๐Construction Engineering Abbreviation Tips
โก๏ธThe common abbreviation used in Construction Industry
๐ท A.A.S.H.T.O โ American Association of state highway Transport Official.
๐ท A.C.I โ American Concrete Institute.
๐ท A.R.E.A โ American Railway Engineering Association.
๐ท A.B โ Anchor Bolt Or Asbestos Board
๐ท AC โ Asphalt Concrete
๐ท A.S.C โ Allowable Stress of concrete.
๐ท A.S.T.M โ American society for testing materials
๐ท AC โ Asbestos Cement.
๐ท AE โ Assistant Engineer
๐ท APM โ Assistant Project Manager
๐ท B.M โ Benchmark
๐ท B.M โ Bending Moment.
๐ท BLK โ Block Work
๐ท BOQ โ Bill Of Quantities
๐ท BRW โ Brick Retaining Wall
๐ท BWK โ Brick Work
๐ท B.O.F โ Bottom Of Foundation
๐ท BHK โ Bedroom, Hall, Kitchen
๐ท C.I.Pipe โ Cast iron pipe.
๐ท C.I.Sheet โ Corrugated Iron sheet.
๐ทCL- Centre Line
๐ทCRW โ Concrete Retaining Wall
๐ท CBW โ Concrete Block Wall
๐ท CIP โ Cast In Place
๐ท CMU โ Concrete Masonry Unit
๐ท CJ โ Construction Joint
๐ท CC โ Centre To Centre
๐ท CC โ Cement concrete.
๐ท CE โ Chief Engineer
๐ท CP โ Cement plaster.
๐ท CPM โ Critical path method.
๐ท CS โ Comparative statement.
๐ท D โ Diameter
๐ท DL โ Development Length
๐ท Dia โ Diameter
๐ท DIM โ Dimension
๐ท D.L โ Dead load.
๐ท DPC โ Damp proof course.
๐ท DPR โ Daily Progress Report
๐ท DRG โ Drawings
๐ท DWLS โ Dowels
๐ท EJ โ Expansion Joint
๐ท E.L โ Environmental load.
๐ท EL โ Existing Load
๐ท EGL โ Existing ground level.
๐ท ELCB โ Earth Leak Circuit Breaker
๐ท F.M โ Fineness Modulus.
๐ท Ft โ Foot Or Feet
๐ท FL โ Floor Level
๐ท FGL โ Formation ground level.
๐ท FOC โ Factor Of Safety
๐ท GL โ Ground Level
๐ท GL โ Ground level.
๐ท GP โ Ground plane.
๐ท HFL โ Highest Flood Level.
๐ท HAC โ High Alumina Cement
๐ท HP โ Horizontal plane.
๐ท IOM โ Inter Office Memo
๐ท ISI โ Indian standard institute.
๐ท JE โ Junior Engineer
๐ท JST โ Joist
๐ท Kg โ Kilogram.
๐ท L.L โ Live load.
๐ท LW โ Light Weight
๐ท LWC โ light Weight Concrete
๐ท LC โ Lime concrete.
๐ท M โ Meter
๐ท MM โ Millimeter.
๐ท MB โ Measurement book.
๐ท MCB โ Miniature Circuit Breaker
๐ท MEP โ Mechanical Electrical Plumbing
๐ท MFL โ Maximum Flood Level
๐ท MRC โ Material Receipt Challan
๐ท MT โ Metric Tonnes
๐ท N โ Newton
๐ท NCF โ Neat cement finishing.
๐ท OPC โ Ordinary Portland Cement
๐ท OGL โ Original ground level.
๐ท OSR โ Open Soace Reservation Area
๐ท PC โ Pile Cap
๐ท PC โ Precast Concrete
๐ท PCC โ Plain Cement Concrete
๐ท PERT โ Programme Evaluation and Review Technique.
๐ท PL โ Plinth level.
๐ท PM โ Project Manager
๐ท PO โ Purchase Order
๐ท PPE โ Personal Protective Equipment
๐ท PPR โ Poly Propylene Random.
๐ท PVC โ Poly vinyl choloride .
๐ท PVC โ Polyvinyl Chloride
๐ท PSF โ Pound Per Square Foot
๐ท PSI โ Pound Per Square Inch
๐ท PWD โ Permanent Works Engineer
๐ท QC โ Quality control
๐ท QS โ Quantity Surveyor
๐ท RC โ Reinforced Concrete
๐ท R.B.W โ Reinforced brick work.
๐ท RBC โ Reinforced Brick concrete.
๐ท RCC โ Reinforced Cement Concrete
๐ท RMC โ Ready Mixed Concrete concrete.
๐ท RL โ Reduced level.
๐ท SCC โ Self Compacting Concrete
๐ท STP โ Sewage Treatment Plant
๐ท SRC โ Sulphate Resisting Cement
๐ท SWG โ Standard wire gauge.
๐ท TB โ Tie Beam
๐ท TBM โ Tunnel Boring Machine
๐ท TDS โ Total Dissolved Solids
๐ท TOB โ Top Of Beam
๐ท TMT โ Thermo Mechanical Treatment
๐ท TOC โ Top Of Concrete
๐ท TOW โ Top Of Wall
๐ท U.S.C โ Ultimate stress of concrete.
๐ท UPVC โ Unplasticized Polyvinyl chloride.
๐ท USD โ Ultimate strength design.
๐ท VP โ Vertical plane.
๐ท W.C โ Water closet.
๐ท WL โ Working Level
๐ท W.S.D โ Working stress Design
๐ท WO โ Work Order
Source:from, etcon page
@etconp
โก๏ธThe common abbreviation used in Construction Industry
๐ท A.A.S.H.T.O โ American Association of state highway Transport Official.
๐ท A.C.I โ American Concrete Institute.
๐ท A.R.E.A โ American Railway Engineering Association.
๐ท A.B โ Anchor Bolt Or Asbestos Board
๐ท AC โ Asphalt Concrete
๐ท A.S.C โ Allowable Stress of concrete.
๐ท A.S.T.M โ American society for testing materials
๐ท AC โ Asbestos Cement.
๐ท AE โ Assistant Engineer
๐ท APM โ Assistant Project Manager
๐ท B.M โ Benchmark
๐ท B.M โ Bending Moment.
๐ท BLK โ Block Work
๐ท BOQ โ Bill Of Quantities
๐ท BRW โ Brick Retaining Wall
๐ท BWK โ Brick Work
๐ท B.O.F โ Bottom Of Foundation
๐ท BHK โ Bedroom, Hall, Kitchen
๐ท C.I.Pipe โ Cast iron pipe.
๐ท C.I.Sheet โ Corrugated Iron sheet.
๐ทCL- Centre Line
๐ทCRW โ Concrete Retaining Wall
๐ท CBW โ Concrete Block Wall
๐ท CIP โ Cast In Place
๐ท CMU โ Concrete Masonry Unit
๐ท CJ โ Construction Joint
๐ท CC โ Centre To Centre
๐ท CC โ Cement concrete.
๐ท CE โ Chief Engineer
๐ท CP โ Cement plaster.
๐ท CPM โ Critical path method.
๐ท CS โ Comparative statement.
๐ท D โ Diameter
๐ท DL โ Development Length
๐ท Dia โ Diameter
๐ท DIM โ Dimension
๐ท D.L โ Dead load.
๐ท DPC โ Damp proof course.
๐ท DPR โ Daily Progress Report
๐ท DRG โ Drawings
๐ท DWLS โ Dowels
๐ท EJ โ Expansion Joint
๐ท E.L โ Environmental load.
๐ท EL โ Existing Load
๐ท EGL โ Existing ground level.
๐ท ELCB โ Earth Leak Circuit Breaker
๐ท F.M โ Fineness Modulus.
๐ท Ft โ Foot Or Feet
๐ท FL โ Floor Level
๐ท FGL โ Formation ground level.
๐ท FOC โ Factor Of Safety
๐ท GL โ Ground Level
๐ท GL โ Ground level.
๐ท GP โ Ground plane.
๐ท HFL โ Highest Flood Level.
๐ท HAC โ High Alumina Cement
๐ท HP โ Horizontal plane.
๐ท IOM โ Inter Office Memo
๐ท ISI โ Indian standard institute.
๐ท JE โ Junior Engineer
๐ท JST โ Joist
๐ท Kg โ Kilogram.
๐ท L.L โ Live load.
๐ท LW โ Light Weight
๐ท LWC โ light Weight Concrete
๐ท LC โ Lime concrete.
๐ท M โ Meter
๐ท MM โ Millimeter.
๐ท MB โ Measurement book.
๐ท MCB โ Miniature Circuit Breaker
๐ท MEP โ Mechanical Electrical Plumbing
๐ท MFL โ Maximum Flood Level
๐ท MRC โ Material Receipt Challan
๐ท MT โ Metric Tonnes
๐ท N โ Newton
๐ท NCF โ Neat cement finishing.
๐ท OPC โ Ordinary Portland Cement
๐ท OGL โ Original ground level.
๐ท OSR โ Open Soace Reservation Area
๐ท PC โ Pile Cap
๐ท PC โ Precast Concrete
๐ท PCC โ Plain Cement Concrete
๐ท PERT โ Programme Evaluation and Review Technique.
๐ท PL โ Plinth level.
๐ท PM โ Project Manager
๐ท PO โ Purchase Order
๐ท PPE โ Personal Protective Equipment
๐ท PPR โ Poly Propylene Random.
๐ท PVC โ Poly vinyl choloride .
๐ท PVC โ Polyvinyl Chloride
๐ท PSF โ Pound Per Square Foot
๐ท PSI โ Pound Per Square Inch
๐ท PWD โ Permanent Works Engineer
๐ท QC โ Quality control
๐ท QS โ Quantity Surveyor
๐ท RC โ Reinforced Concrete
๐ท R.B.W โ Reinforced brick work.
๐ท RBC โ Reinforced Brick concrete.
๐ท RCC โ Reinforced Cement Concrete
๐ท RMC โ Ready Mixed Concrete concrete.
๐ท RL โ Reduced level.
๐ท SCC โ Self Compacting Concrete
๐ท STP โ Sewage Treatment Plant
๐ท SRC โ Sulphate Resisting Cement
๐ท SWG โ Standard wire gauge.
๐ท TB โ Tie Beam
๐ท TBM โ Tunnel Boring Machine
๐ท TDS โ Total Dissolved Solids
๐ท TOB โ Top Of Beam
๐ท TMT โ Thermo Mechanical Treatment
๐ท TOC โ Top Of Concrete
๐ท TOW โ Top Of Wall
๐ท U.S.C โ Ultimate stress of concrete.
๐ท UPVC โ Unplasticized Polyvinyl chloride.
๐ท USD โ Ultimate strength design.
๐ท VP โ Vertical plane.
๐ท W.C โ Water closet.
๐ท WL โ Working Level
๐ท W.S.D โ Working stress Design
๐ท WO โ Work Order
Source:from, etcon page
@etconp
โค15๐4๐ฅฐ1
Ethiopian Construction Vacancy & Tender
๐แฐแแ แแต แคแฐแฐแฆแปแฝแ แฅแแแฝ แ แ แจแแนแ แแฐแจแต แจ ETABS แฒแถแญแซแ แชแตแฎ แ แ แแญแ แแแ แจ introduction แแแฎ Analysis แฅแ Design แฃแซแฐแ แแญแฅ แชแตแฎ แฃแแแ
แฐแแแนแแแข ๐ซตแฅแแ แแฌ แญแแ 4 แญแแแแน แแฅแฐแแ๐ https://youtu.be/iYTyYlebxjU
YouTube
๐ ETABS Full Course 2026 โ Part 9 | แจแแแช แฅแตแจ Advanced | ETABS Tutorial แ แ แแญแ ๐๏ธ๐
๐ ETABS Full Course โ Part 9 | Structural Design & Analysis Tutorial
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 9, we continue the ETABS workflowโฆ
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 9, we continue the ETABS workflowโฆ
๐ฅ1
๐ง๐๏ธ แจแแ แฅแซแแฝ แแแฃแณ | WATER WORKS CONSTRUCTION ๐ฐ๐ทโโ๏ธ
๐ก แจแแ แฅแซ แแแฃแณ แจแแ แฅ แแแ แจแแแฉ แแญแ แจแแ แซแแแซ แฆแณ แ แแแณแต แแฐ แแ แ แจแฐแฅแฃ แแฐ แคแถแฝแฃ แแฐ แตแญแ แถแฝ แฅแ แแฐ แแแฝ แจแแ แฐแ แแแแฝ แ แ แตแฐแแแแ แ แฐแแฃแฃแญ แแแณ แฅแแฒแฐแญแต แจแแซแตแฝแ แจแแ แแตแตแ แฅแซแแฝแ แซแซแตแณแแข ๐ฆ
แ แแ แฅแซ แแฎแแญแต แแตแฅ แจแฅแซแแ แแ แ แ แตแญแญแ แแแแซแตแ แจแแฎแแญแฑแ แแช แแแตแแต แฐแแซแฉ แจแแแชแซ แ แแถแฝ แญแ แแแแข ๐๐
๐น แจแแ แแแญ แแแต โ No. / แแฅแญ
แจแแแญ แแแตแฃ แจแแตแแต แฅแซ แแญแ แจแแ แแซแฃ แแแ แญ แฅแแฐ แ แแต แจแฅแซ แญแแ แฒแแ แญแข ๐ง
๐น แจแแ แงแแง แแตแแญ แแญแแณ โ m / ML (แแตแญ)
แจแฐแแจแแ แจแงแแง แแตแแญ แญแแแตแข ๐ฐ๐
๐น แจแงแแง แแตแแญ แแแฎ โ mยณ (แชแฉแขแญ แแตแญ)
แจแฐแแแจแ แจแแฌแต แแ แแข โ๏ธ
๐น แจแงแแง แแตแแญ แจแ แธแ แ แแ แแแ แต โ mยณ
แ แงแแงแ แตแญ แจแแฐแจแแ แจแ แธแ แแฃแ แแ แแข
๐น แจแงแแง แแแแต (Backfilling) โ mยณ
แงแแงแ แจแฐแฐแจแ แ แแ แฆแฉแ แ แแฌแต แแญแ แ แฐแแจแ แแณแแต แจแแแแต แแ แแข
๐น แจแแ แแ แซแแแซ แแแฃแณ โ mยณ / mยฒ
แจแฎแแญแชแต แฅแซ mยณแฃ แจแแแตแฐแญแ แจแแฝแณ แฅแซ mยฒ แแแซ แญแฝแแแข ๐๏ธ
๐น แจแแแ แฃแขแซ แแแฃแณ โ mยฒ / mยณ / No.
