๐Job Vacancy Announcement ๐๏ธ
๐ซAser Construction
๐ง30 different job titles ๐
๐ซApplicants are instructed to submit applications within 10 working days from the announcement date. โณ
Engineering & Technical Roles ๐ง
Senior Project Office Engineer (2 open positions)
Senior Engineer / Real Estate (2 open positions)
Office Engineer / Real Estate (2 open positions)
Asphalt Plant Site Engineer (2 open positions)
Senior Laboratory Technician (2 open positions)
Maintenance & Operations ๐จ
Maintenance Planner (2 open positions)
Maintenance Coordinator (1 open position)
Maintenance Forman
Excavator Operator
Industrial Electrician
Procurement & Logistics ๐
Project Supply Head
Procurement Officer
Local Purchaser Section Head
Transport Coordinator
Project Store Keeper
Drivers & Heavy Equipment
Heavy Truck Driver
Truck Mixer Driver
Bulk Load Driver
Low bed Driver
Concrete Pump Operator and Driver
๐ Deadline: June 27, 2026
@etconp
๐ซAser Construction
๐ง30 different job titles ๐
๐ซApplicants are instructed to submit applications within 10 working days from the announcement date. โณ
Engineering & Technical Roles ๐ง
Senior Project Office Engineer (2 open positions)
Senior Engineer / Real Estate (2 open positions)
Office Engineer / Real Estate (2 open positions)
Asphalt Plant Site Engineer (2 open positions)
Senior Laboratory Technician (2 open positions)
Maintenance & Operations ๐จ
Maintenance Planner (2 open positions)
Maintenance Coordinator (1 open position)
Maintenance Forman
Excavator Operator
Industrial Electrician
Procurement & Logistics ๐
Project Supply Head
Procurement Officer
Local Purchaser Section Head
Transport Coordinator
Project Store Keeper
Drivers & Heavy Equipment
Heavy Truck Driver
Truck Mixer Driver
Bulk Load Driver
Low bed Driver
Concrete Pump Operator and Driver
๐ Deadline: June 27, 2026
@etconp
๐4โค1
๐๏ธ แ แแแแฝแ แจแแแแชแซแ แจแถแแญ แตแณแฒแจแ แ แตแฐแแแ แจแฅแจแต แแแ
แญ แแญแแณ แฐแแแจ!
โแ แ แจแแแดแ แแแ แแแฃแณ (Sustainable Construction) แจแแต แ แแแ แแญ แ แฒแต แณแชแญ แแฐแซ แจแฐแแจแ แ แแแ แตแณแฒแจแแฃ แฅแ แ แแณแแ แแตแฅแตแฅ แจแฐแฃแแแ แแแซแ แ แณแญแทแแข
โแจแแแฃแณแ แแแ แจแแแ แจแปแญแ แฉแฃแแซแฃ แจแตแณแฒแจแแ แแแ แจแฃแซ แฅแจแต แแแ แญ (Steel Structure) แจแแแแชแซ แแญ แแฐ แแญ แจแแแณแตแ แจแแแ แ แตแซ (First Lift) แ แฐแณแซ แแแณ แแ แแแแ แ แตแณแแแแข
โ๐ก แญแ แตแณแฒแจแ แแแ แแฉ แแ?
โข โแแ แ แแ แ แถแแญ แแญแ แจแแฐแซแฆ แตแณแฒแจแ แ แแญแแฑ แจแแแแชแซแแ แแ แ แแ แ แแแญ แฅแญแแ แ แแซแแแ แณแณแฝ แแญแ แฅแแฒแแแณแแต แฐแฐแญแ แแ แฅแจแฐแแแฃ แซแแแข
โข โแจแแ แแตแตแ แฅแ แฅแฆ แ "แแถ แแญ แฅแแฐแแตแแแจแฑแตแฃ แญแฅ แ แญแฝ แซแแแ แฅแ แ แแแ แจแแแแ แจแฃแซ แแแ แญ แ แตแญแญแแ แแแ แแฐ แแญ แจแแแณแฑ แแฐแต (Lifting operation) แจแแฐแ แจแแ แแตแตแ แฅแ แฅแ แฅแแแ แจแฐแแแ แต แแแข
โข โแแ แซแฃแข แฐแตแแ (Eco-friendly)แฆ แแฎแแญแฑ แ แแแ แแแฃแณแแฝ แแญ แจแแแฃแแ แจแซแญแฆแ แแแตแ แ แจแแฐแ แฐแจแ แแแแแต แ แฒแต แ แ แฃแซ แ แแแซแฝ แฅแจแแ แญแแแแข
โแจแ แแแ แจแแแฃแณ แดแญแแแ แ แแต แฅแญแแ แแฐแแต แซแปแแจแ แญแ แแฎแแญแตแฃ แ แแแ แแ แแตแตแ (Sustainable Engineering) แจแแต แแแฐแแฑ แตแแ แแณแซ แจแแแ แแแข
โแฅแแแฐแต แ แแแซแฝแ แแฐแ แแแ แตแณแฒแจแแฝแ แแฐแจแฐ แแแถแฝ แแญ แณแณแฝ แแญแแ (แจแแแญ แฅแญแแแ) แ แแแ แถ แแ แแ แแผ แ แตแแต แญแแแซแ แฅแแฝแ แณแตแฃแแฝแ? แ แตแฐแซแจแณแฝแแ แ แฎแแแต แ แแฉแ!
