If the slope is too flat, waste may not flow properly. If the slope is too steep, liquids move too fast and solids can settle inside the pipe.

๐Ÿ”น Recommended pipe slopes:
โ€ข 2โ€ โ€“ 3โ€ pipes: 1.5% slope (15 mm per meter)
โ€ข 4โ€ โ€“ 6โ€ pipes: 1% slope (10 mm per meter)
โ€ข 8โ€ pipes: 0.8% slope (8 mm per meter)

โš ๏ธ Common mistakes:
โ€ข 0% slope: No flow, blockage risk
โ€ข More than 2% slope: Liquids run faster than solids causing sediment buildup

โœ… Maintaining the correct slope ensures smooth flow, prevents clogging, and increases the life of the drainage system.

In civil engineering, small details like pipe slope can make a big difference in performance and maintenance.

#CivilEngineering
#Construction
#SiteEngineering
#DrainageSystem
#PlumbingEngineering
#CivilEngineer
#ConstructionManagement
#Infrastructure
#EngineeringKnowledge
#SiteWork
#EngineeringTips
#CivilEngineeringLife

@etconp
โค9๐Ÿ‘4๐Ÿ‘1
โ€‹๐ŸŒ แ‹จแ‹“แˆˆแˆ›แ‰ฝแŠ• แŠฅแŒ…แŒ แŠ แˆตแŒˆแˆซแˆš 4 แˆ…แŠ•แƒแ‹Žแ‰ฝ

๐Ÿ”–แ‹›แˆฌ แ‰ แŒแŠ•แ‰ฃแ‰ณ แŒฅแ‰ แ‰ฅ แ‹แˆตแŒฅ แ‹จแ‰ฐแˆแŒ แˆฉแฃ แ‹จแˆฐแ‹ แˆแŒ…แŠ• แ‹จแˆแŒ แˆซ แ‰ฝแˆŽแ‰ณ แ‹ˆแ‹ฐ แˆŒแˆ‹ แ‹ฐแˆจแŒƒ แ‹ซแˆธแŒ‹แŒˆแˆฉ แŠ แˆตแŒˆแˆซแˆš แˆ…แŠ•แƒแ‹Žแ‰ฝแŠ• แŠฅแŠ“แˆตแŒŽแ‰ แŠ›แ‰ฝแˆแข

โ€‹1. แŠฉแˆญแ‰ฃแ‹ แˆ…แŠ•แƒ (The Crooked House) - แ–แˆ‹แŠ•แ‹ต ๐Ÿ‡ต๐Ÿ‡ฑ

โ€‹แ‹ญแˆ… แˆ…แŠ•แƒ แ‹จแŠซแˆญแ‰ฑแŠ• แˆแˆตแˆ แŠฅแŠ•แŒ‚ แŠฅแ‹แАแ‰ฐแŠ› แˆ…แŠ•แƒ แŠ แ‹ญแˆ˜แˆตแˆแˆแข แ‹จแ‰ฐแŒˆแАแ‰ฃแ‹ แ‰ แŠ แˆญแ‰ฒแˆตแ‰ถแ‰ฝ แˆตแ‹•แˆ แ‰ฐแˆ˜แˆตแŒฆ แАแ‹แข
แŒแ‹ตแŒแ‹ณแ‹Žแ‰นแฃ แˆ˜แˆตแŠฎแ‰ถแ‰นแŠ“ แŒฃแˆชแ‹ซแ‹ แˆแˆ‰ แ‹จแ‰ณแŒ แ‰ แ‹ญแˆ˜แˆตแˆ‹แˆ‰แค แАแŒˆแˆญ แŒแŠ• แˆ™แˆ‰ แ‰ แˆ™แˆ‰ แ‰ฐแŒแ‰ฃแˆซแ‹Š แŠ แŒˆแˆแŒแˆŽแ‰ต แ‹จแˆšแˆฐแŒฅ แ‹จแŒˆแ‰ แ‹ซ แˆ›แ‹•แŠจแˆ แАแ‹แข