แจแแแ แฅแซ mยฒแฃ แจแฎแแญแชแต แฅแซ mยณแฃ แแแแ แแฃแชแซแแฝ No. แแแ แญแฝแแแข โ๏ธ
๐น แซแแญ แฅแ แแฒแแ แแตแจแ โ No. / แแฅแญ
Valves, bends, tees, reducers แฅแ แแแฝ แแฒแแแฝ แ แแฅแญ แญแแซแแข ๐ง
๐น แจแซแแญ แปแแ แญ แแแฃแณ โ No. / mยณ / mยฒ
แปแแ แฉ แฅแแฐ แ แแต แจแฐแ แแแ แฅแซ No. แแแ แญแฝแแแค แฎแแญแชแต mยณ แฅแ แแแตแฐแญ mยฒ แญแแซแแข
๐น แจแแ แแฃแชแซ แฅแซ โ No. / LS
แจแแฃแชแซ แแฃแชแซแแฝ แ แแฅแญแฃ แ แแณแแต แจแฐแแ แจแฅแซ แญแแแฝแ Lump Sum (LS) แแแ แญแฝแแแข ๐งช
๐น แจแแ แแแต แแจแซ โ m / ML
แจแแแฐแแ แจแงแแง แแตแแญ แญแแแตแข ๐๐ฆ
๐น แจแแ แฅแซแต แแญแแซ โ No. / Test
แจแแฅแซแถแช แแญแแซแแฝ แ แแฐแจแแต แจแแจแซ แฅแแต แแแฉ แญแฝแแแข ๐งช
๐ แ แ แ แแแญ แ แแ แฅแซ BOQ แ แฅแแต แจแแ แแ แแแชแซแแฝแฆ
m/ML โ แญแแแต ๐
mยฒ โ แจแแฝแณ แตแแต
mยณ โ แจแตแแ /แจแฉแฅ แแ แ
No. โ แแฅแญ
kg โ แญแฅแฐแต โ๏ธ
LS โ Lump Sum / แจแฐแ แแแ แแ
๐ก แตแญแญแแ แจแฅแซ แแ แ + แตแญแญแแ แจแแแชแซ แ แแต + แตแญแญแแ BOQ = แจแฐแปแ แจแแช แแฅแฅแญ! ๐๐ฐ๐๏ธ
#WaterWorks #BOQ #CivilEngineering #HydraulicEngineering #Construction #แจแแ_แฅแซ #แจแแ_แแแฃแณ #BOQ #แฒแชแ_แขแแแแชแแ ๐ช๐น
@etconp
๐ก แจแแ แฅแซ แแแฃแณ แจแแ แฅ แแแ แจแแแฉ แแญแ แจแแ แซแแแซ แฆแณ แ แแแณแต แแฐ แแ แ แจแฐแฅแฃ แแฐ แคแถแฝแฃ แแฐ แตแญแ แถแฝ แฅแ แแฐ แแแฝ แจแแ แฐแ แแแแฝ แ แ แตแฐแแแแ แ แฐแแฃแฃแญ แแแณ แฅแแฒแฐแญแต แจแแซแตแฝแ แจแแ แแตแตแ แฅแซแแฝแ แซแซแตแณแแข ๐ฆ
แ แแ แฅแซ แแฎแแญแต แแตแฅ แจแฅแซแแ แแ แ แ แตแญแญแ แแแแซแตแ แจแแฎแแญแฑแ แแช แแแตแแต แฐแแซแฉ แจแแแชแซ แ แแถแฝ แญแ แแแแข ๐๐
๐น แจแแ แแแญ แแแต โ No. / แแฅแญ
แจแแแญ แแแตแฃ แจแแตแแต แฅแซ แแญแ แจแแ แแซแฃ แแแ แญ แฅแแฐ แ แแต แจแฅแซ แญแแ แฒแแ แญแข ๐ง
๐น แจแแ แงแแง แแตแแญ แแญแแณ โ m / ML (แแตแญ)
แจแฐแแจแแ แจแงแแง แแตแแญ แญแแแตแข ๐ฐ๐
๐น แจแงแแง แแตแแญ แแแฎ โ mยณ (แชแฉแขแญ แแตแญ)
แจแฐแแแจแ แจแแฌแต แแ แแข โ๏ธ
๐น แจแงแแง แแตแแญ แจแ แธแ แ แแ แแแ แต โ mยณ
แ แงแแงแ แตแญ แจแแฐแจแแ แจแ แธแ แแฃแ แแ แแข
๐น แจแงแแง แแแแต (Backfilling) โ mยณ
แงแแงแ แจแฐแฐแจแ แ แแ แฆแฉแ แ แแฌแต แแญแ แ แฐแแจแ แแณแแต แจแแแแต แแ แแข
๐น แจแแ แแ แซแแแซ แแแฃแณ โ mยณ / mยฒ
แจแฎแแญแชแต แฅแซ mยณแฃ แจแแแตแฐแญแ แจแแฝแณ แฅแซ mยฒ แแแซ แญแฝแแแข ๐๏ธ
๐น แจแแแ แฃแขแซ แแแฃแณ โ mยฒ / mยณ / No.
แจแแแ แฅแซ mยฒแฃ แจแฎแแญแชแต แฅแซ mยณแฃ แแแแ แแฃแชแซแแฝ No. แแแ แญแฝแแแข โ๏ธ
๐น แซแแญ แฅแ แแฒแแ แแตแจแ โ No. / แแฅแญ
Valves, bends, tees, reducers แฅแ แแแฝ แแฒแแแฝ แ แแฅแญ แญแแซแแข ๐ง
๐น แจแซแแญ แปแแ แญ แแแฃแณ โ No. / mยณ / mยฒ
แปแแ แฉ แฅแแฐ แ แแต แจแฐแ แแแ แฅแซ No. แแแ แญแฝแแแค แฎแแญแชแต mยณ แฅแ แแแตแฐแญ mยฒ แญแแซแแข
๐น แจแแ แแฃแชแซ แฅแซ โ No. / LS
แจแแฃแชแซ แแฃแชแซแแฝ แ แแฅแญแฃ แ แแณแแต แจแฐแแ แจแฅแซ แญแแแฝแ Lump Sum (LS) แแแ แญแฝแแแข ๐งช
๐น แจแแ แแแต แแจแซ โ m / ML
แจแแแฐแแ แจแงแแง แแตแแญ แญแแแตแข ๐๐ฆ
๐น แจแแ แฅแซแต แแญแแซ โ No. / Test
แจแแฅแซแถแช แแญแแซแแฝ แ แแฐแจแแต แจแแจแซ แฅแแต แแแฉ แญแฝแแแข ๐งช
๐ แ แ แ แแแญ แ แแ แฅแซ BOQ แ แฅแแต แจแแ แแ แแแชแซแแฝแฆ
m/ML โ แญแแแต ๐
mยฒ โ แจแแฝแณ แตแแต
mยณ โ แจแตแแ /แจแฉแฅ แแ แ
No. โ แแฅแญ
kg โ แญแฅแฐแต โ๏ธ
LS โ Lump Sum / แจแฐแ แแแ แแ
๐ก แตแญแญแแ แจแฅแซ แแ แ + แตแญแญแแ แจแแแชแซ แ แแต + แตแญแญแแ BOQ = แจแฐแปแ แจแแช แแฅแฅแญ! ๐๐ฐ๐๏ธ
#WaterWorks #BOQ #CivilEngineering #HydraulicEngineering #Construction #แจแแ_แฅแซ #แจแแ_แแแฃแณ #BOQ #แฒแชแ_แขแแแแชแแ ๐ช๐น
@etconp
๐5โค2
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแฝ
๐แ แฒแต แ แแต แแญแแซแต แ แแจแ แจ แทแแแ 1 แแแฎ แฅแตแจ แทแแแ 5 แจแแแญ Quantity Surveying แฅแ Ms Project แฆแแแญแ แฎแญแถแฝ แตแแ แ แจ 25% แ แแฝ แ แญแแแ๐
๐ฉแแแแแแฅ @Philemona7 แญแแแแ
๐Qs แแแแตแฑ ETABS แฆแแต แฅแแฐแฐแ แ แ แแ๐
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
แแแซแ แ แฒแต แ แแต๐
@etconp
๐แ แฒแต แ แแต แแญแแซแต แ แแจแ แจ แทแแแ 1 แแแฎ แฅแตแจ แทแแแ 5 แจแแแญ Quantity Surveying แฅแ Ms Project แฆแแแญแ แฎแญแถแฝ แตแแ แ แจ 25% แ แแฝ แ แญแแแ๐
๐ฉแแแแแแฅ @Philemona7 แญแแแแ
๐Qs แแแแตแฑ ETABS แฆแแต แฅแแฐแฐแ แ แ แแ๐
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
แแแซแ แ แฒแต แ แแต๐
@etconp
๐4โค3
๐แ แแต แจแแฐแ แจแณแญแต แขแแแแญ (แแแแฒแต) แ แฐแแญแ แแ แแ แแ แแณแฎแฝ แแญ แจแณแญแต (แจแแตแญ) แฅแแแต แแซแณแฅแญ แญแแฃแ?
========================
แจแแฐแ แจแณแญแต แขแแแแญ แแแต แ แแแฃแณ แแญ แ แซแฐแแฝแ แฅแป แจแแแฃแ แญ แณแญแแ แจแแแฃแณ แฅแซแแฝ แ แฐแแแฑ แตแแแฝแฃ แดแญแแซแ แแญแแญ แแแแซแแฝแฃ แฐแจแแแฝแฃ แจแแ แแตแแญแถแฝ แฅแ แจแฆแณแ แตแญแญแแ แแแณ แแ แจแต แ แตแญแญแแฃ แ แฅแซแตแฃ แ แฐแ แแแตแฃ แ แฐแแขแ แแช แฅแ แ แฐแแฐแแ แแ แฅแแฒแจแแแ แจแแซแจแแแฅ แจแดแญแแญ แฃแแแซ แแแข
1. แจแขแแแแชแแ แตแแแฝแ แแแ แฅแ แแฐแญแแ
แจแณแญแต แฒแชแ แขแแแแญ แจแแแฃแณ แตแแแฝแ แ แตแญแญแ แแแ แฅแฃ แแจแณแตแฃ แแฐแญแแ แฅแ แ แณแญแต แแญ แฐแแฃแซแ แแตแจแ แแปแ แ แแ แตแข
แ แฐแแญแแฆ
โข แจแณแญแต แแญแ แแต แตแแแฝ
โข แจแ แญแญแดแญแธแญ แตแแแฝ
โข แจแตแตแซแญแธแญ แตแแแฝ
โข แจแฒแชแ แตแแแฝ
โข แจแแแแต แตแแแฝ
โข แจแแ แแแฐแป แตแญแแต แตแแแฝ
โข แจแแ แ แ แญแฆแต แตแแแฝ
โข แจแฆแญแฃ แจแซแแจแญแต แฅแ แจแตแแตแญ แตแแแฝ
โข แจแแฌแฒแแแ แจแแจแแแ แตแแแฝ
โข แจแแญแแญ แตแแแฝ (Detail Drawings)
โข แจแฑแ แตแแแฝ (Shop Drawings)
โข แจแ แต-แกแแต แตแแแฝ (As-Built Drawings)
โข แจแฎแแตแซแต แตแแแฝ
โข แดแญแแซแ แแญแแญ แแแแซแแฝ
แ แตแแแฝ แแญ แซแ แฒแแแฝแแฝแฃ แจแแณแแฝแฃ แฎแญแฒแแถแฝแฃ แปแญแแ แฃ แ แแญแแแแตแฃ แดแญแฝแแฃ แคแแฌแฝแแฃ แจแแณแแต แแตแแญแถแฝแฃ แจแแแฃแณ แตแญแญแแแแต แแฐแแฝ (Tolerances) แฅแ แแแฝ แดแญแแซแ แแแชแซแแฝแ แแจแณแต แ แแ แตแข
แ แฐแแญแ แ แตแแแฝ แแซแจแ แจแแแฉ แแฉแแถแฝแแ แแญแถแฝแ แแแฃแณ แจแแแแฉ แ แแต แแแ แฅแ แแตแฐแซแจแซ แแ แจแ แ แแ แตแข
แฅแฉ แจแณแญแต แขแแแแญ แตแแแ แ แแแณ แจแแจแฐแ แฅแป แ แญแฐแแแค แฒแแญแ แ แฅแแแฐแแ แจแณแญแต แแแณ แแญ แ แฐแแฃแญ แแแแฃ แจแแฝแ แแแแ แซแจแแแฃแแข
2. แจแณแญแต แฐแญแฌแญแแแ แดแฒแแ-แ แแต
แฐแญแฌแญแแ แแ แแต แจแณแญแต แฒแชแ แขแแแแญ แฅแ แ แ แตแแแ แจแแ แฐแแฃแซแ แฅแแแต แแแข
แฅแแฐแแจแฐแแต แซแ แแณแฎแฝแ แแจแณแต แ แแ แตแฆ
โข Benchmark แฅแ Temporary Benchmark
โข Reduced Level (RL)
โข Coordinates
โข Chainage
โข Alignment
โข Centerline
โข Offset
โข Profile
โข Cross-section
โข Existing Level แฅแ Proposed Level
โข Horizontal แฅแ Vertical Control
โข Gradient แฅแ Slope
แ แฐแจแแชแ Auto Levelแฃ Total Stationแฃ Theodolite แฅแ GPS/GNSS แจแแณแฐแ แจแฐแญแฌแญ แแณแชแซแแฝแ แ แ แแแแ แจแแฐแกแตแ แแจแ แแจแณแต แ แแ แตแข
แจแ แแแฃ แจแแแแตแฃ แจแตแแตแญแฃ แจแซแแจแญแตแฃ แจแแ แแตแแญ แฅแ แแแฝ แฒแชแ แฅแซแแฝ แ แตแญแญแแ แฆแณแฃ แ แแญแแแแต แฅแ แจแแณ แแญ แแแแฃแณแธแแ แแจแแแฅ แ แแ แตแข
3. แจแแฌแต แฅแซแ แแแฎ
แจแณแญแต แขแแแแญ แตแ Earthwork แ แแซแซ แฐแแฃแซแ แฅแแแต แแแจแ แญแแฃแแข
แญแ แแฆ
โข Site Clearance
โข Topsoil Stripping
โข Excavation
โข Trench Excavation
โข Foundation Excavation
โข Rock Excavation
โข Backfilling
โข Filling
โข Embankment Construction
โข Cut and Fill
โข Subgrade Preparation
โข Soil Compaction
โข Borrow Material
โข Spoil Disposal
โข Unsuitable Material Removal
โข Slope Protection แจแแซแซแตแต แแแข
แ แฐแจแแชแ แตแ แ แแญ แแฐแฃแฃ แจแ แแญ แฅแญแฅแ แตแฃ แจแ แแญ แฅแแแตแฃ Bearing Capacityแฃ Settlementแฃ Compactionแฃ CBRแฃ Atterberg Limitsแฃ Soil Stabilization แฅแ Groundwater แแ แจแณแ แฅแแแต แแแจแ แญแแฃแแข
แฅแแฒแแ แจแแฌแต แแญแแซแ แจแแฆแซแถแช แแญแแซ แแคแถแฝแ แแจแณแตแ แ แแแฃแณ แแณแ แแญ แแ แแ แแปแ แ แแ แตแข