@etconp
โแ แ แจแแแดแ แแแ แแแฃแณ (Sustainable Construction) แจแแต แ แแแ แแญ แ แฒแต แณแชแญ แแฐแซ แจแฐแแจแ แ แแแ แตแณแฒแจแแฃ แฅแ แ แแณแแ แแตแฅแตแฅ แจแฐแฃแแแ แแแซแ แ แณแญแทแแข
โแจแแแฃแณแ แแแ แจแแแ แจแปแญแ แฉแฃแแซแฃ แจแตแณแฒแจแแ แแแ แจแฃแซ แฅแจแต แแแ แญ (Steel Structure) แจแแแแชแซ แแญ แแฐ แแญ แจแแแณแตแ แจแแแ แ แตแซ (First Lift) แ แฐแณแซ แแแณ แแ แแแแ แ แตแณแแแแข
โ๐ก แญแ แตแณแฒแจแ แแแ แแฉ แแ?
โข โแแ แ แแ แ แถแแญ แแญแ แจแแฐแซแฆ แตแณแฒแจแ แ แแญแแฑ แจแแแแชแซแแ แแ แ แแ แ แแแญ แฅแญแแ แ แแซแแแ แณแณแฝ แแญแ แฅแแฒแแแณแแต แฐแฐแญแ แแ แฅแจแฐแแแฃ แซแแแข
โข โแจแแ แแตแตแ แฅแ แฅแฆ แ "แแถ แแญ แฅแแฐแแตแแแจแฑแตแฃ แญแฅ แ แญแฝ แซแแแ แฅแ แ แแแ แจแแแแ แจแฃแซ แแแ แญ แ แตแญแญแแ แแแ แแฐ แแญ แจแแแณแฑ แแฐแต (Lifting operation) แจแแฐแ แจแแ แแตแตแ แฅแ แฅแ แฅแแแ แจแฐแแแ แต แแแข
โข โแแ แซแฃแข แฐแตแแ (Eco-friendly)แฆ แแฎแแญแฑ แ แแแ แแแฃแณแแฝ แแญ แจแแแฃแแ แจแซแญแฆแ แแแตแ แ แจแแฐแ แฐแจแ แแแแแต แ แฒแต แ แ แฃแซ แ แแแซแฝ แฅแจแแ แญแแแแข
โแจแ แแแ แจแแแฃแณ แดแญแแแ แ แแต แฅแญแแ แแฐแแต แซแปแแจแ แญแ แแฎแแญแตแฃ แ แแแ แแ แแตแตแ (Sustainable Engineering) แจแแต แแแฐแแฑ แตแแ แแณแซ แจแแแ แแแข
โแฅแแแฐแต แ แแแซแฝแ แแฐแ แแแ แตแณแฒแจแแฝแ แแฐแจแฐ แแแถแฝ แแญ แณแณแฝ แแญแแ (แจแแแญ แฅแญแแแ) แ แแแ แถ แแ แแ แแผ แ แตแแต แญแแแซแ แฅแแฝแ แณแตแฃแแฝแ? แ แตแฐแซแจแณแฝแแ แ แฎแแแต แ แแฉแ!
@etconp
โค9๐2
๐แจแแแแต แแแฃแณ แแ แฐแจแแแฝ (Main Stages of Road Construction)
๐งแแแแต แแแฃแณ แ แจแฐแจแแ แ แฅแแแ แจแแจแแแ แฅแซ แฒแแ แฅแซแแณแแฑ แฐแจแ แแแแแฑ แฅแแซแฌแฃ แแแแแต แฅแ แฐแ แแแต แตแแ แแ แ แแแข
1. แจแณแญแต แแแ แต (Site Preparation)
แแแฝแฃแแฅแแฆแแฝ แฅแ แแแฝ แฅแแ แแถแฝแ แแตแแแต (Clearing & Grubbing)
แจแแแแฑแ แ แ แฃแซ แฅแ แแฐแ แ แฐแญแฌแญ แแแฐแ (Setting Out)
แจแแแฃแณ แฆแณแแ แแตแซ แแแ แแตแจแ
2. แจแแฌแต แฅแซ (Earthwork)
แจแ แซแ แฆแณ แแแแญ (Cut)
แแ แฐแ แฆแณ แ แ แแญ แแแแต (Fill)
แ แแฉแ แ แฎแแแญแฐแญ แแ แแจแญ (Compaction)
แจแแแแฑแ Formation Level แแแแแต
3. แณแฅแแฌแต (Subgrade)
แญแ แจแแแแฑ แแ แจแณแ แจแ แแญ แญแแ แแแข
แแแแ แจแแญแ แแฅแญแฅแฎแฝ แจแแธแจแ แแ แจแต แแแข
แ แตแญแญแ แซแแฐแฎแแแญแต แแแแฑ แ แแฅแแต แแ แแฝ แญแฝแแแข
4. แณแฅ-แคแ (Sub-base)
แ Subgrade แแญ แจแแแแฅ แจแ แ แญ แแญแ แจแฐแแจ แตแแแญ แแฅแญแฅแญ แแแข
แญแแตแ แ แตแแต แซแฐแซแซแแข
แจแแ แแณแฝแ แซแปแฝแแแข
5. แคแ แฎแญแต (Base Course)
แจแแแแฑ แแ แญแแต แฐแธแซแ แญแแ แแแข
แจแฐแฝแจแญแซแชแแฝแ แญแฅแฐแต แแฐ แณแฝแแ แแฅแญแฅแญ แซแตแฐแแแแแข
แจแฐแแจ แตแแแญ (Crushed Aggregate) แญแ แซแแข
6. แฃแญแแฐแญ แฎแญแต (Binder Course)
แ Base Course แฅแ Wearing Course แแซแจแ แซแ แจแ แตแแแต แแฅแญแฅแญ แแแข