โ€‹2. แ‹จแˆŽแ‰ฐแˆต แ‰คแ‰ฐ แˆ˜แ‰…แ‹ฐแˆต (Lotus Temple) - แˆ…แŠ•แ‹ต ๐Ÿ‡ฎ๐Ÿ‡ณ

โ€‹แ‹จแˆŽแ‰ฐแˆต แŠ แ‰ แ‰ฃแŠ• แ‰…แˆญแ… แ‰ แˆ˜แ‹ซแ‹ แ‹จแ‰ฐแŒˆแАแ‰ฃแ‹ แ‹ญแˆ… แˆ…แŠ•แƒแฃ แ‰ แ‹“แˆˆแˆ›แ‰ฝแŠ• แŠฅแŒ…แŒ แ‹แ‰ฅ แŠจแˆ†แŠ‘ แ‹จแŠชแА-แˆ…แŠ•แƒ แˆตแˆซแ‹Žแ‰ฝ แŠ แŠ•แ‹ฑ แАแ‹แข
27 แАแŒญ แŠฅแ‰ฅแАแ‰ แˆจแ‹ต แ‹จแ‰ฐแˆธแˆแŠ‘ แ‹จ"แ”แ‰ณแˆ" แ‰…แˆญแŒพแ‰ฝ แ‹ซแˆ‰แ‰ต แˆฒแˆ†แŠ•แฃ แ‰ แˆ›แŠ•แŠ›แ‹แˆ แˆƒแ‹ญแˆ›แŠ–แ‰ต แˆ‹แˆˆ แˆฐแ‹ แŠญแแ‰ต แАแ‹แข แ‹ญแˆ… แˆ…แŠ•แƒ แˆแŠ•แˆ แŠ แ‹ญแАแ‰ต แ‰€แŒฅแ‰ฐแŠ› แŒแ‹ตแŒแ‹ณ แ‹จแˆˆแ‹แˆ!

โ€‹3. แ‹จแ‹ณแŠ•แˆฒแŠ•แŒ แˆƒแ‹แˆต (Dancing House) - แ‰ผแŠญ แˆชแแ‰ฅแˆŠแŠญ ๐Ÿ‡จ๐Ÿ‡ฟ

โ€‹แ‰ แ•แˆซแŒ แŠจแ‰ฐแˆ› แ‹จแˆšแŒˆแŠ แ‹ญแˆ… แˆ…แŠ•แƒ แˆแˆˆแ‰ต แŠ แ‰ฅแˆจแ‹ แ‹จแˆšแ‹ฐแŠ•แˆฑ แˆฐแ‹Žแ‰ฝแŠ• แ‹ญแˆ˜แˆตแˆ‹แˆแข
แŠ แŠ•แ‹ฑ แŠญแแˆ แŠฅแŠ•แ‹ฐ แ‹ˆแŠ•แ‹ตแฃ แˆŒแˆ‹แŠ›แ‹ แ‹ฐแŒแˆž แŠฅแŠ•แ‹ฐ แˆดแ‰ต แ‹ณแŠ•แˆฐแŠ› แ‰ฐแ‹ฐแˆญแŒŽ แ‹จแ‰ฐแˆฐแˆซแ‹ แ‹ญแˆ… แ‹จแ‰ขแˆฎ แˆ…แŠ•แƒแฃ แ‰ แ‹˜แˆ˜แŠ“แ‹Šแ‹ แŠฅแŠ“ แ‰ แŒฅแŠ•แ‰ณแ‹Šแ‹ แ‹จแŠจแ‰ฐแˆ›แ‹‹ แ‹จแŒแŠ•แ‰ฃแ‰ณ แˆตแˆแ‰ต แˆ˜แŠซแŠจแˆ แˆแ‹ฉ แ‹ตแˆแ‰€แ‰ต แŠ แˆˆแ‹แข

โ€‹4. แ‹จแ‰…แˆญแŒซแ‰ต แˆ…แŠ•แƒ (The Basket Building) - แŠ แˆœแˆชแŠซ ๐Ÿ‡บ๐Ÿ‡ธ

โ€‹แŠฉแ‰ฃแŠ•แ‹ซแ‹ แ‹จแŒˆแАแ‰ฃแ‹ แ‹ญแˆ… แˆ…แŠ•แƒแฃ แˆแŠญ แŠฅแŠ•แ‹ฐ แŒแ‹™แ แ‹จแŠฅแŒ… แŒฅแ‰ แ‰ฅ แ‰…แˆญแŒซแ‰ต แ‹ญแ‰ณแ‹ซแˆแข แŠ แˆแˆตแ‰ต แŽแ‰… แ‹ซแˆˆแ‹ แˆฒแˆ†แŠ•แฃ แ‹จแˆ…แŠ•แƒแ‹ แŠฅแŒ€แ‰ณแ‹Žแ‰ฝ (Handles) แŠฅแŠ•แŠณแŠ• แˆณแ‹ญแ‰€แˆญ แ‰ แ‰ตแŠญแŠญแˆ แ‰ฐแŒˆแŠ•แ‰ฅแ‰ฐแ‹ แ‹จแ‰…แˆญแŒซแ‰ฑแŠ• แ‰…แˆญแ… แ‰ แˆšแŒˆแ‰ฃ แŠ แˆณแ‹ญแ‰ฐแ‹‹แˆแข

แ‹จแŒแŠ•แ‰ฃแ‰ณ แŒฅแ‰ แ‰ฅ แˆแŠ• แ‹ซแˆ…แˆ แˆแŒ แˆซ แˆŠแŒจแˆ˜แˆญแ‰ แ‰ต แŠฅแŠ•แ‹ฐแˆšแ‰ฝแˆ แ‰ตแˆแ‰… แˆ›แˆณแ‹ซ แАแ‹แข

โ€‹๐Ÿ’ก แ‹จแ‰ฐแŒˆแАแ‰ฃแ‹ แˆ˜แ‰ผ แАแ‹? แˆˆแˆแŠ• แ‹“แˆ‹แˆ›? แ‹จแˆšแˆˆแ‹แŠ• แŠฎแˆœแŠ•แ‰ต แˆ‹แ‹ญ แŠ แˆตแ‰€แˆแŒกแˆแŠ•!

