๐How to be treated-Forgotten Items in Previous Interim Payments?
๐ซA contractor can be paid for a forgotten item of work in the final payment, but it depends on contract terms and proper documentation.
๐ง1. Contractual Basis
โบIf the item is part of the original scope of work (included in BOQ, drawings, or specifications) but was mistakenly omitted in earlier interim payments, it can be included in the final account.
โบIf it is an extra or variation, a formal variation order or instruction should be approved before payment.
๐ง2. Verification
โบThe Resident Engineer (RE) or Consultant must verify that:
โบThe work has been executed to the required standard.
โบIt was not previously paid for.
โบIt is not a duplication of another item.
๐ง3. Payment Procedure
โบInclude the forgotten item in the Final Payment Certificate.
โบProvide a measurement sheet or payment summary showing the work done and its valuation.
โบObtain approval from the Engineer/Consultant and Client before release of payment.
๐ง4. Contract Clauses
โบRefer to the contract clauses on Final Account, Variations, and Payment Certificates (FIDIC, PPA, or local standard contract conditions).
๐ฐ4.1 FIDIC (1999 Red Book)
โถ๏ธClause 14.6 โ Issue of Interim Payment Certificates
โถ๏ธโThe Engineer may in any payment certificate make any correction or modification that should properly be made to any previous payment certificate.โ
โถ๏ธThis means if an item was forgotten in the first payment, it can be included in later interim payments, provided it was part of the contract works.
๐ฐ4.2 Ethiopian Public Procurement Agency (PPA) Conditions of Contract
โถ๏ธClause 43.1 โ Interim Payment Certificates
โถ๏ธโThe Engineer may in any payment certificate make any correction or modification that should properly be made to any previous certificate.โ
โถ๏ธClause 47 โ Final Statement and Payment also confirms that any remaining adjustments or omissions shall be included in the final payment
โถ๏ธOnce the final certificate is signed, no additional claims are normally accepted unless there is a formal dispute.
๐ง5. Practices
โบAccording to the Ethiopian Standard Conditions of Contract (MoWE or ERA):
โบClause on Interim Payment Certificates allows correction of previous omissions or errors in subsequent certificates.
โบPayment is cumulative โ meaning any forgotten item can be added later as long as it is justified.
๐ง6. Time Limitation
โบSome contracts state that claims not raised within a certain time (e.g., 28 days after discovery) may be invalid. Check the contract for such provisions.
๐Key References
-PPA 2011
-Ethiopian Roads Authority (ERA) General Conditions of Contract
-FIDIC Conditions of Contract (1999 Edition)
@etconp
๐ซA contractor can be paid for a forgotten item of work in the final payment, but it depends on contract terms and proper documentation.
๐ง1. Contractual Basis
โบIf the item is part of the original scope of work (included in BOQ, drawings, or specifications) but was mistakenly omitted in earlier interim payments, it can be included in the final account.
โบIf it is an extra or variation, a formal variation order or instruction should be approved before payment.
๐ง2. Verification
โบThe Resident Engineer (RE) or Consultant must verify that:
โบThe work has been executed to the required standard.
โบIt was not previously paid for.
โบIt is not a duplication of another item.
๐ง3. Payment Procedure
โบInclude the forgotten item in the Final Payment Certificate.
โบProvide a measurement sheet or payment summary showing the work done and its valuation.
โบObtain approval from the Engineer/Consultant and Client before release of payment.
๐ง4. Contract Clauses
โบRefer to the contract clauses on Final Account, Variations, and Payment Certificates (FIDIC, PPA, or local standard contract conditions).
๐ฐ4.1 FIDIC (1999 Red Book)
โถ๏ธClause 14.6 โ Issue of Interim Payment Certificates
โถ๏ธโThe Engineer may in any payment certificate make any correction or modification that should properly be made to any previous payment certificate.โ
โถ๏ธThis means if an item was forgotten in the first payment, it can be included in later interim payments, provided it was part of the contract works.
๐ฐ4.2 Ethiopian Public Procurement Agency (PPA) Conditions of Contract
โถ๏ธClause 43.1 โ Interim Payment Certificates
โถ๏ธโThe Engineer may in any payment certificate make any correction or modification that should properly be made to any previous certificate.โ
โถ๏ธClause 47 โ Final Statement and Payment also confirms that any remaining adjustments or omissions shall be included in the final payment
โถ๏ธOnce the final certificate is signed, no additional claims are normally accepted unless there is a formal dispute.
๐ง5. Practices
โบAccording to the Ethiopian Standard Conditions of Contract (MoWE or ERA):
โบClause on Interim Payment Certificates allows correction of previous omissions or errors in subsequent certificates.
โบPayment is cumulative โ meaning any forgotten item can be added later as long as it is justified.
๐ง6. Time Limitation
โบSome contracts state that claims not raised within a certain time (e.g., 28 days after discovery) may be invalid. Check the contract for such provisions.
