Ethiopian Construction Vacancy & Tender
18.1K subscribers
4.57K photos
56 videos
536 files
3.78K links
Ethiopian Construction Vacancy & Tender
Daily updates on construction Engineering Works, job vacancies, tenders,News,Technology and bid announcements in Ethiopia & World

Buy ads: https://telega.io/c/ETCONpWORK

📩 @Philemona7
Download Telegram
👉𝖧𝗈𝗐 𝖽𝗈 𝗌𝗎𝗋𝗏𝖾𝗒𝗈𝗋𝗌 𝗏𝖾𝗋𝗂𝖿𝗒 𝗆𝗈𝖽𝖾𝗋𝗇 𝗂𝗇𝗌𝗍𝗋𝗎𝗆𝖾𝗇𝗍 𝗈𝖻𝗌𝖾𝗋𝗏𝖺𝗍𝗂𝗈𝗇𝗌 𝖻𝖾𝖿𝗈𝗋𝖾 𝗂𝗇𝖼𝗈𝗋𝗉𝗈𝗋𝖺𝗍𝗂𝗇𝗀 𝗍𝗁𝖾𝗆 𝗂𝗇𝗍𝗈 𝖺𝗇 𝖾𝗌𝗍𝖺𝖻𝗅𝗂𝗌𝗁𝖾𝖽 𝗍𝗋𝖺𝗏𝖾𝗋𝗌𝖾 𝗇𝖾𝗍𝗐𝗈𝗋𝗄?

Modern surveying instruments can collect angles, distances, and coordinates rapidly, but electronically recorded observations are not automatically reliable.

Before new observations are incorporated into an established traverse network, surveyors verify that the measurements are consistent with the existing control and the required survey accuracy.

The work begins with checking the instrument itself.

The Total Station or GNSS receiver is confirmed to be suitable for the required accuracy, with appropriate calibration and operational checks completed.

For a Total Station, the surveyor checks the instrument setup carefully.

The instrument must be properly centered over the traverse station and accurately leveled.

The station identification, instrument height, prism height, prism constant, and measurement settings are also verified.

The backsight is then observed to confirm the orientation.

Where the survey procedure requires it, the direction is checked through additional observations rather than relying on a single sight.

Horizontal angles and distances to the new traverse station are then observed.

Important observations may be repeated, including observations on both faces of the instrument where appropriate.

The repeated results are compared to identify abnormal differences before the data are accepted.

GNSS observations require their own checks.

The receiver configuration, antenna information, observation method, correction source, coordinate reference system, and solution quality are reviewed.

Where GNSS is being connected to existing traverse control, the resulting coordinates are compared with the known control within the specified accuracy.

The new observations are also checked against the geometry of the existing network.

A new traverse connection may be observed from more than one control station, or the traverse may be closed onto established control.

These independent relationships provide stronger evidence that the new measurements are consistent with the network.

Any significant discrepancy is investigated before the observation is incorporated.

Surveyors review the original field data, station identification, orientation, instrument settings, observation conditions, and coordinate computations to determine whether the problem comes from the new observation or the existing control.

The objective is not simply to make the new measurements agree with the established network.

The observations must be independently supported and shown to satisfy the required accuracy before they become part of the control framework.

Once the observations pass the necessary checks, they can be incorporated into the traverse computation and, where appropriate, adjusted with the rest of the network.

This process protects the established control from being weakened by a single unreliable observation.

It also ensures that modern instruments improve the efficiency of traverse surveying without replacing the fundamental principles of independent verification and quality control.

Here is something to think about:

If a new Total Station traverse connection disagrees with established control while the instrument passes its calibration checks, what other evidence should a surveyor examine before accepting or rejecting the new observations?