โ€‹#Architecture #Engineering #AmazingBuildings #Construction #Design #EthioCon
โ€‹
@etconp
โค16๐Ÿ‘2
๐Ÿ‘‰RAFT FOUNDATION STEP-BY-STEP GUIDE

๐ŸทA raft (mat) foundation is a large reinforced concrete slab that supports multiple columns and walls by spreading structural loads over a wide area.

๐ŸงทIt is commonly used where the soil has low bearing capacity or where individual footings would overlap.

โบA properly designed raft foundation reduces differential settlement, improves structural stability, and provides a strong, uniform base for buildings.

๐Ÿ”—Main Components

โ€ข Reinforcement steel provides tensile strength.
โ€ข Top and bottom rebar mesh distribute loads and control cracking.
โ€ข Column starter bars connect the foundation to columns.
โ€ข Block/void formers reduce concrete volume and self-weight.
โ€ข Conduits and pipes are installed before concreting for utilities.
โ€ข Side formwork and support props maintain the slab shape during casting.
โ€ข A well-compacted base with PCC ensures a stable and level foundation.

๐ŸชงConstruction Sequence:

1. Excavate to the required depth.

2. Prepare and compact the foundation base.

3. Install formwork and supports.

4. Fix bottom reinforcement with proper concrete cover.

5. Place block/void formers and install top reinforcement.

6. Pour, vibrate, level, and cure the concrete for the specified duration.

๐Ÿ”–Benefits of a Raft Foundation

โœ” Distributes structural loads evenly.
โœ” Ideal for weak and compressible soils.
โœ” Minimizes differential settlement.
โœ” Improves overall building stability.
โœ” Reduces the need for multiple isolated footings.
โœ” Provides excellent performance for heavy structures.

#RaftFoundation #MatFoundation #FoundationEngineering #CivilEngineering #StructuralEngineering #Construction #BuildingConstruction #Reinforcement #Rebar #Concrete #ConcreteWork #Footing @ETCONpWORK

@etconp
โค4๐Ÿ‘3
๐Ÿ›ฃ๏ธ Every Great Road Starts with a Strong Foundation! ๐Ÿ—๏ธ

A road is much more than the asphalt you see on the surface. Its strength, durability, and performance depend on a well-designed pavement structureโ€”from the compacted subgrade to the sub-base, base course, binder course, and wearing course. Proper cross-section design, camber (2.5%), shoulders, and drainage ensure safer roads and a longer service life. ๐Ÿšœ๐Ÿ“

๐Ÿ‡ช๐Ÿ‡น แŒ แŠ•แŠซแˆซ แˆ˜แŠ•แŒˆแ‹ต แ‹จแˆšแŒ€แˆแˆจแ‹ แ‰ แŒ แŠ•แŠซแˆซ แˆ˜แˆ แˆจแ‰ต แАแ‹!๐Ÿ—๏ธ

๐Ÿ’ซแ‹จแˆแŠ“แ‹จแ‹ แŠ แˆตแ‹แˆแ‰ต แ‰ฅแ‰ป แŠ แ‹ญแ‹ฐแˆˆแˆแค แ‹จแˆ˜แŠ•แŒˆแ‹ฑ แŒฅแŠ•แŠซแˆฌแŠ“ แ‹˜แˆ‹แ‰‚แАแ‰ต แŠจSubgrade, Sub-base, Base Course, Binder Course, แŠฅแŠ“ Wearing Course แ‰ แ‰ตแŠญแŠญแˆ แŠจแ‰ฐแŒˆแАแ‰ก แ‹ญแŒ€แˆแˆซแˆแข แ‰ตแŠญแŠญแˆˆแŠ› แ‹จแˆ˜แŠ•แŒˆแ‹ต แˆ˜แˆตแ‰€แˆ แŠญแแˆ (Cross Section) แŠฅแŠ“ แ‹จแ‹แˆƒ แแˆฐแ‰ต แŠ•แ‹ตแ แ‹ฐแˆ…แŠ•แАแ‰ตแŠ•แŠ“ แ‹จแˆ˜แŠ•แŒˆแ‹ฑแŠ• แ‹•แ‹ตแˆœ แ‹ซแˆณแ‹ตแŒ‹แˆ‰๐ŸŒ๐Ÿšง

#CivilEngineering #RoadConstruction #HighwayEngineering #PavementDesign #Asphalt #Infrastructure #ETCONP #Construction #Engineering #Ethiopia ๐Ÿ‡ช๐Ÿ‡น

@etconp
โค5๐Ÿ‘1
๐Ÿ’งDesign Period in Water Supply Scheme & Factors Affecting Per Capita Water Demand

A well-designed water supply system must ensure safe and adequate water for present and future needs.