๐Key References
-PPA 2011
-Ethiopian Roads Authority (ERA) General Conditions of Contract
-FIDIC Conditions of Contract (1999 Edition)
@etconp
โค18
แจแจแณ
แ แฒแต แแแ แแตแจแจแ 9 2018 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแตแจแจแ 9 2018 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
๐4โค2
แจแจแณ
แ แฒแต แแแ แแตแจแจแ 9 2018 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแตแจแจแ 9 2018 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
๐5
แจแจแณ
แ แฒแต แแแ แแตแจแจแ 7 2018 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
แ แฒแต แแแ แแตแจแจแ 7 2018 แแ 2017 แ. แ แแตแ แแญ แจแฐแแฐแฐ
https://t.me/ETCONpWORK
@etconp
โค4
๐Ethiopia to Build East Africa's Biggest National Integrated Health Rehabilitation Center
๐ซThe Ministry of Health has emphasized that the groundbreaking National Integrated Rehabilitation Center will mark an important milestone in integrating Ethiopia's health infrastructure.
๏ปฟ
๐งIn her speech during the occasion, the minister emphasized that the new rehabilitation center will be a benchmark for the country's health-care sector.
โบEthiopia's current rehabilitation center has been carrying out operations on patients for more than 40 years, and the new venture aims to transform it into a continental center of excellence, Africa's leading rehabilitation center for health-challenged people.
โบDr. Mekdes reaffirmed the government's emphasis on health policy, particularly in dealing with non-communicable diseases, which have been a priority over the past three decades.
โถ๏ธAccording to the minister, comprehensive rehabilitation programs will also be available to patients with cognitive, psychological, and bodily impairment.
โถ๏ธUpon completion, the National Integrated Rehabilitation Center will be East Africa's biggest, delivering specialized care for accident injuries, chronic ailments, and natural conditions.
โบThe entire project is funded by the Ethiopian state, the minister explained, a testament to the country's resolve to add rehabilitation services and promote health tourism.
โบThe center will be a beacon institution that will boost the living conditions of underprivileged communities within Ethiopia as well as the whole continent, she added.
Via ENA
@etconp
๐ซThe Ministry of Health has emphasized that the groundbreaking National Integrated Rehabilitation Center will mark an important milestone in integrating Ethiopia's health infrastructure.
Minister of Health Dr. Mekdes Daba has launched the construction of the National Integrated Rehabilitation Center at Gefersa, Sheger City, in a ceremony attended by senior government officials and medical practitioners.
๏ปฟ
๐งIn her speech during the occasion, the minister emphasized that the new rehabilitation center will be a benchmark for the country's health-care sector.
โบEthiopia's current rehabilitation center has been carrying out operations on patients for more than 40 years, and the new venture aims to transform it into a continental center of excellence, Africa's leading rehabilitation center for health-challenged people.
โบDr. Mekdes reaffirmed the government's emphasis on health policy, particularly in dealing with non-communicable diseases, which have been a priority over the past three decades.
The new center, as announced by the minister, will consolidate 17 different facilities into one integrated institution, offering joint services for physical disabilities alongside mental illnesses.
โถ๏ธAccording to the minister, comprehensive rehabilitation programs will also be available to patients with cognitive, psychological, and bodily impairment.
The complex, which will span more than 17 hectares, will host 13 blocks of medical, therapeutic, residential, and recreational services, according to the minister, adding that it will also comprise urban agriculture programs to support patient care, enable therapy, and create employment opportunities for professionals across different fields.
โถ๏ธUpon completion, the National Integrated Rehabilitation Center will be East Africa's biggest, delivering specialized care for accident injuries, chronic ailments, and natural conditions.
โบThe entire project is funded by the Ethiopian state, the minister explained, a testament to the country's resolve to add rehabilitation services and promote health tourism.
โบThe center will be a beacon institution that will boost the living conditions of underprivileged communities within Ethiopia as well as the whole continent, she added.
Via ENA
@etconp
โค12
๐Modern construction technology
๐ซModern construction technology encompasses advancements in digital design (BIM), AI and robotics, 3D printing, and new advanced building materials to enhance efficiency, accuracy, and sustainability in construction projects.
โญ๏ธKey technologies include modular construction and prefabrication, which use off-site manufacturing for faster assembly and better quality control. Drones, laser surveying, and connected data platforms improve project management, while green concrete and self-repairing materials address environmental challenges.
โฆ๏ธKey Modern Construction Technologies
๐นBuilding Information Modeling (BIM): A digital 3D design and management process that improves planning, collaboration, and project outcomes.
๐นArtificial Intelligence (AI) & Robotics: AI enhances decision-making and project management, while robots automate labor-intensive tasks like excavation and rebar work, improving safety and efficiency.
๐น3D Printing: Used to create building components or even entire structures off-site or on-site, leading to faster construction and customized designs.
๐นModular Construction & Prefabrication: Building entire modules or components like walls, floors, and panels in controlled factory environments before transporting them to the site for assembly.
๐นDrones: Used for site monitoring, surveying, and progress tracking, replacing the need for multiple workers and increasing efficiency.
๐นAdvanced Building Materials: Includes green concrete, self-repairing materials, cross-laminated timber (CLT), and structural insulated panels (SIPs) that offer improved durability, sustainability, and energy efficiency.
๐นDigital Twins: Virtual replicas of physical assets that allow for real-time monitoring, analysis, and prediction of performance throughout the building lifecycle.
๐นInternet of Things (IoT) & Wearable Technology: Smart sensors and connected devices provide real-time data and worker performance metrics, enhancing safety and project management.
โฆ๏ธBenefits of Modern Construction Technology
๐นIncreased Efficiency and Speed: Off-site prefabrication and digital workflows significantly reduce construction timelines.
๐นImproved Accuracy and Quality: Factory-controlled manufacturing ensures greater precision and consistency compared to traditional on-site methods.