#SurveyQuality #TotalStation #TraverseSurveying #SurveyControl #LandSurveying

@etconp
❤3👍1
👉Complete Guide to Reading Building Drawings

📐መፅሃፉ የህንፃን ድሮዊንግ በተግባር ለመረዳት እና ስለ ጠቅላላ አርክቴክቸር ሳይነስ የሚዳስስ ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውሩዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6aa7c4a30b34d_etconp
❤2🥰1
👉የኮብልስቶን ንጣፍ አሰራር እና የቅስት (Fan Pattern) ዲዛይን ጥቅሞች! 🛣️🧱

🌟​በምስሉ ላይ እንደምታዩት የኮብልስቶን ድንጋዮች በቅስት ቅርጽ (Segmental Arc / Fan Pattern) ተደርድረው የተነጠፉበት አሰራር በከተማ ውበት እና በመንገድ ግንባታ ላይ በርካታ ጥቅሞች አሉት፦

​1️⃣ ከፍተኛ የሸክም ስርጭት (Load Distribution)፦ ድንጋዮቹ በቅስት/በክብ ቅርጽ መደረደራቸው የመጡትን የተሽከርካሪ እና የእግረኛ ጫናዎች በእኩል በመበተን ንጣፉ እንዳይነቀል ያደርጋል።

2️⃣ የዝናብ ውኃ ፍሰት እና መሬት መስመጥ መከላከል፦ በመገጣጠሚያዎች (Joints) መካከል ባሉ ክፍተቶች ውኃ ወደ መሬት እንዲሰርግ በማድረግ የመንገድ ላይ ውኃ መቋጠርን ይቀንሳል።

3️⃣ ዘላቂነት እና ውበት (Durability & Aesthetics)፦ ከተፈጥሮ ድንጋይ የሚዘጋጅ በመሆኑ ለአስርተ ዓመታት ያለ ከፍተኛ ጥገና የሚያገለግል እና ለአካባቢው የላቀ የሕንፃ/የመንገድ ውበት የሚሰጥ ነው።

​ጥራት ያለው የኮብልስቶን አነጣጥ ስራ — ለመንገዶቻችን ጽዳት እና ውበት🤝

​​🌐ለተጨማሪ መረጃ እና ሌሎች የኮንስትራክሽን ዘርፍ ዜናዎች የ YouTube ገፃችን ከታች ባለው ሊንክ በመግባት SubScribe አርገው ቤተሰብ ይሁኑ👇

https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
‎
‎@etconp
🔥2
👉የሳምንቱ ዓለም አቀፍ የኮንስትራክሽን ዜናዎችና ቴክኖሎጂዎች 🏗️🌍

☄​ለዚህ ሳምንት ዓለም አቀፍ የኮንስትራክሽን እና የሪል ስቴት ዘርፍ ትኩረትን የሳቡ ዋና ዋና ክስተቶች፣ የዘመናዊ ቴክኖሎጂ ፈጠራዎች እና የግንባታ ማሻሻያዎች ከዚህ በታች ተዘርዝረዋል፦

​አርቴፊሻል ኢንተለጀንስ (AI) በግንባታ ደህንነት ቁጥጥር ላይ በአውሮፓ እና በሰሜን አሜሪካ የሚገኙ ግንባር ቀደም የኮንስትራክሽን ኩባንያዎች የደህንነት ካሜራዎችን ከ AI ቴክኖሎጂ ጋር በማቀናጀት በግንባታ ቦታዎች ላይ ሊከሰቱ የሚችሉ አደጋዎችን አስቀድሞ የሚጠቁም ሥርዓት በስፋት እየተጠቀሙበት ይገኛሉ።

ቴክኖሎጂው ሠራተኞች የግንባታ እቃዎችን (ለምሳሌ ሄልሜት እና የደህንነት ማሰሪያዎችን) በትክክል ማጥለቃቸውን በራስ-ሰር በመከታተል የሥራ ላይ አደጋዎችን በከፍተኛ ሁኔታ መቀነስ ችሏል።

​የካርቦን ልቀት ቅነሳ በሲሚንቶ ማምረቻዎች
ዓለም አቀፍ የሲሚንቶ አምራቾች ማህበር ባወጣው አዲስ ሪፖርት መሰረት፣ በግንባታ ግብአቶች ዘርፍ የሚወጣውን የካርቦን ዳይኦክሳይድ ልቀት በግማሽ ለመቀነስ የሚያስችሉ አዳዲስ 'ግሪን ሲሚንቶ' (Green Cement) አማራጮች ተጠናክረው ቀጥለዋል።