Engineers select a suitable design period for each component based on its expected service life, future population growth, and economic considerations.

๐Ÿ“Œ What is Design Period?

The design period is the future time span for which a water supply system or its components are planned and designed to meet the anticipated water demand efficiently.

๐Ÿ“Š Typical Design Period of Water Supply Components

๐ŸŒŠ Source & Intake Structures: 30โ€“50 years

๐Ÿ—๏ธ Reservoirs: 30โ€“50 years

๐Ÿšฐ Transmission & Distribution Mains: 30โ€“40 years

๐Ÿ  Buildings & Pump Houses: 15โ€“25 years

๐Ÿ’ฆ Factors Affecting Per Capita Water Demand

1. ๐ŸŒก๏ธ Climate โ€“ Hot and dry climates increase water consumption.

2. ๐Ÿ™๏ธ Size of the City โ€“ Larger cities generally require more water per person.

3. ๐Ÿ‘จโ€๐Ÿ‘ฉโ€๐Ÿ‘งโ€๐Ÿ‘ฆ Standard of Living โ€“ Higher living standards lead to greater water use.

4. ๐Ÿ› Habits and Customs โ€“ Bathing, washing, gardening, and lifestyle influence demand.

5. ๐Ÿญ Industrial & Commercial Development โ€“ More industries and businesses increase consumption.

6. โš™๏ธ Pressure in the Distribution System โ€“ Higher pressure often results in higher usage and leakage.

7. ๐Ÿ’ฐ Water Tariff โ€“ Lower tariffs encourage greater consumption, while higher tariffs help reduce wastage.

๐Ÿ“ Key Note:

Per capita water demand varies with location, climate, population, economic conditions, and lifestyle.

Accurate estimation is essential for designing an economical, efficient, and reliable water supply system.

#CivilEngineering #WaterSupply #DesignPeriod #PerCapitaDemand #EnvironmentalEngineering #WaterResources #Hydraulics #PublicHealthEngineering #MunicipalEngineering #Infrastructure #EngineeringStudents #Construction #EngineeringNotes #StudyMaterial #WaterDistribution #WaterTreatment #SmartInfrastructure #EngineeringEducation

@etconp
โค5
๐Ÿ‘‰Topographic Survey Points โ€“

โฌ‡๏ธThe Foundation of Accurate Land Mapping

๐Ÿ”†Topographic survey points are fixed and measured reference locations used to determine the shape, elevation, and contours of the land. They provide accurate ground data for planning, design, and construction projects, ensuring structures are built safely and efficiently.

๐Ÿ—‚Key Types of Survey Points

๐Ÿ”ด Control Point (Benchmark - BM):

โบPermanent reference point with a known elevation.

โบServes as the primary datum for all survey measurements.

โบEnsures consistency throughout the project.

๐Ÿ”ต Detail Point:

โ–ถ๏ธRecords the elevation and position of natural and man-made features.

โ–ถ๏ธUsed to generate contour maps and terrain models.

โ–ถ๏ธHelps engineers understand site topography.

๐ŸŸข Check Point:

โ˜„Independent point used to verify survey accuracy.
โ˜„Detects measurement errors and maintains quality control.
โ˜„Essential for reliable survey results.

๐Ÿ›Why Topographic Survey Matters

โœ… Produces accurate contour maps.

โœ… Supports road, bridge, and building design.

โœ… Assists in earthwork volume calculations.

โœ… Improves drainage and grading design.

โœ… Reduces construction errors and project costs.

โœ… Provides reliable data for engineers and surveyors.

๐ŸŒŸCommon Survey Equipment

โ–ถ๏ธTotal Station
โ–ถ๏ธGNSS/GPS Receive
โ–ถ๏ธAuto Level
โ–ถ๏ธDigital Level
โ–ถ๏ธSurvey Prism
โ–ถ๏ธMeasuring Tape and Survey Markers

#TopographicSurvey #LandSurvey #Surveying #CivilEngineering #Construction #Benchmark #ControlPoint #Elevation #ContourMapping #SiteSurvey #Engineering #Infrastructure #Earthwork #RoadConstruction #SurveyEquipment #TotalStation #GPSSurvey #BuildingConstruction #EngineeringEducation

@etconp
โค5
๐Ÿ‘‰Common Defects in Concrete โ€“ Causes, Effects & Prevention

โ˜„Concrete defects can reduce strength, durability, appearance, and service life if they are not identified and controlled during construction. Here are some common defects every civil engineer and site professional should know:

1. Honeycombing โ€“ Voids on the concrete surface caused mainly by poor compaction or improper placement. It can reduce strength and durability.

2. Segregation โ€“ Separation of coarse aggregate from the cement mortar, often due to excess water or improper handling and mixing. It produces non-uniform concrete and weak zones.