4. แฎแแญแชแต แดแญแแแแ แจแฎแแญแชแต แฅแซ
แจแณแญแต แฒแชแ แขแแแแญ แจแฎแแญแชแตแ แแณแแถแฝแฃ แ แแแแแตแฃ แ แแแแฅแฃ แแ แแจแญแฃ แแ แแจแชแซ (Curing) แฅแ แจแฅแซแต แแฅแฅแญ แ แฐแแฅ แแซแแ แญแแฃแแข
แญแ แแฆ
โข Cement
โข Fine Aggregate
โข Coarse Aggregate
โข Water
โข Admixtures
โข Workability
โข Slump
โข Segregation
โข Bleeding
โข Setting
โข Strength
โข Durability
โข Shrinkage
โข Creep
โข Curing
แซแซแตแณแแข
แจแฎแแญแชแต แแแฐแต แ แแต แจFormworkแฃ Reinforcementแฃ Concrete Coverแฃ Embedded Itemsแฃ Construction Joints แฅแ แจแณแญแต แแแ แต แ แตแญแญแ แแแแธแแ แแแฐแฝ แ แแ แตแข
แ แฎแแญแชแต แฅแซ แแ แต แฐแแ แจแฎแแญแชแต แฅแซแตแฃ แแแแแฃ แ แแแแฅแฃ แซแญแฅแฌแฝแแฃ แแแบแแ แฅแ แชแฉแชแแ แ แฐแแขแ แแจแแแแธแแ แแจแแแฅ แ แแ แตแข
แฅแแฐ Honeycombingแฃ Cold Jointแฃ Crackingแฃ Segregationแฃ Bleedingแฃ Poor Compaction แฅแ Poor Curing แซแ แจแฎแแญแชแต แแตแแถแฝแ แแแจแตแ แแแตแคแซแธแแ แแแญแแญ แ แแ แตแข
5. แจแแ แแจแชแซ แฅแจแต แฅแซ
แ Reinforced Concrete แฅแซ แแญ แจแแฐแซ แจแณแญแต แขแแแแญ แจReinforcement แแซแแ แแแญแแญ แ แแญแแญ แแซแแ แญแแฃแแข
แญแ แแฆ
โข แจแฅแจแต แฐแจแ
โข แจแฅแจแต แฒแซแแตแญ
โข แจแฅแจแต แญแแฐแต
โข Main Reinforcement
โข Distribution Reinforcement
โข Shear Reinforcement
โข Stirrups
โข Links
โข Ties
โข Chairs
โข Spacers
โข Concrete Cover
โข Development Length
โข Anchorage
โข Lap Splicing
โข Hooks
โข Bends
โข Curtailment แซแซแตแณแแข
แฎแแญแชแต แจแแแฐแฑ แ แแต แจReinforcement แฅแซแ แจแฐแแแฐแ Structural Drawing แฅแ Specification แแญ แแฃแฃแแ แแจแแแฅ แ แแ แตแข
แ แฐแแญแ แจแฅแจแต แฒแซแแตแญแฃ แฅแแตแฃ แญแแฐแตแฃ แฆแณแฃ Anchorageแฃ Lap Locationแฃ Developmentแฃ Concrete Cover แฅแ แจReinforcement แตแแ แ แตแญแญแ แแแแธแแ แแแฐแฝ แ แแ แตแข
6. FORMWORK แฅแ TEMPORARY WORKS
แจแณแญแต แขแแแแญ Formwork แฅแ Temporary Works แ แตแญแญแ แแซแแธแแแฃ แแฐแแแธแแแ แฐแ แแแณแธแแ แแแฐแฝ แ แแ แตแข
แแแณแแฆ
โข Dimension
โข Alignment
โข Level
โข Plumbness
โข Stability
โข Support
โข Bracing
โข Shoring
โข Reshoring
โข Joint
โข Surface Condition
โข Cleanliness แแแฐแฝ แ แแ แตแข
Formwork แจแแแแณแแตแฃ แจแแ แแแแฃ แจแแแฐแตแฃ แจแแแแ แแญแ แจแ แ แซแแแ แตแแ แจแฐแแณ แจแแแ แฉ แฝแแฎแฝแ แ แแ แแแจแต แ แแ แตแข
7. แจแแ แจแต แแแฃแณ
แจแณแญแต แขแแแแญ แจแฐแแซแฉ แจFoundation แแญแแถแฝแ แฅแ แจแแแฃแณ แแฐแณแธแแ แแซแแ แญแแฃแแข
แฅแแแ แแฆ
โข Isolated Foundation
โข Combined Foundation
โข Strip Foundation
โข Raft Foundation
โข Pile Foundation
โข Footing
โข Ground Beam
@etconp
========================
แจแแฐแ แจแณแญแต แขแแแแญ แแแต แ แแแฃแณ แแญ แ แซแฐแแฝแ แฅแป แจแแแฃแ แญ แณแญแแ แจแแแฃแณ แฅแซแแฝ แ แฐแแแฑ แตแแแฝแฃ แดแญแแซแ แแญแแญ แแแแซแแฝแฃ แฐแจแแแฝแฃ แจแแ แแตแแญแถแฝ แฅแ แจแฆแณแ แตแญแญแแ แแแณ แแ แจแต แ แตแญแญแแฃ แ แฅแซแตแฃ แ แฐแ แแแตแฃ แ แฐแแขแ แแช แฅแ แ แฐแแฐแแ แแ แฅแแฒแจแแแ แจแแซแจแแแฅ แจแดแญแแญ แฃแแแซ แแแข
1. แจแขแแแแชแแ แตแแแฝแ แแแ แฅแ แแฐแญแแ
แจแณแญแต แฒแชแ แขแแแแญ แจแแแฃแณ แตแแแฝแ แ แตแญแญแ แแแ แฅแฃ แแจแณแตแฃ แแฐแญแแ แฅแ แ แณแญแต แแญ แฐแแฃแซแ แแตแจแ แแปแ แ แแ แตแข
แ แฐแแญแแฆ
โข แจแณแญแต แแญแ แแต แตแแแฝ
โข แจแ แญแญแดแญแธแญ แตแแแฝ
โข แจแตแตแซแญแธแญ แตแแแฝ
โข แจแฒแชแ แตแแแฝ
โข แจแแแแต แตแแแฝ
โข แจแแ แแแฐแป แตแญแแต แตแแแฝ
โข แจแแ แ แ แญแฆแต แตแแแฝ
โข แจแฆแญแฃ แจแซแแจแญแต แฅแ แจแตแแตแญ แตแแแฝ
โข แจแแฌแฒแแแ แจแแจแแแ แตแแแฝ
โข แจแแญแแญ แตแแแฝ (Detail Drawings)
โข แจแฑแ แตแแแฝ (Shop Drawings)
โข แจแ แต-แกแแต แตแแแฝ (As-Built Drawings)
โข แจแฎแแตแซแต แตแแแฝ
โข แดแญแแซแ แแญแแญ แแแแซแแฝ
แ แตแแแฝ แแญ แซแ แฒแแแฝแแฝแฃ แจแแณแแฝแฃ แฎแญแฒแแถแฝแฃ แปแญแแ แฃ แ แแญแแแแตแฃ แดแญแฝแแฃ แคแแฌแฝแแฃ แจแแณแแต แแตแแญแถแฝแฃ แจแแแฃแณ แตแญแญแแแแต แแฐแแฝ (Tolerances) แฅแ แแแฝ แดแญแแซแ แแแชแซแแฝแ แแจแณแต แ แแ แตแข
แ แฐแแญแ แ แตแแแฝ แแซแจแ แจแแแฉ แแฉแแถแฝแแ แแญแถแฝแ แแแฃแณ แจแแแแฉ แ แแต แแแ แฅแ แแตแฐแซแจแซ แแ แจแ แ แแ แตแข
แฅแฉ แจแณแญแต แขแแแแญ แตแแแ แ แแแณ แจแแจแฐแ แฅแป แ แญแฐแแแค แฒแแญแ แ แฅแแแฐแแ แจแณแญแต แแแณ แแญ แ แฐแแฃแญ แแแแฃ แจแแฝแ แแแแ แซแจแแแฃแแข
2. แจแณแญแต แฐแญแฌแญแแแ แดแฒแแ-แ แแต
แฐแญแฌแญแแ แแ แแต แจแณแญแต แฒแชแ แขแแแแญ แฅแ แ แ แตแแแ แจแแ แฐแแฃแซแ แฅแแแต แแแข
แฅแแฐแแจแฐแแต แซแ แแณแฎแฝแ แแจแณแต แ แแ แตแฆ
โข Benchmark แฅแ Temporary Benchmark
โข Reduced Level (RL)
โข Coordinates
โข Chainage
โข Alignment
โข Centerline
โข Offset
โข Profile
โข Cross-section
โข Existing Level แฅแ Proposed Level
โข Horizontal แฅแ Vertical Control
โข Gradient แฅแ Slope
แ แฐแจแแชแ Auto Levelแฃ Total Stationแฃ Theodolite แฅแ GPS/GNSS แจแแณแฐแ แจแฐแญแฌแญ แแณแชแซแแฝแ แ แ แแแแ แจแแฐแกแตแ แแจแ แแจแณแต แ แแ แตแข
แจแ แแแฃ แจแแแแตแฃ แจแตแแตแญแฃ แจแซแแจแญแตแฃ แจแแ แแตแแญ แฅแ แแแฝ แฒแชแ แฅแซแแฝ แ แตแญแญแแ แฆแณแฃ แ แแญแแแแต แฅแ แจแแณ แแญ แแแแฃแณแธแแ แแจแแแฅ แ แแ แตแข
3. แจแแฌแต แฅแซแ แแแฎ
แจแณแญแต แขแแแแญ แตแ Earthwork แ แแซแซ แฐแแฃแซแ แฅแแแต แแแจแ แญแแฃแแข
แญแ แแฆ
โข Site Clearance
โข Topsoil Stripping
โข Excavation
โข Trench Excavation
โข Foundation Excavation
โข Rock Excavation
โข Backfilling
โข Filling
โข Embankment Construction
โข Cut and Fill
โข Subgrade Preparation
โข Soil Compaction
โข Borrow Material
โข Spoil Disposal
โข Unsuitable Material Removal
โข Slope Protection แจแแซแซแตแต แแแข
แ แฐแจแแชแ แตแ แ แแญ แแฐแฃแฃ แจแ แแญ แฅแญแฅแ แตแฃ แจแ แแญ แฅแแแตแฃ Bearing Capacityแฃ Settlementแฃ Compactionแฃ CBRแฃ Atterberg Limitsแฃ Soil Stabilization แฅแ Groundwater แแ แจแณแ แฅแแแต แแแจแ แญแแฃแแข
แฅแแฒแแ แจแแฌแต แแญแแซแ แจแแฆแซแถแช แแญแแซ แแคแถแฝแ แแจแณแตแ แ แแแฃแณ แแณแ แแญ แแ แแ แแปแ แ แแ แตแข
4. แฎแแญแชแต แดแญแแแแ แจแฎแแญแชแต แฅแซ
แจแณแญแต แฒแชแ แขแแแแญ แจแฎแแญแชแตแ แแณแแถแฝแฃ แ แแแแแตแฃ แ แแแแฅแฃ แแ แแจแญแฃ แแ แแจแชแซ (Curing) แฅแ แจแฅแซแต แแฅแฅแญ แ แฐแแฅ แแซแแ แญแแฃแแข
แญแ แแฆ
โข Cement
โข Fine Aggregate
โข Coarse Aggregate
โข Water
โข Admixtures
โข Workability
โข Slump
โข Segregation
โข Bleeding
โข Setting
โข Strength
โข Durability
โข Shrinkage
โข Creep
โข Curing
แซแซแตแณแแข
แจแฎแแญแชแต แแแฐแต แ แแต แจFormworkแฃ Reinforcementแฃ Concrete Coverแฃ Embedded Itemsแฃ Construction Joints แฅแ แจแณแญแต แแแ แต แ แตแญแญแ แแแแธแแ แแแฐแฝ แ แแ แตแข
แ แฎแแญแชแต แฅแซ แแ แต แฐแแ แจแฎแแญแชแต แฅแซแตแฃ แแแแแฃ แ แแแแฅแฃ แซแญแฅแฌแฝแแฃ แแแบแแ แฅแ แชแฉแชแแ แ แฐแแขแ แแจแแแแธแแ แแจแแแฅ แ แแ แตแข
แฅแแฐ Honeycombingแฃ Cold Jointแฃ Crackingแฃ Segregationแฃ Bleedingแฃ Poor Compaction แฅแ Poor Curing แซแ แจแฎแแญแชแต แแตแแถแฝแ แแแจแตแ แแแตแคแซแธแแ แแแญแแญ แ แแ แตแข
5. แจแแ แแจแชแซ แฅแจแต แฅแซ
แ Reinforced Concrete แฅแซ แแญ แจแแฐแซ แจแณแญแต แขแแแแญ แจReinforcement แแซแแ แแแญแแญ แ แแญแแญ แแซแแ แญแแฃแแข
แญแ แแฆ
โข แจแฅแจแต แฐแจแ
โข แจแฅแจแต แฒแซแแตแญ
โข แจแฅแจแต แญแแฐแต
โข Main Reinforcement
โข Distribution Reinforcement
โข Shear Reinforcement
โข Stirrups
โข Links
โข Ties
โข Chairs
โข Spacers
โข Concrete Cover
โข Development Length
โข Anchorage
โข Lap Splicing
โข Hooks
โข Bends
โข Curtailment แซแซแตแณแแข
แฎแแญแชแต แจแแแฐแฑ แ แแต แจReinforcement แฅแซแ แจแฐแแแฐแ Structural Drawing แฅแ Specification แแญ แแฃแฃแแ แแจแแแฅ แ แแ แตแข
แ แฐแแญแ แจแฅแจแต แฒแซแแตแญแฃ แฅแแตแฃ แญแแฐแตแฃ แฆแณแฃ Anchorageแฃ Lap Locationแฃ Developmentแฃ Concrete Cover แฅแ แจReinforcement แตแแ แ แตแญแญแ แแแแธแแ แแแฐแฝ แ แแ แตแข