๐นEnhanced Sustainability: New materials and methods help reduce waste and environmental impact, contributing to eco-friendly construction.
๐นBetter Safety: Automation and robotics take over hazardous jobs, while drones and sensors provide enhanced safety monitoring on site.
๐นReduced Costs: Streamlined processes, less waste, and improved efficiency lead to lower overall project costs.
@etconp
๐ซModern construction technology encompasses advancements in digital design (BIM), AI and robotics, 3D printing, and new advanced building materials to enhance efficiency, accuracy, and sustainability in construction projects.
โญ๏ธKey technologies include modular construction and prefabrication, which use off-site manufacturing for faster assembly and better quality control. Drones, laser surveying, and connected data platforms improve project management, while green concrete and self-repairing materials address environmental challenges.
โฆ๏ธKey Modern Construction Technologies
๐นBuilding Information Modeling (BIM): A digital 3D design and management process that improves planning, collaboration, and project outcomes.
๐นArtificial Intelligence (AI) & Robotics: AI enhances decision-making and project management, while robots automate labor-intensive tasks like excavation and rebar work, improving safety and efficiency.
๐น3D Printing: Used to create building components or even entire structures off-site or on-site, leading to faster construction and customized designs.
๐นModular Construction & Prefabrication: Building entire modules or components like walls, floors, and panels in controlled factory environments before transporting them to the site for assembly.
๐นDrones: Used for site monitoring, surveying, and progress tracking, replacing the need for multiple workers and increasing efficiency.
๐นAdvanced Building Materials: Includes green concrete, self-repairing materials, cross-laminated timber (CLT), and structural insulated panels (SIPs) that offer improved durability, sustainability, and energy efficiency.
๐นDigital Twins: Virtual replicas of physical assets that allow for real-time monitoring, analysis, and prediction of performance throughout the building lifecycle.
๐นInternet of Things (IoT) & Wearable Technology: Smart sensors and connected devices provide real-time data and worker performance metrics, enhancing safety and project management.
โฆ๏ธBenefits of Modern Construction Technology
๐นIncreased Efficiency and Speed: Off-site prefabrication and digital workflows significantly reduce construction timelines.
๐นImproved Accuracy and Quality: Factory-controlled manufacturing ensures greater precision and consistency compared to traditional on-site methods.
๐นEnhanced Sustainability: New materials and methods help reduce waste and environmental impact, contributing to eco-friendly construction.
๐นBetter Safety: Automation and robotics take over hazardous jobs, while drones and sensors provide enhanced safety monitoring on site.
๐นReduced Costs: Streamlined processes, less waste, and improved efficiency lead to lower overall project costs.
@etconp
๐8โค2๐2
ADVERTISMENT
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โ แจแแแฐแฃแธแ แ แแแแแถแฝ
๐ แแแต any Size & thickness
๐ แ แฆแแต (แฅแญแต แแแฃแตแ แแ แ)
๐ แจแฐแแซแฉ [modefic] แตแซแแฝแ แฅแแฐแซแแแข
โฆ๏ธ แแแแแแ แฅแจแณ แฅแจแต แฅแแแแแแข
โ๏ธแตแแญ 0904040477 แแญแ 0911016833 แฐแแแ แซแแแ
๐ฑแดแแแซแ แแญ แฆhttps://t.me/heavenic1
แ แตแซแปแฆ แ 1.แแญแซแถ
แ.2 แ แจแญ แคแ แชแณแ แแ แจแต
แฅแซแตแ แณแแแแต แแแซแฝแ แแแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โ แจแแแฐแฃแธแ แ แแแแแถแฝ
๐ แแแต any Size & thickness
๐ แ แฆแแต (แฅแญแต แแแฃแตแ แแ แ)
๐ แจแฐแแซแฉ [modefic] แตแซแแฝแ แฅแแฐแซแแแข
โฆ๏ธ แแแแแแ แฅแจแณ แฅแจแต แฅแแแแแแข
โ๏ธแตแแญ 0904040477 แแญแ 0911016833 แฐแแแ แซแแแ
๐ฑแดแแแซแ แแญ แฆhttps://t.me/heavenic1
แ แตแซแปแฆ แ 1.แแญแซแถ
แ.2 แ แจแญ แคแ แชแณแ แแ แจแต
แฅแซแตแ แณแแแแต แแแซแฝแ แแแข
แณแแซแต แแแต แฅแ แ แฆแแต แ แ แซแข
โค3
๐JOB VACANCY
๐งHeritage Watch Ethiopia is opening opportunities for passionate professionals to join our mission of preserving culture and building sustainable futures. ๐ฟโจ
๐ Open Positions:
1๏ธโฃ Archival Documentation Assistant (Historic Garden & Landscape)
2๏ธโฃ Landscape Designer & Site Supervisor
3๏ธโฃ Purchaser
4๏ธโฃ Research & Documentation Assistant (Heritage & Climate-Resilient Plants)
๐ Location: Addis Ababa (Contractual)
๐ฐ Salary: Negotiable
๐ซIf youโre dedicated, skilled, and eager to make an impact โ weโd love to hear from you!