3. Bleeding โ€“ Water rises to the concrete surface during or after finishing, commonly due to excessive water content. It can result in a weak surface and poor bond.

4. Cracks โ€“ Cracking may occur due to shrinkage, temperature changes, or structural stresses. Structural cracks require proper engineering assessment.

5. Spalling โ€“ Pieces of concrete break away from the surface, often associated with reinforcement corrosion, environmental exposure, or freeze-thaw action.

6. Efflorescence โ€“ White, powdery salt deposits appear on the concrete surface due to moisture movement and soluble salts. It is mainly an appearance issue but may indicate moisture movement.

7. Scaling โ€“ The surface layer of concrete peels or flakes away, commonly due to freeze-thaw cycles, de-icing salts, poor finishing, or inadequate curing.

8. Voids / Air Pockets โ€“ Entrapped air or large cavities remain inside concrete because of inadequate vibration or compaction, reducing strength and durability.

Prevention

โœ” Use good-quality materials
โœ” Maintain the specified water-cement ratio
โœ” Ensure proper mixing, placing and vibration
โœ” Avoid excessive water addition at site
โœ” Provide adequate curing
โœ” Follow approved concrete specifications and construction practices
โœ” Inspect reinforcement, formwork and concrete placement carefully

Remember: Prevention is better than repair. Proper workmanship, quality control and curing are essential for durable concrete.

#CivilEngineering #Concrete #ConcreteTechnology #Construction #CivilTechTime #ConcreteDefects #Honeycombing #Segregation #Bleeding #ConcreteCracks #Spalling #Efflorescence

@etconp
โค8
๐Ÿ—๏ธ๐ŸงชWhat Tests Should Be Done on Fresh Concrete? |

Fresh concrete must be tested before and during placement to make sure it has the required workability, consistency, uniformity, and air content. These tests help identify problems earlyโ€”before they become defects in the hardened concrete. ๐Ÿ‘ทโ€โ™‚๏ธ๐Ÿ—๏ธ

1๏ธโƒฃ Slump Test โ€” แ‹จSlump แˆแˆญแˆ˜แˆซ

The slump test is one of the most common field tests for fresh concrete. It gives an indication of the concreteโ€™s consistency and workability and helps determine whether the mix is suitable for placing and compacting.

๐Ÿ‘‰ Too much slump may indicate excessive water or other issues, while very low slump can make placement and compaction difficult.

แ‹จSlump แˆแˆญแˆ˜แˆซ แ‹จแ‰ตแŠฉแˆต แŠฎแŠ•แŠญแˆชแ‰ตแŠ• แ‹จแˆ˜แˆตแˆซแ‰ต แ‰€แˆ‹แˆแАแ‰ต (Workability) แŠฅแŠ“ Consistency แˆˆแˆ˜แŒˆแˆแŒˆแˆ แ‹จแˆšแˆจแ‹ณ แ‹จแˆ˜แˆตแŠญ แˆแˆญแˆ˜แˆซ แАแ‹แข

2๏ธโƒฃ Workability Tests โ€” แ‹จWorkability แˆแˆญแˆ˜แˆซแ‹Žแ‰ฝ

Workability describes how easily fresh concrete can be mixed, transported, placed, compacted and finished without segregation or excessive bleeding.

๐Ÿ‘‰ The appropriate test depends on the type and consistency of concrete.

Workability แˆ›แˆˆแ‰ต แŠฎแŠ•แŠญแˆชแ‰ต แˆณแ‹ญแˆˆแ‹ซแ‹ญ (Segregation) แŠฅแŠ“ แŠจแˆ˜แŒ แŠ• แ‰ แˆ‹แ‹ญ แ‹แˆƒ แˆณแ‹ญแˆˆแ‰… (Bleeding) แ‰ แ‰€แˆ‹แˆ‰ แˆŠแ‰€แˆ‹แ‰€แˆแฃ แˆŠแŒ“แŒ“แ‹แฃ แˆŠแ‹˜แˆจแŒ‹ แŠฅแŠ“ แˆŠแŒ แ‰ แ‰… (Compaction) แ‹จแˆšแ‰ฝแˆแ‰ แ‰ตแŠ• แ‰ฝแˆŽแ‰ณ แ‹ซแˆ˜แˆˆแŠญแ‰ณแˆแข

3๏ธโƒฃ Compacting Factor Test โ€” แ‹จCompacting Factor แˆแˆญแˆ˜แˆซ

This test is particularly useful for low-workability concrete. It measures the degree of compaction achieved under standardized conditions and provides an indication of workability.

๐Ÿ‘‰ It can be more sensitive than the slump test for stiff concrete.

4๏ธโƒฃ Setting Time โ€” แ‹จSetting Time แˆแˆญแˆ˜แˆซ

Setting time indicates how long the cementitious material takes to begin and substantially complete setting. It is important for determining available time for placing and finishing concrete.