6. FORMWORK แฅแ TEMPORARY WORKS
แจแณแญแต แขแแแแญ Formwork แฅแ Temporary Works แ แตแญแญแ แแซแแธแแแฃ แแฐแแแธแแแ แฐแ แแแณแธแแ แแแฐแฝ แ แแ แตแข
แแแณแแฆ
โข Dimension
โข Alignment
โข Level
โข Plumbness
โข Stability
โข Support
โข Bracing
โข Shoring
โข Reshoring
โข Joint
โข Surface Condition
โข Cleanliness แแแฐแฝ แ แแ แตแข
Formwork แจแแแแณแแตแฃ แจแแ แแแแฃ แจแแแฐแตแฃ แจแแแแ แแญแ แจแ แ แซแแแ แตแแ แจแฐแแณ แจแแแ แฉ แฝแแฎแฝแ แ แแ แแแจแต แ แแ แตแข
7. แจแแ แจแต แแแฃแณ
แจแณแญแต แขแแแแญ แจแฐแแซแฉ แจFoundation แแญแแถแฝแ แฅแ แจแแแฃแณ แแฐแณแธแแ แแซแแ แญแแฃแแข
แฅแแแ แแฆ
โข Isolated Foundation
โข Combined Foundation
โข Strip Foundation
โข Raft Foundation
โข Pile Foundation
โข Footing
โข Ground Beam
@etconp
โค8๐ฅฐ4๐3
Ethiopian Construction Vacancy & Tender pinned ยซ๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแฝ ๐แ แฒแต แ แแต แแญแแซแต แ แแจแ แจ แทแแแ 1 แแแฎ แฅแตแจ แทแแแ 5 แจแแแญ Quantity Surveying แฅแ Ms Project แฆแแแญแ แฎแญแถแฝ แตแแ แ แจ 25% แ
แแฝ แ แญแแแ๐ ๐ฉแแแแแแฅ @Philemona7 แญแแแแ ๐Qs แแแแตแฑ ETABS แฆแแต แฅแแฐแฐแ แ แ แแ๐ https://ye-buna.com/etconp?ref=product_detail&product=6โฆยป
๐แแแชแซ แคแต แแฅ แฒแแแ แตแฉแจแต แแฐแจแ แซแแฃแธแ แแณแฎแฝ
๐แแแแแ แแแชแซ แคแต แแฅ แฒแแ แ แตแฉแจแต แแตแจแ แซแแฃแฝแ แแณแฎแฝ แจแแจแฐแแต แแธแแกแก
โ แ แแแแชแซ แญแแณแ แ แแ แซแญแณ (แจแญแแณ แแจแแแซ แแตแญแญ แแจแแต)แ แ แแ แแแ แซแแ แแแ แ แแ แตแกแก
โ แ แปแญ แฅแ แซแ แฐแแถแฝแ แ แญ/แจแฐแแ แ แแแแฅ แคแต แ แปแญ แตแ แซแ แจแญแแณ แแ แฐแญ แแญ แฐแแถแฝ แ แตแฉแฉ แ แแต แ แญแแต แแแแธแแ แแจแแแฅแกแก แ แฐแแญแ แ แซแญแณแ แแญ แซแแ แจแซแญแณ แแฅแญแ แ แญ/แจแฐแ แแแแฅ แคแต แซแแ แแช แซแญแณ แแฅแญ แฐแแณแณแญ แแแ แ แแ แตแกแก
โ แจแญแแณ แแ แฐแฉ แจแฅแณแฃแฅแแณแ แแแฝ แญแแจแแแฝ แแ แแแแ แแจแแแฅ แญแแฃแแกแก แจแแ แฅแณ แแฅแ แฅแตแจ แฅแณแ แแแแต แจแแแแ แจแแ แฅแณแแ แแตแฐแแแ แญแปแแแกแก
โ แตแณแญ แซแแ แจแแ แจแแณแ แฉแแต แจแตแณแญ แแจแแแซ แแตแญแญ แแจแแตแกแก แตแณแญ แจแแแ แจแแ แญแ แแ แจแแซแจแแแฅ แแจแ แซแตแแแแแกแก
โ แ แแ แจแฝแซแญ แแ แจแแตแ แแ แจแฅ แญแแญแ แณแแกแก
โ แ แแญแแ แจแแปแปแก แจแแ แแญแแแ แ แแ แแแแ แแญแแ แจแฐแ แ แจแแตแ แฐแแ แแจแแแฅ แญแปแแแกแก
โ แ แฐแจแแชแ แ แ แซแ แแฐ แแธแ แ แคแต แแถ แคแฑแ แ แ แซแ แแจแตแ แแจแแแฅ แฐแแข แแแกแก
โ แจแแฌแต แ แ แแแ แแญ แ แฐแซแซแ แแแตแ แญแแณแ แแฐ แแต แแแแชแซ แแญแต แแฐ แแแต แแแจแญ แญแปแแ แจแแแแ แแณแฅแ แจแแแฃแณ แจแแณ แแญ แจแฐแซแซแ แแณแฎแฝแ แ แแญแ แซแ แฃแแแซแแฝแ แแแจแญแ แแจแแแฅ แญแปแแแกแก
@etcon0
๐แแแแแ แแแชแซ แคแต แแฅ แฒแแ แ แตแฉแจแต แแตแจแ แซแแฃแฝแ แแณแฎแฝ แจแแจแฐแแต แแธแแกแก
โ แ แแแแชแซ แญแแณแ แ แแ แซแญแณ (แจแญแแณ แแจแแแซ แแตแญแญ แแจแแต)แ แ แแ แแแ แซแแ แแแ แ แแ แตแกแก
โ แ แปแญ แฅแ แซแ แฐแแถแฝแ แ แญ/แจแฐแแ แ แแแแฅ แคแต แ แปแญ แตแ แซแ แจแญแแณ แแ แฐแญ แแญ แฐแแถแฝ แ แตแฉแฉ แ แแต แ แญแแต แแแแธแแ แแจแแแฅแกแก แ แฐแแญแ แ แซแญแณแ แแญ แซแแ แจแซแญแณ แแฅแญแ แ แญ/แจแฐแ แแแแฅ แคแต แซแแ แแช แซแญแณ แแฅแญ แฐแแณแณแญ แแแ แ แแ แตแกแก
โ แจแญแแณ แแ แฐแฉ แจแฅแณแฃแฅแแณแ แแแฝ แญแแจแแแฝ แแ แแแแ แแจแแแฅ แญแแฃแแกแก แจแแ แฅแณ แแฅแ แฅแตแจ แฅแณแ แแแแต แจแแแแ แจแแ แฅแณแแ แแตแฐแแแ แญแปแแแกแก
โ แตแณแญ แซแแ แจแแ แจแแณแ แฉแแต แจแตแณแญ แแจแแแซ แแตแญแญ แแจแแตแกแก แตแณแญ แจแแแ แจแแ แญแ แแ แจแแซแจแแแฅ แแจแ แซแตแแแแแกแก
โ แ แแ แจแฝแซแญ แแ แจแแตแ แแ แจแฅ แญแแญแ แณแแกแก
โ แ แแญแแ แจแแปแปแก แจแแ แแญแแแ แ แแ แแแแ แแญแแ แจแฐแ แ แจแแตแ แฐแแ แแจแแแฅ แญแปแแแกแก
โ แ แฐแจแแชแ แ แ แซแ แแฐ แแธแ แ แคแต แแถ แคแฑแ แ แ แซแ แแจแตแ แแจแแแฅ แฐแแข แแแกแก
โ แจแแฌแต แ แ แแแ แแญ แ แฐแซแซแ แแแตแ แญแแณแ แแฐ แแต แแแแชแซ แแญแต แแฐ แแแต แแแจแญ แญแปแแ แจแแแแ แแณแฅแ แจแแแฃแณ แจแแณ แแญ แจแฐแซแซแ แแณแฎแฝแ แ แแญแ แซแ แฃแแแซแแฝแ แแแจแญแ แแจแแแฅ แญแปแแแกแก
@etcon0
โค6๐3
๐แจแตแแตแฉ แแ แแฐแแแซ แจแตแแแญ แแแฅ (Masonry Abutment /Retaining Wall) แ แจแแฐแ แจแแ แฅแ แจแแแฎแฝ แ แแญ แซแ แแญแแซแต แฐแฐแญแแทแแข
โ๐ด แแฉ แแตแต (Backfill / Embankment Soil Washout)แฆ แจแแแก แ แตแฐแแญแฃ แซแแ แ แแญ แ แแ แแธแญแธแญ (Scouring) แฅแ แ แแ แแแต (Hydrostatic Pressure) แแญแแซแต แตแแแ แ แฅแถ แแแฑแ แซแณแซแแข
โ๐ตแฐแแซแ แแตแต (Masonry Retaining Wall Collapse)แฆ แจแฃแต แญแแต แจแแธแจแ แฅแ แ แแญ แจแแฐแแ แ แ แ แซแแ แจแตแแแญ แแแฅ (Stone Masonry Abutment) แแ แ แแ แจแแแ แญ แตแฅแซแต แ แแฅแแต แแฐแญแแฑแ แซแณแซแแข
โ๐ก แขแซ แแตแต (Bridge Superstructure / Girder Bearing Zone)แฆ แจแตแแตแฉ แฎแแญแชแต แแฃแ (Superstructure Slab/Deck) แจแแซแญแแ แต แจแคแชแแ (Bearing Zone) แญแแ แฒแแแฃ แจแแฐแแแซแ แแแฅ แ แแแฑ แแญแแซแต แจแตแแตแฉ แ แซแ แซแ แ แ แตแแ แ แ แจแญ แแญ แฐแแ แแฅแ แญแแแแข
โโ ๏ธ แแแ แ แฐแแ แแฐแญแแต แแแ แแญแแซแถแฝแฆ
1๏ธโฃ Lack of Weep Holes / Drainage Systemแฆ แจแแแก แ แตแฐแแญแฃ แจแแจแแธแแ แแ แแแตแแฃแต แจแแซแตแฝแ แจแแ แแแจแ แแณแณแแฝ (Weep Holes) แ แแแแญ แแญแ แแฐแแแฃ แญแ แ แจแแฐแ แจแแ แซแ (Hydrostatic Pressure) แญแแฅแซแแข
2๏ธโฃ Inadequate Wall Thickness & Base Depthแฆ แจแตแแแญ แแแก แแแจแต แฅแ แแฐแจแต แจแแญ แจแแแฃแ แจแตแซแแญ แฅแ แจแ แแญ แซแ แแญ แ แแแแฃแ แแข
3๏ธโฃ Scouring Effectsแฆ แ แแญแ แแ แต แ แแแก แตแญ แซแแ แ แแญ แ แแ แฐแธแญแฝแฎ แแแฑ (Subgrade Erosion)แข
@etconp
โ๐ด แแฉ แแตแต (Backfill / Embankment Soil Washout)แฆ แจแแแก แ แตแฐแแญแฃ แซแแ แ แแญ แ แแ แแธแญแธแญ (Scouring) แฅแ แ แแ แแแต (Hydrostatic Pressure) แแญแแซแต แตแแแ แ แฅแถ แแแฑแ แซแณแซแแข
โ๐ตแฐแแซแ แแตแต (Masonry Retaining Wall Collapse)แฆ แจแฃแต แญแแต แจแแธแจแ แฅแ แ แแญ แจแแฐแแ แ แ แ แซแแ แจแตแแแญ แแแฅ (Stone Masonry Abutment) แแ แ แแ แจแแแ แญ แตแฅแซแต แ แแฅแแต แแฐแญแแฑแ แซแณแซแแข
โ๐ก แขแซ แแตแต (Bridge Superstructure / Girder Bearing Zone)แฆ แจแตแแตแฉ แฎแแญแชแต แแฃแ (Superstructure Slab/Deck) แจแแซแญแแ แต แจแคแชแแ (Bearing Zone) แญแแ แฒแแแฃ แจแแฐแแแซแ แแแฅ แ แแแฑ แแญแแซแต แจแตแแตแฉ แ แซแ แซแ แ แ แตแแ แ แ แจแญ แแญ แฐแแ แแฅแ แญแแแแข
โโ ๏ธ แแแ แ แฐแแ แแฐแญแแต แแแ แแญแแซแถแฝแฆ
1๏ธโฃ Lack of Weep Holes / Drainage Systemแฆ แจแแแก แ แตแฐแแญแฃ แจแแจแแธแแ แแ แแแตแแฃแต แจแแซแตแฝแ แจแแ แแแจแ แแณแณแแฝ (Weep Holes) แ แแแแญ แแญแ แแฐแแแฃ แญแ แ แจแแฐแ แจแแ แซแ (Hydrostatic Pressure) แญแแฅแซแแข
2๏ธโฃ Inadequate Wall Thickness & Base Depthแฆ แจแตแแแญ แแแก แแแจแต แฅแ แแฐแจแต แจแแญ แจแแแฃแ แจแตแซแแญ แฅแ แจแ แแญ แซแ แแญ แ แแแแฃแ แแข
3๏ธโฃ Scouring Effectsแฆ แ แแญแ แแ แต แ แแแก แตแญ แซแแ แ แแญ แ แแ แฐแธแญแฝแฎ แแแฑ (Subgrade Erosion)แข
@etconp
โค12
๐TENDER EVALUATION CHALLENGE | แจแจแจแณ แแแแ แแฐแ
แถแตแต แฐแแซแฎแฝ แจแจแณ แ แแจแกแข
Technical Evaluation = 30%
Financial Evaluation = 70%
๐น Contractor A
- Technical = 26%
- Financial = 95 Million Birr
๐น Contractor B
- Technical = 29%
- Financial = 100 Million Birr
๐น Contractor C
- Technical = 24%
- Financial = 90 Million Birr
โ แฅแซแแแฝ
1๏ธโฃ Determine the Financial Score
แจแฅแซแแณแแฑแ แฐแซแซแฝ แจแแญแแแปแ แแคแต แซแตแแข
Formula:
Financial Score = Lowest Bid รท Bidder's Bid ร 100
2๏ธโฃ Compute the Final Weighted Score
แจแแจแจแปแแ แจแญแฅแฐแต แแฅแฅ แซแตแแข
Formula:
Final Score = (Technical ร 30%) + (Financial ร 70%)
3๏ธโฃ Rank the Contractors
๐ฅ 1st
๐ฅ 2nd
๐ฅ 3rd
4๏ธโฃ ๐ Recommend the Winning Bidder
แจแตแแ แฐแแซแญ แจแแแแชแซ แฐแจแ แซแแแ?