๐ง Apply by sending your CV & cover letter to: heritagewatch.ethiopia@gmail.com
๐For more information contact us : +251913049329
โบLetโs shape the future together, while preserving Ethiopiaโs rich heritage. ๐๐ฑ
Via Heritage Watch
@etconp
๐งHeritage Watch Ethiopia is opening opportunities for passionate professionals to join our mission of preserving culture and building sustainable futures. ๐ฟโจ
๐ Open Positions:
1๏ธโฃ Archival Documentation Assistant (Historic Garden & Landscape)
2๏ธโฃ Landscape Designer & Site Supervisor
3๏ธโฃ Purchaser
4๏ธโฃ Research & Documentation Assistant (Heritage & Climate-Resilient Plants)
๐ Location: Addis Ababa (Contractual)
๐ฐ Salary: Negotiable
๐ซIf youโre dedicated, skilled, and eager to make an impact โ weโd love to hear from you!
๐ง Apply by sending your CV & cover letter to: heritagewatch.ethiopia@gmail.com
๐For more information contact us : +251913049329
โบLetโs shape the future together, while preserving Ethiopiaโs rich heritage. ๐๐ฑ
Via Heritage Watch
@etconp
โค1๐1
Subject: Request for Feedback โ Draft Ease of Doing Business (EoDB) Framework for the Construction Sector
Dear Stakeholder,
A month ago, Deputy Prime Minister Temesgen Tiruneh launched the Construction Industry Transformation Initiative (CITI)โa 25-year plan to make Ethiopiaโs construction sector globally competitive, reduce reliance on imported materials, and promote technology-driven methods.
To support this effort, the Ministry of Urban and Infrastructure (MUI), in collaboration with CITI, has prepared a Draft Ease of Doing Business (EoDB) Framework for the Construction Sector.
We kindly request your valuable insights by completing the Stakeholder Feedback Form at the link below:๐
https://forms.gle/WSacGtv3Tu9wVLww7
Your feedback will help us refine the framework to ensure it is practical, transparent, and aligned with the needs of the construction sector. Please share specific comments wherever possible, and feel free to reference section numbers or attach supporting documents.
Deadline for submission: September 22, 2025
Thank you for your time and expertise. Your contribution is essential to building a more efficient, transparent, and competitive construction sector in Ethiopia.
Kind regards,
Sewagegn
Ethiopian Construction Authority (ECA)
@etconp
Dear Stakeholder,
A month ago, Deputy Prime Minister Temesgen Tiruneh launched the Construction Industry Transformation Initiative (CITI)โa 25-year plan to make Ethiopiaโs construction sector globally competitive, reduce reliance on imported materials, and promote technology-driven methods.
To support this effort, the Ministry of Urban and Infrastructure (MUI), in collaboration with CITI, has prepared a Draft Ease of Doing Business (EoDB) Framework for the Construction Sector.
We kindly request your valuable insights by completing the Stakeholder Feedback Form at the link below:๐
https://forms.gle/WSacGtv3Tu9wVLww7
Your feedback will help us refine the framework to ensure it is practical, transparent, and aligned with the needs of the construction sector. Please share specific comments wherever possible, and feel free to reference section numbers or attach supporting documents.
Deadline for submission: September 22, 2025
Thank you for your time and expertise. Your contribution is essential to building a more efficient, transparent, and competitive construction sector in Ethiopia.
Kind regards,
Sewagegn
Ethiopian Construction Authority (ECA)
@etconp
โค3๐2
๐Foundation Strengthening
๐ซFoundation strengthening is necessary when an existing structureโs foundation is no longer adequate to safely carry the imposed loads due to
โ Soil settlement or loss of bearing capacity
โ Changes in building loads (e.g., adding extra floors)
โ Construction defects or deterioration
โ Seismic or flood vulnerability
โ Nearby excavation or changes in ground condition
๐งDifferent types of foundation Strengthening
โ Mass Concrete Underpinning: Simple & cost-effective for shallow foundations.
โ Beam & Base (Pier & Beam): Transfers load to stronger soil, less digging.
โ Mini / Micro-Piles: Deep support, minimal disturbance.
โ Needle-and-Pile / Cantilever Needles: Localized or one-sided reinforcement.
โ Concrete Jacketing: Encases foundations to increase capacity.
โ Chemical / Jet Grouting: Densifies soil or fills voids, perfect for tight spaces.
โ Screw Piles / Helical Piers: Quick installation, low vibration.
โ Angle / Root Piling: Stabilizes nearby walls & structures.
โ Soil Stabilization: Geosynthetics, polymers, or geofoam for stronger ground.
โ Base Isolation: Protects buildings in earthquake zones.
#FoundationStrengthening #StructuralSafety #CivilEngineering
#EthiopianConstructionEngineering
#SiteExecution #PlanningToBuild
#ConstructionBasics #BuildSmart
#OnSiteLearning #ECEMS #EthiopianConstruction #Ethioconstruction
@etconp
๐ซFoundation strengthening is necessary when an existing structureโs foundation is no longer adequate to safely carry the imposed loads due to
โ Soil settlement or loss of bearing capacity
โ Changes in building loads (e.g., adding extra floors)
โ Construction defects or deterioration
โ Seismic or flood vulnerability
โ Nearby excavation or changes in ground condition
๐งDifferent types of foundation Strengthening
โ Mass Concrete Underpinning: Simple & cost-effective for shallow foundations.
โ Beam & Base (Pier & Beam): Transfers load to stronger soil, less digging.
โ Mini / Micro-Piles: Deep support, minimal disturbance.
โ Needle-and-Pile / Cantilever Needles: Localized or one-sided reinforcement.
โ Concrete Jacketing: Encases foundations to increase capacity.