๐Ÿ‘‰ In practice, setting characteristics are commonly assessed through cement/paste tests, while concrete behavior can also be monitored using appropriate methods depending on the specification.

5๏ธโƒฃ Air Content Test โ€” แ‹จAir Content แˆแˆญแˆ˜แˆซ

This test determines the amount of air present in fresh concrete.

๐Ÿ‘‰ Air content is especially important in air-entrained concrete because the correct amount of entrained air can improve durability against freeze-thaw exposure. Excessive unintended air, however, can reduce strength.

๐Ÿ” Other Important Fresh Concrete Checks

โœ… Concrete Temperature Test โ€” แ‹จแŠฎแŠ•แŠญแˆชแ‰ต แˆ™แ‰€แ‰ต แˆแˆญแˆ˜แˆซ
Temperature affects setting, workability, strength development and durability.

โœ… Bleeding Test โ€” แ‹จBleeding แˆแˆญแˆ˜แˆซ
Checks the tendency of water to rise to the surface of fresh concrete.

โœ… Segregation Assessment โ€” แ‹จSegregation แˆแˆญแˆ˜แˆซ
Checks whether coarse aggregate separates from the cement paste and mortar.

โœ… Unit Weight / Density Test โ€” แ‹จUnit Weight/Density แˆแˆญแˆ˜แˆซ
Helps assess the density and uniformity of fresh concrete and can be used alongside air-content measurements.

๐Ÿ“Œ Remember: Fresh-concrete testing is not just about getting a good slump. Temperature, workability, air content, bleeding, segregation and uniformity can all affect the final quality of the structure.

๐Ÿ—๏ธ Good concrete starts with proper testing!
๐Ÿ‘ทโ€โ™‚๏ธ Quality control today = safer and more durable structures tomorrow.

#ConcreteTesting #FreshConcrete #SlumpTest #CompactingFactor #Workability #AirContent #ConcreteTechnology #CivilEngineering #Construction #QualityControl #StructuralEngineering

@etconp
โค5
๐Ÿ’ง๐Ÿ—๏ธ แ‹จแ‹แˆƒ แˆฅแˆซแ‹Žแ‰ฝ แŒแŠ•แ‰ฃแ‰ณ | WATER WORKS CONSTRUCTION ๐Ÿšฐ๐Ÿ‘ทโ€โ™‚๏ธ

๐Ÿ’ก แ‹จแ‹แˆƒ แˆฅแˆซ แŒแŠ•แ‰ฃแ‰ณ แ‹จแˆ˜แŒ แŒฅ แ‹แˆƒแŠ• แŠจแˆแŠ•แŒฉ แ‹ˆแ‹ญแˆ แŠจแˆ›แŒ แˆซแ‰€แˆšแ‹ซ แ‰ฆแ‰ณ แ‰ แˆ˜แАแˆณแ‰ต แ‹ˆแ‹ฐ แˆ›แˆ…แ‰ แˆจแˆฐแ‰ฅแฃ แ‹ˆแ‹ฐ แ‰คแ‰ถแ‰ฝแฃ แ‹ˆแ‹ฐ แ‹ตแˆญแŒ…แ‰ถแ‰ฝ แŠฅแŠ“ แ‹ˆแ‹ฐ แˆŒแˆŽแ‰ฝ แ‹จแ‹แˆƒ แ‰ฐแŒ แ‰ƒแˆšแ‹Žแ‰ฝ แ‰ แŠ แˆตแ‰ฐแˆ›แˆ›แŠแŠ“ แ‰ แ‰ฐแ‰€แŒฃแŒฃแ‹ญ แˆแŠ”แ‰ณ แŠฅแŠ•แ‹ฒแ‹ฐแˆญแˆต แ‹จแˆšแ‹ซแˆตแ‰ฝแˆ‰ แ‹จแˆแˆ…แŠ•แ‹ตแˆตแŠ“ แˆฅแˆซแ‹Žแ‰ฝแŠ• แ‹ซแŠซแ‰ตแ‰ณแˆแข ๐Ÿ’ฆ

แ‰ แ‹แˆƒ แˆฅแˆซ แ•แˆฎแŒ€แŠญแ‰ต แ‹แˆตแŒฅ แ‹จแˆฅแˆซแ‹แŠ• แˆ˜แŒ แŠ• แ‰ แ‰ตแŠญแŠญแˆ แˆˆแˆ˜แˆˆแŠซแ‰ตแŠ“ แ‹จแ•แˆฎแŒ€แŠญแ‰ฑแŠ• แ‹ˆแŒช แˆˆแˆ›แˆตแˆ‹แ‰ต แ‰ฐแˆˆแ‹ซแ‹ฉ แ‹จแˆ˜แˆˆแŠชแ‹ซ แŠ แˆƒแ‹ถแ‰ฝ แ‹ญแŒ แ‰€แˆ›แˆ‰แข ๐Ÿ“๐Ÿ“‹