๐ก BONUS QUESTION:
แแ แฐแ แแ แซแแจแ แฐแแซแญ แแแแ แ แธแแ แญแแแ?
๐ Your answer? Calculate it before checking the solution!
โ๐ แฐแจแแช แแญแแญ แแจแแแฝแ แฅแ แจแณแแแฑแ แจแฎแแตแตแซแญแฝแ แแแแฝ แแแแแต โแจแแตแกแญ แแแฝแ แญแแฅแ๐
https://www.facebook.com/profile.php?id=61592085774934
@etconp
แถแตแต แฐแแซแฎแฝ แจแจแณ แ แแจแกแข
Technical Evaluation = 30%
Financial Evaluation = 70%
๐น Contractor A
- Technical = 26%
- Financial = 95 Million Birr
๐น Contractor B
- Technical = 29%
- Financial = 100 Million Birr
๐น Contractor C
- Technical = 24%
- Financial = 90 Million Birr
โ แฅแซแแแฝ
1๏ธโฃ Determine the Financial Score
แจแฅแซแแณแแฑแ แฐแซแซแฝ แจแแญแแแปแ แแคแต แซแตแแข
Formula:
Financial Score = Lowest Bid รท Bidder's Bid ร 100
2๏ธโฃ Compute the Final Weighted Score
แจแแจแจแปแแ แจแญแฅแฐแต แแฅแฅ แซแตแแข
Formula:
Final Score = (Technical ร 30%) + (Financial ร 70%)
3๏ธโฃ Rank the Contractors
๐ฅ 1st
๐ฅ 2nd
๐ฅ 3rd
4๏ธโฃ ๐ Recommend the Winning Bidder
แจแตแแ แฐแแซแญ แจแแแแชแซ แฐแจแ แซแแแ?
๐ก BONUS QUESTION:
แแ แฐแ แแ แซแแจแ แฐแแซแญ แแแแ แ แธแแ แญแแแ?
๐ Your answer? Calculate it before checking the solution!
โ๐ แฐแจแแช แแญแแญ แแจแแแฝแ แฅแ แจแณแแแฑแ แจแฎแแตแตแซแญแฝแ แแแแฝ แแแแแต โแจแแตแกแญ แแแฝแ แญแแฅแ๐
https://www.facebook.com/profile.php?id=61592085774934
@etconp
Facebook
Ethio Construction Engineering - ETCONp | Addis Ababa
Ethio Construction Engineering - ETCONp, Addis Ababa. 715 followers ยท 49 talking about this. World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and...
Latest updates, tips, and tutorials on building, civil engineering, and...
โค10๐5
JOB VACANCY
Material Engineer
Deadline: September 22, 2026
Education Qualification: แจแแแแชแซ แฒแแช
Key Responsibilities
Identify and determine the appropriate materials required for woodwork production.
Prepare material specifications and requirements based on drawings, designs, and production needs.
Calculate material quantities required for production and support material planning.
Inspect and verify the quality of timber, plywood, MDF, particle board, veneer, laminates, adhesives, hardware, and other woodwork materials.
Check materials received from suppliers against approved specifications, quantities, and quality requirements.
Monitor material consumption and compare actual usage with approved quantities.
Monitor and analyze material wastage and recommend methods to reduce unnecessary waste.
Coordinate with the Woodwork Shop, Store, Procurement, Design, Quantity Surveying, and Project teams regarding material requirements.
Maintain accurate records of material usage, wastage, stock, and production requirements.
Prepare material take-off and material requirement schedules when required.
Review technical specifications, shop drawings, and material samples.Ensure that materials are properly stored, handled, and protected to prevent damage.
Identify defective or non-conforming materials and report them to the concerned supervisor.
Support the development of standard material consumption rates for different woodwork products.
Assist in controlling material costs and improving production efficiency.Prepare daily, weekly, and monthly material reports.
Support the implementation of ERP or other digital systems for material tracking and production control.
Perform other related duties assigned by the Department Head or Management.
Qualifications
Bachelor's Degree in Materials Engineering, Wood Engineering, Industrial Engineering, Mechanical Engineering, Civil Engineering, or a related field.
Relevant experience in a woodwork, furniture, manufacturing, interior finishing, or construction environment is highly preferred.
Good knowledge of wood and wood-based materials, including timber, plywood, MDF, particle board, veneer, laminates, and related products.
Knowledge of material estimation, material take-off, inventory control, and material utilization.
Strong Microsoft Excel skills.Knowledge of ERP systems is an advantage.
Ability to read and understand technical drawings and specifications is preferred.
Required Skills and Competencies
Strong knowledge of woodwork materials and their applications.
Excellent material planning and estimation skills.
Strong analytical and problem-solving abilities.
Good attention to detail.
Ability to identify material defects and quality problems.
Strong understanding of material wastage and cost control.Good communication and coordination skills.
Ability to work effectively with workshop production teams.Strong reporting and documentation skills.
Ability to work under pressure and meet production deadlines.
High level of integrity, responsibility, and accountability.
For further information or to apply
please contact:
+251 944 32 60 86
+251 933 60 05 89
+251 11 557 62 49 / 53 / 54 / 57 / 58 / 62
Fax: +251 11 113 20 58 89
๐ฉSend Your CV๐
Vacancies@elmiconstruction.com
natnaelhr@elmiconstruction.com
temesgen@elmiconstruction.com
@etconp
Material Engineer
Deadline: September 22, 2026
Education Qualification: แจแแแแชแซ แฒแแช
Key Responsibilities
Identify and determine the appropriate materials required for woodwork production.
Prepare material specifications and requirements based on drawings, designs, and production needs.
Calculate material quantities required for production and support material planning.
Inspect and verify the quality of timber, plywood, MDF, particle board, veneer, laminates, adhesives, hardware, and other woodwork materials.
Check materials received from suppliers against approved specifications, quantities, and quality requirements.
Monitor material consumption and compare actual usage with approved quantities.
Monitor and analyze material wastage and recommend methods to reduce unnecessary waste.
Coordinate with the Woodwork Shop, Store, Procurement, Design, Quantity Surveying, and Project teams regarding material requirements.
Maintain accurate records of material usage, wastage, stock, and production requirements.
Prepare material take-off and material requirement schedules when required.
Review technical specifications, shop drawings, and material samples.Ensure that materials are properly stored, handled, and protected to prevent damage.
Identify defective or non-conforming materials and report them to the concerned supervisor.
Support the development of standard material consumption rates for different woodwork products.
Assist in controlling material costs and improving production efficiency.Prepare daily, weekly, and monthly material reports.
Support the implementation of ERP or other digital systems for material tracking and production control.
Perform other related duties assigned by the Department Head or Management.
Qualifications
Bachelor's Degree in Materials Engineering, Wood Engineering, Industrial Engineering, Mechanical Engineering, Civil Engineering, or a related field.
Relevant experience in a woodwork, furniture, manufacturing, interior finishing, or construction environment is highly preferred.
Good knowledge of wood and wood-based materials, including timber, plywood, MDF, particle board, veneer, laminates, and related products.
Knowledge of material estimation, material take-off, inventory control, and material utilization.
Strong Microsoft Excel skills.Knowledge of ERP systems is an advantage.
Ability to read and understand technical drawings and specifications is preferred.
Required Skills and Competencies
Strong knowledge of woodwork materials and their applications.
Excellent material planning and estimation skills.
Strong analytical and problem-solving abilities.
Good attention to detail.
Ability to identify material defects and quality problems.
Strong understanding of material wastage and cost control.Good communication and coordination skills.
Ability to work effectively with workshop production teams.Strong reporting and documentation skills.
Ability to work under pressure and meet production deadlines.
High level of integrity, responsibility, and accountability.
For further information or to apply
please contact:
+251 944 32 60 86
+251 933 60 05 89
+251 11 557 62 49 / 53 / 54 / 57 / 58 / 62
Fax: +251 11 113 20 58 89
๐ฉSend Your CV๐
Vacancies@elmiconstruction.com
natnaelhr@elmiconstruction.com
temesgen@elmiconstruction.com
@etconp
โค6
Ethiopian Construction Vacancy & Tender
๐แฐแแ แแต แคแฐแฐแฆแปแฝแ แฅแแแฝ แ แ แจแแนแ แแฐแจแต แจ ETABS แฒแถแญแซแ แชแตแฎ แ แ แแญแ แแแ แจ introduction แแแฎ Analysis แฅแ Design แฃแซแฐแ แแญแฅ แชแตแฎ แฃแแแ
แฐแแแนแแแข ๐ซตแฅแแ แแฌ แญแแ 4 แญแแแแน แแฅแฐแแ๐ https://youtu.be/iYTyYlebxjU
YouTube
๐ ETABS Full Course 2026 โ Part 10 | แจแแแช แฅแตแจ Advanced | ETABS Tutorial แ แ แแญแ ๐๏ธ๐
๐ ETABS Full Course โ Part 10 | Structural Design & Analysis Tutorial
Continue the complete ETABS Full Course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 10, we continue the ETABSโฆ
Continue the complete ETABS Full Course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 10, we continue the ETABSโฆ
โค1
๐แ แแต แจแแฐแ แจแณแญแต แขแแแแญ (แแแแฒแต) แ แฐแแญแ แแ แแ แแ แแณแฎแฝ แแญ แจแณแญแต (แจแแตแญ) แฅแแแต แแซแณแฅแญ แญแแฃแ? แจแฃแแแ แจแแ แ..
