📑 BILL OF QUANTITIES (BOQ) — WHY IS IT IMPORTANT IN TENDERING?
A Bill of Quantities is a structured document that describes construction work items and provides quantities and units used for pricing and procurement, according to the applicable tender arrangements.
🔹 What Does a BOQ Usually Contain?
📌 Item number.
📌 Description of work.
📌 Unit of measurement.
📌 Quantity.
📌 Unit rate, where required.
📌 Total amount, where required.
🏗️ Example
If the quoted unit rate is 5,000 currency units per m³, the amount for this illustrative item is: 10 × 5,000 = 50,000 currency units.
🔹 Why Is the BOQ Important?
✅ Provides a structured pricing format.
✅ Supports tender comparison where applicable.
✅ Helps estimate project costs.
✅ Supports valuations and cost monitoring under the contract.
⚠️ Always follow the official BOQ format, measurement rules, and tender instructions. Do not change prescribed quantities or descriptions unless permitted.
@ETCONpWORK
A Bill of Quantities is a structured document that describes construction work items and provides quantities and units used for pricing and procurement, according to the applicable tender arrangements.
🔹 What Does a BOQ Usually Contain?
📌 Item number.
📌 Description of work.
📌 Unit of measurement.
📌 Quantity.
📌 Unit rate, where required.
📌 Total amount, where required.
🏗️ Example
If the quoted unit rate is 5,000 currency units per m³, the amount for this illustrative item is: 10 × 5,000 = 50,000 currency units.
🔹 Why Is the BOQ Important?
✅ Provides a structured pricing format.
✅ Supports tender comparison where applicable.
✅ Helps estimate project costs.
✅ Supports valuations and cost monitoring under the contract.
⚠️ Always follow the official BOQ format, measurement rules, and tender instructions. Do not change prescribed quantities or descriptions unless permitted.
@ETCONpWORK
❤1
👉የስራ ቅጥር ማስታወቂያ
🌟ፍላጎት ያላቸው እና መስፈርቱን የሚያሟሉ አመልካቾች የትምህርት ማስረጃቸውን፣ የሥራ ልምድ ማስረጃቸውን እና የቅርብ ጊዜ ሲቪ (CV) በማያያዝ ከላይ በተገለጸው አድራሻ እስከ October 30, 2026 ድረስ ማመልከት ይችላሉ።
@etconp
🌟ፍላጎት ያላቸው እና መስፈርቱን የሚያሟሉ አመልካቾች የትምህርት ማስረጃቸውን፣ የሥራ ልምድ ማስረጃቸውን እና የቅርብ ጊዜ ሲቪ (CV) በማያያዝ ከላይ በተገለጸው አድራሻ እስከ October 30, 2026 ድረስ ማመልከት ይችላሉ።
@etconp
❤2👍2
📐 PLUMB BOB (PLUMMET) – VERTICAL ALIGNMENT TOOL 🏗️
A plumb bob is a traditional construction tool that uses gravity to establish a true vertical line. It consists of a weighted metal body attached to a string.
🔹 Main Components
1️⃣ String or rope
2️⃣ Metal weight
3️⃣ String guide
4️⃣ Adjusting cap
5️⃣ Pointed tip
🔹 Applications
✅ Checking wall and column verticality.
✅ Transferring points between floors.
✅ Aligning formwork and structural elements.
✅ Supporting construction layout and surveying.
📌 Important Tip: Allow the plumb bob to stop swinging and protect it from wind for accurate readings.
@ETCONpWORK
A plumb bob is a traditional construction tool that uses gravity to establish a true vertical line. It consists of a weighted metal body attached to a string.
🔹 Main Components
1️⃣ String or rope
2️⃣ Metal weight
3️⃣ String guide
4️⃣ Adjusting cap
5️⃣ Pointed tip
🔹 Applications
✅ Checking wall and column verticality.
✅ Transferring points between floors.
✅ Aligning formwork and structural elements.
✅ Supporting construction layout and surveying.
📌 Important Tip: Allow the plumb bob to stop swinging and protect it from wind for accurate readings.
@ETCONpWORK
👍3❤1
🌟Internal & External Vacancy Announcement
🚥Engineering Corporation of Oromia would like to invite qualified and competent professionals on the following positions.