๐Ÿ”น แ‹จแ‹แˆƒ แˆแŠ•แŒญ แˆแˆ›แ‰ต โ€” No. / แ‰แŒฅแˆญ
แ‹จแˆแŠ•แŒญ แˆแˆ›แ‰ตแฃ แ‹จแŒ‰แ‹ตแŒ“แ‹ต แˆฅแˆซ แ‹ˆแ‹ญแˆ แ‹จแ‹แˆƒ แˆ˜แ‹ซแ‹ฃ แˆ˜แ‹‹แ‰…แˆญ แŠฅแŠ•แ‹ฐ แŠ แŠ•แ‹ต แ‹จแˆฅแˆซ แŠญแแˆ แˆฒแ‰†แŒ แˆญแข ๐Ÿ’ง

๐Ÿ”น แ‹จแ‹แˆƒ แ‰งแŠ•แ‰ง แˆ˜แˆตแˆ˜แˆญ แ‹แˆญแŒ‹แ‰ณ โ€” m / ML (แˆœแ‰ตแˆญ)
แ‹จแ‰ฐแ‹˜แˆจแŒ‹แ‹ แ‹จแ‰งแŠ•แ‰ง แˆ˜แˆตแˆ˜แˆญ แˆญแ‹แˆ˜แ‰ตแข ๐Ÿšฐ๐Ÿ“

๐Ÿ”น แ‹จแ‰งแŠ•แ‰ง แˆ˜แˆตแˆ˜แˆญ แ‰แ‹แˆฎ โ€” mยณ (แŠชแ‹ฉแ‰ขแŠญ แˆœแ‰ตแˆญ)
แ‹จแ‰ฐแ‰†แˆแˆจแ‹ แ‹จแˆ˜แˆฌแ‰ต แˆ˜แŒ แŠ•แข โ›๏ธ

๐Ÿ”น แ‹จแ‰งแŠ•แ‰ง แˆ˜แˆตแˆ˜แˆญ แ‹จแŠ แˆธแ‹‹ แŠ แˆแŒ‹ แ‹แŒแŒ…แ‰ต โ€” mยณ
แ‰ แ‰งแŠ•แ‰งแ‹ แˆตแˆญ แ‹จแˆšแ‹ฐแˆจแŒˆแ‹ แ‹จแŠ แˆธแ‹‹ แŠ•แŒฃแ แˆ˜แŒ แŠ•แข

๐Ÿ”น แ‹จแ‰งแŠ•แ‰ง แˆ˜แˆ™แˆ‹แ‰ต (Backfilling) โ€” mยณ
แ‰งแŠ•แ‰งแ‹ แŠจแ‰ฐแ‰ฐแŠจแˆˆ แ‰ แŠ‹แˆ‹ แ‰ฆแ‹ฉแŠ• แ‰ แˆ˜แˆฌแ‰ต แ‹ˆแ‹ญแˆ แ‰ แ‰ฐแˆ˜แˆจแŒ  แ‰แˆณแ‰แˆต แ‹จแˆ˜แˆ™แˆ‹แ‰ต แˆ˜แŒ แŠ•แข

๐Ÿ”น แ‹จแ‹แˆƒ แˆ›แŒ แˆซแ‰€แˆšแ‹ซ แŒแŠ•แ‰ฃแ‰ณ โ€” mยณ / mยฒ
แ‹จแŠฎแŠ•แŠญแˆชแ‰ต แˆฅแˆซ mยณแฃ แ‹จแ•แˆ‹แˆตแ‰ฐแˆญแŠ“ แ‹จแŒˆแŒฝแ‰ณ แˆฅแˆซ mยฒ แˆŠแˆˆแŠซ แ‹ญแ‰ฝแˆ‹แˆแข ๐Ÿ—๏ธ

๐Ÿ”น แ‹จแ“แˆแ• แŒฃแ‰ขแ‹ซ แŒแŠ•แ‰ฃแ‰ณ โ€” mยฒ / mยณ / No.
แ‹จแˆ•แŠ•แƒ แˆฅแˆซ mยฒแฃ แ‹จแŠฎแŠ•แŠญแˆชแ‰ต แˆฅแˆซ mยณแฃ แ“แˆแ•แŠ“ แˆ˜แˆฃแˆชแ‹ซแ‹Žแ‰ฝ No. แˆŠแˆ†แŠ‘ แ‹ญแ‰ฝแˆ‹แˆ‰แข โš™๏ธ

๐Ÿ”น แ‰ซแˆแ‰ญ แŠฅแŠ“ แŠแ‰ฒแŠ•แŒ แˆ˜แ‰ตแŠจแˆ โ€” No. / แ‰แŒฅแˆญ
Valves, bends, tees, reducers แŠฅแŠ“ แˆŒแˆŽแ‰ฝ แŠแ‰ฒแŠ•แŒŽแ‰ฝ แ‰ แ‰แŒฅแˆญ แ‹ญแˆˆแŠซแˆ‰แข ๐Ÿ”ง