โ Chemical / Jet Grouting: Densifies soil or fills voids, perfect for tight spaces.
โ Screw Piles / Helical Piers: Quick installation, low vibration.
โ Angle / Root Piling: Stabilizes nearby walls & structures.
โ Soil Stabilization: Geosynthetics, polymers, or geofoam for stronger ground.
โ Base Isolation: Protects buildings in earthquake zones.
#FoundationStrengthening #StructuralSafety #CivilEngineering
#EthiopianConstructionEngineering
#SiteExecution #PlanningToBuild
#ConstructionBasics #BuildSmart
#OnSiteLearning #ECEMS #EthiopianConstruction #Ethioconstruction
@etconp
โค13
๐แณแแ แจแขแตแฎแตแซ แแณแด แแตแฅ แจแแ แแแฎ แแแฅแแแฝ แญแแต แฅแแฐแแแ แฐแแแ
๐ซแจแฑแชแแ แแแตแตแญ แฐแแแ แซแณ แแตแกแ แแแฅแแต แจแแแแ แขแตแฎแตแซแแซแ แ แขแตแฎแตแซ แ แจแญ แแแแต แ แฉแ แฐแแแแ แ แแแฅแแต แฅแแฐแแฝแ แ แตแณแแแแแข
แ แจแญ แแแแฑ แ แณแแแต แแแต แแ แแฐ แแฃ แ แซแซ แฅแแฐแแซแฐแญแ แจแแแแต แแแตแตแฏแค แ แฅแซแแณแแฑ แ แจแซแ 50 แแฅแแแฝแ แซแตแฐแแแณแ แฅแแแแข
แแตแกแ แจแแฐแ แจแฑแชแแ แแฐแจแป แแแตแจแ แฃแแแฅแถแฝแ แจแฑแชแแ แแญแ แฐแแแฎแฝ แ แตแฐแแ แ แฅแแฒแซแฐแญแแ แฅแช แ แ แญแ แแแข
แ แแ แแญ แ แแแแแฑ แจแขแตแฎแตแซ แ แจแญ แแแแต แแญ แ แแฐแฃแ แญ แแแแฉแ แ แแตแฐแ แค แ แแฃแญ แจแฐแแแแก แฅแ แแแต แซแแธแ แ แตแแฅแ แตแญแ แถแฝ แแญ แแแตแซแต แ แแ แต แฐแญแ แฅแจแฐแฐแซแ แต แแแแ แ แแตแฐแแแข
แตแแซแ แ แแแ แแแฃแณ แแญ แ แแแ แแฅแแฑ แฐแญแถ แแแต แฅแแฐแแแ แแแธแแแข
@etconp
๐ซแจแฑแชแแ แแแตแตแญ แฐแแแ แซแณ แแตแกแ แแแฅแแต แจแแแแ แขแตแฎแตแซแแซแ แ แขแตแฎแตแซ แ แจแญ แแแแต แ แฉแ แฐแแแแ แ แแแฅแแต แฅแแฐแแฝแ แ แตแณแแแแแข
แ แจแญ แแแแฑ แ แณแแแต แแแต แแ แแฐ แแฃ แ แซแซ แฅแแฐแแซแฐแญแ แจแแแแต แแแตแตแฏแค แ แฅแซแแณแแฑ แ แจแซแ 50 แแฅแแแฝแ แซแตแฐแแแณแ แฅแแแแข
แแตแกแ แจแแฐแ แจแฑแชแแ แแฐแจแป แแแตแจแ แฃแแแฅแถแฝแ แจแฑแชแแ แแญแ แฐแแแฎแฝ แ แตแฐแแ แ แฅแแฒแซแฐแญแแ แฅแช แ แ แญแ แแแข
แ แแ แแญ แ แแแแแฑ แจแขแตแฎแตแซ แ แจแญ แแแแต แแญ แ แแฐแฃแ แญ แแแแฉแ แ แแตแฐแ แค แ แแฃแญ แจแฐแแแแก แฅแ แแแต แซแแธแ แ แตแแฅแ แตแญแ แถแฝ แแญ แแแตแซแต แ แแ แต แฐแญแ แฅแจแฐแฐแซแ แต แแแแ แ แแตแฐแแแข
แตแแซแ แ แแแ แแแฃแณ แแญ แ แแแ แแฅแแฑ แฐแญแถ แแแต แฅแแฐแแแ แแแธแแแข
@etconp
โค7
๐Modular offices
แจแฐแแฃแฃแ แขแฎ แ แแแณแแฝ
๐ซแฅแ แฐแแฝ แตแแฐแแฃแฃแ แขแฎแแฝ แ แแแณ แฒแ แญแ แจแแฐแกแต แแแฝ แ แแแ แจแแแจแฑ แฅแ แจแแแฃแ แ แแแแธแแ แจแแแแน แแธแแข
๐งแญแแแ แฐแแฃแฃแ แขแฎแแฝ แจแฅแแแ แ แฐแจแแช แจแแจแฐแแตแ แ แแแณแแฝแ แซแซแฐแฑ แแธแแกแก
โญ๏ธแฅแแฐแแแแณแฝแ แจแฐแแซแจ แญแแตแฃ แ แญแฝแ แตแแตแ แจแฐแแ แฑ แแธแ
๐แฐแแฃแฃแ แขแฎแแฝ แแขแฎ แ แณแฐแ แแแแแ แฆแณ แแญ แฅแ แฐแ แแแ แ แแแแแ แตแแตแ แ แญแฝ แฐแแญแฐแแฃ แ แแฅแแต แฐแแฃแฅแแ แ แแแแแต แจแแตแ แต แฅแแตแ แจแฐแแ แฑ แแธแแข