แแฅแญแฅแฎแนแ แฅแแฒแฃแ แ แซแฐแญแแแข
แฐแจแแช แฅแแซแฌ แญแฐแฃแแข
7. แแชแแ แฎแญแต (Wearing Course)
แญแ แฐแฝแจแญแซแชแแฝ แ แแฅแณ แจแแแแณแแฑแ แต แจแแแแฑ แจแแญแแ แญแแ แแแข
แแตแแณ แแ แญแแฅแซแแข
แจแแ แแแธแซแฐแตแ แญแแแณแแข
แแแแฑแ แจแแแญแฃ แจแแแฅ แฅแ แจแแแฝ แจแ แจแญ แแแณแแฝ แญแ แฅแแแข
8. แพแแฐแญ แฅแ แตแฌแแ (Shoulder and Drain)
แพแแฐแญ (Shoulder) แ แแแแฑ แแ แจแแแ แญแแ แแแข
แแ แฐแ แแ แแแแซ แญแแแแข
แจแแแแฑแ แ แญแ แญแฐแแแแข
แตแฌแแ (Drainage) แฐแแ แจแแแฅ แแแ แจแแแแฑ แแแซแ แญแ แ แแแข
9. แจแแแแต แแแญแถแฝ แฅแ แแณแชแซแแฝ (Road Markings and Furniture)
แจแแตแแญ แแแญแถแฝ (Lane Markings)
แจแตแซแแญ แแแญแถแฝ (Traffic Signs)
แแญแตแฌแ (Guardrails)
แจแแแแต แแฅแซแถแฝ (Street Lights)
แฅแแแ แแ แแแแแต แฐแ แแแแฝ แฐแ แแแตแ แตแซแแญ แแฅแฅแญ แ แตแแแ แแธแแข
๐ซแ แ แแแญ แจRoad Pavement Layer แ แฐแ แฐแจแฐแ
Wearing Course โฌ๏ธ
Binder Course โฌ๏ธ
Base Course โฌ๏ธ
Sub-base โฌ๏ธ
Subgrade (Compacted Soil)
@etconp
๐งแแแแต แแแฃแณ แ แจแฐแจแแ แ แฅแแแ แจแแจแแแ แฅแซ แฒแแ แฅแซแแณแแฑ แฐแจแ แแแแแฑ แฅแแซแฌแฃ แแแแแต แฅแ แฐแ แแแต แตแแ แแ แ แแแข
1. แจแณแญแต แแแ แต (Site Preparation)
แแแฝแฃแแฅแแฆแแฝ แฅแ แแแฝ แฅแแ แแถแฝแ แแตแแแต (Clearing & Grubbing)
แจแแแแฑแ แ แ แฃแซ แฅแ แแฐแ แ แฐแญแฌแญ แแแฐแ (Setting Out)
แจแแแฃแณ แฆแณแแ แแตแซ แแแ แแตแจแ
2. แจแแฌแต แฅแซ (Earthwork)
แจแ แซแ แฆแณ แแแแญ (Cut)
แแ แฐแ แฆแณ แ แ แแญ แแแแต (Fill)
แ แแฉแ แ แฎแแแญแฐแญ แแ แแจแญ (Compaction)
แจแแแแฑแ Formation Level แแแแแต
3. แณแฅแแฌแต (Subgrade)
แญแ แจแแแแฑ แแ แจแณแ แจแ แแญ แญแแ แแแข
แแแแ แจแแญแ แแฅแญแฅแฎแฝ แจแแธแจแ แแ แจแต แแแข
แ แตแญแญแ แซแแฐแฎแแแญแต แแแแฑ แ แแฅแแต แแ แแฝ แญแฝแแแข
4. แณแฅ-แคแ (Sub-base)
แ Subgrade แแญ แจแแแแฅ แจแ แ แญ แแญแ แจแฐแแจ แตแแแญ แแฅแญแฅแญ แแแข
แญแแตแ แ แตแแต แซแฐแซแซแแข
แจแแ แแณแฝแ แซแปแฝแแแข
5. แคแ แฎแญแต (Base Course)
แจแแแแฑ แแ แญแแต แฐแธแซแ แญแแ แแแข
แจแฐแฝแจแญแซแชแแฝแ แญแฅแฐแต แแฐ แณแฝแแ แแฅแญแฅแญ แซแตแฐแแแแแข
แจแฐแแจ แตแแแญ (Crushed Aggregate) แญแ แซแแข
6. แฃแญแแฐแญ แฎแญแต (Binder Course)
แ Base Course แฅแ Wearing Course แแซแจแ แซแ แจแ แตแแแต แแฅแญแฅแญ แแแข
แแฅแญแฅแฎแนแ แฅแแฒแฃแ แ แซแฐแญแแแข
แฐแจแแช แฅแแซแฌ แญแฐแฃแแข
7. แแชแแ แฎแญแต (Wearing Course)
แญแ แฐแฝแจแญแซแชแแฝ แ แแฅแณ แจแแแแณแแฑแ แต แจแแแแฑ แจแแญแแ แญแแ แแแข
แแตแแณ แแ แญแแฅแซแแข
แจแแ แแแธแซแฐแตแ แญแแแณแแข
แแแแฑแ แจแแแญแฃ แจแแแฅ แฅแ แจแแแฝ แจแ แจแญ แแแณแแฝ แญแ แฅแแแข
8. แพแแฐแญ แฅแ แตแฌแแ (Shoulder and Drain)
แพแแฐแญ (Shoulder) แ แแแแฑ แแ แจแแแ แญแแ แแแข
แแ แฐแ แแ แแแแซ แญแแแแข
แจแแแแฑแ แ แญแ แญแฐแแแแข