👉1. Material Inspector (MI-06)
👉2. Structural Inspector (SI-07)
Deadline: October 27, 2026
Positions Detail and to apply Visit ECO Corporate careers Website👇
https://careers.ecoet.org/
@etconp
🚥Engineering Corporation of Oromia would like to invite qualified and competent professionals on the following positions.
👉1. Material Inspector (MI-06)
👉2. Structural Inspector (SI-07)
Deadline: October 27, 2026
Positions Detail and to apply Visit ECO Corporate careers Website👇
https://careers.ecoet.org/
@etconp
👍3
Ethiopian Construction Vacancy & Tender
Types of construction drawing @ETCONpWORK
🏗️ Building Construction – የህንፃ ግንባታ አጋዥ መጽሐፍ!
📚ከBuilding Drawing እስከ Foundation, Floor, Wall, Roof, Stairs, Finishing, Formwork እና Site Safety ድረስ የሚያካትት ሙሉ መመሪያ
👷 ለCivil Engineering Students, Engineers, Architects, QS & Contractors ጠቃሚ ነው ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6abccc8ece63c_etconp
📚ከBuilding Drawing እስከ Foundation, Floor, Wall, Roof, Stairs, Finishing, Formwork እና Site Safety ድረስ የሚያካትት ሙሉ መመሪያ
👷 ለCivil Engineering Students, Engineers, Architects, QS & Contractors ጠቃሚ ነው ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6abccc8ece63c_etconp
👌2❤1🥰1
🏛 VACANCY ANNOUNCEMENT
🌟Bisrat 11 Housing Cooperative
☄Bisrat 11 Housing Cooperative was established in December 2015 E.C. by 72 members in accordance with Article 10 of Proclamation No. 985/2009 of the Addis Ababa City Administration Cooperative Society.
▶️The cooperative was organized by bringing together members registered for the 20/80 and 40/60 housing programs.
⏺Having completed substructure construction work with our hired building construction contractor and consulting firm, we are currently executing superstructure construction works.
🗂We are currently seeking to hire a qualified professional for the following position:
📌 Job Title: Client Engineer
Employment Type: Full-time, Part-time, or Contractual basis
Place of Work: Woreda 07, Chefe Meda, Akaki Kality, Addis Ababa, Ethiopia
Salary: Based on Negotiation
Deadline: October 26, 2026
🎓 Required Education & Experience:
BSc in Civil Engineering, Construction Technology & Management, or related fields.
5 years of gross experience, of which: 3 years must be in contract administration.
2 years as an office engineer, contract administration engineer, project coordinator, or related assignments.
📋 Roles & Responsibilities:
The employee will guarantee the client's interests by ensuring all parties fulfill contractual obligations, managing project documentation, controlling costs, mitigating risks, and ensuring the project is administered fairly and in accordance with contract documents.
Detailed Responsibilities:
Contract Management: Master all contract documents (agreements, conditions, drawings, specifications, addenda), clarify obligations of both client and contractor, and rigorously monitor site activities.
Documentation Control: Manage project documentation by controlling the issuance, revision, and archiving of all RFIs, shop drawings, submittals, and meeting minutes. Maintain a complete, organized record of all correspondence and decisions.
Cost & Financial Control: Meticulously scrutinize monthly requisitions for completed work and materials, recommend/certify payments, monitor the contract sum, contingency funds, and financial impacts of changes, and administer payment holdbacks.
Schedule & Claims Management: Evaluate baseline and updated schedules (including CPM), compare progress against timelines, and assess Time Extension claims fairly.
Dispute Mitigation: Proactively identify issues, implement Early Warning processes, act as a mediator to resolve disagreements, and provide organized records for formal resolutions.
Communication & Meetings: Run regular progress meetings, ensure accurate minutes, act as the official point of contact for formal written communications, and issue notices of non-conformance or delays.
Project Closeout: Ensure submission of final documents (as-built drawings, O&M manuals, warranties, certificates), coordinate final deficiency lists, and process final payments and retention funds.
📩 How to Apply:
Interested applicants who meet the minimum requirements can send their applications via email:
✉️ Primary Email: bisrat112023@gmail.com
📋 CC To: gesethiopia@gmail.com & hayleambe@gmail.com
📞 For More Information:
📱 0911879718 / 0911517167
@etconp
🌟Bisrat 11 Housing Cooperative
☄Bisrat 11 Housing Cooperative was established in December 2015 E.C. by 72 members in accordance with Article 10 of Proclamation No. 985/2009 of the Addis Ababa City Administration Cooperative Society.