๐Ÿ”น แ‹จแ‰ซแˆแ‰ญ แ‰ปแˆแ‰ แˆญ แŒแŠ•แ‰ฃแ‰ณ โ€” No. / mยณ / mยฒ
แ‰ปแˆแ‰ แˆฉ แŠฅแŠ•แ‹ฐ แŠ แŠ•แ‹ต แ‹จแ‰ฐแŒ แŠ“แ‰€แ‰€ แˆฅแˆซ No. แˆŠแˆ†แŠ• แ‹ญแ‰ฝแˆ‹แˆแค แŠฎแŠ•แŠญแˆชแ‰ต mยณ แŠฅแŠ“ แ•แˆ‹แˆตแ‰ฐแˆญ mยฒ แ‹ญแˆˆแŠซแˆ‰แข

๐Ÿ”น แ‹จแ‹แˆƒ แˆ›แŒฃแˆชแ‹ซ แˆฅแˆซ โ€” No. / LS
แ‹จแˆ›แŒฃแˆชแ‹ซ แˆ˜แˆฃแˆชแ‹ซแ‹Žแ‰ฝ แ‰ แ‰แŒฅแˆญแฃ แŠ แŠ•แ‹ณแŠ•แ‹ต แ‹จแ‰ฐแˆŸแˆ‹ แ‹จแˆฅแˆซ แŠญแแˆŽแ‰ฝแˆ Lump Sum (LS) แˆŠแˆ†แŠ‘ แ‹ญแ‰ฝแˆ‹แˆ‰แข ๐Ÿงช

๐Ÿ”น แ‹จแ‹แˆƒ แŒแŠแ‰ต แˆ™แŠจแˆซ โ€” m / ML
แ‹จแˆšแˆแ‰ฐแАแ‹ แ‹จแ‰งแŠ•แ‰ง แˆ˜แˆตแˆ˜แˆญ แˆญแ‹แˆ˜แ‰ตแข ๐Ÿ“๐Ÿ’ฆ

๐Ÿ”น แ‹จแ‹แˆƒ แŒฅแˆซแ‰ต แˆแˆญแˆ˜แˆซ โ€” No. / Test
แ‹จแˆ‹แ‰ฅแˆซแ‰ถแˆช แˆแˆญแˆ˜แˆซแ‹Žแ‰ฝ แ‰ แˆšแ‹ฐแˆจแŒ‰แ‰ต แ‹จแˆ™แŠจแˆซ แ‰ฅแ‹›แ‰ต แˆŠแˆˆแŠฉ แ‹ญแ‰ฝแˆ‹แˆ‰แข ๐Ÿงช

๐Ÿ“Œ แ‰ แŠ แŒ แ‰ƒแˆ‹แ‹ญ แ‰ แ‹แˆƒ แˆฅแˆซ BOQ แ‰ แ‰ฅแ‹›แ‰ต แ‹จแˆšแŒ แ‰€แˆ™ แˆ˜แˆˆแŠชแ‹ซแ‹Žแ‰ฝแฆ

m/ML โ†’ แˆญแ‹แˆ˜แ‰ต ๐Ÿ“
mยฒ โ†’ แ‹จแŒˆแŒฝแ‰ณ แˆตแ‹แ‰ต
mยณ โ†’ แ‹จแ‹ตแˆแ…/แ‹จแŠฉแ‰ฅ แˆ˜แŒ แŠ•
No. โ†’ แ‰แŒฅแˆญ
kg โ†’ แŠญแ‰ฅแ‹ฐแ‰ต โš–๏ธ
LS โ†’ Lump Sum / แ‹จแ‰ฐแŒ แ‰ƒแˆˆแˆˆ แ‹‹แŒ‹

๐Ÿ’ก แ‰ตแŠญแŠญแˆˆแŠ› แ‹จแˆฅแˆซ แˆ˜แŒ แŠ• + แ‰ตแŠญแŠญแˆˆแŠ› แ‹จแˆ˜แˆˆแŠชแ‹ซ แŠ แˆƒแ‹ต + แ‰ตแŠญแŠญแˆˆแŠ› BOQ = แ‹จแ‰ฐแˆปแˆˆ แ‹จแ‹ˆแŒช แ‰แŒฅแŒฅแˆญ! ๐Ÿ“‹๐Ÿ’ฐ๐Ÿ—๏ธ

#WaterWorks #BOQ #CivilEngineering #HydraulicEngineering #Construction #แ‹จแ‹แˆƒ_แˆฅแˆซ #แ‹จแ‹แˆƒ_แŒแŠ•แ‰ฃแ‰ณ #BOQ #แˆฒแ‰ชแˆ_แŠขแŠ•แŒ‚แАแˆชแŠ•แŒ ๐Ÿ‡ช๐Ÿ‡น

@etconp
๐Ÿ‘5โค2