แตแฌแแ (Drainage) แฐแแ แจแแแฅ แแแ แจแแแแฑ แแแซแ แญแ แ แแแข
9. แจแแแแต แแแญแถแฝ แฅแ แแณแชแซแแฝ (Road Markings and Furniture)
แจแแตแแญ แแแญแถแฝ (Lane Markings)
แจแตแซแแญ แแแญแถแฝ (Traffic Signs)
แแญแตแฌแ (Guardrails)
แจแแแแต แแฅแซแถแฝ (Street Lights)
แฅแแแ แแ แแแแแต แฐแ แแแแฝ แฐแ แแแตแ แตแซแแญ แแฅแฅแญ แ แตแแแ แแธแแข
๐ซแ แ แแแญ แจRoad Pavement Layer แ แฐแ แฐแจแฐแ
Wearing Course โฌ๏ธ
Binder Course โฌ๏ธ
Base Course โฌ๏ธ
Sub-base โฌ๏ธ
Subgrade (Compacted Soil)
@etconp
โค17๐7
๐JOB VACANCY
๐Junior Cost Control Engineer
โ๏ธVacancy code - Hahu Commercial 011/2026
๐Jimma
๐Bachelor's Degree in Civil Engineering or with related field of study with relevant work experience
- Generate cost & productivity reports accurately & timely
- Generate productivity evaluation reports according to the company productivity norm
- Generate loss reports covering material, labor, and equipment usage
- Generate cost related risk management report & the mitigation required.
- Conduct market assessments to support cost analysis and decision-making
- Ensure compliance with company cost control procedures and guidelines
Quanitity Required: 5
Minimum Years Of Experience: #0_years
Maximum Years Of Experience: #2_years
Deadline: June 26, 2026
Note: Applicants should be residents of Jimma and only graduates of 2025/2026 academic year are eligible to apply.
๐ฉHow To Apply: Click the apply button below๐
https://application.eecproducts.com/
@etconp
๐Junior Cost Control Engineer
โ๏ธVacancy code - Hahu Commercial 011/2026
๐Jimma
๐Bachelor's Degree in Civil Engineering or with related field of study with relevant work experience
- Generate cost & productivity reports accurately & timely
- Generate productivity evaluation reports according to the company productivity norm
- Generate loss reports covering material, labor, and equipment usage
- Generate cost related risk management report & the mitigation required.
- Conduct market assessments to support cost analysis and decision-making
- Ensure compliance with company cost control procedures and guidelines
Quanitity Required: 5
Minimum Years Of Experience: #0_years
Maximum Years Of Experience: #2_years
Deadline: June 26, 2026
Note: Applicants should be residents of Jimma and only graduates of 2025/2026 academic year are eligible to apply.
๐ฉHow To Apply: Click the apply button below๐
https://application.eecproducts.com/
@etconp
โค8
แแคแตแแ แญแแแจแฑ!