በተለይ እንደ ቮልካን አሽ እና በኢንዱስትሪ ቆሻሻዎች ላይ የተመሰረቱ የሲሚንቶ ማምረቻ ቴክኖሎጂዎች በፈረንሳይ እና ጀርመን በስፋት ወደ ሥራ እየገቡ ናቸው።

​የትላልቅ ከተሞች የከርሰ ምድር መሠረተ ልማት እና አውቶሜትድ ቦይ ማዕቀፎች
በእስያ እያደጉ ባሉ መካከለኛ እና ታላላቅ ከተሞች፣ የትራፊክ መጨናነቅን እና የቧንቧ መስመር ጥገና ፈተናዎችን ለመቅረፍ ባለ ብዙ ደረጃ የከርሰ ምድር መሠረተ ልማት ኔትወርኮች እየተገነቡ ይገኛሉ።

እነዚህ ፕሮጀክቶች ሙሉ በሙሉ በሮቦቲክስ እና በዲጂታል መንታ (Digital Twin) ቴክኖሎጂዎች የሚታገዙ ሲሆን፣ የከተሞችን የረጅም ጊዜ ዘላቂነት እያረጋገጡ ይገኛሉ።

🚥​በቅድመ-ግንባታ

(Prefabrication) እና ሞጁላር ህንፃዎች ላይ የሚታየው ዕድገት በአሜሪካ እና በMiddle East (መካከለኛው ምስራቅ) የሪል ስቴት ገበያ የጊዜ እና የወጪ ቆጣቢነቱን ከፍ ለማድረግ በፋብሪካ ተጠናቀው የሚገጠሙ የሞጁላር ህንፃዎች ፍላጎት ከዕለት ወደ ዕለት እየጨመረ ነው።

ይህ አሰራር የግንባታ ጊዜን እስከ 40 በመቶ መቀነስ እንደቻለ የዘርፉ ጥናቶች ያመለክታሉ።

🌟ለተጨማሪ ዓለም አቀፍ እና የሀገር ውስጥ የኮንስትራክሽን መረጃዎች ሌላኛው የቴሌግራም ቻናላችንን ይቀላቀሉ።

https://t.me/ETCONpWORK
❤3🥰2
👉የግንባታ ፌሮ ብረት አስተጣጠፍ (Rebar Bending) Stages ━━━━━━━━━━━━━━
🌟በግንባታ ሳይት የRebar አስተጣጠፍ ሂደት በአጠቃላይ እንዲህ ይከናወናል፦

1. Drawing/Bar Bending Schedule (BBS) ማጥናት

Bar diameter, shape, length, spacing እና quantity ማረጋገጥ።

2. Steel Cutting – መቁረጥ

ብረቱን በBBS መሰረት በትክክለኛው ርዝመት መቁረጥ።

3. Marking – ምልክት ማድረግ

Bend point, hook, crank ወዘተ የሚጀምርበትን ቦታ ማርክ ማድረግ።

4. Bending – ማጠፍ/ማስተጣጠፍ

Bar bending machine ወይም ተገቢውን manual tool በመጠቀም ብረቱን በDrawing/BBS የተጠየቀውን shape ማድረግ።

5. Shape & Dimension Checking – መፈተሽ

Length, angle, hook length, bend diameter እና shape ከBBS ጋር ማነፃፀር።

6 Identification & Bundling – መለየትና ማሰር

የተጠፈውን ብረት በBar Mark/Member መለያ መሰረት ማደራጀት።

7. Storage – በትክክል ማስቀመጥ

ከመሬት ከፍ ብሎ፣ ከጭቃና ከውሃ ተጠብቆ ማስቀመጥ።

8. Fixing/Installation – በStructure ላይ መግጠም

Footing, Column, Beam, Slab ወዘተ ላይ በDrawing መሰረት ማስቀመጥና በBinding Wire ማሰር።

🚥In Short:-

✅Drawing/BBS → Cutting → Marking → Bending → Checking → Bundling → Storage → Fixing