แจแแ แจแต แแแฃแณ แแ แต แจSetting-outแฃ Excavationแฃ Founding Levelแฃ Soil Conditionแฃ Dewateringแฃ Blinding Concreteแฃ Reinforcementแฃ Formworkแฃ Concrete Placementแฃ Waterproofing แฅแ Backfilling แฅแซแแฝแ แ แตแญแญแ แแแฃแ แญ แ แแ แตแข
8. แจแตแตแซแญแธแซแ แฒแชแ แฅแซแแฝ
แจแณแญแต แขแแแแญ แจแแจแฐแแตแ แจแแแฃแณ แฅแซแแฝ แจแแแฃแณ แ แฐแ แฐแจแฐแแ แจแฅแซแต แแตแแญแถแฝ แจแแฎ แแซแแ แญแแฃแแฆ
โข Foundations
โข Columns
โข Beams
โข Slabs
โข Shear Walls
โข Retaining Walls
โข Staircases
โข Ground Beams
โข Roof Structures
โข Reinforced Concrete Structures
โข Bridges
โข Culverts
แฅแซแแณแแฑ แจแแแฃแณ แฅแซ แ แแแ แฅแซ แแญ แจแแแจแแ แฐแ แแ แแจแณแต แ แแ แตแข
9. แจMASONRY แฅแ แจแ แแ แฒแชแ แฅแซแแฝ
แจแณแญแต แฒแชแ แขแแแแญ แ แฐแแญ แ แ แแ แแฎแแญแต แแญ แจแแแธแ แจMasonry แฅแ Finishing แฅแซแแฝแแ แแซแแ แญแแฃแแข
แญแ แแฆ
โข Blockwork
โข Brickwork
โข Mortar
โข Wall Alignment
โข Wall Plumbness
โข Jointing
โข Lintels
โข Openings
โข Plastering
โข Screeding
โข Flooring
โข Tiling
โข Waterproofing
โข External Works แซแซแตแณแแข
10. แจแแแแต แแแฃแณ
แ แแแแต แแฎแแญแต แแญ แจแแฐแซ แจแณแญแต แฒแชแ แขแแแแญ แจแแแแต แแแฃแณแ แ แฅแแแต แแซแแ แญแแฃแแข
แญแ แแฆ
โข Road Alignment
โข Chainage
โข Horizontal Alignment
โข Vertical Alignment
โข Gradient
โข Crossfall
โข Camber
โข Superelevation
โข Formation Level
โข Subgrade
โข Subbase
โข Base Course
โข Prime Coat
โข Tack Coat
โข Asphalt Works
โข Shoulders
โข Roadside Drainage
โข Road Furniture แซแซแตแณแแข
แฅแแฒแแ แจแแแแต แแณแแถแฝ แฅแซแตแฃ Compactionแฃ Aggregate Qualityแฃ Pavement Construction แฅแ แจแฅแซ แฅแซแต แแตแแญแถแฝแ แแจแณแต แ แแ แตแข
11. แจแแ แแแฐแปแ HYDRAULIC STRUCTURES
แจแณแญแต แขแแแแญ แจDrainage แแแฃแณแ แ แฐแแฃแญ แแซแแ แญแแฃแแข
แญแ แแฆ
โข Open Drains
โข Closed Drains
โข Pipe Culverts
โข Box Culverts
โข Manholes
โข Catch Basins
โข Headwalls
โข Wing Walls
โข Aprons
โข Outfalls
โข Side Drains
โข Cross-Drainage Structures
โข Scour Protection Works
แซแซแตแณแแข
แจDrainage แ แแญแแแแตแฃ Invert Levelแฃ Gradientแฃ Flow Directionแฃ Hydraulic Capacityแฃ Erosionแฃ Scour แฅแ Outlet Protection แ แฐแแขแ แแจแแแแธแแ แแจแแแฅ แ แแ แตแข
12. แจแแ แ แ แญแฆแตแ PIPELINE แฅแซแแฝ
แ Water Supply แแฎแแญแต แแญ แจแแฐแซ แฒแชแ แขแแแแญ แตแแฆ
โข Water Supply Pipelines
โข Pipe Materials
โข Pipe Classes
โข Pipe Fittings
โข Valves
โข Valve Chambers
โข Pipe Bedding
โข Thrust Blocks
โข Pipe Jointing
โข Pressure Testing
โข Leakage Testing
โข Disinfection
โข Storage Tanks
โข Pump Systems
โข Distribution Networks
แ แแซแซ แฅแแแต แแแจแ แญแแฃแแข
13. แจแฅแซ แแ แ แแฌแตแ BOQ
แฅแฉ แจแณแญแต แฒแชแ แขแแแแญ แจแฐแแธแแแ แจแแแฃแณ แฅแซ แแ แ แ แตแญแญแ แแแซแตแ แแจแแแฅ แแปแ แ แแ แตแข
แฅแแฐแฆ
โข Excavation
โข Backfilling
โข Concrete
โข Reinforcement
โข Formwork
โข Masonry
โข Plastering
โข Flooring
โข Piping
โข Drainage
โข Road Works
โข Culverts
โข Bridges
แซแ แฅแซแแฝแ แแแซแตแ แจBOQ แแญ แแแณแจแญ แ แแ แตแข
แ แฐแจแแชแ Approved Quantityแฃ Executed Quantityแฃ Measured Quantityแฃ Certified Quantity แฅแ Paid Quantity แแซแจแ แซแแแ แแฉแแต แแจแณแต แ แแ แตแข
14. แจแแช แแฅแฅแญแ แจแแแฃแณ แแ แแแต
แจแณแญแต แขแแแแญ แจแแแฃแณ แแชแ แ แฐแแฃแญ แแจแณแต แ แแ แตแข
แญแ แแฆ
โข Material Cost
โข Labour Cost
โข Equipment Cost
โข Direct Cost
โข Indirect Cost
โข Overhead
โข Productivity
โข Material Wastage
โข Unit Rate
โข Rate Analysis
โข Cost Control
โข Budget Monitoring
แซแซแตแณแแข
แ แแณแแตแฃ แ แฅแซ แแ แแฃ แ แจแแแฃแณ แแดแฃ แ แ แซแฐแ แแญแณแแแต แฅแ แ แแณแชแซ แ แ แแแ แจแแแ แญ แแแฅ แ แแฎแแญแฑ แแช แแญ แจแแซแณแตแจแแ แฐแ แแ แแจแณแต แ แแ แตแข
15. แจแแแฃแณ แแ แตแ แจแแ แฐแแณ
แจแณแญแต แฒแชแ แขแแแแญ แจแแแฃแณ แแ แตแแฃ แจแฅแซ แ แฐแ แฐแจแฐแแ แฅแ แจแแ แฐแแณแ แแจแณแต แ แแ แตแข
แ แฐแแญแแฆ
โข Work Breakdown Structure
โข Construction Program
โข Activity Sequencing
โข Critical Path
โข Float
โข Milestones
โข Resource Allocation
โข Look-Ahead Planning
โข Daily Planning
โข Weekly Planning
โข Progress Monitoring
โข Recovery Program
แแจแณแต แ แแ แตแข
แจแแฎแแญแต แแแแจแต แฒแแ แญ แแญแแซแฑแ แ แตแญแญแ แแญแถ แฐแแฃแซแ แจแแ แจแแตแฐแซแจแซ แฅแญแแ แแ แจแฅ แ แแ แตแข
16. แจแฅแซแต แแจแแแซแ แจแฅแซแต แแฅแฅแญ (QA/QC)
Quality Control แจแณแญแต แฒแชแ แขแแแแญ แแ แแแแแถแฝ แ แแฑ แแแข
แขแแแแฉ แตแแฆ
โข Quality Management Plan
โข Inspection and Test Plan (ITP)
โข Method Statement
โข Material Approval
โข Material Inspection
โข Inspection Request
โข Laboratory Testing
โข Field Testing
โข Quality Records
โข Non-Conformance Report (NCR)
โข Corrective Action
โข Preventive Action
แฅแฉ แฅแแแต แแแจแ แญแแฃแแข
แจแฐแแธแ แฅแซ แจแแแแฑ แ แแต แจApproved Drawingsแฃ Specificationsแฃ Standardsแฃ Approved Materials แฅแ แจแฅแซ แฅแซแต แแตแแญแถแฝ แแญ แแฃแฃแแ แแจแแแฅ แ แแ แตแข
แ แแต แฅแซ แจแฅแซแต แแตแแญแตแ แซแแแ แฅแซแแ แแแ แจแแแฃแ แแผ แฅแแฐแแแ แแแ แ แแ แตแข
แจแแ แจแต แแแฃแณ แแ แต แจSetting-outแฃ Excavationแฃ Founding Levelแฃ Soil Conditionแฃ Dewateringแฃ Blinding Concreteแฃ Reinforcementแฃ Formworkแฃ Concrete Placementแฃ Waterproofing แฅแ Backfilling แฅแซแแฝแ แ แตแญแญแ แแแฃแ แญ แ แแ แตแข
8. แจแตแตแซแญแธแซแ แฒแชแ แฅแซแแฝ
แจแณแญแต แขแแแแญ แจแแจแฐแแตแ แจแแแฃแณ แฅแซแแฝ แจแแแฃแณ แ แฐแ แฐแจแฐแแ แจแฅแซแต แแตแแญแถแฝ แจแแฎ แแซแแ แญแแฃแแฆ
โข Foundations
โข Columns
โข Beams
โข Slabs
โข Shear Walls
โข Retaining Walls
โข Staircases
โข Ground Beams
โข Roof Structures
โข Reinforced Concrete Structures
โข Bridges
โข Culverts
แฅแซแแณแแฑ แจแแแฃแณ แฅแซ แ แแแ แฅแซ แแญ แจแแแจแแ แฐแ แแ แแจแณแต แ แแ แตแข
9. แจMASONRY แฅแ แจแ แแ แฒแชแ แฅแซแแฝ
แจแณแญแต แฒแชแ แขแแแแญ แ แฐแแญ แ แ แแ แแฎแแญแต แแญ แจแแแธแ แจMasonry แฅแ Finishing แฅแซแแฝแแ แแซแแ แญแแฃแแข
แญแ แแฆ
โข Blockwork
โข Brickwork
โข Mortar
โข Wall Alignment
โข Wall Plumbness
โข Jointing
โข Lintels
โข Openings
โข Plastering
โข Screeding
โข Flooring
โข Tiling
โข Waterproofing
โข External Works แซแซแตแณแแข
10. แจแแแแต แแแฃแณ
แ แแแแต แแฎแแญแต แแญ แจแแฐแซ แจแณแญแต แฒแชแ แขแแแแญ แจแแแแต แแแฃแณแ แ แฅแแแต แแซแแ แญแแฃแแข
แญแ แแฆ
โข Road Alignment
โข Chainage
โข Horizontal Alignment
โข Vertical Alignment
โข Gradient
โข Crossfall
โข Camber
โข Superelevation
โข Formation Level
โข Subgrade
โข Subbase
โข Base Course
โข Prime Coat
โข Tack Coat
โข Asphalt Works
โข Shoulders
โข Roadside Drainage
โข Road Furniture แซแซแตแณแแข
แฅแแฒแแ แจแแแแต แแณแแถแฝ แฅแซแตแฃ Compactionแฃ Aggregate Qualityแฃ Pavement Construction แฅแ แจแฅแซ แฅแซแต แแตแแญแถแฝแ แแจแณแต แ แแ แตแข
11. แจแแ แแแฐแปแ HYDRAULIC STRUCTURES
แจแณแญแต แขแแแแญ แจDrainage แแแฃแณแ แ แฐแแฃแญ แแซแแ แญแแฃแแข
แญแ แแฆ
โข Open Drains
โข Closed Drains
โข Pipe Culverts
โข Box Culverts
โข Manholes
โข Catch Basins
โข Headwalls
โข Wing Walls
โข Aprons
โข Outfalls
โข Side Drains
โข Cross-Drainage Structures
โข Scour Protection Works
แซแซแตแณแแข
แจDrainage แ แแญแแแแตแฃ Invert Levelแฃ Gradientแฃ Flow Directionแฃ Hydraulic Capacityแฃ Erosionแฃ Scour แฅแ Outlet Protection แ แฐแแขแ แแจแแแแธแแ แแจแแแฅ แ แแ แตแข
12. แจแแ แ แ แญแฆแตแ PIPELINE แฅแซแแฝ
แ Water Supply แแฎแแญแต แแญ แจแแฐแซ แฒแชแ แขแแแแญ แตแแฆ
โข Water Supply Pipelines
โข Pipe Materials
โข Pipe Classes
โข Pipe Fittings
โข Valves
โข Valve Chambers
โข Pipe Bedding
โข Thrust Blocks
โข Pipe Jointing
โข Pressure Testing
โข Leakage Testing
โข Disinfection
โข Storage Tanks
โข Pump Systems
โข Distribution Networks
แ แแซแซ แฅแแแต แแแจแ แญแแฃแแข
13. แจแฅแซ แแ แ แแฌแตแ BOQ
แฅแฉ แจแณแญแต แฒแชแ แขแแแแญ แจแฐแแธแแแ แจแแแฃแณ แฅแซ แแ แ แ แตแญแญแ แแแซแตแ แแจแแแฅ แแปแ แ แแ แตแข
แฅแแฐแฆ
โข Excavation
โข Backfilling
โข Concrete
โข Reinforcement
โข Formwork
โข Masonry
โข Plastering
โข Flooring
โข Piping
โข Drainage
โข Road Works
โข Culverts
โข Bridges
แซแ แฅแซแแฝแ แแแซแตแ แจBOQ แแญ แแแณแจแญ แ แแ แตแข
แ แฐแจแแชแ Approved Quantityแฃ Executed Quantityแฃ Measured Quantityแฃ Certified Quantity แฅแ Paid Quantity แแซแจแ แซแแแ แแฉแแต แแจแณแต แ แแ แตแข
14. แจแแช แแฅแฅแญแ แจแแแฃแณ แแ แแแต
แจแณแญแต แขแแแแญ แจแแแฃแณ แแชแ แ แฐแแฃแญ แแจแณแต แ แแ แตแข
แญแ แแฆ
โข Material Cost
โข Labour Cost
โข Equipment Cost
โข Direct Cost
โข Indirect Cost
โข Overhead
โข Productivity
โข Material Wastage
โข Unit Rate
โข Rate Analysis
โข Cost Control
โข Budget Monitoring
แซแซแตแณแแข
แ แแณแแตแฃ แ แฅแซ แแ แแฃ แ แจแแแฃแณ แแดแฃ แ แ แซแฐแ แแญแณแแแต แฅแ แ แแณแชแซ แ แ แแแ แจแแแ แญ แแแฅ แ แแฎแแญแฑ แแช แแญ แจแแซแณแตแจแแ แฐแ แแ แแจแณแต แ แแ แตแข
15. แจแแแฃแณ แแ แตแ แจแแ แฐแแณ
แจแณแญแต แฒแชแ แขแแแแญ แจแแแฃแณ แแ แตแแฃ แจแฅแซ แ แฐแ แฐแจแฐแแ แฅแ แจแแ แฐแแณแ แแจแณแต แ แแ แตแข
แ แฐแแญแแฆ
โข Work Breakdown Structure
โข Construction Program
โข Activity Sequencing
โข Critical Path
โข Float
โข Milestones
โข Resource Allocation
โข Look-Ahead Planning
โข Daily Planning
โข Weekly Planning
โข Progress Monitoring
โข Recovery Program
แแจแณแต แ แแ แตแข
แจแแฎแแญแต แแแแจแต แฒแแ แญ แแญแแซแฑแ แ แตแญแญแ แแญแถ แฐแแฃแซแ แจแแ แจแแตแฐแซแจแซ แฅแญแแ แแ แจแฅ แ แแ แตแข
16. แจแฅแซแต แแจแแแซแ แจแฅแซแต แแฅแฅแญ (QA/QC)
Quality Control แจแณแญแต แฒแชแ แขแแแแญ แแ แแแแแถแฝ แ แแฑ แแแข
แขแแแแฉ แตแแฆ
โข Quality Management Plan
โข Inspection and Test Plan (ITP)
โข Method Statement
โข Material Approval
โข Material Inspection
โข Inspection Request
โข Laboratory Testing
โข Field Testing
โข Quality Records
โข Non-Conformance Report (NCR)
โข Corrective Action
โข Preventive Action
แฅแฉ แฅแแแต แแแจแ แญแแฃแแข
แจแฐแแธแ แฅแซ แจแแแแฑ แ แแต แจApproved Drawingsแฃ Specificationsแฃ Standardsแฃ Approved Materials แฅแ แจแฅแซ แฅแซแต แแตแแญแถแฝ แแญ แแฃแฃแแ แแจแแแฅ แ แแ แตแข
แ แแต แฅแซ แจแฅแซแต แแตแแญแตแ แซแแแ แฅแซแแ แแแ แจแแแฃแ แแผ แฅแแฐแแแ แแแ แ แแ แตแข
โค6๐1
17. แจแแแฃแณ แฎแแตแซแต แ แตแฐแณแฐแญ
แจแแฐแ แแแต แซแแ Site Civil Engineer แจแแแฃแณ แฎแแตแซแตแ แ แฐแแฃแญ แแจแณแต แ แแ แตแข
แญแ แแฆ
โข Contract Conditions
โข Employer's Requirements
โข Contractor's Obligations
โข Engineer's Responsibilities
โข Site Instructions
โข Requests for Information (RFI)
โข Variations
โข Delays
โข Extension of Time (EOT)
โข Claims
โ๐แแฐแจแแช แแจแ แฅแ แแแฝ แจแฎแแตแตแซแญแฝแ แแญแ แแแแฝ แจ YouTube แแแฝแ แจแณแฝ แฃแแ แแแญ แ แแแฃแต SubScribe แ แญแแ แคแฐแฐแฅ แญแแ๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
แจแแฐแ แแแต แซแแ Site Civil Engineer แจแแแฃแณ แฎแแตแซแตแ แ แฐแแฃแญ แแจแณแต แ แแ แตแข
แญแ แแฆ
โข Contract Conditions
โข Employer's Requirements
โข Contractor's Obligations
โข Engineer's Responsibilities
โข Site Instructions
โข Requests for Information (RFI)
โข Variations
โข Delays
โข Extension of Time (EOT)
โข Claims
โ๐แแฐแจแแช แแจแ แฅแ แแแฝ แจแฎแแตแตแซแญแฝแ แแญแ แแแแฝ แจ YouTube แแแฝแ แจแณแฝ แฃแแ แแแญ แ แแแฃแต SubScribe แ แญแแ แคแฐแฐแฅ แญแแ๐
https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
@etconp
โค8
๐แแ แจแฎแแตแตแซแญแฝแ แตแซแแฝ แแญ แผแญ แแตแต แจแแแ แจแณแฝ แฃแแ แแแญ แ แแญแฐแ แญแ แแ๐
โฌ๏ธConstruction Work Permit Cheaklist Package
โ Excavation & Earthwork Checklists
โ Foundation & Substructure Checklists
โ Reinforced Concrete (RC) Work Checklists
โ Formwork & Reinforcement Checklists
โ Concrete Casting Checklists
โ Masonry & Block Work Checklists แฅแ แแแฝ ...