แจแฐแ 04-12/2018 แ.แ แจแฐแฐแ แ แจ2018 แ.แ แจแจแแฐแ แตแแ แญแต แจแแแซ แแฐแ (Exit Exam) แแคแต แแณแจแต แแแฏแแข
แแคแตแแ แแแจแต ๐
https://result.ethernet.edu.et
แแแฉแ แจแฐแซแ แ แแ 'Exit Examination' แแญ 'View Results' แจแแแแ แ แแซแแ Username แ แแตแแฃแต แแคแตแแ แญแแแจแฑแข
@etconp
แจแฐแ 04-12/2018 แ.แ แจแฐแฐแ แ แจ2018 แ.แ แจแจแแฐแ แตแแ แญแต แจแแแซ แแฐแ (Exit Exam) แแคแต แแณแจแต แแแฏแแข
แแคแตแแ แแแจแต ๐
https://result.ethernet.edu.et
แแแฉแ แจแฐแซแ แ แแ 'Exit Examination' แแญ 'View Results' แจแแแแ แ แแซแแ Username แ แแตแแฃแต แแคแตแแ แญแแแจแฑแข
@etconp
โค4๐1
JOB VACANCY
Position: Data Collector ๐
Company: Compass Construction ๐๏ธ
Education: BSc degree in Civil Engineering or other related fields of study ๐
Experience: 0 Years (Fresh Graduates) ๐ฑ
Additional Requirements: ๐
Basic understanding of data collection and reporting principles, good communication and organizational skills, ability to work in field environments when required, and basic computer literacy (MS Office is an advantage) ๐ป
Work location: Addis Ababa - Ethiopia ๐
โก๏ธDeadline: Jun. 26, 2026 ๐๏ธ
๐ฉHow to apply: Interested applicants who meet the above criteria are invited to apply by submitting non-returnable copies of original documents at the office found at Gorgorios Round about to, Welosefer road Amanuelwa Building, 2nd floor ๐ข
@etconp
Position: Data Collector ๐
Company: Compass Construction ๐๏ธ
Education: BSc degree in Civil Engineering or other related fields of study ๐
Experience: 0 Years (Fresh Graduates) ๐ฑ
Additional Requirements: ๐
Basic understanding of data collection and reporting principles, good communication and organizational skills, ability to work in field environments when required, and basic computer literacy (MS Office is an advantage) ๐ป
Work location: Addis Ababa - Ethiopia ๐
โก๏ธDeadline: Jun. 26, 2026 ๐๏ธ
๐ฉHow to apply: Interested applicants who meet the above criteria are invited to apply by submitting non-returnable copies of original documents at the office found at Gorgorios Round about to, Welosefer road Amanuelwa Building, 2nd floor ๐ข
@etconp
โค9๐3๐ฅฐ1๐1
๐แแตแณแแแซ
๐ชงแ 70/30 แจแแซ แ แแ แแแชแซ แคแต แ online แ แฐแ แฃแฃแแแต แแฐแแแแฃแฝแ
https://t.me/ETCONpWORK
@etconp
๐ชงแ 70/30 แจแแซ แ แแ แแแชแซ แคแต แ online แ แฐแ แฃแฃแแแต แแฐแแแแฃแฝแ
https://t.me/ETCONpWORK
@etconp
โค11๐2
๐แฅแแแฝ แฅแฃแซแน แ
แแน แ แซแแแแ แฃแแนแต แแ แจแต แฆแแแญแ แตแแ แแแปแฝแ แแแแฃ แตแแ แแแจแแ
โแญแจแแต แฅแแแตแ แฅแ แแซแ แแณแ แญ แญแแแแ?
๐ซแฅแแแตแซแแต แจ ETABS แฅแ QUANTITY SURVEYING แแ แฆแแแญแ แฎแญแต แ 25 % แ แแฝ แแแแฃ แแแจแแ แฅแแฒแแ แแแฑแ แฎแญแถแฝ แ แ แแต แแญ แแแแตแฑ แจ แฅแซแแณแแฑ แจ 40% แ แแฝ แญแฐแจแแแนแแ๐
๐ฉแแแแแแฅ @Philemona7 แญแแแแ แแญแ แแ แแ แแจแ แ 0925446661 แญแฐแแแแโค๏ธ
@etconp