━━━━━━━━━━━━━━
🌟ለተጨማሪ ዓለም አቀፍ እና የሀገር ውስጥ የኮንስትራክሽን መረጃዎች ሌላኛው የቴሌግራም ቻናላችንን ይቀላቀሉ👇

https://t.me/ETCONp
❤5👍1🔥1🥰1
👉Complete Guide to Reading Building Drawings

📐መፅሃፉ የህንፃን ድሮዊንግ በተግባር ለመረዳት እና ስለ ጠቅላላ አርክቴክቸር ሳይነስ የሚዳስስ ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውሩዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6aa7c4a30b34d_etconp
🥰2👌2
👉የSurveying (ሰርቬይንግ) የስራ ቅደም ተከተል በአጠቃላይ እንዲህ ነው፦                 ━━━━━━━━━━━━━━
1. Reconnaissance / Site Reconnaissance – ቦታውን ቀድሞ መመርመርና መረጃ መሰብሰብ።

2. Establish Control Points – BM, TBM, control points መመስረት።

3. Benchmark (BM) Establishment – የከፍታ መነሻ ነጥብ ማዘጋጀት።

4. Instrument Setup – Total Station, Level, GPS/GNSS ወዘተ በትክክል ማቆም።

5. Orientation / Backsight – መሳሪያውን ወደ known point በማዞር አቅጣጫ ማዘጋጀት።

6. Field Observation / Measurement – አንግል፣ ርቀት፣ elevation እና coordinates መለካት።

7. Detail Survey / Topographic Survey – የመሬት ቅርጽ፣ existing structures፣ road፣ drainage ወዘተ መሰብሰብ።

8. Leveling – RL/elevation ማስላት።

9. Data Download & Processing – የመለኪያ መረጃን ወደ computer ማስገባትና ማስላት።

10. CAD/Drawing Preparation – plan, profile, contour, setting-out drawing ማዘጋጀት።

11. Setting Out – ከdrawing ወደ ground የbuilding/road/grid/column points ማስተላለፍ።

12. As-Built Survey – የተገነባውን ስራ ከapproved drawing ጋር ማረጋገጥ።

13. Quality Control & Reporting – measurements መፈተሽ፣ errors ማረምና survey report ማዘጋጀት።

🌟በአጠቃላይ የSurveying (ሰርቬይንግ) የስራ ቅደም ተከተል፦
     
✏️Reconnaissance → Control Points → BM/TBM → Instrument Setup → Backsight → Measurement → Data Processing → Drawing → Setting Out → As-Built → Reporting
           ━━━━━━━━━━━━━━
​​🌐ለተጨማሪ መረጃ እና ሌሎች የኮንስትራክሽን ዘርፍ ዜናዎች የ YouTube ገፃችን ከታች ባለው ሊንክ በመግባት SubScribe አርገው ቤተሰብ ይሁኑ👇

https://youtube.com/@ethiopianconstruction7?si=ils307xXQQpIdCwG
‎
‎@etconp
❤4👏4👍1🔥1
👉ምርጥ ቤዝመንት ያለው G+5 ህንፃ ማለትም አርክቴክቸራል፣ስትራክቸራል፣ኤሌክትሪካል እና ሳኒተሪ ያካተተ በ Auto Cad የተሰራ ዲዛይን ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6a75638f22910_etconp
🥰4👏1
👉የኮንክሪት ስላብ ከተሞላ በኋላ Curing (ውኃ ማጠጣት) መቼ እና እንዴት መጀመር አለበት? 🏗️💧

በምስሉ ላይ እንደምታዩት፣ አዲስ የተሞላ የኮንክሪት ስላብ (Concrete Slab) ተገቢውን ጥንካሬ (Design Strength) እንዲያገኝ ውኃ ማጠጣት (Curing) ወሳኝ ደረጃ ነው።

💡 Curing መቼ መጀመር አለበት?

- የመጀመሪያው ደረጃ (Initial Curing)፦ ኮንክሪቱ መድረቅ እና ጠንካራ መሆን ሲጀምር — ማለትም ኮንክሪት ከተሞላ ከ6 እስከ 10 ሰዓታት በኋላ (Final Setting Time ላይ ሲደርስ) ወይም በሁለተኛው ቀን ጠዋት በቂ እርጥበት መስጠት መጀመር አለበት።