▶️The cooperative was organized by bringing together members registered for the 20/80 and 40/60 housing programs.
⏺Having completed substructure construction work with our hired building construction contractor and consulting firm, we are currently executing superstructure construction works.
🗂We are currently seeking to hire a qualified professional for the following position:
📌 Job Title: Client Engineer
Employment Type: Full-time, Part-time, or Contractual basis
Place of Work: Woreda 07, Chefe Meda, Akaki Kality, Addis Ababa, Ethiopia
Salary: Based on Negotiation
Deadline: October 26, 2026
🎓 Required Education & Experience:
BSc in Civil Engineering, Construction Technology & Management, or related fields.
5 years of gross experience, of which: 3 years must be in contract administration.
2 years as an office engineer, contract administration engineer, project coordinator, or related assignments.
📋 Roles & Responsibilities:
The employee will guarantee the client's interests by ensuring all parties fulfill contractual obligations, managing project documentation, controlling costs, mitigating risks, and ensuring the project is administered fairly and in accordance with contract documents.
Detailed Responsibilities:
Contract Management: Master all contract documents (agreements, conditions, drawings, specifications, addenda), clarify obligations of both client and contractor, and rigorously monitor site activities.
Documentation Control: Manage project documentation by controlling the issuance, revision, and archiving of all RFIs, shop drawings, submittals, and meeting minutes. Maintain a complete, organized record of all correspondence and decisions.
Cost & Financial Control: Meticulously scrutinize monthly requisitions for completed work and materials, recommend/certify payments, monitor the contract sum, contingency funds, and financial impacts of changes, and administer payment holdbacks.
Schedule & Claims Management: Evaluate baseline and updated schedules (including CPM), compare progress against timelines, and assess Time Extension claims fairly.
Dispute Mitigation: Proactively identify issues, implement Early Warning processes, act as a mediator to resolve disagreements, and provide organized records for formal resolutions.
Communication & Meetings: Run regular progress meetings, ensure accurate minutes, act as the official point of contact for formal written communications, and issue notices of non-conformance or delays.
Project Closeout: Ensure submission of final documents (as-built drawings, O&M manuals, warranties, certificates), coordinate final deficiency lists, and process final payments and retention funds.
📩 How to Apply:
Interested applicants who meet the minimum requirements can send their applications via email:
✉️ Primary Email: bisrat112023@gmail.com
📋 CC To: gesethiopia@gmail.com & hayleambe@gmail.com
📞 For More Information:
📱 0911879718 / 0911517167
@etconp
❤5🥰1
🎨 INTERNAL PAINTING COST ANALYSIS
📊 Indicative Cost Breakdown
1️⃣ Surface Preparation – 10%
2️⃣ Wall Putty – 20%
3️⃣ Primer Coat – 10%
4️⃣ Paint Materials – 35%
5️⃣ Labour – 20%
6️⃣ Tools & Consumables – 3%
7️⃣ Overheads & Wastage – 2%
✅ Total = 100%
Factors Affecting Cost: ✔️ Paint quality and number of coats
✔️ Wall condition and surface area
✔️ Labour rates and material prices
✔️ Site conditions and wastage
⚠️ Note: These percentages are illustrative. Actual costs depend on project specifications and local market rates.
@ETCONpWORK
📊 Indicative Cost Breakdown
1️⃣ Surface Preparation – 10%
2️⃣ Wall Putty – 20%
3️⃣ Primer Coat – 10%
4️⃣ Paint Materials – 35%
5️⃣ Labour – 20%
6️⃣ Tools & Consumables – 3%
7️⃣ Overheads & Wastage – 2%
✅ Total = 100%
Factors Affecting Cost: ✔️ Paint quality and number of coats
✔️ Wall condition and surface area
✔️ Labour rates and material prices
✔️ Site conditions and wastage
⚠️ Note: These percentages are illustrative. Actual costs depend on project specifications and local market rates.