โแญแจแแต แฅแแแตแ แฅแ แแซแ แแณแ แญ แญแแแแ?
๐ซแฅแแแตแซแแต แจ ETABS แฅแ QUANTITY SURVEYING แแ แฆแแแญแ แฎแญแต แ 25 % แ แแฝ แแแแฃ แแแจแแ แฅแแฒแแ แแแฑแ แฎแญแถแฝ แ แ แแต แแญ แแแแตแฑ แจ แฅแซแแณแแฑ แจ 40% แ แแฝ แญแฐแจแแแนแแ๐
๐ฉแแแแแแฅ @Philemona7 แญแแแแ แแญแ แแ แแ แแจแ แ 0925446661 แญแฐแแแแโค๏ธ
@etconp
โค7๐1
JOB VACANCY
Position: Junior Construction Supervisor ๐ทโโ๏ธ๐๏ธ
Company: Menschen fuer Menschen Foundation
Education: B.Sc. in Civil Engineering (CGPA โฅ 3.5; Fresh Graduate of 2024/25 Academic year) ๐
Experience: 0-1 years (Entry Level / Fresh Graduate) ๐ฑ
Additional Requirements: Good command of spoken & written English; skills in teamwork, problem-solving, and construction technologies; ๐ ๏ธ๐ค
Salary: Negotiable ๐ฐ
Required qty: 1
Work location: Gambela ๐
Deadline: June 29, 2026 ๐
How to apply:
Interested applicants fulfilling the requirements can send a non-returnable application mentioning the job title and duty station in the subject line, CV, and copies of relevant credentials to the following address: ๐ฌ
Menschen fuer Menschen
P. O. BOX 2568
ADDIS ABABA, ETHIOPIA
Must submit a Civil Engineering Degree, Student Copy, High School Transcript, Application Letter, and CV. ๐โจ
@etconp
Position: Junior Construction Supervisor ๐ทโโ๏ธ๐๏ธ
Company: Menschen fuer Menschen Foundation
Education: B.Sc. in Civil Engineering (CGPA โฅ 3.5; Fresh Graduate of 2024/25 Academic year) ๐
Experience: 0-1 years (Entry Level / Fresh Graduate) ๐ฑ
Additional Requirements: Good command of spoken & written English; skills in teamwork, problem-solving, and construction technologies; ๐ ๏ธ๐ค
Salary: Negotiable ๐ฐ
Required qty: 1
Work location: Gambela ๐
Deadline: June 29, 2026 ๐
How to apply:
Interested applicants fulfilling the requirements can send a non-returnable application mentioning the job title and duty station in the subject line, CV, and copies of relevant credentials to the following address: ๐ฌ
Menschen fuer Menschen
P. O. BOX 2568
ADDIS ABABA, ETHIOPIA
Must submit a Civil Engineering Degree, Student Copy, High School Transcript, Application Letter, and CV. ๐โจ
@etconp
โค7๐3
๐แจแแ แจแฐ-แแแต แแญแ แ แแซแฎแฝแ แฃแแแซแแฝ แ แ แ แ แซแฝ แ แตแฐแแแต แแชแซ แจแแแแค แแตแจแ แซ แตแแ แ แฐแ แ
แจแแ แจแฐ-แแแต แแญแ แ แแซแฎแฝแ แฃแแแซแแฝ แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแชแแ แฒแ แณแแญแ แแแตแจแ แณแตแฆ แ แ แ แ แซแฝ แ แตแฐแแแต แแชแซ แจแแแแค แแตแจแ แซ แตแแ แ แฐแ แฅแทแแกแก
แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแชแ แ แแแ แแแ แฐแจแ แฒแ แณแ แดแญแแแแ แ แแ แแ แฅแจแฐแซแแแ แฅแจแแแ แจแแแฃแฑ แแญ แฐแซแญแ แจแฐแแ แ แแซแฎแฝแ แฃแแแซแแฝ แจแแแ แแญ แซแณแธแแ แแฅแแ แ แฅแแแตแ แ แญแ แแต แแตแแ แ แแแแต แ แแแซแฝแ แจแแจแแแ แจแแ แจแฐ-แแแถแฝ แ แแแ แญแแแฝ แฐแแฃแซแ แฅแแฒแแ แตแแ แแ แฅแ แ แจแแ แแ แซแแต แ แแแตแดแญ แแตแชแซ แคแฑ แจแแ แจแฐ-แแแต แแญแ แ แแซแช แ แถ แแฒแ แแขแญ แแตแจแฉแ แ แจแแฑแ แต แแ แต แแแกแก