- የቆይታ ጊዜ (Duration)፦ የኮንክሪት ስላብ ቢያንስ ከ7 እስከ 14 ቀናት ተከታታይ ውኃ ማግኘት አለበት (Ordinary Portland Cement ከሆነ 7 ቀን፣ Rapid Hardening ወይም ሞቃታማ ቦታ ከሆነ እስከ 14 ቀን)።

💡 ውኃ የማጠጫ የተመደቡ ዘዴዎች፦

1️⃣ Ponding Method (ውኃ በግደብ መቋጠር)፦ በስላቡ ዙሪያ በጭቃ/በአሸዋ ግደብ በመስራት ውኃ እንዲቋጥር ማድረግ (ለስላብ በጣም ተመራጭ)።

2️⃣ Wet Covering (እርጥብ ጆንያ አልፎ አልፎ ማልበስ)፦ በጆንያ (Wet Gunny Bags) በመሸፈን አየር እንዳያደርቀው ማድረግ።

🚥Curing በሰዓቱ አለመጀመር የፕላስቲክ ሽሪንኬጅ ስንጥቅ (Plastic Shrinkage Cracks) እና የኮንክሪት ጥንካሬ መቀነስ ያስከትላል! 🤝

🌟የ ‎C-25 Concrete Cost Breakdown & Detailed Calculation ከነ Excel እና PDF Note ከፈለጉ ከታች ባለው ሊንክ ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6a86960fc21e9_etconp
❤7🥰1
JOB VACANCY

Quantity Surveyor III (Building Projects)

Ethiopian Engineering Corporation

Addis Ababa

Bachelor’s Degree in Civil Engineering or with related field of study with relevant work experience

Duties and Responsibilities

- Prepare detailed quantity take-offs for building works (structural, architectural, finishes, MEP)
- Verify subcontractor and supplier quantities against project drawings and specifications.
- Maintain updated records of material usage and labor quantities.
- Prepare interim payment applications and final accounts for clients.
- Review and certify subcontractor payment requests based on actual progress.
- Ensure compliance with contract terms and project milestones.
- Identify, evaluate, and document variations in scope (design changes, additional works, site conditions).
- Prepare variation orders and claims documentation for client approval.

Quanitity Required: 2

Minimum Years Of Experience: #3_years

Deadline: October 6, 2026

📩How To Apply: Click the apply button below👇

https://application.eecproducts.com/apply/quantity-surveyor-ethiojobs-51a6gh

@etconp
❤8👍1
Ethiopian Construction Vacancy & Tender
"በ2020 ከኖህ ሪልስቴት በተፈራረምነው የሽያጭ ውል የገዛናቸውን ቤቶች በ36 ወራት ሊያስረክቡን ተወስኖ ነበር። የውል ጊዜው ካለፈ ከ3 ዓመታት በላይ ቢሆንም ቤቶቻችንን አልተረከብንም " - ገዢዎች ድርጅቱ ለደንበኞቹ ቤት በወቅቱ አለማስረከቡን አምኖ፣ ከመስረም 18 ቀን 2019 ዓ/ም ጀምሮ እንደሚያረክብ ቃል ገብቷል። በአዲስ አበባ ወሰን አካባቢ በሚገኝ "Noah Hills" በተሰኘ የኖህ ሪልስቴት…
👉የፌዴራል ከፍተኛ ፍርድ ቤት ልደታ ምድብ ፍትሐ ብሔር ችሎት፥ ኖህ ሪልስቴት የ32 ቤት ገዢዎችን 24 አፓርታማ ቤቶች እንዳይሸጥ እግድ ጣለ❗️

በአዲስ አበባ ሴቶች አደባባይ በሚገኝ "ቪክትሪ ሳይት" የኖህ ሪልስቴት 32 ቤት ገዢዎች፥ ድርጅቱ በውሉ መሰረት ቤታችንን ስላላስረከበን ክስ ልንመሰርት በመሆኑ ክሱን እስክናቀርብ ቤቶች እንዳይሸጡ፣ እንዳይለወጡ እግድ ይሰጥልን በሚል ያቀረቡትን ቅድመ ክስ ችሎቱ ማጽናቱን የከሳሾች ጠበቃና የፍርድ ቤት ሰነድ አመለከቱ።