@ETCONpWORK
👍3🥰2
🏛ምርጥ ቤዝመንት ያለው G+5 ህንፃ ማለትም አርክቴክቸራል፣ስትራክቸራል፣ኤሌክትሪካል እና ሳኒተሪ ያካተተ በ Auto Cad የተሰራ ዲዛይን ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a75638f22910_etconp
@etconp
https://ye-buna.com/etconp?ref=product_detail&product=6a75638f22910_etconp
@etconp
👌3❤1🥰1
🎯 SITE ENGINEER INTERVIEW QUESTION
Question: You discover that completed construction work does not meet the approved drawings or specifications. What would you do?
A professional answer should demonstrate technical judgment, communication, and respect for project procedures.
🔹 Step 1: Identify the Issue
Confirm what differs from the approved requirements.
🔹 Step 2: Check the Documents
Review the relevant drawings, specifications, and inspection requirements.
🔹 Step 3: Communicate
Notify the responsible supervisor, quality team, or engineer through the appropriate process.
🔹 Step 4: Document the Finding
Record the discrepancy and supporting evidence.
🔹 Step 5: Follow the Approved Resolution Process
Obtain the required technical assessment and authorization before corrective work or a design change.
🔹 Step 6: Verify the Outcome
Confirm that the approved corrective action has been completed and documented.
📝 Sample Interview Answer
"I would document the discrepancy, review the relevant approved documents, and inform the responsible project team. I would follow the project's nonconformance and approval procedures, ensuring that any corrective action is properly authorized and verified."
📌 Interview Tip: Never suggest concealing defects or making unauthorized structural changes.
@ETCONpWORK
Question: You discover that completed construction work does not meet the approved drawings or specifications. What would you do?
A professional answer should demonstrate technical judgment, communication, and respect for project procedures.
🔹 Step 1: Identify the Issue
Confirm what differs from the approved requirements.
🔹 Step 2: Check the Documents
Review the relevant drawings, specifications, and inspection requirements.
🔹 Step 3: Communicate
Notify the responsible supervisor, quality team, or engineer through the appropriate process.
🔹 Step 4: Document the Finding
Record the discrepancy and supporting evidence.
🔹 Step 5: Follow the Approved Resolution Process
Obtain the required technical assessment and authorization before corrective work or a design change.
🔹 Step 6: Verify the Outcome
Confirm that the approved corrective action has been completed and documented.
📝 Sample Interview Answer
"I would document the discrepancy, review the relevant approved documents, and inform the responsible project team. I would follow the project's nonconformance and approval procedures, ensuring that any corrective action is properly authorized and verified."
📌 Interview Tip: Never suggest concealing defects or making unauthorized structural changes.
@ETCONpWORK
👍3❤2🥰2
👉የኮንስትራክሽን ሥራ ውል ከመዘጋጀቱ በፊት ሊታወቁና ሊካተቱ የሚገባቸውን ዋና ዋና ጉዳዮች በአማርኛ የሚያብራራ ሙያዊ መመሪያ PDF
👷 ሲቪልና ኮንስትራክሽን መሐንዲሶች
⚖️ የሕግ ባለሙያዎች
🏗️ ተቋራጮችና አማካሪዎች
📋 ፕሮጀክት ማኔጀሮች
🎓 የኮንስትራክሽን ተማሪዎች የሚጠቅም ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
👷 ሲቪልና ኮንስትራክሽን መሐንዲሶች
⚖️ የሕግ ባለሙያዎች
🏗️ ተቋራጮችና አማካሪዎች
📋 ፕሮጀክት ማኔጀሮች
🎓 የኮንስትራክሽን ተማሪዎች የሚጠቅም ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6a9aa58c0b37b_etconp
🥰3
መገጭ - ጎንደር
ከተጀመረ 18 ዓመታትን ያስቆጠረው በጎንደር ዙሪያ ሲገነባ የነበረው የመገጭ መስኖ ግድብ ፕሮጀክት ዛሬ መመረቁ ተገልጿል።
ለአርሶ አደሮች የመስኖ ልማት ጥቅም ይሰጣል እንዲሁም በጎንደርና አካባቢው ከተሞች ያለውን የንጹህ መጠጥ ውሃ ችግር ይቀርፋል ተብሎ ተስፋ ተጠሎበታል።
ጥቅምት 13 ቀን 2019 ዓ/ም
@etconp