๐ทแแชแแ แญแแแณแ
๐ฒแ แแแ แจแแแฃแ แแ แจแแแแณแแฑ แแธแ
โบแฐแแฃแฃแ แขแฎแแฝ แ แฎแแตแซแญแฐแฎแฝ แฐแแซแญ แซแฐแจแแธแ แแญแแซแถแฝ แแตแฅ แ แแฅแแต แฐแแฃแฅแแ แ แแแแแต แจแฐแก แ แแ แฐแแแ แแ แแฐ แแ แณแญแต แ แแแฐแต แฅแแฐแแ แฐแแณแณแญ แ แแแแแต แแแตแ แต แจแแแ แแแแธแ แแแกแก
โ๏ธแฐแแฃแฃแ แขแฎแแฝ แจแฐแ แแญแแ แแแแต แ แจแแจ แแฅแญ แแฅแซ แ แแบ แ แแ แ แญแฝแ แตแแต แฐแแแฃแฅแแ แฅแ แฐแแฃแฅแแ แแแแตแ แ แแฅแแต แจแแแแต แแตแแ แจแแแฅแฉ แแธแแกแก
@etconp
แจแฐแแฃแฃแ แขแฎ แ แแแณแแฝ
๐ซแฅแ แฐแแฝ แตแแฐแแฃแฃแ แขแฎแแฝ แ แแแณ แฒแ แญแ แจแแฐแกแต แแแฝ แ แแแ แจแแแจแฑ แฅแ แจแแแฃแ แ แแแแธแแ แจแแแแน แแธแแข
๐งแญแแแ แฐแแฃแฃแ แขแฎแแฝ แจแฅแแแ แ แฐแจแแช แจแแจแฐแแตแ แ แแแณแแฝแ แซแซแฐแฑ แแธแแกแก
โญ๏ธแฅแแฐแแแแณแฝแ แจแฐแแซแจ แญแแตแฃ แ แญแฝแ แตแแตแ แจแฐแแ แฑ แแธแ
๐แฐแแฃแฃแ แขแฎแแฝ แแขแฎ แ แณแฐแ แแแแแ แฆแณ แแญ แฅแ แฐแ แแแ แ แแแแแ แตแแตแ แ แญแฝ แฐแแญแฐแแฃ แ แแฅแแต แฐแแฃแฅแแ แ แแแแแต แจแแตแ แต แฅแแตแ แจแฐแแ แฑ แแธแแข
๐ทแแชแแ แญแแแณแ
แฐแแฃแฃแ แขแฎแแฝ แ แขแแแต แแญแ แฐแแซแญ แซแฐแจแแธแ แแญแแซแถแฝ แ แแฑ แ แแฐแ แ แจแแแฃแณ แจแแ แฉ แขแฎแแฝ แ แฃแ แ แแตแฐแ แ แแ แแช แจแแแแก แแแแธแ แแแกแก แ แแญแ แฐแแซแแชแแฝ แ แแจแ แแจแ แแฐแจแตแก- แฐแแฃแฃแ แขแฎแแฝแ แแแแแฃแต แจแแซแตแแแ แแช แ แแฐแ แแ แ แ แซแญ แจแแแแฃ แขแฎ แ แ แแต แตแฉแจแญ แซแ แตแแต แฅแตแจ 40 แจแ แแชแซ แถแแญ แแชแ แจแแแแฑ แแธแแกแก
๐ฒแ แแแ แจแแแฃแ แแ แจแแแแณแแฑ แแธแ
โบแฐแแฃแฃแ แขแฎแแฝ แ แฎแแตแซแญแฐแฎแฝ แฐแแซแญ แซแฐแจแแธแ แแญแแซแถแฝ แแตแฅ แ แแฅแแต แฐแแฃแฅแแ แ แแแแแต แจแฐแก แ แแ แฐแแแ แแ แแฐ แแ แณแญแต แ แแแฐแต แฅแแฐแแ แฐแแณแณแญ แ แแแแแต แแแตแ แต แจแแแ แแแแธแ แแแกแก
แแแแต แ แจแแจ แแฅแญ แ แแแ แจแแตแแแต แแตแแ แญแแฅแซแ
โ๏ธแฐแแฃแฃแ แขแฎแแฝ แจแฐแ แแญแแ แแแแต แ แจแแจ แแฅแญ แแฅแซ แ แแบ แ แแ แ แญแฝแ แตแแต แฐแแแฃแฅแแ แฅแ แฐแแฃแฅแแ แแแแตแ แ แแฅแแต แจแแแแต แแตแแ แจแแแฅแฉ แแธแแกแก
@etconp
โค10๐1
#ADVERTISEMENT
๐ง๐๐แแแฝ แแแต แฅแ แแฆแแต ๐๐
แแแแจแป แตแญแ แตโ๐ง๐
๐ ๐ ๐ แจแแแฐแฃแธแ แ แแแแแถแฝ๐ ๐ ๐
1 แแแแซแฝแ แจแแแ แจแแฐแแญ แตแซแแฝ
2 แฅแฒแแ แแแต แจ 1แแแ แฅแตแจ 30 แแแ แฅแแแญแฃแแ แฅแ แณแแ
3 แ แแแ แ แแฆแแต 12แ แฅแตแจ 32แตแจแต แฅแญแต แ แแฅแฐแ แ แฅแแ แฅแแแญแฃแแ
4 แจแฐแแซแฉ แฆแแถแฝ แ แแแแต แแฅแ
แ1. แ แฅแแต แฃแ แตแแญ แแแฐ แ แญแฅ
แ2. แ แณแณแชแแฝ แแแ แฎแญแป แฐแซ
แ3. แ แจแญ แคแ แชแณแ แแ แจแต แแข แแแแแ แแแซ แฅแแ แ แแแแ แแฝแ แฅแแญแฃแแ
แ4. แดแแต แแจแ แคแต แ แ แญแฃ แฃแซแฑแ แ แ แฃแซ
แแณแฐแฅแซ
แจแแแ แ แแแญ แจแแ แแจแต แซแณแฐแฆแต แฅแแ แฅแแแญแ แแแตแ แ แ แ แแซแตแกแต แแแญ แตแซแแ แญแฐแซแ แญแฐแแ
แตแแญ แแฅแญโ๏ธ
๐0939180889
๐0912492727
๐0944064945
แแแซแ แตแซ แแซแต แแ แธแญ แญแแ แแน แแแฝ
แแแต แฅแ แแฆแแต!