https://ye-buna.com/etconp?ref=product_detail&product=6a744a079bb13_etconp
โฌ๏ธConstruction Work Permit Cheaklist Package
โ Excavation & Earthwork Checklists
โ Foundation & Substructure Checklists
โ Reinforced Concrete (RC) Work Checklists
โ Formwork & Reinforcement Checklists
โ Concrete Casting Checklists
โ Masonry & Block Work Checklists แฅแ แแแฝ ...
https://ye-buna.com/etconp?ref=product_detail&product=6a744a079bb13_etconp
โค1๐ฅฐ1
JOB VACANCY
Project Architect
Deadline: September 15, 2026
Education Qualification: แจแแแแชแซ แฒแแช
๐Skills
3D Graphic Design
Work Address:-mesqal square
๐Job Description
About the Role:
Sunshine Business PLC is seeking a qualified, creative, and detail-oriented Project Architect to join our dynamic team for the ongoing expansion of the prestigious Marriott Executive Apartments located at Bole Medhanialem, Addis Ababa.
The ideal candidate will be responsible for producing architectural drawings, overseeing site quality execution, and driving technical alignment across engineering and construction disciplines.
๐Key Responsibilities
Prepare comprehensive architectural working drawings, floor plans, blueprints, and construction documents in full compliance with project specifications.
Manage project technical specifications and make necessary blueprint corrections/modifications to address site execution challenges
Coordinate actively with structural engineers, interior designers, MEP consultants, and general contractors across all project execution phases
Attend routine construction site meetings and conduct visual progress reviews to ensure ongoing work precisely matches approved design plans.
๐ฅJob Requirementsยท
Education: B.Sc. Degree in Architecture.ยท
Experience: Minimum of two (2) years and above of relevant hands-on working experience as an Architect (experience in commercial/hospitality projects is an advantage).ยท
Technical Knowledge: Solid practical understanding of building materials, architectural construction detailing, local building regulations, quality standards, and statutory codes.ยท
Software Proficiency: Exceptional skill in standard architectural design and rendering software (e.g., AutoCAD, SketchUp, 3ds Max/VIZ, Revit) and graphic tools such as Adobe Photoshop.ยท
Portfolio: A strong portfolio showcasing previous technical working drawings, 3D renderings, and completed architectural projects is required.ยท
Core Competencies: High creativity with strong 3D spatial visualization capabilities, keen visual awareness, meticulous eye for detail, excellent communication, and strong project coordination skills.Interested and qualified applicants who fulfill the above requirements are invited to submit their application letter, CV, copies of credentials, and a copy/link to their architectural design portfolio within 10 consecutive working days from the date of this announcement.
๐ฉEmail: fitih@sunshineretail.com
@etconp
Project Architect
Deadline: September 15, 2026
Education Qualification: แจแแแแชแซ แฒแแช
๐Skills
3D Graphic Design
Work Address:-mesqal square
๐Job Description
About the Role:
Sunshine Business PLC is seeking a qualified, creative, and detail-oriented Project Architect to join our dynamic team for the ongoing expansion of the prestigious Marriott Executive Apartments located at Bole Medhanialem, Addis Ababa.
The ideal candidate will be responsible for producing architectural drawings, overseeing site quality execution, and driving technical alignment across engineering and construction disciplines.
๐Key Responsibilities
Prepare comprehensive architectural working drawings, floor plans, blueprints, and construction documents in full compliance with project specifications.
Manage project technical specifications and make necessary blueprint corrections/modifications to address site execution challenges
Coordinate actively with structural engineers, interior designers, MEP consultants, and general contractors across all project execution phases
Attend routine construction site meetings and conduct visual progress reviews to ensure ongoing work precisely matches approved design plans.
๐ฅJob Requirementsยท
Education: B.Sc. Degree in Architecture.ยท
Experience: Minimum of two (2) years and above of relevant hands-on working experience as an Architect (experience in commercial/hospitality projects is an advantage).ยท
Technical Knowledge: Solid practical understanding of building materials, architectural construction detailing, local building regulations, quality standards, and statutory codes.ยท
Software Proficiency: Exceptional skill in standard architectural design and rendering software (e.g., AutoCAD, SketchUp, 3ds Max/VIZ, Revit) and graphic tools such as Adobe Photoshop.ยท
Portfolio: A strong portfolio showcasing previous technical working drawings, 3D renderings, and completed architectural projects is required.ยท
Core Competencies: High creativity with strong 3D spatial visualization capabilities, keen visual awareness, meticulous eye for detail, excellent communication, and strong project coordination skills.Interested and qualified applicants who fulfill the above requirements are invited to submit their application letter, CV, copies of credentials, and a copy/link to their architectural design portfolio within 10 consecutive working days from the date of this announcement.
๐ฉEmail: fitih@sunshineretail.com
@etconp
โค3๐1
๐แตแ แแตแแต แ แญแญแดแญแธแญ แฅแ แแแฃแณ แ แฐแแฃแญ แแแแญ แจแแจแณ 4 แแญแฅ แแ
แแ แ แ แแต แแญ แ แแแ
แฐแแ๐
๐ แจแแซแซแตแฐแแฆ
โ Mosque Architecture
โ Concept & Geometry
โ Space Planning
โ Design Synthesis & Form
โ แจแ แญแญแดแญแธแซแ แฅแ Structural Drawings แจแแณแ แแฎแแญแถแฝ
โ แแแแญแ แแแฎแแญแต แแฃแแป แจแแแ แแญแแญ แแฅแซแชแซแแฝ แซแแ แแ๐
๐ซแฅแแแ แแ แแ แจแแแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6a8fbfb8b8611_etconp
๐ แจแแซแซแตแฐแแฆ
โ Mosque Architecture
โ Concept & Geometry
โ Space Planning
โ Design Synthesis & Form
โ แจแ แญแญแดแญแธแซแ แฅแ Structural Drawings แจแแณแ แแฎแแญแถแฝ
โ แแแแญแ แแแฎแแญแต แแฃแแป แจแแแ แแญแแญ แแฅแซแชแซแแฝ แซแแ แแ๐
๐ซแฅแแแ แแ แแ แจแแแ แจแณแฝ แฃแแ แแแญ แซแแญแฑแต๐
https://ye-buna.com/etconp?ref=product_detail&product=6a8fbfb8b8611_etconp
๐3โค1๐คฃ1
๐แ แแแฃแณ แแญแ แแตแฅ แแฎแแญแถแฝ แฅแแฐ แ แแแแแณแธแแฃ แฅแแฐ แแ แแธแ แฅแ แฅแแฐแแ แญแแต แจแดแญแแแ แฐแจแ แ แแแแต แ แ แซแต แแ แแ แแญแแฝ แญแจแแแแข
โโโโโโโโโโโโโโ
๐1. แจแแแชแซ แคแต แแแฃแณ (Residential Construction)
โ แฐแแฝ แแแแชแซแแต แจแแ แแแฃแธแแ แฆแณแแฝ แจแแธแแ แจแแแฃแณ แ แญแแต แแแข
โ แแฐแ แ แแแชแซ แคแถแฝแก แฃแ แ แแต แแญแ แฃแ แแแต แแ แแแชแซ แคแถแฝ (Villas)แฃ แชแแแฝ แฅแ แจแแจแซแซ แคแถแฝแข
โ แจแแซ แแแชแซ แคแถแฝแก แ แแญแตแแแถแฝแฃ แฎแแถแแแจแแฝ แฅแ แจแแแชแซ แแแฐแฎแฝ (Real Estate complexes)แข
๐2. แจแแแตแ แแ แ แซแ แ แแแแแต แแแฃแณ (Commercial & Institutional Construction)
โ แแแแตแฃ แแตแซ แฅแ แแแ แ แซแ แ แแแแแถแฝ แจแแแ แแแฃแณแแฝแ แซแ แแแแแข
โ แจแแแต แ แแแแฝแก แจแแ แซ แแแจแแต (Malls)แฃ แจแขแฎ แ แแแแฝแฃ แแดแแฝแฃ แฅแ แฃแแฎแฝแข
โ แจแแ แ แซแ แ แแแแแตแก แตแแ แญแต แคแถแฝแฃ แฉแแจแญแฒแฒแแฝแฃ แแตแแณแแฝแฃ แคแฐ-แแปแ แแต แฅแ แจแแแแตแต แแตแชแซ แคแถแฝแข
๐3. แจแจแฃแต/แแฐแจแฐ แแแต แแแฃแณ (Heavy / Infrastructure Construction)
โ แ แแตแ แแแญ แแญแ แจแฐแ แแแตแฌแต แจแแซแตแแแ แตแแแ แจแแฐแจแฐ แแแต แแฎแแญแถแฝ แแธแแข
โ แจแแแแต แฅแ แตแซแแตแแญแตแก แ แตแแแต แแแแถแฝแฃ แตแแตแฎแฝแฃ แจแฃแกแญ แแตแแฎแฝแฃ แจแแแแต แแแแซแแฝ (Overpasses/Tunnels) แฅแ แคแญแแญแถแฝแข
โ แจแแแ แแญแ แแฐแจแฐ แแแตแก แแตแฆแฝแฃ แจแแ แแฃแชแซ แฃแขแซแแฝแฃ แจแแณแฝ แแตแแฎแฝแฃ แฅแ แจแแญแตแฎ แคแแญแตแชแญ แฃแขแซแแฝแข
๐4. แจแขแแฑแตแตแช แแแฃแณ (Industrial Construction)
โ แจแแฐแ แขแแแแชแแ แฅแ แแฉ แแฉ แดแญแแแแแฝแ แจแแ แญแ แจแแแฃแณ แ แญแแถแฝ แแธแแข
โ แแฅแชแซแแฝแ แ แแซแฝ แขแแฑแตแตแชแแฝแก แจแฅแแแฝ แแแจแปแแฝแฃ แจแจแญแแจแญแ แฅแ แจแแแฅ แแฅแชแซแแฝแข
โ แแแแแฝแ แจแแญแ แแแจแแตแก แแแ แจแฅแแแฝ แแจแแป แแแแแฝ (Warehouses)แฃ แจแแณแ แแฃแชแซแแฝ (Refineries) แฅแ แจแแ แฃแขแซแแฝแข
๐แ แแแฃแณ แแณแแตแ แแแ แญ (Structure) แ แญแแต แฒแจแแแก
โ แจแฎแแญแชแต แ แแแแฝ (Reinforced Concrete Structures): แ แฅแจแตแ แ แฎแแญแชแต แจแแแแก (แ แ แแซแฝแ แ แฅแแต แจแแฐแซแ แต)แข
โ แจแฅแจแต แ แแแแฝ (Steel Structures): แ แแแแต แ แฅแจแต แแแแ แจแแแแก (แแแฅแชแซแแฝแ แแตแแแ แ แณแซแพแฝ แจแแซแแแแ)แข
โ แจแตแแแญแ แจแกแฅ แ แแแแฝ (Masonry Structures): แ แตแแแญแฃ แ แกแฅ แแญแ แ แฅแแฌแต แจแแแแกแข
โ แจแฅแแจแต แ แแแแฝ (Wooden Structures): แแ แ แแ แแญแ แ แจแแ แ แฅแแจแต แจแแแแกแข
โโโโโโโโโโโโโโ
@etconp
โโโโโโโโโโโโโโ
๐1. แจแแแชแซ แคแต แแแฃแณ (Residential Construction)
โ แฐแแฝ แแแแชแซแแต แจแแ แแแฃแธแแ แฆแณแแฝ แจแแธแแ แจแแแฃแณ แ แญแแต แแแข
โ แแฐแ แ แแแชแซ แคแถแฝแก แฃแ แ แแต แแญแ แฃแ แแแต แแ แแแชแซ แคแถแฝ (Villas)แฃ แชแแแฝ แฅแ แจแแจแซแซ แคแถแฝแข
โ แจแแซ แแแชแซ แคแถแฝแก แ แแญแตแแแถแฝแฃ แฎแแถแแแจแแฝ แฅแ แจแแแชแซ แแแฐแฎแฝ (Real Estate complexes)แข
๐2. แจแแแตแ แแ แ แซแ แ แแแแแต แแแฃแณ (Commercial & Institutional Construction)
โ แแแแตแฃ แแตแซ แฅแ แแแ แ แซแ แ แแแแแถแฝ แจแแแ แแแฃแณแแฝแ แซแ แแแแแข
โ แจแแแต แ แแแแฝแก แจแแ แซ แแแจแแต (Malls)แฃ แจแขแฎ แ แแแแฝแฃ แแดแแฝแฃ แฅแ แฃแแฎแฝแข
โ แจแแ แ แซแ แ แแแแแตแก แตแแ แญแต แคแถแฝแฃ แฉแแจแญแฒแฒแแฝแฃ แแตแแณแแฝแฃ แคแฐ-แแปแ แแต แฅแ แจแแแแตแต แแตแชแซ แคแถแฝแข
๐3. แจแจแฃแต/แแฐแจแฐ แแแต แแแฃแณ (Heavy / Infrastructure Construction)
โ แ แแตแ แแแญ แแญแ แจแฐแ แแแตแฌแต แจแแซแตแแแ แตแแแ แจแแฐแจแฐ แแแต แแฎแแญแถแฝ แแธแแข
โ แจแแแแต แฅแ แตแซแแตแแญแตแก แ แตแแแต แแแแถแฝแฃ แตแแตแฎแฝแฃ แจแฃแกแญ แแตแแฎแฝแฃ แจแแแแต แแแแซแแฝ (Overpasses/Tunnels) แฅแ แคแญแแญแถแฝแข
โ แจแแแ แแญแ แแฐแจแฐ แแแตแก แแตแฆแฝแฃ แจแแ แแฃแชแซ แฃแขแซแแฝแฃ แจแแณแฝ แแตแแฎแฝแฃ แฅแ แจแแญแตแฎ แคแแญแตแชแญ แฃแขแซแแฝแข
๐4. แจแขแแฑแตแตแช แแแฃแณ (Industrial Construction)
โ แจแแฐแ แขแแแแชแแ แฅแ แแฉ แแฉ แดแญแแแแแฝแ แจแแ แญแ แจแแแฃแณ แ แญแแถแฝ แแธแแข
โ แแฅแชแซแแฝแ แ แแซแฝ แขแแฑแตแตแชแแฝแก แจแฅแแแฝ แแแจแปแแฝแฃ แจแจแญแแจแญแ แฅแ แจแแแฅ แแฅแชแซแแฝแข
โ แแแแแฝแ แจแแญแ แแแจแแตแก แแแ แจแฅแแแฝ แแจแแป แแแแแฝ (Warehouses)แฃ แจแแณแ แแฃแชแซแแฝ (Refineries) แฅแ แจแแ แฃแขแซแแฝแข
๐แ แแแฃแณ แแณแแตแ แแแ แญ (Structure) แ แญแแต แฒแจแแแก
โ แจแฎแแญแชแต แ แแแแฝ (Reinforced Concrete Structures): แ แฅแจแตแ แ แฎแแญแชแต แจแแแแก (แ แ แแซแฝแ แ แฅแแต แจแแฐแซแ แต)แข
โ แจแฅแจแต แ แแแแฝ (Steel Structures): แ แแแแต แ แฅแจแต แแแแ แจแแแแก (แแแฅแชแซแแฝแ แแตแแแ แ แณแซแพแฝ แจแแซแแแแ)แข
โ แจแตแแแญแ แจแกแฅ แ แแแแฝ (Masonry Structures): แ แตแแแญแฃ แ แกแฅ แแญแ แ แฅแแฌแต แจแแแแกแข
โ แจแฅแแจแต แ แแแแฝ (Wooden Structures): แแ แ แแ แแญแ แ แจแแ แ แฅแแจแต แจแแแแกแข
โโโโโโโโโโโโโโ
@etconp
โค1๐1๐ฅฐ1
Ethiopian Construction Vacancy & Tender
๐แฐแแ แแต แคแฐแฐแฆแปแฝแ แฅแแแฝ แ แ แจแแนแ แแฐแจแต แจ ETABS แฒแถแญแซแ แชแตแฎ แ แ แแญแ แแแ แจ introduction แแแฎ Analysis แฅแ Design แฃแซแฐแ แแญแฅ แชแตแฎ แฃแแแ
แฐแแแนแแแข ๐ซตแฅแแ แแฌ แญแแ 4 แญแแแแน แแฅแฐแแ๐ https://youtu.be/iYTyYlebxjU
YouTube
๐ ETABS Full Course 2026 โ Part 11 | แจแแแช แฅแตแจ Advanced | ETABS Tutorial แ แ แแญแ ๐๏ธ๐
๐ ETABS Full Course โ Part 11 | Structural Design & Analysis Tutorial
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 11, we continue the ETABS workflowโฆ
Continue the complete ETABS course from Beginner to Advanced with this practical, step-by-step tutorial focused on structural analysis and design.