แจแฐแ แ แซแฝ แ แตแฐแแแต แซแแ แแแณ แ แแแแฝแแ แ แขแตแฎแตแซ แจแดแญแแแ แแญแ แฅแ แ แแณแ แแ แฅแจแฐแซแแฐ แจแแแ แแแแ แจแ แแฑแต แฃแแแซแ แจแแแต แฐแแแต แฅแซแแฝแ แ แแแแ แ แ แณแฒแต แแ แซแแฝแ แฅแแ แฅแซแฐแจแ แญแแแ แฅแแแแข
แ แฐแแญ แ แจแฐแ แแแต แฅแ แแ แจแฐ แแแต แแญแ แจแฐแ แ แซแฝ แ แตแฐแแแต (AI) แซแแ แ แแ แฃแแแซแ แฅแแณแฅแซแฉแต แแแแ แจแจแฐแ แแแ (Smart City Planning): แณแฐแแญแต แฅแ แตแฎแแฝ แจแแฐแ แตแกแตแ แแจแ แ แแ แแ แจแฐแแฝ แฅแแดแต แฅแแฐแแซแตแ แ แตแแตแ แแฐแแ แญ แญแปแแแข
แญแ แ แแฌแตแ แ แ แแฃแก แแแ แแแ แ แ-แแฅ แฐแแซแแฝแ แแแแฃแ แญ แญแจแณแแข
แจแตแซแแตแแญแตแ แแแแต แ แตแฐแณแฐแญ (Traffic Optimization): แ แตแซแแญ แแฅแซแถแฝแ แซแแซแแฝ แ แแซแแแต แจแตแซแแญ แแจแแแ แ แแแฃแ แญ แฅแ แฐแฝแจแญแซแชแแฝ แซแ แแแ แฅแแจแ แฅแแฒแแแณแแฑ แแตแจแ แญแปแแแข
แจแ แแแแแต แ แฐแฃแฅ แแแแแแต (E-Governance): แฅแแฐ แ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แซแ แ แซแแต แจแแแชแแฝแ แแจแแ แ แแแแแต (แแแณแ แจแฒแชแ แแแแฃ) แแแแแ แ แ AI แจแฐแฐแแ แฒแแณแ แฒแตแฐแแฝแ แฅแแฐแแ แแ แ แตแแ แแ แฐแแแฟแแข
Via แจแฐแแ แแฐแจแฐ แแแต แแแตแดแญ
@etconp
แจแแ แจแฐ-แแแต แแญแ แ แแซแฎแฝแ แฃแแแซแแฝ แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแชแแ แฒแ แณแแญแ แแแตแจแ แณแตแฆ แ แ แ แ แซแฝ แ แตแฐแแแต แแชแซ แจแแแแค แแตแจแ แซ แตแแ แ แฐแ แฅแทแแกแก
แจแฎแแตแตแซแญแฝแ แขแแฑแตแตแชแ แ แแแ แแแ แฐแจแ แฒแ แณแ แดแญแแแแ แ แแ แแ แฅแจแฐแซแแแ แฅแจแแแ แจแแแฃแฑ แแญ แฐแซแญแ แจแฐแแ แ แแซแฎแฝแ แฃแแแซแแฝ แจแแแ แแญ แซแณแธแแ แแฅแแ แ แฅแแแตแ แ แญแ แแต แแตแแ แ แแแแต แ แแแซแฝแ แจแแจแแแ แจแแ แจแฐ-แแแถแฝ แ แแแ แญแแแฝ แฐแแฃแซแ แฅแแฒแแ แตแแ แแ แฅแ แ แจแแ แแ แซแแต แ แแแตแดแญ แแตแชแซ แคแฑ แจแแ แจแฐ-แแแต แแญแ แ แแซแช แ แถ แแฒแ แแขแญ แแตแจแฉแ แ แจแแฑแ แต แแ แต แแแกแก
แจแฐแ แ แซแฝ แ แตแฐแแแต แซแแ แแแณ แ แแแแฝแแ แ แขแตแฎแตแซ แจแดแญแแแ แแญแ แฅแ แ แแณแ แแ แฅแจแฐแซแแฐ แจแแแ แแแแ แจแ แแฑแต แฃแแแซแ แจแแแต แฐแแแต แฅแซแแฝแ แ แแแแ แ แ แณแฒแต แแ แซแแฝแ แฅแแ แฅแซแฐแจแ แญแแแ แฅแแแแข
แ แฐแแญ แ แจแฐแ แแแต แฅแ แแ แจแฐ แแแต แแญแ แจแฐแ แ แซแฝ แ แตแฐแแแต (AI) แซแแ แ แแ แฃแแแซแ แฅแแณแฅแซแฉแต แแแแ แจแจแฐแ แแแ (Smart City Planning): แณแฐแแญแต แฅแ แตแฎแแฝ แจแแฐแ แตแกแตแ แแจแ แ แแ แแ แจแฐแแฝ แฅแแดแต แฅแแฐแแซแตแ แ แตแแตแ แแฐแแ แญ แญแปแแแข
แญแ แ แแฌแตแ แ แ แแฃแก แแแ แแแ แ แ-แแฅ แฐแแซแแฝแ แแแแฃแ แญ แญแจแณแแข
แจแตแซแแตแแญแตแ แแแแต แ แตแฐแณแฐแญ (Traffic Optimization): แ แตแซแแญ แแฅแซแถแฝแ แซแแซแแฝ แ แแซแแแต แจแตแซแแญ แแจแแแ แ แแแฃแ แญ แฅแ แฐแฝแจแญแซแชแแฝ แซแ แแแ แฅแแจแ แฅแแฒแแแณแแฑ แแตแจแ แญแปแแแข
แจแ แแแแแต แ แฐแฃแฅ แแแแแแต (E-Governance): แฅแแฐ แ แฒแต แ แ แฃ แจแฐแ แ แตแฐแณแฐแญ แซแ แ แซแแต แจแแแชแแฝแ แแจแแ แ แแแแแต (แแแณแ แจแฒแชแ แแแแฃ) แแแแแ แ แ AI แจแฐแฐแแ แฒแแณแ แฒแตแฐแแฝแ แฅแแฐแแ แแ แ แตแแ แแ แฐแแแฟแแข
Via แจแฐแแ แแฐแจแฐ แแแต แแแตแดแญ
@etconp
โค10
๐แพแชแแ (Shoring) แแแตแ แแ?