๐ง๐๐แแแฝ แแแต แฅแ แแฆแแต ๐๐
แแแแจแป แตแญแ แตโ๐ง๐
๐ ๐ ๐ แจแแแฐแฃแธแ แ แแแแแถแฝ๐ ๐ ๐
1 แแแแซแฝแ แจแแแ แจแแฐแแญ แตแซแแฝ
2 แฅแฒแแ แแแต แจ 1แแแ แฅแตแจ 30 แแแ แฅแแแญแฃแแ แฅแ แณแแ
3 แ แแแ แ แแฆแแต 12แ แฅแตแจ 32แตแจแต แฅแญแต แ แแฅแฐแ แ แฅแแ แฅแแแญแฃแแ
4 แจแฐแแซแฉ แฆแแถแฝ แ แแแแต แแฅแ
๐ แ แตแซแป แแแแฝแ
แ1. แ แฅแแต แฃแ แตแแญ แแแฐ แ แญแฅ
แ2. แ แณแณแชแแฝ แแแ แฎแญแป แฐแซ
แ3. แ แจแญ แคแ แชแณแ แแ แจแต แแข แแแแแ แแแซ แฅแแ แ แแแแ แแฝแ แฅแแญแฃแแ
แ4. แดแแต แแจแ แคแต แ แ แญแฃ แฃแซแฑแ แ แ แฃแซ
แแณแฐแฅแซ
แจแแแ แ แแแญ แจแแ แแจแต แซแณแฐแฆแต แฅแแ แฅแแแญแ แแแตแ แ แ แ แแซแตแกแต แแแญ แตแซแแ แญแฐแซแ แญแฐแแ
แตแแญ แแฅแญโ๏ธ
๐0939180889
๐0912492727
๐0944064945
แแแซแ แตแซ แแซแต แแ แธแญ แญแแ แแน แแแฝ
แแแต แฅแ แแฆแแต!
๐JOB VACANCY
โญ๏ธJunior Site Engineer
#samket_engineering_and_construction_plc
#Addis_Ababa
๐ซMSc or BSc Degree in Civil Engineering or in a related field of study with relevant work experience, out of which 2 Years & above Experience in the same Position on Building.
๐Place of Work: A.A & Project
๐Duties and Responsibilities:
- Acting as the main site responsible person for project execution.
- Ensuring materials and work conform to specifications.
- Monitoring and interpreting site progress and resolving technical issues.
Liaising with consultants, subcontractors, supervisors, and workforce.
Communicating with clients, including attending progress meetings.
โบQuanitity Required: 4
โบMinimum Years Of Experience: #4_years
โก๏ธDeadline: September 29, 2025
๐ฉHow To Apply: Submit your non-returnable application and CV along with supporting document in person to in person to the office Located at Addis Ababa,Megenanya to the Way of Gurd Sholla Road Near to Century Mall,on TS BG Building 4th Floor Human Resource Dep;t Tel: +25116676738/+25116676739
@etconp
โญ๏ธJunior Site Engineer
#samket_engineering_and_construction_plc
#Addis_Ababa
๐ซMSc or BSc Degree in Civil Engineering or in a related field of study with relevant work experience, out of which 2 Years & above Experience in the same Position on Building.
๐Place of Work: A.A & Project
๐Duties and Responsibilities:
- Acting as the main site responsible person for project execution.
- Ensuring materials and work conform to specifications.
- Monitoring and interpreting site progress and resolving technical issues.
Liaising with consultants, subcontractors, supervisors, and workforce.
Communicating with clients, including attending progress meetings.
โบQuanitity Required: 4
โบMinimum Years Of Experience: #4_years
โก๏ธDeadline: September 29, 2025
๐ฉHow To Apply: Submit your non-returnable application and CV along with supporting document in person to in person to the office Located at Addis Ababa,Megenanya to the Way of Gurd Sholla Road Near to Century Mall,on TS BG Building 4th Floor Human Resource Dep;t Tel: +25116676738/+25116676739
@etconp
Telegram
Ethio Construction Engineering
๐จ World Construction Engineering
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
๐จ @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
Latest updates, tips, and tutorials on building, civil engineering, and construction in World.