ቲክቫህ ኢትዮጵያ የተመለከተው የፌዴራል ከፍተኛ ፍርድ ቤት ልደታ ምድብ ፍትሐ ብሔር ችሎት ሰነድ፣ የእግድ ክስ እንዲሰጥ ነሐሴ 20/2018 ዓ/ም በገዢዎች መጠየቁን አያይዞ፣ ተለዋጭ ትዕዛዝ እስኪሰጥ ድርጅቱ የ32 ቤት ገዢዎችን ቤቶች እንዳይሸጥ፣ እንዳይለውጥና ለሦስተኛ ወገን እንዳያስተላልፍ እግድ ማጽናቱን ያስረዳል።

የከሳሾች ጠበቃ አበበ ገብሩ አብርሃምና ጓደኞቹ የሕግ አገልግሎት ቢሮ ምን አለ?

የከሳሽ ጠበቆች ስድስት መሆናቸውን የገለጹት ከጠበቆች አንዱ፣ "የቅድመ ክስ ልናዘጋጅ ስለሆነ ድርጅቱ (ኖህ ሪልስቴት) የተሸጡ አፓርትመንቶችን ውል ሰርዞ ለሌላ ሦስተኛ ወገን ለማስተላለፍ ቅድመ ማስጠንቀቂያ ስለሰጠን እኛ ብንከስ ደግሞ ፍርድ ቤቱ ቢፈርድ ሊፈጸም የሚችልበት ንብረት ስለማይኖር ክሱን እስክናቀርብ የ60 ቀን እግድ ይሰጠን" በሚል ለፍ/ቤት አቤቱታ ማቅረባቸውን ለቲክቫህ ኢትዮጵያ ተናግረዋል።

ፍርድ ቤቱም ነሐሴ 16 ቀን 2018 ዓ/ም የሚጠናቀቅ የ30 ቀን እግድ እንደሰጣቸው አስታውሰው፣ በዚህም 16 የሚለው ቅዳሜ እለት ስለነበር በቀን 20 ለፌዴራል ከፍተኛ ፍርድ ቤት ልደታ ምድብ ፍትሐ ብሔር ችሎት መደበኛ ክሱን እንዳቀረቡ ገልጸዋል።

"ችሎቱ የቀረበውን ክስ መሰረት አድርጎ ከዚህ ቀደም ተሰጥቶ የነበረው ጊዜያዊ እግድ ክርክሩ የመጨረሻ እልባት እስኪያገኝ ድረስ 32 ሰዎች የገዟቸው 24 ቤቶች እንዳይሸጡ፣ ለሦስተኛ ወገን እንዳይተላለፉ እግድ ሰጥቷል" ብለዋል።

እግዱ ለሚመለከታቸው ተቋማትና ለኖህ ሪልስቴት እንዲደርስ መደረጉን ገልጸዋል። "አሁን የፍርድ ቤቶች የእረፍት ወቅት ስለሆነ በጥቅምት ችሎት እንደተጀመረ መደበኛ ክርክሩ ይቀጥላል" መባሉን ጠቁመዋል።

በጉዳዩ አስተያየት እንዲሰጥ ፍርድ ቤቱ ለኖህ መጥሪያ እንደላከ ገልጸው፣ "መጥሪያውን ፈርመው ተቀብለዋል፤ በዚያ ላይ የሰጡት መልስ፣ ለኛ የደረሰን ነገር የለም፤ ምላሽ መስጠት ይጠበቅባቸዋል" ብለዋል።

ጉዳዩን በስምምነት ለመፍታት ለኖህ ሪልስቴት ቅድመ ማስጠንቀቂያ መሰጡን ተናግረዋል።

"ችግሩ በውይይት እንዲፈታ የ15 ቀናት ማስጠንቀቂያ በውሉ መሰረት ተሰጥቶ ነበር፤ ድርጅቱ ማስጠንቀቂያውን ተቀብሎ ምላሽ አልሰጠም፤ የሰጠው ምላሽ 'የጠበቆች ማንነት የሚገልጽ ነገር ላኩልን' የሚል ነው፤ ይህንም የላኩት ቅድመ ማስጠንቀቂያው በ15 ሊያበቃ በ14 ነው። ይህ የሚያመላክተው ጉዳዩን በድርድር ለፍታት ፍላጎት እንደሌላቸው ነው" ብለዋል።