ከተጀመረ 18 ዓመታትን ያስቆጠረው በጎንደር ዙሪያ ሲገነባ የነበረው የመገጭ መስኖ ግድብ ፕሮጀክት ዛሬ መመረቁ ተገልጿል።
ለአርሶ አደሮች የመስኖ ልማት ጥቅም ይሰጣል እንዲሁም በጎንደርና አካባቢው ከተሞች ያለውን የንጹህ መጠጥ ውሃ ችግር ይቀርፋል ተብሎ ተስፋ ተጠሎበታል።
ጥቅምት 13 ቀን 2019 ዓ/ም
@etconp
❤6🥰1
📊Professional Interim Payment Certificate (IPC) Excel Template
🌟የግንባታ ሥራ ክፍያን በቀላሉ ለማስላት፣ ለመከታተል እና IPC ለማዘጋጀት ይህን Editable Excel Template ይጠቀሙ👇
https://ye-buna.com/etconp?ref=product_detail&product=6aafe8a2089de_etconp
🌟የግንባታ ሥራ ክፍያን በቀላሉ ለማስላት፣ ለመከታተል እና IPC ለማዘጋጀት ይህን Editable Excel Template ይጠቀሙ👇
https://ye-buna.com/etconp?ref=product_detail&product=6aafe8a2089de_etconp
❤2👍2
📊 MICROSOFT EXCEL SKILLS EVERY ASPIRING QUANTITY SURVEYOR SHOULD LEARN
Excel is a valuable tool for quantity estimation, cost calculations, BOQs, valuations, and construction reporting.
🔹 Start With These Skills
1️⃣ Basic formulas: addition, subtraction, multiplication, and division.
2️⃣ SUM: Calculate totals.
3️⃣ Percentage calculations: Work with tax, allowances, or percentage-based values where applicable.
4️⃣ Cell references: Understand relative and absolute references.
5️⃣ IF functions: Apply simple logical conditions.
6️⃣ Sorting and filtering: Organize large datasets.
7️⃣ Lookup functions: Retrieve relevant information from tables.
8️⃣ Formatting: Make cost reports and BOQs easier to read.
🏗️ Practical Exercise
Create a small BOQ containing:
- Item description.
- Unit.
- Quantity.
- Unit rate.
- Total amount.
Use a formula to calculate:
Amount = Quantity × Unit Rate
Then calculate the overall total using the SUM function.
📌 Always verify quantities, formulas, units, and rounding. A spreadsheet can calculate incorrectly if its inputs or formulas are wrong.
@ETCONpWORK
Excel is a valuable tool for quantity estimation, cost calculations, BOQs, valuations, and construction reporting.
🔹 Start With These Skills
1️⃣ Basic formulas: addition, subtraction, multiplication, and division.
2️⃣ SUM: Calculate totals.
3️⃣ Percentage calculations: Work with tax, allowances, or percentage-based values where applicable.
4️⃣ Cell references: Understand relative and absolute references.
5️⃣ IF functions: Apply simple logical conditions.
6️⃣ Sorting and filtering: Organize large datasets.
7️⃣ Lookup functions: Retrieve relevant information from tables.
8️⃣ Formatting: Make cost reports and BOQs easier to read.
🏗️ Practical Exercise
Create a small BOQ containing:
- Item description.
- Unit.
- Quantity.
- Unit rate.
- Total amount.
Use a formula to calculate:
Amount = Quantity × Unit Rate
Then calculate the overall total using the SUM function.
📌 Always verify quantities, formulas, units, and rounding. A spreadsheet can calculate incorrectly if its inputs or formulas are wrong.
@ETCONpWORK
❤3👍2🥰1
👷 10 SKILLS THAT CAN HELP YOU BECOME A STRONGER SITE ENGINEER
A site engineer needs more than theoretical knowledge. Practical skills, communication, and attention to detail are also important.
1️⃣ Drawing Interpretation: Understand dimensions, sections, and construction details.
2️⃣ Setting Out: Understand surveying references and setting-out procedures.
3️⃣ Quality Control: Recognize inspection and testing requirements.
4️⃣ Quantity Measurement: Calculate and verify construction quantities.
5️⃣ Material Knowledge: Understand basic material properties and handling.
6️⃣ Documentation: Prepare accurate site reports and records.
7️⃣ Safety Awareness: Recognize hazards and follow safety procedures.
8️⃣ Planning: Understand activity sequences and dependencies.
9️⃣ Communication: Coordinate with project teams.