Learn, build, and grow with us!
๐จ @Philemona7 Or @ETCONpBOT
For Ad:- https://telega.io/c/etconp
โค6
๐JOB VACANCY
๐งProject Coordinator
#yencomad_construction_plc
#Addis_Ababa
๐ซBachelorโs Degree in Civil Engineering, Construction Technology & Management, or related field of study with relevant work experience
๐Duties and Responsibilities:
- Coordinate project schedules, resources, equipment, and information.
- Liaise with clients to define project requirements, scope, and objectives.
- Assist in preparing project proposals, budgets, and timelines.
- Monitor and track project progress and handle arising issues.
โบQuanitity Required: 1
โบMinimum Years Of Experience: #5_years
โก๏ธDeadline: September 29, 2025
๐ฉHow To Apply: Submit your non-returnable application and CV along with supporting document in person to the office Located at the back of Demble City Center, Human Resource Team No.9. For further information contact Tel: +251115533766
@etconp
๐งProject Coordinator
#yencomad_construction_plc
#Addis_Ababa
๐ซBachelorโs Degree in Civil Engineering, Construction Technology & Management, or related field of study with relevant work experience
๐Duties and Responsibilities:
- Coordinate project schedules, resources, equipment, and information.
- Liaise with clients to define project requirements, scope, and objectives.
- Assist in preparing project proposals, budgets, and timelines.
- Monitor and track project progress and handle arising issues.
โบQuanitity Required: 1
โบMinimum Years Of Experience: #5_years
โก๏ธDeadline: September 29, 2025
๐ฉHow To Apply: Submit your non-returnable application and CV along with supporting document in person to the office Located at the back of Demble City Center, Human Resource Team No.9. For further information contact Tel: +251115533766
@etconp
Telegram
ETCONp Discussion
๐ฉแแแแแแ แแณแฅ แฅแ แ แตแฐแซแจแต @Philemona7
โ๏ธแญแ แจ @etconp แแแซแซ แแฉแแน แแแข
โThis is discussion group of @ETCONpWORK
.
๐แแณแฐแฅแซ ...
.
โก๏ธแแฉแ แแญ แแแแแ แจ แฎแแตแตแซแญแฝแ แแณแฎแฝ แแช แแแ แ แ แแแ แ แญแแแตแ!
@ETCONpBOT แแแแ แฅแแแฐแแแแ๐
โ๏ธแญแ แจ @etconp แแแซแซ แแฉแแน แแแข
โThis is discussion group of @ETCONpWORK
.
๐แแณแฐแฅแซ ...
.
โก๏ธแแฉแ แแญ แแแแแ แจ แฎแแตแตแซแญแฝแ แแณแฎแฝ แแช แแแ แ แ แแแ แ แญแแแตแ!
@ETCONpBOT แแแแ แฅแแแฐแแแแ๐
๐2โค1
๐JOB VACANCY
๐ฒDesign Coordinator (Highway)
๐ซBSc Degree in Architecture, Civil Engineering or in a related field of study with relevant work experience
๐Duties and Responsibilities:
- Conducts and manages activities to conceptualize, evaluate alternatives and receive approvals for project implementation:
- Defines project work scopes, coordinates with permitting and public/private utility agencies, collects and reviews project documentation, performs field data collection, analyzes alternatives and prepares recommendations and applications. Create and maintain BIM software template files to assure standards.
- Prepares agendas, leads, and participates in project and construction meetings. Participates in regular on-site contractor meetings to discuss project schedule and milestones.
โบQuanitity Required: 1
โบMinimum Years Of Experience: #5_years
โ๏ธDeadline: September 28, 2025
๐Addis Ababa
๐ฉHow To Apply: Apply using the provided link below๐
โก๏ธNote: use this Vacancy Code-Design 003/2025
https://forms.office.com/Pages/ResponsePage.aspx?id=fbibbAsHyk2HrMuCOdJR7l_tOeSslK1NsGRsQb8bHJdURUg0Q1JGN1VVNUs0MlNZSUFDRzFGVFk1My4u
@etconp
๐ฒDesign Coordinator (Highway)
๐ซBSc Degree in Architecture, Civil Engineering or in a related field of study with relevant work experience
๐Duties and Responsibilities:
- Conducts and manages activities to conceptualize, evaluate alternatives and receive approvals for project implementation:
- Defines project work scopes, coordinates with permitting and public/private utility agencies, collects and reviews project documentation, performs field data collection, analyzes alternatives and prepares recommendations and applications. Create and maintain BIM software template files to assure standards.
- Prepares agendas, leads, and participates in project and construction meetings. Participates in regular on-site contractor meetings to discuss project schedule and milestones.
โบQuanitity Required: 1
โบMinimum Years Of Experience: #5_years
โ๏ธDeadline: September 28, 2025
๐Addis Ababa
๐ฉHow To Apply: Apply using the provided link below๐
โก๏ธNote: use this Vacancy Code-Design 003/2025
https://forms.office.com/Pages/ResponsePage.aspx?id=fbibbAsHyk2HrMuCOdJR7l_tOeSslK1NsGRsQb8bHJdURUg0Q1JGN1VVNUs0MlNZSUFDRzFGVFk1My4u
@etconp
โค7๐ฅฐ1