๐ แพแชแแ (Shoring) แแแต แ แแแฃแณแฃ แ แแแฎ แแญแ แ แแแจแต แฅแซแแฝ แแ แต แแแแแฝแฃ แแตแแณแแฝ แแญแ แจแแแฎ แแแฝ แฅแแณแญแแญแฑ แแแแ แจแแฐแจแ แจแแฐแแแซ แตแญแแต แแแข
แจแพแชแแ แแญแแถแฝ
1. แจแแแ แพแชแแ (Structural Shoring)
แญแ แแญแแต แพแชแแ แแตแแณแแฝแแฃ แแแแฝแแฃ แฃแชแซแแฝแ แแญแ แแ แแแแแฝแ แ แแแซแแแต แแแฐแแ แญแ แ แแแข
แ) แแแ แ แพแชแแ (Raking Shoring)
แแตแแณแ แฅแแณแญแแตแ แแญแ แฅแแณแญแแแฅแ แ แแแแ แจแฐแแแก แจแตแแ แ แฃแแต (Rakers) แญแ แแแแข
แ) แ แซแช แพแชแแ (Flying Shoring)
แ แแแต แฐแแซแฃแฝ แแแแแฝ แแซแจแ แซแ แญแแ แฒแแแต แแญแ แฒแแญแต แแแแแนแ แแแฐแแ แ แแตแ แจแตแแ แ แฃแแต แญแ แแแแข
แ) แแฅแฐแ แพแชแแ (Dead Shoring)
แแตแแณแฃ แแแต แแญแ แแ แจแต แแญ แแปแปแซ แฅแซ แฒแจแแแ แญแแฑแ แแแธแจแ แแฅ แซแ แจแตแแ แ แฃแแต แญแ แแแแข
2. แจแแแฎ แพแชแแ (Excavation or Trench Shoring)
แญแ แแญแแต แพแชแแ แจแแแฎ แแแฝ แฅแแณแญแแญแฑ แฅแ แจแแฐแฉ แฐแซแฐแแฝแ แจแ แฐแ แแแ แ แ แญแ แ แแแข
แจแฐแแแฑ แแดแแฝแฆ
โ แจแฅแแจแต แพแชแแ (Timber Shoring)
โ แจแแญแตแฎแแญ แพแชแแ (Hydraulic Shoring)
โ แจแบแต แแญแ แพแชแแ (Sheet Pile Shoring)
โ แจแถแแแญ แแญแ แฅแ แแแแ แตแญแแต (Soldier Pile and Lagging)
แจแพแชแแ แแแแแฝ
โ แจแแแฎ แแญแ แจแแแ แแแจแตแ แแจแแจแแข
โ แจแฐแซแฐแแฝแ แฐแ แแแต แแจแแแฅแข
โ แ แแแฃแณแฃ แ แฅแแ แแญแ แ แแแจแต แฅแซแแฝ แแ แต
โ แแแ แฉแ แจแฐแจแแ แแตแจแแข
โ แ แแ แจแต แแแฃแณ แฅแ แ แแฌแต แแตแฅ แจแแ แจแฐ แแแต แฅแซแแฝ แแ แต แจแ แซแฃแขแแ แแจแแแต แแ แ แ แข
@etconp
๐ แพแชแแ (Shoring) แแแต แ แแแฃแณแฃ แ แแแฎ แแญแ แ แแแจแต แฅแซแแฝ แแ แต แแแแแฝแฃ แแตแแณแแฝ แแญแ แจแแแฎ แแแฝ แฅแแณแญแแญแฑ แแแแ แจแแฐแจแ แจแแฐแแแซ แตแญแแต แแแข
แจแพแชแแ แแญแแถแฝ
1. แจแแแ แพแชแแ (Structural Shoring)
แญแ แแญแแต แพแชแแ แแตแแณแแฝแแฃ แแแแฝแแฃ แฃแชแซแแฝแ แแญแ แแ แแแแแฝแ แ แแแซแแแต แแแฐแแ แญแ แ แแแข
แ) แแแ แ แพแชแแ (Raking Shoring)
แแตแแณแ แฅแแณแญแแตแ แแญแ แฅแแณแญแแแฅแ แ แแแแ แจแฐแแแก แจแตแแ แ แฃแแต (Rakers) แญแ แแแแข
แ) แ แซแช แพแชแแ (Flying Shoring)
แ แแแต แฐแแซแฃแฝ แแแแแฝ แแซแจแ แซแ แญแแ แฒแแแต แแญแ แฒแแญแต แแแแแนแ แแแฐแแ แ แแตแ แจแตแแ แ แฃแแต แญแ แแแแข
แ) แแฅแฐแ แพแชแแ (Dead Shoring)
แแตแแณแฃ แแแต แแญแ แแ แจแต แแญ แแปแปแซ แฅแซ แฒแจแแแ แญแแฑแ แแแธแจแ แแฅ แซแ แจแตแแ แ แฃแแต แญแ แแแแข
2. แจแแแฎ แพแชแแ (Excavation or Trench Shoring)
แญแ แแญแแต แพแชแแ แจแแแฎ แแแฝ แฅแแณแญแแญแฑ แฅแ แจแแฐแฉ แฐแซแฐแแฝแ แจแ แฐแ แแแ แ แ แญแ แ แแแข
แจแฐแแแฑ แแดแแฝแฆ
โ แจแฅแแจแต แพแชแแ (Timber Shoring)
โ แจแแญแตแฎแแญ แพแชแแ (Hydraulic Shoring)
โ แจแบแต แแญแ แพแชแแ (Sheet Pile Shoring)
โ แจแถแแแญ แแญแ แฅแ แแแแ แตแญแแต (Soldier Pile and Lagging)
แจแพแชแแ แแแแแฝ
โ แจแแแฎ แแญแ แจแแแ แแแจแตแ แแจแแจแแข
โ แจแฐแซแฐแแฝแ แฐแ แแแต แแจแแแฅแข
โ แ แแแฃแณแฃ แ แฅแแ แแญแ แ แแแจแต แฅแซแแฝ แแ แต
โ แแแ แฉแ แจแฐแจแแ แแตแจแแข
โ แ แแ แจแต แแแฃแณ แฅแ แ แแฌแต แแตแฅ แจแแ แจแฐ แแแต แฅแซแแฝ แแ แต แจแ แซแฃแขแแ แแจแแแต แแ แ แ แข
@etconp
๐7โค3