🔟 Problem Solving: Identify discrepancies and follow proper procedures to resolve them.
📌 Build these skills through relevant training, supervised practical work, and continued learning.
📘 THE SITE ENGINEER'S ULTIMATE HANDBOOK
👷♂️ ለሲቪል ኢንጂነሮች እና ለግንባታ ባለሙያዎች እጅግ አስፈላጊ መፅሐፍ
✅ 200 አስፈላጊ የSite Engineering ክህሎቶችና ወሳኝ እውቀቶች የያዘ
🏗️ስለ የግንባታ፣ Quantity Estimation፣ Concrete፣ QA/QC፣ HSE፣ Project Management እና ሌሎችንም በቀላሉ ይማሩ የኮንስትራክሽን እውቀትዎ ያስፉ👇
https://ye-buna.com/etconp?ref=product_detail&product=6aca98e1644ce_etconp
A site engineer needs more than theoretical knowledge. Practical skills, communication, and attention to detail are also important.
1️⃣ Drawing Interpretation: Understand dimensions, sections, and construction details.
2️⃣ Setting Out: Understand surveying references and setting-out procedures.
3️⃣ Quality Control: Recognize inspection and testing requirements.
4️⃣ Quantity Measurement: Calculate and verify construction quantities.
5️⃣ Material Knowledge: Understand basic material properties and handling.
6️⃣ Documentation: Prepare accurate site reports and records.
7️⃣ Safety Awareness: Recognize hazards and follow safety procedures.
8️⃣ Planning: Understand activity sequences and dependencies.
9️⃣ Communication: Coordinate with project teams.
🔟 Problem Solving: Identify discrepancies and follow proper procedures to resolve them.
📌 Build these skills through relevant training, supervised practical work, and continued learning.
📘 THE SITE ENGINEER'S ULTIMATE HANDBOOK
👷♂️ ለሲቪል ኢንጂነሮች እና ለግንባታ ባለሙያዎች እጅግ አስፈላጊ መፅሐፍ
✅ 200 አስፈላጊ የSite Engineering ክህሎቶችና ወሳኝ እውቀቶች የያዘ
🏗️ስለ የግንባታ፣ Quantity Estimation፣ Concrete፣ QA/QC፣ HSE፣ Project Management እና ሌሎችንም በቀላሉ ይማሩ የኮንስትራክሽን እውቀትዎ ያስፉ👇
https://ye-buna.com/etconp?ref=product_detail&product=6aca98e1644ce_etconp
❤4👌1
🏗️ QUICK RCC BUILDING MATERIAL ESTIMATION
📐 Useful Thumb Rules
1️⃣ Concrete: 0.036 × Built-up area (m²)
2️⃣ Shuttering: 2.4–2.5 × Built-up area (m²)
3️⃣ Plywood Sheets: Shuttering area ÷ 2.98 m²
4️⃣ Nails: Approx. 0.075 kg/m² of shuttering
5️⃣ Binding Wire: Approx. 0.075 kg/m² of shuttering
6️⃣ Shuttering Oil: Approx. 0.065 L/m²
7️⃣ Steel (G+0 to G+2): 4–4.5 kg/ft²
8️⃣ Steel (Above G+2): 5.5–6.5 kg/ft²
⚠️ Engineering Note: These are preliminary estimates only. Actual quantities depend on structural design, soil conditions, loads, and site practices. Always refer to approved drawings and the BOQ.
🏗️ Building Construction – የህንፃ ግንባታ አጋዥ መጽሐፍ!
📚ከBuilding Drawing እስከ Foundation, Floor, Wall, Roof, Stairs, Finishing, Formwork እና Site Safety ድረስ የሚያካትት ሙሉ መመሪያ
👷 ለCivil Engineering Students, Engineers, Architects, QS & Contractors ጠቃሚ ነው ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6abccc8ece63c_etconp
📐 Useful Thumb Rules
1️⃣ Concrete: 0.036 × Built-up area (m²)
2️⃣ Shuttering: 2.4–2.5 × Built-up area (m²)
3️⃣ Plywood Sheets: Shuttering area ÷ 2.98 m²
4️⃣ Nails: Approx. 0.075 kg/m² of shuttering
5️⃣ Binding Wire: Approx. 0.075 kg/m² of shuttering
6️⃣ Shuttering Oil: Approx. 0.065 L/m²
7️⃣ Steel (G+0 to G+2): 4–4.5 kg/ft²
8️⃣ Steel (Above G+2): 5.5–6.5 kg/ft²
⚠️ Engineering Note: These are preliminary estimates only. Actual quantities depend on structural design, soil conditions, loads, and site practices. Always refer to approved drawings and the BOQ.