In Part 11, we continue the ETABS workflowโฆ
๐ฅฐ3๐3โค1
แจแตแซ แ
แฅแญ แแตแณแแแซ
Position ๐
แณแณ แฎแแญแฐแญ
Company ๐ข
Ayat Share Company
Education ๐
แณแแ แฎแแ /แฉแแจแญแฒแฒ แ แฒแชแ แขแแแแชแแแค แ แฎแแตแตแซแญแฝแ แแแ แแแต แแญแ แ แฐแแณแณแญ แจแตแแ แญแต แแตแญ แจแแแแชแซ แฒแแช แซแแ/แแต
Experience โณ
0 แแแต
Salary ๐ฐ
แ แตแญแ แฑ แฐแแแ แตแฌแ แแ แจแต
Required qty ๐งโ๐คโ๐ง
3
Work location ๐
แ แฒแต แ แ แฃ แฅแ แ แ แซแฃแขแ
Deadline ๐
September 15, 2026
How to apply ๐
แ แแแซแพแฝ แแแแแฃ แฒแแญแก แจแตแแ แญแตแ แจแฅแซ แแแต แแตแจแแแปแธแแ แแแแแ แจแแญแแแต แแถ แฎแ แญแแ แแแฃแต แ แแฃแธแแข
Location: แ แซแต แ แญแฒแฎแ แแ แ แญ แแ แ/แคแต (แจแแแแ แแฐ แแฐแ แแซแแต แ แแแตแฐแ แแแแต แแซแคแ แจแตแซแแญ แแฅแซแฑ แ แ แแฅ) ๐บ๏ธ
Phone Number: 011-854-71-99 ๐
@etconp
Position ๐
แณแณ แฎแแญแฐแญ
Company ๐ข
Ayat Share Company
Education ๐
แณแแ แฎแแ /แฉแแจแญแฒแฒ แ แฒแชแ แขแแแแชแแแค แ แฎแแตแตแซแญแฝแ แแแ แแแต แแญแ แ แฐแแณแณแญ แจแตแแ แญแต แแตแญ แจแแแแชแซ แฒแแช แซแแ/แแต
Experience โณ
0 แแแต
Salary ๐ฐ
แ แตแญแ แฑ แฐแแแ แตแฌแ แแ แจแต
Required qty ๐งโ๐คโ๐ง
3
Work location ๐
แ แฒแต แ แ แฃ แฅแ แ แ แซแฃแขแ
Deadline ๐
September 15, 2026
How to apply ๐
แ แแแซแพแฝ แแแแแฃ แฒแแญแก แจแตแแ แญแตแ แจแฅแซ แแแต แแตแจแแแปแธแแ แแแแแ แจแแญแแแต แแถ แฎแ แญแแ แแแฃแต แ แแฃแธแแข
Location: แ แซแต แ แญแฒแฎแ แแ แ แญ แแ แ/แคแต (แจแแแแ แแฐ แแฐแ แแซแแต แ แแแตแฐแ แแแแต แแซแคแ แจแตแซแแญ แแฅแซแฑ แ แ แแฅ) ๐บ๏ธ
Phone Number: 011-854-71-99 ๐
@etconp
โค1๐1
๐แ แตแฐแณแฝ แแ แแแ
แปแแ แคแฐแฐแฆแฝ
โก๏ธ3 แแแต แแฉแต
๐แ แฒแต แ แแต แแญแแซแต แ แแจแ แจ แทแแแ 1 แแแฎ แฅแตแจ แทแแแ 5 แจแแแญ Quantity Surveying แฅแ Ms Project แฆแแแญแ แฎแญแถแฝ แตแแ แ แจ 25% แ แแฝ แ แญแแแ๐
๐ฉแแแแแแฅ @Philemona7 แญแแแแ
๐Qs แแแแตแฑ ETABS แฆแแต แฅแแฐแฐแ แ แ แแ๐
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
แแแซแ แ แฒแต แ แแต๐
@etconp
โก๏ธ3 แแแต แแฉแต
๐แ แฒแต แ แแต แแญแแซแต แ แแจแ แจ แทแแแ 1 แแแฎ แฅแตแจ แทแแแ 5 แจแแแญ Quantity Surveying แฅแ Ms Project แฆแแแญแ แฎแญแถแฝ แตแแ แ แจ 25% แ แแฝ แ แญแแแ๐
๐ฉแแแแแแฅ @Philemona7 แญแแแแ
๐Qs แแแแตแฑ ETABS แฆแแต แฅแแฐแฐแ แ แ แแ๐
https://ye-buna.com/etconp?ref=product_detail&product=6a5e233a9c5e0_etconp
แแแซแ แ แฒแต แ แแต๐
@etconp
โค1๐ฅฐ1
๐ แ แแแ แแ แซ
๐ 03/13/2018
โฐ 07:00
๐๏ธ แ แแแ แจแฎแแตแตแซแญแฝแ แฐแฅ-แตแตแซแญแธแญ แแดแชแซแ แแ
โโโโโโโโโโโโโโโโโโ
๐ฉ 1. แฅแจแต (Steel)
๐งต 2. แตแณแ แฝแฆ
แ แชแ
1.5 mm โ 350.00
2.5 mm โ 350.00
๐จ 3. แแตแแญ
แ แชแ โ แแซแญแแ
แ แจแแแญ: 290 โ 340
แธแญแปแช: 340 โ 400
๐ 4. แแญแแฎ โ DH Geda
G-28
28 โ 2,480.00
30 โ 1,980.00
32 โ 1,530.00
35 โ 1,170.00
๐ฐ 5. PPR Pipes
Rack
25 โ 950.00
32 โ 1,800.00
40 โ 2,500.00
50 โ 3,500.00
63 โ 5,800.00
75 โ 12,500.00
90 โ -----------
110 โ ----------
Roxi
25 โ 1,450.00
32 โ 2,500.00
40 โ 4,500.00
50 โ 7,000.00
63 โ 8,500.00
75 โ 14,000.00
90 โ -----------
110 โ 28,000.00
๐ต 6. HDPE Pipes
โช 7. U-PVC Pipes
PN 4
50 mm โ 1,000.00
75 mm โ 1,550.00
110 mm โ 2,300.00
160 mm โ 4,800.00
200 mm โ 7,500.00
PN 6
50 mm โ 1,300.00
75 mm โ 2,000.00
110 mm โ 3,200.00
125 mm โ 5,800.00
160 mm โ 7,000.00
200 mm โ 9,200.00
250 mm โ 25,000.00
PN 10
90 mm โ 6,700.00
110 mm โ 7,000.00
160 mm โ 15,000.00
200 mm โ 21,000.00
250 mm โ ----------
380 mm โ 35,000.00
PN 16
20 mm โ 2,200.00
25 mm โ 2,800.00
50 mm โ 3,500.00
โก 8. แแฎแฎ แฎแแตแฉแต
แ แแตแญ
13 โ 1,500.00
16 โ 2,100.00
19 โ 2,200.00
20 โ 2,500.00
25 โ 2,500.00
โก 9. แแญแแ แฎแแตแฉแต
แ แแตแญ
16 โ 90.00
19 โ 110.00
25 โ 125.00
โโโโโโโโโโโโโโโโโโ
โแแแ แจ แฎแแตแตแซแญแฝแ แแณแฎแฝ แจแแณแฐแตแ แต แแ แแแต แชแตแฎแแฝ แฅแ แตแแ แญแถแฝ แแแแซแ แต แปแแแฝแ แซแแฐแแแแ แฅแ แแแญ แฃแแแฆแณแ แฅแ แจแณแฝ แฃแแ แแแญ แ แแแฃแต แแญแ แฃแญแแ แคแฐแฐแฅ แญแแ แแแณแ แ แญแแฅแ๐
https://t.me/ETCONp
๐ 03/13/2018
โฐ 07:00
๐๏ธ แ แแแ แจแฎแแตแตแซแญแฝแ แฐแฅ-แตแตแซแญแธแญ แแดแชแซแ แแ
โโโโโโโโโโโโโโโโโโ
๐ฉ 1. แฅแจแต (Steel)
๐งต 2. แตแณแ แฝแฆ
แ แชแ
1.5 mm โ 350.00
2.5 mm โ 350.00
๐จ 3. แแตแแญ
แ แชแ โ แแซแญแแ
แ แจแแแญ: 290 โ 340
แธแญแปแช: 340 โ 400
๐ 4. แแญแแฎ โ DH Geda
G-28
28 โ 2,480.00
30 โ 1,980.00
32 โ 1,530.00
35 โ 1,170.00
๐ฐ 5. PPR Pipes
Rack
25 โ 950.00
32 โ 1,800.00
40 โ 2,500.00
50 โ 3,500.00
63 โ 5,800.00
75 โ 12,500.00
90 โ -----------
110 โ ----------
Roxi
25 โ 1,450.00
32 โ 2,500.00
40 โ 4,500.00
50 โ 7,000.00
63 โ 8,500.00
75 โ 14,000.00
90 โ -----------
110 โ 28,000.00
๐ต 6. HDPE Pipes
โช 7. U-PVC Pipes
PN 4
50 mm โ 1,000.00
75 mm โ 1,550.00
110 mm โ 2,300.00
160 mm โ 4,800.00
200 mm โ 7,500.00
PN 6
50 mm โ 1,300.00
75 mm โ 2,000.00
110 mm โ 3,200.00
125 mm โ 5,800.00
160 mm โ 7,000.00
200 mm โ 9,200.00
250 mm โ 25,000.00
PN 10
90 mm โ 6,700.00
110 mm โ 7,000.00
160 mm โ 15,000.00
200 mm โ 21,000.00
250 mm โ ----------
380 mm โ 35,000.00
PN 16
20 mm โ 2,200.00
25 mm โ 2,800.00
50 mm โ 3,500.00
โก 8. แแฎแฎ แฎแแตแฉแต
แ แแตแญ
13 โ 1,500.00
16 โ 2,100.00
19 โ 2,200.00
20 โ 2,500.00
25 โ 2,500.00
โก 9. แแญแแ แฎแแตแฉแต
แ แแตแญ
16 โ 90.00
19 โ 110.00
25 โ 125.00
โโโโโโโโโโโโโโโโโโ
โแแแ แจ แฎแแตแตแซแญแฝแ แแณแฎแฝ แจแแณแฐแตแ แต แแ แแแต แชแตแฎแแฝ แฅแ แตแแ แญแถแฝ แแแแซแ แต แปแแแฝแ แซแแฐแแแแ แฅแ แแแญ แฃแแแฆแณแ แฅแ แจแณแฝ แฃแแ แแแญ แ แแแฃแต แแญแ แฃแญแแ แคแฐแฐแฅ แญแแ แแแณแ แ แญแแฅแ๐
https://t.me/ETCONp
โค12