Via ቲክቫህ ኢትዮጵያ

@etconp
❤7
JOB VACANCY

Organization: Planet Development Consultant PLC

PLANET Development Consultant PLC is a dynamic infrastructure consulting firm established in Ethiopia, and want to hire competent and highly motivated professionals for the following position:

Position: Surveyor/Surveying Engineering

No. of Staff: 5

Duty Station: 
Office and project site

Salary: NegotiableJob Requirements

Required Qualification:MSc/BSc/Diploma in Surveying/Surveying Engineering or related field 

Relevant Experience:Minimum 6/8/10 years of experience in Surveying/Surveying Engineering using different sofwares for road and bridge, water supply and sanitation design and supervision, etc.

How To Apply

Interested and qualified candidates meeting the minimum requirement are invited to submit their application letter, updated CV and copies of all supporting documents, and professional license stating the position in the subject line; and mail to Planetdcplc@gmail.com.

Also, you can send your application and supporting documents through our WhatsApp number of 
+251-(0)930013249/+251-(0) 913129704. 

We take applications only for 10(ten) working days starting from the first date of this announcement on Ethio jobs/other platforms. 

Early bird application is encouraged for the positions as we immediately start screening and selection of. 


Only shortlisted applicants will be contacted.

Qualified female candidates are strongly encouraged to apply.


@etconp
❤8🔥1😢1
👉Complete Guide to Reading Building Drawings

📐መፅሃፉ የህንፃን ድሮዊንግ በተግባር ለመረዳት እና ስለ ጠቅላላ አርክቴክቸር ሳይነስ የሚዳስስ ምርጥ መፅሐፍ ከታች ባለው ሊንክ ያውሩዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6aa7c4a30b34d_etconp
❤4🔥2🥰1
JOB VACANCY

Plumber

Addis Ababa, Ethiopia

Type: በተመደቡበት የሚሰራ - ቋሚ

Deadline: October 1, 2026

Education Qualification: ዲፕሎማ

ያለምንም ልምድ

Work Address mexico

Job Description

Qualification: Level IV or above in Plumbing

Experience: Fresh graduates or experienced candidates may apply

Gender: Male/Female

Send Your CV here to This Telegram Number +251959047079

@etconp
🥰3❤2
👉ለኮንትራክተሮች እና የማነኛውም ኮንስትራክሽን እና ኮንሰልታንት እንዲሁም የቢዝነስ ባለቤቶች

🌟ለድርጅታቹ እድገት እና ስራቹ በቀላሉ ማስተዳደር እንድትችሉ የሚያግዝ በ EXCEL የተገነባ ሲስተም ፋይል አዘጋጅተንላቹዋል ከታች ባለው ሊንክ በመግባት ያውርዱት👇

https://ye-buna.com/etconp?ref=product_detail&product=6aaa29dcad3b0_etconp
👏3🥰2
JOB VACANCY

Interested applicants who meet the requirements should submit copies of their testimonials alongside an updated CV and work experience.

Deadline: Within 7 working days from the announcement date.

By Email: info@centuryaddiscon.com.et

In Person: Bole on Atlas Road, Above 2000 Habesha Restaurant or Near Aya or Mado Hotel at Century Executive Tower, 17th Floor, Human Resources Development and Management Department.

Contact Phone: +251-0116393451

@etconp
❤2👍2
👉የስራ ቅጥር ማስታወቂያ

☄የወጣበት ቀን መስከረም 3, 2019

አመልካቾች ይህ ማስታወቂያ ከወጣበት ቀን ጀምሮ ባሉት 7 ተከታታይ የስራ ቀናት ዋናው ቢሮ በመገኘት ኦሪጅናልና የማይመለስ ፎቶ ኮፒ በመያዝ መመዝገብ የምትችሉ መሆኑን እያወቅን ከቀበሌ ለሚመጣ የሥራ ልምድ የግብር መክፈላችሁን የሚያሳይ ደብዳቤ ከክፍያ ትርጉም ጽ/ቤት በማሳወቅ ይዛችሁ መቅረብ ይኖርባችኋል።

ለበለጠ መረጃ 011-4-70-20-44


@etconp
👍4❤3