🏗️ Building Construction – የህንፃ ግንባታ አጋዥ መጽሐፍ!
📚ከBuilding Drawing እስከ Foundation, Floor, Wall, Roof, Stairs, Finishing, Formwork እና Site Safety ድረስ የሚያካትት ሙሉ መመሪያ
👷 ለCivil Engineering Students, Engineers, Architects, QS & Contractors ጠቃሚ ነው ከታች ባለው ሊንክ ያውርዱት👇
https://ye-buna.com/etconp?ref=product_detail&product=6abccc8ece63c_etconp
❤5🙏2
👉JOB VACANCY
Interested and qualified applicants are invited to submit their CV, copies of relevant educational credentials, and work-experience documents.
Application deadline: Within 10 days from the date of announcement of the vacancy.
Application method: Submit your CV and relevant documents by email to jewadengineers@gmail.com or contact 0113690612.
JEWAD BUILDING CONTRACTOR
@etconp
Interested and qualified applicants are invited to submit their CV, copies of relevant educational credentials, and work-experience documents.
Application deadline: Within 10 days from the date of announcement of the vacancy.
Application method: Submit your CV and relevant documents by email to jewadengineers@gmail.com or contact 0113690612.
JEWAD BUILDING CONTRACTOR
@etconp
❤4
👉ክፍት የሥራ ቦታ ማስታወቂያ
🌟የወጣበት ቀን ጥቅምት 12/2019 ዓ.ም
🚥ሌሎች የሥራ ማስታወቂያዎችን ለማግኘት👇👇👇
https://t.me/ETCONpWORK
@etconp
🌟የወጣበት ቀን ጥቅምት 12/2019 ዓ.ም
🚥ሌሎች የሥራ ማስታወቂያዎችን ለማግኘት👇👇👇
https://t.me/ETCONpWORK
@etconp
❤5👍1
🏗️የኮንስትራክሽን ፕሮጀክት እና የወጪ መቆጣጠሪያ ኤክሴል ሲስተም
🌟ለኮንትራክተሮች፣ መሐንዲሶችና የሳይት ፕሮጀክት ሃላፊዎች የተዘጋጀ የተሟላ ሲስተም
• የሳይት ወጪና በጀት መከታተያ (Cost Tracking)
• የክፍያ ሰርተፊኬቶች (IPC)፣ Advance እና Retention ማስተዳደሪያ
• የገንዘብ እንቅስቃሴ (Cash Flow) እና የትርፍ/ኪሳራ ትንተና
• የስራ ሂደት እና ማይልስቶን መቆጣጠሪያ እና ሌሎች የተካተቱበት ለኢትዮጵያ ኮንስትራክሽን ኢንዱስትሪ የተዘጋጀ በቀላሉ የሚስተካከል Fully Editable Excel ሲሰተም ነው ከታች ባለው ሊንክ አውርደው ይጠቀሙበት 👇
https://ye-buna.com/etconp?ref=product_detail&product=6ab379e956fc3_etconp
🌟ለኮንትራክተሮች፣ መሐንዲሶችና የሳይት ፕሮጀክት ሃላፊዎች የተዘጋጀ የተሟላ ሲስተም
• የሳይት ወጪና በጀት መከታተያ (Cost Tracking)
• የክፍያ ሰርተፊኬቶች (IPC)፣ Advance እና Retention ማስተዳደሪያ
• የገንዘብ እንቅስቃሴ (Cash Flow) እና የትርፍ/ኪሳራ ትንተና
• የስራ ሂደት እና ማይልስቶን መቆጣጠሪያ እና ሌሎች የተካተቱበት ለኢትዮጵያ ኮንስትራክሽን ኢንዱስትሪ የተዘጋጀ በቀላሉ የሚስተካከል Fully Editable Excel ሲሰተም ነው ከታች ባለው ሊንክ አውርደው ይጠቀሙበት 👇
https://ye-buna.com/etconp?ref=product_detail&product=6ab379e956fc3_etconp
👌2❤1